1 TOWNSHIP OF RUSSELL SPECIAL COUNCIL MEETING AGENDA December 12, :00 p.m. Gaston R. Patenaude Hall 717 Notre-Dame Street Embrun, ON CANTON DE RUSSELL SÉANCE EXTRAORDINAIRE DU CONSEIL ORDRE DU JOUR Le 12 décembre h Salle Gaston R. Patenaude 717, rue Notre-Dame Embrun ON JEAN-PAUL ST. PIERRE Mayor/Maire ERIC BAZINET Councillor/Conseiller CRAIG CULLEN Councillor/Conseiller PIERRE LEROUX Councillor/Conseiller JAMIE LAURIN Councillor/Conseiller

2 Special Council Meeting December 12, 2013 Page 2 of 26

3 Township of Russell Special Council Meeting Séance extraordinaire du conseil municipal du canton de Russell AGENDA / ORDRE DU JOUR December 12, 2013 at 3:00 p.m. Le 12 décembre 2013 à 15 h PAGE NO. 1. CALL TO ORDER RAPPEL À L'ORDRE 2. ADOPTION OF THE AGENDA ADOPTION DE L'ORDRE DU JOUR Be it resolved that we open this special meeting of council and approve the agenda as presented. Qu il soit résolu que nous ouvrions cette réunion extraordinaire du conseil et que nous approuvions l ordre du jour tel que présenté. 3. DISCLOSURE OF PECUNIARY INTEREST DÉCLARATION D'INTÉRÊT PÉCUNIAIRE 4. REPORTS FROM DEPARTMENTS AND COMMITTEES RAPPORTS DES DIRECTEURS DE SERVICES ET DES COMITÉS a. Environmental Services Embrun Sanitary Sewage Collection System Servicing Options (Report PU ) Services environnementaux Options d entretien système de collection d égouts sanitaire d Embrun (rapport PU ) RESOLUTIONS AND BY-LAWS RÉSOLUTIONS ET RÈGLEMENTS a. Resolution Environmental Services Embrun Sanitary Sewage Collection System Servicing Options (Report PU ) Résolution Options d entretien système de collection d égouts sanitaire d Embrun (rapport PU ) Be it resolved that Council acknowledges receipt of report PU 12- Special Council Meeting December 12, 2013 Page 3 of 26

4 2013 dated December 12, 2013 and accepts the administration s recommendation and directs staff to proceed to implement option # 3 of the Embrun Sewage Collection System Servicing Options for Sanitary Pump Station #3 Catchment Area presented in Appendix A of the report. Qu il soit résolu que le conseil accuse réception du rapport PU daté du 12 décembre 2013 et que le conseil approuve la recommandation de l administration et qu il ordonne au personnel de procéder à la mise en oeuvre de l option #3 contenue dans le rapport intitulé Système de collecte des eaux usées d Embrun Options d entretien pour l aire de captage de la station de pompage #3 présenté à l annexe «A». 6. CLOSURE CLÔTURE Be it resolved that we close this special meeting of council. Qu'il soit résolu que nous clôturions cette séance extraordinaire du conseil. Special Council Meeting December 12, 2013 Page 4 of 26

5 REPORT TO COUNCIL: RAPPORT AU CONSEIL: PU DATE: 12/12/2013 EMBRUN SANITARY SEWAGE COLLECTION SYSTEM SERVICING OPTIONS OPTIONS D ENTRETIEN - SYSTÈME DE COLLECTION D ÉGOUTS SANITAIRE D EMBRUN SUBJECT Servicing Options for the upgrading of the Sanitary Collection System from Pumping Station #3 to the New Patenaude East Subdivision PS # 8. RECOMMENDATION That Council accepts the administration s recommendation and directs staff to proceed to implement option # 3 of the Embrun Sewage Collection System Servicing Options for Sanitary Pump Station #3 Catchment Area report presented in Appendix A. FINANCIAL IMPLICATION Increased costs to option retained by Council in April 2013 now represent an additional $310, due to the additional 2.0 metre excavation required for the siphon elevation. SUJET Options d entretien pour la modernisation du système de collecte des eaux usées, de la station de pompage #3 jusqu à la station de pompage #8 du nouveau lotissement Patenaude Est RECOMMANDATION Que le conseil approuve la recommandation de l administration et qu il ordonne au personnel de procéder à la mise en oeuvre de l option #3 contenue dans le rapport intitulé Système de collecte des eaux usées d Embrun Options d entretien pour l aire de captage de la station de pompage #3 présenté à l annexe «A». IMPLICATIONS FINANCIÈRES L augmentation des coûts pour l option retenue par le conseil en avril 2013 représente maintenant un montant additionnel de $ en raison de l excavation additionnelle de 2 mètres requise pour l élévation du siphon. Implementing option # 3 under the present Class D cost estimate will represent an additional $100,000 over the initial Township s share of the project of $565,000. The municipal share of the project costs for the pumping station and the siphon is to be financed by Development charges and by existing users in respective shares of 84 % and 16 %. This additional $16,000 cost to existing users will be added to the amount of $408,638 to be borrowed. BUSINESS PLAN The Capital Project is part of the 2013 Business Plan under Item T La mise en oeuvre de l option #3 en vertu de la présente estimation des coüts de classe D représente un montant additionnel de $ pour la municipalité par rapport au montant initial de $ La part municipale des coûts du projet de la station de pompage et du siphon doit être financée par les redevances d aménagement et par les utilisateurs existants dans une proportion de 84 % - 16 %. Le coût additionnel de $ pour les utilisateurs existants sera ajouté au montant de $ qui doit être emprunté PLAN D AFFAIRES LE PROJET D IMMOBILISATION EST INCLUS DANS L ARTICLE T DU PLAN D AFFAIRES. COMMUNICATION PLAN PLAN DE COMMUNICATION Page 5 of 26

6 N/A Sans objet. SUBMITTED BY SOUMIS PAR: Graham Gorman, Director, Environmental Services And Daniel Gatien, Director, Economic Development Date: December 10 th, décembre, 2013 APPROVAL(S) APPROBATION(S): Jean Leduc Date Chief Administrative Officer Directeur général Claudette Landry Date: Executive Director of Administrative Services/Treasurer Directeur exécutif des services administratifs/ Trésorière PROJECT DESCRIPTION DU PROJET HISTORY, REFERENCE AND SUPPORT INFORMATION Council approved the siphon design contract through Resolution # Initial project costs were presented to Council through report ECO DEV Pumping Station # 8 Servicing Agreement (Appendix B ). The initial intent of the Township was to design and construct a sanitary sewer siphon system to transport sewage effluent from PS # 3 (Ste. Marie Rd.) to the new sanitary pumping station # 8 located in the proposed Patenaude East subdivision at a cost of $ 565,000.00, plus the contingency. HISTORIQUE, RÉFÉRENCES ET INFORMATION DE SUPPORT Le conseil a approuvé la conception du siphon en vertu de la résolution # Le rapport ECO DEV «Station de pompage # 8 Entente de service (annexe «B» a présenté au conseil les coûts initiaux du projet. Le plan initial de la municipalité était de concevoir et de construire un système de siphon d égout sanitaire pour acheminer les eaux usées de la station de pompage #3 (chemin Ste-Marie) vers la nouvelle station de pompage #8 située dans le futur lotissement Patenaude Est au coût de $, plus les dépenses imprévues. Page 6 of 26

7 A cost sharing agreement with Melanie Construction has been concluded whereas the Township s share is 48 percent of the cost of the pumping station and the developer is to assume 52%. The cost of the siphon project is 100% the municipality s responsibility as per resolution Upon the receipt of the preliminary designs for the siphon, the identified elevation required that the new pumping station be constructed at an additional depth of 2.0 meters. McIntosh & Perry Consulting Engineering Ltd. designed the new PS # 8 for Mélanie Construction at an approximate depth of 6.9 meters. The extra excavation and additional shoring costs has led to a subsequent cost estimate of $ 310, as provided from the contractor - Louis Bray Construction, for the required increased amount to the Township s portion of the proposed PS # 8 construction, due to. This information prompted a Value Engineering meeting between the Township, McIntosh & Perry Consulting Engineers Ltd. and Louis Bray Construction Ltd. (Contractor of PS # 8, for Mélanie Construction Ltd.) During the Value Engineering session, numerous suggested options were tabled and mentioned by the attendees prompting the request to produce the Embrun Sewage Collection System Servicing Options for Sanitary Pump Station #3 Catchment Area report to be presented to Council for their decision. After performing a cost analysis and review of all identified options in the Class D cost estimates for the servicing options within the report (Appendix A ), the administration recommends the implementation of options # 3. James Ricker, from Stantec Consulting Ltd. and representative of the Township in this matter will be in attendance to present and give the conclusion of the Embrun Sewage Collection System Servicing Options for Sanitary Pump Station #3 Catchment Area report. L accord de partage des coûts conclu avec Mélanie Construction prévoyait une participation de 48 % des coûts de la construction de la station de pompage pour la municipalité et de 52 % pour le promoteur. Conformément à la résolution, la municipalité devait assumer 100 % des coûts du siphon. Les plans préliminaires du siphon,ont indiqué que la nouvelle station de pompage devait être construite à une profondeur additionnelle de deux mètres. McIntosh & Perry Consulting Engineering Ltd. a conçu la nouvelle station de pompage #8 pour Mélanie Construction à une profondeur d environ 6,9 mètres. L excavation et les coûts additionnels d étayage ont porté à $ le coût du projet, tel que prévu par l entrepreneur Louis Bray Construction, d où l augmentation de la portion municipale pour le projet de construction de la station de pompage #8. Ces données ont donné lieu à une réunion sur l évaluation des coûts entre la municipalité, McIntosh & Perry Consulting Engineers Ltd. et Louis Bray Construction Ltd. (entrepreneur pour la station de pompage #8 pour Mélanie Construction Ltd.). Durant cet exercice d analyse de la valeur, plusieurs options ont été proposées par les participants conduisant ainsi à la rédaction du rapport intitulé Système de collecte des eaux usées d Embrun Options d entretien pour l aire de captage de la station de pompage #3 soumis à l approbation du conseil. Après avoir effectué une analyse des coûts et évalué toutes les options définies dans l estimation des coüts de classe D pour les options d entretien contenues dans le rapport (annexe «A»), l administration recommande l option #3. James Ricker de Stantec Consulting Ltd et représentant de la municipalité dans ce dossier sera présent pour présenter les conclusions du rapport intitulé Système de collecte des eaux usées d Embrun Options d entretien pour l aire de captage de la station de pompage #3. OTHER OPTION(S) TO THE RECOMMENDATION AUTRES OPTION(S) À LA RECOMMANDATION Choose other options within the report. CHOISISSEZ D AUTRES OPTIONS DANS LE Page 7 of 26

8 RAPPORT ATTACHMENT(S) Appendix A Township of Russell Embrun Sewage System Servicing Options for Sanitary Pump Station # 3 Catchment Areas. Appendix B ECO DEV Report Pumping Station # 8 Servicing Agreement PIÈCE(S) JOINTE(S) Annexe «A» Système de collecte des eaux usées d Embrun Options d entretien pour l aire de captage de la station de pompage #3 Annexe «B» Rapport ECO DEV Station de pompage #8 Entente de service Page 8 of 26

9 Stantec Consulting Ltd Clyde Avenue Ottawa ON K2C 3G4 Tel: (613) Fax: (613) December 5, 2013 File: Attention: Mr. Daniel Gatien, Economic Development Director Township of Russell 717 Notre-Dame Street Embrun Ontario K0A 1W1 Canada Dear Mr. Gatien, Reference: Township of Russell Embrun Sewage Collection System - Servicing Options for Sanitary Pump Station #3 Catchment Area It is our understanding that the elevations of the proposed sanitary siphon, to service the Pump Station #3 (PS#3) catchment, under the Castor River will result in the lowering of the new Sanitary Pump Station #8 (PS#8) at significant cost. As per our meeting on November 29, 2013, Stantec was requested to redirect our original Level of Effort to produce a functional design of the siphon towards developing a high level evaluation of various servicing options of the Pump Station #3 catchment in order to determine the best course of action for the Township of Russell (Township). Costing of the wetwell deepening for PS#8 was provided by Louis Bray Construction and Operation and Maintenance costs for PS#3 was provided by the Township. Seven (7) potential options were discussed at the November 29 th meeting and it was agreed that these options would be presented in this letter. All costs are in 2013 dollars and and the opinions of probable cost associated with each option are considered a Class D estimate, therefore a 50% contingency was assumed. Note that any option that requires construction under or over the river will require an amendment to the existing Environmental Class Assessment, titled Sewage System Upgrading Muncipal Class EA, Phase 3 Report, August 2009, and will require public consultation which will impact schedule. Additionally, approval from the Ministry of the Environment will be required for changes to the servicing of the PS#3 catchment. Servicing Options Description Option 1 Do Nothing The first option is to keep the existing pump station as is, whereby PS#3 forcemain continues to discharge to the main sanitary trunk and flows to PS#2. No modifications to PS#8 are required (i.e. deepening, larger pumps) due to the PS#3 catchment and the only costs to the township in the short term are the existing operation and maintenance (O&M) costs of PS#3. This option is not viable as PS#3 will require a doubling Page 9 of 26

10 December 5, 2013 Mr. Daniel Gatien, Economic Development Director Page 2 of 5 Reference: Township of Russell Embrun Sewage Collection System - Servicing Options for Sanitary Pump Station #3 Catchment Area of its firm capacity (i.e. 30L/s to 64L/s) to accommodate future growth and the downstream sanitary system does not have the capacity to accommodate this growth. Additionally, by not deepening the new PS#8 wetwell, future servicing options of PS#3 catchment are limited to forcemain only. Summary: Least cost and risk near term, but limits development in PS#3 catchment. Option 2 Deepen PS#8 Wetwell and Defer Upgrades at PS#3 Similar to Option 1, PS#3 catchment would continue as-is and the future serving of PS#3 catchment would be deferred until the Township can acquire the funds. The wetwell for PS#8 would be deepened in order to accommodate the depth required for a potential siphon solution, so as to not limit the solution to forcemain only. Other advantages of a deeper wetwell are additional storage and the ability to service other development areas. A disadvantage of this solution is not only the capital cost of wetwell deepening, but that larger pumps, starters and generator for PS#8 would be required. Additionally, the longer the ultimate servicing solution takes to implement, the condition of the existing PS#3 will continue to deteriorate. Summary: Initial costs are associated with deepening of the wetwell only, which provides no benefit in the near term to PS#3 catchment, but upgrade at PS#8 leaves more options for future servicing. Option 3 Construct Forcemain under Castor River and Operate PS#3 in Perpetuity This option would result in the construction of a forcemain underneath the Castor River. Initial calculations indicate that the Total Dynamic Head (TDH) for the pumps is similar to the existing forcemain, therefore 30L/s could be pumped to PS#8 with minimal changes to PS#3. As the catchment is built out, the existing pumps will require replacement to increase the firm capacity to 64L/s. No deepening of PS#8 is required as the forcemain will much shallower than the proposed siphon. PS#3 will need to operate in perpetuity and PS#8 does not require larger pumps as the wetwell is the same elevation as the original developer design. Additionally, the upgrades to PS#3 could be staged to reduce initial capital cost (i.e. Stage 1 Construct FM and pump 35L/s, Stage 2 Replace Piping and pumps and pump 55L/s, Stage 3 Upgrade electrical and pumps and pump 64L/s) Summary: No change to the level of service for existing PS#3 catchment, results in constant O&M cost at PS#3. PS#8 requires no upgrades due to the PS#3 catchment. Additionally, the upgrades to PS#3 could be staged to reduce initial capital costs. Option 4 - Construct Forcemain and Attach to Bridge Structures across River and Operate PS#3 in Perpetuity Similar to Option 3, a forcemain would be constructed from PS#3 to PS#8, but the forcemain would be strapped to the existing bridges. This results in a significant increase in forcemain length and unknown risks associated with attachment to existing bridge structures. Also the bridges are not owned by the Township, but by the United Counties. As such approvals (i.e. EA addendum) and structural upgrades to the bridge structure make this option unfeasible within a short timeframe. Page 10 of 26

11 December 5, 2013 Mr. Daniel Gatien, Economic Development Director Page 3 of 5 Reference: Township of Russell Embrun Sewage Collection System - Servicing Options for Sanitary Pump Station #3 Catchment Area Summary: Solution is more costly than option 3 and offers more risk in delay for approvals and construction. Option 5 Construct Siphon under Castor River and Operate PS#3 Temporarily This option proposes the construction of a HDD double barreled siphon under the River (i.e. 177mm and 220mm inside diameter (ID) pipes). One barrel will handle buildout average daily flow and the twin barrels will pass the peak wet weather flow. Based on the siphon design calculations the wetwell at PS#8 would be required to be lowered by 2m in order to prevent sewer backup into the PS#3 catchment. The PS#3 catchment area currently does not generate sufficient flow to provide scouring velocities within the siphon barrels. PS#3 would need to be redirected to pump to the siphon until sufficient base flow can keep the velocity high enough to cleanse the siphon barrels. Summary: Significant cost to construct a double barreled siphon that cannot operate effectively until the PS#3 catchment area is larger. Should development be delayed, the cost to operate PS#3 rises. Also PS#8 requires a 2m deeper wetwell in order for the siphon to function. Option 6 - Construct Siphon under River and Operate PS#3 as Settling Basin Temporarily Similar to Option 5, a double barreled siphon would be constructed under the river. Instead of operating PS#3 as a pump station to the siphon, the wetwell would be used as a settling basin to prevent fouling of the siphon barrels. In order to prevent odour complaints, an actived carbon system would be required to draw off air at the PS#3 wetwell for treatment and the wetwell would require frequent cleaning by vacuum trucks and the concrete protected from corrosion. Summary: Significant cost to construct a double barreled siphon that cannot operate effectively until the PS#3 catchment area is larger. Should development be delayed, the cost to operate PS#3 as a settling basin and odour treatment facility rises. Also PS#8 requires a 2m deeper wetwell in order for the siphon to function. Option 7 Construct Gravity Sewer under Castor River This option would result in the immediate decommissioning of PS#3 and construction of a gravity sewer across the river utilizing a jack & bore method. This solution would require a significant deepening of the PS#8 wetwell and much larger pumps would be required. Summary: Significant construction risk to installing the gravity sewer under the river (i.e. groundwater and geotechnical concerns). Considerable capital construction cost of the sewer and PS#8 infrastructure. Page 11 of 26

12 December 5, 2013 Mr. Daniel Gatien, Economic Development Director Page 4 of 5 Reference: Township of Russell Embrun Sewage Collection System - Servicing Options for Sanitary Pump Station #3 Catchment Area Opinion of Probable Cost The following table and graph present the opinion of probable cost for each option. These opinions are considered a Class D estimate and a 50% contingency has been applied to the base capital cost estimate. An annual O&M cost for PS#3 in 2012 was provided by the Township. O&M costs for the settling basin and treatment system were estimated and a present day 10year O&M cost was developed for both scenarios. Option Capital Construction Cost O&M Cost (10yr) Total 10yr Cost Description 1 $- $181,523 $181,523 Do nothing. PS#3 pumps to PS#2 catchment 2 $473,000 $181,523 $654,523 Deepen PS#8 WW and defer other changes. PS#3 pumps to PS#2 catchment 3 $1,425,000 $181,523 $1,606,523 Construct FM across river via HDD. PS#3 remains active and pumps to PS#8 4 $1,579,000 $181,523 $1,760,523 Construct FM across river by strapping to bridge. PS#3 remains active and pumps to PS#8 5 $2,273,000 $181,523 $2,454,523 Construct Siphon, Operate PS#3 until flows increase 6 $2,549,000 $471,000 $3,020,000 Construct Siphon, PS#3 acts as settling basin until flows increase 7 $4,401,000 $- $4,401,000 Decommission PS#3 and construct Gravity Sewer across river $5,000,000 Pump Station #3 Catchment Servicing Options $4,500,000 $4,000,000 $3,500,000 Capital Construction Cost O&M Cost (10yr) Total 10yr Cost $3,000,000 $2,500,000 $2,000,000 $1,500,000 $1,000,000 $500,000 $ Option Page 12 of 26

13 December 5, 2013 Mr. Daniel Gatien, Economic Development Director Page 5 of 5 Reference: Township of Russell Embrun Sewage Collection System - Servicing Options for Sanitary Pump Station #3 Catchment Area Conclusion While Options 1 and 2 are the least expensive, they do not provide the Township with the ability to increase the level of development within the PS#3 catchment. Options 3 and 4 can be constructed independently of the new PS#8 as the forcemain is much shallower at the new station. Option 4 presents undefined level of risk/cost as the forcemain attached to the bridge could trigger additional work on the bridge structures. Options 5 and 6 result in significant costs to deepen the PS#8 wetwell and additionally presents a timing issue as the deep siphon outlet structure next to the new station should be built at the same time given the challenging geotechnical conditions. Option 7, presents significant construction risk and results in a much deeper PS#8 wetwell and is not considered feasible. Based on the analysis for a ten (10) year cost, Option 3 (i.e. FM constructed under Castor River) provides the required level of service to the PS#3 catchment at the least cost to the Township. This would result in no modifications to the PS#8 wetwell, but PS#3 will remain operational in perpetuity. Additionally, the upgrades to PS#3 could be staged to reduce initial capital costs. Comparing the forcemain to the siphon options, it appears that the modified PS#3 could operate in excess of 30years before the siphon would become comparable in cost even assuming that the PS#3 does not need to operate for a period of time to achieve cleansing velocities. Regards, STANTEC CONSULTING LTD. James Ricker, P.Eng. Project Manager Phone: (613) Fax: (613) james.ricker@stantec.com Attachment: Costing sheets for PS#3 Servicing Options (10 pages) c. Graham Gorman, Jean Hebert, John Krug Jean Hébert, M.A.Sc.,ing.,P.Eng.,MPM Senior Environmental Engineer Phone: (613) Fax: (613) jean.hebert@stantec.com jcr w:\active\1634_01201_russell_sanitary sewer prelim siphon design\project_management\correspondence\let_131205_ps3_servicing_options_jr.docx Page 13 of 26

14 Servicing Pump Station #3 Catchment Area (Existing / Future Development) Option Capital Construction Cost O&M Cost (10yr) Total 10yr Cost Description Notes 1 $ $ 181,523 $ 181,523 Do nothing. PS#3 pumps to PS#2 catchment PS#2 catchment at capacity and PS#3 cannot increase flows. Limits development 2 $ 473,000 $ 181,523 PS#2 catchment at capacity and PS#3 cannot increase flows. Limits development. Deepen $ 654,523 Deepen PS#8 WW and defer other changes. PS#3 pumps to PS#2 catchment PS#8 wetwell to accept future development from the north. Defer cost for future. 3 $ 1,425,000 $ 181,523 PS#8 does not need additional deepening or larger pumps as FM is at higher elevation. Inlet $ 1,606,523 Construct FM across river via HDD. PS#3 remains active and pumps to PS#8 structure much shallower Construct FM across river by strapping to bridge. PS#3 remains active and 4 $ 1,579,000 $ 181,523 $ 1,760,523 pumps to PS#8 PS#8 does not need additional deepening or larger pumps as FM is at higher elevation. Inlet structure much shallower. Unknown risks associated with approvals to attach FM to bridge. EA addendum and bridges are owned by the United Counties not the Township. 5 $ 2,273,000 $ 181,523 $ 2,454,523 Construct Siphon, Operate PS#3 until flows increase 6 $ 2,549,000 $ 471,000 $ 3,020,000 Construct Siphon, PS#3 acts as settling basin until flows increase 7 $ 4,401,000 $ $ 4,401,000 Decommission PS#3 and construct Gravity Sewer across river Notes: Opinion of Probable cost considered Class D (50% contingency) Siphon will not have enough flow for cleansing velocities until buildout increases. Therefore PS#3 needs to pump to the siphon until flows are adequate. Deepening of PS#8 wetwell by 2m required and deep siphon outlet structure next to the PS required. Siphon will not have enough flow for cleansing velocities until buildout increases. PS#3 used as settling basin before siphon until flows are adequate. Active odour control required at PS#3 and cleaning of the wetwell will be required. Deepening of PS#8 wetwell by 2m required and deep siphon outlet structure next to the PS required. Jack and bore a gravity sewer across river. Deepen PS#8 significantly. Larger pumps required. PS#3 no longer required $5,000,000 Pump Station #3 Catchment Servicing Options $4,500,000 $4,000,000 $3,500,000 $3,000,000 $2,500,000 $2,000,000 Capital Construction Cost O&M Cost (10yr) Total 10yr Cost $1,500,000 $1,000,000 $500,000 $ Option Page 14 of 26

15 Servicing Pump Station #3 Catchment Area (Existing / Future Development) Option Capital Construction Cost O&M Cost (20yr) Total 20yr Cost Description Notes 1 $ $ 363,047 $ 363,047 Do nothing. PS#3 pumps to PS#2 catchment PS#2 catchment at capacity and PS#3 cannot increase flows. Limits development 2 $ 473,000 $ 363,047 PS#2 catchment at capacity and PS#3 cannot increase flows. Limits development. Deepen $ 836,047 Deepen PS#8 WW and defer other changes. PS#3 pumps to PS#2 catchment PS#8 wetwell to accept future development from the north. Defer cost for future. 3 $ 1,425,000 $ 363,047 PS#8 does not need additional deepening or larger pumps as FM is at higher elevation. Inlet $ 1,788,047 Construct FM across river via HDD. PS#3 remains active and pumps to PS#8 structure much shallower Construct FM across river by strapping to bridge. PS#3 remains active and PS#8 does not need additional deepening or larger pumps as FM is at higher elevation. Inlet 4 $ 1,579,000 $ 363,047 $ 1,942,047 pumps to PS#8 structure much shallower 5 $ 2,273,000 $ 363,047 $ 2,636,047 Construct Siphon, Operate PS#3 until flows increase 6 $ 2,549,000 $ 942,000 $ 3,491,000 Construct Siphon, PS#3 acts as settling basin until flows increase 7 $ 4,401,000 $ $ 4,401,000 Decommission PS#3 and construct Gravity Sewer across river Notes: Opinion of Probable cost considered Class D (50% contingency) $5,000,000 Siphon will not have enough flow for cleansing velocities until buildout increases. Therefore PS#3 needs to pump to the siphon until flows are adequate. Deepening of PS#8 wetwell by 2m required and deep siphon outlet structure next to the PS required. Siphon will not have enough flow for cleansing velocities until buildout increases. PS#3 used as settling basin before siphon until flows are adequate. Active odour control required at PS#3 and cleaning of the wetwell will be required. Deepening of PS#8 wetwell by 2m required and deep siphon outlet structure next to the PS required. Jack and bore a gravity sewer across river. Deepen PS#8 significantly. Larger pumps required. PS#3 no longer required $4,500,000 $4,000,000 $3,500,000 $3,000,000 $2,500,000 $2,000,000 Capital Construction Cost O&M Cost (20yr) Total 20yr Cost $1,500,000 $1,000,000 $500,000 $ Option Page 15 of 26

16 PS#3 Annual Operation and Maintenance Costs Unit Rate # Cost Notes 1 Electrical Cost $ 5,252 1 $ 5, Provided by Township (2012) 2 Mechanical Maintenance (labour) $ $ 4, No generator at site. Maintenance on pumps only. 2hrs a month, 2 operators at $100/hr for 4hr day 3 Landscape Maintenance $ $ 1, Snowclearing / Yardwork 3 Parts $ 2,000 1 $ 2,000.00? 4 Wet well Cleaning $ 1,500 1 $ 1, One / yr 5 Administration (Supervisor) $ $ 3, say 2hrs/month for scheduling. 1 supervisor at $150/hr Total Subtotal O&M Cost $ 18, Township $ 16, O&M cost including electricity 2012 $5, electricity cost Page 16 of 26

17 PS#3 Annual Operation and Maintenance Costs Unit Rate # Cost Notes 1 Electrical Cost $ 2,500 1 $ 2, for Odour control fan power 2 Mechanical Maintenance (labour) $ $ 1, No generator at site. Maintenance on odour control required. 1 days a month, 2 operato 3 Landscape Maintenace $ $ 1, Snowclearing / Yardwork 4 Parts $ 2,500 4 $ 10, Carbon replacement (4X per annum) 5 Wet well Cleaning $ 1, $ 28, cleanings a month 6 Administration (Supervisor) $ $ 3, say 2hrs per month for scheduling. 1 supervisor at $150/hr Total $ 47, Page 17 of 26

18 Servicing PS#3 Catchment Area Revised: 12/5/2013 Opinion of Probable Cost (CLASS D) - Option 2 - Deepen PS#8 Wetwell and Defer other work STANTEC PROJECT NO.: Date: December 5, 2013 Item No. Division and Description Units Unit Cost Quantity Estimate Division Total Division 1 - General Requirements 1 LS 1 Division Subtotal $0 Division 2 - Site/Civil Work 1 Deepen wetwell in PS#8 LS $ 315, $315,000 cost provided by Bray Division Subtotal $315,000 Division 5 - Metals 1 LS 1 $0 Division 6 - Wood and Plastics 1 LS $0 Division Subtotal $0 Division 15 - Mechanical 1 ea 1 $0 Division Subtotal $0 Division 16 - Electrical 1 LS 1 $0 Division Subtotal $0 ESTIMATED TOTAL CONSTRUCTION COST Construction Contingency ENGINEER'S OPINION OF COST (CONSTRUCTION) Note: All division subtotals within the opinion of probable cost are rounded to the nearest thousand. $315,000 50% $158,000 $473,000 Page 18 of 26

19 Servicing PS#3 Catchment Area Revised: 12/5/2013 Opinion of Probable Cost (CLASS D) - Option 3 - Forcemain installed under River STANTEC PROJECT NO.: Date: December 5, 2013 Item No. Division and Description Units Unit Cost Quantity Estimate Division Total Division 1 - General Requirements 1 Mobilization/Demobilization LS 3% 1 $22,140 2 Traffic Control LS $5,000 1 $5,000 3 Health & Safety LS $5,000 1 $5,000 4 Administration LS 10% 1 $72,800 5 Bid Bonding and Insurance LS 2% 1 $14,560 Division Subtotal $120,000 Division 2 - Site/Civil Work 1 Site Work including removals, infrastructure relocations and utility trenching LS $5,000 1 $5,000 2 Groundwater Dewatering and Pumping Wells LS $5,000 1 $5,000 3 Earth Excavation 3.1 Gravity Sewer Trench (Typical) m3 $ $45,900 4 Granular Backfill 4.1 Gravity Sewer Trench m3 $35 92 $3,213 5 Trenchless Forcemain Installation 5.1 River Crossing m $1, $300, Drilling Mud Disposal LS $50,000 1 $50,000 6 Precast Concrete Chambers 6.1 Gravity Sewer MH ea $5,348 2 $10, Isolation Valve Chambers (Either side of River) ea $5,348 2 $10,696 7 Gravity Sewer (375mm) m $ $9,637 8 Forcemain Pipe (HDPE DR11) 8.1 Forcemain (250mm) m $ $7, Other Restoration LS $10,000 1 $10,000 Division Subtotal $458,000 Division 5 - Metals 1 Misc. Metals Including Landings and Ladders LS $5,000 1 $5,000 Division Subtotal $5,000 Division 15 - Mechanical 1 Isolation Valves (either side of river crossing) each $7,500 2 $15,000 2 Replace Pumps and starters for 64L/s firm capacity each $50,000 2 $100,000 3 Install New outdoor Generator & fuel system each $75,000 2 $150,000 Division Subtotal $265,000 Provisional Items 1 $0 Division Subtotal $0 ESTIMATED TOTAL CONSTRUCTION COST Construction Contingency Design and Contract Administration Amendment to EA ENGINEER'S OPINION OF COST (CONSTRUCTION) $848,000 50% $424,000 15% $128,000 $25,000 $1,425,000 Page 19 of 26 Note: All division subtotals within the opinion of probable cost are rounded to the nearest thousand.

20 Servicing PS#3 Catchment Area Revised: 12/5/2013 Opinion of Probable Cost (CLASS D) - Option 4 - Forcemain Installed Along Bridge STANTEC PROJECT NO.: Date: December 5, 2013 Item No. Division and Description Units Unit Cost Quantity Estimate Division Total Division 1 - General Requirements 1 Mobilization/Demobilization LS 3% 1 $24,570 2 Traffic Control LS $10,000 1 $10,000 3 Health & Safety LS $5,000 1 $5,000 4 Administration LS 10% 1 $80,400 5 Bid Bonding and Insurance LS 2% 1 $16,080 Division Subtotal $137,000 Division 2 - Site/Civil Work 1 Site Work including removals, infrastructure relocations and utility trenching LS $20,000 1 $20,000 2 Groundwater Dewatering and Pumping Wells LS $7,500 1 $7,500 3 Earth Excavation 3.1 Gravity Sewer Trench (Typical) m3 $ $45, Forcemain Trench m3 $ $67,500 Length? Granular Backfill 4.1 Gravity Sewer Trench m3 $35 92 $3, Forcemain Trench m3 $ $7,875 5 Precast Concrete Chambers 5.1 Gravity Sewer MH ea $5,348 2 $10, Isolation Valve Chambers (Either side of River) ea $5,348 2 $10,696 6 Forcemain Pipe (HDPE DR11) 6.1 Forcemain (250mm) m $ $62, Other Restoration LS $10,000 1 $10,000 7 Bridge modifications (assume drilling through abutments, possible reinforcement) LS $250,000 1 $250,000?? 8 Gravity Sewer (375mm) m $ $9,637 9 Roadway 9.1 Granular A m3 $65 68 $4,388 Length? Granular B m3 $ $4, Superpave 12.5 (50mm) t $ $7,031 Surface Area Superpave 19 (70mm) t $ $12,206 Division Subtotal $534,000 Division 5 - Metals 1 Misc. Metals Including Landings and Ladders LS $5,000 1 $5,000 Division Subtotal $5,000 Division 15 - Mechanical 1 Isolation Valves each $7,500 2 $15,000 2 Replace Pumps and starters for 64L/s firm capacity each $50,000 2 $100,000 3 Insulation for Forcemain LS $50,000 1 $50,000 4 Strapping for Forcemain on Bridge LS $100,000 1 $100,000 Division Subtotal $265,000 Provisional Items 1 $0 Division Subtotal $0 ESTIMATED TOTAL CONSTRUCTION COST Construction Contingency Design and Contract Administration Amendment to EA ENGINEER'S OPINION OF COST (CONSTRUCTION) $941,000 50% $471,000 15% $142,000 $25,000 $1,579,000 Page 20 of 26 Note: All division subtotals within the opinion of probable cost are rounded to the nearest thousand.

21 Servicing PS#3 Catchment Area Revised: 12/5/2013 Opinion of Probable Cost (CLASS D) - Option 5 - Siphon Under River w Active PS#3 STANTEC PROJECT NO.: Date: December 5, 2013 Page 21 of 26 Item No. Division and Description Units Unit Cost Quantity Estimate Division Total Division 1 - General Requirements 1 Mobilization/Demobilization LS 3% 1 $35,550 2 Traffic Control LS $5,000 1 $5,000 3 Health & Safety LS $5,000 1 $5,000 4 Administration LS 10% 1 $117,500 5 Bid Bonding and Insurance LS 2% 1 $23,500 Division Subtotal $187,000 Division 2 - Site/Civil Work 1 Site Work including removals, infrastructure relocations and utility trenching LS $5,000 1 $5,000 2 Groundwater Dewatering and Pumping Wells LS $5,000 1 $5,000 3 Earth Excavation 3.1 Gravity Sewer Trench (Typical) m3 $ $45,900 4 Granular Backfill 4.1 Gravity Sewer Trench m3 $35 92 $3,213 5 Trenchless Siphon Barrel Installation 5.1 River Crossing 10" HDPE DR11 m $1, $280, River Crossing 8" HDPE DR11 m $1, $260, Drilling Mud Disposal LS $100,000 1 $100,000 6 Precast Concrete Chambers 6.1 Gravity Sewer MH ea $5,348 2 $10, Upstream siphon chamber ea $25,000 1 $25, Downstream siphon chamber ea $80,000 1 $80,000 7 Forcemain Pipe (HDPE DR11) 7.1 Forcemain (250mm) m $ $5, Other Restoration LS $10,000 1 $10,000 8 Gravity Sewer (375mm) m $ $9,637 9 Deepen Wetwell PS#8 LS $315,000 1 $315,000 Division Subtotal $1,155,000 Division 5 - Metals 1 Misc. Metals Including Landings and Ladders (stoplogs) LS $10,000 1 $10,000 Division Subtotal $10,000 Division 15 - Mechanical 1 Overflow flap gate (at upstream chamber) each $10,000 1 $10,000 Division Subtotal $10,000 Provisional Items 1 $0 Division Subtotal $0 ESTIMATED TOTAL CONSTRUCTION COST Construction Contingency Design and Contract Administration Amendment to EA ENGINEER'S OPINION OF COST (CONSTRUCTION) Note: All division subtotals within the opinion of probable cost are rounded to the nearest thousand. $1,362,000 50% $681,000 15% $205,000 $25,000 $2,273,000

22 Servicing PS#3 Catchment Area Revised: 12/5/2013 Opinion of Probable Cost (CLASS D) - Option 6 - Siphon Under River w PS#3 as settling basin STANTEC PROJECT NO.: Date: December 5, 2013 Page 22 of 26 Item No. Division and Description Units Unit Cost Quantity Estimate Division Total Division 1 - General Requirements 1 Mobilization/Demobilization LS 3% 1 $39,900 2 Traffic Control LS $5,000 1 $5,000 3 Health & Safety LS $5,000 1 $5,000 4 Administration LS 10% 1 $132,000 5 Bid Bonding and Insurance LS 2% 1 $26,400 Division Subtotal $209,000 Division 2 - Site/Civil Work 1 Site Work including removals, infrastructure relocations and utility trenching LS $5,000 1 $5,000 2 Groundwater Dewatering and Pumping Wells LS $5,000 1 $5,000 3 Earth Excavation 3.1 Gravity Sewer Trench (Typical) m3 $ $45,900 4 Granular Backfill 4.1 Gravity Sewer Trench m3 $35 92 $3,213 5 Trenchless Siphon Barrel Installation 5.1 River Crossing 10" HDPE DR11 m $1, $280, River Crossing 8" HDPE DR11 m $1, $260, Drilling Mud Disposal LS $100,000 1 $100,000 6 Precast Concrete Chambers ########## Gravity Sewer MH ea $5,348 2 $10, Upstream siphon chamber ea $25,000 1 $25, Downstream siphon chamber ea $60,000 1 $60,000 7 Forcemain Pipe (HDPE DR11) 7.1 Forcemain (250mm) m $ $5, Other Restoration LS $10,000 1 $10,000 8 Gravity Sewer (375mm) m $ $9,637 9 Dedirect sewers to PS and new Gravity sewer to act as settling basin LS $20,000 1 $20, Deepen Wetwell PS#8 LS $315,000 1 $315,000 Division Subtotal $1,155,000 Division 5 - Metals 1 Misc. Metals Including Landings and Ladders (stoplogs) LS $10,000 1 $10,000 Division Subtotal $10,000 Division 15 - Mechanical 1 Overflow flap gate (at upstream chamber) each $10,000 1 $10,000 2 Odour control system, fan and stack each $120,000 1 $120,000 3 Decommission PS LS $25,000 1 $25,000 Division Subtotal $155,000 Provisional Items 1 $0 Division Subtotal $0 ESTIMATED TOTAL CONSTRUCTION COST Construction Contingency Design and Contract Administration Amendment to EA ENGINEER'S OPINION OF COST (CONSTRUCTION) Note: All division subtotals within the opinion of probable cost are rounded to the nearest thousand. $1,529,000 50% $765,000 15% $230,000 $25,000 $2,549,000

23 Servicing PS#3 Catchment Area Revised: 12/5/2013 Opinion of Probable Cost (CLASS D) - Option 7 - Gravity Sewer across River STANTEC PROJECT NO.: Date: December 5, 2013 Item No. Division and Description Units Unit Cost Quantity Estimate Division Total Division 1 - General Requirements 1 Mobilization/Demobilization LS 3% 1 $69,210 2 Traffic Control LS $5,000 1 $5,000 3 Health & Safety LS $10,000 1 $10,000 4 Administration LS 10% 1 $229,200 5 Bid Bonding and Insurance LS 2% 1 $45,840 Division Subtotal $360,000 Division 2 - Site/Civil Work 1 Site Work including removals, infrastructure relocations and utility trenching LS $5,000 1 $5,000 2 Groundwater Dewatering and Pumping Wells LS $75,000 1 $75,000 3 Earth Excavation 3.1 Shallow Gravity Sewer Trench (Typical) m3 $ $45, Entry and Exit Pits for Jack and Bore (sheet piled) LS $600,000 1 $600,000 4 Granular Backfill 4.1 Gravity Sewer Trench m3 $35 92 $3,213 5 Trenchless Gravity Sewer Installation 5.1 Jack and Bore installation (375mm sewer) m $3, $525,000 6 Precast Concrete Chambers ########## shallow Gravity Sewer MH ea $5,348 2 $10, Deep gravity sewer MH either side of river (16m depth) ea $20,855 2 $41,711 8 Gravity Sewer (375mm) m $ $9,637 9 Deepen Wetwell in PS#8 LS $900,000 1 $900,000 Division Subtotal $2,217,000 Division 5 - Metals 1 Misc. Metals Including Landings and Ladders LS $25,000 1 $25,000 Page 23 of 26 Division Subtotal $25,000 Division 15 - Mechanical 1 Larger Pumps in PS#8 each $25,000 2 $50,000 Division Subtotal $50,000 Provisional Items 1 $0 Division Subtotal $0 ESTIMATED TOTAL CONSTRUCTION COST Construction Contingency Design and Contract Administration Amendment to EA ENGINEER'S OPINION OF COST (CONSTRUCTION) Note: All division subtotals within the opinion of probable cost are rounded to the nearest thousand. $2,652,000 50% $1,326,000 15% $398,000 $25,000 $4,401,000

24 REPORT TO COUNCIL: RAPPORT AU CONSEIL: ECO DEV DATE: 06/04/2013 SUBJECT PUMPING STATION #8 - SERVICING AGREEMENT/ STATION DE POMPAGE #8 - ENTENTE DE SERVICE Service agreement for the pumping station #8 between Melanie Construction and the Township of Russell. RECOMMENDATION That Council authorizes the Mayor and Clerk to sign the service agreement with Melanie Construction as recommended. SUJET Entente de service pour la station de pompage # 8 entre Mélanie Construction et la municipalité de Russell. RECOMMANDATION Que le conseil municipal autorise le Maire et la greffière de signer l entente de service avec Mélanie Construction tel que recommandée. FINANCIAL IMPLICATION - The cost of the project with Melanie Construction is estimated at approximately $4.6 million. - The township s share is 45% of the cost $2,070, In addition to these costs, we have other expenses that are entirely the responsibility of the township and are estimated at $600, The user fee contributions are estimated at $430,000 and the balance will come from the development charges. (This is subject to changes to the development charges By-law as discussed with Council in previous reports.) - These expenses are included in the 2013 budget. IMPLICATIONS FINANCIÈRES - Le coût du projet avec Mélanie Construction est évalué à environ 4,6 millions de dollars. - La part de la municipalité est 45 % du coût, soit $. - En plus de ces dépenses, nous avons des coûts qui sont entièrement la responsabilité de la municipalité et sont évalués à environ $. - La part des usagers sera environ $ et la balance proviendra des frais de développement. (Ceci est sujet à ce que le nouveau règlement des redevances d exploitation soit modifié tel que confirmé par des rapports antérieurs au conseil.) - Ces dépenses sont prévues dans le budget BUSINESS PLAN PLAN D AFFAIRES This is part of the proposed 2013 business plan. Ceci fait partie du plan d affaires proposé pour COMMUNICATION PLAN Provide a press release to all media once the agreement is signed. PLAN DE COMMUNICATION Fournir un communiqué de presse à tous les médias lorsque le contrat sera signé. SUBMITTED BY SOUMIS PAR: Daniel Gatien Directeur développement économique/ Economic Development Date: June 4 juin, 2013 Page 24 of 26

25 APPROVAL(S) APPROBATION(S): June 4 juin 2013 Jean Leduc Chief Administrative Officer Directeur général Date Claudette Landry Director of Finance Directeur des finances Date PROJECT DESCRIPTION DU PROJET HISTORY, REFERENCE AND SUPPORT INFORMATION We have been working on this file since the fall of 2011 and we have reached an agreement for the construction of the new pumping station. This station will serve the new subdivisions of Melanie Construction (land east and west of Ste-Marie south and section north-west in Embrun). The new pumping station will solve much of the problems with the sewer collection for the village of Embrun. The highlights of the new agreements are: - The pumping station will be situated in Richelieu Park. - There will be a syphon underneath the Castor River with a structure on the north side on the Lapalme property and the pumping station on the south side. - The project will be completed by the end of October The project includes a new pumping station and the forcemain that will connect to the lagoon. - The Township will reimburse 50% of the costs for the hydrological studies for the syphon and pumping station (approximately $15,000). - Contribution of $15,000 by Melanie Construction for the exchange of land with the Lapalme family. - Contribution of $130,000 from the Township for the sewer pipes in the subdivision (Melanie claims that this work is the responsibility of the township). - The Township will reimburse Melanie Construction for the capacities used beyond its allocated capacities if they are used within fifteen (15) years from the date that the pumping station HISTORIQUE, RÉFÉRENCES ET INFORMATION DE SUPPORT Nous travaillons sur ce dossier depuis l automne 2011 et nous sommes venus à une entente de service pour la construction d une nouvelle station de pompage. Cette station servira pour le développement des terrains de Mélanie Construction (terrains ouest et est de la rue Ste-Marie sud ainsi que la section nordouest du village d Embrun.) Cette nouvelle station de pompage règlera en grande partie les problèmes de notre système de collection du système sanitaires pour le village d Embrun. Voici les grandes lignes de l entente: - La station de pompage sera située dans le Parc Richelieu. - Il y aura un siphon sous la rivière Castor avec une structure sur le terrain Lapalme (côté nord) et la station pompage (côté sud). - Le projet sera complété pour la fin du mois d octobre Le projet comprend la nouvelle station de pompage ainsi que le «forcemain» qui se raccorde à la lagune. - La municipalité remboursera 50 % des coûts pour les études hydrologiques pour le siphon et station de pompage (environ $). - Contribution de $ de Mélanie Construction pour l échange de terrain avec la famille Lapalme. - Contribution de $ de la municipalité pour la section des tuyaux sanitaires dans la subdivision (Mélanie réclame que ces travaux sont la responsabilité de la municipalité). - La municipalité remboursera Mélanie Construction pour les capacités de la station de pompage qu elle utilisera au-delà de ses capacités allouées si celles-ci sont utilisées dans les quinze (15) ans REPORT- ECO DEV Entente de service station de pompage #8 Page 2 of 3 6/5/2013 Page 25 of 26

26 is operational. After this period, the responsibility of the township is to ensure that the capacities allocated to Melanie Construction are retained until the lands are developed by Melanie. All residual capacities will be allocated to the township with no compensation to Melanie Construction. - If the project does not go forward, all expenses incurred on this project will be split 55/45. de la date que la station de pompage est opérationnelle. Après cette période, la responsabilité de la municipalité est d assurer que les capacités allouées à Mélanie Construction sont retenues jusqu à ce que les terrains de Mélanie soient développés. Toutes capacités résiduelles seront attribuées à la municipalité avec aucune compensation à Mélanie Construction. - Si le projet ne va pas de l avant, tous les coûts dépensés pour ce projet seront répartis 55/45. OTHER OPTION(S) TO THE RECOMMENDATION Install a new sanitary sewer pipe from the west side of the village of Embrun to pumping station #1. It will also be necessary to make improvements to the same pumping station. ATTACHMENT(S) By-law with agreement AUTRES OPTION(S) À LA RECOMMANDATION Installer un nouveau tuyau collecteur sanitaire à partir de l ouest du village d Embrun jusqu à la station pompage #1. Aussi, il faudra faire des améliorations à cette même station de pompage. PIÈCE(S) JOINTE(S) Règlement avec entente REPORT- ECO DEV Entente de service station de pompage #8 Page 3 of 3 6/5/2013 Page 26 of 26

Report to Rapport au: Agriculture and Rural Affairs Committee Comité de l'agriculture et des affaires rurales 24 November 2016 / 24 novembre 2016

Report to Rapport au: Agriculture and Rural Affairs Committee Comité de l'agriculture et des affaires rurales 24 November 2016 / 24 novembre 2016 1 Report to Rapport au: Agriculture and Rural Affairs Committee Comité de l'agriculture et des affaires rurales 24 November 2016 / 24 novembre 2016 and Council et au Conseil 14 December 2016 / 14 décembre

More information

1. PETITION FOR DRAINAGE WORKS 1566 AND 1600 STAGECOACH ROAD PÉTITION POUR LES TRAVAUX DE DRAINAGE 1566 ET 1600 RUE STAGECOACH

1. PETITION FOR DRAINAGE WORKS 1566 AND 1600 STAGECOACH ROAD PÉTITION POUR LES TRAVAUX DE DRAINAGE 1566 ET 1600 RUE STAGECOACH 1 COMITÉ DE L AGRICULTURE ET 1. PETITION FOR DRAINAGE WORKS 1566 AND 1600 STAGECOACH ROAD PÉTITION POUR LES TRAVAUX DE DRAINAGE 1566 ET 1600 RUE STAGECOACH COMMITTEE RECOMMENDATION That Council consider

More information

1. TRANSIT SERVICES BY-LAW AMENDMENTS (REGULATORY REQUIREMENTS FOR FARE INSTRUMENTS)

1. TRANSIT SERVICES BY-LAW AMENDMENTS (REGULATORY REQUIREMENTS FOR FARE INSTRUMENTS) 1 COMMISSION DU 1. TRANSIT SERVICES BY-LAW AMENDMENTS (REGULATORY REQUIREMENTS FOR FARE INSTRUMENTS) MODIFICATIONS AU RÈGLEMENT SUR LE (EXIGENCES RÉGLEMENTAIRES RELATIVES AUX TITRES DE TRANSPORT) COMMISSION

More information

LNG INCIDENT IDENTIFICATION A COMPILATION AND ANALYSIS BY THE INTERNATIONAL LNG IMPORTER S GROUP

LNG INCIDENT IDENTIFICATION A COMPILATION AND ANALYSIS BY THE INTERNATIONAL LNG IMPORTER S GROUP LNG INCIDENT IDENTIFICATION A COMPILATION AND ANALYSIS BY THE INTERNATIONAL LNG IMPORTER S GROUP IDENTIFICATION DES INCIDENTS GNL UNE COLLECTE ET UNE ANALYSE REALISEE PAR LE GROUPE INTERNATIONAL DES IMPORTATEURS

More information

Regional District of Okanagan-Similkameen 101 Martin Street Penticton, BC V2A 5J9. November 2008 Project No

Regional District of Okanagan-Similkameen 101 Martin Street Penticton, BC V2A 5J9. November 2008 Project No Sawmill Road Area Sanitary Sewer Feasibility Study Regional District of Okanagan-Similkameen 101 Martin Street Penticton, BC V2A 5J9 November 2008 Project No. 104258 Table of Contents SECTION TITLE PAGE

More information

Pressure Sewer Systems. Why Use a Barnes Pressure Sewer System?

Pressure Sewer Systems. Why Use a Barnes Pressure Sewer System? Pressure Sewer Systems Why Use a Barnes Pressure Sewer System? Why Use a Presssure Sewer System? Pressure sewer systems are an effective method to move residential wastewater through small diameter pipes

More information

Office of the Auditor General / Bureau du vérificateur général DETERMINATION OF SAMPLING REQUIREMENTS FOR AUDITS OF PAYROLL ACCURACY 2010

Office of the Auditor General / Bureau du vérificateur général DETERMINATION OF SAMPLING REQUIREMENTS FOR AUDITS OF PAYROLL ACCURACY 2010 Office of the Auditor General / Bureau du vérificateur général DETERMINATION OF SAMPLING REQUIREMENTS FOR AUDITS OF PAYROLL ACCURACY 2010 DÉTERMINATION DES EXIGENCES D ÉCHANTILLONNAGE POUR LES VÉRIFICATIONS

More information

MINUTES OF PROCEEDINGS. of the. 208 th MEETING. Montreal November 20, 2013 ADOPTED

MINUTES OF PROCEEDINGS. of the. 208 th MEETING. Montreal November 20, 2013 ADOPTED MINUTES OF PROCEEDINGS of the 208 th MEETING Montreal November 20, 2013 ADOPTED Minutes of the 208 th meeting of the Kativik Environmental Quality Commission, held in Montreal on November 20, 2013. Present:

More information

DESIGNING PRESSURE SEWER SYSTEMS FOR TOPOGRAPHICALLY CHALLENGING CATCHMENTS: AN ACCOUNT OF THE OPUA PRESSURE SEWER SCHEME

DESIGNING PRESSURE SEWER SYSTEMS FOR TOPOGRAPHICALLY CHALLENGING CATCHMENTS: AN ACCOUNT OF THE OPUA PRESSURE SEWER SCHEME DESIGNING PRESSURE SEWER SYSTEMS FOR TOPOGRAPHICALLY CHALLENGING CATCHMENTS: AN ACCOUNT OF THE OPUA PRESSURE SEWER SCHEME Graeme Salmon GHD Ltd, New Zealand ABSTRACT This paper will present the challenges

More information

Appel d'offres général ECCFIN/R4/2010/001

Appel d'offres général ECCFIN/R4/2010/001 Questions Answers 1 2 3 4 5 Question sur la liste générale des prix, point 5.2 :La création et installation de la signalétique correspond-il à la conception graphique, la production et l installation de

More information

Driven pile capacity for wind farms in western Ontario, Canada

Driven pile capacity for wind farms in western Ontario, Canada Driven pile capacity for wind farms in western Ontario, Canada Prapote Boonsinsuk & Siva Nadarajah AMEC Earth & Environmental, a Division of AMEC Americas Limited, Scarborough, Ontario, Canada Trudy Laidlaw

More information

Displacement and effective stresses changes underneath strip footing on stiff ground with single and double voids

Displacement and effective stresses changes underneath strip footing on stiff ground with single and double voids Displacement and effective stresses changes underneath strip footing on stiff ground with single and double voids Reem Sabouni Department of Civil Engineering ALHOSN University, Abu Dhabi, Abu Dhabi, United

More information

PLANNING COMMITTEE REPORT AUGUST COMITÉ DE L URBANISME RAPPORT 35 LE 29 AOÛT ZONING 2084 MONTREAL ROAD

PLANNING COMMITTEE REPORT AUGUST COMITÉ DE L URBANISME RAPPORT 35 LE 29 AOÛT ZONING 2084 MONTREAL ROAD 1 COMITÉ DE L URBANISME 1. ZONING 2084 MONTREAL ROAD ZONAGE 2084, CHEMIN MONTRÉAL COMMITTEE RECOMMENDATION That Council approve an amendment to Zoning By-law 2008-250 to change the zoning of 2084 Montreal

More information

Fulton street transit center foundation design and construction in a dense urban environment

Fulton street transit center foundation design and construction in a dense urban environment Fulton street transit center foundation design and construction in a dense urban environment Joseph Appleby & Craig Covil Arup, New York, NY, USA Uday Durg & Hsin Wu Metropolitan Transportation Authority

More information

Tunnel Works. How we got here - Fort Wayne s Consent Decree. Tunnel Works Program Frequently Asked Questions

Tunnel Works. How we got here - Fort Wayne s Consent Decree. Tunnel Works Program Frequently Asked Questions City Utilities operates the largest municipally-owned wastewater collection and treatment system in Indiana. The system serves 161 square miles and includes 1,014 miles of sanitary sewer lines, 365 miles

More information

Archived Content. Contenu archivé

Archived Content. Contenu archivé ARCHIVED - Archiving Content ARCHIVÉE - Contenu archivé Archived Content Contenu archivé Information identified as archived is provided for reference, research or recordkeeping purposes. It is not subject

More information

Annual Report on the Administration of the Access to Information Act

Annual Report on the Administration of the Access to Information Act Annual Report on the Administration of the Access to nformation Act 1 April 28 to 31 March 29 Table of Contents Annual Report 28-29 Access to nformation Act ntroduction... 2 Canada Council for the Arts...

More information

INTERNATIONAL STANDARD NORME INTERNATIONALE

INTERNATIONAL STANDARD NORME INTERNATIONALE IEC 62304 INTERNATIONAL STANDARD NORME INTERNATIONALE Edition 1.0 2006-05 Medical device software Software life cycle processes Logiciels de dispositifs médicaux Processus du cycle de vie du logiciel IEC

More information

Alternative No. 1 Total Cost DRAFT

Alternative No. 1 Total Cost DRAFT OPINION OF PROBABLE PROJECT COSTS SUMMARY OF ALL THREE ALTERNATIVE ALIGNMENTS Item Description Alternative No. 1 Total Cost Alternative No. 2 Total Cost Alternative No. 3 Total Cost Design Phase 1. Preliminary

More information

SANITARY SEWER FEASIBILITY STUDY AND REPORT NORTH SEBASTIAN AREA

SANITARY SEWER FEASIBILITY STUDY AND REPORT NORTH SEBASTIAN AREA SANITARY SEWER FEASIBILITY STUDY AND REPORT FOR THE NORTH SEBASTIAN AREA INDIAN RIVER COUNTY, FLORIDA November 2013 Prepared for: Indian River County Utilities Prepared by: MASTELLER & MOLER, INC. ~ CONSULTING

More information

Preferred Elevated Tank Site

Preferred Elevated Tank Site Preferred Elevated Tank Site Preferred Site No. 3 is on private property owned by Hopewell Developments. Approximately 5 acres of land will be required, including lands required for a permanent access

More information

Sunnyside Valley Irrigation District Enclosed Lateral Improvements Projects Contract : Regions 011, 13 & 014

Sunnyside Valley Irrigation District Enclosed Lateral Improvements Projects Contract : Regions 011, 13 & 014 Sunnyside Valley Irrigation District Addendum No. 1 Enclosed Lateral Improvements Projects 2010-2011 Issued: 8/30/2010 Contract 10-003: Regions 011, 013 & 014 Page 1 of 7 Sunnyside Valley Irrigation District

More information

UTILITIES COMMISSION CITY OF NEW SMYRNA BEACH, FLORIDA 200 CANAL STREET P.O. BOX 100 NEW SMYRNA BEACH, FL

UTILITIES COMMISSION CITY OF NEW SMYRNA BEACH, FLORIDA 200 CANAL STREET P.O. BOX 100 NEW SMYRNA BEACH, FL DATE: January 5, 2018 UTILITIES COMMISSION CITY OF NEW SMYRNA BEACH, FLORIDA 200 CANAL STREET P.O. BOX 100 NEW SMYRNA BEACH, FL 32170-010 ITB# 04-18 REPLACE 12 WATER MAIN AT TURNBULL BAY (DAMAGED DURING

More information

Electrical/Electronics

Electrical/Electronics Electrical/Electronics Volume 5 August 2007 Issue date: August 8, 2007 Info Update is published by the Canadian Standards Association (CSA) eight times a year. It contains important information about new

More information

Appendix P. CNR Crossing Application

Appendix P. CNR Crossing Application Appendix P CNR Crossing Application AECOM 3292 Production Way, Floor 4 604 444 6400 tel Burnaby, BC, Canada V5A 4R4 604 294 8597 fax www.aecom.com May 17, 2017 British Columbia Railway Company 600-221

More information

Alexandria Sewage Lagoon Treatment Facility Municipal Class C Environmental Assessment Public Information Centre #2 Welcome!

Alexandria Sewage Lagoon Treatment Facility Municipal Class C Environmental Assessment Public Information Centre #2 Welcome! Alexandria Sewage Lagoon Treatment Facility Municipal Class C Environmental Assessment Public Information Centre #2 Welcome! Municipal Class Environmental Assessment Status We are Here Study Overview The

More information

Early age strength assesement for high rise buildings

Early age strength assesement for high rise buildings Early age strength assesement for high rise buildings Marijan SKAZLIĆ 1, Claus Germann PETERSEN 2, Zoran KRNJAK 3 1 Faculty of Civil Engineering, University of Zagreb, Zagreb, Croatia, marijan.skazlic@grad.hr

More information

REQUEST FOR PROPOSAL (RFP) RFP

REQUEST FOR PROPOSAL (RFP) RFP REQUEST FOR PROPOSAL (RFP) ENGINEERING CONSULTANT REGIONAL WASTEWATER PIPELINE FEASIBILITY STUDY FEBRUARY 9, 2015 TABLE OF CONTENTS SECTION 1 SUMMARY AND BACKGROUND 2 SECTION 2 PROJECT SCOPE 3 SECTION

More information

The Don River and Central Waterfront are among the most degraded waterways in the City of Toronto.

The Don River and Central Waterfront are among the most degraded waterways in the City of Toronto. This document was put together following the fourth round of public consultation for the Class Environmental Assessment study for this Project. In June 2011, the Project Team consulted with stakeholders

More information

CULINARY WATER PROJECT COST ESTIMATES & LOCATION MAPS. Appendix B

CULINARY WATER PROJECT COST ESTIMATES & LOCATION MAPS. Appendix B CULINARY WATER PROJECT COST ESTIMATES & LOCATION MAPS Appendix B RIVERDALE CITY CAPITAL FACILITIES PLAN CULINARY WATER Engineer's Cost Estimate January 2009 Project Name: Culinary Water Reservoir - Tank

More information

Benefits and costs of urban drainage and flood control projects. Neil S. Grigg

Benefits and costs of urban drainage and flood control projects. Neil S. Grigg Benefits and costs of urban drainage and flood control projects Neil S. Grigg Abstract. In recent urban development, drainage and flood control projects have often lost out to higher priority public investments.

More information

Village of Arlington Heights. Sewer Back-up Rebate Program

Village of Arlington Heights. Sewer Back-up Rebate Program Village of Arlington Heights Sewer Back-up Rebate Program (Including Enhanced Program Information) Updated: October 1, 2017 Village of Arlington Heights Building & Life Safety Department 33 S. Arlington

More information

Facilities Plan. Technical Memorandum No. TM-WW-7 Hydraulic Analysis and Effluent Pump Station

Facilities Plan. Technical Memorandum No. TM-WW-7 Hydraulic Analysis and Effluent Pump Station City of St. Joseph, Missouri Hydraulic Analysis and Effluent Pump Station By Work Order No. 09-001 B&V Project 163509 May 20, 2010 Table of Contents 1.0 Executive Summary...1 2.0 Purpose of Study...2 3.0

More information

Jason McDiarmid, R.E.T. Terra Erosion Control Ltd.

Jason McDiarmid, R.E.T. Terra Erosion Control Ltd. Career History Terra Erosion Control Ltd. Project Manager Nelson, British Columbia November 2009 to Present Stantec Consulting Ltd. Edmonton Alberta Environmental Consultant / Project Manager May 2003

More information

ONTARIO LABOUR RELATIONS BOARD. Colleges Collective Bargaining Act, 2008

ONTARIO LABOUR RELATIONS BOARD. Colleges Collective Bargaining Act, 2008 ONTARIO LABOUR RELATIONS BOARD Colleges Collective Bargaining Act, 2008 OLRB Case No: 0625-16-R Certification (Industrial) Ontario Public Service Employees Union ("OPSEU"), Applicant v College Employer

More information

Les opportunités dans les domaines «Blue Growth» & «Rural Renaissance»

Les opportunités dans les domaines «Blue Growth» & «Rural Renaissance» Horizon-2020 appels 2016-2017 Les opportunités dans les domaines «Blue Growth» & «Rural Renaissance» Les slides seront disponibles sur le site web du NCP-Wallonie François LOUESSE Disclaimer Cette présentation

More information

SITE SERVICES GUELPH TRANSIT OPERATIONS & MAINTENANCE SECTION WATSON ROAD FACILITY PAGE 1 OF 6 WATER RECLAMATION PROJECT JUNE 2013

SITE SERVICES GUELPH TRANSIT OPERATIONS & MAINTENANCE SECTION WATSON ROAD FACILITY PAGE 1 OF 6 WATER RECLAMATION PROJECT JUNE 2013 WATSON ROAD FACILITY PAGE 1 OF 6 PART 1 GENERAL 1.1 Description The work covered by this Section includes all labour, materials, equipment, and supervision necessary to complete the site services as shown

More information

2nd Cycle of the Periodic Reporting Exercise Europe and North America

2nd Cycle of the Periodic Reporting Exercise Europe and North America Information Meeting 2nd Cycle of the Periodic Reporting Exercise Europe and North America 38th session of the World Heritage Committee Doha, 19 June 2014 Réunion d information 2ème cycle de l exercice

More information

Acting SRSG Graaff Statement to the General Assembly 2 June 2015

Acting SRSG Graaff Statement to the General Assembly 2 June 2015 Acting SRSG Graaff Statement to the General Assembly 2 June 2015 As delivered Your Excellency, Mr. Kutesa, President of the General Assembly, Mr. Secretary-General, Ladies and Gentlemen, I am pleased to

More information

Analysis on influence of retaining wall deflection and ground settlement caused by Top-down and Bottom-up excavation methods

Analysis on influence of retaining wall deflection and ground settlement caused by Top-down and Bottom-up excavation methods Analysis on influence of retaining wall deflection and ground settlement caused by Top-down and Bottom-up excavation methods Ching-Jiang Jeng Department of Environmental and Hazards-Resistant Design, Huafan

More information

CHAPTER 8 EROSION AND SEDIMENT CONTROL PLAN REQUIREMENTS

CHAPTER 8 EROSION AND SEDIMENT CONTROL PLAN REQUIREMENTS CHAPTER 8 EROSION AND SEDIMENT CONTROL PLAN REQUIREMENTS 8.1 INTRODUCTION To minimize the detrimental effects of erosion and sedimentation, Henrico County requires that those individuals responsible for

More information

TOWN OF MOUNT PLEASANT WESTCHESTER COUNTY, NEW YORK

TOWN OF MOUNT PLEASANT WESTCHESTER COUNTY, NEW YORK TOWN OF MOUNT PLEASANT WESTCHESTER COUNTY, NEW YORK COST EVALUATION FOR ROLLING HILLS AREA WATER MAIN EXTENSION PROFESSIONAL CONSULTING, LLC. Octagon 10, Office Center 1719 Route 10, Suite 225 Parsippany,

More information

City of Grenora, ND Municipal Infrastructure Needs Assessment August 2012

City of Grenora, ND Municipal Infrastructure Needs Assessment August 2012 City of Grenora, ND Municipal Infrastructure Needs Assessment August 2012 Project made possible by US Dept. of HUD Regional Substantiality Planning Grant and ND Energy Development Infrastructure and Impact

More information

Municipality of Morin-Heights. MINUTES In case of discrepancy, the French version prevails over the English translation.

Municipality of Morin-Heights. MINUTES In case of discrepancy, the French version prevails over the English translation. PROVINCE OF QUEBEC ARGENTEUIL COUNTY MRC DES PAYS D EN-HAUT MINUTES In case of discrepancy, the French version prevails over the English translation. Minutes of the regular session of the Municipal council

More information

Report to Rapport au:

Report to Rapport au: 1 Report to Rapport au: Environment and Climate Protection Committee Comité de l environnement et de la protection climatique 20 June 2017 / 20 juin 2017 and Council et au Conseil 28 June 2017 / 28 juin

More information

Office of the Auditor General / Bureau du vérificateur général FOLLOW-UP TO THE 2008 AUDIT OF THE BUILDING CODE SERVICES PROCESS FOR 215 PRESTON

Office of the Auditor General / Bureau du vérificateur général FOLLOW-UP TO THE 2008 AUDIT OF THE BUILDING CODE SERVICES PROCESS FOR 215 PRESTON Office of the Auditor General / Bureau du vérificateur général FOLLOW-UP TO THE 2008 AUDIT OF THE BUILDING CODE SERVICES PROCESS FOR 215 PRESTON STREET 2010 SUIVI DE LA VÉRIFICATION DU PROCESSUS DES SERVICES

More information

LEHDER Environmental Services Limited ont tenté d'obtenir une FTSS mis à jour. Aucune mise à jour est disponible pour la raison identifiée ci-dessous:

LEHDER Environmental Services Limited ont tenté d'obtenir une FTSS mis à jour. Aucune mise à jour est disponible pour la raison identifiée ci-dessous: LEHDER Environmental Services Limited ont tenté d'obtenir une FTSS mis à jour. Aucune mise à jour est disponible pour la raison identifiée ci-dessous: Le fabricant/fournisseur confirme ceci pour être un

More information

Lobbyists, and how to deal with them. Lobbyists, conflict of interest, and suggested solutions. Mtre Sébastien Dorion, Attorney

Lobbyists, and how to deal with them. Lobbyists, conflict of interest, and suggested solutions. Mtre Sébastien Dorion, Attorney Lobbyists, conflict of interest, and how to deal with them Lobbyists, Mtre Sébastien Attorney conflict ofdorion, interest, and suggested solutions Mtre Sébastien Dorion, Attorney Lobbying and conflict

More information

10:00 AM, Wednesday, April 8, 2015

10:00 AM, Wednesday, April 8, 2015 NOTICE OF MANDATORY PRE-BID CONFERENCE WILL BE HELD AT 10:00 AM, Wednesday, April 8, 2015 IN ROOM 16, CITY HALL BUILDING, 101 NORTH MAIN STREET WINSTON-SALEM, NORTH CAROLINA The purpose of this conference

More information

Sanitary Sewer Extensions, Lift Stations, and Force Mains Engineering Report Form. I. General Information. 1. Name of Facility:

Sanitary Sewer Extensions, Lift Stations, and Force Mains Engineering Report Form. I. General Information. 1. Name of Facility: Oklahoma Department of Environmental Quality Water Quality Division Phone: 405-702-8100 Construction Permitting Section 707 N. Robinson, OKC, OK 73102-6010 P.O. Box 1677, OKC, OK 73101-1677 Sanitary Sewer

More information

Aquaculture products prices on the Paris market

Aquaculture products prices on the Paris market Aquaculture products prices on the Paris market Calleja P. Marketing of aquaculture products Zaragoza : CIHEAM Cahiers Options Méditerranéennes; n. 17 1996 pages 133-138 Article available on line / Article

More information

Rural Servicing Guidelines

Rural Servicing Guidelines Rural Servicing Guidelines for Low-Pressure Sanitary Sewer System and Trickle Feed Water Distribution System FOREWORD This manual is intended to provide information to Developers, Engineering and Geotechnical

More information

The Chief Estimator Software. Item Cost Summary Bridge & Overpass Projects

The Chief Estimator Software. Item Cost Summary Bridge & Overpass Projects The Chief Estimator Software Item Cost Summary Bridge & Overpass Projects Elevated Transit Guideways Precast Girder Elevated Guideway 10 Abutment Excavation & Backfill 1,500.00 m3 222 10,368 8,634 1,309

More information

Section XXV Preconstruction Assessments and Damage Mitigation Procedures

Section XXV Preconstruction Assessments and Damage Mitigation Procedures Section XXV Preconstruction Assessments and Damage Mitigation Procedures A. Introduction - In recent years, HRSD has received an increasing number of complaints from residents and locality staff regarding

More information

Open Trench Construction Plan Review The open trench construction plan review involves the following general investigative elements:

Open Trench Construction Plan Review The open trench construction plan review involves the following general investigative elements: TNC Fisher Slough Final Design and Permitting Subject: Inverted Siphon Construction Feasibility To: From: Jenny Baker (TNC) Dave Olson (DD3) Brian Olson (DD17) Bob Boudinot Skagit County David Cline (Tetra

More information

NOTICE TO EMPLOYEES OF APPLICATION FOR CERTIFICATION

NOTICE TO EMPLOYEES OF APPLICATION FOR CERTIFICATION File No.: 0625-16-R Application Filing Date: May 31, 2016 COLLEGES COLLECTIVE BARGAINING ACT, 2008 NOTICE TO EMPLOYEES OF APPLICATION FOR CERTIFICATION APPLICATION FOR CERTIFICATION This Notice has been

More information

IFC-based Data Model for Integrated Maintenance Management

IFC-based Data Model for Integrated Maintenance Management IFC-based Data Model for Integrated Maintenance Management Mohammad A. Hassanain 1, Thomas M. Froese 2, MASCE, and Dana J. Vanier 3 Abstract This paper presents an object model for maintenance management

More information

Julia Bahen, Urban Strategies Inc.

Julia Bahen, Urban Strategies Inc. THE MUNICIPAL INFRASTRUCTURE GROUP LTD. 8800 Dufferin Street, Suite 200 Vaughan, Ontario L4K 0C5 T 905.738.5700 F 905.738.0065 www.tmig.ca TECHNICAL MEMORANDUM DATE June 13, 2017 TO CC SUBJECT FROM PROJECT

More information

For more information, visit our web site at: h2o.enr.state.nc.us/ndpu/

For more information, visit our web site at: h2o.enr.state.nc.us/ndpu/ State of North Carolina Department of Environment and Natural Resources Division of Water Quality INSTRUCTIONS FOR FORM: PSFMGSA 10/99 (PUMP STATIONS, FORCE MAINS, AND GRAVITY SEWERS) The Division of Water

More information

Contact the Jurisdictional Engineer for materials allowed by each jurisdiction.

Contact the Jurisdictional Engineer for materials allowed by each jurisdiction. Design Manual Chapter 3 - Sanitary Sewers 3C - Facility Design 3C-1 Facility Design A. Capacity of Pipe Pipe sizes 15 inches and smaller should carry the peak flow at a depth of no more than 0.67 of the

More information

AUTHORITY OF THE BOROUGH OF CHARLEROI WASHINGTON COUNTY, PENNSYLVANIA ACT 537 SEWAGE FACILITIES PLAN UPDATE

AUTHORITY OF THE BOROUGH OF CHARLEROI WASHINGTON COUNTY, PENNSYLVANIA ACT 537 SEWAGE FACILITIES PLAN UPDATE PLAN SUMMARY AUTHORITY OF THE BOROUGH OF CHARLEROI WASHINGTON COUNTY, PENNSYLVANIA ACT 537 SEWAGE FACILITIES PLAN UPDATE The Pennsylvania Sewage Facilities Act (Act 537) was enacted by the Pennsylvania

More information

City of Surrey, ND Municipal Infrastructure Needs Assessment September 2012

City of Surrey, ND Municipal Infrastructure Needs Assessment September 2012 City of Surrey, ND Municipal Infrastructure Needs Assessment September 2012 Project made possible by US Dept. of HUD Regional Substantiality Planning Grant and ND Energy Development Infrastructure and

More information

Sea to Sky Geotechnique 2006

Sea to Sky Geotechnique 2006 INTRINSIC SENSITIVITY AND AQUIFER VULNERABILITY IN THE COLD LAKE-BEAVER RIVER BASIN, ALBERTA, CANADA. Tony Lemay, Energy and Utilities Board Alberta Geological Survey, Edmonton, Alberta, Canada ABSTRACT

More information

CONSULTANT SENIOR EXPERT (PfP TRUST FUND PROJECT IN UKRAINE)

CONSULTANT SENIOR EXPERT (PfP TRUST FUND PROJECT IN UKRAINE) HUMAN RESOURCES DIVISION DIVISION DES RESSOURCES HUMAINES HR/2018/26/CLT/LB/07-ASB/WEB DB/ef 20 March 2018 POST DETAILS Ref. N : Organization: CONSULTANT SENIOR EXPERT (PfP TRUST FUND PROJECT IN UKRAINE)

More information

International Gas Union (IGU) outsourced to Intergas Marketing (IGM), two studies which were handled by 2 workgroups IGM1 and IGM2 IGM2

International Gas Union (IGU) outsourced to Intergas Marketing (IGM), two studies which were handled by 2 workgroups IGM1 and IGM2 IGM2 International Gas Union International Gas Union (IGU) outsourced to Intergas Marketing (IGM), two studies which were handled by 2 workgroups IGM1 and IGM2 IGM2 THE IMPACT AND OPPORTUNITIES ON NATURAL GAS

More information

The Executive Summary and proposed Grid Code (in both English and French) are provided below, in addition to the full report (in English only).

The Executive Summary and proposed Grid Code (in both English and French) are provided below, in addition to the full report (in English only). January 16, 2006 Dear Reader, During 2005 it became apparent that Canadian provinces were operating largely in isolation along their own timeframes to develop interconnection requirements for wind turbines

More information

CHAPTER 6 COLLECTION SYSTEM HYDRAULIC MODEL

CHAPTER 6 COLLECTION SYSTEM HYDRAULIC MODEL CHAPTER 6 COLLECTION SYSTEM HYDRAULIC MODEL INTRODUCTION The District developed a hydraulic model of the sanitary sewer system as part the 2000 Wastewater Comprehensive Plan. The output from this model

More information

THE ADVANTAGES HDPE MANHOLES

THE ADVANTAGES HDPE MANHOLES NIC HDPE manholes are custom fabricated for many varied applications including municipal and industrial manholes, sewer and storm water manholes, leach ate collection, sewer lift stations, siphon structures,

More information

Developer Services. Building over or near a sewer. DEV 005G Guidance notes and procedure. What is a public sewer?

Developer Services. Building over or near a sewer. DEV 005G Guidance notes and procedure. What is a public sewer? Developer Services DEV 005G Guidance notes and procedure Building over or near a sewer If you are thinking of building a structure (for example, a new building, extension, conservatory, garage etc.) you

More information

Wastewater Flow Monitoring Services

Wastewater Flow Monitoring Services Wastewater Flow Monitoring Services For San Gabriel, CA July 13, 2015 through July 21, 2015 Revised October 9, 2015 Leaders in Sewer Flow Monitoring Services 601 N. Parkcenter Dr., Suite 209 Santa Ana,

More information

SECTION 3 DRAINAGE. 3-1 General. 3-2 Drainage Ordinances and Legal Requirements

SECTION 3 DRAINAGE. 3-1 General. 3-2 Drainage Ordinances and Legal Requirements SECTION 3 DRAINAGE 3-1 General All Drainage plans for proposed development shall be prepared by a Professional Engineer registered in Virginia, except as noted below. Further, their seal and signature

More information

CONDUCTING MOCK UPS IN THE WORKPLACE: PROCESS, CASE STUDIES AND LESSONS LEARNED

CONDUCTING MOCK UPS IN THE WORKPLACE: PROCESS, CASE STUDIES AND LESSONS LEARNED CONDUCTING MOCK UPS IN THE WORKPLACE: PROCESS, CASE STUDIES AND LESSONS LEARNED Tanya Morose Taylor d Ergonomics Incorporated, 1400 Northumberland Street, Box 1107, Ayr, Ontario, N0B 1E0. info@taylordergo.com

More information

DUBAi ATIBT MARKETING PROGRAMME MARKETING AND COMMUNICATION REVIEW OF PROPOSED ACTIONS FOR LAURENT LAGADEC and BERTRAND FAUCON

DUBAi ATIBT MARKETING PROGRAMME MARKETING AND COMMUNICATION REVIEW OF PROPOSED ACTIONS FOR LAURENT LAGADEC and BERTRAND FAUCON ATIBT FORUM DUBAi 2017 ATIBT MARKETING PROGRAMME MARKETING AND COMMUNICATION REVIEW OF 2016 - PROPOSED ACTIONS FOR 2017 2018 LAURENT LAGADEC and BERTRAND FAUCON A T I B T M A R K E T I N G P R O G R A

More information

SEWER SYSTEM DESIGN GUIDELINES

SEWER SYSTEM DESIGN GUIDELINES SEWER SYSTEM DESIGN GUIDELINES PART 1 GENERAL 1.1 GENERAL GUIDELINES A. The following sewer system design guidelines are based on Federal, State and Local health requirements, and the Berkeley County Water

More information

ACT 537 SPECIAL STUDY WASTEWATER CONVEYANCE SYSTEM CAPACITY ANALYSIS WASHINGTON TOWNSHIP MUNICIPAL AUTHORITY

ACT 537 SPECIAL STUDY WASTEWATER CONVEYANCE SYSTEM CAPACITY ANALYSIS WASHINGTON TOWNSHIP MUNICIPAL AUTHORITY ACT 537 SPECIAL STUDY WASTEWATER CONVEYANCE SYSTEM CAPACITY ANALYSIS for WASHINGTON TOWNSHIP MUNICIPAL AUTHORITY WASHINGTON TOWNSHIP, FRANKLIN COUNTY, PENNSYLVANIA Prepared by: CET Engineering Services

More information

LIBRA : prioritizing investments in combined sewer systems

LIBRA : prioritizing investments in combined sewer systems LIBRA : prioritizing investments in combined sewer systems LIBRA : planifier les investissements pour les systèmes d'assainissement unitaires Van den Broeck S.*, Vaes G.** * Vlaamse MilieuMaatschappij,

More information

UNDERGROUND CONSTRUCTION ISSUE TRAUTWEIN TACKLES NEWHOPE PLACENTIA TRUNK SEWER REPLACEMENT PROJECT CONSTRUCTION, INC. PG. 6

UNDERGROUND CONSTRUCTION ISSUE TRAUTWEIN TACKLES NEWHOPE PLACENTIA TRUNK SEWER REPLACEMENT PROJECT CONSTRUCTION, INC. PG. 6 UNDERGROUND CONSTRUCTION ISSUE TRAUTWEIN CONSTRUCTION, INC. PG. 6 TACKLES NEWHOPE PLACENTIA TRUNK SEWER REPLACEMENT PROJECT TRAUTWEIN CONSTRUCTION, INC. TACKLES NEWHOPE PLACENTIA TRUNK SEWER REPLACEMENT

More information

1 er RAPPORT D ACTIVITÉS ANNUEL

1 er RAPPORT D ACTIVITÉS ANNUEL Secrétariat Exécutif Sud Expert Plantes Rapport d activité du dossier numéro : 353 Titre du projet : 1 er RAPPORT D ACTIVITÉS ANNUEL Développement du logiciel d identification pour les arbres et leur pollen

More information

ANNUAL REPORTS TO PARLIAMENT

ANNUAL REPORTS TO PARLIAMENT 28 ANNUAL REPORTS TO PARLIAMENT Access to Information Act and Privacy Act Library and Archives Canada Cataloguing in Publication Canadian Tourism Commission Access to Information Act and Privacy Act, annual

More information

BIDDING SCHEDULE SEWER LIFT STATION NO. 2 REPLACEMENT PROJECT CITY OF ALHAMBRA City s Project No. N2M17-83

BIDDING SCHEDULE SEWER LIFT STATION NO. 2 REPLACEMENT PROJECT CITY OF ALHAMBRA City s Project No. N2M17-83 Item No. BIDDING SCHEDULE SEWER LIFT STATION NO. 2 REPLACEMENT PROJECT CITY OF ALHAMBRA City s Project No. N2M17-83 DESCRIPTION EST. QTY. UNIT UNIT PRICE TOTAL PRICE GENERAL BID ITEMS 1 Per Plans and Specifications

More information

Northfield Township WWTP Capacity Evaluation Report

Northfield Township WWTP Capacity Evaluation Report Northfield Township WWTP Capacity Evaluation Report March 18, 2015 PRESENTED TO PRESENTED BY Northfield Township 8350 Main Street Suite A Whitmore Lake, Michigan 48189 Tetra Tech 710 Avis Drive Suite 100

More information

Appendix D - Evaluation of Interim Solutions

Appendix D - Evaluation of Interim Solutions Appendix D - Evaluation of Interim Solutions D.1 Introduction The implementation of long-term improvements is projected to take 5 to 8 years. To reduce the number of years of flooding impacts, the partner

More information

Item Name Description Unit of Measure Mobilization Per WSDOT Lump Sum

Item Name Description Unit of Measure Mobilization Per WSDOT Lump Sum Page 1 of 6 DESIGN STANDARDS FOR: MEASUREMENT AND PAYMENT Where bids are utilities for construction, repair or alteration for Public Work park projects, the following bid item descriptions and units of

More information

Controlling Odour and Corrosion in the Collection System: Region of Peel s Trunk Sewer Odour and Corrosion Control Master Plan

Controlling Odour and Corrosion in the Collection System: Region of Peel s Trunk Sewer Odour and Corrosion Control Master Plan Controlling Odour and Corrosion in the Collection System: Region of Peel s Trunk Sewer Odour and Corrosion Control Master Plan Mark Andrews 1*, P.Eng., Imran Motala 2, P.Eng., Chris Hunniford 3, Jim Joyce

More information

SI-08 : STRATÉGIE SI 2 crédits ECTS

SI-08 : STRATÉGIE SI 2 crédits ECTS SI-08 : STRATÉGIE SI 2 crédits ECTS SI-08 : IS STRATEGY CODIFICATION ECTS : GMM1207EFZ L objectif du module SI-08 est de permettre aux apprenants de comprendre les enjeux de la stratégie SI et la nécessité

More information

OMBI 2012 Data Dictionary Wastewater Services

OMBI 2012 Data Dictionary Wastewater Services C CAO ( ) WASTEWATER SERVICES WWTR001 Population This result feeds from the Municipal data input area. Population is as per FIR Schedule 90, line 0020 column 2 WWTR002 WWTR005 WWTR006 Override Population

More information

Estimation of urbanization effects by a parallel cascades model

Estimation of urbanization effects by a parallel cascades model The influence of man on the hydrological regime with special reference to representative and experimental basins L'influence de l'homme sur le régime hydrologique avec référence particulière aux études

More information

Moncton Watermain Relocation Moncton, New Brunswick. TRS 2010 Dr Mark Knight University of Waterloo

Moncton Watermain Relocation Moncton, New Brunswick. TRS 2010 Dr Mark Knight University of Waterloo Moncton Watermain Relocation Moncton, New Brunswick TRS 2010 Dr Mark Knight University of Waterloo Presentation Outline Overview of the project Design and construction Issues Trenchless construction Lessons

More information

CITY OF TAMPA WASTEWATER DEPARTMENT TECHNICAL STANDARDS GUIDELINE. FOR CONSTRUCTION OF WASTEWATER FACILITIES July 2014 Version 6

CITY OF TAMPA WASTEWATER DEPARTMENT TECHNICAL STANDARDS GUIDELINE. FOR CONSTRUCTION OF WASTEWATER FACILITIES July 2014 Version 6 CITY OF TAMPA WASTEWATER DEPARTMENT TECHNICAL STANDARDS GUIDELINE FOR CONSTRUCTION OF WASTEWATER FACILITIES July 2014 Version 6 2545 Guy N Verger Boulevard, Tampa, FL 33605 www.tampagov.net TECHNICAL STANDARDS

More information

HOLDING TANK PLANNING & INSTALLATION GUIDELINES

HOLDING TANK PLANNING & INSTALLATION GUIDELINES HOLDING TANK PLANNING & INSTALLATION GUIDELINES Under no circumstances is sewage from a holding tank to be discharged onto the surface of the ground or into groundwater or surface waters. TABLE OF CONTENTS

More information

Quantity of sewage. Dry weather flow: Domestic and industrial wastewater (Base flow) including inflow, infiltration and exfiltration

Quantity of sewage. Dry weather flow: Domestic and industrial wastewater (Base flow) including inflow, infiltration and exfiltration Quantity of sewage Quantity of sewage depends on Dry weather flow and storm water Dry weather flow: Domestic and industrial wastewater (Base flow) including inflow, infiltration and exfiltration Infiltration

More information

(a) If this solicitation is amended, then all terms and conditions which are not modified remain unchanged.

(a) If this solicitation is amended, then all terms and conditions which are not modified remain unchanged. Inspiration Water & Sewer Adjustments Bid No. 16-217-05-17 Page 3 of 26 Addendum #1, RFB 16-217-05-17, May 13, 2016 be furnished to all bidders as an amendment to the solicitation, if such information

More information

TRENCHLESS CONSTRUCTION (BORING, JACKING, AND TUNNELING)

TRENCHLESS CONSTRUCTION (BORING, JACKING, AND TUNNELING) PART 1 - GENERAL TRENCHLESS CONSTRUCTION (BORING, JACKING, AND TUNNELING) 1.01 SECTION INCLUDES A. Trenchless Installation of Carrier Pipe with Casing Pipe B. Trenchless Installation of Carrier Pipe without

More information

CITY OF SASKATOON DESIGN AND DEVELOPMENT STANDARDS MANUAL SECTION FIVE SANITARY SEWER COLLECTION SYSTEM

CITY OF SASKATOON DESIGN AND DEVELOPMENT STANDARDS MANUAL SECTION FIVE SANITARY SEWER COLLECTION SYSTEM CITY OF SASKATOON DESIGN AND DEVELOPMENT STANDARDS MANUAL SECTION FIVE SANITARY SEWER COLLECTION SYSTEM JANUARY 2017 TABLE OF CONTENTS Section Five Sanitary Sewer Collection System SECTION PAGE NUMBER

More information

M.J.D. Dobie 1* and P.F. McCombie 2. Tensar International Limited, Jakarta, Indonesia. University of Bath, Bath, United Kingdom. Corresponding Author

M.J.D. Dobie 1* and P.F. McCombie 2. Tensar International Limited, Jakarta, Indonesia. University of Bath, Bath, United Kingdom. Corresponding Author Proceedings of the XVI ECSMGE Geotechnical Engineering for Infrastructure and Development ISBN 978-0-7277-6067-8 The authors and ICE Publishing: All rights reserved, 2015 doi:10.1680/ecsmge.60678 Reinforced

More information

Annex I Lyons Ferry Hatchery Modification Plan

Annex I Lyons Ferry Hatchery Modification Plan Annex I Lyons Ferry Hatchery Modification Plan Table I1 Figure I1 Figure I2 Figure I3 Figure I4 Figure I5 Well Characteristics Lyons Ferry Hatchery Vicinity Map Lyons Ferry Hatchery Site Plan Water Supply

More information

Module 2 : System of Sanitation. Lecture 2 : System of Sanitation

Module 2 : System of Sanitation. Lecture 2 : System of Sanitation 1 P age Module 2 : System of Sanitation Lecture 2 : System of Sanitation 2 P age 2.1 BACKGROUND For safe disposal of the sewage generated from a locality efficient collection, conveyance, adequate treatment

More information

Greenfield Pond B Rehabilitation

Greenfield Pond B Rehabilitation Preliminary Investigation Report Centennial, Colorado November 15, 2011 Prepared for: Liverpool Metropolitan District Prepared by: Stantec Consulting Services, Inc. Table of Contents Executive Summary...

More information

CITY OF HOMESTEAD Utility Rights-of-Way Use Permit Application

CITY OF HOMESTEAD Utility Rights-of-Way Use Permit Application CITY OF HOMESTEAD Utility Rights-of-Way Use Permit Application Good for 90 days from the Date Issued This permit is only required if the work location is owned or controlled by the City of Homestead and

More information