Rational Method vs OTTHYMO, Comparing Peak Discharge Rates By Alex Nichols, P.Eng.

Size: px
Start display at page:

Download "Rational Method vs OTTHYMO, Comparing Peak Discharge Rates By Alex Nichols, P.Eng."

Transcription

1 Rational Method vs OTTHYMO, Comparing Peak Discharge Rates By Alex Nichols, P.Eng. Urban stormwater management for small site is becoming more complex. All of the methods rely upon statistically derived storms representing various return rates (1 in 2 year, 1 in 50 year, etc) acting upon a study area, whose characteristics are represented by a number of variables that in some way are intended to represent the behaviour of a surface type during a storm event. However, the complexity and the end result can vary substantially from method to method. As such, a basic understanding of the differences between methods should be understood prior to their use. In order to show these differences, a comparison will be made between the (Modified) Rational Method and OTTHYMO (software model) as a way of showing the effectiveness and limitations of each method. Probably the most commonly used method for calculating peak discharge rates is the rational method. It is generally used in the design of conveyance systems such as storm sewers. For example, when designing a storm sewer system, contributing catchment areas are allocated a peak discharge rate based on area, a runoff coefficient and the local municipality s design storm (usually a 2 year or 5 year storm event).however, typically the rational method is only used for smaller areas (less than 2.0ha). There are only a few variables that must be known about a study area in order to use the rational method to calculate the peak discharge rate generated during a storm event. As a result the rational method s main advantage is its simplicity. The Rational Method equation is as follows: Q = 2.78 x C x i x A Based on the above equation, all that is required to calculate the peak discharge rate (Q, in m 3 /s) is the runoff coefficient C (a dimensionless coefficient based on the various surface types that make up a study area), intensity i (in mm/hr at a specified time of concentration) and the site area (in hectares). In southern Ontario this method typical uses storms derived using the Chicago distribution. The 2.78 is for the conversion of units. The intensity is calculated based on an intensity-duration-frequency (IDF) curve representing a particular storm event, usually in the form of: i = A / (t + B)^C A, B, and C are specific to a statistically derived storm event (i.e. 5 year event) and t is the time of concentration (in minutes). The initial time of concentration is usually prescribed by the local conservation authority or municipality and is usually given in minutes or it is calculated for large predevelopment areas using methods such as the Airport or Bransby Williams Formulas. If one wants to compare the peak discharge from a 2 year event and a 100 year event for an area with the same runoff coefficient, then calculating the i for the two events using their respective IDF curve equations is typically all that is required. Runoff coefficients lend themselves well to use in the rational method as they are a simplified representation of reality, representing a ratio of volume of runoff generated to actual volume of rainfall. This coefficient may be increased by 25% to represent a 100 year storm event. They also represent the proportion of generated runoff to total rainfall that does not change for the entire duration of any storm event. For example, a runoff coefficient of 0.25 means 25% of rainfall contributing to runoff while a runoff coefficient of 0.90 means 90% of rainfall contributes to runoff. 1 of 7

2 For large study areas or areas that require some representation of complexity, it has become industry practice that computer modeling software be used. While the main advantage of the rational method is its simplicity, for more complex or larger sites this is a disadvantage. The Rational Method, through the use of a runoff coefficient, simplifies the assumed amount of runoff that can be generated by setting a runoff coefficient for a surface with very little regard to soil type, slope and initial abstraction. While the runoff coefficient can be adjusted to better take these factors into account, it can be difficult to do so and cannot represent behaviour such as delayed peaking caused by the site s various characteristics. A good example of this is a surface s Initial Abstraction. Initial Abstraction reflects a surface s inherent ability to physically store rainfall on site. For most surface types, particularly pervious surfaces (landscaping, etc), very little runoff is generated for small frequent events as their initial abstraction is large enough to significantly reduce or eliminate runoff. In the City of Toronto for example, up to 90% of all storms can be considered small or frequent events. As a result the larger storms, which represent only a small fraction of the total rainfall in any given year, will generate any significant amount of runoff. This is especially true of large pervious areas. This behaviour cannot be easily represented with the rational method. Conversely, stormwater management models, such as OTTHYMO, don t have the same inherent simplicity in their calculation of peak flows. While these models are also a simplification of reality, they can take into account a larger variety of surface parameters to more closely represent the actual behaviour of a study area. Their disadvantage is that a fair amount must be known about an area before peak discharge rates can be determined. In some cases there are a number of parameters that must be derived from geotechnical investigations and sets of calculations based on the characteristics of the study area. There is also opportunity to calibrate the models if the real world data exists for flows, etc. When all of these parameters are correctly utilized smaller events generally generate less runoff than that calculated by the rational method and larger events can generate flows closer to or higher than calculated using the rational method. The variance between the methods are attributed to the many characteristics of a study area that are being incorporated into the model during a storm event. The differences between the two methods can be clearly seen in the following table. During smaller storms there is a considerable difference in peak flow, i.e. during the 2 year storm event the OTTHYMO model indicates that the study area would produce 61.2% of the value obtained through the use of the Rational Method. During the larger the events the two methods are closer, however, the OTTHYMO model still produces noticeably smaller flows than what the rational method produces. 2 of 7

3 Peak Discharge Rate Comparison 4 hour Chicago Storm Storm Event Rational Method [L/s] OTTHYMO [L/s] 2 year year year year year year Note: Peak Discharge rates are based on an Area = 10,000m2 (1ha), Runoff Coefficient C =0.40using City of Toronto 4 Hour Chicago Storm Events. Per the MTO Drainage Management Manual, the runoff coefficient for 2, 5 and 10 year storm events are equivalent, while 25 year is increased by 10%, 50 year is increased by 20% and 100 year is increase by 25% over the 2 year value. In OTTHYMO, STANDHYD is used with default parameters. 3 of 7

4 When calculating the required detention storage for a site, usually as the result of the need to reduce post-development flows to pre-development levels, these differences can be further reinforced. When using the rational method, in the form of the modified rational method, for determining detention volumes it is not uncommon to see considerable difference to the OTTHYMO results. This difference is largely a factor or the characteristics of the site and the differences in how peak discharge rates are calculated between the two methods. OTTHYMO generally speaking represents a more conservative (compared to rational method) and when used properly a more realistic, representation of how an area will behave in both smaller and larger storms events. As a result of this conservatism in the smaller events, the use of OTTHYMO will generally result in more storage then the simpler Modified Rational Method approach which if not used properly can underestimate storage requirements. While this may have some cost implications to achieve higher storage volumes, this required volume allows a designer to practice good engineering, to help ensure that the detention storage system being designed is not undersized and is capable of handling real world events. 4 of 7

5 Peak Detention Storage Volume Comparison 4 hour Chicago Storm Storm Event Rational Method [m 3 ] OTTHYMO [m 3 ] 2 year year year year year year Note: Peak Discharge rates are based on an Area = 10,000m2 (1ha), Runoff Coefficient C =0.40 using City of Toronto 4 Hour Chicago Storm Events. Per the MTO Drainage Management Manual, the runoff coefficient for 2, 5 and 10 year storm events are equivalent, while 25 year is increased by 10%, 50 year is increased by 20% and 100 year is increase by 25% over the 2 year value. All discharge rates are being controlled to 50 L/s. In OTTHYMO, STANDHYD is used with default parameters. 5 of 7

6 While the use of the (Modified) Rational Method is an acceptable method for calculating both the peak flows and the peak detention storage requirements for smaller sites in most municipalities or for checking larger sites, any larger area or area with complex hydraulic behaviour is best modelled using OTTHYMO or other acceptable computer modelling software. Though OTTHYMO may have its own limitations and modelling assumptions, it offers a result more in line with how the site may actually behave during an actual storm event. However, it should be noted that this is true for any kind of stormwater management modeling software or method. Modelling software during small events will typically produce less volume and during larger events it has the potential to produce more volume than the (Modified) Rational Method. It is always good when using computer modelling software to check whether the results that are being obtained are reasonable, which is something that the rational method offers as it provides a quick check for the results obtained. Despite the effectiveness in using one method to verify the other, these two methods have very different ways of calculating peak flows, even if the same IDF curve data is used, and as a result it is not always easy to compare the two directly. One is effective as a check for the other in that it can at least give a designer an idea if their numbers make sense. Even if this comparison is hard to make, when it comes to designing stormwater management systems, the tendency is to make use of the method that produces the smaller volume (due to issues with space and costs) required to control a peak discharge rate to an allowable rate. As a result, any stormwater detention system designed with that smaller number obtained by the rational method may be undersized. As this smaller volume is usually the result of the Modified Rational Method (especially in intensified urban environments), this difference only reinforces that an intensified urban environment is in many ways a more complex environment than what the (Modified) Rational Method is capable of representing. For complex environments this leaves the (Modified) Rational Method more appropriate as a checking tool to test the minimum It should be noted that while we might focus on the comparison of the results of two different calculation methods it should be noted there also can be issues with the comparison of the results using the same calculation method. This is something that is usually not considered. Most existing municipal storm sewers were designed decades ago and as a result, that there is a good chance that the IDF curve data that was used to design those old sewers may not be the same IDF curve data that that the local municipality s design manual currently prescribes. It should be noted that this may or may not lead to the system being more or less conservative. Based on our observations, most municipalities accept the following: - OTTHYMO and other modeling software can be helpful in more closely representing the actual behaviour of a study area; - The Rational Method is a quick way to determine peak discharge rates and the accepted method to design conveyance systems (storm sewers); - The Modified Rational Method can be effective for smaller sites to determine detention volume and is a quick way to check that OTTHYMO (or any other modelling software) is calculating a reasonable peak discharge rate or detention volume; - The Rational Method to design storm sewers and allowable peak discharge rates from areas contributing to that storm sewer; - OTTHYMO should not be used to calculate allowable (or pre-development) peak sewer flows; - The Rational Method should not be used to calculate (post-development) peak flows and storage requirements for large and complex sites; and 6 of 7

7 - OTTHYMO, or other modelling software, should be used to calculate (post-development) peak flows and storage requirements for large and complex sites but isn t always accepted as the correct method; Given the various preferences and limitations, perhaps the industry should find a way to reconcile the accepted uses of each calculation method. Similar to the prescriptive methods for wet pond design (MOE SM Manual), it might be time for the industry to consider developing a more prescriptive approach to stormwater management for urban sites, which can accept complexity. Currently we are usually left with only one accepted method or approach, even if there is another that may be more appropriate for the given situation. As a result, if an alternative method is more appropriate sometimes considerable effort must be used to try and justify that method and to show that it follows good engineering practice, even if its merits from that perspective are almost immediately apparent. As we move forward with stormwater management into the future, the designs will become more complex as the design criteria becomes more stringent and refined. The more time spent on trying to support or argue the merits of one method over another, less time is spent on coming up with inventive solutions to stormwater management issues. The industry is in need of an urban method, that follows good engineering practice that clearly prescribes when and where to use each method, eliminating the need to justify the use of the method for every project. 7 of 7

Modelling and Analysis of EES Systems Using SWMM

Modelling and Analysis of EES Systems Using SWMM Planning and Design of a Right-of-Way LID (Etobicoke Exfiltration System) July 24 th 2015 Toronto, Ontario, Canada ling and Analysis of EES Systems Using SWMM Darko Joksimovic Department of Civil Engineering,

More information

THE RATIONAL METHOD FREQUENTLY USED, OFTEN MISUSED

THE RATIONAL METHOD FREQUENTLY USED, OFTEN MISUSED THE RATIONAL METHOD FREQUENTLY USED, OFTEN MISUSED Mark Pennington, Engineer, Pattle Delamore Partners Ltd, Tauranga ABSTRACT The Rational Method has been in use in some form or another at least since

More information

Chapter 7 : Conclusions and recommendations

Chapter 7 : Conclusions and recommendations Chapter 7 : Conclusions and recommendations 7.1 Conclusions The main goal of this research was to investigate the modelling and rainfall data requirements for the design of combined sewer systems and the

More information

IBS Site Drainage: Senior Design Project

IBS Site Drainage: Senior Design Project IBS Site Drainage: Senior Design Project Len Wright, Ph.D., PE Lecturer, CEAE Wright.Len@gmail.com September 11, 2008 mwsw204i1.ppt/1 OUTLINE Motivation for Stormwater Management Quantity (both onsite,

More information

Chapter 6. Hydrology. 6.0 Introduction. 6.1 Design Rainfall

Chapter 6. Hydrology. 6.0 Introduction. 6.1 Design Rainfall 6.0 Introduction This chapter summarizes methodology for determining rainfall and runoff information for the design of stormwater management facilities in the City. The methodology is based on the procedures

More information

6.0 Runoff. 6.1 Introduction. 6.2 Flood Control Design Runoff

6.0 Runoff. 6.1 Introduction. 6.2 Flood Control Design Runoff October 2003, Revised February 2005 Chapter 6.0, Runoff Page 1 6.1 Introduction 6.0 Runoff The timing, peak rates of discharge, and volume of stormwater runoff are the primary considerations in the design

More information

STORM WATER MANAGEMENT REPORT

STORM WATER MANAGEMENT REPORT Silvercreek Junction STORM WATER MANAGEMENT REPORT Howitt Creek at the Silvercreek Parkway Site Guelph, Ontario August, 2008 TSH File 22304A-04 August 19, 2008 STORMWATER MANAGEMENT REPORT Howitt Creek

More information

5/11/2007. WinTR-55 for Plan Reviews Small Watershed Hydrology Overview

5/11/2007. WinTR-55 for Plan Reviews Small Watershed Hydrology Overview WinTR-55 for Plan Reviews Small Watershed Hydrology Overview 1 Overview Course Outline Historical Background Program Description Model Capabilities and Limitations This is the Overview portion of the training.

More information

MISMANAGEMENT OF STORMWATER MANAGEMENT A CASE STUDY

MISMANAGEMENT OF STORMWATER MANAGEMENT A CASE STUDY MISMANAGEMENT OF STORMWATER MANAGEMENT A CASE STUDY P Allen Pr Eng BSc (Civil Engineering), IMESA Retired Fellow ABSTRACT Stormwater management is an essential municipal function, not given enough attention

More information

DRAINAGE & DESIGN OF DRAINAGE SYSTEM

DRAINAGE & DESIGN OF DRAINAGE SYSTEM Drainage on Highways DRAINAGE & DESIGN OF DRAINAGE SYSTEM P. R.D. Fernando Chartered Engineer B.Sc.(Hons), M.Eng. C.Eng., MIE(SL) Drainage Requirement of Highway Drainage System Introduction Drainage means

More information

Rainfall, Runoff and Peak Flows: Calibration of Hydrologic Design Methods for the Kansas City Area

Rainfall, Runoff and Peak Flows: Calibration of Hydrologic Design Methods for the Kansas City Area Rainfall, Runoff and Peak Flows: Calibration of Hydrologic Design Methods for the Kansas City Area Bruce McEnroe, Bryan Young, Ricardo Gamarra and Ryan Pohl Department of Civil, Environmental, and Architectural

More information

Appendix I: Guidelines for Stormwater Management

Appendix I: Guidelines for Stormwater Management Appendix I: Guidelines for Stormwater Management 1.0 INTRODUCTION This document is Appendix I to the CRCA Environmental Planning Policies (2014). It should be read in conjunction with the CRCA Environmental

More information

DESIGN BULLETIN #16/2003 (Revised July 2007) Drainage Guidelines for Highways Under Provincial Jurisdiction in Urban Areas.

DESIGN BULLETIN #16/2003 (Revised July 2007) Drainage Guidelines for Highways Under Provincial Jurisdiction in Urban Areas. Drainage Guidelines for Highways Under Provincial Jurisdiction in Urban Areas. July 2007 Update to Design Bulletin #16/2003: Added under Design Criteria Culverts of 600mm diameter are commonly used to

More information

STORMWATER MANAGEMENT: Emerging Planning Approaches and Control Technologies

STORMWATER MANAGEMENT: Emerging Planning Approaches and Control Technologies STORMWATER MANAGEMENT: Emerging Planning Approaches and Control Technologies Chapter 5 " HYDROLOGIC SYSTEMS " CHAPTER 5 5.1 INTRODUCTION 5.1.1 Training Objectives The objectives of this module are:! to

More information

UNIT HYDROGRAPH AND EFFECTIVE RAINFALL S INFLUENCE OVER THE STORM RUNOFF HYDROGRAPH

UNIT HYDROGRAPH AND EFFECTIVE RAINFALL S INFLUENCE OVER THE STORM RUNOFF HYDROGRAPH UNIT HYDROGRAPH AND EFFECTIVE RAINFALL S INFLUENCE OVER THE STORM RUNOFF HYDROGRAPH INTRODUCTION Water is a common chemical substance essential for the existence of life and exhibits many notable and unique

More information

HYDROLOGIC MODELING CONSISTENCY AND SENSITIVITY TO WATERSHED SIZE

HYDROLOGIC MODELING CONSISTENCY AND SENSITIVITY TO WATERSHED SIZE HYDROLOGIC MODELING CONSISTENCY AND SENSITIVITY TO WATERSHED SIZE by James C.Y. Guo. Professor, Civil Engineering, U. Of Colorado at Denver, James.Guo@cudenver.edu.. And Eric Hsu, Project Engineer, Parson

More information

What s so hard about Stormwater Modelling?

What s so hard about Stormwater Modelling? What s so hard about Stormwater Modelling? A Pugh 1 1 Wallingford Software Pty Ltd, ann.pugh@wallingfordsoftware.com Abstract A common misconception of stormwater modelling is that it is simple. While

More information

Section 600 Runoff Table of Contents

Section 600 Runoff Table of Contents Section 600 Runoff Table of Contents 601 INTRODUCTION...600-1 602 RATIONAL METHOD...600-1 602.1 Rational Method Formula...600-2 602.2 Time of Concentration...600-2 602.3 Intensity...600-4 602.4 Runoff

More information

Chapter H. Introduction to Surface Water Hydrology and Drainage for Engineering Purposes

Chapter H. Introduction to Surface Water Hydrology and Drainage for Engineering Purposes Chapter H. Introduction to Surface Water Hydrology and Drainage for Engineering Purposes As seen in Figure H.1, hydrology is a complex science that deals with the movement of water between various stages

More information

Software Applications for Runoff Hydrological Assessment

Software Applications for Runoff Hydrological Assessment Bulletin UASVM Horticulture, 67(2)/2010 Print ISSN 1843-5254; Electronic ISSN 1843-5394 Software Applications for Runoff Hydrological Assessment Severin CAZANESCU 1), Sorin CIMPEANU 1), Oana GUI 2), Dana

More information

FUN NCTIONAL SER RVICING AN ND STO R MA ORMWATER ANAGEMENT PREPARED FOR: CITY O 333 AN REET EAST ND 351 KING STR OF TORONTO VICTORIA PA

FUN NCTIONAL SER RVICING AN ND STO R MA ORMWATER ANAGEMENT PREPARED FOR: CITY O 333 AN REET EAST ND 351 KING STR OF TORONTO VICTORIA PA FUN NCTIONAL SER RVICING AN ND STO ORMWATER R MA ANAGEMENT T RE PORT 333 AN ND 351 KING STR REET EAST P PREPARED FOR: CITY O OF TORONTO F IRST GULF COR PORATION 3 751 VICTORIA PA ARK AVENUE T TORONTO,

More information

Learning objectives. Upon successful completion of this lecture, the participants will be able to:

Learning objectives. Upon successful completion of this lecture, the participants will be able to: Solomon Seyoum Learning objectives Upon successful completion of this lecture, the participants will be able to: Describe and perform the required step for designing sewer system networks Outline Design

More information

Appendix C. FSSR 14 Regional Growth Curves with Irish River Data. and. FSSR 16 (Greenfield) Rainfall Runoff Model Estimation

Appendix C. FSSR 14 Regional Growth Curves with Irish River Data. and. FSSR 16 (Greenfield) Rainfall Runoff Model Estimation Appendix C FSSR 14 Regional Growth Curves with Irish River Data and FSSR 16 (Greenfield) Rainfall Runoff Model Estimation Appendix C March 2005 C1 FSSR 14 Growth Curves with Irish River Data The Irish

More information

Table of Contents. Overview... 1

Table of Contents. Overview... 1 Chapter 3 Chapter 3 Table of Contents Overview... 1 Rainfall... 2 3-2-1 Rainfall Depths and Intensities... 2 3-2-2 Design Storm Distribution for Colorado Urban Hydrograph Procedure (CUHP)... 5 3-2-3 Temporal

More information

Pennsylvania Stormwater Best Management Practices Manual. Chapter 3. Stormwater Management Principles and Recommended Control Guidelines

Pennsylvania Stormwater Best Management Practices Manual. Chapter 3. Stormwater Management Principles and Recommended Control Guidelines Pennsylvania Stormwater Best Management Practices Manual Chapter 3 Stormwater Management Principles and Recommended Control Guidelines 363-0300-002 / December 30, 2006 Chapter 3 Stormwater Management Principles

More information

Engineering Hydrology Class 3

Engineering Hydrology Class 3 Engineering Hydrology Class 3 Topics and Goals: I.Develop s (estimate precipitation) II.Develop simple constant intensity design storm III.Develop SCS design storm Ocean s Why do we want to derive the?

More information

DRAINAGE CRITERIA MANUAL (V. 1) RUNOFF

DRAINAGE CRITERIA MANUAL (V. 1) RUNOFF Section CONTENTS Page RO- 1.0 OVERVIEW... 1 2.0 RATIONAL METHOD... 3 2.1 Rational Formula... 3 2.2 Assumptions... 4 2.3 Limitations... 4 2.4 Time of Concentration... 5 2.4.1 Initial Flow Time... 5 2.4.2

More information

Stormwater Retention Pond Recovery Analysis

Stormwater Retention Pond Recovery Analysis Stormwater Retention Pond Recovery Analysis By Nicolas E Andreyev The first in a series of courses on Green Drainage Design www.suncam.com Page 1 of 33 Forward To design a stormwater retention pond, one

More information

visual otthymo version 2.0

visual otthymo version 2.0 2 visual otthymo version 2.0 R E F E R E N C E M A N U A L Visual OTTHYMO v2.0 Reference Manual July 2002 Table of Contents PROGRAM REFERENCE...1 INTRODUCTION...1 VISUAL OTTHYMO FILES...1 Project Files...1

More information

Rising Sun. Scaffold Hill. Flood Risk Assessment

Rising Sun. Scaffold Hill. Flood Risk Assessment Rising Sun Scaffold Hill Flood Risk Assessment August 2010 Contents 1.0 Introduction... 4 2.0 Site Description... 5 3.0 Legislative Framework... 6 4.0 Flood Risk... 10 5.0 Surface Water Drainage... 11

More information

Water Balance Methodology

Water Balance Methodology Water Balance Methodology Integrating the Site with the Watershed and the Stream March 2012 An initiative under the umbrella of the Water Sustainability Action Plan for British Columbia Water Balance Methodology

More information

1956 Altona Road, City of Pickering Functional Servicing and Stormwater Management Report. Marshall Homes. Project # E15031

1956 Altona Road, City of Pickering Functional Servicing and Stormwater Management Report. Marshall Homes. Project # E15031 1956 Altona Road, City of Pickering Functional Servicing and Stormwater Management Report Marshall Homes Project # E15031 August 2016 Table of Contents 1.0 Introduction and Background... 1 2.0 Existing

More information

HYDROLOGIC CONSIDERATIONS. 22 nd Annual Nonpoint Source Pollution Conference Saratoga Springs, NY

HYDROLOGIC CONSIDERATIONS. 22 nd Annual Nonpoint Source Pollution Conference Saratoga Springs, NY LOW IMPACT DEVELOPMENT HYDROLOGIC CONSIDERATIONS 22 nd Annual Nonpoint Source Pollution Conference Saratoga Springs, NY May 18, 2011 PRESENTATION AGENDA Introduction Definitions Discuss Impacts to Hydrologic

More information

iswm TM Technical Manual Hydrology:

iswm TM Technical Manual Hydrology: : 1.0 2.0 Downstream Assessment 3.0 Streambank Protection 4.0 Water Balance 5.0 Rainfall Tables 6.0 Hydrologic Soils Data Table of Contents 1.0... HO-1 1.1 Estimating Runoff... HO-1 1.1.1 Introduction

More information

Porous Pavement Flow Paths

Porous Pavement Flow Paths POROUS PAVEMENT MODELING Clear Creek Solutions, Inc., 2010 Porous pavement includes porous asphalt or concrete and grid/lattice systems (nonconcrete) and paving blocks. The use of any of these types of

More information

Runoff Hydrographs. The Unit Hydrograph Approach

Runoff Hydrographs. The Unit Hydrograph Approach Runoff Hydrographs The Unit Hydrograph Approach Announcements HW#6 assigned Storm Water Hydrographs Graphically represent runoff rates vs. time Peak runoff rates Volume of runoff Measured hydrographs are

More information

ROOF AND PROPERTY DRAINAGE

ROOF AND PROPERTY DRAINAGE CHAPTER 4 ROOF AND PROPERTY DRAINAGE 4.1 INTRODUCTION... 4-1 4.2 ROOF DRAINAGE SYSTEM... 4-1 4.3 ROOF DRAINAGE DESIGN PROCEDURE... 4-2 4.3.1 Catchment Area... 4-2 4.3.2 Design Average Recurrence Intervals...

More information

TECHNICAL BULLETIN. Synthetic Turf Athletic Field Drainage Design Assistance

TECHNICAL BULLETIN. Synthetic Turf Athletic Field Drainage Design Assistance TECHNICAL BULLETIN Synthetic Turf Athletic Field Drainage Design Assistance The SportsEdge HQ geocomposite strip drain products are engineered specifically for use in synthetic turf athletic field base

More information

HYDROLOGIC-HYDRAULIC STUDY ISABELLA OCEAN RESIDENCES ISLA VERDE, CAROLINA, PR

HYDROLOGIC-HYDRAULIC STUDY ISABELLA OCEAN RESIDENCES ISLA VERDE, CAROLINA, PR HYDROLOGIC-HYDRAULIC STUDY ISABELLA OCEAN RESIDENCES ISLA VERDE, CAROLINA, PR 1 INTRODUCTION 1.1 Project Description and Location Isabella Ocean Residences is a residential development to be constructed

More information

Hydrologic Study Report for Single Lot Detention Basin Analysis

Hydrologic Study Report for Single Lot Detention Basin Analysis Hydrologic Study Report for Single Lot Detention Basin Analysis Prepared for: City of Vista, California August 18, 2006 Tory R. Walker, R.C.E. 45005 President W.O. 116-01 01/23/2007 Table of Contents Page

More information

SWMM5 LID Control for Green Infrastructure Modeling

SWMM5 LID Control for Green Infrastructure Modeling SWMM5 LID Control for Green Infrastructure Modeling Ohio Water Environment Association Collection Systems Workshop Matt McCutcheon, E.I. Water Resources Engineer CDM Smith May 9, 2013 11:15 AM 11:45 AM

More information

Index. Page numbers followed by f indicate figures.

Index. Page numbers followed by f indicate figures. Index Aerodynamic method, 103, 110 111 Algae, 131, 173, 175 Alternate depth, 88 Alternating block method, 132, 140 141 Attenuation, 106, 107f, 118, 120 Page numbers followed by f indicate figures. Baseflow

More information

Simple Method for Estimating Phosphorus Export

Simple Method for Estimating Phosphorus Export Appendix L Simple Method for Estimating Phosphorus Export 1. The Simple Method The Simple Method is a technique used for estimating storm pollutant export delivered from urban development sites. The method

More information

Activity Calculating Property Drainage

Activity Calculating Property Drainage Page 1 of 5 Activity 2.3.11 Calculating Property Drainage Introduction When a property is developed, it is important to understand that changes to watershed characteristics (i.e., land use, slope, soil

More information

Integrated Catchment Modelling

Integrated Catchment Modelling Integrated Catchment Modelling Modelling the whole water cycle in one package Ann Pugh Integrated Water Planning Historically water, wastewater and stormwater modelling occurred in silos with little integration

More information

Assessment of the Climate Change Impact on a Dry Detention Pond at Kota Damansara, Malaysia

Assessment of the Climate Change Impact on a Dry Detention Pond at Kota Damansara, Malaysia Assessment of the Climate Change Impact on a Dry Detention Pond at Kota Damansara, Malaysia Yuk San LIEW 1*, Fang Yenn TEO 1,2, Aminudin AB. GHANI 3 1 National Hydraulic Research Institute of Malaysia

More information

CONSISTENCY BETWEEN CUHP AND RATIONAL METHODS James C.Y. Guo, PhD, P.E., and Ben Urbonas, P.E., D.WRD 08/04/2008

CONSISTENCY BETWEEN CUHP AND RATIONAL METHODS James C.Y. Guo, PhD, P.E., and Ben Urbonas, P.E., D.WRD 08/04/2008 CONSISTENCY BETWEEN CUHP AND RATIONAL METHODS James C.Y. Guo, PhD, P.E., and Ben Urbonas, P.E., D.WRD 08/04/2008 When estimating runoff for a storm event it is assumed that the storm runoff occurs from

More information

6 STOREY CONDOMINIUM 7480 DERRY ROAD WEST, MILTON

6 STOREY CONDOMINIUM 7480 DERRY ROAD WEST, MILTON 6 STOREY CONDOMINIUM 7480 DERRY ROAD WEST, MILTON STORM WATER MANAGEMENT DESIGN BRIEF NEW DEVELOPMENT DRAINAGE SYSTEM REV 0 August 29, 2017 PREPARED BY: HALLEX PROJECT #170532 HALLEX NIAGARA HALLEX HAMILTON

More information

CHAPTER 3 STORMWATER HYDROLOGY. Table of Contents SECTION 3.1 METHODS FOR ESTIMATING STORMWATER RUNOFF

CHAPTER 3 STORMWATER HYDROLOGY. Table of Contents SECTION 3.1 METHODS FOR ESTIMATING STORMWATER RUNOFF CHAPTER 3 STORMWATER HYDROLOGY Table of Contents SECTION 3.1 METHODS FOR ESTIMATING STORMWATER RUNOFF 3.1.1 Introduction to Hydrologic Methods...3.1-1 3.1.2 Symbols and Definitions...3.1-3 3.1.3 Rainfall

More information

Preliminary Drainage Analysis

Preliminary Drainage Analysis Preliminary Drainage Analysis Tanimura and Antle Employee Housing Town of Spreckels County of Monterey, California LIB150205 May 29, 2015 Prepared For: Tanimura and Antle Produce Prepared By: 9699 Blue

More information

Stormwater Volume and Treatment Methods Simplifying the Numbers. IAFSM March 10, Presented by: Tom Powers P.E., CFM, LEED AP, CPESC

Stormwater Volume and Treatment Methods Simplifying the Numbers. IAFSM March 10, Presented by: Tom Powers P.E., CFM, LEED AP, CPESC Stormwater Volume and Treatment Methods Simplifying the Numbers IAFSM March 10, 2011 Presented by: Tom Powers P.E., CFM, LEED AP, CPESC Introduction GOALS: Improve understanding of Rate and Volume (Quantity)

More information

The Islamic University of Gaza- Civil Engineering Department Sanitary Engineering- ECIV 4325 L5. Storm water Management

The Islamic University of Gaza- Civil Engineering Department Sanitary Engineering- ECIV 4325 L5. Storm water Management The Islamic University of Gaza- Civil Engineering Department Sanitary Engineering- ECIV 4325 L5. Storm water Management Husam Al-Najar Storm water management : Collection System Design principles The Objectives

More information

Stormwater Treatment Wetlands

Stormwater Treatment Wetlands Florida Chamber Summer School July, 2014 Stormwater Treatment Wetlands Chris Keller, P.E. Wetland Solutions, Inc. Why Wetlands? Wetlands are the natural stormwater management systems in the landscape Wetlands

More information

Storm Sewer Design. Bob Pitt University of Alabama and Shirley Clark Penn State Harrisburg

Storm Sewer Design. Bob Pitt University of Alabama and Shirley Clark Penn State Harrisburg Storm Sewer Design Bob Pitt University of Alabama and Shirley Clark Penn State Harrisburg Major floods are dramatic and water flow routes must be recognized when minor drainage systems fail. These types

More information

APPENDIX IV. APPROVED METHODS FOR QUANTIFYING HYDROLOGIC CONDITIONS OF CONCERN (NORTH ORANGE COUNTY)

APPENDIX IV. APPROVED METHODS FOR QUANTIFYING HYDROLOGIC CONDITIONS OF CONCERN (NORTH ORANGE COUNTY) APPENDIX IV. APPROVED METHODS FOR QUANTIFYING HYDROLOGIC CONDITIONS OF CONCERN (NORTH ORANGE COUNTY) Hydromodification design criteria for the North Orange County permit area are based on the 2- yr, 24-hr

More information

Context of Extreme Alberta Floods

Context of Extreme Alberta Floods Context of Extreme Alberta Floods Introduction Design of water management and stream crossing infrastructure requires determination of hydrotechnical design parameters. These parameters often consist of

More information

Modelling Climate Change and Urbanization Impacts on Urban Stormwater and Adaptation Capacity

Modelling Climate Change and Urbanization Impacts on Urban Stormwater and Adaptation Capacity 9th International Conference on Urban Drainage Modelling, Belgrade 2012 C4. Climate change impacts, pp.287-288 Modelling Climate Change and Urbanization Impacts on Urban Stormwater and Adaptation Capacity

More information

4.1 General Methodology and Data Base Development

4.1 General Methodology and Data Base Development Chapter 4 METHODOLOGY 4.1 General and Data Base Development This report project utilized several computer software models and analysis techniques to create the numeric data on which decisions for this

More information

Pre-Treatment Bioretention Cells Bioswales IOWA STORMWATER MANAGEMENT MANUAL DECEMBER 16, 2015

Pre-Treatment Bioretention Cells Bioswales IOWA STORMWATER MANAGEMENT MANUAL DECEMBER 16, 2015 Pre-Treatment Bioretention Cells Bioswales IOWA STORMWATER MANAGEMENT MANUAL DECEMBER 16, 2015 Urban Runoff Background How we got here What Problem?? Provenance of the Problem Unified Sizing Criteria What

More information

EVALUATION OF THE CHANGES BETWEEN THE FIRST AND SECOND EDITIONS OF THE URBAN STORMWATER MANAGEMENT MANUAL FOR MALAYSIA (MSMA)

EVALUATION OF THE CHANGES BETWEEN THE FIRST AND SECOND EDITIONS OF THE URBAN STORMWATER MANAGEMENT MANUAL FOR MALAYSIA (MSMA) EVALUATION OF THE CHANGES BETWEEN THE FIRST AND SECOND EDITIONS OF THE URBAN STORMWATER MANAGEMENT MANUAL FOR MALAYSIA (MSMA) Ir. Dr. Quek Keng Hong B.E. (civil), M.Eng.Sc, Ph.D. (NSW), PE Managing Director,

More information

La Riereta Catchment Sant Boi de Llobregat

La Riereta Catchment Sant Boi de Llobregat La Riereta Catchment Sant Boi de Llobregat Final Report Team 2 Enrique Amaya (COL) Lilian Yamamoto (BRA) Martín Pez (ARG) Sergio Esquivel (MEX) Instructor: José Macor Summary Contents 1. Introduction...

More information

MODELING AND RELIABILITY OF RAINWATER HARVESTING SYSTEM AT EDUCATIONAL INSTITUTION

MODELING AND RELIABILITY OF RAINWATER HARVESTING SYSTEM AT EDUCATIONAL INSTITUTION MODELING AND RELIABILITY OF RAINWATER HARVESTING SYSTEM AT EDUCATIONAL INSTITUTION Abstract Thamer Ahmad Mohammad, Abdul Halim Ghazali, Megat Johari Megat Mohd. Noor Department of Civil Engineering Faculty

More information

TECHNICAL MEMORANDUM. SUBJECT: Determination of watershed historic peak flow rates as the basis for detention basin design

TECHNICAL MEMORANDUM. SUBJECT: Determination of watershed historic peak flow rates as the basis for detention basin design TECHNICAL MEMORANDUM FROM: Ken MacKenzie and Ryan Taylor SUBJECT: Determination of watershed historic peak flow rates as the basis for detention basin design DATE: June 7, 2012 The purpose of this memorandum

More information

DIVISION 5 STORM DRAINAGE CRITERIA

DIVISION 5 STORM DRAINAGE CRITERIA DIVISION 5 STORM DRAINAGE CRITERIA Section 5.01 GENERAL The following storm drainage design criteria shall apply to all storm drainage designs in the City. Additional design criteria are specified in the

More information

Hydrology Study. Ascension Heights Subdivision Ascension Drive at Bel Aire Road San Mateo, California (Unincorporated)

Hydrology Study. Ascension Heights Subdivision Ascension Drive at Bel Aire Road San Mateo, California (Unincorporated) Hydrology Study Ascension Heights Subdivision Ascension Drive at Bel Aire Road San Mateo, California (Unincorporated) Prepared for San Mateo Real Estate & Construction March 9, 21 Rev. 1 11-8-211 Rev.

More information

Chapter 3 Calculating the WQCV and Volume Reduction

Chapter 3 Calculating the WQCV and Volume Reduction Contents 1.0 Introduction... 1 2.0 Hydrologic Basis of the WQCV... 1 2.1 Development of the WQCV... 1 2.2 Optimizing the Capture Volume... 3 2.3 Attenuation of the WQCV (BMP Drain Time)... 4 2.4 Excess

More information

SEWAGE TREATMENT AND DISPOSAL

SEWAGE TREATMENT AND DISPOSAL SEWAGE TREATMENT AND DISPOSAL QUANTITY OF SANITARY SEWAGE AND STORM WATER Zerihun Alemayehu Unpolluted cooling water Intercept or sewer Sources of Sewage Residential and commercial sewage Industrial wastewater

More information

The SuDS Manual Frequently asked questions

The SuDS Manual Frequently asked questions The SuDS Manual Frequently asked questions 1. Is source control still a requirement of the new SuDS Manual? Yes. Source control components are fundamental elements of a SuDS scheme. The benefits of source

More information

Section 2: Hydrology. Introduction. What is the Return Period? Intensity-Duration-Frequency Data. Generating a runoff hydrograph 85 Minutes

Section 2: Hydrology. Introduction. What is the Return Period? Intensity-Duration-Frequency Data. Generating a runoff hydrograph 85 Minutes Section 2: Hydrology Generating a runoff hydrograph 85 Minutes Press Space, PageDown, or Click to advance. Press PageUp to reverse. Esc to exit. Right-Click for other options. Copyright 2004 HydroCAD Software

More information

Appendix G Preliminary Hydrology Study

Appendix G Preliminary Hydrology Study Appendix G Preliminary Hydrology Study Preliminary Hydrology Study VESTING TTM 72608 Long Beach, CA Prepared for: The Long Beach Project, LLC 888 San Clemente, Suite 100 New Port Beach, CA May 28, 2014

More information

EFFECT OF RAINGAGE DENSITY ON RUNOFF SIMULATION MODELING by ABSTRACT

EFFECT OF RAINGAGE DENSITY ON RUNOFF SIMULATION MODELING by ABSTRACT EFFECT OF RAINGAGE DENSITY ON RUNOFF SIMULATION MODELING by Ben Urbonas, P.E., D.WRE 1, Michael Paul Jansekok 2, James C.Y. Guo, PhD, P.E. 3 ABSTRACT Rainfall and runoff data for a 3.08 square mile urban

More information

Overview of NRCS (SCS) TR-20 By Dr. R.M. Ragan

Overview of NRCS (SCS) TR-20 By Dr. R.M. Ragan Overview of NRCS (SCS) TR-20 By Dr. R.M. Ragan TR-20 is a computer program for the simulation of runoff occurring from a single storm event. The program develops flood hydrographs from runoff and routes

More information

Water supply components

Water supply components Water supply components Water sources structures (Dams, wells, reservoirs) Surface water Groundewater Pipelines from source Water treatment plant components Pumping stations Storage (elevated tanks) Distribution

More information

Project Drainage Report

Project Drainage Report Design Manual Chapter 2 - Stormwater 2A - General Information 2A-4 Project Drainage Report A. Purpose The purpose of the project drainage report is to identify and propose specific solutions to stormwater

More information

A HYDROLOGY MODEL FOR MIMICKING PRE AND POST DEVELOPMENT RUNOFF VOLUMES

A HYDROLOGY MODEL FOR MIMICKING PRE AND POST DEVELOPMENT RUNOFF VOLUMES A HYDROLOGY MODEL FOR MIMICKING PRE AND POST DEVELOPMENT RUNOFF VOLUMES Mr. Randel Lemoine AUTHOR: Fort Benning, DPW Engineering Division, Meloy Dr. Bldg 6, RM 320-T, Fort Benning, Georgia, 315. REFERENCE:

More information

Chapter 8. Inlets. 8.0 Introduction. 8.1 General

Chapter 8. Inlets. 8.0 Introduction. 8.1 General . Introduction This chapter provides criteria and design guides for evaluating and designing storm sewer inlets in the City of Centennial. The review of all planning submittals will be based on the criteria

More information

Phase 1 Part 2 CSO Control Plan Wellington Avenue CSO Facility. Hydraulic Modeling Software Selection

Phase 1 Part 2 CSO Control Plan Wellington Avenue CSO Facility. Hydraulic Modeling Software Selection DRAFT Technical Memorandum Phase 1 Part 2 CSO Control Plan Wellington Avenue CSO Facility Hydraulic Modeling Software Selection Prepared for: City of Newport Public Works Department 70 Halsey Street Newport,

More information

Effect of the Underlying Groundwater System on the Rate of Infiltration of Stormwater Infiltration Structures.

Effect of the Underlying Groundwater System on the Rate of Infiltration of Stormwater Infiltration Structures. Effect of the Underlying Groundwater System on the Rate of Infiltration of Stormwater Infiltration Structures. Presented at: Storm Water Infiltration & Groundwater Recharge A Conference on Reducing Runoff

More information

Analysis of the Sensitivity of the Variables Affecting Urban Flood through Two Rational and SWMM Methods by SSA

Analysis of the Sensitivity of the Variables Affecting Urban Flood through Two Rational and SWMM Methods by SSA Bulletin of Environment, Pharmacology and Life Sciences Bull. Env.Pharmacol. Life Sci., Vol 4 [Spl issue ] 5: 36-37 4 Academy for Environment and Life Sciences, India Online ISSN 77-88 Journal s URL:http://www.bepls.com

More information

Pinellas County Stormwater Management Manual Training Workshop SMALL COMMERCIAL AREA CASE STUDY

Pinellas County Stormwater Management Manual Training Workshop SMALL COMMERCIAL AREA CASE STUDY Pinellas County Stormwater Management Manual Training Workshop SMALL COMMERCIAL AREA CASE STUDY PRE POST (ACTUAL) WHICH IS THE APPROPRIATE PERFORMANCE STANDARD? Post = 90% of Pre vs. 55% N and 80% P reduction

More information

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN PLANT GREENE COUNTY ASH POND ALABMA POWER COMPANY

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN PLANT GREENE COUNTY ASH POND ALABMA POWER COMPANY INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN PLANT GREENE COUNTY ASH POND ALABMA POWER COMPANY Section 257.82 of EPA s regulations requires the owner or operator of an existing or new CCR surface impoundment

More information

SuDS design criteria for catchment flood protection Are current criteria appropriate?

SuDS design criteria for catchment flood protection Are current criteria appropriate? SuDS design criteria for catchment flood protection Are current criteria appropriate? Richard Kellagher SuDS Drainage design for catchment flood protection All countries of UK (roughly) in alignment, BUT

More information

1. Stream Network. The most common approach to quantitatively describing stream networks was postulated by Strahler (1952).

1. Stream Network. The most common approach to quantitatively describing stream networks was postulated by Strahler (1952). 1. Stream Network The most common approach to quantitatively describing stream networks was postulated by Strahler (1952). First Order Streams streams with no tributaries. Second Order Streams begin at

More information

Modelling Stormwater Contaminant Loads in Older Urban Catchments: Developing Targeted Management Options to Improve Water Quality

Modelling Stormwater Contaminant Loads in Older Urban Catchments: Developing Targeted Management Options to Improve Water Quality Modelling Stormwater Contaminant Loads in Older Urban Catchments: Developing Targeted Management Options to Improve Water Quality Frances J. CHARTERS 1, Thomas A. COCHRANE 1, Aisling D. O SULLIVAN 1 1

More information

Infiltration Parameters from Surface Irrigation Advance and Run-off Data

Infiltration Parameters from Surface Irrigation Advance and Run-off Data Infiltration Parameters from Surface Irrigation and Run-off Data M.H. GILLIES AND R.J. SMITH National Centre for Engineering in Agriculture and Cooperative Research Centre for Irrigation Futures, University

More information

Integrated urban water systems modelling with a simplified surrogate modular approach

Integrated urban water systems modelling with a simplified surrogate modular approach Integrated urban water systems modelling with a simplified surrogate modular approach Z. Vojinovic 1 *, and S.D. Seyoum 2 Department of Hydroinformatics and Knowledge Management, UNESCO-IHE, Institute

More information

Kitchener s Stormwater Utility

Kitchener s Stormwater Utility Kitchener s Stormwater Utility Nick Gollan, C.E.T. City of Kitchener Southern Ontario Stream Monitoring and Research Team December 2, 2013 Seneca College Presentation Agenda 1. Stormwater Funding Review

More information

Water sensitive urban design. Developing design objectives for urban development in South East Queensland

Water sensitive urban design. Developing design objectives for urban development in South East Queensland Water sensitive urban design Developing design objectives for urban development in South East Queensland Version 2-8 November 2007 Contents Contents......... ii Executive Summary............1 1 Introduction.........1

More information

Stormwater and LEED. Vancouver LEED User s Group May 27, Craig Kipkie, M.Sc., P.Eng, LEED AP

Stormwater and LEED. Vancouver LEED User s Group May 27, Craig Kipkie, M.Sc., P.Eng, LEED AP Stormwater and LEED Vancouver LEED User s Group May 27, 2005 Craig Kipkie, M.Sc., P.Eng, LEED AP Outline Sustainable Sites 2 Stormwater credits SSc6.1 SSc6.2 Synergies with other Credits Case Study How

More information

Performance Evaluation of Rainwater Harvesting Systems Toronto, Ontario

Performance Evaluation of Rainwater Harvesting Systems Toronto, Ontario Performance Evaluation of Rainwater Harvesting Systems Toronto, Ontario Prepared by: Toronto and Region Conservation 2010 Toronto, Ontario A final report prepared by: Toronto and Region Conservation Authority

More information

Uncertainty in Hydrologic Modelling for PMF Estimation

Uncertainty in Hydrologic Modelling for PMF Estimation Uncertainty in Hydrologic Modelling for PMF Estimation Introduction Estimation of the Probable Maximum Flood (PMF) has become a core component of the hydrotechnical design of dam structures 1. There is

More information

Rhode Island Stormwater Design and Installation Standards Manual-- Final Draft: Public Informational Session May 26, 2010 at CCRI

Rhode Island Stormwater Design and Installation Standards Manual-- Final Draft: Public Informational Session May 26, 2010 at CCRI Rhode Island Stormwater Design and Installation Standards Manual-- Final Draft: Public Informational Session May 26, 2010 at CCRI Questions and Answers Chapter 3 Q1. Will there be a provision for revising

More information

Considerations In Estimating Tailwater Elevations

Considerations In Estimating Tailwater Elevations Considerations In Estimating Tailwater Elevations by Alphonse (Al) J. Stewart, P.E., President www.suncam.com Page 1 of 39 ************************************************************************ This

More information

Municipal Stormwater Ordinances Summary Table

Municipal Stormwater Ordinances Summary Table APPENDIX F Municipal Ordinances Summary Table Municipality Abington Bryn Athyn Borough Hatboro Borough Ordinance, SALDO Runoff equals pre post Erosion Sediment Control Water Quality Requirements Any which

More information

STORMCEPTOR HYDROLOGY AND NON-POINT SOURCE POLLUTION REMOVAL ESTIMATES

STORMCEPTOR HYDROLOGY AND NON-POINT SOURCE POLLUTION REMOVAL ESTIMATES STORMCEPTOR HYDROLOGY AND NON-POINT SOURCE POLLUTION REMOVAL ESTIMATES Graham Bryant, Brian Lee, Scott Perry AUTHORS: Stormwater Specialist, Imbrium Systems Corporation, 12 Madison Ave, Toronto, Ontario,

More information

Urban Drainage Introduction. A.Ramachandra Rao. C.B. Burke. T.T. Burke, Jr.

Urban Drainage Introduction. A.Ramachandra Rao. C.B. Burke. T.T. Burke, Jr. 32 Urban Drainage A.Ramachandra Rao Purdue University C.B. Burke Christopher B. Burke Engineering, Ltd. T.T. Burke, Jr. Christopher B. Burke Engineering, Ltd. 32.1 Introduction 32.2 The Rational Method

More information

Modelling storm water control operated by green roofs at the urban catchment scale

Modelling storm water control operated by green roofs at the urban catchment scale Modelling storm water control operated by green roofs at the urban catchment scale A. Palla*, C. Berretta, L.G. Lanza and P. La Barbera Department of Civil, Environmental and Architectural Engineering,

More information

The City of Cocoa (City) is located in east

The City of Cocoa (City) is located in east FWRJ Reclaimed Water and Stormwater: A Perfect Pair to Meet Total Maximum Daily Load Wasteload Allocations? Danielle Honour, James Wittig, John A. Walsh, and Don Stevens Danielle Honour, P.E., D.WRE, and

More information

Highway Drainage 1- Storm Frequency and Runoff 1.1- Runoff Determination

Highway Drainage 1- Storm Frequency and Runoff 1.1- Runoff Determination Highway Drainage Proper drainage is a very important consideration in design of a highway. Inadequate drainage facilities can lead to premature deterioration of the highway and the development of adverse

More information