Request Number IR1-11: FRPD309. Information Request

Size: px
Start display at page:

Download "Request Number IR1-11: FRPD309. Information Request"

Transcription

1 Request Number IR1-11: FRPD309 Information Request 1. If real production data are available for the trailing arm suction hopper dredge FRPD 309, assess whether the use of this equipment would be a technically and economically feasible alternative means. Clearly state the criteria used to assess technical and economic feasibility. 2. If this alternative is considered to be technically and economically feasible, briefly assess the potential environmental effects of this alternative on valued components that could be affected by this alternative. 3. Evaluate whether the use of the FRPD 309 alternative could be considered as the preferred alternative means. VFPA Response 1. If real production data are available for the trailing arm suction hopper dredge FRPD 309, assess whether the use of this equipment would be a technically and economically feasible alternative means. Clearly state the criteria used to assess technical and economic feasibility As described in the VFPA s response to IR1-06, the alternative means analyses were conducted in accordance with the CEA Agency Operational Policy Statement (OPS) Addressing Purpose of and Alternative Means under the Canadian Environmental Assessment Act, 2012 (the current OPS). The methodology first requires an analysis of whether an alternative is technically feasible and economically feasible. An alternative needs to meet all technical criteria to be considered technically feasible, and if all technical criteria are met, then economic feasibility is considered. An effects assessment, within the scope of an alternative means analysis, is only conducted on alternatives that are deemed to be technically and economically feasible It should be noted that in the EIS and this response, the VFPA makes reference to specific pieces of equipment, such as Fraser River Pile and Dredge s (FRPD s) Columbia, FRPD309, or Titan, for the purposes of environmental assessment only (i.e., preparation of the EIS, including description of the Project). For the procurement and actual construction of the Project, the VFPA intends to allow contractors to propose and use alternative pieces of equipment, provided these pieces of equipment meet the Project s objectives, constraints, and requirements. Sufficiency Information Request #11 (IR1-11) Page 1

2 The FRPD309, FRPD s newest dredge, entered the B.C. region in late 2013 for trials, and since then has been performing the annual Fraser River maintenance dredging, thereby replacing the aging Titan. It has proven itself to be both technically and economically feasible to perform this task. The reason the FRPD309 was not considered in the EIS is simply that the FRPD309 did not exist locally when the technical analysis for the EIS was prepared. When the FRPD309 entered the local market in late 2013, the VFPA considered revising its analysis to take it into account; however, reliable production/operation data to perform a re-analysis was not available in advance of EIS preparation. As a result, the FRPD309 was mentioned in EIS Section as a potential alternative, and the construction methodologies and environmental assessments, which were based on the older FRPD Titan and an unspecified second dredge being used for reclaim dredging at the Intermediate Transfer Pit (ITP), were not changed. The incorporation into the preliminary construction schedule of older and smaller dredges provided for a more conservative environmental effects assessment The technical criteria that was considered in the evaluation of dredging equipment alternatives included the following: The equipment has sufficient dredging depth capability; and The equipment has pump ashore capability Economic criteria considered in the evaluation included equipment efficiency, in terms of both acceptability of operating costs and schedule implications With FRPD309 s pump ashore capability, large hopper size, and acceptable dredging depth capability, the FRPD309 is a technically and economically feasible alternative for use as the second dredge during sand reclamation from the ITP. Table IR in Appendix IR1-11-A summarises the feasibility analyses conducted for the FRPD309 and other dredges that were previously assessed in the EIS. 2. If this alternative is considered to be technically and economically feasible, briefly assess the potential environmental effects of this alternative on valued components that could be affected by this alternative The FRPD309 is considered a suitable alternative dredge for reclaim dredging of the ITP (replacing the second unspecified dredge). A comparison of the potential environmental effects associated with these dredges is provided in Appendix IR1-11-A: Table IR Sufficiency Information Request #11 (IR1-11) Page 2

3 3. Evaluate whether the use of the FRPD 309 alternative could be considered as the preferred alternative means Based on technical and economic feasibility, and anticipated lower environmental effects for the FRPD309 compared to other local dredges, should the FRPD309 be available for this Project, it would be considered the preferred local alternative under the current Coastal Trade Act constraint, which limits the use of foreign dredges (see IR1-09 response for the alternative evaluation of a foreign dredge). The FRPD309 has the required production capacity to meet the schedule requirement (in concert with the Columbia) as outlined in the EIS for this activity, and, since it is newer, it is assumed to be more efficient and produce less air and noise emissions than other local equipment. Appendices Appendix IR1-11-A Supporting Table Sufficiency Information Request #11 (IR1-11) Page 3

4 APPENDIX IR1-11-A SUPPORTING TABLE

5 Table IR Alternative Analysis for FRPD309 and Other Activity-applicable Dredges Alternatives Considered for Dredging Equipment Technical Evaluation Proven Use for Equipment (sufficient working depth, pump ashore capability) Economic Evaluation Construction Phase Costs Acceptable (operation cost, schedule implications) Feasibility and Supporting Rationale for Rejection of Alternative Environmental Evaluation Comparison of Potential Effects for Key Valued Components Alternative Means Analysis Conclusion Reclaim Dredging of the ITP in Concert with FRPD s Columbia Titan (without pump ashore capability) No Not applicable as not technically feasible. Not feasible, as dredgeate from the ITP requires pumping to the containment dyke areas, and without pump ashore capability this is not possible. Not applicable as not technically feasible. Not a technically feasible alternative. Unspecified second dredge (with pump ashore capability) Yes Yes Feasible Human Health Compared to the FRPD309, air and noise emissions may be higher for the unspecified second dredge (assessed in the EIS), which could be older and less efficient (i.e., generating more noise and air pollution). Marine Fish, Marine Mammals, Coastal Birds Compared to the FRPD309, underwater noise emissions may be higher for the unspecified second dredge (assessed in the EIS), which could be older and emit more noise underwater. Coastal Birds Compared to the FRPD309, noise emissions may be higher for unspecified second dredge (assessed in the EIS), which could be older and emit more noise. Least preferred alternative as air and noise emissions may be higher. This alternative was assessed in EIS (in concert with the Columbia) as no other alternative, such as the FRPD309, was locally available at the time of assessment. FRPD309 (with pump ashore capability) Yes Yes Feasible Human Health Air and noise emissions may be lower than the emissions of the unspecified second dredge. Marine Fish, Marine Mammals, Coastal Birds Underwater noise emissions may be lower than the emissions of the unspecified second dredge. Coastal Birds Noise emissions may be lower than the emissions of the unspecified second dredge. Preferred alternative as the FRPD309 has the required production capacity to meet the schedule requirement (in concert with the Columbia) as outlined in the EIS for this activity, and since it is the newest local equipment, it is assumed to be more efficient, and produce less air and noise emissions. Sufficiency Information Request #11 (IR1-11) Page 1

Project Review Application Form

Project Review Application Form Project Review Application Form Information supplied in this application may be made public during consultation with adjacent municipalities, First Nations groups and other interested parties, as well

More information

Project & Environmental Review. Guidelines Demolition. May 2016

Project & Environmental Review. Guidelines Demolition. May 2016 Project & Environmental Review Guidelines Demolition May 2016 TABLE OF CONTENTS 1. Introduction... 3 2. Objectives... 3 3. Applicability and Building Permits... 3 4. Guidelines for Preparing a Project

More information

DOCUMENT STATUS. Details of Revision:

DOCUMENT STATUS. Details of Revision: (I) DOCUMENT STATUS Details of Revision: Revision Rev. Date Sections Amendment Source and/or Details A 30 Aug 2013 All Issued for Approval B 23 Sep 2013 All Revised for Approval C 24 Sep 2013 4, 5 D 8

More information

8.0 EFFECTS ASSESSMENT METHODS

8.0 EFFECTS ASSESSMENT METHODS 8.0 EFFECTS ASSESSMENT METHODS This section describes the methods used to assess potential Project-related effects, including cumulative effects. These methods have been developed to meet the requirements

More information

WESTRIDGE MARINE TERMINAL UPGRADE AND EXPANSION PROJECT APPLICATION TO VANCOUVER FRASER PORT AUTHORITY

WESTRIDGE MARINE TERMINAL UPGRADE AND EXPANSION PROJECT APPLICATION TO VANCOUVER FRASER PORT AUTHORITY WESTRIDGE MARINE TERMINAL IN WATER EXCAVATION REPORT WESTRIDGE MARINE TERMINAL UPGRADE AND EXPANSION PROJECT APPLICATION TO VANCOUVER FRASER PORT AUTHORITY Trans Mountain Pipeline ULC Kinder Morgan Canada

More information

Guidelines for Preparing an Alternatives Analysis

Guidelines for Preparing an Alternatives Analysis Policy Number: Policy No. 2017-01 Title: Guidelines for Preparing an Alternatives Analysis Effective Date: September 7, 2017 Authority: Policy: Public Law 91-575, 84 Stat. 1509 et seq., Sections 3.1, 3.4(2),

More information

A Guide to Project Review

A Guide to Project Review A Guide to Project Review Updated March 2015 Vancouver Fraser Port Authority, doing business as Port Metro Vancouver, has prepared this guide to assist tenants, terminal operators, consulting firms and

More information

ENVIRONMENTAL IMPACT STATEMENT GUIDELINES FOR THE REVIEW OF THE WHITES POINT QUARRY AND MARINE TERMINAL PROJECT

ENVIRONMENTAL IMPACT STATEMENT GUIDELINES FOR THE REVIEW OF THE WHITES POINT QUARRY AND MARINE TERMINAL PROJECT ENVIRONMENTAL IMPACT STATEMENT GUIDELINES FOR THE REVIEW OF THE WHITES POINT QUARRY AND MARINE TERMINAL PROJECT MARCH 2005 TABLE OF CONTENTS PART I: CONTEXT OF THE REVIEW... 5 1. ENVIRONMENTAL ASSESSMENT

More information

CONSTRUCTION OF A PERIMETER BUND USING THE PRE-MIXED (PM)-CLAY METHOD

CONSTRUCTION OF A PERIMETER BUND USING THE PRE-MIXED (PM)-CLAY METHOD 24 Terra et Aqua Number 133 December 2013 TAKU SAITOH CONSTRUCTION OF A PERIMETER BUND USING THE PRE-MIXED (PM)-CLAY METHOD ABSTRACT Securing disposal fields to receive soft dredged material has become

More information

Sand extraction Maasvlakte 2 Project: License, Environmental Impact Assessment and Monitoring.

Sand extraction Maasvlakte 2 Project: License, Environmental Impact Assessment and Monitoring. Sand extraction Maasvlakte 2 Project: License, Environmental Impact Assessment and Monitoring. Ad Stolk and Chris Dijkshoorn Ministry of Transport, Public Works and Water Management Rijkswaterstaat North

More information

REPORT. Giant Nickel Tailings Dams INDEPENDENT REVIEW OF 2014 DAM SAFETY INSPECTION REPORT. November 26, 2014

REPORT. Giant Nickel Tailings Dams INDEPENDENT REVIEW OF 2014 DAM SAFETY INSPECTION REPORT. November 26, 2014 INDEPENDENT REVIEW OF 2014 DAM SAFETY INSPECTION REPORT Giant Nickel Tailings Dams Submitted to: Barrick Gold Inc. PO Box 788 Penticton, BC V2A 6Y7 Attention: Robbin Harmati REPORT Reference Number: 1412161-003-R-Rev1-2000

More information

Information Request 37

Information Request 37 Information Request 37 Information Request 37 37-1 Response to Information Request 37 Response to Information Requests 37a Response to Information Requests 37b 37-3 37-5 Federal Review Panel Information

More information

GENERAL SPECIFICATION FOR TEMPORARY FLOW CONTROL FOR CONSTRUCTION IN WATERBODIES

GENERAL SPECIFICATION FOR TEMPORARY FLOW CONTROL FOR CONSTRUCTION IN WATERBODIES ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS.PROV 185 NOVEMBER 2012 GENERAL SPECIFICATION FOR TEMPORARY FLOW CONTROL FOR CONSTRUCTION IN WATERBODIES TABLE OF CONTENTS 185.01 SCOPE 185.02 REFERENCES

More information

Summary Report - Terminal 2 (T2) Trade-Off Process and Outputs Container Capacity Improvement Program

Summary Report - Terminal 2 (T2) Trade-Off Process and Outputs Container Capacity Improvement Program Summary Report - Terminal 2 (T2) Trade-Off Process and Outputs Container Capacity Improvement Program February 2012 Executive Summary Overview This summary report documents concept design and planning

More information

Welcome! Contact Information

Welcome! Contact Information Welcome! Thank you for taking the time to participate in this information session for G3 Terminal Vancouver (G3), an export grain terminal to be built at Lynnterm West Gate in the City of North Vancouver

More information

State of Oregon Department of Environmental Quality

State of Oregon Department of Environmental Quality State of Oregon Department of Environmental Quality Industrial Stormwater Advisory Committee Meeting 8- April 20, 200 Jenine Camilleri, Stormwater Coordinator and Doug Drake, Lower Willamette Basin Coordinator,

More information

Environment Agency Guidance on Requirements for Land Contamination Reports. July 2005

Environment Agency Guidance on Requirements for Land Contamination Reports. July 2005 Environment Agency Guidance on Requirements for Land Contamination Reports July 2005 ENVIRONMENT AGENCY GUIDANCE ON REQUIREMENTS FOR LAND CONTAMINATION REPORTS Context Who is this guidance aimed at? Developers,

More information

ORCA SAND AND GRAVEL PROJECT COMPREHENSIVE STUDY REPORT

ORCA SAND AND GRAVEL PROJECT COMPREHENSIVE STUDY REPORT ORCA SAND AND GRAVEL PROJECT COMPREHENSIVE STUDY REPORT WITH RESPECT TO THE REQUIREMENTS OF A COMPREHENSIVE STUDY PURSUANT TO THE CANADIAN ENVIRONMENTAL ASSESSMENT ACT JUNE 30, 2005 EXECUTIVE SUMMARY...

More information

Project Overview. Northwest Innovation Works LLC and the Port of Kalama propose to develop and operate

Project Overview. Northwest Innovation Works LLC and the Port of Kalama propose to develop and operate Project Overview Northwest Innovation Works LLC and the Port of Kalama propose to develop and operate a natural gas-tomethanol production plant and storage facilities, and a new marine terminal, in the

More information

F. Impact on the Receiving Environment

F. Impact on the Receiving Environment F. Impact on the Receiving Environment Dredging is a necessity for the port to remain commercially active. However, over the past two decades the Port of Waterford has acquired numerous reports and investigations

More information

Chapter 9 Wetlands Park Study Team

Chapter 9 Wetlands Park Study Team Chapter 9 Wetlands Park Study Team Objective How can we help Clark County facilitate implementation of the Clark County Wetlands Park Master Plan, and provide for the management of various ecosystems within

More information

Environmental Assessment Matrix

Environmental Assessment Matrix For FCC Use Only Date: Customer Name: Environmental Assessment Matrix Loan Number: Please complete each question. Some answers may require additional information. Attach additional documentation where

More information

7 Mineral and Energy Resources

7 Mineral and Energy Resources 7 Mineral and Energy Resources This chapter examines Humboldt County s mineral (including sand and gravel extraction) and energy (oil, gas, and geothermal) resources. Existing General Plan policies and

More information

Appendix C Canadian Pacific Rail License of Entry Document

Appendix C Canadian Pacific Rail License of Entry Document Appendix C Canadian Pacific Rail License of Entry Document 01-13283-GG-0000-SE-RPT- 0001 Trans Mountain Expansion Project License of Entry CP Rail Contractor Revision Date: Contractor Revision No.: 2017-03-06

More information

MATERIAL SPECIFICATION FOR AGGREGATES - GENERAL

MATERIAL SPECIFICATION FOR AGGREGATES - GENERAL ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 1001 NOVEMBER 2013 MATERIAL SPECIFICATION FOR AGGREGATES - GENERAL TABLE OF CONTENTS 1001.01 SCOPE 1001.02 REFERENCES 1001.03 DEFINITIONS 1001.04 DESIGN

More information

Vessel slowdown trial: Info session breakfast

Vessel slowdown trial: Info session breakfast Vessel slowdown trial: Info session breakfast Presented by: Vancouver Fraser Port Authority April 27, 2017 Morning Overview Welcome Overview of ECHO program and vessel slowdown trial Overview of industry

More information

Outline for. Protected Areas Management Planning

Outline for. Protected Areas Management Planning Outline for Protected Areas Management Planning Level One: Community-based protected area management organizations and Level Two: Conservation organizations / Non-governmental organizations Outline for

More information

Shell Quest Carbon Capture and Storage Project. Shell Canada Limited

Shell Quest Carbon Capture and Storage Project. Shell Canada Limited SCREENING SCOPING DOCUMENT For the proposed Shell Quest Carbon Capture and Storage Project Shell Canada Limited Prepared by: Canadian Environmental Assessment Agency Natural Resources Canada Fisheries

More information

22.0 EFFECTS OF THE ENVIRONMENT ON THE PROJECT

22.0 EFFECTS OF THE ENVIRONMENT ON THE PROJECT 22.0 EFFECTS OF THE ENVIRONMENT ON THE PROJECT Under CEAA, environmental assessments are required to include a consideration of the effect of the environment on projects. The following natural events and

More information

Site C Clean Energy Project Agricultural Mitigation and Compensation Plan

Site C Clean Energy Project Agricultural Mitigation and Compensation Plan Site C Clean Energy Project Agricultural Mitigation and Compensation Plan Revision 1: September 25, 2017 Table of Contents 1.0 Background... 4 1.1 The Site C Clean Energy Project... 4 1.2 Project Benefits...

More information

Appendix D LPRSA RM 10.9 Removal Action and Pilot Tests - Statement of Work Page 1 of 10 APPENDIX D LOWER PASSAIC RIVER STUDY AREA RM 10.

Appendix D LPRSA RM 10.9 Removal Action and Pilot Tests - Statement of Work Page 1 of 10 APPENDIX D LOWER PASSAIC RIVER STUDY AREA RM 10. Page 1 of 10 APPENDIX D LOWER PASSAIC RIVER STUDY AREA RM 10.9 REMOVAL ACTION I. INTRODUCTION A. Purpose The purpose of this Statement of Work is to provide a framework under which the Settling Parties

More information

Dredging for Climate Change and Transport in the Netherlands

Dredging for Climate Change and Transport in the Netherlands Dredging for Climate Change and Transport in the Netherlands Dredging to survive Polite Laboyrie (Chairman of CEC and Head of Hydr&Env Eng RWS) Organisation Ministry of Transport Dredging for Climate Change

More information

CHANGE OF AN OLD NAVY BASE TO A MODERN MARINA IN BOLTENHAGEN (BALTIC SEA)

CHANGE OF AN OLD NAVY BASE TO A MODERN MARINA IN BOLTENHAGEN (BALTIC SEA) CHANGE OF AN OLD NAVY BASE TO A MODERN MARINA IN BOLTENHAGEN (BALTIC SEA) Siegmund Schlie*, Bernd Opfermann** and Torsten Retzlaff*** * Heinrich Hirdes GmbH, Rostock ** b & o - Ingenieure, Hamburg ***

More information

TECHNICAL GUIDANCE. Concentration Limits for the Protection of Aquatic Receiving Environments ON CONTAMINATED SITES

TECHNICAL GUIDANCE. Concentration Limits for the Protection of Aquatic Receiving Environments ON CONTAMINATED SITES 15 TECHNICAL GUIDANCE ON CONTAMINATED SITES Concentration Limits for the Protection of Aquatic Receiving Environments Version 1 Draft 12 July 2012 This guidance document establishes concentration limits

More information

MARINE POLLUTION DEGRADATION MITIGATION MANAGEMENT IS ESSENTIAL FOR IMPROVING MARINE ENVIRONMENT

MARINE POLLUTION DEGRADATION MITIGATION MANAGEMENT IS ESSENTIAL FOR IMPROVING MARINE ENVIRONMENT MARINE POLLUTION DEGRADATION MITIGATION MANAGEMENT IS ESSENTIAL FOR IMPROVING MARINE ENVIRONMENT The health of the world s oceans and marine life is degrading rapidly as a result of excess human activities.

More information

OIL SANDS TAILINGS TECHNOLOGY: UNDERSTANDING THE IMPACT TO RECLAMATION. Melinda Mamer, P.Eng

OIL SANDS TAILINGS TECHNOLOGY: UNDERSTANDING THE IMPACT TO RECLAMATION. Melinda Mamer, P.Eng OIL SANDS TAILINGS TECHNOLOGY: UNDERSTANDING THE IMPACT TO RECLAMATION Melinda Mamer, P.Eng Suncor Energy Inc. P.O. Box 4001 Fort McMurray, AB T9H 3E3 ABSTRACT Managing tailings is a critical component

More information

Operations Mine Site, Tote Road and Railway

Operations Mine Site, Tote Road and Railway Operations Mine Site, Tote Road and Railway 2 Panel Members Michael Anderson Richard Cook John Binns Fernand Beaulac Steve Walker Mike Lepage Michael Sheahan 3 The Panel will address: FEIS Volumes 3, 5,

More information

Canada s National Programme of Action. for the Protection of the Marine Environment. from Land-based Activities (NPA)

Canada s National Programme of Action. for the Protection of the Marine Environment. from Land-based Activities (NPA) Canada s National Programme of Action for the Protection of the Marine Environment from Land-based Activities (NPA) Prepared by the Federal/Provincial/Territorial Advisory Committee on Canada s National

More information

KIEWIT LEDCOR TMEP PARTNERSHIP 2115 Commissioner Street Site 1 - PER Application, Category C. August 17, Vancouver Fraser Port Authority

KIEWIT LEDCOR TMEP PARTNERSHIP 2115 Commissioner Street Site 1 - PER Application, Category C. August 17, Vancouver Fraser Port Authority August 17, 2017 Vancouver Fraser Port Authority 100 The Pointe, 999 Canada Place Vancouver, BC, Canada V6C 3T4 Attention: Jessica Mehigan Subject: Overview Kiewit Ledcor TMEP Partnership ( KLTP ) has been

More information

Pacific NorthWest LNG. Draft Environmental Assessment Report

Pacific NorthWest LNG. Draft Environmental Assessment Report Pacific NorthWest LNG Draft Environmental Assessment Report February 2016 Cover photo credited to (Pacific NorthWest LNG Ltd). Her Majesty the Queen in Right of Canada, represented by the Minister of Environment

More information

Noise from geophysical surveys Assessment, mitigation, monitoring. Sónia Mendes

Noise from geophysical surveys Assessment, mitigation, monitoring. Sónia Mendes Noise from geophysical surveys Assessment, mitigation, monitoring Sónia Mendes RISK ASSESSMENT The conclusions are remarkably consistent! The risk of auditory injury to marine mammals is limited to the

More information

PROCEDURE FOR THE ISSUANCE (INITIAL AND RENEWAL) OF ENVIRONMENTAL PERMIT / NO OBJECTION CERTIFICATE (NOC) # Type of Permit Applicability

PROCEDURE FOR THE ISSUANCE (INITIAL AND RENEWAL) OF ENVIRONMENTAL PERMIT / NO OBJECTION CERTIFICATE (NOC) # Type of Permit Applicability PROCEDURE FOR THE ISSUANCE (INITIAL AND RENEWAL) OF ENVIRONMENTAL PERMIT / NO OBJECTION CERTIFICATE (NOC) 1.0 PURPOSE This procedure specifies the process of securing Environmental Permit or No Objection

More information

KITSAULT MINE PROJECT ENVIRONMENTAL ASSESSMENT. Section 5.0. Assessment Methodology

KITSAULT MINE PROJECT ENVIRONMENTAL ASSESSMENT. Section 5.0. Assessment Methodology Section 5.0 Assessment Methodology VE51988 TABLE OF CONTENTS PART B - ASSESSMENT OF POTENTIAL EFFECTS, MITIGATION, AND SIGNIFICANCE OF RESIDUAL EFFECTS... 5-1 5.0... 5-1 5.1 Introduction... 5-1 5.2 Objectives...

More information

Background Information Document

Background Information Document Environmental Impact Assessment (EIA) of the Proposed Development of Phosphate Deposits off the Coast of Namibia Background Information Document Note 1. This BID addresses the proposed activities within

More information

Response to Comments of Don and Tricia Nevis (Letter I25) See the master response to Public Outreach Process.

Response to Comments of Don and Tricia Nevis (Letter I25) See the master response to Public Outreach Process. Freeport Regional Water Authority and the U.S. Department of the Interior, Bureau of Reclamation Chapter 8. Responses to Comments from Individuals Don and Tricia Nevis (I25) Response to Comments of Don

More information

CHAPTER 7. San Dieguito River Flooding Adaptation

CHAPTER 7. San Dieguito River Flooding Adaptation CHAPTER 7 San Dieguito River Flooding Adaptation This chapter includes a range of adaptation measures to address vulnerabilities from flooding along the San Dieguito River, including the river valley,

More information

Federal Regulation. Copyright 2011 Gary A. Robbins. All rights reserved.

Federal Regulation. Copyright 2011 Gary A. Robbins. All rights reserved. Federal Regulation Copyright 2011 Gary A. Robbins. All rights reserved. Roles Different Federal agencies have different jurisdictions over water resources Main agencies Army Corp of Engineers (USACE) Bureau

More information

Texas-Sized Challenges

Texas-Sized Challenges Aerial view of the City of Austin s Water Treatment Plant No. 4 in northwest Austin near the intersection of RM 620 and Bullick Hollow Road. cover story Delivering Water Provides Texas-Sized Challenges

More information

Ag obair i gcomhpháirtíocht Irish Water

Ag obair i gcomhpháirtíocht Irish Water Irish Water All of our customers should receive a safe and reliable supply of drinking water and have their wastewater collected and safely returned to the environment. We will protect the environment

More information

Construction Permit Application Overview of Potential Project Effects Vancouver Harbour Response Base 2800 Commissioner Street, Vancouver, BC

Construction Permit Application Overview of Potential Project Effects Vancouver Harbour Response Base 2800 Commissioner Street, Vancouver, BC Construction Permit Application Overview of Potential Project Effects Vancouver Harbour Response Base 2800 Commissioner Street, Vancouver, BC Prepared for: Western Canada Marine Response Corporation 201

More information

Jurgen Franke P. Eng., Director, Engineering & Terminal Development. Review and rationale for changes to Environmental Management Plans

Jurgen Franke P. Eng., Director, Engineering & Terminal Development. Review and rationale for changes to Environmental Management Plans Soleil 342 Rosehill Wynd Tsawwassen, BC V4M 3l9 29 April 2015 Fraser Surrey Docks Limited Partnership 11060 Elevator Road Surrey, BC, Canada V3V 2R7 Attention: Jurgen Franke P. Eng., Director, Engineering

More information

RED MOUNTAIN UNDERGROUND GOLD PROJECT VOLUME 3 CHAPTER 8 NOISE EFFECTS ASSESSMENT

RED MOUNTAIN UNDERGROUND GOLD PROJECT VOLUME 3 CHAPTER 8 NOISE EFFECTS ASSESSMENT RED MOUNTAIN UNDERGROUND GOLD PROJECT VOLUME 3 CHAPTER 8 NOISE EFFECTS ASSESSMENT Table of Contents 8 Noise Effects Assessment... 1 8.1 Introduction... 1 8.2 Regulatory and Policy Setting... 5 8.3 Scope

More information

STRENGTHENING YOUR PORT S FINANCIAL STABILITY THROUGH DIVERSIFICATION

STRENGTHENING YOUR PORT S FINANCIAL STABILITY THROUGH DIVERSIFICATION STRENGTHENING YOUR PORT S FINANCIAL STABILITY THROUGH DIVERSIFICATION A Case Study of the Vancouver Fraser Port Authority s Natural Advantages and Diversification Strategies Larry Sawrenko, Director Finance

More information

Vancouver Wharves Diesel Handling Facility Expansion Project

Vancouver Wharves Diesel Handling Facility Expansion Project Vancouver Wharves Diesel Handling Facility Expansion Project March 2018 1 Project Information 1. Vancouver Wharves Today 2. Project Rationale 3. Project Overview New Tanks, Railcar and Vessels 4. Project

More information

POINTE DU BOIS MODERNIZATION PROJECT

POINTE DU BOIS MODERNIZATION PROJECT POINTE DU BOIS MODERNIZATION PROJECT CONSTRUCTION OF NEW FACILITIES AT PRESENT SITE AND DECOMMISSIONING OF EXISTING FACILITIES ENVIRONMENTAL ASSESSMENT DRAFT SCOPING DOCUMENT Submitted By Manitoba Hydro

More information

Framework Directive (MSFD):

Framework Directive (MSFD): SEA and EU Marine Strategy Framework Directive (MSFD): Introduction of MSFD: relationship with SEA Andrea Weiß MSFD-Secretariat Function for the Federal Ministry of the Environment Espoo Seminar Berlin,

More information

Liquefied Natural Gas As Marine Fuel. April 04, 2017

Liquefied Natural Gas As Marine Fuel. April 04, 2017 Liquefied Natural Gas As Marine Fuel April 04, 2017 Port of Vancouver Our Vision The Vancouver Fraser Port Authority vision: to be the world s most sustainable port. Port 2050 Scenario Planning Process

More information

Information Request 11

Information Request 11 Information Request 11 Information Request 11 11-1 Responses to Information Request 11 Response to Information Request 11a Response to Information Request 11b 11-2 11-6 Federal Review Panel Information

More information

February Reference Section in Supplemental. Reference Section in Consultants Reports. Reference Section in Application. TOR No.

February Reference Section in Supplemental. Reference Section in Consultants Reports. Reference Section in Application. TOR No. Request i Final Terms of Environmental Impact Assessment Report for Coal Valley Resources Inc. (CVRI) Proposed Robb Trend Project Cross (Concordance) Table to Location in ii PURPOSE OF THE TERMS OF REFERENCE

More information

ROW: Siting, Vegetation Management, and Avian Issues - Program 57

ROW: Siting, Vegetation Management, and Avian Issues - Program 57 ROW: Siting, Vegetation Management, and Avian Issues - Program 57 Program Description Program Overview As the power grid is upgraded and expanded, safe and reliable operation takes on heightened importance.

More information

Airborne Noise and The New NY Bridge Project

Airborne Noise and The New NY Bridge Project Airborne Noise and The New NY Bridge Project Photo Courtesy of New York State Thruway Authority Presented by: Kenneth Avery, PE DISCLAIMER Video or photography is not allowed during this presentation.

More information

Operational Policy Statement

Operational Policy Statement Operational Policy Statement Determining Whether a Designated Project is Likely to Cause Significant Adverse Environmental Effects under the Canadian Environmental Assessment Act, 2012 November 2015 i

More information

Proposed Northern Gateway Pipeline

Proposed Northern Gateway Pipeline Fall 2014 Proposed Northern Gateway Pipeline RISK MITIGATION STRATEGY REPORT JEFFREY KENT YORK UNIVERSITY Disaster Risk Management Course Table of Contents Introduction... 1 Description of Mitigation Strategies...

More information

Dealing with cumulative effects of offshore windfarms on marine ecology

Dealing with cumulative effects of offshore windfarms on marine ecology Dealing with cumulative effects of offshore windfarms on marine ecology Applying first results in consenting process for offshore wind in Dutch North Sea Maarten Platteeuw, Ministry of Infrastructure and

More information

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized I. Basic Information Date prepared/updated: 10/28/2009 INTEGRATED SAFEGUARDS DATASHEET

More information

There is No Need for a Second Container Terminal at Roberts Bank, B.C. June 11, 2017

There is No Need for a Second Container Terminal at Roberts Bank, B.C. June 11, 2017 There is No Need for a Second Container Terminal at Roberts Bank, B.C. June 11, 2017 Port of Vancouver Lowest Case Container s Are Not Being Realized The Vancouver Fraser Port Authority, known as the Port

More information

Outreach Report Water Wall Turbine Inc.

Outreach Report Water Wall Turbine Inc. Outreach Report Water Wall Turbine Inc. Project: 443 MH - WWT Dent Island Tidal Power Generation Project March 2017 I. Executive Summary The Water Wall Turbine (WWT) project has produced the world s first

More information

The World of. Work safely and effectively in shallow waters. Innovative urban dredging. Keeping an urban waterway operational

The World of. Work safely and effectively in shallow waters. Innovative urban dredging. Keeping an urban waterway operational The World of N E W S L E T T E R 2 0 1 7 smart solution for hard work Work safely and effectively in shallow waters Innovative urban dredging Keeping an urban waterway operational www.watermaster.fi Operating

More information

Scoping Document for the Environmental Assessment. BP Exploration (Canada) Ltd. Tangier 3D Seismic Survey

Scoping Document for the Environmental Assessment. BP Exploration (Canada) Ltd. Tangier 3D Seismic Survey Scoping Document for the Environmental Assessment BP Exploration (Canada) Ltd. Tangier 3D Seismic Survey Exploration Licenses 2431, 2432, 2433, and 2434 August 2013 Contents 1.0 Purpose... 2 2.0 Regulatory

More information

MATERIAL SPECIFICATION FOR AGGREGATES - MISCELLANEOUS

MATERIAL SPECIFICATION FOR AGGREGATES - MISCELLANEOUS ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS.PROV 1004 NOVEMBER 2012 MATERIAL SPECIFICATION FOR AGGREGATES - MISCELLANEOUS TABLE OF CONTENTS 1004.01 SCOPE 1004.02 REFERENCES 1004.03 DEFINITIONS

More information

Draft Environmental Assessment Terminal B/C Redevelopment, Secure National Hall, and Related Improvements

Draft Environmental Assessment Terminal B/C Redevelopment, Secure National Hall, and Related Improvements JUNE 2016 RONALD REAGAN WASHINGTON NATIONAL AIRPORT Draft Environmental Assessment Terminal B/C Redevelopment, Secure National Hall, and Related Improvements PREPARED BY: Ricondo & Associates, Inc. IN

More information

ROTAWN ENERGY AND LOGISTICS DREDGING PROFILE

ROTAWN ENERGY AND LOGISTICS DREDGING PROFILE ROTAWN ENERGY AND LOGISTICS DREDGING PROFILE DREDGING PROFILE ABOUT US Rotawn Energy and Logistics Services Ltd was established in 2007 as an indigenous Nigerian company offering tailor made solutions

More information

Theme and Project-Specific Studies

Theme and Project-Specific Studies Appendix D 2015 Monitoring and Analysis Plan January 2015 Table of Contents Tables Table 1. 2015 Monitoring and Analysis Plan Theme and Project- Specific Studies...2 Studies Study 8 Egg Survival and Emergence

More information

2.1 Backfill - General

2.1 Backfill - General 2.1 Backfill - General Excavations are made for the purpose of constructing bridge substructure elements, and consequently requiring competent backfill material. The backfill material must be adequately

More information

Carbon footprint report 2013

Carbon footprint report 2013 Carbon footprint report 2013 For DEME activities in Belgium and the Netherlands; in accordance with the CO2 Performance ladder in Ton CO2 Rev. 2014-04-02 Uncontrolled if printed. Most recent version is

More information

Chatham Rock Phosphate. Chatham Islands. April 2013

Chatham Rock Phosphate. Chatham Islands. April 2013 Chatham Rock Phosphate Chatham Islands April 03 Who we are Chatham Rock Phosphate Golden Bay co started by us 006 Chris Castle - CEO Linda Sanders Comms director Toko Kapea and Adrian Wilson stakeholder

More information

Navigating the Permit Process for Desalination LBWD Experience

Navigating the Permit Process for Desalination LBWD Experience Navigating the Permit Process for Desalination LBWD Experience AWWA Desalination Symposium May 8, 2006 Long Beach Water Department Tai Tseng, P.E. 1 Presentation Outline Long Beach Overview Permits for

More information

Floodplain Jurisdiction 6/9/2014. Texas Floodplain Management Association May 29, 2014

Floodplain Jurisdiction 6/9/2014. Texas Floodplain Management Association May 29, 2014 Texas Floodplain Management Association May 29, 2014 Loretta E Mokry, PWS Craig T. Maske, P.E., CFM Alan Plummer Associates, Inc. Who really owns the floodplain? What do I have to do to use/develop the

More information

Water Quality and Pollution

Water Quality and Pollution Chapter 6 Water Quality and Pollution Guiding Principles: Chapter 4 details all the guiding principles relevant to the overall management of the Harbour. Whilst all should be given some consideration the

More information

Marine Strategy for the Netherlands part of the North Sea , Part 1

Marine Strategy for the Netherlands part of the North Sea , Part 1 Marine Strategy for the Netherlands part of the North Sea 2012-2020, Part 1 Marine Strategy for the Netherlands part of the North Sea 2012-2020, Part I Disclaimer: In all cases the Dutch version of this

More information

Request for Proposals. Acoustic Survey to Determine Noise Signature at the Fundy Ocean Research Center for Energy Demonstration Site

Request for Proposals. Acoustic Survey to Determine Noise Signature at the Fundy Ocean Research Center for Energy Demonstration Site Request for Proposals Acoustic Survey to Determine Noise Signature at the Fundy Ocean Research Center for Energy Demonstration Site Release date: April 21, 2011 Fundy Ocean Research Center for Energy (FORCE)

More information

Environmental Checklist:. 10.Ports and Harbors (1) Yes: Y No: N (a) (b) (c) (d)

Environmental Checklist:. 10.Ports and Harbors (1) Yes: Y No: N (a) (b) (c) (d) Checklist:. 10.Ports and Harbors (1) 1 Permits and Explanation 2 Pollution Control (1) EIA and Permits (2) Explanation to the Local Stakeholders (3) Examination of Alternatives (1) Air Quality (2) Water

More information

DATA ITEM DESCRIPTION TITLE: TRAINING EVALUATION DOCUMENT Number: DI-PSSS-81524C Approval Date:

DATA ITEM DESCRIPTION TITLE: TRAINING EVALUATION DOCUMENT Number: DI-PSSS-81524C Approval Date: DATA ITEM DESCRIPTION TITLE: TRAINING EVALUATION DOCUMENT Number: DI-PSSS-81524C Approval Date: 20141120 AMSC Number: N9493 Limitation: DTIC Applicable: No GIDEP Applicable: No Office Of Primary Responsibility:

More information

Ground Improvement Techniques in Land Reclamation. M. Kitazume Tokyo Institute of Technology

Ground Improvement Techniques in Land Reclamation. M. Kitazume Tokyo Institute of Technology Ground Improvement Techniques in Land Reclamation M. Kitazume Tokyo Institute of Technology Contents Introduction Ground Improvement Techniques Sand drain method Kansai International Airport PVD method

More information

June 15, RE: WesPac LNG Project. To whom it may concern:

June 15, RE: WesPac LNG Project. To whom it may concern: June 15, 2015 WesPac Tilbury Marine Jetty Project Canadian Environmental Assessment Agency 410-701 West Georgia Street Vancouver, BC V7Y 1C6 Fax: 604-666-6990 CEAA.TilburyJetty-JeteeTilbury.ACEE@ceaa-acee.gc.ca

More information

Code of Construction Practice Part B: Site Specific Requirements

Code of Construction Practice Part B: Site Specific Requirements Thames Tideway Tunnel Thames Water Utilities Limited Application for Development Consent Application Reference Number: WWO10001 Code of Construction Practice Part B: Site Specific Requirements Blackfriars

More information

Long Island s. Environmental Issues. Environmental Issues. Environmental Setting. Environmental Setting. Suburbia and the Environment

Long Island s. Environmental Issues. Environmental Issues. Environmental Setting. Environmental Setting. Suburbia and the Environment Environmental Issues Long Island s Environmental Issues Copyright 2011 AFG 1 agricultural land air pollution aquifers automobile barrier islands biozones fisheries groundwater recharge invasive species

More information

Obstacles to Implementing Working with Nature Concepts

Obstacles to Implementing Working with Nature Concepts Obstacles to Implementing Working with Nature Concepts Douglas Clarke Environmental Laboratory U.S. Army Corps of Engineers Engineer Research and Development Center US Army Corps of Engineers Engineer

More information

Appendix J. Clean Water Nashville Overflow Abatement Program GUIDANCE FOR DESIGN PERMIT INFORMATION. Version 3.0

Appendix J. Clean Water Nashville Overflow Abatement Program GUIDANCE FOR DESIGN PERMIT INFORMATION. Version 3.0 Appendix J Clean Water Nashville Overflow Abatement Program GUIDANCE FOR DESIGN PERMIT INFORMATION Version 3.0 April 2015 Table of Contents Section 1 General Information... 1 Section 2 State of Tennessee

More information

Appendix D. Stormwater Pollution Prevention Plan

Appendix D. Stormwater Pollution Prevention Plan Appendix D Memorandum AECOM 3292 Production Way, Floor 4 604 444 6400 tel Burnaby, BC, Canada V5A 4R4 604 294 8597 fax www.aecom.com To Joan Liu, Metro Vancouver Page 1 CC Subject Conveyance for the NSWWTP

More information

PORT INFORMATION GUIDE NOTICE OF AMENDMENT

PORT INFORMATION GUIDE NOTICE OF AMENDMENT PORT INFORMATION GUIDE NOTICE OF AMENDMENT Date Issued: June 15 th, 2015 Date effective: July 15 th, 2015 Subject: This notice is being posted publicly to notify industry, stakeholders and the public of

More information

SECTION 14.0 CAPITAL COST ESTIMATES

SECTION 14.0 CAPITAL COST ESTIMATES SECTION 14.0 CAPITAL COST ESTIMATES 1 14.0 Capital Cost Estimates CONTENTS 14.0 CAPITAL COST ESTIMATES...4 14.1 Introduction...4 14.2 Overall Summary...4 14.3 Mining Capital Cost Estimate...5 14.3.1 Pre-Production

More information

The Concept of the Development of Turkmenbashi International Seaport and the Marine Merchant Fleet till Year 2020 was approved with Resolution of the

The Concept of the Development of Turkmenbashi International Seaport and the Marine Merchant Fleet till Year 2020 was approved with Resolution of the The Concept of the Development of Turkmenbashi International Seaport and the Marine Merchant Fleet till Year 2020 was approved with Resolution of the Esteemed President of Turkmenistan CURRENT VIEW OVER

More information

Pasquia Area Drainage and Pumping System

Pasquia Area Drainage and Pumping System Pasquia Area Drainage and Pumping System Review of Operating Guidelines Public Open House August 22, 2017 Welcome! Manitoba Infrastructure, the Rural Municipality (RM) and The Pas and District Farmer s

More information

Immersed Tunnels in the Natural Environment

Immersed Tunnels in the Natural Environment Immersed Tunnels in the Natural Environment An information paper produced by the International Tunnelling and Underground Space Association Working Group 11 for Immersed and Floating Tunnels 00000-ITA-DOC-8P.indd

More information

VALLECITOS WATER DISTRICT

VALLECITOS WATER DISTRICT VALLECITOS WATER DISTRICT WATER, WASTEWATER, AND RECYCLED WATER MASTER PLAN Draft Program Environmental Impact Report SCH No. 2010071073 VALLECITOS WATER DISTRICT 2008 Water, Wastewater and Recycled Water

More information

Jason McDiarmid, R.E.T. Terra Erosion Control Ltd.

Jason McDiarmid, R.E.T. Terra Erosion Control Ltd. Career History Terra Erosion Control Ltd. Project Manager Nelson, British Columbia November 2009 to Present Stantec Consulting Ltd. Edmonton Alberta Environmental Consultant / Project Manager May 2003

More information

Our Strategy for Climate Action

Our Strategy for Climate Action Our Strategy for Climate Action Introduction Climate change is real, it is directly influenced by human activity, and it requires decisive global action to address. At Teck, we believe our company and

More information

2/24/2009. The factors that determine what type of forest will grow in a region are temperature precipitation growing season soil land forms

2/24/2009. The factors that determine what type of forest will grow in a region are temperature precipitation growing season soil land forms FOREST FACTS Forestry 37% of Canada's land area covered by forests. Stretches in a continuous band from BC to NL. Commercial forests are forests that could be easily be harvested for timber. Non-commercial

More information

Northwest Power and Conservation Council

Northwest Power and Conservation Council Northwest Power and Conservation Council Pumped Storage GRAC Meeting Banks Lake Pumped Storage Project (North Dam) FERC Project No. 14329 Portland, Oregon January 27, 2015 Presented by: Lloyd Reed and

More information