Chapter 5: Conveyance Assessment 2020 Baseline Conditions

Size: px
Start display at page:

Download "Chapter 5: Conveyance Assessment 2020 Baseline Conditions"

Transcription

1 Chapter 5: Conveyance Assessment 2020 Baseline Conditions 5.1 Introduction The performance of the conveyance system for 2020 Baseline conditions is assessed in this chapter using the hydraulic models. The configuration of the hydraulic models represents the conveyance system including future projects that the Milwaukee Metropolitan Sewerage District (MMSD) has committed to build. The committed projects that were included in the model for this analysis are listed in Table 5-1. Chapter 8 has a more complete list of the committed projects; the list in Table 5-1 contains the projects in the model as of the time of the analysis. The main committed projects are: Harbor Siphon capacity improvements IS (Intercepting Structure) improvements Northwest Side Relief Sewer North 27 th Street ISS Extension West Wisconsin Avenue Relief Sewer Hydraulic simulations used flows generated by the Flow Forecasting System (FFS) model and were based on the estimated 2020 Baseline population and land use conditions. The 2020 Baseline flows are based on the calibrated 2000 flows with additions to the base sanitary flow and the infiltration and inflow (I/I) to account for additional population and increases in commercial and industrial land use areas. The model assumes that I/I from the current system remains constant. This assumption implies that municipalities and MMSD maintain their existing systems so that the I/I does not increase above current levels. The conveyance system assessment consists of the following topics: Conveyance system reaches with hydraulic restrictions Combined sewer overflow (CSO) and separate sewer overflow (SSO) frequencies, volumes, and locations This chapter presents the analytical results of simulations that were run to asses the performance of the committed system with the 2020 Baseline population and land use conditions. Subsequent to this analysis, the modeling system was further refined to evaluate alternatives for the Recommended Plan. At the time of this analysis, the simulation period of record was from January 1940 to December 2002; this was a 63-year period of record. The Mini-MOUSE model was used to simulate the volumes and frequencies of SSOs and CSOs during a 63-year period of record. Subsequent refinements to the modeling system used an extended 64.5-year period of record (from January 1940 through June 2004). Therefore, the simulation results in this chapter and the previous chapter are not based on the most recent refinements to the modeling system. Chapter 9 contains the results from the refined models which were used to develop of the Recommended Plan. 5-1

2 Committed Project Name Jones Island Harbor Siphons and Headworks Northwest Side Relief Sewer North 27 th Street ISS Extension West Wisconsin Avenue Relief Sewer Comment 27 MG New MIS segment East and West Warnimont Avenue 2010 Facilities Plan Project (updated design, December 2005) Honey Creek and South 81 st Street North 31 st and Hampton Avenue South 27 th Street South 35 th Street South 41 st Street Veterans Administration Hospital Barclay / 4 th / Chase (Basin A Relief) Canal Street (Basin D Relief) Central MIS Sewer Lining Projects IS Structure Improvements Scott Street MIS Water Street (Basin A Replacement) Auer Avenue Siphon Replacement and IS207A Bruce Street MIS Replacement Bruce Street / Muskego Avenue MIS Replacement Clybourn Street MIS Rehabilitation Clybourn Street West MIS Relocation Estabrook Park and Auer Avenue Aqueduct Replacement 1 st Street Siphon Green Bay Road Overflow Improvement Project Hopkins Street Near Surface Collector Menomonee Special, MIS Replacement and Realignment Miller Area Rehabilitation Miller Area, State Street and North 37 th Street MIS Northeast Side Flow Control Gates North 30 th Street Relief Sewer North 32 nd and Hampton Avenue Pump Station, BS0502A Nicholson Avenue Diversion Structure, DC0607 NS-6 Outfall Sewer Relay Oak Creek South Interceptor, New MIS Oak Creek SW Interceptor, New MIS Providence Avenue Replacement Range Line Road Relief Sewer South Howell Avenue Pump Station 2010 Facilities Plan Project 2010 Facilities Plan Project 2010 Facilities Plan Project 2010 Facilities Plan Project 2010 Facilities Plan Project 2010 Facilities Plan Project Central MIS Project Central MIS Project Central MIS Project Central MIS Project Central MIS Project Central MIS Project Connection from Hampton Ave MIS to Villard Avenue MIS removal of two SSO sites Disconnection of storm flow and reroute of flow to new NSC Sewer lining project MIS replacement/realignment DC0509 and gate at NS-3 Sewer replacement and new IS73 and IS74A structures Increase size of sewer for better conveyance of flow New pump station and diversion TABLE 5-1 COMMITTED PROJECTS 2020 CONVEYANCE REPORT 5/2/07 CR_05.T cdr

3 A hydraulic restriction in the metropolitan interceptor sewer (MIS) system is defined as a reach of pipe that does not have sufficient conveyance capacity to prevent overflows or basement backups from occurring. Consequently, a hydraulic restriction causes the hydraulic grade line to rise above critical elevations. In general, the critical elevations are the inverts of connections from local sewer systems owned by the satellite municipalities. 5.2 Modeling Strategies and Operational Parameters The upgraded harbor siphons, the modified IS structures, and the Northwest Side Relief Sewer were modeled explicitly in the 2020 Baseline configuration. The North 27 th Street ISS extension and the West Wisconsin Avenue Relief Sewer were not modeled explicitly with additional pipe segments or storage elements in the model. Instead, the volume of the inline storage system (ISS) was increased by 27 million gallons (MG) (from 405 MG to 432 MG) and the volume reserved for separate sewer inflow (VRSSI) was increased an equal amount (from 150 to 177 MG) to account for the storage increase represented by these projects. Additional operational parameters used in the simulations are listed in Table 5-2. TABLE 5-2 OPERATIONAL PARAMETERS AND SIMULATION CONDITIONS Parameter ISS Volume VRSSI Jones Island Wastewater Treatment Plant Peak Capacity South Shore Wastewater Treatment Plant Peak Capacity ISS Pump Out Limit to Jones Island Wastewater Treatment Plant ISS Pump Out Limit to South Shore Wastewater Treatment Plant Lake Michigan Water Level 1 (MMSD datum) Meteorological Input Source Population and Land Use Conditions Value 432 MG 177 MG 390 MGD (includes up to 60 MGD of blending) 300 MGD 80 MGD 40 MGD -2.0 ft General Mitchell International Airport 2020 Baseline ft = Feet MG = Million Gallons MMSD = Milwaukee Metropolitan Sewerage District Commission VRSSI = Volume Reserved for Separate Sewer Inflow ISS = Inline Storage System MGD = Million Gallons per Day SEWRPC = Southeastern Wisconsin Regional Planning 1) MMSD datum (equal to feet, NGVD 1929) 5-3

4 5.3 Metropolitan Interceptor Sewer /Near Surface Collector Sewer / Inline Storage System Capacity Evaluation The capacity of the conveyance system was evaluated for two extreme events: March 1960 and August The simulation results were used to evaluate the response of the 2020 committed facilities and the 2020 Baseline population and land use to the hydrologic conditions of the extreme events. These simulations are not reconstructions of the historical events of March 1960 and August Rather, these simulations are used to evaluate the performance of the system (with the committed facilities) in response to the hydrologic conditions similar to the March 1960 and the August 1986 events. Because these simulation results are for extreme events, they are useful for identifying parts of the MIS that were evaluated for potential conveyance restriction in subsequent modeling refinements. Chapter 9 presents the conveyance system improvement projects in the recommended plan for the five- and 10-year levels of protection. Therefore, these extreme simulation results are preliminary results that were used to help focus more detailed evaluations of the conveyance system in further model refinements Extreme Event: Large Simulated Sanitary Sewer Overflow Volume March 1960 As described in Chapter 4, the large wastewater volume and long duration of the March 1960 event produced the largest simulated SSO volume during the period of record. Although the total rainfall depth was only 2.6 inches, with peak intensities less than 0.9 inches/hour, a large wastewater volume was generated by this event due to snowmelt over a four-day period in addition to the precipitation. This type of hydrologic event stressed the storage capacities of the system and resulted in large simulated SSO volumes. Figure 5-1 shows the sections of the MIS with simulated hydraulic restrictions during this extreme event for 2020 Baseline conditions Extreme Event: Large Simulated Combined Sewer Overflow Volume August 1986 The August 1986 event was an intense, short duration storm. The total rainfall depth was 6.8 inches with peak intensities of 4.3 inches/hour. The high peak flow rates generated by this event stressed the conveyance capacity of the system and produce the largest simulated CSO discharge. Figure 5-2 shows the sections of the MIS that had hydraulic restrictions during this event under 2020 Baseline simulated model conditions. Several of the hydraulic restrictions in the 2000 model configuration, as shown in Chapter 4, Conveyance Assessment Existing 2000 Conditions, Figures 4-1 and 4-2, were resolved by the committed projects. Other hydraulic restrictions remained in 2020 Baseline conditions because the committed projects were not designed for the extreme conditions represented by the August 1986 event. Other hydraulic restrictions were due to higher flows simulated in the separate sewer service area with 2020 conditions (compared to the Existing 2000 simulations in Chapter 4) Near Surface Collector Sewer Performance The NSCS had adequate conveyance capacity for 2020 Baseline conditions. No hydraulic restrictions were identified in the NSCS for the simulated extreme events. In these simulations, the NSCS successfully conveyed flow to the ISS while the ISS was open to the combined sewer area. 5-4

5 FIGURE 5-1 HYDRAULIC RESTRICTIONS: LARGEST SIMULATED SSO EVENT, 2020 CONDITIONS 2020 CONVEYANCE REPORT 5/2/07 CR_ cdr

6 FIGURE 5-2 HYDRAULIC RESTRICTIONS: LARGEST SIMULATED CSO EVENT, 2020 CONDITIONS 2020 CONVEYANCE REPORT 5/2/07 CR_ cdr

7 5.4 Sanitary Sewer Overflow and Combined Sewer Overflow Evaluation Extreme Event Simulated Combined Sewer Overflow and Sanitary Sewer Overflow Volumes The model results presented in Table 5-3 show the simulated CSO and SSO volumes for the two extreme events (March 1960 and August 1986) assuming 2020 Baseline population and land use. For the March 1960 event, both the CSO and SSO volumes are consistent among the three models. The simulated CSO volume was approximately 900 to 1,000 MG and the simulated SSO volume was approximately 900 MG, which is the largest simulated SSO in the period of record. TABLE 5-3 SIMULATED COMBINED SEWER OVERFLOW AND SANITARY SEWER OVERFLOW VOLUMES FOR TWO EXTREME EVENTS ASSUMING 2020 BASELINE POPULATION AND LAND USE Simulated CSO Volume (MG) Simulated SSO Volume (MG) Modeling Tool Maximum Simulated SSO event (March 1960 hydrology) Streamline-Model of Urban Sewers (MOUSE) Mini-MOUSE MACRO 1, Maximum Simulated CSO event (August 1986 hydrology 1 ) Streamline-MOUSE 1, Mini-MOUSE 2, MACRO 2,102 0 CSO = Combined Sewer Overflows SSO = Sanitary Sewer Overflows MG = Million Gallons MOUSE = Model of Urban Sewers 1) SSOs during the August 1986 event are associated with MIS capacity restrictions, not tunnel closing. MACRO cannot model SSOs that are not tunnel related. For the August 1986 simulations, the simulated CSO volume (approximately 2,000 MG) is the largest simulated CSO during the period of record. The August 1986 event stressed the conveyance capacity rather than the storage capacity in the model; consequently, the role of hydraulic routing in the simulation is very important. The Streamline-MOUSE model has the modeling capability to simulate the routing of this event properly. Therefore, the Streamline- MOUSE simulated SSO volume is believed to be the most accurate. The simulated SSO volumes computed by the three models are small. The high intensity and short duration rainfall (and relatively dry antecedent conditions) of this event does not cause a large volume of flow in the separate sewer service area. Because the ISS remains open to separate sewer inflows, the SSOs that do occur are due to hydraulic restrictions in the MIS. These conveyance-related SSOs 5-7

8 are sensitive to the brief but high peak flows of the August 1986 event. The SSO volume is 14 MG in Streamline-MOUSE; 20 MG in Mini-MOUSE; and 0 MG in MACRO because the MACRO model can not simulate conveyance related SSOs Combined Sewer Overflow and Sanitary Sewer Overflow Event Frequency Mini-MOUSE and MACRO simulation results were used to estimate the frequency of overflows and average annual overflow volume assuming 2020 Baseline population and land use. The simulations evaluated the 63-year period from 1940 to The simulated CSO and SSO results presented in Table 5-4 show the consistency between the Mini-MOUSE and MACRO results for the long-term total values. The simulated MACRO SSO events must be compared to the tunnel-related SSO events in Mini-MOUSE. TABLE 5-4 LONG-TERM SIMULATION COMBINED SEWER OVERFLOW AND SANITARY SEWER OVERFLOW RESULTS: MINI-MOUSE AND MACRO FOR 2020 BASELINE CONDITIONS 63-year Simulation Period ( ) 2020 Baseline Population and Land Use Conditions Simulated Quantity Mini-MOUSE MACRO CSO Volume (MG) 47,600 58,400 CSO Events SSO Volume (MG) 8,200 7,100 SSO Events 75 n/a Tunnel-related SSO Events CSO = Combined Sewer Overflows SSO = Sanitary Sewer Overflows MG = Million Gallons MOUSE = Model of Urban Sewers The CSO frequency is expressed as the average number of CSO events per year. During the 63- year period, the simulated number of CSO events was 227 in the Mini-MOUSE model and 224 in the MACRO model. Based on the Mini-MOUSE results, the average simulated CSO frequency is predicted to be approximately 3.6 events per year under assumed 2020 Baseline conditions. In the simulated Mini-MOUSE results, there were 75 SSOs (of which only 40 were tunnel related). The SSO frequency is expressed as a recurrence interval. Based on the Mini-MOUSE results, 75 simulated SSO events during the period of record are equivalent to a 0.8-year recurrence interval for SSO events. 5-8

9 5.4.3 Sanitary Sewer Overflow Locations and Volumes The Mini-MOUSE model has 19 SSO locations. Most sites are the same as those in the 2000 model discussed in Chapter 4, Conveyance Assessment Existing 2000 Conditions, except that one site was added and one was eliminated. A new SSO site on the Milwaukee River, BS0515 (where BS is bypass structure ) was added near the Pillsbury Silos site (200 East River Woods Parkway). The Honey Creek Project (proposed in the 2010 Facilities Plan) eliminated SSO site BS0303. Figure 5-3 shows the locations of the SSO sites by Wisconsin Pollutant Discharge Elimination System (WPDES) number. Figure 5-4 shows the simulated SSO volumes at each SSO location in the Mini-MOUSE model. These volumes are the cumulative SSO volumes from all events in the 63-year simulation period. The overflow at DC0103 was the dominant SSO location, followed by DC0402, BS0515, and BS0404 (the overflowing manholes near the Green Tree Pump Station). All of these sites were responsive to tunnel closure (tunnel-related SSOs). The SSO at BS0101 was due to MIS capacity limitations near Howell and Grange (i.e., not tunnel related). The total simulated SSO volume at all sites was 8,200 MG, which is equivalent to a simulated average annual volume of 130 MG per year Combined Sewer Overflow Locations and Volumes The Mini-MOUSE model has 20 CSO groups associated with the tunnel drop shafts. These are the same CSO groups used for the 2000 conditions, shown in Figure 4-5 of Chapter 4, Conveyance Assessment Existing 2000 Conditions. Figure 5-5 shows the simulated CSO volumes for each CSO group in the Mini-MOUSE model. The overflows associated with dropshafts CT-3/4 (where CT is cross town ) and CT-5/6 were the dominant CSO locations, followed by KK-3 and NS-7. The total simulated CSO volume at all sites was 47,600 MG, which is equivalent to an average annual volume of approximately 755 MG per year. This is 26% less CSO volume than the 2000 simulation results. For the 2020 configuration, the harbor siphons improvement project (one of the committed projects), increased the capacity of the siphons resulting in more gravity flow from the combined sewer service area to Jones Island Wastewater Treatment Plant (JIWWTP). As a result, the CSO volume was reduced. A secondary effect of treating more combined area flow at JIWWTP is a minor reduction in the treatment of separate area flow and, therefore, a small increase in the SSO volume. Most of the increase in the SSO volume, however, is due to the greater flow generated by 2020 Baseline projected increase in population and commercial/industrial growth. 5.5 Summary The models for 2020 conditions include the committed projects and the projected 2020 Baseline population and land use conditions. The simulated conveyance system performance shows more SSOs and slightly less frequent CSOs compared to the Existing 2000 conditions. The CSO volume decreased from 1,000 MG per year for 2000 conditions to 755 MG per year for 2020 Baseline conditions. Fewer CSOs is a consequence of the upgraded harbor siphons. The average number of CSOs decreased from 4.1 to 3.6 CSO events per year. 5-9

10 FIGURE 5-3 MINI-MOUSE SSO GROUPS, 2020 CONDITIONS 2020 CONVEYANCE REPORT 5/2/07 CR_ cdr

11 FIGURE 5-4 MINI-MOUSE SIMULATED SSO VOLUME: 63-YEAR PERIOD ( ) 2020 FACILITIES PLAN 5/2/07 CR_ cdr

12 CT-2 CT-3/4 CT-5/6 CT-7 CT-8 KK-1 KK-2 KK-3 KK-4 LM-N LM-S NS-4 NS-5 NS-6 NS-7 NS-8 NS-9 NS-10 NS-11 NS-12 12,000 10,000 8,000 6,000 4,000 2, Population and Land Use Conditions 2020 Facilities Total CSO Volume = 47,600 MG FIGURE 5-5 MINI-MOUSE SIMULATED CSO VOLUME: 63-YEAR PERIOD ( ) 2020 CONVEYANCE REPORT 5/1/07 CR_ cdr Simulated CSO Volume (MG) During 63-Year Record

13 In the separate sewer service area, the population increase produces significantly more base sanitary flow and more I/I. The average annual SSO volume increased from 36 MG per year for Existing 2000 conditions to 130 MG per year for 2020 Baseline conditions. The SSO recurrence interval also changed from 1.4-years to 0.8 years for 2020 Baseline conditions. Table 5-5 shows the simulated frequency of overflows and the simulated average annual volume of CSOs and SSOs per year for 2020 Baseline population and land use conditions. TABLE 5-5 SIMULATED COMBINED SEWER OVERFLOW AND SANITARY SEWER OVERFLOW FREQUENCY AND AVERAGE ANNUAL OVERFLOW VOLUME FOR 2020 BASELINE POPULATION AND LAND USE CONDITIONS CSO SSO Frequency of overflow 3.6 events per year 0.8-year recurrence interval Average Annual Volume (MG/year) CSO = Combined Sewer Overflow MG/year = Million Gallons per Year SSO = Sanitary Sewer Overflow 5-13

Table of Contents Chapter 1: Introduction Chapter 2: Description of Conveyance Facilities

Table of Contents Chapter 1: Introduction Chapter 2: Description of Conveyance Facilities Table of Contents Chapter 1: Introduction... 1-1 1.1 Purpose... 1-1 1.2 Description and Responsibilities of Milwaukee Metropolitan Sewerage District... 1-1 1.3 History of Facilities Planning... 1-1 1.4

More information

Milwaukee Metropolitan Sewerage District Conveyance and Treatment System. MACRO made available by

Milwaukee Metropolitan Sewerage District Conveyance and Treatment System. MACRO made available by Milwaukee Metropolitan Sewerage District Conveyance and Treatment System MACRO made available by Eric Loucks,, CDM MMSD Collection System Operations MMSD operates an extensive system of sanitary sewers

More information

Chapter 1: Introduction

Chapter 1: Introduction Chapter 1: Introduction 1.1 Purpose The purpose of this chapter is to describe the contents of the Conveyance Report, which is a component of the Milwaukee Metropolitan Sewerage District (MMSD) 2020 Facilities

More information

Chapter 10: Conveyance Recommended Plan

Chapter 10: Conveyance Recommended Plan 2020 Facilities Plan Conveyance Report Chapter 10: Conveyance Recommended Plan 10.1 Introduction and Plan Summary 10.1.1 Background As a regional governmental agency providing wastewater treatment and

More information

Chapter 3: Analytical Methods/Data Sources

Chapter 3: Analytical Methods/Data Sources 3.1 Introduction Chapter 3: Analytical Methods/Data Sources This chapter describes hydrologic and hydraulic models of the conveyance system and defines the range of application of each. This chapter also

More information

December 20, MMSD Contract No: M03002P01 MMSD File Code: M009PE000.P7400

December 20, MMSD Contract No: M03002P01 MMSD File Code: M009PE000.P7400 December 20, 2011 MMSD Contract No: M03002P01 MMSD File Code: M009PE000.P7400 Determining the Potential of Green Infrastructure to Reduce Overflows in Milwaukee Prepared for: Milwaukee Metropolitan Sewerage

More information

Table of Contents. Chapter 1: Introduction Facilities Plan Facilities Plan Report

Table of Contents. Chapter 1: Introduction Facilities Plan Facilities Plan Report Table of Contents Chapter 1: Introduction... 1-1 1.1 Purpose... 1-1 1.2 Description and Responsibilities of Milwaukee Metropolitan Sewerage District... 1-1 1.3 History of Facilities Planning... 1-3 1.3.1

More information

Chapter 3: Analytical Methods/Data Sources

Chapter 3: Analytical Methods/Data Sources Chapter 3: Analytical Methods/Data Sources 3.1 Introduction A large amount of data was collected and analyzed to assess the existing and future conditions in the Milwaukee Metropolitan Sewerage District

More information

Chapter 2: Description of Treatment Facilities

Chapter 2: Description of Treatment Facilities 2020 Facilities Plan Treatment Report 2.1 Introduction Chapter 2: Description of Treatment Facilities This chapter defines the Milwaukee Metropolitan Sewerage District (MMSD) service area. It also describes

More information

Hydraulic Modeling of Deep Tunnel Provides Cost Savings

Hydraulic Modeling of Deep Tunnel Provides Cost Savings 5 Hydraulic Modeling of Deep Tunnel Provides Cost Savings Taymour El-Hosseiny, Karen Reinhart and M. P. Cherian In 2005, the City of Columbus, Ohio submitted a plan to the Ohio Environmental Protection

More information

2020 Facilities Plan State of the Art Report. Table of Contents. Chapter 1: Introduction Appendix 1A: Production Theory...

2020 Facilities Plan State of the Art Report. Table of Contents. Chapter 1: Introduction Appendix 1A: Production Theory... Table of Contents Chapter 1: Introduction... 1-1 1.1 Background... 1-1 1.2 Objectives of the Production Theory Analysis... 1-5 Chapter 1 Figures 1-1 RWQMPU Study Area and MMSD 2020 Planning Boundary...

More information

WEF Collection Systems Conference 2017

WEF Collection Systems Conference 2017 Davenport, Iowa 14th District Diversion Study Karol Giokas, P.E., RJN Group Tom Leabhart, P.E., Davenport, IA ABSTRACT The 14 th District sanitary sewer basin in Davenport, Iowa has high levels of inflow

More information

Chapter 9: Alternative Analysis

Chapter 9: Alternative Analysis Chapter 9: Alternative Analysis 9.1 Introduction The development and evaluation of alternatives are key elements in the facilities planning process. The purpose of this chapter is to evaluate alternatives

More information

Capacity, Management, Operation and Maintenance (CMOM) Program Annual Report for Milwaukee Metropolitan Sewerage District

Capacity, Management, Operation and Maintenance (CMOM) Program Annual Report for Milwaukee Metropolitan Sewerage District Capacity,, Operation and Maintenance (CMOM) Program Annual Report for 2009 Milwaukee Metropolitan Sewerage District TABLE OF CONTENTS Section 1: Program Overview Section 2: Plan Section 3: Plan Section

More information

Design and Construction of Local Public and Private Sewers and Ancillary Facilities

Design and Construction of Local Public and Private Sewers and Ancillary Facilities Chapter 2 Design and Construction of Local Public and Private Sewers and Ancillary Facilities Subchapter I - General 2.101 Purpose...1 2.102 Applicability...1 2.103 Electronic data...1 2.104 Effect of

More information

Technical Memorandum No. 1

Technical Memorandum No. 1 DISTRICT OF COLUMBIA WATER AND SEWER AUTHORITY Serving the Public Protecting the Environment Technical Memorandum No. 1 Multi-Jurisdictional Use Facilities Capital Cost Allocation DRAFT April 17, 2013

More information

Chapter 5: Treatment Assessment Future Condition

Chapter 5: Treatment Assessment Future Condition 2020 Facilities Plan Treatment Report 5.1 Introduction Chapter 5: Treatment Assessment Future Condition The future performance of the Milwaukee Metropolitan Sewerage District (MMSD) wastewater treatment

More information

4. CONVEYANCE SYSTEM

4. CONVEYANCE SYSTEM 4. CONVEYANCE SYSTEM 4.1. Background... 1 4.2. Existing Conveyance System... 1 4.3. Current Conveyance Deficiencies for Centralized Treatment... 4 4.4. Existing Facility Condition Assessment... 5 CONVEYANCE

More information

Assessing SWMM 5 Hydrologic Parameter Benefits for Model Calibration

Assessing SWMM 5 Hydrologic Parameter Benefits for Model Calibration Assessing SWMM 5 Hydrologic Parameter Benefits for Model Calibration Justin Siegrist, 1 Daniel Anderson, 2 Joseph Koran, 2 Mark Pribak, 3 Uzair M. (Sam) Shamsi 4 and Dave White 1 1 Wade Trim, Inc., Cincinnati,

More information

Community Open House

Community Open House Mayor Kasim Reed The Department of Watershed Management & Atlanta Memorial Park Conservancy Community Open House 10/28/2016 1 AGENDA: Meet & Greet Opening Remarks & Introductions District 8 Council Member

More information

LEHIGH COUNTY REGIONAL SEWER SYSTEM

LEHIGH COUNTY REGIONAL SEWER SYSTEM LEHIGH COUNTY AUTHORITY Lowhill Township New Tripoli, PA 18066 LEHIGH COUNTY REGIONAL SEWER SYSTEM Kline s Island WWTP EPA Administrative Order Public Meeting Lehigh County Government Center November 13,

More information

Chapter 8 Addressing I/I Issues and High Flows

Chapter 8 Addressing I/I Issues and High Flows Chapter Outline Chapter 8 Addressing I/I Issues and High Flows This chapter is organized into the following sections: Introduction Background Estimation of Infiltration Volume Conveyance Costs Effect of

More information

Storm Water and Sanitary Sewer

Storm Water and Sanitary Sewer Public Works Department Summary Report on Planned Capital Improvements Storm Water and Sanitary Sewer Introduction Public Works has assembled this summary report to highlight major capital improvements

More information

Somerset Raritan Valley Sewerage Authority SSO Abatement and Storm Control Treatment Facility

Somerset Raritan Valley Sewerage Authority SSO Abatement and Storm Control Treatment Facility Somerset Raritan Valley Sewerage Authority SSO Abatement and Storm Control Treatment Facility Michael Sanders, P.E., Kleinfelder Collection Systems Specialty Conference NEWEA September 12, 2016 Presentation

More information

Sanitary Sewer 101. Jan. 12, 2016 Keith Fisher, P.E. Director of Public Works

Sanitary Sewer 101. Jan. 12, 2016 Keith Fisher, P.E. Director of Public Works Sanitary Sewer 101 Jan. 12, 2016 Keith Fisher, P.E. Director of Public Works What We Will Cover -What is Sanitary Sewer? -Components -History -What types of systems are there? -What types of materials

More information

CHAPTER 4 SYSTEM DESIGN CRITERIA

CHAPTER 4 SYSTEM DESIGN CRITERIA INTRODUCTION CHAPTER 4 SYSTEM DESIGN CRITERIA Adequate design of the District s wastewater conveyance facilities requires the determination of the quantity of wastewater from contributing sources. The

More information

Integrated Long Term Control Plan Targeted Inflow Reduction for CSO Control. OWEA Conference June 29, 2016

Integrated Long Term Control Plan Targeted Inflow Reduction for CSO Control. OWEA Conference June 29, 2016 Integrated Long Term Control Plan Targeted Inflow Reduction for CSO Control OWEA Conference June 29, 2016 WWTP Average Daily Flow 6 MGD Peak Flow (Primary Only) 12 MGD Collection System 123 Miles (8 to

More information

Managing Water Where It Falls: Green Infrastructure in Milwaukee, Wisconsin

Managing Water Where It Falls: Green Infrastructure in Milwaukee, Wisconsin Managing Water Where It Falls: Green Infrastructure in Milwaukee, Wisconsin Presented by: Kevin L. Shafer, Executive Director Milwaukee Metropolitan Sewerage District (MMSD) Hosted by the Association of

More information

Regional Hydraulic Model Plan

Regional Hydraulic Model Plan APPENDIX 3 Regional Hydraulic Model Plan November 17, 2008 Contents Section 1 Introduction Section 2 Model Objectives and Capabilities 2.1 Model Software Capabilities... 2-1 Section 3 Model Development

More information

Environmental Task Force SSSMP Summary, September 18, 2011 Scheduled for City Council Approval September 26, 2017

Environmental Task Force SSSMP Summary, September 18, 2011 Scheduled for City Council Approval September 26, 2017 Attachment 1 Environmental Task Force SSSMP Summary, September 18, 2011 Scheduled for City Council Approval September 26, 2017 Sanitary Sewer System Master Plan Summary Points - City s sanitary system

More information

City of Elmhurst Comprehensive Flooding Plan December 5, 2011

City of Elmhurst Comprehensive Flooding Plan December 5, 2011 December 5, 2011 City of Elmhurst Comprehensive Flooding Plan December 5, 2011 Sanitary Sewer System Summary of Findings Prepared by CBBEL RJN Group Sanitary Sewer Presentation Outline Where: Sources of

More information

Executive Summary. Introduction

Executive Summary. Introduction Executive Summary Introduction The City of Terre Haute has developed a (CSO LTCP), which describes the measures they will take to reduce the combined sewer overflows and improve water quality in the Wabash

More information

Surge Analysis for the Proposed OSIS Augmentation Relief Sewer Tunnel

Surge Analysis for the Proposed OSIS Augmentation Relief Sewer Tunnel 5 Surge Analysis for the Proposed OSIS Augmentation Relief Sewer Tunnel M. P. Cherian, Ari Pandian, Karen Ridgway and Gregory Barden The City of Columbus, Ohio, submitted a wet weather management plan

More information

Consent Decree Appendix 1. Control Measures and Performance Criteria

Consent Decree Appendix 1. Control Measures and Performance Criteria Case: 1:10-cv-02895-DCN Doc #: 2-2 Filed: 12/22/10 1 of 6. PageID #: 82 United States and State of Ohio v. Northeast Ohio Regional Sewer District Consent Decree Appendix 1 Control Measures and Performance

More information

Long-Term CSO Control Plan for North Dorchester Bay and the Reserved Channel

Long-Term CSO Control Plan for North Dorchester Bay and the Reserved Channel Massachusetts Water Resources Authority Long-Term CSO Control Plan for North Dorchester Bay and the Reserved Channel Frederick A. Laskey Executive Director March 8, 2004 How Sewer Separation Works 2 How

More information

HSA SEWER PROJECT FAQs

HSA SEWER PROJECT FAQs HSA SEWER PROJECT FAQs Q1: Why do some residents in the Phase II project area have only 45 days to comply with the HSA water tightness regulations? A1: Some homeowners in the Phase II project area are

More information

Appendix A3 Connector Lines Between Stations June 1999 (Updated April 2010)

Appendix A3 Connector Lines Between Stations June 1999 (Updated April 2010) Appendix A3 Connector Lines Between Stations June 1999 (Updated April 2010) MADISON METROPOLITAN SEWERAGE DISTRICT COLLECTION SYSTEM TECHNICAL GUIDELINES APPENDIX 3 CONNECTOR LINES BETWEEN STATIONS Stations

More information

Hartford WPCF Master Plan Clean Water Project. Executive Summary. February 2010

Hartford WPCF Master Plan Clean Water Project. Executive Summary. February 2010 Hartford WPCF Master Plan Clean Water Project Executive Summary February 2010 An outline of work at the Hartford Water Pollution Control Facility that will achieve compliance with regulatory requirements

More information

Using SWMM 5 to Develop Wet Weather Operating Strategies in a Large Sewer System

Using SWMM 5 to Develop Wet Weather Operating Strategies in a Large Sewer System 15 Using SWMM 5 to Develop Wet Weather Operating Strategies in a Large Sewer System Mi Chen, Fang Cheng, Edward Burgess, Gregory Barden, Hunter Kelly and Timothy Fallara The City of Columbus wastewater

More information

AUTHORITY OF THE BOROUGH OF CHARLEROI WASHINGTON COUNTY, PENNSYLVANIA ACT 537 SEWAGE FACILITIES PLAN UPDATE

AUTHORITY OF THE BOROUGH OF CHARLEROI WASHINGTON COUNTY, PENNSYLVANIA ACT 537 SEWAGE FACILITIES PLAN UPDATE PLAN SUMMARY AUTHORITY OF THE BOROUGH OF CHARLEROI WASHINGTON COUNTY, PENNSYLVANIA ACT 537 SEWAGE FACILITIES PLAN UPDATE The Pennsylvania Sewage Facilities Act (Act 537) was enacted by the Pennsylvania

More information

CHAPTER 6 COLLECTION SYSTEM HYDRAULIC MODEL

CHAPTER 6 COLLECTION SYSTEM HYDRAULIC MODEL CHAPTER 6 COLLECTION SYSTEM HYDRAULIC MODEL INTRODUCTION The District developed a hydraulic model of the sanitary sewer system as part the 2000 Wastewater Comprehensive Plan. The output from this model

More information

Chapter 3 Previous Studies

Chapter 3 Previous Studies Chapter 3 Previous Studies The Vista Grande stormwater conveyance system and watershed area has been evaluated in a number of reports and studies for the CCSF, the Daly City and San Mateo County over the

More information

North Sandwich Sanitary Sewer System Flow Monitoring & Stormwater Conveyance Analysis Studies

North Sandwich Sanitary Sewer System Flow Monitoring & Stormwater Conveyance Analysis Studies North Sandwich Sanitary Sewer System Flow Monitoring & Stormwater Conveyance Analysis Studies City of Sandwich Flood Reduction Program Presented By: Jeffrey W. Freeman, P.E., CFM, LEED AP Timothy N. Paulson,

More information

MINUTES SEWRPC ADVISORY COMMITTEE ON REGIONAL WATER QUALITY MANAGEMENT PLAN UPDATE FOR THE GREATER MILWAUKEE WATERSHEDS

MINUTES SEWRPC ADVISORY COMMITTEE ON REGIONAL WATER QUALITY MANAGEMENT PLAN UPDATE FOR THE GREATER MILWAUKEE WATERSHEDS MINUTES SEWRPC ADVISORY COMMITTEE ON REGIONAL WATER QUALITY MANAGEMENT PLAN UPDATE FOR THE GREATER MILWAUKEE WATERSHEDS DATE: December 14, 2006 TIME: PLACE: 1:30 p.m. City of Mequon City Hall Upper Level

More information

PHASE 1 OF THE CONSENT DECREE/ WET WEATHER IMPROVEMENT PROGRAM ACCOMPLISHMENTS THROUGH 2017

PHASE 1 OF THE CONSENT DECREE/ WET WEATHER IMPROVEMENT PROGRAM ACCOMPLISHMENTS THROUGH 2017 PHASE 1 OF THE CONSENT DECREE/ WET WEATHER IMPROVEMENT PROGRAM ACCOMPLISHMENTS THROUGH 2017 MSD is delivering Phase 1 is under the original cost estimate Improving Trends in Water Quality MSDGC has completed

More information

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN PLANT GASTON GYPSUM POND ALABAMA POWER COMPANY

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN PLANT GASTON GYPSUM POND ALABAMA POWER COMPANY INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN PLANT GASTON GYPSUM POND ALABAMA POWER COMPANY Section 257.82 of EPA s regulations requires the owner or operator of an existing or new CCR surface impoundment or

More information

City of Gardiner, Maine Wastewater Committee Meeting. CSO Storage Tank & Screening Evaluation

City of Gardiner, Maine Wastewater Committee Meeting. CSO Storage Tank & Screening Evaluation City of Gardiner, Maine Wastewater Committee Meeting CSO Storage Tank & Screening Evaluation December 11, 2013 Introduction - Update on field work - Flow monitoring - Survey - GIS - Borings - Assessment

More information

Maximizing Your Investment

Maximizing Your Investment Maximizing Your Investment City of Lorain Collection System Optimization Eliminates SSOs Ohio Water Environment Association June 24, 2015 Mary Garza City of Lorain Laura McGinnis, P.E. ARCADIS Tim Ruggaber,

More information

Sanitation District No.1 Cost Effectively Reduces Overflows Into the Ohio River

Sanitation District No.1 Cost Effectively Reduces Overflows Into the Ohio River Sanitation District No. 1 of Northern Kentucky Sanitation District No.1 Cost Effectively Reduces Overflows Into the Ohio River Ohio WEA Collection Systems Workshop May 5, 2011 Sanitation District No. 1

More information

The Indianapolis Deep Tunnel Surge Analysis: Debugging Future Operational Issues in the Present

The Indianapolis Deep Tunnel Surge Analysis: Debugging Future Operational Issues in the Present The Indianapolis Deep Tunnel Surge Analysis: Debugging Future Operational Issues in the Present Karen Ridgway, P.E., Applied Science Inc. Chris Ranck, P.E., BCEE, D.WRE, RW Armstrong Dave Klunzinger, P.E.,

More information

CRYSTAL LAKE FLOODING STUDY EXECUTIVE SUMMARY

CRYSTAL LAKE FLOODING STUDY EXECUTIVE SUMMARY Project #08223 CRYSTAL LAKE FLOODING STUDY EXECUTIVE SUMMARY PREPARED FOR: City of Crystal Lake 100 West Woodstock Street Crystal Lake, Illinois 60014 FEBRUARY 11, 2009 26575 W. COMMERCE DRIVE, SUITE 601,

More information

This page is blank to facilitate double-sided printing.

This page is blank to facilitate double-sided printing. Supplement No. 2 September 2013 This page is blank to facilitate double-sided printing. Introduction and Purpose The Metropolitan St. Louis Sewer District (MSD) prepared an update to its Combined Sewer

More information

Wilmette - Background

Wilmette - Background Reducing Basement Backups through Intergovernmental Cooperation and Design-Build Presented By Michael N. Young, P.E. Brigitte Ann Berger, P.E. Wilmette - Background North Shore Suburb of Chicago 5 Square

More information

EXECUTIVE SUMMARY ES.1 INTRODUCTION

EXECUTIVE SUMMARY ES.1 INTRODUCTION ES.1 INTRODUCTION The purpose of this Wastewater Collection System Master Plan (Master Plan) is to provide the City of Lake Oswego (City) a plan for management and operation of their wastewater collection

More information

The Metropolitan District. Stormwater & I/I Reduction Presentation March 16, 2017

The Metropolitan District. Stormwater & I/I Reduction Presentation March 16, 2017 The Metropolitan District Stormwater & I/I Reduction Presentation March 16, 2017 AGENDA Introductions/MDC Background CWP Background Consent Decree/SSO Program Discussion Private Inflow Discussion Program

More information

Interim Interconnector Sewer Operational Plan

Interim Interconnector Sewer Operational Plan Interim Interconnector Sewer Operational Plan Gary Hickman Plant Manager Jackson Pike Wastewater Treatment Plant Jeff Hall Assistant Plant Manager Southerly Wastewater Treatment Plant Columbus Area Collection

More information

Using SWMM EXTRAN to Simulate WWTP Hydraulics

Using SWMM EXTRAN to Simulate WWTP Hydraulics 11 Using SWMM EXTRAN to Simulate WWTP Hydraulics Derek Wride, Carl Chan, Ben Gamble, Joseph Koran and Susan Moisio SWMM EXTRAN has been successfully deployed to simulate wastewater treatment plant hydraulics

More information

Report. Inflow Design Flood Control System Plan St. Clair Power Plant St. Clair, Michigan. DTE Energy Company One Energy Plaza, Detroit, MI

Report. Inflow Design Flood Control System Plan St. Clair Power Plant St. Clair, Michigan. DTE Energy Company One Energy Plaza, Detroit, MI Report Inflow Design Flood Control System Plan St. Clair Power Plant St. Clair, Michigan DTE Energy Company One Energy Plaza, Detroit, MI October 14, 2016 NTH Project No. 62-160047-04 NTH Consultants,

More information

Evaluation of Collection System Design Standards

Evaluation of Collection System Design Standards Wastewater Master Plan DWSD Project No. CS-1314 Evaluation of Collection System Design Standards Technical Memorandum Original Date: August 9, 2001 Revision Date: September 2003 Author: CDM Table of Contents

More information

LAKE MICHIGAN DIVERSION ACCOUNTING WATER YEAR 2008 ANNUAL REPORT

LAKE MICHIGAN DIVERSION ACCOUNTING WATER YEAR 2008 ANNUAL REPORT LAKE MICHIGAN DIVERSION ACCOUNTING WATER YEAR 2008 ANNUAL REPORT EXECUTIVE SUMMARY This document is the Water Year (WY) 2008 Annual Report of the Chicago District, U. S. Army Corps of Engineers activities

More information

CHAPTER 8: SANITARY SEWER

CHAPTER 8: SANITARY SEWER CHAPTER 8: SANITARY SEWER 8.1 EXECUTIVE SUMMARY The Metropolitan Land Planning Act (amended 1995) requires local governments to prepare comprehensive plans and submit them to the Metropolitan Council (MCES)

More information

Greater Milwaukee Watersheds Pathogen Source Identification

Greater Milwaukee Watersheds Pathogen Source Identification Greater Milwaukee Watersheds Pathogen Source Identification Executive Summary MMSD Contract No. M03016P02 Greater Milwaukee Watersheds Pathogen Source Identification Executive Summary Report: March 1,

More information

Technical Memorandum - Final

Technical Memorandum - Final Technical Memorandum Final Water andenvironment Subject: Tuscany Meadows Offsite Sewerage Impacts Evaluation Prepared For: Patricia Chapman, DDSD Prepared by: Chris van Lienden, RMC Reviewed by: Gisa Ju,

More information

DOWNTOWN SHALL NOT FLOOD AGAIN

DOWNTOWN SHALL NOT FLOOD AGAIN DOWNTOWN SHALL NOT FLOOD AGAIN Robert C. Steidel**, Robert Stone**, Lin Liang*, Edward J. Cronin*, Federico E. Maisch* *Greeley and Hansen LLC 2116 W Laburnum Avenue, Suite 100 Richmond, Virginia 23227

More information

APPENDIX F: DRAINAGE AND STORMWATER MANAGEMENT

APPENDIX F: DRAINAGE AND STORMWATER MANAGEMENT APPENDIX F: DRAINAGE AND STORMWATER MANAGEMENT Downtown Ottawa Transit Tunnel: Tunney s Pasture to Blair Station via a Downtown LRT Tunnel Prepared for: City of Ottawa 110 Laurier Avenue West Ottawa, ON

More information

RULES OF THE TENNESSEE DEPARTMENT OF ENVIRONMENT AND CONSERVATION WATER RESOURCES DIVISION CHAPTER PRIORITY RANKING SYSTEM

RULES OF THE TENNESSEE DEPARTMENT OF ENVIRONMENT AND CONSERVATION WATER RESOURCES DIVISION CHAPTER PRIORITY RANKING SYSTEM RULES OF THE TENNESSEE DEPARTMENT OF ENVIRONMENT AND CONSERVATION WATER RESOURCES DIVISION CHAPTER 0400-46-01 PRIORITY RANKING SYSTEM TABLE OF CONTENTS 0400-46-01-.01 Priority Ranking System: General 0400-46-01-.03

More information

The South Hartford Conveyance and Storage Tunnel

The South Hartford Conveyance and Storage Tunnel The South Hartford Conveyance and Storage Tunnel South Hartford The Metropolitan District June 16 th -17 th, 2015 Purpose of This Public Meeting Communicate with Residents Directly Adjacent to the Project

More information

Streamlining I/I Repairs in Berlin Charter Township

Streamlining I/I Repairs in Berlin Charter Township Case Study: Streamlining I/I Repairs in Berlin Charter Township Presented by: Rich Grant, PE Agenda Discussion of the problems & the SAW I/I Evaluation & SSES = Asset Management Groundtruthing of Results

More information

Miami Upgrades. Deficiencies in Florida s

Miami Upgrades. Deficiencies in Florida s Miami Upgrades Florida s Miami-Dade Water and Sewer Department creates a $13.5 billion capital improvement plan to provide safe and high-quality service. by Janice Hoppe Deficiencies in Florida s Miami-Dade

More information

SECTION 1 SUMMARY, CONCLUSIONS AND RECOMMENDATIONS

SECTION 1 SUMMARY, CONCLUSIONS AND RECOMMENDATIONS SECTION 1 SUMMARY, CONCLUSIONS AND RECOMMENDATIONS This Combined Sewer Overflow (CSO) Master Plan was prepared to meet the conditions set forth in Special Condition A, Paragraph 4 of the February 6, 2009

More information

Section 3 Modeling and Capacity Analysis

Section 3 Modeling and Capacity Analysis Section 3 Modeling and Capacity Analysis The capacity of the existing DSRSD wastewater collection system and the future capacity requirements of the system were determined through hydraulic modeling. This

More information

Massachusetts Water Resources Authority Update on 2018 Water and Wastewater Master Plan

Massachusetts Water Resources Authority Update on 2018 Water and Wastewater Master Plan Massachusetts Water Resources Authority Update on 2018 Water and Wastewater Master Plan February 12, 2019 Background 33 Years of MWRA Capital Investment FY86 18 $8.3 Billion Capital Spending 70% on Wastewater

More information

Sewer Modeling of Near- Term Development Technical Memorandum

Sewer Modeling of Near- Term Development Technical Memorandum Sewer Modeling of Near- Term Development City of Reedley, CA March 8, 2018 Page Intentionally Blank The City of Reedley (City) is anticipating near-term developments to the north of the City s currently

More information

APPENDIX A - INTEGRATED PLAN PRIORITIZED PROJECT LIST

APPENDIX A - INTEGRATED PLAN PRIORITIZED PROJECT LIST APPENDIX A - INTEGRATED PLAN PRIORITIZED PROJECT LIST Rank Project Name Integrated Baseline Plan Scenario Scenario 2040 2040 Total Environmental Score Total Economic Score Total Social Score 1 Northside

More information

EAST VALLEY WATER DISTRICT Wastewater Collection System Master Plan. Table 4-1 Capacity Evaluation d/d Criteria

EAST VALLEY WATER DISTRICT Wastewater Collection System Master Plan. Table 4-1 Capacity Evaluation d/d Criteria EAST VALLEY WATER DISTRICT Wastewater Collection System Master Plan 4 Capacity Analysis The capacity analysis used the calibrated dry weather and wet weather wastewater collection system model to evaluate

More information

CITY OF BROOKFIELD STORMWATER MANAGEMENT PLAN APPLICATION PACKAGE STANDARD FORM

CITY OF BROOKFIELD STORMWATER MANAGEMENT PLAN APPLICATION PACKAGE STANDARD FORM CITY OF BROOKFIELD STORMWATER MANAGEMENT PLAN APPLICATION PACKAGE STANDARD FORM Contents: Storm Water Management Plan Application Dry Weather Storm Sewer Visual Inspection Form Rainfall Depths for Design

More information

Massachusetts Water Resources Authority. [Presenter Title]

Massachusetts Water Resources Authority. [Presenter Title] Massachusetts Water Resources Authority [Presenter Title] Deer Island Operations: Self-Generation Self-Generation Power Generation, MWh J A S O N D J F M A M J Hydro CTGs STGs 100% 90% 80% 70% 60% 50%

More information

Wastewater Flow Monitoring Services

Wastewater Flow Monitoring Services Wastewater Flow Monitoring Services For San Gabriel, CA July 13, 2015 through July 21, 2015 Revised October 9, 2015 Leaders in Sewer Flow Monitoring Services 601 N. Parkcenter Dr., Suite 209 Santa Ana,

More information

Water Management and Diversion Accounting Activities Annual Report. (October 2013 September 2014)

Water Management and Diversion Accounting Activities Annual Report. (October 2013 September 2014) Water Management and Diversion Accounting Activities 2014 Annual Report (October 2013 September 2014) Hydrology and Hydraulics Section Design Branch Technical Services Division Chicago District October

More information

Refinement Task 19 Minne Lusa Basin Search for Hybrid Alternatives

Refinement Task 19 Minne Lusa Basin Search for Hybrid Alternatives Refinement Task 19 Minne Lusa Basin Search for Hybrid Alternatives TO: Roger Coffey, PMT Document Control Center, CH2M Hill COPY: Jim Theiler, City of Omaha Scott Aurit, PMT Tom Heinemann, PMT FROM: Jim

More information

HARTFORD METROPOLITAN DISTRICT (MDC) WET WEATHER EXPANSION PROJECT PHASE 1 NEW 200 HEADWORKS FACILITIES

HARTFORD METROPOLITAN DISTRICT (MDC) WET WEATHER EXPANSION PROJECT PHASE 1 NEW 200 HEADWORKS FACILITIES HARTFORD METROPOLITAN DISTRICT (MDC) WET WEATHER EXPANSION PROJECT PHASE 1 NEW 200 HEADWORKS FACILITIES THOMAS A. TYLER, PE GREGORY S. BAZYDOLA, PE NEWEA Conference January 22, 2018 Presentation Agenda

More information

Sewer Separation and Stormwater Management (with Emphasis on Flood Control)

Sewer Separation and Stormwater Management (with Emphasis on Flood Control) Sewer Separation and Stormwater Management (with Emphasis on Flood Control) July 15, 2002 Justin Wiedeman, P.E. NPU A Board Member Chastain Civic Association Board Member This Presentation Came About Because:

More information

Using Sanitary Sewer I/I Field Data to Calibrate a Storm Sewer Model

Using Sanitary Sewer I/I Field Data to Calibrate a Storm Sewer Model 15 Using Sanitary Sewer I/I Field Data to Calibrate a Storm Sewer Model Josh A. Reinicke, Marc A. Lehmann and C. Timothy Fallara Since 1992, the City of Columbus Division of Sewerage and Drainage (DOSD)

More information

HYDRAULIC HYDRODYNAMIC MODELING AS AN EFFECTIVE MANAGEMENT TOOL FOR LARGE COLLECTION SYSTEMS - THE L.A. STORY

HYDRAULIC HYDRODYNAMIC MODELING AS AN EFFECTIVE MANAGEMENT TOOL FOR LARGE COLLECTION SYSTEMS - THE L.A. STORY HYDRAULIC HYDRODYNAMIC MODELING AS AN EFFECTIVE MANAGEMENT TOOL FOR LARGE COLLECTION SYSTEMS - THE L.A. STORY Fernando Gonzalez, Adel Hagekhalil, Bryan Trussell, City of Los Angeles Bureau of Sanitation

More information

Green Build-Out Model: Quantifying Stormwater Management Benefits of Trees & Green Roofs in the District of Columbia

Green Build-Out Model: Quantifying Stormwater Management Benefits of Trees & Green Roofs in the District of Columbia Green Build-Out Model: Quantifying Stormwater Management Benefits of Trees & Green Roofs in the District of Columbia Casey Trees Endowment Fund (Courtesy American Forests) LimnoTech Piney Branch Outfall

More information

4 EXISTING FACILITIES EVALUATION

4 EXISTING FACILITIES EVALUATION 4 EXISTING FACILITIES EVALUATION The City is served by a combination of wastewater collection, conveyance, and treatment systems. The City owns and operates the collection system that collects wastewater

More information

Milwaukee Metropolitan Sewerage District

Milwaukee Metropolitan Sewerage District Milwaukee Metropolitan Sewerage District Notice of Information Gathering for Proposed Rule Making Regarding Acceptance by MMSD of Discharges of Noncontact Cooling Water The Milwaukee Metropolitan Sewerage

More information

APPENDIX 7. MWRA Completed Projects

APPENDIX 7. MWRA Completed Projects APPENDIX 7 MWRA Completed Projects Project Total Cost ($000) Wastewater $4,097,634 Waterworks $385,101 Business and Operations $46,180 Support MWRA Total $4,528,915 MWRA Completed Projects (as of June

More information

THE STUDY ON INTEGRATED URBAN DRAINAGE IMPROVEMENT FOR MELAKA AND SUNGAI PETANI IN MALAYSIA FINAL REPORT

THE STUDY ON INTEGRATED URBAN DRAINAGE IMPROVEMENT FOR MELAKA AND SUNGAI PETANI IN MALAYSIA FINAL REPORT THE GOVERNMENT OF MALAYSIA PRIME MINISTER S DEPARTMENT ECONOMIC PLANNING UNIT THE STUDY ON INTEGRATED URBAN DRAINAGE IMPROVEMENT FOR MELAKA AND SUNGAI PETANI IN MALAYSIA FINAL REPORT VOL. 5: TECHNICAL

More information

WASTEWATER TREATMENT PLANT AND DALE AVENUE PUMP STATION WET WEATHER CAPACITY ANALYSIS AND ALTERNATIVES EVALUATION

WASTEWATER TREATMENT PLANT AND DALE AVENUE PUMP STATION WET WEATHER CAPACITY ANALYSIS AND ALTERNATIVES EVALUATION WASTEWATER TREATMENT PLANT AND DALE AVENUE PUMP STATION WET WEATHER CAPACITY ANALYSIS AND ALTERNATIVES EVALUATION Prepared for City of San M ateo, California July 7, 2009 WASTEWATER TREATMENT PLANT AND

More information

ENGINEERED SOLUTIONS. Wastewater Solutions

ENGINEERED SOLUTIONS. Wastewater Solutions ENGINEERED SOLUTIONS Wastewater Solutions Municipal and Industrial Wastewater Solutions For more than 100 years (since 1904), Contech Engineered Solutions LLC has been a leader in the pipe industry. From

More information

Rulemaking Hearing Rules of the Tennessee Department of Environment and Conservation State Revolving Fund Loan Program

Rulemaking Hearing Rules of the Tennessee Department of Environment and Conservation State Revolving Fund Loan Program Rulemaking Hearing Rules of the Tennessee Department of Environment and Conservation State Revolving Fund Loan Program Chapter 1200-22-01 Priority Ranking System Amendments Table of Contents 1200-22-01-.01

More information

Bloomingdale Neighborhood Flooding Mitigation Washington, DC

Bloomingdale Neighborhood Flooding Mitigation Washington, DC District of Columbia Water and Sewer Authority George S. Hawkins, General Manager Briefing on: Bloomingdale Neighborhood Flooding Mitigation Washington, DC Briefing for: Federal Water Quality Association

More information

WELCOME TO THE SEPTEMBER EDITION OF THE 2016 M&R SEMINAR SERIES

WELCOME TO THE SEPTEMBER EDITION OF THE 2016 M&R SEMINAR SERIES 2006 R&D SEMINAR SERIES WELCOME TO THE SEPTEMBER EDITION OF THE 2016 M&R SEMINAR SERIES SAFETY PRECAUTIONS BEFORE WE BEGIN PLEASE FOLLOW EXIT SIGN IN CASE OF EMERGENCY EVALUATION AUTOMATED EXTERNAL DEFIBRILLATOR

More information

City of Lawrence, Kansas

City of Lawrence, Kansas Table of Contents 1 EXECUTIVE SUMMARY... 1-1 1.1 General Overview... 1-1 1.2 Phase 1 Field Investigation Findings... 1-3 1.2.1 Public Sector Inflow/Infiltration Sources... 1-3 1.2.2 Private Sector Inflow/Infiltration

More information

City of Elmhurst Comprehensive Flooding Plan Task Force Meeting

City of Elmhurst Comprehensive Flooding Plan Task Force Meeting April 26, 2011 City of Elmhurst Comprehensive Flooding Plan Task Force Meeting Prepared by CBBEL RJN Group Meeting Overview Progress Report on Comprehensive Plan Sanitary Sewer System Storm Sewer System

More information

APPENDIX 6. MWRA Completed Projects

APPENDIX 6. MWRA Completed Projects Wastewater $3,998,920 Waterworks $167,781 Business and Operations $33,644 Support MWRA Total $4,200,345 Wastewater Residuals Management Interim Phase S.106 Wellesley Extension Replacement Sewer $109,407

More information

Anacostia River Tunnel Briefing For: ANC 6B

Anacostia River Tunnel Briefing For: ANC 6B District of Columbia Water and Sewer Authority George S. Hawkins, General Manager Briefing On: Anacostia River Tunnel Briefing For: ANC 6B October 26, 2011 Agenda Welcome and Introductions DC Water Organization

More information

Russell Avenue Slip Technical Report

Russell Avenue Slip Technical Report Russell Avenue Slip Technical Report Prepared by Jenny C. Fisher, Courtney L. Winter, Sandra L. McLellan School of Freshwater Sciences University of Wisconsin-Milwaukee Summary: The McLellan lab has monitored

More information

The City of Cocoa (City) is located in east

The City of Cocoa (City) is located in east FWRJ Reclaimed Water and Stormwater: A Perfect Pair to Meet Total Maximum Daily Load Wasteload Allocations? Danielle Honour, James Wittig, John A. Walsh, and Don Stevens Danielle Honour, P.E., D.WRE, and