2 INDEX SECTION PAGE NO. I. Executive Summary 2 II. Introduction 2 III. Project Description 4 IV. Site Analysis 9 V. Proposed Infrastructure 10 VI. R& R Plan 14 VII. Project Implementation Strategy and 14 Financial analysis VIII. Conclusion 15

3 1.0 EXECUTIVE SUMMARY The proposed project is an initiative of Odisha Urban Infrastructure Development Fund (OUIDF) under the scheme of Swatchh Bharat Mission, GoI to cater the needs of municipal solid waste management in different ULBs of Odisha. The proposed project is being developed under Integrated Municipal Solid Waste Management approach which consists of decentralized composting facilities and centralized sanitary landfill facility. In this approach, each ULB have their own processing system while a common sanitary landfill is being proposed to receive inert and rejects of compost. The entire study is being carried out in accordance to the MSW rules In this context, studied ULB will have their own processing system and common sanitary landfill (capacity TPD at Bealpahar) will be developed and constructed which will be used by Brajrajnagar as well as Belpahar. Further, the estimated cost for entire proposed facility of Belpahar has been estimated about Lakhs. 2.0 INTRODUCTION ULBs are responsible for providing solid waste related services like arrangement for road sweeping, collection of waste, transportation facility; processing and disposal of waste but ULBs has limited technical, managerial and financial resources, inadequate to manage the increased waste quantity. However, the services provided by the municipal authorities are outdated, unscientific and inefficient. Waste is generally disposed of by the citizens on the streets, drains, open spaces, water bodies, etc., which create in-sanitary conditions. Against this background, Odisha Urban Infrastructure Development Fund (OUIDF) under the scheme of Swatchh Bharat Mission has initiated development of projects for scientific management of MSW in the state of Odisha, keeping in view the obligations of Urban Local Bodies (ULBs) under MSW (M&H) Rules 2000 and the present status of Municipal Solid Waste (MSW) management. For above purpose, the cluster approach has been adopted which shall be viable. Now it is proposed to implement an Integrated MSW Management Project for studied ULBs (comprising of two ULB namely Barjrajnagar and Belpahar) with decentralized processing system facility at each ULB and development of Page 1

4 Sanitary Land Fill site to dispose-off Processing rejects / inerts at Village Kadupada which is existing dumping site under the ownership of Belpahar Municipality. The proposed Integrated MSW Management Project will comprise of all component of MSW management but not limited to: 1. Direct collection of segregated MSW (Door to Door Collection) within Municipal limits of both ULBs. 2. Street cleaning and efficient implementation of MSW rules. 3. Storage & Transportation of segregated MSW from secondary collection points to MSW processing site of all ULBs with the provision for separate transportation of street sweeping & drain cleaning waste. 4. Transportation of inert and rejects of composting to designated landfill site. 5. MSW processing facility to process 26.6 MT/day of MSW collected & transported from Belpahar Municipality. 6. To develop centralized engineered sanitary landfill site of TPD capacity for scientific disposal of processing rejects/inerts at Village Kadupada. The proposed MSW management project will addresses mandatory provisions made in Municipal Solid Waste (Management and Handling) Rules 2000, which necessitates providing proper management facilities for MSW including treatment and disposal. The rules encourage reuse, recycle and recover i.e. waste minimization and adequate scientific processing of MSW prior to its final disposal to minimize the volume of MSW to be land filled. As per the standards laid down in Schedule III of the MSW (Management & Handling) Rules 2000, only processing rejects & inert material shall be disposed in the engineered landfills. Inspite of this, proposed project will increase cleanliness in studied ULB. Directly or indirectly business opportunity and employment will increase after implementation of this project. Page 2

5 3.0 PROJECT DESCRPTION As per the EIA notification dated 14th September, 2006, as amended till date, the proposed project falls under the Project / Activity: 7 (i) Common Municipal Solid Waste Management Facility (CMSWMF) under Category A because the proposed site area falls under CPAs of IB- Jharsuguda cluster. The location map of study area is as shown below:- Figure- I : Location map of project area The proposed project site for installation of composting unit and development of landfill site is located at Kadupada which is as shown below:- Page 3

6 Figure- II : Location of Project Site Project Site With considering the EIA notification and their regular amendments, the existing landuse pattern of study area is shown below and the salient features of proposed project is tabulated in table- I Figure- III Study area Project Site Page 4

7 Table:- I Salient Features of Project S.No Particulars Detail 1. Name of ULB Belpahar Municipality 2. Total no. of Ward Total Area Km 2 4. Category of project (as per EIA notification) Category A (falls under CPAs) 5. Population (as per census 2011) Projected Population (2017) Projected Population (2037) Current Waste Generation 18.2 MT 9. Projected Waste Generation (2017) 18.8 MT 10. Projected Waste Generation (2037) 26.6 MT 11. Component of Proposed Facilities Processing System, SLF and other related accessories at Kadupada, Belpahar 12. Proposed Processing Facilities Controlled Aerobic Process (Capacity MT/day) 13. Proposed Landfill SLF (Capacity TPD) 14. Water Requirement Construction- 2-3 m 3 /day Operational m 3 /day 15. Power Requirement 25 kw 16. Manpower Construction Daily Operational Estimated Capital Expenditure Lakhs (2017) 18. Estimated O&M Cost (2017) Lakhs per year 19. Estimated Revenue generation Lakhs per year (2017) Furthermore, the activities planned in the proposed project include collection, transportation, treatment & disposal of municipal solid waste in compliance to the MSW Handling Rules (2000). The basic concept for the solid waste management of the Belpahar Municipality is presented in the form of the flow chart as shown in figure IV. Page 5

8 Figure- IV: Flow Diagram of MSW management The generated waste from this ULB contains different percentage of physical ingredients which is as presented below: Table- II: Physical characterization of generated waste S.no Component Percentage i. Organics ii. Combustible iii. Recyclable 1.62 iv. Inert v. Clothes 0.10 vi. Others Further, the municipal waste received at processing site will be processed at proposed site by segregating the waste into recyclable, compost and inert material. After segregation of recyclable material, organic waste will be diverted to compost machinery which will be equipped with all the latest equipment and technologies:- Table- III: Process of proposed composting system S.No. Particulars Machinery Equipment I. Primary Storage Shed, Segregation, Temporary Storage II. Pre Processing Unit Chopping, Sqeezing, Conveyor loading III. Processing Unit Feeding, aerobic digester with mechanical equipment and sensor Page 6

9 IV. Leachate Treatment Pond Leachate storage tank, Lifting pump, Aerobic treatment V. Post Processing Drying area, weighing scale, Packaging and storage The above mentioned equipment will be installed to ensure successful implementation of proposed controlled aerobic technology for faster decomposition of organic waste with minimal environmental impact. The involved process within this processing system is shown below in figure- V. Figure- V: Process involved in Proposed Composting System Finally, the generated inert material and residue of composting material shall be deposited in proposed Sanitary Landfill Fill. The brief about landfill is presented below:- Table- V: Landfill detail S.No Particulars Detail i. Name of landfill site Kadupada ii. Capacity TPD iii. Life of landfill 20 Years iv. Available land 10 acres v. Land Utilization Composting acres (for Belpahar only) and SLF acres (for both Belpahar as well as Brajrajnagar) Page 7

10 The designing and development of landfill will be carried out with following CPHEEO manual and US-EPA guidelines. The following items shall be covered during designing the landfill:- Volume and required area Life of landfill Footprint of landfill site (Phase wise) Design of leachate collection system Design of liner system Assessment of landfill gas Collection of landfill gas Design of final cover system However, during construction, consumption of 2-3 m 3 /day water while during operation phase m 3 /day of water requirement has been envisaged. Furthermore, it is estimated that proposed machinery and infrastructure require 10 kw of power consumption during construction while 25 kw during operational phase. 4.0 SITE ANALYSIS Already, the proposed site is being utilized as dumping site of Belpahar Municipality. The photograph of project site is shown below:- Page 8

11 The salient feature about project site is tabulated below:- Table- VI: Detail about Project Site S.No Particulars Detail i. Total Area 10 acres ii. Proposed facilities Processing system and landfill with accessories iii. Category of project (as per EIA Category- A notification) iv. Area Breakup (in acres) Composting SLF v. Projected life span of project 20 Years vi. Connectivity Road- NH Km, N & SH Km ENE Railway- 1.6 KM, N vii. Landuse pattern Existing dumping site viii. Topography Flat terrain ix. Notified Eco sensitive area Not Applicable (Bikarmakhol, Reserve Forest-2.7 Km, North) x. Water bodies Hinjankharu Jhor- 3.6 Km, West Lilari Nala- 4.5 Km, South xi. Religious place Jagarnath Temple 0.8 Km xii. Anthropogenic sensitive area School Km xiii. Defence installation Not Applicable xiv. Airport 21.4 Km xv. Nearest Habitat Encroachment at 0.2 Km (approx.) 5.0 PROPOSED INFRASTRUCTURE With considering the growth of urbanization and population, each ULB of this cluster should have proper infrastructure facilities to manage the generated waste properly. The entire process of best management can be divided in followings:- a) Door to Door Collection This practice is treated as most important step to manage the solid waste effectively for any city. It shall be indicator of city cleanness and play an important role to make techno economic success of any processing and treatment facilities. Provision to start this system in all wards of this ULB by Page 9

12 providing 10 litres bin to each household and collection of waste in tricycle of 240 litres capacity which will be equipped with separate compartments for biodegradable and non-biodegradable. b) Street Sweeping Sweeping would be provided in each ward and all along length of road, falling under municipal/ulb boundary to collect maximum amount of generated waste. Apart from sweeping, the sweepers would also collect the waste from existing open points and deposit it in the community bins. Each sweeper would sweep on an average of 0.6 km of road length/day. The sweepers must be equipped with proper tools and safety gear such as metal plates, long handled brooms, uniforms, masks, gloves etc. c) Secondary waste collection All the wastes collected through Primary Collection System from the households, shops and other establishments would be taken to the processing or disposal site either directly necessitating a large feet of vehicles and manpower or through cost effective systems which will be designed to ensure that all the waste collected from the sources of waste generation is transported within reasonable time. The storage facilities/ secondary collection points near markets must not create unhygienic and unsanitary conditions around the waste bins. This means that it would be: Out of reach of stray animals. Would not obstruct the traffic of spread on road. Easily accessible in terms of distance for the user. Fully covered and not exposed. Able to hold the expected waste, depending on the size and waste generator. Concrete/pucca structure with roofing, to prevent Vector and bird menace, under and adjoining areas of dustbins at Secondary Collection Points Aesthetically acceptable. Designed to be easy to operate, handle, transfer and transport. Page 10

13 d) Development of Institutional capacity For better and successful implementation of MSW management, adequate number of human resource and infrastructure facilities is required. Henceforth, municipal authority should therefore take adequate measures for institutional strengthening through induction of professionals, decentralization of administration, delegation of powers, human resources development, encouraging private sector and NGO participation. e) Proposed Processing System TPD Compost Plant is envisaged to process organic fraction of MSW generated from studied ULB. The composting process is as defined below: Controlled aerobic composting is the process of degradation of biodegradable organic waste into simple organic compounds by number of aerobic microorganisms in the presence of air. The process begins in presence of air and temperature by the activity of mesophilic bacteria which oxidize carbon to CO2, thus liberating large amount of heat. Usually, the temperature of the waste reaches more than 50 0 C and this represents the limit of temperature tolerance of the mesophilic organisms. At this point the process is taken over by thermophilic bacteria and the temperature continues to rise. Most of the thermophilic phase, takes place in the temperature range 55 0 C 65 0 C, should the temperature increase beyond 65 0 C, activity temporarily declines. The process is dependent of course, on the provision of a suitable environment for the bacteria, in addition to the nutrients provided by the wastes. The main requirements are adequate supplies of air and moisture. The proposed technology will be equipped with sensor which will reflect the ongoing process inside the digester. The limiting factor can be removed for faster degradation with better nutrient quality. Compared to anaerobic process, aerobic conversion process is preferable as it is fast, exothermic and free from odour. Aerobic process also helps to eliminate pathogenic bacteria weed seeds, larva etc. as a result of high temperature developed during the process. Page 11

14 f) Landfill development Engineered Sanitary Landfill shall be developed at Village Kadupada for disposal of processing rejects and residual inert matter. The Engineered Sanitary landfill design and construction shall be in conformation to the guidelines prescribed in Central Pollution Control Board and in accordance with Municipal Solid Wastes (Management and Handling) Rules, The technical specifications for design of landfill shall be in line with Manual on Municipal Solid Waste Management published by CPHEEO. g) Other utilities requirement Basic facilities of infrastructure like admin building, processing area, Laboratory, Leachate treatment system Landfill vehicle parking, Staff vehicle parking, Panel room, Weigh bridge with cabin, Circulation area, internal roads etc. will be developed on the project site.transportation of Solid waste will be carried out through approach road and finally through existing road. h) Green belt development Increasing vegetation in the form of greenbelt is one of the preferred methods to mitigate air pollution, odour as well as biological pollutants. Plants serve as a sink for pollutants, act as a barrier to break the wind speed as well as allow the dust and other particulates to settle out on them. It also helps to reduce the noise level to some extent. Hence, proper green belt development will be ensured to mitigate air and noise pollution. This is hereby ensured that the mostly indigenous/ local plants will be planted all around the periphery of the project area and along the roadsides. Plantations would be of large leaf trees that provide adequate shade and are semi-evergreen to evergreen to reduce odour in all-weather condition. This mix plantation will be sprawled over an area of more than 33 % of total project area. i) IEC initiatives A clean city is a concerted effort by the city managers and the civil society. The decision-making process for managing solid waste in urban areas is going through a paradigm shift from the decide, announce, defend premise of local Page 12

15 authorities to more involved public participation. It is important to make people understand the importance of having good SWM systems and the steps they can take to help municipal authorities and solid waste managers and workers perform their work better. The main objectives of IEC are to make people understand: The concept of source segregation and its necessity in different aspects; The need to store waste at source in two separate receptacles one for biodegradable waste and one for recyclable waste and the need to keep toxic and hazardous waste separate; The role citizens can play in primary collection of waste from the household and handing over of the waste materials to rag pickers or waste collectors; The need to pay for sweeping, waste collection and disposal services; The need to use litter bins on the roads and public places sensibly and sensitively; The impact of solid waste on public health and the environment. 6.0 REHABLITATION & RESETTLEMENT (R & R) PLAN The proposed site is being used for dumping of collected MSW of Belpahar Municipality which does not attract involvement of any land acquisition process. Further, no any settlement falls within the project boundary hence, no R&R plan is applicable for this site. 7.0 PROJECT IMPLEMENTATION STRATEGY AND FINANCIAL ANALYSIS The proposed project will be developed in phase wise planned manner and the concession period for this project would be 20 years (i.e. from ). The phase wise implementation will be in accordance to detail designing based on CPHEEO manual. Further, financial analysis has been carried out to access the viability of proposed project. In this context, the cost of any development project is segregated basically in two categories like Capital Expenditure (CapEx) and Operation and Maintainance Expenditure (OpEx); which is based on the occurrence and nature of cost. Further, in SWM Project the CapEx includes the purchase of assets under the 7 Head s i.e Primary Storage, Primary collection, Page 13

16 Segregation at source, Secondary storage, Transportation, Treatment and Processing and Disposal while OpEx consist of recurring expenses on aforementioned services. The generation of revenue from sale of compostable and recyclable material along with collection of user charges is anticipated. The brief about financial study of this ULB is presented below:- Table - VII : Estimated cost of proposed project S.no. Particular Cost (INR in Lakhs) I. Total Capex II. Total OpEx Total Revenue Composting (2017) 4.49 Sale of recyclable material (2017) User charges from commercial 9.11 establishment (2017) User charges from HHs (2017) CONCLUSION The objective of the study is to carry out Environmental Impact Assessment (EIA) for the proposed Integrated Municipal Solid Waste Facility at Kadupada, Belpahar to meet the environmental compliances laid down by the Ministry of Environment and Forests & Climate Change (MoEF&CC), Government of India. The EIA study assessed the environmental impacts likely to be caused due to the proposed development and to suggest suitable mitigative measures to safeguard the environment. This study will include the description of project setting, appraisal of project activities and assessment of adverse impacts related to the location, design, construction and operation of the project. Environmental Management Plan (EMP) will be prepared which includes mitigation measures, including evaluation of alternatives to reduce or mitigate/ eliminate the impacts that are likely to cause significant environmental impacts. Further, the complete EIA study will be carried out with following guidelines of EIA Notification 2006 and their amendments. Page 14

Report of the committee set up to frame National Sustainable Habitat Standards for the Municipal Solid Waste Management

Report of the committee set up to frame National Sustainable Habitat Standards for the Municipal Solid Waste Management Report of the committee set up to frame National Sustainable Habitat Standards for the Municipal Solid Waste Management Introduction The National Mission for Sustainable Habitat was approved by the Prime

More information

Guwahati: 29 th April, A presentation by Chief Town Planner, Manipur

Guwahati: 29 th April, A presentation by Chief Town Planner, Manipur Guwahati: 29 th April, 2013 A presentation by Chief Town Planner, Manipur 2 MANIPUR - PHYSICAL PROFILE: Hills Valley Hills As per 2001 Census, the urban population of Manipur was 5.50 lakhs. There are

More information

with special reference to the Solid Waste Management Project implemented in the CAPITAL COMPLEX,ITANAGAR

with special reference to the Solid Waste Management Project implemented in the CAPITAL COMPLEX,ITANAGAR SOLID WASTE MANAGEMENT IN ARUNACHAL PRADESH By: Gyamar Tachung M/Secy.DUDA with special reference to the Solid Waste Management Project implemented in the CAPITAL COMPLEX,ITANAGAR 1 Map Of Arunachal Pradesh

More information

CHECKLIST FOR SUBMISSION AND SCRUTINY OF DPR

CHECKLIST FOR SUBMISSION AND SCRUTINY OF DPR CHECKLIST FOR SUBMISSION AND SCRUTINY OF DPR (MUNICIPAL SOLID WASTE MANAGEMENT) Reduce Reuse Recycle March 2012 MINISTRY OF URBAN DEVELOPMENT GOVERNMENT OF INDIA http://urbanindia.nic.in Index of Contents

More information

International Journal of Advance Research in Engineering, Science & Technology

International Journal of Advance Research in Engineering, Science & Technology Impact Factor (SJIF): 5.301 International Journal of Advance Research in Engineering, Science & Technology e-issn: 2393-9877, p-issn: 2394-2444 Volume 5, Issue 3, MaRCH-2018 Assessment of Municipal Solid

More information

Composition of Municipal Solid Waste (MSW)

Composition of Municipal Solid Waste (MSW) Composition of MSW 16.28 19.23 16.78 17.02 21.44 21.44 28.86 28.15 32.82 30.85 29.57 28.15 50.89 51.91 50.41 52.38 50.41 53.41 A Note on Bio-degradable Waste in India Dr.Satpal Singh and Dr.Shyamala Mani

More information

PRE FEASIBILITY REPORT. Company of production capacity: 14,40,000 CFT/ Year located at Khasra No near Village:

PRE FEASIBILITY REPORT. Company of production capacity: 14,40,000 CFT/ Year located at Khasra No near Village: PRE FEASIBILITY REPORT 1.0 EXECUTIVE SUMMARY In our Masonry Stone Mining Lease (M.L. No. 15/96, Area: 1.0 ha), Production capacity of masonry stone: 142920 TPA and existing Stone Crusher Unit named M/s.

More information

PRE-FEASIBILITY REPORT FOR MUNICIPAL SOLID WASTE MANAGEMENT FOR JODA

PRE-FEASIBILITY REPORT FOR MUNICIPAL SOLID WASTE MANAGEMENT FOR JODA PRE-FEASIBILITY REPORT FOR MUNICIPAL SOLID WASTE MANAGEMENT FOR JODA MARCH 2016 SUBMITTED TO ODISHA URBAN INFRASTRUCTURE DEVELOPMENT FUND (OUIDF) (FOR JODA MUNICIPALITY) BY TATA CONSULTING ENGINEERS LIMITED

More information

Technologies for Waste Management/Infrastructure Agra (India)

Technologies for Waste Management/Infrastructure Agra (India) Technologies for Waste Management/Infrastructure Agra (India) 1. SOLID WASTE MANAGEMENT A typical waste management system in Agra is similar to any other medium city in India and has following major steps:

More information

2. The expected cost of the project is Rs.50 crores.

2. The expected cost of the project is Rs.50 crores. Subject Application for obtaining Environmental Clearance for development of an "Integrated Municipal Solid Waste Management System for Pathankot Cluster" by Municipal Council, Pathankot at Village Kalanaur,

More information

SWOT ANALYSIS FOR IMPROVEMENT OF MUNICIPAL SOLID WASTE MANAGEMENT PLANNING: A CASE OF AMOD TOWN,BHARUCH

SWOT ANALYSIS FOR IMPROVEMENT OF MUNICIPAL SOLID WASTE MANAGEMENT PLANNING: A CASE OF AMOD TOWN,BHARUCH SWOT ANALYSIS FOR IMPROVEMENT OF MUNICIPAL SOLID WASTE MANAGEMENT PLANNING: A CASE OF AMOD TOWN,BHARUCH Kapil K. Patel 1, Sejal S. Bhagat 2 M.E Student, Civil Engineering Department, Sarvajanik College

More information

STONE QUARRY Survey No. : 57/5, Village : Dhadhade, Tehsil: Vikramgad, District Thane, Maharashtra Area (2.0 Ha)

STONE QUARRY Survey No. : 57/5, Village : Dhadhade, Tehsil: Vikramgad, District Thane, Maharashtra Area (2.0 Ha) Pre Feasibility Report On STONE QUARRY Survey No. : 57/5, Village : Dhadhade, Tehsil: Vikramgad, District Thane, Maharashtra Area (2.0 Ha) Submitted to MINISTRY OF ENVIRONMENT & FOREST STATE LEVEL ENVIRONMENTAL

More information

Service Level Benchmarking of

Service Level Benchmarking of Service Level Benchmarking of Bruhat Bangalore Mahanagara Palike Bangalore Two days results workshop on 14-15 Dec 09 City Profile 2001 Census Population of BMP 43.01 lakhs (58.92-BBMP) Present estimated

More information

Challenges in municipal solid waste management in Indian cities: A case study of Bilaspur (Chhattisgarh)

Challenges in municipal solid waste management in Indian cities: A case study of Bilaspur (Chhattisgarh) Challenges in municipal solid waste management in Indian cities: A case study of Bilaspur (Chhattisgarh) 1 Shristi Sinha, 2 Mr. R K Bhatia 1 M.E. Environmental Engineering, JEC, Jabalpur, MP, India 2 Associate

More information

Challenges of Service Delivery In Water and Sanitation. Government of Punjab February 20, 2013

Challenges of Service Delivery In Water and Sanitation. Government of Punjab February 20, 2013 Challenges of Service Delivery In Water and Sanitation Government of Punjab February 20, 2013 1 Current Coverage of Water & Sanitation Coverage as on 2012 Water Supply 88% Sewerage 63% Sewage Treatment

More information

9.2 SOLID WASTE MANAGEMENT Background

9.2 SOLID WASTE MANAGEMENT Background 9.2 SOLID WASTE MANAGEMENT 9.2.1 Background Solid Waste Management (SWM) is one of the most expensive municipal services that a local body has to provide as its obligatory municipal function and absorbs

More information

Chapter - VII SUMMARY AND CONCLUSION

Chapter - VII SUMMARY AND CONCLUSION Chapter - VII SUMMARY AND CONCLUSION Waste management is a critical problem for the local self governments. The unscientific method of dumping waste in open space creates several environmental as well

More information

For PROPOSED IT PARK. By M/s.Balewadi Tech Park Pvt.Ltd. Submitted to State Environment Expert Appraisal Committee III, Maharashtra

For PROPOSED IT PARK. By M/s.Balewadi Tech Park Pvt.Ltd. Submitted to State Environment Expert Appraisal Committee III, Maharashtra Draft Terms of References (ToR) (Based on the model TOR given in Environmental Impact Assessment Guidance Manual for building construction projects by MoEF & CC) For PROPOSED IT PARK By M/s.Balewadi Tech

More information

During the discussions, the Committee finalized the following additional TOR for further study:

During the discussions, the Committee finalized the following additional TOR for further study: Finalization of ToR for development of Visakhapatnam?Kakinada Corridor for the Establishment of Petroleum, Chemicals and Petrochemicals Investment Region (VK- PCPIR), Andhra Pradesh by M/s VK- PCPIR Special

More information

STATUS OF SOLID WASTE MANAGEMENT IN BANGALORE & REVIEW OF SOLID WASTE TECHNIQUES ADOPTED.

STATUS OF SOLID WASTE MANAGEMENT IN BANGALORE & REVIEW OF SOLID WASTE TECHNIQUES ADOPTED. STATUS OF SOLID WASTE MANAGEMENT IN BANGALORE & REVIEW OF SOLID WASTE TECHNIQUES ADOPTED Naveen.B.P 1, Sitharam.T.G 2, Sivapullaiah.P.V 3, 1 Research Scholar, Department of Civil Engineering, Indian Institute

More information

GIZ Support to Ministry of Urban Development Training on Preparation of City Sanitation Plan Part III State of Telangana

GIZ Support to Ministry of Urban Development Training on Preparation of City Sanitation Plan Part III State of Telangana GIZ Support to Ministry of Urban Development Training on Preparation of City Sanitation Plan Part III State of Telangana Session 3B: Technical Options for CSPs Hyderabad, 20-22 April 2016 Slide 1 Technological

More information

Pre-Feasibility Report

Pre-Feasibility Report Pre-Feasibility Report 1. Executive Summary Residential, Commercial, Retail and Hotel projects and an IT/ITES. The Project has already obtained an Environmental Clearance from Ministry of Environment &

More information

Conclusion & Recommendation

Conclusion & Recommendation 14 th Chapter Conclusion & Recommendation 14.0 Introduction This research responds to the need for an assessment of Solid Waste Management in Bilaspur City. The objectives of this research were: 1) to

More information

SUNYA: Towards Zero Waste in South Asia

SUNYA: Towards Zero Waste in South Asia SUNYA: Towards Zero Waste in South Asia Sixth Regional 3R Forum in Asia and the Pacific Plenary Session 7 Emani Kumar ICLEI South Asia 19th August 2015 Project Partners: Goals Promotion of zero-waste concept

More information

City Report. (Draft) < Rajkot, Gujarat, India>

City Report. (Draft) < Rajkot, Gujarat, India> Eighth Regional 3R Forum in Asia and the Pacific Achieving Clean Water, Clean Land and Clean Air through 3R and Resource Efficiency- A 21 st Century Vision for Asia-Pacific Communities Indore, Madhya Pradesh,

More information

Proposed Terms of reference for EIA studies ToR for EIA studies in respect of the isolated storages, which are involved in handling of hazardous

Proposed Terms of reference for EIA studies ToR for EIA studies in respect of the isolated storages, which are involved in handling of hazardous Proposed Terms of reference for EIA studies ToR for EIA studies in respect of the isolated storages, which are involved in handling of hazardous chemicals may include, but not limited to the following

More information

DESCRIPTIVE REPORT ON STATUS OF COMPLIANCE TO THE CONDITIONS OF ENVIRONMENTAL CLEARANCE AND ENVIRONMENTAL MANAGEMENT

DESCRIPTIVE REPORT ON STATUS OF COMPLIANCE TO THE CONDITIONS OF ENVIRONMENTAL CLEARANCE AND ENVIRONMENTAL MANAGEMENT DESCRIPTIVE REPORT ON STATUS OF COMPLIANCE TO THE CONDITIONS OF ENVIRONMENTAL CLEARANCE AND ENVIRONMENTAL MANAGEMENT Subject: Compliance report of Environmental Clearance for CDR & Revamp Reference: J-11011/272/2007-IA,

More information

Programmatic CDM Project Using Municipal Organic Waste of 64 Districts of Bangladesh

Programmatic CDM Project Using Municipal Organic Waste of 64 Districts of Bangladesh Programmatic CDM Project Using Municipal Organic Waste of 64 Districts of Bangladesh Presented by: Abul Kalam Azad, Project Director Project Director, 64 District CDM Project on Waste Management Department

More information

Pre-Feasibility Report For

Pre-Feasibility Report For Pre-Feasibility Report For Proposed New Project for manufacturing of Intermediates of Agro Chemicals & Synthetic Organic Chemicals. By M/s. MANBRO POLYMERS LIMITED, Plot No. D-2/CH-275, INDUSTRIAL ESTATE,

More information

SUNYA - Towards Zero Waste Initiative of Coimbatore City Municipal Corporation

SUNYA - Towards Zero Waste Initiative of Coimbatore City Municipal Corporation SUNYA - Towards Zero Waste Initiative of Coimbatore City Municipal Corporation Rajasthan Mayors Conference, Udaipur, April 27, 2016 Amar Deep Singh, CUTS SUNYA PROJECT Ward 23 has been selected as Model

More information

Involvement of Expert for Technical Design of Decentralized Municipal Solid Waste Treatment Plant in Udaipur

Involvement of Expert for Technical Design of Decentralized Municipal Solid Waste Treatment Plant in Udaipur Involvement of Expert for Technical Design of Decentralized Municipal Solid Waste Treatment Plant in Udaipur Title Location Terms of Reference Technical Expert for Feasibility Assessment and Technical

More information

PRE-FEASIBILITY REPORT. Name of Company / Mine Owner Shri Jayant Kumar Choudhary Location

PRE-FEASIBILITY REPORT. Name of Company / Mine Owner Shri Jayant Kumar Choudhary Location 1. SUMMARY PRE-FEASIBILITY REPORT Project Stone Quarry Name of Company / Mine Owner Shri Jayant Kumar Choudhary Location Village Taluka District State Rupapali Basna Mahasamund Chhattisgarh 1 Mining Lease

More information

Solid Waste Management of Kashmir Valley

Solid Waste Management of Kashmir Valley Solid Waste Management of Kashmir Valley Danish Ahmed, Dr. M.A.Lone ABSTRACT The valley of Kashmir is presently facing a lot of problems, in terms of Solid Waste Management. There is no proper disposal

More information

EXECUTIVE SUMMARY. Kumardeipur Sand Quarry Cum ' 13.3" N to 20 44' 20.7"N Longitude " E to 85 35'27.5 "E

EXECUTIVE SUMMARY. Kumardeipur Sand Quarry Cum ' 13.3 N to 20 44' 20.7N Longitude  E to 85 35'27.5 E EXECUTIVE SUMMARY 1.0 INTRODUCTION Sri Mahesh Prasad Mishra proposes to mine Sand Quarry from an approved Mining Lease over an area of 14.85 Ac or 6.01 hectares (Non-Forest Land) which is located in at

More information

Adoption of decentralised waste management systems in Zanzibar

Adoption of decentralised waste management systems in Zanzibar Adoption of decentralised waste management systems in Zanzibar Centre for Science and Environment New Delhi, India EXISTING WASTE MANAGEMENT PRACTICES IN ZANZIBAR Zanzibar municipality is divided into

More information

Waste Management in India and Experience with the Implementation of Projects based on Public Private Partnership (PPP) model

Waste Management in India and Experience with the Implementation of Projects based on Public Private Partnership (PPP) model Waste Management in India and Experience with the Implementation of Projects based on Public Private Partnership (PPP) model Sundeep Kumar, IL&FS Environmental Infrastructure and Services Limited IRRC

More information

Greater Amman Municipality

Greater Amman Municipality Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized ECO Consult Municipal Solid Waste Management & Carbon Finance in Amman Greater Amman

More information

PREFEASIBILITY REPORT

PREFEASIBILITY REPORT (B) PREFEASIBILITY REPORT OF EXISTING SAND MINING PROJECT OF RAJESHBHAI BHAGUBHAI PATEL AT VILLAGE:- Panchlai, TALUKA:- Pardi, DIST.:-Valdad. 1 CONTENTS 1.0 INTRODUCTION 1.1 PREAMBLE 2.0 EXECUTIVE SUMMARY

More information

Analysis & Recycling of Municipal Solid Waste: A Case Study of Aurangabad City, Maharashtra, India

Analysis & Recycling of Municipal Solid Waste: A Case Study of Aurangabad City, Maharashtra, India International Journal of Scientific Research in Engineering www.ijsrejournal.com Vol. 2, Issue 1, January 2017, pp.01-07 Analysis & Recycling of Municipal Solid Waste: A Case Study of Aurangabad City,

More information

REGIONAL TRAINING WORKSHOP ON HUMAN SETTLEMENT INDICATORS. Module 5: Solid Waste Management

REGIONAL TRAINING WORKSHOP ON HUMAN SETTLEMENT INDICATORS. Module 5: Solid Waste Management REGIONAL TRAINING WORKSHOP ON HUMAN SETTLEMENT INDICATORS Module 5: Solid Waste Management Esther Njiru & Nao Takeuchi 26 th 29 th March 2018 Bangkok, Thailand 26 th 29 th March 2018 Outline 1) Background

More information

Preparation of City Sanitation Plan Part III. Session 2: Technical Options for CSPs

Preparation of City Sanitation Plan Part III. Session 2: Technical Options for CSPs Preparation of City Sanitation Plan Part III Session 2: Technical Options for CSPs Slide 1 Technological options for On-site Sanitation systems Septic Tank with Soak pit Twin-Pit Latrine Bio-Digester DRDO

More information

INTERNATIONAL JOURNAL OF ENVIRONMENTAL SCIENCES Volume 2, No 2, Copyright 2010 All rights reserved Integrated Publishing Association

INTERNATIONAL JOURNAL OF ENVIRONMENTAL SCIENCES Volume 2, No 2, Copyright 2010 All rights reserved Integrated Publishing Association INTERNATIONAL JOURNAL OF ENVIRONMENTAL SCIENCES Volume 2, No 2, 2011 Copyright 2010 All rights reserved Integrated Publishing Association Case Study ISSN 0976 4402 Municipal Solid Waste Management at Amravati

More information

Report on Solid Waste Management in Dehradun. By- Vidush Pandey (Volunteer with HKFPR)

Report on Solid Waste Management in Dehradun. By- Vidush Pandey (Volunteer with HKFPR) Report on Solid Waste Management in Dehradun By- Vidush Pandey (Volunteer with HKFPR) Introduction Solid Waste Management is one of the important obligatory functions of urban local bodies as well as of

More information

Overburden dumps are stacked separately as per the guidelines and the same will be used for backfilling in mined out area.

Overburden dumps are stacked separately as per the guidelines and the same will be used for backfilling in mined out area. ENVIRONMENT CLEARANCE COMPLIANCE STATUS ENVIRONMENT CLEARANCE No. J-11015/406/2006-IA.II(M) dt. 13/04/2007 DHANGARWADI MINES Sr. CONDITIONS COMPLIANCE No. A) Specific Conditions :- i) Top soil to be stacked

More information

SOLID WASTE MANAGEMENT

SOLID WASTE MANAGEMENT Journal of Computer Science & Technology SOLID WASTE MANAGEMENT Ravi Sharma Department of Chemistry, DAV College Amritsar, Punjab, India 1 INTRODUCTION Solid waste management is one among the basic essential

More information

Need for Decentralised Waste Management in Zanzibar. Swati Singh Sambyal Programme Manager Centre for Science and Environment New Delhi, India

Need for Decentralised Waste Management in Zanzibar. Swati Singh Sambyal Programme Manager Centre for Science and Environment New Delhi, India Need for Decentralised Waste Management in Zanzibar Swati Singh Sambyal Programme Manager Centre for Science and Environment New Delhi, India About CSE and its intervention in Zanzibar 37 years, 170+ staff,

More information

Environmental Management Plan for Small Scale Composting Plant at Baridhara, Dhaka

Environmental Management Plan for Small Scale Composting Plant at Baridhara, Dhaka Environmental Management Plan for Small Scale Composting Plant at Baridhara, Dhaka December, 2013 Prepared by: Practical Action, Bangladesh House 12/B, Road # 4 Dhanmondi R/A, Dhaka-1205 On Behalf of Swisscontact

More information

Issues in Municipal Waste to Energy

Issues in Municipal Waste to Energy Issues in Municipal Waste to Energy K. Kasturirangan Member, Planning Commission August 27, 2013 Trivandrum Status Generation - As per Central Pollution Control Board report of 2012, 1,30,562 TPD of MSW

More information

Sustainable Municipal Solid Waste Management in Indian Cities - Challenges and Opportunities

Sustainable Municipal Solid Waste Management in Indian Cities - Challenges and Opportunities Sustainable Municipal Solid Waste Management in Indian Cities - Challenges and Opportunities Contact Dr. (Mrs.) Regina Dube, Mrs. Vaishali Nandan, Mr. Ramana Gudipudi, GTZ GTZ-ASEM (Advisory Services in

More information

modern lifestyle and food habit, increase in municipal solid waste. Characteristics of municipal solid waste

modern lifestyle and food habit, increase in municipal solid waste. Characteristics of municipal solid waste Solid Waste Management Maaz Allah Khan 1, Mohd Zafar Siddiqi 2, Mohd Waqar Waseem 3, Nizamuddeen 4 Abstract: Solid management is one of the basic essential services provided by municipal authorities, NGO,private

More information

FORUM OF CITIES THAT SEGREGATE ASSESSMENT MEETING (7 TH JUNE, 2018) NEW DELHI CITY ULB NAME: MUNICIPAL CORPORATION AMBIKAPUR, CHHATTISGARH

FORUM OF CITIES THAT SEGREGATE ASSESSMENT MEETING (7 TH JUNE, 2018) NEW DELHI CITY ULB NAME: MUNICIPAL CORPORATION AMBIKAPUR, CHHATTISGARH FORUM OF CITIES THAT SEGREGATE ASSESSMENT MEETING (7 TH JUNE, 2018) NEW DELHI CITY ULB NAME: MUNICIPAL CORPORATION AMBIKAPUR, CHHATTISGARH EXISTING STATUS OF WASTE MANAGEMENT Population: 1,32,000 Generation:

More information

Solid Waste Management: The Case of Bangkok. Department of Environment Bangkok Metropolitan Administration

Solid Waste Management: The Case of Bangkok. Department of Environment Bangkok Metropolitan Administration Thailand Country Report Solid Waste Management: The Case of Bangkok Department of Environment Bangkok Metropolitan Administration Thailand The Land of Smile Location of Thailand Geographic and Social Indicator

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT Page1 PRE FEASIBILITY REPORT KALDA FLAG STONE QUARRY AREA OF -1.55 HACTARE STRICTLY AS PER MOEF GUIDELINE DATE 30/12/2006 IN TERMS OF PROVISIONS OF EIA NOTIFICATION 2006 VILLAGE KALDA TEHSIL PAWAI DISTRICT

More information

MODIFIED QUARRYING PLAN FOR "SHINGATALOOR SAND MINING BLOCK-2" EXTENT Acres (4.86 Ha) IN TUNGABHADRA RIVER BED ADJ ACENT TO SY.

MODIFIED QUARRYING PLAN FOR SHINGATALOOR SAND MINING BLOCK-2 EXTENT Acres (4.86 Ha) IN TUNGABHADRA RIVER BED ADJ ACENT TO SY. MODIFIED QUARRYING PLAN FOR "SHINGATALOOR SAND MINING BLOCK-2" EXTENT -12.00 Acres (4.86 Ha) IN TUNGABHADRA RIVER BED ADJ ACENT TO SY.NO - 129 & 131OF SHINGATALOOR - VILLAGE MUNDARGI - TALUK GADAG - DISTRICT

More information

CSP Baseline Assessment

CSP Baseline Assessment CSP Baseline Assessment The CSP should include baseline information related to sanitation and sanitation related services in the city. It is required that all information cited will refer to the source

More information

To reduce the environmental impact we should ISOLATE or CONTAIN the waste in an IMPERMEABLE BARRIER

To reduce the environmental impact we should ISOLATE or CONTAIN the waste in an IMPERMEABLE BARRIER To reduce the environmental impact we should ISOLATE or CONTAIN the waste in an IMPERMEABLE BARRIER 1 COMPONENTS OF ENGINEERED LANDFILL a) A Liner System b) A Leachate Collection Facility c) A Gas Control

More information

PRE FEASIBILITY REPORT FOR. Silica Sand Beneficiation Plant

PRE FEASIBILITY REPORT FOR. Silica Sand Beneficiation Plant PRE FEASIBILITY REPORT FOR Silica Sand Beneficiation Plant BY Shree Silicaam Minerals LLP VILLAGE : CHOKI TALUKA : JAGADIA DIST : BHARUCH GUJARAT (INDIA) PRE-FEASIBILITY REPORT: SILICA SAND BENIFICIATION

More information

The Nexus: Waste Management, Environment &Health

The Nexus: Waste Management, Environment &Health The Nexus: Management, Environment &Health 70 Million TPA of waste generated in urban centers is estimated to more than double by 2031 to 165 Mil.TPA. Only 10% is processed Around 25% of Particulate Matter

More information

Role of Contracts in Solid Waste Management Service Delivery: Case of Pune City Door to Door Collection Contracts Dipti Shinde 1 Prof.

Role of Contracts in Solid Waste Management Service Delivery: Case of Pune City Door to Door Collection Contracts Dipti Shinde 1 Prof. Role of Contracts in Solid Waste Management Service Delivery: Case of Pune City Door to Door Collection Contracts Dipti Shinde 1 Prof. Mona Iyer 2 Environmental Planner Assistant Professor Abstract: Rapid

More information

Table 1.1: The Salient Features of the Project Proposed Quartz Mine Of M/s. Viswanadha Stone Crusher & 16 others

Table 1.1: The Salient Features of the Project Proposed Quartz Mine Of M/s. Viswanadha Stone Crusher & 16 others 1. EXECUTIVE SUMMARY 1.1 Introduction The Road Metal Quarries was granted in Guntur District, Andhra Pradesh has been allotted to M/s. Viswanadha Stone Crusher & 16 others by Assistant Director of Mines

More information

ASSESSMENT OF THE SOLID WASTE MANAGEMENT SYSTEM OF BAHIR DAR TOWN AND THE GAPS ISWM PLAN IDENTIFIED FOR THE DEVELOPMENT OF AN.

ASSESSMENT OF THE SOLID WASTE MANAGEMENT SYSTEM OF BAHIR DAR TOWN AND THE GAPS ISWM PLAN IDENTIFIED FOR THE DEVELOPMENT OF AN. SYSTEM OF BAHIR DAR TOWN AND THE GAPS IDENTIFIED FOR THE DEVELOPMENT OF AN ISWM PLAN Forum for Environment 0 P a g e Forum for Environment in collaboration with Bahir Dar City Administration Dream Light

More information

North Eastern Region Capital Cities Development Investment Programme

North Eastern Region Capital Cities Development Investment Programme North Eastern Region Capital Cities Development Investment Programme Presentation on Solid Waste Management in Shillong Practices and Challenges 29 th April 2013 North Eastern Region Capital Cities Development

More information

INTERNATIONAL JOURNAL OF ENVIRONMENTAL SCIENCES Volume 6, No 2, Copyright by the authors - Licensee IPA- Under Creative Commons license 3.

INTERNATIONAL JOURNAL OF ENVIRONMENTAL SCIENCES Volume 6, No 2, Copyright by the authors - Licensee IPA- Under Creative Commons license 3. INTERNATIONAL JOURNAL OF ENVIRONMENTAL SCIENCES Volume 6, No 2, 2015 Copyright by the authors - Licensee IPA- Under Creative Commons license 3.0 Research article ISSN 0976 4402 Generation, composition

More information

Executive Brief for NAMA Consultation Workshop

Executive Brief for NAMA Consultation Workshop Executive Brief for NAMA Consultation Workshop Nationally Appropriate Mitigation Action (NAMA) programme in the Waste Sector: Waste to Resources for Cities in Vietnam Hanoi, Vietnam, 26 November 2013 1

More information

Cement Manufacturing Company Ltd. Page 1

Cement Manufacturing Company Ltd. Page 1 Six Monthly Compliance status of Environment Clearance for Cement Plant (2400 TPD) at Village Lumshnong, Meghalaya July to December 2013 Ref.: Environmental Clearance no. SEIAA/Project-6/2008/23 dtd. 16.03.10.

More information

Regulation SWM: Yard Trash and Land-Clearing Debris; and Compost

Regulation SWM: Yard Trash and Land-Clearing Debris; and Compost South Carolina Department of Health and Environmental Control Regulation 61-107.4 SWM: Yard Trash and Land-Clearing Debris; and Compost Effective Date: April 23, 1993 Bureau of Land & Waste Management

More information

PRE-FEASIBILITY REPORT

PRE-FEASIBILITY REPORT PRE-FEASIBILITY REPORT For Excavation of Brick Earth (Total Mining Area 1.112Ha.) (For Manufacturing of Bricks) Submitted By M/s New Kaptan Brick Field Shri Krishna Kr. Singh S/o Shri Brahma DevSingh Pure

More information

INSPIRE INDUSTRIES PVT. LTD.

INSPIRE INDUSTRIES PVT. LTD. For Proposed 0.999 MTPA Coal Washery At Village: Bhelai, Tehsil: Baloda, District: Janjgir-Champa, Chhattisgarh Envirotech East (P) Limited An ISO 9001:2008, 14001:2004 & OHSAS:18001:2007 Company Laboratory

More information

PRE FEASIBILITY REPORT PROPOSED CONSCTRUCTION BUILDING PROJECT GUJARAT HOUSING BOARD

PRE FEASIBILITY REPORT PROPOSED CONSCTRUCTION BUILDING PROJECT GUJARAT HOUSING BOARD PRE FEASIBILITY REPORT FOR PROPOSED CONSCTRUCTION BUILDING PROJECT (66460.23 SQ. M) BY GUJARAT HOUSING BOARD AFFORDABLE RESIDENTIAL BUILDING & COMMERCIAL PROJECT PACKAGE 23, PLOT NO. 61/1, 63/1 & 64, TARSAMIYA,

More information

PRE-FEASIBILTY REPORT SUNATHAR STONE QUARRY. VILLAGE: Sunathar. TAHASIL: Purushottampur. DIST: Ganjam LESSEE SRI KAPILA CHANDRA SAHU

PRE-FEASIBILTY REPORT SUNATHAR STONE QUARRY. VILLAGE: Sunathar. TAHASIL: Purushottampur. DIST: Ganjam LESSEE SRI KAPILA CHANDRA SAHU PRE-FEASIBILTY REPORT OF SUNATHAR STONE QUARRY VILLAGE: Sunathar TAHASIL: Purushottampur DIST: Ganjam LESSEE SRI KAPILA CHANDRA SAHU Vill/Po- Gandala, P.S.- Hinjili, Dist.-Ganjam Odisha. CONTENTS CHAPTER

More information

(B) PREFEASIBILITY REPORT OF EXISTING BLACK TRAP PROJECT OF

(B) PREFEASIBILITY REPORT OF EXISTING BLACK TRAP PROJECT OF (B) PREFEASIBILITY REPORT OF EXISTING BLACK TRAP PROJECT OF Makwana Dineshbhai Khimjibhai AT VILLAGE:- Tithava, TALUKA:- Wankaner, DIST.:- Morbi 1 CONTENTS 1.0 INTRODUCTION 1.1 PREAMBLE 2.0 EXCUTIVE SUMMARY

More information

Analysis of Energy Contained in Domestic Solid Waste

Analysis of Energy Contained in Domestic Solid Waste Analysis of Energy Contained in Domestic Solid Waste Co-Author Harsh Gupta Assistant Professor Department of Mechanical Engineering I.T.S Engineering College, Greater Noida moveharsh@rediffmail.com Puneet

More information

EXISTING PROJECT FOR ORDINARY SAND MINING

EXISTING PROJECT FOR ORDINARY SAND MINING (C) PROJECT REPORT OF EXISTING PROJECT FOR ORDINARY SAND MINING OF JASHUBEN CHHAGANBHAI OAD AT VILLAGE:-TIMBA, TALUKA:- KAMREJ, DIST.:- SURAT 1 CONTENTS 1.0 INTRODUCTION 1.1 PREAMBLE 2.0 EXECUTIVE SUMMARY

More information

Environmental Management Plan during Construction Phase

Environmental Management Plan during Construction Phase Management Plan during Phase Sr 1 Ambient Air Quity Negative inside site premises outside site 2 ise Negative near noise generation sources inside premises on ambient noise levels in the Surrounding area

More information

Fax: (+39) Web site:

Fax: (+39) Web site: Copies of FAO publications can be requested from: SALES AND MARKETING GROUP Information Division Food and Agriculture Organization of the United Nations Viale delle Terme di Caracalla 00100 Rome, Italy

More information

A Model Bylaw for Solid Waste Management in Gram Panchayats

A Model Bylaw for Solid Waste Management in Gram Panchayats A Model Bylaw for Solid Waste Management in Gram Panchayats Bylaw for..gram Panchayat.Panchayat Union of.district. Approved by Gram Sabha on / /..2017 PART I General 1. The jurisdiction of the bylaw is

More information

Environmental Guideline on Stone crushing plant set up temporarily for the purpose of a project by a public department

Environmental Guideline on Stone crushing plant set up temporarily for the purpose of a project by a public department 2017 [Type a quote from the document or the summary of an interesting point. You can position the text box anywhere in the document. Use the Drawing Tools tab to change the formatting of the pull quote

More information

Proposed TOR Calix Industries

Proposed TOR Calix Industries 1 A tabular with index for point-wise compliance of below mentioned TORs. 2 Executive summary of the project giving a prima facie idea of the objectives of the proposal, use of resources, justification,

More information

Nothing Should Go Waste

Nothing Should Go Waste Nothing Should Go Waste Mailhem Engineers Pvt. Ltd. Keywords: Biogas, Pune Municipal Corporation, Biomethanation, Power Generation, UASB, Waste to Energy, Renewable energy Ab s t r a c t Waste to Energy

More information

ENVIRONMENTAL MANAGEMENT PLAN FOR DALPATPUR STONE QUARRY AT VILLAGE DALPUTPUR TEHSIL KHURAI AND DISTRICT SAGAR [MP], AREA (0.

ENVIRONMENTAL MANAGEMENT PLAN FOR DALPATPUR STONE QUARRY AT VILLAGE DALPUTPUR TEHSIL KHURAI AND DISTRICT SAGAR [MP], AREA (0. ENVIRONMENTAL MANAGEMENT PLAN FOR DALPATPUR STONE QUARRY AT VILLAGE DALPUTPUR TEHSIL KHURAI AND DISTRICT SAGAR [MP], AREA (0.920ha) 1.1 Introduction The subject quarry is proposed for metal stone on 0.920

More information

Performance Improvement Planning for Urban Water Supply and Sanitation Services

Performance Improvement Planning for Urban Water Supply and Sanitation Services Performance Improvement Planning for Urban Water Supply and Sanitation Services CEPT University June 2013 Performance Improvement Planning for Urban Water Supply and Sanitation Services CEPT University

More information

Proposed Project of Halcyon Labs Pvt Ltd D-2/CH : 335,336,337, GIDC-Dahej-2, DIst: Bharuch, Gujarat Ramans Enviro Services Pvt Ltd Ahmedabad

Proposed Project of Halcyon Labs Pvt Ltd D-2/CH : 335,336,337, GIDC-Dahej-2, DIst: Bharuch, Gujarat Ramans Enviro Services Pvt Ltd Ahmedabad 1. EXECUTIVE SUMMARY OF THE PROJECT BRIEF SUMMARY OF THE PROJECT : TYPE OF PROJECT : Proposed Project for manufacturing of pharma intermediates by Halcyon Labs Pvt.Ltd. LOCATION : Proposed Project of Halcyon

More information

Proposed Draft Terms of Reference for Preparation of EIA & EMP for Louis Pharmaceuticals Pvt Ltd STANDARD TERMS OF REFERENCE

Proposed Draft Terms of Reference for Preparation of EIA & EMP for Louis Pharmaceuticals Pvt Ltd STANDARD TERMS OF REFERENCE Proposed Draft Terms of Reference for Preparation of EIA & EMP for Louis Pharmaceuticals Pvt Ltd 1. Executive Summary 2. Introduction STANDARD TERMS OF REFERENCE I. Details of the EIA Consultant including

More information

THE STUDY ON REGIONAL SOLID WASTE MANAGEMENT FOR ADANA-MERSIN IN THE REPUBLIC OF TURKEY

THE STUDY ON REGIONAL SOLID WASTE MANAGEMENT FOR ADANA-MERSIN IN THE REPUBLIC OF TURKEY JAPAN INTERNATIONAL COOPERATION AGENCY () THE MINISTRY OF ENVIRONMENT THE REPUBLIC OF TURKEY THE STUDY ON REGIONAL SOLID WASTE MANAGEMENT FOR ADANA-MERSIN IN THE REPUBLIC OF TURKEY FINAL REPORT VOLUME

More information

EXECUTIVE SUMMARY 1.0 PROJECT DESCRIPTION 1.1 INTRODUCTION

EXECUTIVE SUMMARY 1.0 PROJECT DESCRIPTION 1.1 INTRODUCTION EXECUTIVE SUMMARY 1.0 PROJECT DESCRIPTION 1.1 INTRODUCTION Jaypee Group is a leading Business House of the country with its presence in Core industries and Service Sectors like Cement, Infrastructure development,

More information

Indonesia. Solid Waste Management Improvement Project for Regional and Metropolitan Cities (P127134)

Indonesia. Solid Waste Management Improvement Project for Regional and Metropolitan Cities (P127134) Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Indonesia Solid Waste Management Improvement Project for Regional and Metropolitan Cities

More information

State Level Environment Impact Assessment Authority Madhya Pradesh Government of India Ministry of Environment & Forests

State Level Environment Impact Assessment Authority Madhya Pradesh Government of India Ministry of Environment & Forests State Level Environment Impact Assessment Authority Madhya Pradesh Government of India Ministry of Environment & Forests Madhya Pradesh Pollution Control Board E 5. Arera Colony Bhopal 4620 16 visit us

More information

4. The ambient air quality monitoring stations We are monitoring the ambient air quality

4. The ambient air quality monitoring stations We are monitoring the ambient air quality GLOBAL CALCIUM PRIVATE LTD., 125&126, SIPCOT COMPLEX, HOSUR 635 126 Ref : No. J-11011/411/2006-IA-II(I) dated 1 st August 2007. Compliance Report for the Period ending 31.3.2015 Sl. Specific Conditions

More information

01 Name of Project Gorai Landfill closure and Gas Capture Project, Mumbai, India 02 Location of Project (Village/District/St ate)

01 Name of Project Gorai Landfill closure and Gas Capture Project, Mumbai, India 02 Location of Project (Village/District/St ate) 01 Name of Project Gorai Landfill closure and Gas Capture Project, Mumbai, India 02 Location of Project (Village/District/St ate) The project is located at the existing Gorai dumpsite in the western suburbs

More information

Summary of Preparatory Study

Summary of Preparatory Study Summary of Preparatory Study ate: September 9, 2008 1. Title of the Cooperation Project Waste Minimization and Recycling Promotion Project 2. Categorization and its reason Environmental Category: B The

More information

Nashik Municipal Corporation

Nashik Municipal Corporation 2011 Nashik Municipal Corporation [MUNICIPAL SOLID WASTE MANAGEMENT PLAN FOR NASHIK MUNCIPAL CORPORATION] 1. Objective... 3 2. City Overview:... 3 3. Legal Background:... 3 4. Roles and Responsibilities

More information

CANADA-WIDE APPROACH FOR THE MANAGEMENT OF WASTEWATER BIOSOLIDS. October 11, 2012 PN 1477

CANADA-WIDE APPROACH FOR THE MANAGEMENT OF WASTEWATER BIOSOLIDS. October 11, 2012 PN 1477 CANADA-WIDE APPROACH FOR THE MANAGEMENT OF WASTEWATER BIOSOLIDS October 11, 2012 PN 1477 Canadian Council of Ministers of the Environment, 2012 Table of Contents 1. Context... 1 2. Policy Statement and

More information

Limited Purpose Landfill Solid Waste Permit Application per WAC

Limited Purpose Landfill Solid Waste Permit Application per WAC Limited Purpose Landfill Solid Waste Permit Application per WAC 173-350-400 Name of Applicant: Name of Facility: Permit # assigned by Health Department: Date Received: Lead Agency Reviewer Name: Phone:

More information

incorporated in 2008 Vision: Mission

incorporated in 2008 Vision: Mission Waste to Energy About ORS ORS was incorporated in 2008 as a strategic initiative between a team of technocrats (sector experts) & group of investors (Intellivate Capital) to promote Green field projects

More information

Policy Resolution for Promotion of. Petroleum, Chemicals and Petrochemical Investment Regions (PCPIRs)

Policy Resolution for Promotion of. Petroleum, Chemicals and Petrochemical Investment Regions (PCPIRs) Policy Resolution for Promotion of Petroleum, Chemicals and Petrochemical Investment Regions (PCPIRs) POLICY OBJECTIVES 1. The Petroleum, Chemicals and Petrochemical industry in India is well established

More information

Department of Civil Engineering, Khulna University of Engineering & Technology (KUET), Bangladesh,

Department of Civil Engineering, Khulna University of Engineering & Technology (KUET), Bangladesh, SCENARIO OF EXISTING SOLID WASTE MANAGEMENT PRACTICES AND INTEGRATED SOLID WASTE MANAGEMENT MODEL FOR DEVELOPING COUNTRY WITH REFERENCE TO JHENAIDAH MUNICIPALITY, BANGLADESH Md. Ashik Ahmed 1 and Shuvra

More information

India s First MSW Treatment Facility

India s First MSW Treatment Facility India s First MSW Treatment Facility Fully Compliant with SWM 2016 guidelines OREX powered Mechanical Biological Treatment Presentation SFC Environmental Technology Pvt. Ltd, India We all agree Urgent

More information

Infrastructure Development and Environment

Infrastructure Development and Environment Infrastructure Development and Environment Few Stories Lift irrigation from Chambal River No Development Zone around Numaligarh Refinery NH - 31 C passing through Jaldapara, Mahananda and Buxa Nh-72 cutting

More information

Energy recovery from Municipal solid waste. Dr. Pooja Ghosh DST Inspire Faculty CRDT, IIT-D

Energy recovery from Municipal solid waste. Dr. Pooja Ghosh DST Inspire Faculty CRDT, IIT-D Energy recovery from Municipal solid waste Dr. Pooja Ghosh DST Inspire Faculty CRDT, IIT-D How we define waste? It is a material, substance, or by-product which is eliminated or discarded, as no longer

More information

Dr. Sukumar Devotta Director National Environmental Engineering Research Institute, Nagpur

Dr. Sukumar Devotta Director National Environmental Engineering Research Institute, Nagpur Landfill M2M Workshop Delhi, 9 March, 2006 Modelling LFG Generation in India Sites Dr. Sukumar Devotta Director National Environmental Engineering Research Institute, Nagpur - 440 020 Email:director@neeri.res.in

More information