1 Update on California WaterFix ACWD Board Meeting August 11, 2016 Month, Day, Year
2 California WaterFix Draft Schedule Biological Assessment and Opinion Draft BA Final BA BA Consultation 9/30/15 1/8/16 Apr 22, 2016 Sept 5, 2016 EIR/S and ROD/NOD Comments, Response, Admin. Draft Final EIR/EIS 2/26/16 5/23/16 ROD/NOD Jun 20, 2016 Sept 16, 2016 SWRCB Permit Petition Notice of Petition & Hearing Draft Order & Public Comments 2/26/16 5/25/16 5/25/16 Adoption? 1/25/17 USACE 404 Permit Sept 15, 2016 Jul Oct Jan Apr Jul Oct Jan
3 In Review, ACWD assumptions for WaterFix are: Increased water supply availability of 6.6 TAF/yr compared to the worst case scenario, Existing Conditions, High Outflow (ECHO) Cost ACWD $106,000,000 ACWD is preparing a Business Case for WaterFix What's it worth? What do we need? 3
4 Alternatives Under Consideration Baseline (48 mgd, build-out demand) Project (48 mgd) No-action Build out (48 mgd demand) Near term (43 mgd (provides What if? ) ) Indirect Potable Reuse (48 mgd) (tonight) Bay Desalination (48 mgd) Los Vaqueros Expansion New addition Sites Reservoir New addition Lake Del Valle Storage Expansion 4
5 August Update Local Bay Desalination Concept Option A2b from 2014 Water Supply Alternatives Study Study found Bay Desal was very costly compared to Regional Desal A2b (Local Bay Desal) Regional Desal Total Unit Cost ($/AF) $4,700 $1,500 5
6 Regional Desal many cost efficiencies Regional Desal Plant Best of 13 alternative sites 20 mgd economy of scale Existing Intake and Water Rights Brine Discharge at adjacent WWTP Close to PG&E Low salinity which is seasonally variable : ~1,000 ppm Winter / Spring. 12,000 ppm Summer / Fall. Reference: to 25,000-35,000 ppm Bay Water 6
7 2014 Water Supply Alternative Study Bay Desalination Option A2b Approx. plant location Brine Line to USD Located in Warm Springs to directly replace some TP2 production Brine discharge via EBDA outfall; limited to dry months only 22mgd facility, 50% recovery, 11mgd permeate Would produce 8,000 AF/yr. over 8 months Intakes would be shallow slant wells beneath the Bay 9 wells, 2.5mgd each 7
8 Discharge Constraint = Cost Sensitivity Dry season only increases Plant Size and # of wells by 50%. Brine to EBDA Outfall Brine Line adds cost ACWD Distribution System Slant Wells in Land near Bay Local Desalination Plant 8
9 Unit Cost Comparison: ACWD Bay Desal and Regional Desal A2b (Local Bay Desal) Regional Desal Slant Wells* Brine Discharge* +40% $105 M $88 M Total Capital Cost $273 M Other Capital Costs $271 M Total Capital Cost $464 M Unit Cost A2b (Local Bay Desal) Regional Desal Unit Cap. Cost ($/AF) $3,300 $800 Unit O&M Cost ($/AF) $1,400 $700 Total Unit Cost ($/AF) $4,700 $1,500 *Includes estimates for overhead, implementation, contingency, and environmental mitigation 9
10 California WaterFix Alternatives Analysis: Bay Desalination 10
11 WaterFix Alternatives Analysis : Bay Desal 2040 Build-Out demands Opt-Out therefore ECHO SWP reliability 11 mgd Bay Desalination Facility run for 8 months a year 8,000 AF/yr. 11
12 Bay Desal as Alternative to WaterFix Capital Cost 2016$ 11 MGD Permeate Desal Facility $464 M Newark Desalination Facility improvements Upper Zone enhancements (offset TP1 function under future, higher demands) $5 M $10 M (likely low) Total Capital Costs $ 479 M 12
13 Bay Desal Modelling Results Improved Reliability Modelled 8TAF Desal for only a 6.6 TAF loss of SWP supply loss Desal is drought proof No change in SFPUC use Groundwater conditions very health Proper usage of Semitropic Storage Investment 13
14 Results: Cost Scenario Assumes Net Capital Costs Amortized Capital Cost Long Term Avg Annual Water Supply and Production Costs Total UWMP Worst Case Status Quo Delta condition $0 $0 $ 41.5 M $41.5 M ECHO $0 $0 $ 42.2 M $42.2 M WaterFix IPR Desal Project Alt 4 (the tunnels) + TP1 upgrade ECHO + IPR + Desal Imps + Upper Zone costs ECHO + Bay Desal + Desal Imps + Upper Zone costs $134 M $ 7.7 M $ 36.1 M $43.8 M $85 M $4.9M $44.8 M $49.6 M $479 M $27.6M $ 50.6 M $78.2 M All costs are in 2016 dollars 14
15 Results: Other Factors Description Water Quality Local Control Resiliency Shortage s % Annual Cost UWMP Worst Case Water Fix IPR Status Quo Delta o o o condition ECHO + o (Local dry conditions) Project Alt 4(the tunnels) + TP1 upgrade + o + ECHO + IPR + Desal Imps + Upper Zone costs + + o 5% (1 in 20 years) $41.5 M 14% (3 in 20 years) $42.2 M 5% (1 in 20 years) $43.8 M Effectively no shortages $49.6 M Bay Desal ECHO + Bay Desal Desal Imps + Upper Zone costs Legend: oneutral +Positive Negative 7% (1 in 80 years) $78.2 M 15
16 Bay Desal Cost Sensitivities Uncertainties that could lower costs Discharge to Salt Ponds Relaxed discharge in winter months / smaller plant Uncertainties that could increase costs Slant wells yields low due to Bay muds Further restrictions on Brine Discharge 16
17 Alternatives Under Consideration Baseline (48 mgd, build-out demand) Project (48 mgd) No-action Build out (48 mgd demand) Near term (43 mgd (provides What if? ) ) Indirect Potable Reuse (48 mgd) (tonight) Bay Desalination (48 mgd) Los Vaqueros Expansion New addition Sites Reservoir New addition Lake Del Valle Storage Expansion 17
18 Questions? 18
19 Facilities Quantity Total Cost Notes Desalination Plant and On-site Pipelines Brine Concentrate Pipeline to EBDA Outfall at WWTP 22 mgd $119,017,305 73, 000 ft. $36,500,000 Brine Concentrate Pump Station 2,193 hp. $2,597,038 Product water clear-well 1 MG $2,000,000 Based on BARDP, excludes intake, clear-well & transmission for product water storage; assumes 50% recovery rate Assumes desalinization facility at Irvington Pump Station Product water distribution pump station Product water pipeline into distribution system Slant wells for intake of bay water 133 hp. $ 543,395 1,000 ft. $ 500,000 Assumes 40 psi needed to enter pressurized distribution system; should be confirmed 9 $ 47,880, MGD per well Easement & Land Acquisition $ 4,224,059 19
Operations and Maintenance Department
Operations and Maintenance Department 1 Agenda Emergency Response and Security Officer Jake Reed Emergency Preparedness Past events Current events Future activities Manager of Operations and Maintenance
More informationCalifornia Water Commission. June 28, 2018
California Water Commission June 28, 2018 1 Los Vaqueros Reservoir Off-stream reservoir in Contra Costa County Operated in conjunction with four Delta intakes Capacity of 160 TAF Uses: Water quality Drought
More informationLos Angeles 3 rd Regional
Los Angeles 3 rd Regional Investors Conference Los Angeles, California March 31, 2016 Metropolitan Water District of Southern California 1 Metropolitan Water District of of Southern California 2 Metropolitan
More informationSierra Mountains. LA Aqueduct. Supplies Conservation
Sierra Mountains LA Aqueduct Delta State Water Project Supplies Groundwater and Recycling Colorado River Aqueduct Supplies Conservation Groundwater Recovery CRA 21% SWP 29% Local Supplies & LA Aqueduct
More informationSpecial Meeting of the Imported Water Committee November 14, 2013
Presented by: Dennis Cushman, Assistant General Manager Ken Weinberg, Director of Water Resources Dana Friehauf, Principal Water Resource Specialist Special Meeting of the Imported Water Committee November
More informationDRAFT Master Water Reclamation Plan. City Council Meeting March 28, 2017
DRAFT Master Water Reclamation Plan City Council Meeting March 28, 2017 Presentation Overview Tonight s Overall Goals Acknowledge Input City has Received Reminder: Where We are in the Process Present the
More informationCommittee on Water. Desalination as a Water Source
Committee on Water Committee on Water Desalination as a Water Source Water Supply Reliability for San Diego County NARUC Summer Policy Summit July 17, 2017 Bob Yamada Director of Water Resources San Diego
More informationWater Management Representatives
Bay Area Water Supply and Conservation Agency A multicounty agency authorized to plan for and acquire supplemental water supplies, encourage water conservation and use of recycled water on a regional basis.
More informationJanuary 9, Bill Rose Gary Bousquet
January 9, 2014 Bill Rose Gary Bousquet Status of BDCP Design Role of Water Authority Review Schedule July August Board Review Process Background & Options to Review Review Update September Costs and Funding
More informationOC Water Reliability Study
OC Water Reliability Study South Orange County (SOC) Update June 2016 Municipal Water District of Orange County 1 Where South Orange County (SOC) Gets Its Water = 90% Import & 10% Local Bay Delta Area
More informationPROJECT OVERVIEW. B.G. Heiland, P.E. June 15, 2016
PROJECT OVERVIEW B.G. Heiland, P.E. June 15, 2016 WATER DELIVERY UPGRADE PERMITTING APPROACH BDCP Habitat Conservation Plan under Section 10 of the U.S. Endangered Species Act. Natural Community Conservation
More informationThe Los Vaqueros Reservoir Expansion Project
The Los Vaqueros Reservoir Expansion Project Marguerite Patil Special Assistant to the General Manager Contra Costa Water District SCVWD/CCWD Joint Meeting July 14, 2016 Today s Itinerary 11:00 11:50 Presentation
More informationCalifornia Drought, Water, Parks, Climate, Coastal Protection, and Outdoor Access for All Act of 2018 (Proposition 68) Item 5.7
California Drought, Water, Parks, Climate, Coastal Protection, and Outdoor Access for All Act of 2018 (Proposition 68) Item 5.7 1 Potential Funding Availability California Drought, Water, Parks, Climate,
More informationWater Planning and Stewardship Committee Item 6a February 8, 2016
Water Planning and Stewardship Committee Item 6a February 8, 2016 Hydrologic Conditions State Water Project Allocation 2016 Water Supply Demand Balances Statewide Conservation Regulations WSDM Tracking
More informationCost Sharing Agreement For The Los Vaqueros Reservoir Expansion Project Planning. ACWD Board Meeting December 8, 2016
Cost Sharing Agreement For The Los Vaqueros Reservoir Expansion Project Planning ACWD Board Meeting December 8, 2016 Los Vaqueros Reservoir (LV) Owned and operated by CCWD Off-stream reservoir, adjacent
More informationMontecito Water District Drought and Quarterly Water Supply Update
Montecito Water District Drought and Quarterly Water Supply Update October 2017 December 2017 Board Meeting February 20, 2018 Page 1 Outline 1. Drought Status 2. Total Production & Customer Demands 3.
More informationPutting Title 22 Water to Beneficial Use in the Central Valley
Central Valley Watereuse Chapter Meeting April 17 th, 2014 Putting Title 22 Water to Beneficial Use in the Central Valley North Valley Regional Recycled Water Program (NVRRWP) Presenters: Will Wong, City
More informationWater Supply Master Plan Update
Water Supply Master Plan Update January 2018 Page 1 Meeting objective Get stakeholder input on water supply projects and strategies Are we including the right mix of projects? Are there factors that we
More informationUse of Optimization and Data Visualization Tools in Water Resources Planning: Case Study of the Los Vaqueros Expansion Investigation
Use of Optimization and Data Visualization Tools in Water Resources Planning: Case Study of the Los Vaqueros Expansion Investigation Tom FitzHugh, Enrique Triana, Samantha Mauzy, and Neil Stewart 2017
More informationBENEFITS AND COSTS OF THE CALIFORNIA WATERFIX.
BENEFITS AND COSTS OF THE CALIFORNIA WATERFIX Dr. Jeffrey Michael Center for Business and Policy Research University of the Pacific San Diego County Water Authority December 8, 2016 1 jmichael@pacific.edu
More informationADOPT A RESOLUTION OF THE CITY COUNCIL IN SUPPORT OF THE CALIFORNIA WATERFIX AND CALIFORNIA ECO RESTORE
ADOPT A RESOLUTION OF THE CITY COUNCIL IN SUPPORT OF THE CALIFORNIA WATERFIX AND CALIFORNIA ECO RESTORE Presented by Gary Takara City Council September 18, 2017 Agenda Item 12 Recommendations Find that
More informationFigure 1 Demands on Lake Athens
Table 1 Projected Demands for Athens MWA and Lake Athens Water User Group Demand on Lake Athens 2010 2020 2030 2040 2050 2060 Comments City of Athens 2,326 2,832 3,431 4,111 5,003 6,108 Henderson Co. Irrigation
More informationIndirect Potable Reuse for Groundwater Recharge Succession Strategy for Recycled Water
EASTERN MUNICIPAL WATER DISTRICT Indirect Potable Reuse for Groundwater Recharge Succession Strategy for Recycled Water Paul D. Jones II, P.E. General Manager, Eastern Municipal Water District March 11,
More informationAdministrative Final 1
1 For the (ARWA), we appreciate the opportunity to comment on the final environmental impact report/environmental impact statement (FEIR/EIS) for the California WaterFix project. These agencies rely, in
More information2019 Water Supply Evaluation Update
2019 Water Supply Evaluation Update Board Meeting Presented by: Wes Mercado Outline 1. Water demand forecasts 2. Reliability Policy 3. Los Vaqueros Expansion water storage 4. Water supply reliability projects
More informationCalifornia League of Cities Briefing on Water Supply Issues
California League of Cities Briefing on Water Supply Issues Stephen N. Arakawa Manager, Bay-Delta Initiatives The Metropolitan Water District of Southern California May 5, 2016 California WaterFix: Securing
More informationPublic Presentation: Water in the Tri-Valley. August 29, 2018
Public Presentation: Water in the Tri-Valley August 29, 2018 Topics Covered The Value of Water Where Our Water Comes From Water Rate-Setting Process Water Supply Challenges in the Tri-Valley Resources
More informationSeawater Desalination Concerns & Benefits
Presentation to the Southern California Association of Governments Seawater Desalination Concerns & Benefits Presented by Kevin L. Wattier, General Manager December 11, 2003 Outline Seawater Desalination
More information2018 OC Reliability Study Draft Report
Item No. 1 2018 OC Reliability Study Draft Report P&O Committee Municipal Water District of Orange County October 1, 2018 Today s Goals Overview Presentation 1) Describe the Study Methodology 2) Present
More informationAn Investigation of the Marginal Cost of Seawater Desalination in California
An Investigation of the Marginal Cost of Seawater Desalination in California by James Fryer, Environmental Scientist March 18, 2010 Sponsored by R 4 R D Residents for Responsible Desalination Organized
More informationWater for Southern California: How Bay-Delta is Key to All of the Above Strategy
Water for Southern California: How Bay-Delta is Key to All of the Above Strategy Stephen N. Arakawa Manager, Bay-Delta Initiatives The Metropolitan Water District of Southern California October 15, 2016
More informationNorth Monterey County Drought Contingency Plan
North Monterey County Water Total Water Management Evaluating Options for a Reliable Water Future North Monterey County Drought Contingency Plan May 31, 2018 Meeting Topics Overview of Drought Contingency
More informationCity of Santa Cruz REGIONAL RECYCLED WATER FACILITIES PLANNING STUDY. Presentation for City of Santa Cruz Water Commission August 7, 2017
City of Santa Cruz REGIONAL RECYCLED WATER FACILITIES PLANNING STUDY Presentation for City of Santa Cruz Water Commission August 7, 2017 Photo of San Lorenzo River at Water Street Bridge on February 7,
More informationSan Mateo Plain Groundwater Basin Assessment Stakeholder Workshop #8 17 APRIL 2018
San Mateo Plain Groundwater Basin Assessment Stakeholder Workshop #8 17 APRIL 2018 PRESENTATION OVERVIEW Introductions Project Overview Summary of Analysis Supporting Model Development Model Development
More informationDoheny Ocean Desalination Project Alternative Power Supply Analysis
Doheny Ocean Desalination Project Alternative Power Supply Analysis CalDesal Conference - February 2018 South Coast Water District Created in 1932 Five-member Board of Directors Serves 40,000 residents
More informationSummary of Issues Strategies Benefits & Costs Key Uncertainties Additional Resources
Summary of Issues Strategies Benefits & Costs Key Uncertainties Additional Resources KEY POINT: In some cases, subsurface intakes can be less expensive than surface water intakes at stand-alone facilities.
More informationPOTABLE REUSE PLANNING WATER SUPPLY SYSTEM MODELING REPORT
POTABLE REUSE PLANNING WATER SUPPLY SYSTEM MODELING REPORT PROJECT NO. 91304001-1215 Prepared by Tracy Hemmeter - Senior Project Manager, SCVWD Eric Olson Engineering Systems Analyst, SCVWD Kent Haake
More informationSan Diego County Water Authority Special Water Planning Committee Meeting October 10, 2012
Public Workshop on issues related to the Carlsbad Desalination Project San Diego County Water Authority Special Water Planning Committee Meeting 1 October 10, 2012 Wholesale water agency created by State
More informationMontecito Water District Desalination Facilities Status Update. Board of Directors Meeting March 17, 2015
Montecito Water District Desalination Facilities Status Update Board of Directors Meeting March 17, 2015 Desalination Studies Update 1) Desalination Feasibility Study 2) Desalination Technical Support
More informationWhy the 2018 Water Reliability Study
2018 OC Reliability Study Draft Report Water Advisory Committee of Orange County (WACO) October 5, 2018 Why the 2018 Water Reliability Study 2 1 Changed Conditions and Need for 2018 Study MET financially
More informationFINAL DRAFT. Bay Area Regional Desalination Project. Greenhouse Gas Analysis
303 Second Street, Suite 300 South San Francisco, California 94107 415-243-2150 FAX: 415-896-0999 FINAL DRAFT Bay Area Regional Desalination Project Greenhouse Gas Analysis 11 January 2013 Prepared for
More informationSupplemental Supply Option: Desalination DEEP WATER DESAL PROJECT
Supplemental Supply Option: Desalination DEEP WATER DESAL PROJECT CONCEPT: The Deep Water Desalination (DWD) Project would consist of a Desalination Facility at the Moss Landing Area and co-located with
More informationBrackish Desalination Water Supply Planning for Resiliency and Growth
Brackish Desalination Water Supply Planning for Resiliency and Growth Paul D. Jones II February 2, 2017 1 emwd.org EMWD Agency Overview Established in 1950 Unique agency, serving: Water/wastewater/recycled
More informationPlans and Goals for 2016
Plans and Goals for 2016 Board Members Employees Calleguas MWD Water wholesaler 630,000 people 19 member purveyors???? AF/year annual demand Historical Deliveries on pace to sell 76,000 AF this year Mission
More informationWater Supply Board Briefing. Water Operations Department March 22, 2016
Water Supply Board Briefing Water Operations Department March 22, 2016 Water Supply Briefing California Water Supply District Water Supply Water Supply Projections Water Supply Schedule 2 California Water
More informationLong Term Water Supply Board of Directors Workshop. March 10, 2015
Long Term Water Supply Board of Directors Workshop March 10, 2015 Agenda Water Supply Management Plan (WSMP) 2040 2014 Activities Use of the Freeport Regional Water Project Planning for the Future Freeport
More informationSaline Water - Considerations for Future Water Supply. Bruce Thomson Water Resources Program UNM
Saline Water - Considerations for Future Water Supply Bruce Thomson Water Resources Program UNM (bthomson@unm.edu) 1 Objectives Provide overview of Reverse Osmosis (RO) technology Identify differences
More informationMetropolitan Water District. July 25, 2013
Metropolitan Water District July 25, 2013 The Mission of the Metropolitan Water District is to provide its service area with adequate and reliable supplies of high-quality water to meet present and future
More informationAPPENDIX A CALCULATION OF NET PRESENT VALUE OF WATER SUPPLY PACKAGES. Total Capital Total Annual O&M Net Present Value ($) ($ per year) ($ Millions)
APPENDIX A CALCULATION OF NET PRESENT VALUE OF WATER SUPPLY PACKAGES Package Package 1 - Recycled Water + Emergency Supply + WTP Expansion Total Capital Total Annual O&M Net Present Value ($) ($ per year)
More information9 CEQA Alternatives. Alternatives
9 CEQA Alternatives 9 CEQA Alternatives CHAPTER 9 CEQA Alternatives Sections Tables 9.1 Introduction 9.2 Alternatives Analysis 9.3 Comparison of Alternatives to the Proposed WSIP 9.4 Alternatives Identification
More information2015 IRP/RUWMP Kickoff Workshop April 8, 2015
2015 IRP/RUWMP Kickoff Workshop April 8, 2015 Update process and goals Draft schedule Review of 2010 IRP targets and current conditions Next steps The IRP Update is split into a two-part process Technical
More informationChabot Dam Seismic Upgrade Spec Board of Directors March 8, 2016
Chabot Dam Seismic Upgrade Spec 2107 Board of Directors March 8, 2016 Project Location NAB Hayward Fault Chabot Dam Project Location North Chabot Reservoir 10,350 Acre-Ft Outlet Tunnel Hayward fault zone
More informationSalinity Management Strategies During Drought
EASTERN MUNICIPAL WATER DISTRICT Salinity Management Strategies During Drought Jayne Joy, P.E. Director of Environmental and Regulatory Compliance October 1, 2015 www.emwd.org 1 Agenda Overview of EMWD
More informationAppendix 5G Comparison of FEIRS Alternative 4A Modeling Results to the California Water Fix Section BA Proposed Action Modeling Results
Appendix G Comparison of FEIRS Alternative A Modeling Results to the California Water Fix Section BA Proposed Action Modeling Results 6 7 8 9 0 6 7 8 9 0 6 7 8 9 0 6 7 Appendix G Comparison of FEIRS Alternative
More informationBrine Dilution Analysis for DeepWater Desal, LLC, Monterey Bay Regional Water Project at Moss Landing, CA
Brine Dilution Analysis for DeepWater Desal, LLC, Monterey Bay Regional Water Project at Moss Landing, CA by Scott A. Jenkins, Ph.D. Deep Water Desal s Science Symposium 16 June 2014 Discharge Compliance
More informationAmortized annual capital cost ($) + Annual Operating Cost ($) = Unit Cost ($/acre-foot) Annual beneficially used water production in acre-feet (AF)
Attention: Water Planning Committee Unit Cost of New Local Water Supply Alternatives (Information) Purpose This report discusses current unit costs for new local water supply alternatives including water
More informationScott Valley Siskiyou County, California: Voluntary Private Well Water Level Monitoring Program Spring 2006 January 2016
Scott Valley Siskiyou County, California: Voluntary Private Well Water Level Monitoring Program Spring 2006 January 2016 (Data collected monthly except January 2011) University of California Davis 2016
More informationSection V: Water Accounting and Water Supply Reliability
Section V: Water Accounting and Water Reliability A. Quantifying the Water Supplier s Water Supplies 1. Agricultural Water Supplier Water Quantities Table 41 shows typical water diversions from the CA
More informationFive Year Strategic Plan. Alameda County Water District
Five Year Strategic Plan Alameda County Water District 2018 ACWD Strategic Plan TABLE OF CONTENTS Introduction... 1 Mission Statement... 2 2018 Strategic Goals... 2 Strategic Goal #1 Cost Effectiveness
More informationSection V: Water Accounting and Water Supply Reliability
Section V: Accounting and Supply Reliability A. Quantifying the Supplier s Supplies 1. Agricultural Supplier Quantities Table 46 illustrate the District s water. The District routinely transfers and/or
More informationPlanning for Our Water Future: City of Santa Cruz & Soquel Creek Water District. September
Planning for Our Water Future: City of Santa Cruz & Soquel Creek Water District September 2011 www.scwd2desal.org 1 Overview Background information on City of Santa Cruz and Soquel Creek Water District
More informationVallecitos Water District 2015 Urban Water Management Plan Page 6-1
Section 6: S System Supplies Ince its formation in 1955, the (VWD) has received 100 percent of its water supply from the San Diego County Authority (SDCWA), of which it is one of 24 member agencies. The
More informationWater Operations 101. Jerry Johns and John Leahigh Department of Water Resources BDCP Steering Committee 5/8/09
Water Operations 101 Jerry Johns and John Leahigh Department of Water Resources BDCP Steering Committee 5/8/09 Water Operations Overview Where Does BDCP Fit Into California Planning Hydrologic Variability
More informationTexas Municipal League Water Conference
Texas Municipal League Water Conference January 8, 2015 Darron Leiker City Manager Wichita Falls, Texas Water Supply Summary Population served w/ water ~ 150,000 Includes 15 wholesale customers Area cities
More informationSection V: Water Accounting and Water Supply Reliability
Section V: Accounting and Supply Reliability A. Quantifying the Supplier s Supplies 1. Agricultural Supplier Quantities Table 38 shows typical water diversions from the CA Aqueduct during the representative
More informationCity of San Diego Pure Water Project October 2014
City of San Diego Pure Water Project October 2014 SDCTA Position: SUPPORT Rationale for Position: Substantial study has demonstrated a potable reuse project within the City of San Diego would be safe,
More informationCalifornia Urban Water Agencies Water Supply Reliability Report
Progress Update on Water Conservation, Supply Diversification and Resource Management California Urban Water Agencies Water Supply Reliability Report August 2012 San Francisco Public Utilities Commission;
More informationSanta Barbara County Region
Attachment 3 Santa Barbara County Region IRWM Implementation Grant Proposal Attachment 3 consists of the following items:. Attachment 3 provides a project description, estimated physical benefits, technical
More informationCortez Sea Water Alternatives
Cortez Sea Water Alternatives Is it the seas last chance (alternative) the only option, or just another scheme to justify consulting fees? Copyright 2009 Agrarian Research & Management Company, LTD. Possible
More informationPotable Reuse as an Alternative Water Supply. AWRA Conference Orlando, FL
Potable Reuse as an Alternative Water Supply AWRA Conference Orlando, FL Who We Are New Port Richey Tampa St. Petersburg 100 percent groundwater pumped from 13 wellfields Tampa Bay Water History Integrated,
More informationWater-Energy-Carbon Nexus and Your Membrane Plant
Advanced Membrane Technologies Stanford University, May 07, 2008 Water-Energy-Carbon Nexus and Your Membrane Plant Alan Zelenka Energy Services Leader Kennedy/Jenks Consultants The Water-Energy-Carbon
More information20. UTILITIES AND SERVICE SYSTEMS
June 28, 2018 Page 20-1 20. UTILITIES AND SERVICE SYSTEMS This EIR chapter describes existing conditions for and distribution, collection and, and solid waste disposal and recycling in the planning area.
More informationThe Confluence Model. Presentation to Modeling and Forecasting Working Group January 21, 2015
The Confluence Model Presentation to Modeling and Forecasting Working Group January 21, 2015 Introductions Presenter: Gary Fiske Working Group Water Department staff Objective: Penetrate the Black Box
More informationSubsurface Desalination Intake & Potable Reuse Feasibility Studies. TAP Workshop #3 City of Santa Barbara, California October 26, 2016
Subsurface Desalination Intake & Potable Reuse Feasibility Studies TAP Workshop #3 City of Santa Barbara, California October 26, 2016 Agenda Feasibility Study Background & Objectives Update following TAP
More informationBay-Delta & WaterFix Update
Bay-Delta & WaterFix Update Regional Water Authority Board of Directors November 8, 2018 Ryan Bezerra 1 It s Complicated 2 State Board Delta Proceedings Bay-Delta Water Quality Control Plan San Joaquin
More informationExecutive Summary. Monterey Peninsula Water Management District. Sand City Desalination Project Feasibility Study. Executive Summary.
Monterey Peninsula Water Management District Sand City Desalination Project Feasibility Study Executive Summary March 25, 2004 EXHIBIT 4- Executive Summary Introduction and Background Camp Dresser & McKee
More informationAGENDA. DECEMBER 15, :30 PM Conference Room A. 1. Water Production, Groundwater Levels, and Lake Level Projections
AGENDA Call To Order ADJOURNED MEETING OF THE WATER PLANNING COMMITTEE DECEMBER 15, 214 3:3 PM Conference Room A Public Comments Discussion Items: 1. Water Production, Groundwater Levels, and Lake Level
More informationDelaware River Basin Commission
New York City Water Supply System is greater than 100 years old Provides water to 9 million people 1.3 billion gallons per day on average The Delaware System provides 50% of the City s water supply need
More informationAGENDA DATE: November 14, 2018
ALAMEDA COUNTY FLOOD CONTROL AND WATER CONSERVATION DISTRICT, ZONE 7 100 NORTH CANYONS PARKWAY, LIVERMORE, CA 94551 PHONE (925) 454-5000 FAX (925) 454-5727 ORIGINATING SECTION: INTEGRATED PLANNING CONTACT:
More informationSanta Cruz Water Department: Water Resources, Conservation, and Water Shortage Contingency Plan. Santa Cruz Neighbors February 18, 2009
Santa Cruz Water Department: Water Resources, Conservation, and Water Shortage Contingency Plan Santa Cruz Neighbors February 18, 2009 Presentation Overview Overview of City s Water Supply System Challenges
More informationCONTRA COSTA WATER DISTRICT. Yield Study Report. for the Refinery Recycled Water Project. May Prepared by: In association with MBK Engineers
CONTRA COSTA WATER DISTRICT Yield Study Report for the Refinery Recycled Water Project Prepared by: In association with MBK Engineers This page is intentionally left blank. Yield Study Report for the Refinery
More informationCurrent Drivers Toward Potable Reuse
Current Drivers Toward Potable Reuse Water reuse is the recycling of treated wastewater for beneficial use Drivers for water reuse: population growth, climate change, and drought Why is there a trend in
More informationRobust Design for a Sustainable Future
Robust Design for a Sustainable Future Solar Desalination for Food and Water Security Dr. Matthew D. Stuber CoFounder and Director WaterFX, Inc. Seminar Outline Introduction to the Problem and Motivation
More information3.1 Desalination Cost Trends
Cost Estimating of SWRO Desalination Plants Day 3: Desalination Project Costs Trends, Examples and Interactive Session June 27, 2013 09:00-10:15 3.1 Desalination Cost Trends Water Water Globe Globe Nikolay
More informationRaw Water Supply Master Plan Development
Raw Water Supply Master Plan Development Stakeholder Outreach Meeting - II 31 August 2016 Welcome Introductions Master Plan Goals and Objectives Refine our standard approach to long-term plan for securing
More informationCity of Santa Cruz Water Supply Advisory Committee Solutions Phase -- Technical Summary Consolidated Alternative 07 - Deepwater Desalination
Consolidated Alternative 07 - Deepwater Desalination Agenda Item 4c Part 2 of 5 This alternative would desalt seawater withdrawn through a new deepwater intake system at Moss Landing, producing approximately
More informationLos Vaqueros Reservoir Expansion Investigation Update on Draft Feasibility Report and State Funding Application
Los Vaqueros Reservoir Expansion Investigation Update on Draft Feasibility Report and State Funding Application February 22, 2018 Los Vaqueros Reservoir Off-stream storage facility currently served by
More informationSan Diego, A Cadillac Desert; Presentation by: Dana Fi Friehauf, fpe P.E. Water Resources Manager
San Diego, A Cadillac Desert; Sustainable Strategies for Living in a Desert Presentation by: Dana Fi Friehauf, fpe P.E. Water Resources Manager Green Lunch Bag Series September 24, 2014 San Diego County
More informationPEACE RIVER MANASOTA REGIONAL WATER SUPPLY AUTHORITY BOARD OF DIRECTORS MEETING December 5, 2018 ROUTINE STATUS REPORTS ITEM 1
PEACE RIVER MANASOTA REGIONAL WATER SUPPLY AUTHORITY BOARD OF DIRECTORS MEETING December 5, 218 ROUTINE STATUS REPORTS ITEM 1 Hydrologic Conditions Report MEMORANDUM Project: Hydrologic Conditions Report
More informationWESTCAS June 21, Maureen Stapleton, General Manager San Diego County Water Authority
WESTCAS June 21, 2017 Maureen Stapleton, General Manager San Diego County Water Authority San Diego County Water Authority Wholesale water agency and regional water planner created by state Legislature
More informationThe Future of Alternative Water Supplies in the SWFWMD. Workshop: Practicable Sustainability: Implementing Water Reuse/Supply/Resource Projects
The Future of Alternative Water Supplies in the SWFWMD Workshop: Practicable Sustainability: Implementing Water Reuse/Supply/Resource Projects 16 counties 10,000 sq. miles 98 local governments Population
More informationHood River Basin Study
Hood River Basin Study Agenda 1). Goals 2). Partners 3). Study Overview 4). Recommendations Goals Evaluate: 1. Current and future water demands 2. Water conservation opportunities 3. Groundwater resources
More informationWholesale water agency created by State Legislature in Mission is to provide safe and reliable water supply to member agencies Service area
Wholesale water agency created by State Legislature in 1944 24 member agencies 36-member board of directors 3 million people $188 billion economy Mission is to provide safe and reliable water supply to
More informationA Vision for Recycled Water at Oro Loma
A Vision for Recycled Water at Oro Loma Jason Warner WateReuse Association Northern California Chapter Meeting March 1, 2019 Oro Loma Sanitary District 2 Agenda A Big Thanks Sara Rhodes Background Status
More informationInvestigation Highlights
Investigation Highlights May 2014 INVESTIGATION HIGHLIGHTS A Summary North-of-the-Delta Offstream Storage (NODOS) would provide a robust set of benefits, including water supply reliability for municipal
More informationWASTEWATER TREATMENT PLANT UPGRADE PROJECT APPEAL NO. A-3-MRB
WASTEWATER TREATMENT PLANT UPGRADE PROJECT APPEAL NO. A-3-MRB-11-001 CCC Briefing Booklet April 2012 A copy of this briefing booklet has been provided to the Central Coast District Staff. Project Description
More informationGM s Report on Water and Wastewater Schedule of Rates and Charges and Setting Public Hearing Date. May 12, 2015
GM s Report on Water and Wastewater Schedule of Rates and Charges and Setting Public Hearing Date May 12, 2015 Agenda Budget and rates calendar Prop 218 rates and charges Other fees, charges, and regulations
More informationAlameda County Water District
Alameda County Water District Alameda Local Agency Formation Commission Meeting Robert Shaver, Assistant General Manager Thursday, March 13, 2014 Month, Day, Year Overview Founded in 1914 Population: ~336,000
More informationCLWA Recycled Water Master Plan
CLWA Recycled Water Master Plan WateReuse LA Chapter Meeting @ Castaic Lake Water Agency October 11, 2016 Shadi Bader, PE, PMP Project Manager for CLWA Dawn Taffler, PE, LEED Project Manager for Kennedy/Jenks
More informationAppendix N. IID Capital Projects
IID Capital Projects IID Capital Projects October 2012 GEI Consultants, Inc. GEI Consultants, Inc. N-ii July 2012 Table of Contents N Capital Project Alternatives 1 N.1 Desalination of Brackish Water
More information