1 City of Palmer, Alaska Prepared by Hattenburg Dilley & Linnell, LLC and G. V. Jones and Associates, Inc. Date:

2 TABLE OF CONTENTS 1.0 INTRODUCTION PURPOSE AND NEED PROJECT PLANNING AREA Location Topography and Geology Vegetation Groundwater Environmental Resources Farmlands Wetlands Wildlife and Fisheries Endangered Species Historical and Archeological Sites Flood Hazards Population Growth Wastewater Flow Projections Population Model Flows Land Use Model Flows Proposed Flows EXISTING FACILITIES Wastewater Treatment Plant History Existing Wastewater Treatment System Existing Sludge Handling Existing Biological Process Current Wastewater Discharge Permit Historical Performance Design Criteria Potential Future Regulatory Requirements Treatment Objectives Projected Wastewater Flow and Strength FINANCIAL STATUS OF EXISTING FACILITIES ALTERNATIVES Alternative 1: Conventional Activated Sludge Description Preliminary Design Criteria Environmental Impacts Land Requirements Cost Estimates Advantages/Disadvantages Alternative 2: Integrated Fixed-Film Activated Sludge Description Preliminary Design Criteria Environmental Impact i

3 6.2.4 Land Requirements Cost Estimates Advantages/Disadvantages Alternative 3: Sequencing Batch Reactor Description Preliminary Design Criteria Environmental Impact Land Requirements Cost Estimates Advantages/Disadvantages Alternative 4: Membrane Bioreactor Description Preliminary Design Criteria Environmental Impacts Land Requirements Cost Estimates Advantages/Disadvantages Alternative 5: Upgrade Existing Lagoons Using Existing Outfall Description Preliminary Design Criteria Environmental Impacts Land Requirements Cost Estimates Advantages/Disadvantages Alternative 6: Upgrade Existing Lagoons with New Outfall to the Main Channel Description Preliminary Design Criteria Environmental Impacts Land Requirements Cost Estimates Advantages/Disadvantages Alternative 7: Upgrade Existing Lagoons with New Percolation Bed Description Preliminary Design Criteria Environmental Impacts Land Requirements Cost Estimates Advantages/Disadvantages Waste Solids Management Screenings and Grit Biosolids Sludge Treatment Alternatives Recommended Sludge Management COMPARATIVE ANALYSIS OF TREATMENT ALTERNATIVES Present Worth Cost Analysis ii

4 7.2 Matrix Rating System FIGURES Figure 1: Location Map... 4 Figure 2: Palmer Project Area Map... 5 Figure 3: Floodplain, Anadromous Waters and Wetlands... 9 Figure 4: Projected Population Growth Rates (Source: KABATA) Figure 5: Projected Study Area Population Figure 6: Wastewater Generated by Zone (Population Model) Figure 7: Sewer Phasing Plan Figure 8: Land Use Map Figure 9: Projected Wastewater Flows Figure 10: Existing Lagoon Site Plan Figure 11: Influent Wastewater Characteristics and Daily Flow (Existing Lagoons) Figure 12: Effluent Wastewater Characteristics (Existing Lagoons) Figure 13: CAS Process Schematic Figure 14: CAS Site Plan with Influent Pumping Figure 15: CAS Site Plan without Influent Pumping Figure 16: IFAS Process Flow Schematic Figure 17: IFAS Site Plan with Influent Pumping Figure 18: IFAS Site Plan without Influent Pumping Figure 19: Sequencing Batch Reactor Process Flow Schematic Figure 20: SBR Site Plan with Influent Pumping Figure 21: SBR Site Plan without Influent Pumping Figure 22: MBR Treatment Process Flow Schematic Figure 23: MBR Site Plan with Influent Pumping Figure 24: MBR Site Plan without Influent Pumping Figure 25: Lagoon Treatment Process Flow Schematic Figure 26: Lagoon Treatment Process Flow Schematic Figure 27: Lagoon and MBBR/DAF Treatment Site Plan Figure 28: Plan View Outfall to Main Channel Figure 29: Details Outfall to Main Channel Figure 30: Lagoon System With Additional Ponds Figure 31: Plan View Outfall to Percolation Bed Figure 32: Details Outfall to Percolation Bed iii

5 TABLES Table 1: City of Palmer Water Sources... 7 Table 2: Projected Residential Area in the Palmer Service Area in Table 3: Wastewater Flows, by Sector (Land Use Model) Table 4: Palmer Lagoon Dredging History Table 5: New and Prior NPDES Permit Limits Table 6: Projected Wastewater Flows Table 7: Palmer Water Sewer Utility Fund Financial Summary Table 8: Palmer Wastewater Rates Table 9: Selected Preliminary CAS Design Parameters Table 10: Selected Preliminary VLR Design Parameters Table 11: Selected Preliminary Design Parameters - IFAS Table 12: Selected Preliminary SBR Design Parameters Table 13: Selected Preliminary MBR Design Parameters Table 14: Design Parameters for Lagoon Upgrade and Existing Outfall Table 15: Design Parameters for Lagoon Upgrade and Main Channel Discharge Table 16: Design Parameters for Lagoon Upgrade & Percolation Bed Discharge Table 17: Comparative Costs Table 18: Criteria Scoring and Weighting Matrix APPENDICES APPENDIX A: APPENDIX B: APPENDIX C: APPENDIX D: APPENDIX E: COST ESTIMATE POPULATION AND WASTEWATER FORECASTS EQUIPMENT INFORMATION MIXING ZONE ANALYSIS PUBLIC MEETINGS iv

6 ACRONYMS ADEC ADF&G ADNR AHRS ANWR AOP ARRC ASCE AWWU BOD 5 C CAS CAT-EX DAF EA EAAS EIS EPA ERWWTF FC FEMA FPPA gfd gpad gpcd gpd gpm HDL HRT HU IFAS ISER KABATA MBR MBBR ME MF Mg mgd MSL NE NEPA NPDES NRCS O&M PER PLC PSA PVDF Alaska Department of Environmental Conservation Alaska Department of Fish and Game Alaska Department of Natural Resources Alaska Heritage Resources Survey Arctic National Wildlife Refuge advanced oxidation processes Alaska Rural Rehabilitation Corporation American Society of Civil Engineers Anchorage Water and Wastewater Utility five day biological oxygen demand Centigrade Conventional Activated Sludge Categorical Exclusion dissolved air flotation Environmental Assessment extended aeration activated sludge Environmental Impact Statement United States Environmental Protection Agency Eagle River Wastewater Treatment Facility fecal coliform Federal Emergency Management Association Farmland Protection Policy Act gallons per square foot per day gallons per acre per day gallons per capita per day gallons per day gallons per minute Hattenburg Dilley & Linnell hydraulic residence time Honchen and Uhlenkott integrated fixed-film activated sludge Institute of Social and Economic Research Knik Arm Bridge and Toll Authority membrane bioreactor moving bed bioreactor Metcalf & Eddy microfilter membrane million gallons million gallons per day mean sea level Northern Economics National Environmental Policy Act National Pollutant Discharge Elimination System Natural Resources Conservation Service Operation and maintenance process logic controllers Palmer Service Area polyvinylidene fluoride v

7 RBC rotating biological contactors RCA Regulatory Commission of Alaska RUS USDA Rural Utilities Service SBR Sequencing Batch Reactor SRT solids retention time SWX Palmer Southwest Utility Extension TSS total suspended solids UA University of Alaska USDA United States Department of Agriculture UV ultraviolet µm microns (1x10-6 meters) WWTP wastewater treatment plant vi

Palmer Wastewater Treatment Plant 6.7 Alternative 7: Upgrade Existing Lagoons with New Percolation Bed

Palmer Wastewater Treatment Plant 6.7 Alternative 7: Upgrade Existing Lagoons with New Percolation Bed 6.7 Alternative 7: Upgrade Existing Lagoons with New Percolation Bed 6.7.1 Description This alternative considers expanding the capacity of the existing lagoon treatment facility and changing the discharge

More information

Advantages & Applications of MBBR Technologies

Advantages & Applications of MBBR Technologies Advantages & Applications of MBBR Technologies Wastewater Technologies Attached Growth Suspended Growth Static Fixed film Trickling filters Rope media Web media Biological active filters (BAF) Dynamic

More information

Water Reclamation Facility Master Plan. Community Workshop November 14, 2016

Water Reclamation Facility Master Plan. Community Workshop November 14, 2016 Water Reclamation Facility Master Plan Community Workshop November 14, 2016 Presentation Overview Introduction Project Goals Project Background Recent and Upcoming Schedule WRF Program Overview Big Picture

More information

Preliminary Engineering Report for Talkeetna Wastewater Treatment Facility Upgrades Talkeetna, Alaska

Preliminary Engineering Report for Talkeetna Wastewater Treatment Facility Upgrades Talkeetna, Alaska Preliminary Engineering Report for Talkeetna Wastewater Treatment Facility Upgrades Talkeetna, Alaska Prepared for: Matanuska-Susitna Borough 350 East Dahlia Avenue Palmer, Alaska 99645 Prepared by: 202

More information

Palmer Wastewater Treatment Plant Environmental Impacts. A summary of the impacts of this treatment alternative are listed below:

Palmer Wastewater Treatment Plant Environmental Impacts. A summary of the impacts of this treatment alternative are listed below: 6.1.3 Environmental Impacts A summary of the impacts of this treatment alternative are listed below: 1. The Matanuska River will receive treated effluent as it currently does. 2. Effluent quality would

More information

City of Portsmouth Wastewater Division. Wastewater Facilities and Programs. City Council Briefing and Public Input Session

City of Portsmouth Wastewater Division. Wastewater Facilities and Programs. City Council Briefing and Public Input Session City of Portsmouth Wastewater Division Wastewater Facilities and Programs City Council Briefing and Public Input Session Briefing #2 June 11, 2012 November 8, 2011 Topics for Discussion Introduction Regulatory

More information

CITY OF OXFORD WASTEWATER TREATMENT FACILITY ANNUAL PERFORMANCE REPORT FOR THE CALENDAR YEAR OF 2018

CITY OF OXFORD WASTEWATER TREATMENT FACILITY ANNUAL PERFORMANCE REPORT FOR THE CALENDAR YEAR OF 2018 CITY OF OXFORD WASTEWATER TREATMENT FACILITY ANNUAL PERFORMANCE REPORT FOR THE CALENDAR YEAR OF 2018 PREPARED: January 2019 2018 ANNUAL PERFORMANCE REPORT FOR THE CITY OF OXFORD WASTEWATER TREATMENT FICILITY

More information

Chapter 2 Screening Approach and Criteria

Chapter 2 Screening Approach and Criteria Chapter 2 Screening Approach and Criteria CHAPTER 2 SCREENING APPROACH AND CRITERIA 2.1 INTRODUCTION As discussed in Chapter 1, the purpose of this report is to identify and screen alternative technologies,

More information

CITY OF OXFORD WASTEWATER TREATMENT FACILITY ANNUAL PERFORMANCE REPORT FOR THE CALENDAR YEAR OF 2014

CITY OF OXFORD WASTEWATER TREATMENT FACILITY ANNUAL PERFORMANCE REPORT FOR THE CALENDAR YEAR OF 2014 CITY OF OXFORD WASTEWATER TREATMENT FACILITY ANNUAL PERFORMANCE REPORT FOR THE CALENDAR YEAR OF 2014 PREPARED: January 2015 2014 ANNUAL PERFORMANCE REPORT FOR THE CITY OF OXFORD WASTEWATER TREATMENT FICILITY

More information

BIOSPHERE MOVING BED BIOLOGICAL SYSTEMS

BIOSPHERE MOVING BED BIOLOGICAL SYSTEMS REACTION TANKS BIOSPHERE MOVING BED BIOLOGICAL SYSTEMS PROVEN FIXED-FILM TECHNOLOGY IDEAL FOR BNR UPGRADES AND CAPACITY EXPANSIONS. SAME FOOTPRINT, BETTER TREATMENT AT NEPTUNE BEACH, FL WWTP Without adding

More information

CITY OF OXFORD WASTEWATER TREATMENT FACILITY ANNUAL PERFORMANCE REPORT FOR THE CALENDAR YEAR OF 2012

CITY OF OXFORD WASTEWATER TREATMENT FACILITY ANNUAL PERFORMANCE REPORT FOR THE CALENDAR YEAR OF 2012 CITY OF OXFORD WASTEWATER TREATMENT FACILITY ANNUAL PERFORMANCE REPORT FOR THE CALENDAR YEAR OF 2012 PREPARED: January 2013 2012 ANNUAL PERFORMANCE REPORT FOR THE CITY OF OXFORD WASTEWATER TREATMENT FICILITY

More information

Donata Dubber 1, Laurence W. Gill 1 Corresponding Author Donata Dubber 1

Donata Dubber 1, Laurence W. Gill 1 Corresponding Author Donata Dubber 1 The suitability of packaged wastewater treatment systems for direct surface water discharge in rural Ireland - A review of performance and cost efficiencies Donata Dubber 1, Laurence W. Gill 1 Corresponding

More information

WEST GLENDIVE PUBLIC MEETING

WEST GLENDIVE PUBLIC MEETING WEST GLENDIVE PUBLIC MEETING Wastewater System Improvements February 7, 2012 Presentation by: Craig Pozega, PE Why Are We Here County has identified wastewater system needs Wastewater System Preliminary

More information

Bloomingdale WWTF Private/Public Partnership Works. Bob Wilcox, PE Fleis & VandenBrink May 10, 2016

Bloomingdale WWTF Private/Public Partnership Works. Bob Wilcox, PE Fleis & VandenBrink May 10, 2016 Bloomingdale WWTF Private/Public Partnership Works Bob Wilcox, PE Fleis & VandenBrink May 10, 2016 Outline Background Need for the Project Biofilm Technologies The Project Performance Background Project

More information

Dawson City Wastewater

Dawson City Wastewater Ken Johnson Planner and Engineer CRYOFRONT COOL IDEAS for management - technology - media Oxygen Concentration Dawson City Wastewater What is bad about sewage? Environment Oxygen depletion Eutrification

More information

Additional Information Requirements for Wastewater Treatment Projects

Additional Information Requirements for Wastewater Treatment Projects Version 04-11-25 Page 1 of 6 Additional Information Requirements for Wastewater Treatment Projects Pursuant to Section 5(2) of the Environmental Impact Assessment Regulation of the Clean Environment Act,

More information

TAMING TIGERS AND WRESTLING ANACONDAS: PENDER COUNTY COMMERCE PARK WWTP

TAMING TIGERS AND WRESTLING ANACONDAS: PENDER COUNTY COMMERCE PARK WWTP ABSTRACT TAMING TIGERS AND WRESTLING ANACONDAS: PENDER COUNTY COMMERCE PARK WWTP Tim Baldwin, PE, Senior Vice President McKim & Creed, Inc. Pender County s Commerce Park was created as a vehicle to attract

More information

Wastewater Master Plan Status Update. City of Portsmouth, New Hampshire

Wastewater Master Plan Status Update. City of Portsmouth, New Hampshire Wastewater Master Plan Status Update City of Portsmouth, New Hampshire November 21, 2011 Topics for Discussion Review of Master Plan Effort Regulatory Status Pilot Effort to Verify Technology Selection

More information

Technology Options for Wastewater Treatment

Technology Options for Wastewater Treatment Technology Options for Wastewater Treatment Outline Sewage Treatment Process Existing Facilities and Technology Used Technology Selection Criteria Technology Options Sewage Treatment Proces Preliminary

More information

City of Redlands Wastewater Treatment Plant. Redlands, CA LOCATION: Carollo Engineers; CH2M HILL MBR MANUFACTURER: COMMENTS:

City of Redlands Wastewater Treatment Plant. Redlands, CA LOCATION: Carollo Engineers; CH2M HILL MBR MANUFACTURER: COMMENTS: FACILITY: City of Redlands Wastewater Treatment Plant LOCATION: Redlands, CA GEO. AREA: Southern California STATUS 07/14: Operational CONSTRUCTION: ENGINEERING: Carollo Engineers; CH2M HILL MBR MANUFACTURER:

More information

TECHNICAL MEMORANDUM (CONTINUED)

TECHNICAL MEMORANDUM (CONTINUED) TECHNICAL MEMORANDUM (CONTINUED) plant would take approximately 1 year, followed by another year of construction. In total, it would take about 3 years from commencement of planning to completion of construction

More information

ISAM SBR with Blower Assisted Jet Aeration Design Calculations For Lyons, CO WWTP Upgrade

ISAM SBR with Blower Assisted Jet Aeration Design Calculations For Lyons, CO WWTP Upgrade ISAM SBR with Blower Assisted Jet Aeration Design Calculations For Lyons, CO WWTP Upgrade May. 28, 2013 A. Site Conditions 1. Site elevation = 5,322 ft MSL 2. Average barometric pressure = 12.07 psia 3.

More information

Appendix D JWPCP Background and NDN

Appendix D JWPCP Background and NDN Appendix D JWPCP Background and NDN JWPCP Background JWPCP Water Quality Primary Clarifiers HPO Reactors Final Clarifiers Unit Influent Primary Effluent Secondary Effluent BOD mg/l 460 240

More information

APPENDIX C. Public Consultation Centre (PCC) Displays. Appendix C1 PCC#1 Appendix C2 PCC#2 Appendix C3 PCC#3

APPENDIX C. Public Consultation Centre (PCC) Displays. Appendix C1 PCC#1 Appendix C2 PCC#2 Appendix C3 PCC#3 APPENDIX C Public Consultation Centre (PCC) Displays Appendix C1 PCC#1 Appendix C2 PCC#2 Appendix C3 PCC#3 Appendix C1 PCC#1 Appendix C2 PCC#2 Township of Red Rock Class Environmental

More information

Decentralized WW Management: Issues for Small-Scale WWTPs. Mike Stephens MWEA Local Sections Committee Frankenmuth, MI

Decentralized WW Management: Issues for Small-Scale WWTPs. Mike Stephens MWEA Local Sections Committee Frankenmuth, MI Decentralized WW Management: Issues for Small-Scale WWTPs Mike Stephens MWEA Local Sections Committee Frankenmuth, MI Topics What is Decentralized Wastewater Treatment? What are small-scale facilities?

More information

Center Sanitation District

Center Sanitation District EHLS Center Sanitation District EHLS Engineering Erik Jorgensen Suzanne Givler Heath Anderson Leryn Gorlitsky Outline of Presentation Background Current and Future Conditions Decision Matrix Description

More information

Northern Michigan Wastewater Operators Seminar Onaway Wetlands Treatment

Northern Michigan Wastewater Operators Seminar Onaway Wetlands Treatment Northern Michigan Wastewater Operators Seminar 2008 Onaway Wetlands Treatment City of Onaway WWTP John Palmer, City of Onaway WWTP Operator Randy Scott, Project Manager, Wilcox Professional Services, LLC

More information

RENNIA ENGINEERING DESIGN, PLLC CIVIL ENVIRONMENTAL STRUCTURAL. Report. Conceptual Wastewater Facility Plan. Olivet Center.

RENNIA ENGINEERING DESIGN, PLLC CIVIL ENVIRONMENTAL STRUCTURAL. Report. Conceptual Wastewater Facility Plan. Olivet Center. Report Conceptual Wastewater Facility Plan Olivet Center Town of Dover, NY APPLICANT: Olivet Management LLC 73 Wheeler Road Wingdale, NY 12594 LOCATION: NYS Route 22 and Wheeler Road Wingdale, NY 12594

More information

21 st Century Biofilm Reactors TREATING FOR TROUT. Northport/Leelanau Township Wastewater Treatment Facility. Presented by: Rich Grant, PE

21 st Century Biofilm Reactors TREATING FOR TROUT. Northport/Leelanau Township Wastewater Treatment Facility. Presented by: Rich Grant, PE 21 st Century Biofilm Reactors Presented by: Rich Grant, PE TREATING FOR TROUT Northport/Leelanau Township Wastewater Treatment Facility Concepts A Revitalizing Story: importance of collection The Technology;

More information

Assuming 100 gallons per capita per day, and 3 people per REU, design flows for the development are proposed to be:

Assuming 100 gallons per capita per day, and 3 people per REU, design flows for the development are proposed to be: Andelina Farms Wastewater Treatment Plant Preliminary Basis of Design May 2018 Andelina Farms is a proposed Planned Unit Development in Saline Township located along US-12 just west of the City of Saline.

More information

Water Reclamation Facility Master Plan. Community Workshop November 14, 2016

Water Reclamation Facility Master Plan. Community Workshop November 14, 2016 Water Reclamation Facility Master Plan Community Workshop November 14, 2016 Presentation Overview Introduction Project Goals Project Background Recent and Upcoming Schedule WRF Program Overview Big Picture

More information

Water Recycling Facility Project

Water Recycling Facility Project Water Recycling Facility May 15, 2006 How did we get here? December 2002 City facing $8,000,000 fines from the Regional Water Quality Control Board (RWQCB) for Wastewater Discharge Violations. Existing

More information

No-Holds-Barred Match: RBC vs. MBR

No-Holds-Barred Match: RBC vs. MBR No-Holds-Barred Match: RBC vs. MBR Northeast Onsite Wastewater Short Course & Exhibition April 6 th, 2016 Erin K. Moore, PE Services provided in NY as T&B Engineering, PC Overview Evaluation target Historic

More information

Is membrane filtration worth it?

Is membrane filtration worth it? Is membrane filtration worth it? A case study of 3 municipal MBR s in Michigan and their operational experiences. Joe Hebert - Ottawa County Public Utilities 1 Who are these MBR s? North Kent Sewer Authority,

More information

Baltimore City Department of Public Works

Baltimore City Department of Public Works Baltimore City Department of Public Works Back River WWTP Process and Construction Overview Michael F. Gallagher, Chief Wastewater Facilities Division Wastewater Treatment Chesapeake Bay Restoration Water

More information

Technology Options for Wastewater Treatment. April 24, 2012

Technology Options for Wastewater Treatment. April 24, 2012 Technology Options for Wastewater Treatment April 24, 2012 Outline Basic Sewage Treatment Processes Existing Maynilad Sewage Management Facilities and Technologies Used Sewage Treatment Processes Selection

More information

1/11/2016. Types and Characteristics of Microorganisms. Topic VI: Biological Treatment Processes. Learning Objectives:

1/11/2016. Types and Characteristics of Microorganisms. Topic VI: Biological Treatment Processes. Learning Objectives: Topic VI: Biological Treatment Processes Learning Objectives: 1. Discuss microbiology and relate it to wastewater treatment. 2. Describe growth kinetics of pure bacterial culture with Monod expression

More information

VILLAGE OF ALGONQUIN 2014 WASTEWATER FACILITY PLAN UPDATE EXECUTIVE SUMMARY

VILLAGE OF ALGONQUIN 2014 WASTEWATER FACILITY PLAN UPDATE EXECUTIVE SUMMARY EXECUTIVE SUMMARY EXECUTIVE SUMMARY INTRODUCTION AND BACKGROUND The Village of Algonquin, located along the Fox River in McHenry County, provides wastewater collection and treatment services to the entire

More information

Demonstration of IFAS Technology for Cold Temperature Nitrification in Lagoon WWTFs at Clare and Ludington, Michigan

Demonstration of IFAS Technology for Cold Temperature Nitrification in Lagoon WWTFs at Clare and Ludington, Michigan Demonstration of IFAS Technology for Cold Temperature Nitrification in Lagoon WWTFs at Clare and Ludington, Michigan Jason Borchert 1, Sarah Hubbell 2*, Heidi Rupp 2 1 Gourdie Fraser, Inc., Traverse City,

More information

MacDonnell Heights Town Center. Poughkeepsie Corporate Center Wastewater Treatment Plant. DRAFT Existing Conditions Report. MHTC Development, LLC

MacDonnell Heights Town Center. Poughkeepsie Corporate Center Wastewater Treatment Plant. DRAFT Existing Conditions Report. MHTC Development, LLC MacDonnell Heights Town Center Town of Poughkeepsie, Dutchess County, New York Poughkeepsie Corporate Center Wastewater Treatment Plant DRAFT Existing Conditions Report Prepared for: MHTC Development,

More information

WASTEWATER TREATMENT PLANT MASTER PLAN 6. BUSINESS CASE EVALUATION OF ALTERNATIVES

WASTEWATER TREATMENT PLANT MASTER PLAN 6. BUSINESS CASE EVALUATION OF ALTERNATIVES WASTEWATER TREATMENT PLANT MASTER PLAN 6. BUSINESS CASE EVALUATION OF ALTERNATIVES A range of potential ammonia limits were identified for alternatives evaluation, as discussed in Section 2.2.5. This chapter

More information

ATTACHMENT 1 GENERAL FACILITY INFORMATION. BOD5 mg/l mg/l TSS mg/l mg/l NH3-N mg/l mg/l

ATTACHMENT 1 GENERAL FACILITY INFORMATION. BOD5 mg/l mg/l TSS mg/l mg/l NH3-N mg/l mg/l ATTACHMENT 1 GENERAL FACILITY INFORMATION 1. Facility Name: 2. Type of Facility: 3. Population Served: Present: Design: 4. Flow: Average Maximum Peak 5. Water Quality: Present Design Assumed Actual Source:

More information

BEING GOOD STEWARDS: IMPROVING EFFLUENT QUALITY ON A BARRIER ISLAND. 1.0 Executive Summary

BEING GOOD STEWARDS: IMPROVING EFFLUENT QUALITY ON A BARRIER ISLAND. 1.0 Executive Summary BEING GOOD STEWARDS: IMPROVING EFFLUENT QUALITY ON A BARRIER ISLAND Brett T. Messner, PE, Tetra Tech, Inc., 201 E Pine St, Suite 1000, Orlando, FL 32801 Brett.Messner@tetratech.com, Ph: 239-851-1225 Fred

More information

Need-to-Know Criteria Wastewater Treatment Operator Class II

Need-to-Know Criteria Wastewater Treatment Operator Class II 2017 Need-to-Know Criteria Wastewater Treatment Operator Class II A Need-to-Know Guide when preparing for the ABC Wastewater Treatment Operator Class II Certification Exam Before You Dive In What is ABC

More information

Presentation Outline

Presentation Outline Presentation Outline Nitrification/denitrification refresher Treatment technologies available for nitrification and BNR/ENR What is the problem? BNR/ENR VPDES permitting Causes of reduced BNR performance

More information

Treatment Systems How they work and what to consider when selecting one. Joe Walsh IOWA Conference 2015

Treatment Systems How they work and what to consider when selecting one. Joe Walsh IOWA Conference 2015 Treatment Systems How they work and what to consider when selecting one Joe Walsh IOWA Conference 2015 Content Treatment systems overview and certification for Irish market Types of secondary treatment

More information

2015 HDR, Inc., all rights reserved.

2015 HDR, Inc., all rights reserved. 2015 HDR, Inc., all rights reserved. Hastings Utilities Water Pollution Control Facility Improvements Brian Bakke, HDR ASCE Environmental Conference 4/6/2017 Review Existing Facilities Need for the Project

More information

Wastewater Facility Plan City of Marshall, Minnesota

Wastewater Facility Plan City of Marshall, Minnesota Wastewater Facility Plan City of Marshall, Minnesota Public Hearing March 14, 2017 Bolton & Menk, Inc. Project No. T22.108560 Glossary of General Terms & Abbreviations MPCA - Minnesota Pollution Control

More information

A Submerged Attached Growth Bioreactor (SAGB) And Membrane Filtration For Water Reuse

A Submerged Attached Growth Bioreactor (SAGB) And Membrane Filtration For Water Reuse A Submerged Attached Growth Bioreactor (SAGB) And Membrane Filtration For Water Reuse Philip B. Pedros, Ph.D., P.E. Andrew R. McBrearty, P.E. Wallace W. Bruce Agenda Introduction Description of Process

More information

Texas A & M University Brayton Fire Field/Disaster city Wastewater Treatment Plant

Texas A & M University Brayton Fire Field/Disaster city Wastewater Treatment Plant Texas A & M University Brayton Fire Field/Disaster city Wastewater Treatment Plant Prepared for: Dr. Heather Wilkinson Texas A & M University BESC 411-500 Fall 2014 Prepared by: Michelle Barton Table of

More information

CERTIFICATION PROPOSAL

CERTIFICATION PROPOSAL WASTEWATER TREATMENT PLANT IMPROVEMENTS Revised: May 11, 2015 WASTEWATER TREATMENT PLANT IMPROVEMENTS INDEX EXECUTIVE SUMMARY 2 1. ELIGIBILITY 4 2. CERTIFICATION CRITERIA 2.1 Technical Criteria 2.1.1.

More information

W O C H H O L Z R E G I O N A L W A T E R R E C L A M A T I O N F A C I L I T Y O V E R V I E W

W O C H H O L Z R E G I O N A L W A T E R R E C L A M A T I O N F A C I L I T Y O V E R V I E W Facility Overview The recently upgraded and expanded Henry N. Wochholz Regional Water Reclamation Facility (WRWRF) treats domestic wastewater generated from the Yucaipa-Calimesa service area. The WRWRF

More information

Preliminary Engineering Report for the USDA RUS Water and Waste Disposal Program May 2017 Village of Taos Ski Valley

Preliminary Engineering Report for the USDA RUS Water and Waste Disposal Program May 2017 Village of Taos Ski Valley Preliminary Engineering Report for the USDA RUS Water and Waste Disposal Program May 2017 Village of Taos Ski Valley Wastewater Treatment Plant Expansion THIS PAGE INTENTIONALLY BLANK 2017, FEI Engineers,

More information

Indian Health Service Sanitation Facilities Construction Program Wastewater Lagoon Operation & Maintenance

Indian Health Service Sanitation Facilities Construction Program Wastewater Lagoon Operation & Maintenance Indian Health Service Sanitation Facilities Construction Program Wastewater Lagoon Operation & Maintenance http://www.dsfc.ihs.gov By: Christen P. Glime, P.E., District Engineer Santa Fe District Office,

More information

WASTEWATER DEPARTMENT. Bentonville Wastewater Treatment Plant Facts:

WASTEWATER DEPARTMENT. Bentonville Wastewater Treatment Plant Facts: Mission: The mission of the Bentonville Wastewater Treatment Utility and staff is to protect public health and the environment through the effective treatment of wastewater. Effective wastewater treatment

More information

CHAPTER 4 WASTEWATER CHARACTERISTICS WASTEWATER FLOWS

CHAPTER 4 WASTEWATER CHARACTERISTICS WASTEWATER FLOWS CHAPTER 4 WASTEWATER CHARACTERISTICS Wastewater collection, treatment, and disposal facilities are designed to handle specific hydraulic and pollutant loads for 20 or more years after they are constructed.

More information

CHAPTER 8 COST AND ENERGY REQUIREMENTS

CHAPTER 8 COST AND ENERGY REQUIREMENTS CHAPTER 8 COST AND ENERGY REQUIREMENTS 8.1 INTRODUCTION Costs associated with wastewater treatment facilities fall under one of two categories: capital costs and operations and maintenance (O&M) costs.

More information

City of Medora, ND Wastewater Infrastructure Needs Assessment November 2012

City of Medora, ND Wastewater Infrastructure Needs Assessment November 2012 City of Medora, ND Wastewater Infrastructure Needs Assessment November 2012 Project made possible by US Dept. of HUD Regional Substantiality Planning Grant and ND Energy Development Infrastructure and

More information

WASTEWATER TREATMENT MASTER PLAN SUPPLEMENT EXECUTIVE SUMMARY

WASTEWATER TREATMENT MASTER PLAN SUPPLEMENT EXECUTIVE SUMMARY City of Modesto Wastewater Treatment Master Plan Jennings Road Secondary Treatment Facility WASTEWATER TREATMENT MASTER PLAN SUPPLEMENT EXECUTIVE SUMMARY DRAFT June 2008 2700 YGNACIO VALLEY ROAD, SUITE

More information

Hillsdale Wastewater Treatment Plant

Hillsdale Wastewater Treatment Plant Hillsdale Wastewater Treatment Plant SRF Project Plan Public Hearing sdgfdgdf June 10, 2014 Presented by: Jeff Pugh, PE and Elaine Venema, PE Synopsis/Agenda Purpose of Presentation Project Background

More information

The alternatives addressed in this EIR were selected in consideration of one or more of the following factors:

The alternatives addressed in this EIR were selected in consideration of one or more of the following factors: CHAPTER 5 Project Alternatives 5.1 Introduction The purpose of the alternatives analysis in an environmental impact report (EIR) is to describe a range of reasonable alternatives to the project that could

More information

Polishing Ponds. Biosolids Storage. Ammonia Removal. Digesters. Thickeners. Pretreatment. Final Clarifiers. Primary Clarifiers.

Polishing Ponds. Biosolids Storage. Ammonia Removal. Digesters. Thickeners. Pretreatment. Final Clarifiers. Primary Clarifiers. Wastewater Treatment Facility (2012) Polishing Ponds Biosolids Storage Ammonia Removal Digesters Thickeners Pretreatment Primary Clarifiers Activated Sludge Final Clarifiers OVERVIEW Whenever a home, business,

More information

membrane bioreactor performance compared to conventional wastewater treatment

membrane bioreactor performance compared to conventional wastewater treatment Water Technologies & Solutions technical paper membrane bioreactor performance compared to conventional wastewater treatment Authors: Thomas C. Schwartz and Brent R. Herring, Woodard and Curran Incorporated

More information

Wet Weather and Advanced Treatment: Procurement Strategies to Secure the Right Technology

Wet Weather and Advanced Treatment: Procurement Strategies to Secure the Right Technology OWEA Annual Conference Mason, OH June 19, 2013, Operations, 11:00-11:45AM Wet Weather and Advanced Treatment: Procurement Strategies to Secure the Right Technology Bill Meinert, PE, O Brien & Gere Often

More information

Facilities Plan. Volume 2 Wastewater Facilities Assessment Report Executive Summary

Facilities Plan. Volume 2 Wastewater Facilities Assessment Report Executive Summary City of St. Joseph, Missouri Volume 2 Wastewater Facilities Assessment Report Executive Summary By Work Order No. 09-001 B&V Project 163509 October 29, 2010 Table of Contents 1.0 Introduction...1 2.0 TM-WW-1:

More information

Need-to-Know Criteria Wastewater Treatment Operator Class IV

Need-to-Know Criteria Wastewater Treatment Operator Class IV 2017 Need-to-Know Criteria Wastewater Treatment Operator Class IV A Need-to-Know Guide when preparing for the ABC Wastewater Treatment Operator Class IV Certification Exam Before You Dive In What is ABC

More information

DELTA WASTEWATER TREATMENT PLANT UPGRADES

DELTA WASTEWATER TREATMENT PLANT UPGRADES Delta, Ohio Environmental and Electrical Engineering, Grant Administration Cost $2.6 million $3.2 million OWDA Loan 1,100 SF Admin Building Addition 0.725 MGD Average Daily Flow 1.5 MGD Peak Capacity Professional

More information

Executive Summary. Introduction

Executive Summary. Introduction Executive Summary Introduction The City of Terre Haute has developed a (CSO LTCP), which describes the measures they will take to reduce the combined sewer overflows and improve water quality in the Wabash

More information

EXECUTIVE SUMMARY A. INTRODUCTION B. FINDINGS AND CONCLUSIONS. 1. Conveyance System

EXECUTIVE SUMMARY A. INTRODUCTION B. FINDINGS AND CONCLUSIONS. 1. Conveyance System EXECUTIVE SUMMARY A. INTRODUCTION NACA has committed to planning, designing and constructing regional wastewater conveyance and treatment facilities to serve several municipalities in Northwest Arkansas.

More information

Public Notice of Application for Permit

Public Notice of Application for Permit US Army Corps of Engineers Alaska District ANCHORAGE Regulatory Division (1145) CEPOA-RD Post Office Box 6898 JBER, Alaska 99506-0898 Public Notice of Application for Permit PUBLIC NOTICE DATE: January

More information

ENVIRONMENTAL ASSESSMENT

ENVIRONMENTAL ASSESSMENT ENVIRONMENTAL ASSESSMENT Project Identification Name: Piqua Wastewater Plant Expansion NRD WPCLF#: CS390755-0009, AIMS #5945 Contact: Gary Huff, City Manager City of Piqua 201 Water Street Piqua, OH 45356

More information

Wastewater Treatment Works and Collections System Annual Report Year 2005 General Information

Wastewater Treatment Works and Collections System Annual Report Year 2005 General Information Wastewater Treatment Works and Collections System Annual Report Year 2005 General Information Facility / System: Town of Farmville Wastewater Collection System and Treatment Facilities Responsible Entity:

More information

SMCSD Headworks, Primary and Secondary Treatment Pre-Design

SMCSD Headworks, Primary and Secondary Treatment Pre-Design Technical Memorandum SMCSD Headworks, Primary and Secondary Treatment Pre-Design Water andenvironment Subject: Prepared For: Prepared by: Reviewed by: SMCSD Mark Takemoto, Dennis Gellerman Steve Clary

More information

Presenters: Rodrigo Pena-Lang, PE (D&B Engineers), Magdalena Gasior, PE (D&B Engineers) and Paul D. Smith, PE (NYCDEP)

Presenters: Rodrigo Pena-Lang, PE (D&B Engineers), Magdalena Gasior, PE (D&B Engineers) and Paul D. Smith, PE (NYCDEP) NYWEA-NEWEA Joint Conference June 7, 2016 Presenters: Rodrigo Pena-Lang, PE (D&B Engineers), Magdalena Gasior, PE (D&B Engineers) and Paul D. Smith, PE (NYCDEP) Overview Port Jervis WWTP History Division

More information

Figure 2.01 Hoodsport Rural Activity Center (RAC) Figure 2.01

Figure 2.01 Hoodsport Rural Activity Center (RAC) Figure 2.01 Figure 2.01 Hoodsport Rural Activity Center (RAC) Figure 2.01 This page is intentionally left blank. Figure 2.02 Hoodsport Service Area 1 Alternative Figure 2.02 This page is intentionally left blank.

More information

CHAPTER 1 - WASTEWATER SYSTEM DESCRIPTION

CHAPTER 1 - WASTEWATER SYSTEM DESCRIPTION CHAPTER 1 - WASTEWATER SYSTEM DESCRIPTION 1.1 Introduction The GWA provides wastewater services for Guam s general population and for Andersen Air Force Base. The wastewater system is made up of seven

More information

UPGRADING GAZA WASTEWATER TREATMENT PLANT. Gaza City is populated with 550,000 inhabitants and it forms 45% of the Gaza strip population.

UPGRADING GAZA WASTEWATER TREATMENT PLANT. Gaza City is populated with 550,000 inhabitants and it forms 45% of the Gaza strip population. Gaza City Gaza City is populated with 550,000 inhabitants and it forms 45% of the Gaza strip population. Gaza City has the oldest wastewater system in Gaza Strip; it consists of some of 280 kilometers

More information

Tuckaseigee Water and Sewer Authority

Tuckaseigee Water and Sewer Authority NORTH CAROLINA AWWA-WEA SPRING CONFERENCE ASHEVILLE, NORTH CAROLINA APRIL 18, 2016 Tuckaseigee Water and Sewer Authority Expands with a 3.5 MGD SBR Wastewater Treatment Facility and Sludge Dryer Stanley

More information

CHAPTER 8 UTILITIES WATER SYSTEM. Summary & Recommendations

CHAPTER 8 UTILITIES WATER SYSTEM. Summary & Recommendations CHAPTER 8 UTILITIES WATER SYSTEM Summary & Recommendations The Waldoboro Water Company is a small water utility serving the downtown area of Waldoboro. The Water Company has 299 residential, 57 industrial

More information

Advanced Wastewater Treatment and Disposal Systems. Wastewater Utility Operation and Management for Small Communities

Advanced Wastewater Treatment and Disposal Systems. Wastewater Utility Operation and Management for Small Communities Advanced Wastewater Treatment and Disposal Systems Wastewater Utility Operation and Management for Small Communities Preliminary Treatment Primary Treatment Secondary Treatment Tertiary Treatment Disinfection

More information

Reducing Inputs: Irrigating with Winery Wastewater Mai Ann Healy, Regional Manager - BioFiltro

Reducing Inputs: Irrigating with Winery Wastewater Mai Ann Healy, Regional Manager - BioFiltro Reducing Inputs: Irrigating with Winery Wastewater Mai Ann Healy, Regional Manager - BioFiltro Winery Wastewater Characteristics Primary Source Points: Wash downs, barrels, pressing, crush pads, rackings.

More information

Town of Robbinsville Constructs Cheoah River BNR Wastewater Treatment Facility to Meet New Nitrogen and Phosphorus Permit Limits

Town of Robbinsville Constructs Cheoah River BNR Wastewater Treatment Facility to Meet New Nitrogen and Phosphorus Permit Limits Town of Robbinsville Constructs Cheoah River BNR Wastewater Treatment Facility to Meet New Nitrogen and Phosphorus Permit Limits NORTH CAROLINA AWWA-WEA SPRING CONFERENCE ASHEVILLE, NORTH CAROLINA APRIL

More information

WASTEWATER SYSTEM MASTER PLAN

WASTEWATER SYSTEM MASTER PLAN ` WASTEWATER SYSTEM MASTER PLAN (Reuse and Effluent Disposal Alternatives and Siting Alternative Analysis) FOR CITY OF GREEN COVE SPRINGS, FLORIDA Prepared by: MITTAUER & ASSOCIATES, INC. Consulting Engineers

More information

Need-to-Know Criteria Wastewater Treatment Operator Class III

Need-to-Know Criteria Wastewater Treatment Operator Class III 2017 Need-to-Know Criteria Wastewater Treatment Operator Class III A Need-to-Know Guide when preparing for the ABC Wastewater Treatment Operator Class III Certification Exam Before You Dive In What is

More information

Clif Bar Pretreatment

Clif Bar Pretreatment Pacific Northwest Pretreatment Workshop September 12, 2017 Clif Bar Pretreatment Larry Rupp and Jason King Keller Associates Meridian, Idaho CITY OF LEWISTON WWTP 2020 IMPROVEMENTS 1 City of Twin Falls

More information

City of Leadwood Wastewater System Engineering Report

City of Leadwood Wastewater System Engineering Report City of Leadwood Wastewater System Engineering Report DRAFT H2O C Engneering www.h2oc.com 877-22-WATER Background The purpose of this report is to describe the City of Leadwood s wastewater system (System

More information

Liquid Waste Management Plan Technical Memorandum

Liquid Waste Management Plan Technical Memorandum Liquid Waste Management Plan Technical Memorandum LWMP Technical Memorandum #7A TO: SUBJECT: Wastewater Advisory Committee Treatment Options DATE: November 1, 2017 Prepared By: Reviewed By: Troy Vassos

More information

by Edward Ollett BEng (Hons) MICE CEng

by Edward Ollett BEng (Hons) MICE CEng Deephams STW AMP5/6 Quality Upgrade - Phase 1 engineering and design support for the preparation of the needs report, options appraisal, site selection and initial stakeholder engagement by Edward Ollett

More information

WATER AND WASTEWATER FACILITY CLASSIFICATION APPLICATION FORM

WATER AND WASTEWATER FACILITY CLASSIFICATION APPLICATION FORM WATER AND WASTEWATER FACILITY CLASSIFICATION APPLICATION FORM APPLICATION INSTRUCTIONS Please print or type. In keeping with the privacy provisions of the Nova Scotia Freedom of Information & Protection

More information

Lowering The Total Cost Of Operation

Lowering The Total Cost Of Operation Lowering The Total Cost Of Operation The system removes more solids than conventional clarification, so filters can run longer between backwash cycles. Fewer backwash cycles means less backwash water,

More information

Bitterroot River Nutrient TMDL Technical Report WASTEWATER TREATMENT

Bitterroot River Nutrient TMDL Technical Report WASTEWATER TREATMENT Bitterroot River Nutrient TMDL Technical Report WASTEWATER TREATMENT Prepared By: Watershed Management Section Montana DEQ April 9, 2010 Technical Advisory Group Draft 1.0 INTRODUCTION This is a technical

More information

DRAFT SUBMITTED TO: TOWNSHIP OF LONG HILL PREPARED BY: KLEINFELDER

DRAFT SUBMITTED TO: TOWNSHIP OF LONG HILL PREPARED BY: KLEINFELDER LONG HILL TOWNSHIP WASTEWATER TREATMENT PLANT CAPACITY ASSURANCE REPORT UPDATE DRAFT SUBMITTED TO: TOWNSHIP OF LONG HILL PREPARED BY: KLEINFELDER FEBRUARY 2018 LONG HILL TOWNSHIP WASTEWATER TREATMENT PLANT

More information

Meridian s Class A Recycled Water Program

Meridian s Class A Recycled Water Program Meridian s Class A Recycled Water Program 2016 PNWS Conference - Boise May 5, 2016 Clint Dolsby, PE City of Meridian Assistant City Engineer Recycled Water Defined Highly treated wastewater effluent for

More information

Special Report MUB WWTP Expansion and Upgrade Evaluation of Alternatives

Special Report MUB WWTP Expansion and Upgrade Evaluation of Alternatives Special Report MUB WWTP Expansion and Upgrade Evaluation of Alternatives Introduction The expansion and upgrade of the MUB Wastewater Treatment Plant (WWTP) is a critical component of MUB s response to

More information

UV Disinfection for a Municipal Wastewater Lagoon Effluent No Prior Filtration Needed? Wayne Wong, M.A.Sc., P.Eng., PMP

UV Disinfection for a Municipal Wastewater Lagoon Effluent No Prior Filtration Needed? Wayne Wong, M.A.Sc., P.Eng., PMP UV Disinfection for a Municipal Wastewater Lagoon Effluent No Prior Filtration Needed? Wayne Wong, M.A.Sc., P.Eng., PMP Acknowledgements 2 Northern Rockies Regional Municipality Northern Rockies Engineering

More information

Wastewater Treatment Technology and Applications in Industrial Facilities

Wastewater Treatment Technology and Applications in Industrial Facilities Wastewater Treatment Technology and Applications in Industrial Facilities Treatment that industrial facilities give wastewater before discharging it to the local wastewater treatment facility is referred

More information

CHAPTER 7. WASTEWATER TREATMENT ALTERNATIVES

CHAPTER 7. WASTEWATER TREATMENT ALTERNATIVES CHAPTER 7. WASTEWATER TREATMENT ALTERNATIVES This chapter summarizes wastewater treatment (including liquid process, disinfection, and solids handling), provides a technical evaluation of the alternative

More information

Algae Removal from a Facultative Lagoon System Using Dissolved Air Flotation. J. Patrick Pierce, P.E. Environmental Treatment Systems, Inc.

Algae Removal from a Facultative Lagoon System Using Dissolved Air Flotation. J. Patrick Pierce, P.E. Environmental Treatment Systems, Inc. Algae Removal from a Facultative Lagoon System Using Dissolved Air Flotation J. Patrick Pierce, P.E. Environmental Treatment Systems, Inc. Facultative Lagoon System Designed for 1.5 MGD Discharging 1.15-1.35

More information

Wastewater Facilities Plan Existing Conditions Demographics Flows and Loads Future Effluent Limitation Scenarios

Wastewater Facilities Plan Existing Conditions Demographics Flows and Loads Future Effluent Limitation Scenarios Agency Review Technical Memorandum Wastewater Facilities Plan Existing Conditions Demographics Flows and Loads Future Effluent Limitation Scenarios Prepared for City of McCall June 2006 322 East Front

More information

Wanganui Wastewater Treatment Plant

Wanganui Wastewater Treatment Plant Wanganui Wastewater Treatment Plant Evaluation of Long-Term Improvements for Consent Compliance 375 375 Prepared for Wanganui District Council 24 April 2013 Document Information Prepared for Wanganui District