Wastewater Master Plan Status Update. City of Portsmouth, New Hampshire
|
|
- Oswald Henderson
- 6 years ago
- Views:
Transcription
1 Wastewater Master Plan Status Update City of Portsmouth, New Hampshire November 21, 2011
2 Topics for Discussion Review of Master Plan Effort Regulatory Status Pilot Effort to Verify Technology Selection Regional Cooperation
3 Wastewater Master Plan Components Wastewater Treatment Facilities Collection System CSO LTCP
4 Combined Sewer Overflow Long Term Control Plan
5 Combined Sewer Overflow Long Term Control Plan - Contract 3B
6 Combined Sewer Overflow Long Term Control Plan - Cass Street Area
7 Secondary Treatment on Peirce Island Within Fence Line
8 Phased Compliance Strategy Peirce Island/Pease Secondary treatment at Peirce Island within existing fence line by late 2016 WMP team identified innovative technologies with potential to reduce footprint of upgrade requirements Preliminary engineering, including on-site testing of potential technologies will be completed to assist with final technology selection Expanding Pease over time as regulatory and economic conditions permit
9 Regulatory Status Current EPA Consent Decree - Wastewater Master Plan - Completed - Upgrade Peirce Island According to Schedule in Wastewater Master Plan - Complete Targeted Long Term Control Plan Sewer Separation Project - EPA Requires a Modification to the Existing Consent Decree to Incorporate Wastewater Master Plan Schedule Peirce Island NPDES Permit Renewal Application Due December 31, Anticipating Secondary only however pressure is building to add Nutrient Removal to the Permit Pease Wastewater Treatment Facility NPDES Permit is pending. Anticipating Secondary only however pressure is building to add Nutrient Removal to the Permit
10 Regulatory Status (cont.) Modified EPA Consent Decree Schedule CSO- LTCP Completion by Contract 3A Lincoln, Spring, Willow, Miller, Broad - Contract 3B Richards, Rockland, Highland, Miller, Merrimac - Contract 3C Streets off of Lincoln, Union, Wibird, Park - Cass Street Area Upgrade Peirce Island Completion Pilot Potential Technologies - Preliminary Design Vender Selection - Final Design - Construction
11 Pilot Study
12 Pilot Program Flow Chart WWMP Piloting Effort Potential Secondary Treatment Technologies Wastewater Characterization Needs Review/Evaluate Potential Treatment Technologies Wastewater Characterization Data Collection Pilot Technology Selection Workshop Initial Piloting Phase Initial Piloting Review Preliminary Design Demonstration Phase Data Review (and Vendor Selection if Needed) Vendor Demonstration/ Verification Phase
13 List of technologies 1. Biological Aerated Filter (BAF) 2. Sequencing Batch Reactor (SBR) with BioMag 3. Conventional Activated Sludge (CAS) with BioMag 4. Moving Bed Bioreactor (MBBR) & ActiFlo 5. Moving Bed Bioreactor (MBBR) & CoMag 6. Moving Bed Bioreactor (MBBR) & DAF 7. Membrane Bioreactor (MBR) 8. Conventional Activated Sludge (CAS)
14 Non-Monetary Evaluation Criteria Operational Track Record/Established Process Operability (No. of Processes/Complexity of Processes) Ability to Retrofit Conv. Secondary Treatment to Meet Future Nitrogen Limits of 8 mg/l Ability to Retrofit TN 8 to Meet Future Nitrogen Limits of 5/3 mg/l Constructability Site Layout Hydraulic Complexity Ability to Stay Within Fence Line for Secondary Treatment Ability to Stay Within Fence Line for Future TN Treatment Ability to Treat High FOG Levels
15 Table 11 Option Evaluation Matrix Option 1 - BAF Option 2 - SBR w/ BioMag (Not Feasible) Option 3 - CAS w/ BioMag Option 4 - MBBR & ActiFlo Option 5 - MBBR & CoMag Option 6 - MBBR & DAF Option 7 - MBR Option 8 - Conventional Activated Sludge Evaluation Criteria Weight Rating Score Rating Score Rating Score Rating Score Rating Score Rating Score Rating Score Rating Score Operational Track Record/Established Process Operability (No. of Processes/Complexity of Processes) Ability to Retrofit Conv. Secondary Treatment Meet Future Nitrogen Limits of 8 mg/l Ability to Retrofit TN 8 to Meet Future Nitrogen Limits of 5/3 mg/l Constructability Site Layout Hydraulic Complexity Ability to Stay Within Fence Line for Secondary Treatment Ability to Stay Within Fence Line for Future TN Treatment Ability to Treat High FOG Levels Total Weighted Criteria Capital Cost (estimated - in millions) $33.0 $37.0 $32.0 $34.0 $32.0 $42.0 $39.0 Value Ratio (criteria/capital cost) Life Cycle Cost (in millions) $40.8 $46.7 $41.2 $47.4 $39.7 $53.3 $46.8 Value Ratio (criteria/ life cycle cost)
16 Technologies Selected For Piloting Biological Aerated Filter (BAF) Conventional Activated Sludge (CAS) with BioMag Moving Bed Bioreactor (MBBR) & DAF
17 Physical Pilot Construct/Assemble Side by Side Pilot Units Treat Primary Effluent in Dry Weather, CEPT Effluent in Wet Weather Initial Focus on Secondary Treatment testing, then modify to achieve Total Nitrogen Removal Initial Pilot 6 Month Period
18 Pilot Unit Construction Photos
19 Pilot Unit Construction Photos
20 Pilot Unit Construction Photos
21 Pilot Unit Construction Photos
22 Comparison of Consent Decree Estimated Costs Cost Item Option 1 - BAF Option 2 - SBR w/biomag Option 3 CAS w/biomag Option 4 - MBBR & ActiFlo Option 5 - MBBR & CoMag Option 6 - MBBR & DAF Option 7 - MBR Option 8 - CAS Capital $33.00 $37.00 $32.00 $34.00 $32.00 $42.00 $ Year Present Worth O&M Not Feasible $7.77 $9.71 $9.19 $13.37 $7.67 $11.32 $ Year Life Cycle Note: All Costs in $ millions $40.77 $46.71 $41.19 $47.37 $39.67 $53.32 $46.81
23 Projected Sewer Rate ($ per Unit) Sewer Rate ($/Unit) $40M 2017 $60M 2017 $80M WWTF Adder Future Rate w/o WWTF Current Rate One Unit = 748 gallons * Imposition of nutrient limits will require additional capital investment
24 Regional Cooperation Why Participate in Regional Cooperation Pending City Permits will be impacted by the decisions the Regulators make relative to the Great Bay and the Piscataqua River Recognition that complex environmental challenges are regional in nature As a Coalition we leverage resources and are more likely to have input in regulatory decision process Southeast Watershed Alliance Great Bay Municipal Coalition Memorandum of Agreement with DES to improve scientific understanding and ensure scientifically based, cost effective, community minded solutions are selected Adaptive Management Plan Allows for an alternative approach to meeting water quality
25 Proposed Adaptive Management Plan The Proposed adaptive management plan allows new information to be incorporated into a watershed management plan. Allows for scientific research, monitoring, and implementation that provides an opportunity to build and measure. Specifically: Commits the communities of Exeter, Dover, Newmarket to a Total Nitrogen limit of 8 mg/l which will reduce DIN to pre-1990 levels Commits communities to participate in water quality monitoring program to improve scientific understanding of the issues Commits communities to participate in eelgrass and shellfish restoration efforts. Commits communities to participate in non-point pollutions reduction Proposed Adaptive Management Plan is Currently being Reviewed by the Regulators
26 Plan of Action Complete Targeted Sewer Separation Underway Continue Regional Cooperation On-going Pilot Emerging Technology - Underway Preliminary Design & Vender Selection- Completion 2013 Final Design Completion Construction Completion - Aug 2016
27 Questions & Answers
City of Portsmouth Wastewater Division. Wastewater Facilities and Programs. City Council Briefing and Public Input Session
City of Portsmouth Wastewater Division Wastewater Facilities and Programs City Council Briefing and Public Input Session Briefing #2 June 11, 2012 November 8, 2011 Topics for Discussion Introduction Regulatory
More informationPublic Information Meeting Wastewater Master Plan Facilities Plan Update June 23, 2010
Public Information Meeting Wastewater Master Plan - 201 Facilities Plan Update June 23, 2010 Agenda Introduction Wastewater Master Plan Background Completed Projects Projects Concurrent with the WMP Master
More informationPEIRCE ISLAND WASTEWATER TREATMENT FACILITY UPGRADE
REQUEST FOR QUALIFICATIONS CITY OF PORTSMOUTH NEW HAMPSHIRE Public Works Department ENGINEERING SERVICES PEIRCE ISLAND WASTEWATER TREATMENT FACILITY UPGRADE VALUE ENGINEERING REVIEW RFQ No. 59-14 City
More informationPeirce Island WWTF Upgrade Construction Public Information Meeting January 17, 2018
Peirce Island WWTF Upgrade Public Information Meeting Topics of Discussion Introductions Work Completed Since Last Meeting Work to be Completed in Coming Month Work Anticipated in Next 6 Months Project
More informationPeirce Island WWTF Upgrade Construction Public Information Meeting May 16, 2018
Peirce Island WWTF Upgrade Construction Public Information Meeting May 16, 2018 Topics of Discussion Introductions Work Completed Since Last Meeting Work to be Completed in Coming Month Work Anticipated
More informationPublic Information Meeting Wastewater Master Plan
Public Information Meeting Wastewater Master Plan October 23, 2007 Presentation Outline Introduction and History Break for Questions Wastewater 101 Break for Questions Regulatory Framework Wastewater Master
More informationRestoration of the Great Bay Estuary
Restoration of the Great Bay Estuary Lets Try a Different Game Plan Paul Hogan and Zach Henderson May 17, 2011 COMMITMENT & INTEGRITY DRIVE RESULTS Items to Note and Remember Great progress had been made
More informationWet Weather and Advanced Treatment: Procurement Strategies to Secure the Right Technology
OWEA Annual Conference Mason, OH June 19, 2013, Operations, 11:00-11:45AM Wet Weather and Advanced Treatment: Procurement Strategies to Secure the Right Technology Bill Meinert, PE, O Brien & Gere Often
More informationFORMAL DISPUTE RESOLUTION
FORMAL DISPUTE RESOLUTION In re: United States of America, Plaintiff, State of New Hampshire, Plaintiff-Intervenor, and City of Portsmouth, New Hampshire Case: 1.09CV-00283-PB CITY OF PORTSMOUTH STATEMENT
More informationby Edward Ollett BEng (Hons) MICE CEng
Deephams STW AMP5/6 Quality Upgrade - Phase 1 engineering and design support for the preparation of the needs report, options appraisal, site selection and initial stakeholder engagement by Edward Ollett
More informationCity of Portsmouth Portsmouth, New Hampshire Public Works Department RFP #52-14 REQUEST FOR PROPOSAL
City of Portsmouth Portsmouth, New Hampshire Public Works Department RFP #52-14 REQUEST FOR PROPOSAL DESIGN ENGINEERING SERVICES PEASE WASTEWATER TREATMENT FACILITY HEADWORKS UPGRADE INVITATION Sealed
More informationBIOSPHERE MOVING BED BIOLOGICAL SYSTEMS
REACTION TANKS BIOSPHERE MOVING BED BIOLOGICAL SYSTEMS PROVEN FIXED-FILM TECHNOLOGY IDEAL FOR BNR UPGRADES AND CAPACITY EXPANSIONS. SAME FOOTPRINT, BETTER TREATMENT AT NEPTUNE BEACH, FL WWTP Without adding
More informationDRAFT. Palmer Wastewater Treatment Plant Preliminary Engineering Report City of Palmer, Alaska
City of Palmer, Alaska Prepared by Hattenburg Dilley & Linnell, LLC and G. V. Jones and Associates, Inc. Date: TABLE OF CONTENTS 1.0 INTRODUCTION... 1 2.0 PURPOSE AND NEED... 2 3.0 PROJECT PLANNING AREA...
More informationA. Identification of proposed services areas and major problems evaluated in the plan.
2. Plan Summary The Official Wastewater Facilities Plan for South Middleton Township is summarized in this chapter. The findings, conclusions and recommendations presented are based on all of the information
More informationBuilding a Phase III WIP for Wastewater, Stormwater & Septic Systems
Building a Phase III WIP for Wastewater, Stormwater & Septic Systems Agriculture Leadership Roundtable Double Tree by Hilton, Annapolis July 25, 2018 Greg Busch gregory.busch@maryland.gov Presentation
More informationPeirce Island WWTF Upgrade Construction Public Information Meeting April 19, 2017
Peirce Island WWTF Upgrade Construction Public Information Meeting Topics of Discussion Introductions Work Completed Since Last Meeting Work to be Completed in Coming Month Work Anticipated in Next 6 Months
More informationChapter 2 Screening Approach and Criteria
Chapter 2 Screening Approach and Criteria CHAPTER 2 SCREENING APPROACH AND CRITERIA 2.1 INTRODUCTION As discussed in Chapter 1, the purpose of this report is to identify and screen alternative technologies,
More informationWATER INTEGRATION FOR SQUAMSCOTT EXETER (WISE)
WATER INTEGRATION FOR SQUAMSCOTT EXETER (WISE) Preliminary Integrated Plan Final Technical Report December 2015 Prepared By: Prepared For: Towns of Exeter, Stratham, and Newfields, New Hampshire WATER
More informationAdvantages & Applications of MBBR Technologies
Advantages & Applications of MBBR Technologies Wastewater Technologies Attached Growth Suspended Growth Static Fixed film Trickling filters Rope media Web media Biological active filters (BAF) Dynamic
More informationWEST GLENDIVE PUBLIC MEETING
WEST GLENDIVE PUBLIC MEETING Wastewater System Improvements February 7, 2012 Presentation by: Craig Pozega, PE Why Are We Here County has identified wastewater system needs Wastewater System Preliminary
More informationCase Studies on Small Community and Decentralized Wastewater Treatment, Reuse and Management
Case Studies on Small Community and Decentralized Wastewater Treatment, Reuse and Management Peter Haase, M.S., P.E., Inc. Wholly H2O Presentation 4/4/11 Presentation Outline Background & Project Experience
More information201 FACILITIES PLAN EXECUTIVE SUMMARY
201 FACILITIES PLAN EXECUTIVE SUMMARY This Executive Summary presents the objectives of the 201 Facilities Plan Update, provides a project background, describes the approaches used to evaluate the wastewater
More informationDesign, Construction and Startup of the First Enhanced Nutrient Removal Plant in Maryland Funded by the Chesapeake Bay Restoration Fund
Design, Construction and Startup of the First Enhanced Nutrient Removal Plant in Maryland Funded by the Chesapeake Bay Restoration Fund Rip Copithorn, Jeff Sturdevant, Vince Maillard GHD Clients People
More informationBaltimore City Department of Public Works
Baltimore City Department of Public Works Back River WWTP Process and Construction Overview Michael F. Gallagher, Chief Wastewater Facilities Division Wastewater Treatment Chesapeake Bay Restoration Water
More informationNutrient TMDLs and NPDES Permits
Nutrient TMDLs and NPDES Permits Mississippi Department of Environmental Quality Adrien Carroll-Perkins, P.E. Bradley Crain, P. E. Nutrient TMDLs in Mississippi Mississippi was a Consent Decree State History
More informationWater Recycling Facility Project
Water Recycling Facility May 15, 2006 How did we get here? December 2002 City facing $8,000,000 fines from the Regional Water Quality Control Board (RWQCB) for Wastewater Discharge Violations. Existing
More informationGreen City, Clean Waters
Green City, Clean Waters Facility Concept Plan F o r t h e Southwest Water Pollution Control Plant Consent Order & Agreement Deliverable IV - c City of Philadelphia Combined Sewer Overflow Long Term Control
More informationAn Evaluation of Nitrogen Loading into Upper Narragansett Bay
An Evaluation of Nitrogen Loading into Upper Narragansett Bay NEWEA Conference January 26, 2010 Catherine Walker & Christine Comeau Narragansett Bay Commission Providence, RI Narragansett Bay Commission
More informationWe Know Water. AnoxKaldnes. Moving Bed Biofilm Reactor (MBBR) Integrated Fixed-Film Activated Sludge (IFAS) and ANITA Mox Deammonification
We Know Water AnoxKaldnes Moving Bed Biofilm Reactor (MBBR) Integrated Fixed-Film Activated Sludge (IFAS) and ANITA Mox Deammonification WATER TECHNOLOGIES AnoxKaldnes MBBR and Hybas Processes AnoxKaldnes
More informationWastewater Systems. By Reza Shams-Khorzani, Ph.D. VP - Bio-Microbics, Inc. 9 th KWEA/KsAWWA Annual Joint Conference August 29, 2017 Wichita, Kansas
MBR Technology for Onn-site Wastewater Systems By Reza Shams-Khorzani, Ph.D. VP - Bio-Microbics, Inc. 9 th KWEA/KsAWWA Annual Joint Conference August 29, 2017 Wichita, Kansas Decentralized Wastewater Systems
More informationWaste Water Treatment in New Hampshire: Analysis of Nitrogen Treatment in the Great Bay Community
University of New Hampshire University of New Hampshire Scholars' Repository Honors Theses and Capstones Student Scholarship Spring 2015 Waste Water Treatment in New Hampshire: Analysis of Nitrogen Treatment
More informationVILLAGE OF ALGONQUIN 2014 WASTEWATER FACILITY PLAN UPDATE EXECUTIVE SUMMARY
EXECUTIVE SUMMARY EXECUTIVE SUMMARY INTRODUCTION AND BACKGROUND The Village of Algonquin, located along the Fox River in McHenry County, provides wastewater collection and treatment services to the entire
More informationSynergy: Addressing Combined Sewer Overflows and Nitrogen
District of Columbia Water and Sewer Authority Briefing on Synergy: Addressing Combined Sewer Overflows and Nitrogen to Anacostia Steering Committee August 27, 2009 1 Introduction Background Addressing
More informationTurning a Negative into a Positive Negotiating a Consent Decree to Develop a Reasonable Endpoint
Turning a Negative into a Positive Negotiating a Consent Decree to Develop a Reasonable Endpoint City of Haverhill s Story Mr. James Drake Mr. Robert Ward, Deputy Superintendent of Public Works, Haverhill
More informationThis page is blank to facilitate double-sided printing.
Supplement No. 2 September 2013 This page is blank to facilitate double-sided printing. Introduction and Purpose The Metropolitan St. Louis Sewer District (MSD) prepared an update to its Combined Sewer
More informationOWEA Annual Technical Conference and Exhibition Upgrading WRFs for Biological Nutrient Removal. June 25, 2015
OWEA Annual Technical Conference and Exhibition Upgrading WRFs for Biological Nutrient Removal June 25, 2015 Agenda Permitting and Planning BNR Overview Case Example Innovative Approaches Proactive Participation
More informationIBBA - Biogas and Biomethane. Norrköping - 06/11/2018
IBBA - Biogas and Biomethane Norrköping - 06/11/2018 BIOTHANE Leading Anaerobic Technologies o 35 years experience in anaerobic technologies o Design and Build plants for industrial wastewater with over
More information6 WASTEWATER. 6.1 Overview. 6.2 Darvill Wastewater Works
6 WASTEWATER 6.1 Overview Umgeni Water currently owns and operates the Darvill and Ixopo Wastewater Works (WWWs). It also operates the Howick WWW for umgungundlovu District Municipality under a management
More informationComprehensive Wastewater Master Planning for the City of Raleigh A Sustainable Approach for Future Growth
Comprehensive Wastewater Master Planning for the City of Raleigh A Sustainable Approach for Future Growth 8 January 2018 RALEIGH, NC NOVEMBER 12 15, 2017 Agenda Background Methodology Treatment Process
More informationPHOSPHORUS REMOVAL: TREATMENT
PHOSPHORUS REMOVAL: TREATMENT TECHNOLOGIES AND CAPABILITIES Jane Madden, PE, BCEE Senior Vice President CAWPCA Fall Workshop November 14, 2014 Agenda Phosphorus Removal Overview Phosphorus Regulations
More informationChapter 10: Conveyance Recommended Plan
2020 Facilities Plan Conveyance Report Chapter 10: Conveyance Recommended Plan 10.1 Introduction and Plan Summary 10.1.1 Background As a regional governmental agency providing wastewater treatment and
More informationEfficient Design Configurations for Biological Nutrient Removal
Efficient Design Configurations for Biological Nutrient Removal A Case Study: Upper Blackstone Water Pollution Abatement District Jane E. Madden, P.E., BCEE August 30, 2017 UBWPAD Wastewater Treatment
More informationPeirce Island WWTF Upgrade Monthly Public Construction Meeting
AECOM 250 Apollo Drive Chelmsford MA, 01824 www.aecom.com 978 905 2100 tel 978 905 2101 fax Meeting Notes Subject Date September 20, 2017 Time Location Peirce Island WWTF Upgrade Monthly Public Construction
More informationSEWPCC Upgrading/Expansion Conceptual Design Report. SECTION 6 - Process Flow Diagram / Mass Balance. Table of Contents
SEWPCC Upgrading/Expansion Conceptual Design Report SECTION 6 - Process Flow Diagram / Mass Balance Table of Contents 6.0 PROCESS FLOW DIAGRAM AND MASS BALANCE...6.1 6.1 INTRODUCTION TO THE PROCESS FLOW
More informationGRANULAR ACTIVATED SLUDGE
CLARKE PRIZE CONFERENCE ON WATER SUSTAINABILITY GRANULAR ACTIVATED SLUDGE THE FUTURE OF BIOLOGICAL NUTRIENT REMOVAL JAMES BARNARD CONTENTS Early observations of granular sludge Selection processes in activated
More informationAdvanced Lagoon Treatment
Environmental Dynamics International Presents Advanced Lagoon Treatment Developments, Technologies & Field Experiences March 16, 2016 Marc W. Salmi, P.E. Environmental Dynamics International Agenda Overview
More informationMEETING COLUMBUS S TREATMENT LIMITS
MEETING COLUMBUS S TREATMENT LIMITS EVEN WHEN WET WEATHER CHANGES THEM Improving Quality of Life AGENDA CEPT Background CEPT Preliminary Testing CEPT Design and Construction CEPT NPDES Permit Modification
More informationIntroduction. Spokane River DO TMDL: Proposed Restrictions. Waste Load Allocation: Based on 50µg/l Total P - Seasonal (Mar Oct) for final TMDL
City of Spokane Riverside Park Water Reclamation Facility (RPWRF) Pilot Studies for Reducing Effluent TP for Discharge to the Spokane River in preparation for the NEXT LEVEL OF TREATMENT Larry A. Esvelt
More informationTechnology Options for Wastewater Treatment
Technology Options for Wastewater Treatment Outline Sewage Treatment Process Existing Facilities and Technology Used Technology Selection Criteria Technology Options Sewage Treatment Proces Preliminary
More informationAltoona Westerly Wastewater Treatment Facility BNR Conversion with Wet Weather Accommodation
Pennsylvania Water Environment Federation PennTEC Annual Technical Conference June 4, 2013 Altoona Westerly Wastewater Treatment Facility BNR Conversion with Wet Weather Accommodation Presented by: Jim
More informationA SUBMERGED ATTACHED GROWTH BIOREACTOR FOR DECENTRALIZED WASTEWATER TREATMENT
A SUBMERGED ATTACHED GROWTH BIOREACTOR FOR DECENTRALIZED WASTEWATER TREATMENT P.B. Pedros * and W.K. Dobie F.R. Mahony & Associates, Inc. 273 Weymouth Street Rockland, MA 02370 ABSTRACT The Amphidrome
More informationPre-RFP Meeting for Integrated Wastewater Treatment Plant Master Plan (MWWTP Master Plan) Presentation to Interested Parties. September 13, 2018
Pre-RFP Meeting for Integrated Wastewater Treatment Plant Master Plan (MWWTP Master Plan) Presentation to Interested Parties September 13, 2018 Agenda Opening remarks Eileen White, Director of Wastewater
More informationCapital Regional District
Capital Regional District Assessment of Wastewater Treatment 1A, 1B and 1C This report was prepared by Stantec Consulting Ltd. Brown and Caldwell for the Capital Regional District. The material in it reflects
More informationPortsmouth, New Hampshire
Portsmouth, New Hampshire Water & Sewer Rate Study April 2006 Weston & Sampson Engineers, Inc. in association with, Inc. Portsmouth, New Hampshire Water & Sewer Rate Study April 2006 Patrick J. Connelly,
More informationWe Know Water. AnoxKaldnes. Moving Bed Biofilm Reactor (MBBR) Integrated Fixed-Film Activated Sludge (IFAS) and ANITA Mox Deammonification
APPENDIX C.2 IFAS We Know Water AnoxKaldnes Moving Bed Biofilm Reactor (MBBR) Integrated Fixed-Film Activated Sludge (IFAS) and ANITA Mox Deammonification WATER TECHNOLOGIES AnoxKaldnes MBBR and Hybas
More informationCity of Columbus Update
City of Columbus Update 5 Cities Conference August 17, 2017 Columbus Division of Sewerage & Drainage 5 County Treatment Area Two large treatment plants: 61 Billion gallons treated Jackson Pike (150 mgd
More informationProceedings of the 4th Annual Texas Water Reuse Conference. A Case Study for Decentralized Wastewater Treatment Plants in Sugar Land, Texas
Proceedings of the 4th Annual Texas Water Reuse Conference A Case Study for Decentralized Wastewater Treatment Plants in Sugar Land, Texas Michael Rolen, P.E. Page 1 Reasons for this Study Subsidence issues
More informationDonata Dubber 1, Laurence W. Gill 1 Corresponding Author Donata Dubber 1
The suitability of packaged wastewater treatment systems for direct surface water discharge in rural Ireland - A review of performance and cost efficiencies Donata Dubber 1, Laurence W. Gill 1 Corresponding
More informationTHE ROLE OF MEMBRANE BIOREACTORS IN ADDRESSING CHESAPEAKE BAY CHALLENGES. Introduction. Chesapeake Bay Water Quality Challenges
THE ROLE OF MEMBRANE BIOREACTORS IN ADDRESSING CHESAPEAKE BAY CHALLENGES Zohreh Movahed, WATEK Engineering Corporation, 604 S. Frederick Ave, Suite 309, Gaithersburg, MD 20877, zmovahed@watek.com, (240)
More informationCouncil Meeting Post Point Wastewater Treatment Plant Improvements March 15, By Ted Carlson PW Director
Council Meeting Post Point Wastewater Treatment Plant Improvements March 15, 2010 By Ted Carlson PW Director tcarlson@cob.org Objectives: 1. Update/confirm peak flow management status 2. Update/confirm
More informationBEING GOOD STEWARDS: IMPROVING EFFLUENT QUALITY ON A BARRIER ISLAND. 1.0 Executive Summary
BEING GOOD STEWARDS: IMPROVING EFFLUENT QUALITY ON A BARRIER ISLAND Brett T. Messner, PE, Tetra Tech, Inc., 201 E Pine St, Suite 1000, Orlando, FL 32801 Brett.Messner@tetratech.com, Ph: 239-851-1225 Fred
More informationHartford WPCF Master Plan Clean Water Project. Executive Summary. February 2010
Hartford WPCF Master Plan Clean Water Project Executive Summary February 2010 An outline of work at the Hartford Water Pollution Control Facility that will achieve compliance with regulatory requirements
More informationHypothetical Case Study for Using Extractive Technologies for Meeting Nutrient Criteria Goals for the Great Bay Estuary, New Hampshire
Hypothetical Case Study for Using Extractive Technologies for Meeting Nutrient Criteria Goals for the Great Bay Estuary, New Hampshire Richard Langan, Ph.D. Director, Coastal and Ocean Technologies Programs
More informationRegional Municipality of Halton Skyway Wastewater Treatment Plant Expansion Municipal Class Environmental Assessment Study
Welcome to the Regional Municipality of Halton Skyway Wastewater Treatment Plant Expansion Municipal Class Environmental Assessment Study September 23, 2009 Please Sign In and take an Information Brief
More informationClif Bar Pretreatment
Pacific Northwest Pretreatment Workshop September 12, 2017 Clif Bar Pretreatment Larry Rupp and Jason King Keller Associates Meridian, Idaho CITY OF LEWISTON WWTP 2020 IMPROVEMENTS 1 City of Twin Falls
More informationPre-Program Work. Omaha CSO Control Program. Agenda. City has worked on addressing CSOs for many years
Omaha CSO Control Program 2008 IWPCA Conference Session 3C- Collection Systems CSO Program Management Approach Agenda Pre-Program Work Summary of Program Approach Steps One through Four Refinement Period
More informationAQUASMART - Water and Wastewater Treatment Solutions
AQUASMART - Water and Wastewater Treatment Solutions A Reconversão de ETAR existentes em Unidades Geradoras de Recursos The Conversion of existing WWTPs to Resource Generating Units Luís Marinheiro DI(FH)
More informationLarge Decentralized Systems a Sustainable Wastewater Solution
Large Decentralized Systems a Sustainable Wastewater Solution Agenda The Good Fight Centralized Exposed in the Real World Decentralized Model System Examples Dennis F. Hallahan, P.E. Technical Director
More informationWater Reclamation Facility Master Plan. Community Workshop November 14, 2016
Water Reclamation Facility Master Plan Community Workshop November 14, 2016 Presentation Overview Introduction Project Goals Project Background Recent and Upcoming Schedule WRF Program Overview Big Picture
More informationIntegrated Planning for Meeting Clean Water Act Requirements
Integrated Planning for Meeting Clean Water Act Requirements NAFSMA STORMWATER COMMITTEE Introduction Since the passage of the Federal Clean Water Act (CWA) in 1972, the Environmental Protection Agency
More informationFremont Water Pollution Control Center Plant Expansion for Nutrient Removal and Wet Weather Flow Treatment
OWEA 2013 Annual Conference June 19, 2013 Fremont Water Pollution Control Center Plant Expansion for Nutrient Removal and Wet Weather Flow Treatment Jeff Lamson, Superintendent, WPCC Robert Hrusovsky,
More informationES.1 Solids Master Planning Background and Goals
Executive Summary The Arlington County Water Pollution Control Plant (WPCP) treats incoming wastewater flows for residents, businesses, and government agencies in the Arlington County sewer service area
More informationWASTEWATER TREATMENT PLANT MASTER PLAN 6. BUSINESS CASE EVALUATION OF ALTERNATIVES
WASTEWATER TREATMENT PLANT MASTER PLAN 6. BUSINESS CASE EVALUATION OF ALTERNATIVES A range of potential ammonia limits were identified for alternatives evaluation, as discussed in Section 2.2.5. This chapter
More informationOperations Report. September 10, 2015
Operations Report September 1, 215 Plant Loading and Operations Summary August 215 Biochemical Oxygen Demand, 5-Day (Avg. 2,151 lb./day) Total Suspended Solids (Avg. 33,197 lb./day) Average Daily Flow
More informationThe State of Enhanced High- Rate Treatment in Ohio
CMF Media Schreiber The State of Enhanced High- Rate Treatment in Ohio WWETCO Tony Yee, PE Project Manager MSDGC 29 June 2017 Jared Hutchins, PE Engineering Manager Black & Veatch What is EHRT? Settling-Based
More informationSOS. City of Akron Combined Sewer Overflow (CSO) Long Term Control Plan. Separate Our Sewers Save Our Streams. Ohio OWEA Collection Systems Workshop
City of Akron Combined Sewer Overflow (CSO) Long Term Control Plan SOS Separate Our Sewers Save Our Streams Ohio OWEA Collection Systems Workshop Patrick Gsellman Genny Hanna Jim Hall Thursday, May 9,
More informationRestoring the Long Island Sound While Saving Money
in Connecticut and New York TMDL at a Glance Long Island Sound Nitrogen TMDL (approved April 2001) www.longislandsoundstudy.net/pubs/reports/tmdl.pdf Factors causing impairment Aesthetics, fishing, and
More informationNo-Holds-Barred Match: RBC vs. MBR
No-Holds-Barred Match: RBC vs. MBR Northeast Onsite Wastewater Short Course & Exhibition April 6 th, 2016 Erin K. Moore, PE Services provided in NY as T&B Engineering, PC Overview Evaluation target Historic
More informationFacilities Plan. Volume 2 Wastewater Facilities Assessment Report Executive Summary
City of St. Joseph, Missouri Volume 2 Wastewater Facilities Assessment Report Executive Summary By Work Order No. 09-001 B&V Project 163509 October 29, 2010 Table of Contents 1.0 Introduction...1 2.0 TM-WW-1:
More informationInitial Alternative Scenarios and Model Results
3 2008 Initial Alternative Scenarios and Model Results 3.1 Introduction Following the release of the Needs Assessment Report, the Mashpee Sewer Commission identified five different management scenarios
More informationVolume 4 Final Facility Plan for the West and East Wastewater Treatment Plants. May 31, 2013
Volume 4 Final Facility Plan for the est and East astewater Treatment Plants May 31, 2013 Revised to include a Negotiated Plan and Resubmitted June 9, 2017 City County Administration Building 1 Martin
More informationCLEARAS WATER RECOVERY S ABNR SOLUTION PROVIDES WASTE- WATER FACILITIES WITH COST RECOVERY OPPORTUNITY WHEN ADDRESSING NUTRIENT DISCHARGE REQUIREMENTS
Wastewatcher Article May 29, 2018 CLEARAS WATER RECOVERY S ABNR SOLUTION PROVIDES WASTE- WATER FACILITIES WITH COST RECOVERY OPPORTUNITY WHEN ADDRESSING NUTRIENT DISCHARGE REQUIREMENTS Tightening nutrient
More informationTHE BIOMAG SYSTEM FOR ENHANCED SECONDARY TREATMENT
MAGNETITE-BALLASTED CLARIFICATION ENABLES THIS 18-FT DIAM. CLARIFIER TO HANDLE 2.3 MGD. DENSE FLOC SETTLES IMMEDIATELY BENEATH THE CENTER WELL, RATHER THAN DISSIPATING THROUGHOUT THE CLARIFIER. THE BIOMAG
More informationMembrane Bioreactor and High Flow Biological Treatment System for the Cox Creek WRF
Membrane Bioreactor and High Flow Biological Treatment System for the Cox Creek WRF Thor Young, GHD With Contributions from Vince Maillard, Rip Copithorn, Kristi Perri, and Jeff Sturdevant, GHD Dimitrios
More informationWWETCO FlexFilter and Bio-FlexFilter
Innovative Filter Technology Tool for Reducing Energy, Expanding Capacity, Wet Weather Management and Nutrient Control WWETCO WWETCO FlexFilter and Bio-FlexFilter AGENDA WWETCO FlexFilter & Bio-FlexFilter
More informationSanitary Sewer Rates Now and in the Future
Sanitary Sewer Rates Now and in the Future December 2008 Steve Nielsen, Chief Engineer/Deputy Director Indianapolis Department of Public Works Mark C. Jacob, Program Manager Indianapolis Clean Stream Team
More informationRole of Entrant s Firm. »» Final Design»» Completion of Funding. »» Engineering Services During Applications. »» Plant Startup and Filtration
ROLE OF OTHERS For the design focus of the project, key partners included:»» Mortenson Construction, Contractor»» Jacobs, Contract Plant Operator»» Portland Engineering and Controls, I&C The City of The
More informationA Primer on Stormwater Management, your Facility and the Chesapeake Bay. Tom Schueler Chesapeake Stormwater Network June
A Primer on Stormwater Management, your Facility and the Chesapeake Bay Tom Schueler Chesapeake Stormwater Network June 5. 2017 Key Themes Why do we need to be concerned about Stormwater? What are all
More informationEnvironmental Improvements Associated with Springfield WWTP EHRT. Using the Compressed Media Filter Technology
Environmental Improvements Associated with Springfield WWTP EHRT Tuesday, June 23 9:30 am Using the Compressed Media Filter Technology WWETCO WWETCO FlexFilter ENGINEERS CLUB OF ST. LOUIS Performance Testing
More informationNJ Future CSO Permittee Meeting
NJ Future CSO Permittee Meeting 1 Best Practices Carter Strickland, JD HDR 2 Getting the Best LTCP CSO controls will be expensive Include Best Practices to Maximize visible and tangible benefits Create
More informationCity of Ames. Water Pollution Control. Long Range Facility Plan
City of Ames Water Pollution Control Long Range Facility Plan Introduction Over 25 years ago, the City of Ames last completed a Wastewater Facility Plan. That Facility Plan prompted design and construction
More informationCenter Sanitation District
EHLS Center Sanitation District EHLS Engineering Erik Jorgensen Suzanne Givler Heath Anderson Leryn Gorlitsky Outline of Presentation Background Current and Future Conditions Decision Matrix Description
More informationSaudi Aramco Efforts in Oily Wastewater Treatment and Reuse
Saudi Aramco Efforts in Oily Wastewater Treatment and Reuse Thamer Almutairi Wastewater Management & Water Conservation Unit Environmental Protection Department Saudi Aramco: Company General Use 1 Environmental
More informationCold Weather Ammonia Removal
MWEA Annual Conference June 21, 2016 Cold Weather Ammonia Removal Mark Prein Welcome to Charlevoix the Beautiful Project Need NPDES Permit Project Need NPDES Permit Project Need MDEQ Compliance Schedule
More informationNarragansett Bay Commission: Providing Wastewater Treatment, Improving Water Quality
Narragansett Bay Commission: Providing Wastewater Treatment, Improving Water Quality Molly Welsh, Christine Comeau, Eliza Moore Environmental Scientists Narragansett Bay Commission The Greene School NBC
More informationDISCUSSION PAPER. 1 Objective. 2 Design Flows and Loads. Capital Regional District Core Area Wastewater Management Program
DISCUSSION PAPER Capital Regional District Core Area Wastewater Management Program Macaulay/McLoughlin Point Wastewater Treatment Plant Discussion Paper Liquid Process Alternatives Evaluation 034-DP-1
More informationProject Name: Central WWTP Capacity Improvements and CSO Reduction Project. MWS Project Number: 14-SC-0153 Last Updated: 12/19/14
Project Name: Central WWTP Capacity Improvements and CSO Reduction Project MWS Project Number: 14-SC-0153 Last Updated: 12/19/14 BACKGROUND / PURPOSE Metro Water Services (MWS), in order to comply with
More informationGeneral Approaches and Recent Developments in Handling Wet Weather Flows in WWTPs. Julian Sandino PhD, PE, BCEE, IWA Fellow
General Approaches and Recent Developments in Handling Wet Weather Flows in WWTPs Julian Sandino PhD, PE, BCEE, IWA Fellow October 2012 1 Improving Wet Weather Flow Management at WWTPs Flows resulting
More informationIntegrated Long Term Control Plan Targeted Inflow Reduction for CSO Control. OWEA Conference June 29, 2016
Integrated Long Term Control Plan Targeted Inflow Reduction for CSO Control OWEA Conference June 29, 2016 WWTP Average Daily Flow 6 MGD Peak Flow (Primary Only) 12 MGD Collection System 123 Miles (8 to
More informationCity of Redlands Wastewater Treatment Plant. Redlands, CA LOCATION: Carollo Engineers; CH2M HILL MBR MANUFACTURER: COMMENTS:
FACILITY: City of Redlands Wastewater Treatment Plant LOCATION: Redlands, CA GEO. AREA: Southern California STATUS 07/14: Operational CONSTRUCTION: ENGINEERING: Carollo Engineers; CH2M HILL MBR MANUFACTURER:
More information