1 PRESENTATION FOR THE POTENTIAL ADDITION OF SPECIAL FLOOD HAZARD AREAS Part 1: Summary of Floodplain Analysis for Los 0 Angeles River Part 2: Los Angeles County Drainage 130 Area 48 (LACDA) study results Prepared by Rene Vermeeren, P.E., D. WRE. Adam Bier, P.E. 17 October 2016 The views, opinions and findings contained in this report are those of the authors(s) and should not be construed as an official Department of the Army position, policy or decision, unless so designated by other official documentation.
2 PART 1: SUMMARY OF FLOODPLAIN ANALYSIS FOR LOS ANGELES RIVER 2 Prepared by Adam Bier, P.E. Senior Hydraulic Engineer Photo: Los Angeles River showing flows near the top of the channel at Los Feliz Boulevard with debris on the railing (January 26, 1969)
3 PRESENTATION OVERVIEW Study Overview and Project Area Los Angeles River Channel Existing Federal Emergency Management Agency (FEMA) Floodplain Hydraulic Modeling Overview 100-Year Floodplain Changes in Floodplain Mapping Results and Summary 3
4 STUDY OVERVIEW AND PROJECT AREA 4 Study Overview Flood Plain Management Services (FPMS) Study Prepared 100-Year and 500-Year Floodplain Maps Analysis completed for the City of Los Angeles Los Angeles River Study Reach Barham Blvd to First St Approximately 13 miles Main Tributaries: Burbank Western Verdugo Wash Arroyo Seco
5 LOS ANGELES COUNTY DRAINAGE AREA 5
6 LOS ANGELES RIVER CHANNEL 6 Topographic Data Sources Overbanks: LARIAC (2006) Provided by City of Los Angeles Channel (Concrete): As-built drawings Channel (Earth bottom): 2008 Survey Corps Topographic Survey Levees Levees are within study reach Levees extend intermittently from Burbank Western Confluence south past Glendale Blvd LARIAC: Los Angeles Region Imagery Acquisition Consortium
7 EXISTING FEMA FLOODPLAIN (100-YEAR) 7 Special Flood Hazard Area (SFHA) Study area currently has 874 parcels in SFHA in City of Los Angeles 100-Year Flood FEMA Classification Zone A In channel - west of I-5 FEMA Classification Zone AE In Channel from Los Feliz Blvd to Arroyo Seco Confluence Overbank flooding south of Interstate 5 (Arroyo Seco) FEMA Flood Insurance Rate Maps Effective date: September 26, 2008 Panel Numbers in Study Area 1339F 1345F 1610F 1626F 1628F 1636F FEMA Flood Map Service Center
8 HYDRAULIC MODELING OVERVIEW Hydraulic Modeling Software Hydrologic Engineering Center River Analysis System (HEC-RAS) Models Current Condition of Channel Dense vegetation and sediment in earth bottom channel reaches Temporary flood barriers are not modeled Hydraulic Model Models how water flows down the river and how it overtops out of the Los Angeles River channel into the Floodplain One Dimensional (1D): Channel Two Dimensional (2D): Overbank areas 27 Bridges in study reach
9 100-YEAR FLOODPLAIN 9 Google Earth Video, 2016
10 FLOODPLAIN MAP EXAMPLE 10
11 CHANGES IN FLOODPLAIN MAPPING Existing Flood Insurance Rate Maps (100-Year Flood) Show; 874 City of Los Angeles parcels currently in Special Flood Hazard Area (SFHA) 11 Difference from the FEMA FIRM and this 2016 Corps FPMS (100-Year Flood) Existing FIRM 373 City of Los Angeles parcels are no longer shown in Floodplain 501 City of Los Angeles parcels are still shown in the Floodplain 2016 Corps FPMS Study Adds: 2,574 City of Los Angeles parcels to the Floodplain Adds: 271 Parcels outside of the City of Los Angeles (Glendale & Burbank) Net Total: 3,075 City Of Los Angeles parcels Parcel Count: City of Los Angeles Estimates
12 RESULTS Number of Parcels shown Floodplain (100-year) 3,075 City of Los Angeles 271 City of Glendale & City of Burbank Average Flood Depths 5-10 feet in the floodplain Approximate Maximum Flood Depth in Overbank 18 feet (Griffith Park) Approximate Area of Inundation: 1,000 acres Flow is contained in channel downstream of Arroyo Seco Confluence 12
13 SUMMARY Corps Study identifies Flood Risk to the public Potential Flooding shown in Bette Davis Park, Griffith Park, Atwater Village, Elysian Valley & other areas 13 Next steps Corps study can be used to help develop evacuation plans & for the public s consideration in purchasing flood insurance Corps will coordinate with local flood control agencies in reducing the flood risk hazard
14 PRESENTATION FOR THE POTENTIAL ADDITION OF SPECIAL FLOOD HAZARD AREAS PART 2: LOS ANGELES COUNTY DRAINAGE AREA STUDY RESULTS Prepared by Rene Vermeeren, P.E., D. WRE. Chief, Hydrology and Hydraulics Branch 17 October 2016 The views, opinions and findings contained in this report are those of the authors(s) and should not be construed as an official Department of the Army position, policy or decision, unless so designated by other official documentation.
15 PRESENTATION OVERVIEW Los Angeles County Drainage Area Feasibility Study Floodplain Mapping LACDA Study Study Results 15
16 LOS ANGELES COUNTY DRAINAGE AREA 16 Review Feasibility Study (1992) Source LACDA Feasibility Study (1992)
17 FLOODPLAIN MAPPING 17 Hansen Dam Los Angeles River Sepulveda Dam Glendale Narrows Downtown Los Angeles Source: LACDA Feasibility Study (1992)
18 LACDA STUDY LACDA study evaluated flooding for entire LACDA system Extended from San Gabriel Mountains to the ocean Purpose: propose modifications to reduce flood risk The flood damage reduction general measures evaluated Reduce inflow to the system (detain water) Convey more water in the system (increase channel capacity) Damage management (floodfighting, floodproofing, etc.) Alter the reservoir s current operating regulations Several measures were considered as solutions to the flooding problem Deepen/Widen channels, alter channel shape Raise channel walls Modify bridges Divert flows into tunnels or detention facilities Source: LACDA Feasibility Study (1992)
19 STUDY RESULTS 19 Project Justification Average Annual Benefits must exceed the Average Annual Cost of the measures considered (B/C ratio) Benefits are derived from reduction of floodplain damages when evaluating measures. Results of study found: Evaluation of measures indicate low benefit to cost ratio Measures not economically justified Report recommended no action for this reach Source: LACDA Feasibility Study (1992)
(THIS PAGE INTENTIONALLY LEFT BLANK)
(THIS PAGE INTENTIONALLY LEFT BLANK) Los Angeles District Hydrology and Hydraulics Branch HYDRAULICS REPORT Floodplain Analysis Los Angeles River: Barham Boulevard to First Street Flood Plain Management
More informationU.S. Army Corps of Engineers Los Angeles District. US Army Corps of Engineers BUILDING STRONG
U.S. Army Corps of Engineers Los Angeles District US Army Corps of Engineers BUILDING STRONG 1. Opening Comments; 2. Los Angeles County Drainage Area Project As-Built Condition, Current Condition, and
More informationLOS ANGELES RIVER 7 LEVEE SYSTEM LOS ANGELES COUNTY, CALIFORNIA NLD SYSTEM ID #
LOS ANGELES COUNTY, CALIFORNIA NLD SYSTEM ID # 3805010078 PERIODIC INSPECTION REPORT NO 1 GENERALIZED EXECUTIVE SUMMARY FINAL SYSTEM RATING: UNACCEPTABLE FINAL RATING DATE: AUGUST 26, 2015 PERIODIC INSPECTION
More informationLA River Ecosystem Restoration Project A document by the Local Sponsor, the City of Los Angeles, California
READER S GUIDE for the LA River Ecosystem Restoration Project A document by the Local Sponsor, the City of Los Angeles, California Final Integrated Feasibility Report (IFR) which includes the Final Environmental
More informationAlluvial Fans 150 Years of Flood Control, Urbanization, and Politics in Los Angeles
Alluvial Fans 150 Years of Flood Control, Urbanization, and Politics in Los Angeles Los Angeles County Department of Public Works Topics to be Addressed Historic Perspectives Current Practices and Constraints
More informationModeling a Complex Hydraulic Environment Using a 1-D Approach Supplemented with Simple 2-D Principles Manas Borah Ed Dickson June 5, 2014
ASFPM 2014 Annual Conference Modeling a Complex Hydraulic Environment Using a 1-D Approach Supplemented with Simple 2-D Principles Manas Borah Ed Dickson June 5, 2014 Agenda Overview and Background Hydrology
More informationTechnical Memorandum No River Geometry
Pajaro River Watershed Study in association with Technical Memorandum No. 1.2.5 River Geometry Task: Collection and Analysis of River Geometry Data To: PRWFPA Staff Working Group Prepared by: J. Schaaf
More informationUSACE LEVEE AND DAM SAFETY PROGRAM AND ISSUES
USACE LEVEE AND DAM SAFETY PROGRAM AND ISSUES 237 237 237 217 217 217 200 200 200 80 119 27 252 174.59 1 255 255 255 0 0 0 163 163 163 131 132 122 239 65 53 110 135 120 112 92 56 62 102 130 102 56 48 130
More informationUSACE LEVEE RISK ASSESSMENT PROCESS LESSONS LEARNED
USACE LEVEE RISK ASSESSMENT PROCESS LESSONS LEARNED 1 237 237 237 217 217 217 200 200 200 80 119 27 252 174.59 255 255 255 0 0 0 163 163 163 131 132 122 239 65 53 110 135 120 112 92 56 62 102 130 102 56
More informationTitle Advanced Hydraulic Modeling to Support Emergency Action Plans
Title Advanced Hydraulic Modeling to Support Emergency Action Plans Abstract Freese and Nichols, Inc. (FNI) developed an Emergency Action Plan (EAP) for a Levee Improvement District (LID) located in a
More information3.3 FLOOD CONTROL AND HYDROLOGY
3.3 FLOOD CONTROL AND HYDROLOGY 3.3.1 AFFECTED ENVIRONMENT The sublease boundary is located approximately 0.25-miles north of the San Gabriel River. The San Gabriel River flows from the San Gabriel Mountains
More information3.3 FLOOD CONTROL AND HYDROLOGY
3.3 FLOOD CONTROL AND HYDROLOGY 3.3.1 AFFECTED ENVIRONMENT The sublease boundary is located approximately 0.25-miles north of the San Gabriel River. The San Gabriel River flows from the San Gabriel Mountains
More informationAPPENDIX J-3 Technical Report on Airport Drainage, Northern Sector Airport and Ordinance Creek Watershed, Airport Creek Hydrologic Models
APPENDIX J-3 Technical Report on Airport Drainage, Northern Sector Airport and Ordinance Creek Watershed, Airport Creek Hydrologic Models Introduction Technical Report on Airport Drainage Appendix J-3:
More informationOVERVIEW OF RESERVOIR OPERATIONS AND FLOOD RISK MANAGEMENT
OVERVIEW OF RESERVOIR OPERATIONS AND FLOOD RISK MANAGEMENT 255 255 255 237 237 237 0 0 0 217 217 217 163 163 163 200 200 200 COLUMBIA RIVER BASIN 131 132 122 239 65 53 80 119 27 110 135 120 252 174.59
More informationFriant Dam and Millerton Reservoir
San Joaquin River Restoration Program Floodplain Management Association Presentation SJRRP Update Continued: Impacts from Subsidence April 18, 2013 1 Friant Dam and Millerton Reservoir Completed in 1942
More informationIII. INVENTORY OF EXISTING FACILITIES
III. INVENTORY OF EXISTING FACILITIES Within the Growth Management Boundary, the existing storm drainage facilities are largely associated with development that has historically occurred in the ten drainage
More informationCOYOTE CREEK 3 LEVEE SYSTEM LOS ANGELES COUNTY AND ORANGE COUNTY, CALIFORNIA NLD SYSTEM ID #
LOS ANGELES COUNTY AND ORANGE COUNTY, CALIFORNIA NLD SYSTEM ID # 3805010025 PERIODIC INSPECTION REPORT NO. 2 GENERALIZED EXECUTIVE SUMMARY FINAL SYSTEM RATING: MINIMALLY ACCEPTABLE FINAL RATING DATE: MARCH
More informationFlood Prevention Authority. Agency Presentation. Gilroy Meeting. June 3, Pajaro River Watershed. Flood Prevention Authority
Pajaro River Watershed Flood Prevention Authority Agency Presentation Gilroy Meeting June 3, 2009 Pajaro River Watershed Flood Prevention Authority Presentation Outline Formation and Purpose of the Pajaro
More informationNEPA Scoping Meeting Rahway River Basin, New Jersey Flood Risk Management Feasibility Study
NEPA Scoping Meeting Rahway River Basin, New Jersey Flood Risk Management Feasibility Study U.S. Army Corps of Engineers New York District New Jersey Department of Environmental Protection Non-Federal
More informationPrepared for: City of Jeffersonville. November Prepared by
JEFFERSONVILLE STORMWATER MASTER PLAN HYDRAULICS APPENDIX JEFFERSONVILLE, INDIANA Prepared for: City of Jeffersonville November 2011 Prepared by Christopher B. Burke Engineering, Ltd. 115 W. Washington
More informationPUBLIC INFORMATION MEETING Rahway River Basin Flood Risk Management Feasibility Study
PUBLIC INFORMATION MEETING Rahway River Basin Flood Risk Management Feasibility Study COL Paul E. Owen District Engineer U.S. Army Corps of Engineers New York District New Jersey Department of Environmental
More informationPresentation Overview
Little Dry Creek Restoration Deep River Flood Risk Management Final Presentation to LCRBDC June 10, 2015 Presentation Overview Project Overview & Background Information Data Collection Model Development
More informationMRG Bernalillo to Belen GRR
MRG Bernalillo to Belen GRR Appendix H Hydrology and Hydraulics July 2017 Albuquerque District South Pacific Division Rio Grande Floodway Bernalillo to Belen, Mt. View - Isleta to Belen Unit Bernalillo
More informationTechnical Memorandum No. 8 June 3, 2013 Page 2. FEMA Floodplain Mapping Flood Elevations at WWTP
Page 2 FEMA Floodplain Mapping Flood Elevations at WWTP Existing Flood Control Facilities The City of Davis WWTP is located immediately north of the Willow Slough Bypass and west of the Yolo Bypass (see
More informationTABLE OF CONTENTS. 1.0 Background Watershed Description Hydrology - HEC-HMS Models Hydraulics - HEC-RAS Models...
TABLE OF CONTENTS 1.0 Background... 1 2.0 Watershed Description... 1 3.0 Hydrology - HEC-HMS Models... 2 3.1 Hydrologic Approach... 2 3.2 Drainage Areas... 2 3.3 Curve Numbers... 2 3.4 Lag Times... 3 3.5
More informationCase Studies in Hazard Class Reductions Implementation of NY s Guidance for Dam Hazard Classification
Case Studies in Hazard Class Reductions Implementation of NY s Guidance for Dam Hazard Classification Gregory J Daviero, PhD, PE, Principal Kevin Ruswick, PE, CFM, Associate May 2, 2014 Schnabel Engineering
More informationMILL CREEK LEVEE SYSTEM SAN BERNARDINO COUNTY, CALIFORNIA NLD SYSTEM ID #
SAN BERNARDINO COUNTY, CALIFORNIA NLD SYSTEM ID # 3805010056 PERIODIC INSPECTION REPORT NO 1 GENERALIZED EXECUTIVE SUMMARY FINAL SYSTEM RATING: MINIMALLY ACCEPTABLE FINAL RATING DATE: SEPTEMBER 23, 2013
More informationSAN GABRIEL RIVER/SAN JOSE CREEK 1 LEVEE SYSTEM LOS ANGELES COUNTY, CALIFORNIA NLD SYSTEM ID #
SAN GABRIEL RIVER/SAN JOSE CREEK 1 LEVEE SYSTEM LOS ANGELES COUNTY, CALIFORNIA NLD SYSTEM ID # 3805010052 PERIODIC INSPECTION REPORT NO 1 GENERALIZED EXECUTIVE SUMMARY FINAL SYSTEM RATING: MINIMALLY ACCEPTABLE
More informationPajaro River Watershed Flood Prevention Authority. Phase 3 and 4a. Pajaro River Watershed Study
Pajaro River Watershed Flood Prevention Authority Phase 3 and 4a FEBRUARY 2005 Funding for this project has been provided in full or in part through a contract with the SWRCB pursuant to the Costa-Machado
More informationBALLONA CREEK 4 LEVEE SYSTEM LOS ANGELES COUNTY, CALIFORNIA NLD SYSTEM ID #
LOS ANGELES COUNTY, CALIFORNIA NLD SYSTEM ID # 3805010045 PERIODIC INSPECTION REPORT NO 1 GENERALIZED EXECUTIVE SUMMARY FINAL SYSTEM RATING: MINIMALLY ACCEPTABLE FINAL RATING DATE: 9 DEC 2014 PERIODIC
More informationFreight Street Development Strategy
Freight Street Development Strategy Appendix B: Naugatuck River Floodplain Analysis Freight Street Development Strategy DECEMBER 2017 Page B-1 1.0 NAUGATUCK RIVER FLOODPLAIN AT FREIGHT STREET 1.1 Watershed
More informationDRAINAGE STUDY CROWS LANDING INDUSTRIAL BUSINESS PARK. Stanislaus County. Prepared by:
DRAINAGE STUDY FOR CROWS LANDING INDUSTRIAL BUSINESS PARK Stanislaus County Prepared by: March, 2017 Revised November, 2017 Table of Contents EXECUTIVE SUMMARY... 1 1. INTRODUCTION... 2 2. HYDROLOGY...
More informationDRAFT. Jacob Torres, P.E.; Nick Fang, Ph.D., P.E.
\ Memorandum SSPEED Center at Rice University Department of Civil & Environmental Engineering 6100 Main MS-317 Houston, Texas 77005-1827 sspeed.rice.edu tel: 713-348-4977 To Andy Yung, P.E. CFM; Lane Lease,
More informationAppendix Q Draft Location Hydraulic Study Report For the State Route 32 Widening Between Fir Street and Yosemite Drive at Dead Horse Slough and South
Appendix Q Draft Location Hydraulic Study Report For the State Route 32 Widening Between Fir Street and Yosemite Drive at Dead Horse Slough and South Fork Dead Horse Slough in the, California Draft Location
More informationDevelopment of Stage-Discharge Ratings for Site 2240 Bear Creek at Cold Spring
Development of Stage-Discharge Ratings for Site 2240 Bear Creek at Cold Spring Prepared for: Urban Drainage and Flood Control District 2480 W. 26 th Avenue Suite 156-B Denver, CO 80211 May 19, 2006 (Rev
More informationODOT Floodplain Management. Jeffrey Syar, P.E., Administrator, Central Office,Hydraulic Engineering
ODOT Floodplain Management Jeffrey Syar, P.E., Administrator, Central Office,Hydraulic Engineering John R. Kasich, Ohio Governor Jerry Wray, ODOT Director Background NFIP Ohio Department of Natural Resource
More informationDES MOINES RIVER RESERVOIRS WATER CONTROL PLAN UPDATES IOWA ASCE WATER RESOURCES DESIGN CONFERENCE
DES MOINES RIVER RESERVOIRS WATER CONTROL PLAN UPDATES 237 237 237 217 217 217 200 200 200 0 0 0 163 163 163 131 132 122 80 119 27 252 174.59 110 135 120 112 92 56 IOWA ASCE WATER RESOURCES DESIGN CONFERENCE
More informationAnalyzing Flood Risk from the I&M Canal s Non-Levee Embankments A Modified Application of FEMA s Natural Valley Procedure
Analyzing Flood Risk from the I&M Canal s Non-Levee Embankments A Modified Application of FEMA s Natural Valley Procedure Tiffany Coleman, PE Senior Project Engineer Stantec/STARR September 10, 2015 How
More informationFEMA/USACE Coordination Plan
FEMA/USACE Coordination Plan Project: Fargo-Moorhead Metropolitan Feasibility Study ND Diversion Channel with upstream staging Federal Plan (Authorized WRRDA 2014) Project Design: Project Reach: U.S. Army
More informationDEPARTMENT OF THE ARMY CHIEF OF ENGINEERS 2600 ARMY PENTAGON WASHINGTON, D.C
DEPARTMENT OF THE ARMY CHIEF OF ENGINEERS 2600 ARMY PENTAGON WASHINGTON, D.C. 20310-2600 DAEN DEC 1 8 2015 THE SECRETARY OF THE ARMY I. I submit for transmission to Congress my report on ecosystem restoration
More informationAPPENDIX A HYDROLOGIC AND HYDRAULIC ANALYSIS
APPENDIX A HYDROLOGIC AND HYDRAULIC ANALYSIS GENERAL The Hydrologic and Hydraulic information presented in this appendix is provided as a supplement to the Dallas Floodway Extension General Re-evaluation
More informationCherokee County Future Conditions Floodplain Development
TECHNICAL MEMORANDUM Cherokee County Future Conditions Floodplain Development Prepared for: Prepared by: Geoff Morton, P.E., County Engineer Cherokee County Richard Greuel, P.E.,, Inc. Richard Taylor,
More informationHackensack River Flood Reduction Study Update
Township of River Vale Hackensack River Flood Reduction Study Update November 11, 2013 Purpose of Study To Analyze Where Frequent Flooding Is Impacting Property and How It Might Be Reduced Hackensack River
More informationModelling the LA River: Threats and opportunities for the Los Angeles River, USA. Master s thesis
Modelling the LA River: Threats and opportunities for the Los Angeles River, USA Master s thesis T. Lassche BSc January 2016 Modelling the LA River: Threats and opportunities for the Los Angeles River,
More informationTechnical Memorandum No Basis of Comparison
Pajaro River Watershed Study in association with Technical Memorandum No. 1.2.1 Basis of Comparison Task: Basis of Comparison To: PRWFPA Staff Working Group Prepared by: J. Schaaf Reviewed by: R. Raines
More informationDraft Environmental Impact Report
Revised Draft Environmental Impact Report San Francisquito Creek Flood Protection, Ecosystem Restoration, and Recreation Project Upstream of Highway 101 This notice announces that a Draft Environmental
More informationSANTA MARIA RIVER 3A LEVEE SEGMENT SANTA BARBARA COUNTY, CALIFORNIA NLD SYSTEM ID #
SANTA MARIA RIVER 3A LEVEE SEGMENT SANTA BARBARA COUNTY, CALIFORNIA NLD SYSTEM ID # 3805010095 PERIODIC INSPECTION REPORT NO. 1 GENERALIZED EXECUTIVE SUMMARY FINAL SYSTEM RATING: MINIMALLY ACCEPTABLE FINAL
More informationPlan Rollout Presentation July 31, Michael G. Hahn, P.E., P.H. Chief Environmental Engineer. Southeastern Wisconsin Regional Planning Commission
Plan Rollout Presentation July 31, 2014 Michael G. Hahn, P.E., P.H. Chief Environmental Engineer Southeastern Wisconsin Regional Planning Commission # 219703 Racine County Flooding Recommendations and
More informationSAN GABRIEL RIVER 1 LEVEE SYSTEM LOS ANGELES COUNTY, CALIFORNIA NLD SYSTEM ID #
LOS ANGELES COUNTY, CALIFORNIA NLD SYSTEM ID # 3805010031 PERIODIC INSPECTION REPORT NO. 2 GENERALIZED EXECUTIVE SUMMARY FINAL SYSTEM RATING: MINIMALLY ACCEPTABLE FINAL RATING DATE: APRIL 19, 2017 PERIODIC
More informationV. DRAINAGE IMPROVEMENTS
V. DRAINAGE IMPROVEMENTS 5.1 Formulation of Drainage Improvements As indicated in Chapter 4, following the completion of the hydrologic analysis associated with future land use conditions, drainage improvements
More informationPassaic River Main Stem and Tributaries, New Jersey, Flood Risk Management Project
Passaic River Main Stem and Tributaries, New Jersey, Flood Risk Management Project New York District Wallington Civic Center 29 October 2015, 7pm Public Information Session US Army Corps of Engineers Purpose
More informationSAN DIMAS WASH 6 LEVEE SYSTEM LOS ANGELES COUNTY, CALIFORNIA NLD SYSTEM ID #
LOS ANGELES COUNTY, CALIFORNIA NLD SYSTEM ID # 3805010067 PERIODIC INSPECTION REPORT NO 1 GENERALIZED EXECUTIVE SUMMARY FINAL SYSTEM RATING: MINIMALLY ACCEPTABLE FINAL RATING DATE: FEBRUARY 27, 2015 PERIODIC
More informationTECHNICAL GUIDANCE and CASE STUDY for INEFFECTIVE FLOW and CONVEYANCE SHADOW AREAS
Utilities electric stormwater wastewater water 700 Wood St. PO Box 580 Fort Collins, CO 80522 970.221.6700 970.221.6619 fax 970.224.6003 TDD utilities@fcgov.com fcgov.com/utilities TECHNICAL GUIDANCE and
More informationIAFSM 2010 Annual Conference. City of Rockford Keith Creek Greenway Flood Mitigation Project
IAFSM 2010 Annual Conference City of Rockford Keith Creek Greenway Flood Mitigation Project March 10, 2010 Introduction Problem Overview 1890 s Building of homes along Keith Creek 1920 s Home construction
More informationINDIAN CREEK WATERSHED PLAN EXECUTIVE SUMMARY
INDIAN CREEK WATERSHED PLAN EXECUTIVE SUMMARY The Indian Creek Watershed covers a 38 square mile area in southern Lake County, Illinois that drains 24,116 acres before discharging into the Des Plaines
More informationSAN DIMAS WASH 7 LEVEE SYSTEM LOS ANGELES COUNTY, CALIFORNIA NLD SYSTEM ID #
LOS ANGELES COUNTY, CALIFORNIA NLD SYSTEM ID # 3805010066 PERIODIC INSPECTION REPORT NO 1 GENERALIZED EXECUTIVE SUMMARY FINAL SYSTEM RATING: MINIMALLY ACCEPTABLE FINAL RATING DATE: FEBRUARY 27, 2015 PERIODIC
More informationIMPROVED MODELING OF THE GREAT PEE DEE RIVER: DOCUMENTATION IN SUPPORT OF FEMA APPEAL. Horry County, South Carolina
IMPROVED MODELING OF THE GREAT PEE DEE RIVER: DOCUMENTATION IN SUPPORT OF FEMA APPEAL Horry County, South Carolina July 15, 2016 CONTENTS 1 Introduction... 2 2 Hydrology... 3 3 HEC-RAS Model... 7 3.1 Cross
More informationBrian Rast, PE, CFM, PMP Lead Silver Jackets Coordinator, Kansas and Missouri Kris Lander, PE, CFM Hydrologist. June 4, 2015
Presentation to the Association of State Floodplain Managers Interagency Partnering for Flood Forecast Inundation Maps Brian Rast, PE, CFM, PMP Lead Silver Jackets Coordinator, Kansas and Missouri Kris
More informationUrban Study. Rocky Branch Watershed Columbia, South Carolina. June 1, Project No
Urban Study Rocky Branch Watershed Columbia, South Carolina Prepared for: City of Columbia 1136 Washington Street Columbia, SC 29217 Prepared by: AMEC Environment & Infrastructure, Inc. 720 Gracern Road
More informationFloodplain Special Review
Larimer County Engineering Dept. Procedural Guide for: August 1, 2007 Floodplain Special Review Floodplain Special Review Process The floodplain special review process contains the following steps: 1.
More informationDistributed Storage Alternative Screening Analysis February 17, 2015
Distributed Storage Alternative Screening Analysis February 17, 2015 Executive Summary The Distributed Storage Alternative (DSA) was conceptualized during the public comment and alternative screening process
More informationDry Creek Flood Control Improvement Project
Dry Creek Flood Control Improvement Project The following is a brief overview of the planned IRWM Stormwater Flood Management Grant Application from the Fresno Metropolitan Flood Control District (FMFCD)
More informationModernization of High Hazard Dams in Austin, Texas. TFMA Spring Conference May 23, 2007
Modernization of High Hazard Dams in Austin, Texas TFMA Spring Conference May 23, 2007 Modernization of High Hazard Dams in Austin, Texas City of Austin Glen Taffinder, P.E. Stormwater Pond Dam Safety
More informationSubject: Comments of Friends of the Los Angeles River on the Draft Environmental Impact Report for the Grayson Repowering Project (DEIR)
Mr. Erik Krause, Interim Deputy Director of Community Development, City of Glendale, Community Development Department, 633 East Broadway, Room 103, Glendale, California 91026-4386; Email: ekrause@glendaleca.gov
More informationCurrent Construction Projects
Zone 4 Report to the Zone Commissioners By Jason Uhley, General Manager-Chief Engineer November 2018 Current Construction Projects Sunnymead MDP Line B (aka Heacock Channel), Stages 3 and 4 (4-8-00011-03,
More informationInformational Meeting- July 21, Boxelder B-2/B-3 Watershed Planning Study
Informational Meeting- July 21, 2015 Boxelder B-2/B-3 Watershed Planning Study Agenda Introductions Background & History Purpose & Need NRCS Watershed Planning Program Work Completed to Date Longer term
More informationChicago Waterways Tail Water Conditions Modeling
MEMORANDUM Chicago Waterways Tail Water Conditions Modeling TO: FROM: Tim Coleman, Phil Bonn, CH2MHILL Marion Kessy, FLUIDCLARITY DATE: June 1, 2008 PROJECT NUMBER: FCL 7000 Purpose This memorandum is
More informationAPPENDIX A. Hydraulic Investigations: Cascade Mall at Burlington
APPENDIX A m SUMMARY REPORT FOR E.I.S. Hydraulic Investigations: Cascade Mall at Burlington July 12, 1982 John E. Norman, P.E. 14779 Northeast 32nd, #A201 Bellevue, WA 98007 (206) 882-1767 92 General A
More informationRE: Recommendations for Staged Implementation of Alternative 3a
March 10, 2006 Ms. Julie Thomas Coastal San Luis Resource Conservation District 545 Main Street, Suite B-1 Morry Bay, Ca 93442 RE: Recommendations for Staged Implementation of Alternative 3a Dear Ms. Thomas,
More informationHydrology and Flooding
Hydrology and Flooding Background The 1996 flood Between February 4, 1996 and February 9, 1996 the Nehalem reporting station received 28.9 inches of rain. Approximately 14 inches fell in one 48 hour period.
More informationS.R. 4031, SECTION FVR OVER BEAVER RUN SEGMENT 0170, OFFSET 6093 EAST NANTMEAL TOWNSHIP, CHESTER CO. ENGINEERING DISTRICT 6-0
S.R. 4031, SECTION FVR OVER BEAVER RUN SEGMENT 0170, OFFSET 6093 EAST NANTMEAL TOWNSHIP, CHESTER CO. ENGINEERING DISTRICT 6-0 HYDROLOGIC & HYDRAULIC STUDY REPORT OCTOBER 2007 Prepared For: Prepared By:
More informationacquiring, managing, and disposing of federal lands and facilities;
2.2.1 HYDROLOGY AND FLOODPLAIN This section discusses and analyzes the surface hydrology and water quality characteristics of the project. The information provided in this section is based on the Preliminary
More informationANALYSIS OF EFFECTS OF PROPOSED MILWAUKEE COUNTY GROUNDS DETENTION BASINS ON FLOODING CONDITIONS ALONG THE MENOMONEE RIVER AND UNDERWOOD CREEK
ANALYSIS OF EFFECTS OF PROPOSED MILWAUKEE COUNTY GROUNDS DETENTION BASINS ON FLOODING CONDITIONS ALONG THE MENOMONEE RIVER AND UNDERWOOD CREEK Prepared for Milwaukee County by the Southeastern Wisconsin
More informationSAN LUIS REY RIVER 3 LEVEE SYSTEM SAN DIEGO COUNTY, CALIFORNIA NLD SYSTEM ID #
SAN DIEGO COUNTY, CALIFORNIA NLD SYSTEM ID # 3805010012 PERIODIC INSPECTION REPORT NO. 1 GENERALIZED EXECUTIVE SUMMARY FINAL SYSTEM RATING: UNACCEPTABLE FINAL RATING DATE: DECEMBER 15, 2017 PERIODIC INSPECTION
More informationApplication for a Dam Permit Ash Basin No. 1
Application for a Dam Permit Ash Basin No. 1 for the Sunbury Generating Station Shamokin Dam, Pennsylvania submitted to Commonwealth of Pennsylvania Department of Environmental Protection Bureau of Waterways
More informationAppendix J: Geomophologic Opinion on Feasibility of Stream Naturalization-The Lower Arroyo SEco
Appendix J: Geomophologic Opinion on Feasibility of Stream Naturalization-The Lower Arroyo SEco IV- j Geomorphologic Opinion on Feasibility of Stream Naturalization: The Lower Arroyo Seco. Prepared by:
More informationSAW MILL RIVER DAYLIGHTING ANALYSIS AT RIVER PARK CENTER
SAW MILL RIVER DAYLIGHTING ANALYSIS AT RIVER PARK CENTER Prepared for: Struever Fidelco Cappelli LLC McLaren Project No. 6 August 28 TABLE OF CONTENTS. INTRODUCTION 2. SAW MILL RIVER: FEMA STUDY... 2..
More informationLos Angeles River Ecosystem Restoration Project: Acquisition of Taylor Yard G2 Parcel
Los Angeles River Ecosystem Restoration Project: Acquisition of Taylor Yard G2 Parcel Addendum to the Integrated Feasibility Report (IFR) Environmental Impact Statement/Environmental Impact Report (EIS/EIR)
More informationA Federal Family Comes Together Association of State Floodplain Managers Conference
A Federal Family Comes Together 2016 Association of State Floodplain Managers Conference Region 6 by the Numbers 5 States 5 USGS Offices 6 USACE Districts 6 HUC2 Regions 40 HUC4 Subregions 403 HUC8 Watersheds
More informationLOWER BOISE RIVER INTERIM FEASIBILITY STUDY
LOWER BOISE RIVER INTERIM FEASIBILITY STUDY Public Information Meetings June 29, 2010 June 30, 2010 July 1, 2010 US Army Corps of Engineers BUILDING STRONG Agenda Introductions / Meeting Objectives Greg
More informationRed River Flooding. June 2015 Caddo and Bossier Parishes. Presented by: Richard Brontoli RRVA, Executive Director
Red River Flooding June 2015 Caddo and Bossier Parishes Presented by: Richard Brontoli RRVA, Executive Director Kiwanis Club of SE Shreveport May 2, 2018 Where the Rain Falls Matters I-30 versus I-20 Caddo
More informationFlood Mitigation Plan
City of Huntsville, Alabama Flood Mitigation Plan 2001 Prepared by Flood Mitigation Planning Committee June 1, 2001 City of Huntsville, Alabama Flood Mitigation Plan Executive Summary 1973 1999 Prepared
More informationManhattan Levee Section 216 Feasibility Study Public Workshop 17Apr13 Manhattan Kansas
Manhattan Levee Section 216 Feasibility Study Public Workshop 17Apr13 Manhattan Kansas Tuttle Creek Dam and Lake Kansas City District Project Development Team Manhattan, KS US Army Corps of Engineers 1
More informationAPPENDIX 4 ARROYO MODELING
APPENDIX 4 ARROYO MODELING The existing HEC-HMS model can serve as a baseline for further development and analysis of major arroyos in the city. The model would need to be updated and expanded to consider
More informationHYDROLOGY REPORT HEACOCK & CACTUS CHANNELS MORENO VALLEY, CALIFORNIA NOVEMBER 2005 REVISED APRIL 2006 REVISED AUGUST 2006
HYDROLOGY REPORT HEACOCK & CACTUS CHANNELS MORENO VALLEY, CALIFORNIA NOVEMBER 2005 REVISED APRIL 2006 REVISED AUGUST 2006 RIVERSIDE COUNTY FLOOD CONTROL AND WATER CONSERVATION DISTRICT TABLE OF CONTENTS
More informationProject Alignment Appendix A
Project Alignment Appendix A Fargo Moorhead Metropolitan Area Flood Risk Management Project EA Document This page is intentionally left blank Project Alignment Appendix A Table of Contents 1 BACKGROUND...
More informationDESIGN & CONSTRUCTION BUDGET AND FIVE YEAR CIP PROJECT SUMMARY - ZONE 1 FISCAL YEARS THROUGH
RIVERSIDE COUNTY FLOOD CONTROL AND WATER CONSERVATION DISTRICT DESIGN & CONSTRUCTION BUDGET AND FIVE YEAR CIP PROJECT SUMMARY - ZONE 1 FISCAL YEARS 2017-18 THROUGH 2021-22 Project Number Stg No. Project
More informationPA of NY&NJ - TETERBORO AIRPORT RUNWAY 6-24 Engineered Material Arresting System (EMAS) UNSTEADY-STATE FLOODPLAIN ANALYSIS
1 NEW JERSEY ASSOCIATION FOR FLOODPLAIN MANAGEMENT PRESENTATION FOR THE 10 TH ANNUAL CONFERENCE PA of NY&NJ - TETERBORO AIRPORT RUNWAY 6-24 Engineered Material Arresting System (EMAS) UNSTEADY-STATE FLOODPLAIN
More informationJune 22, Francis E. Borcalli, P.E.
CACHE CREEK SETTLING BASIN SYMPOSIUM Managing the Settling Basin Who s Doing What! June 22, 2009 Francis E. Borcalli, P.E. CACHE CREEK SETTLING BASIN SYMPOSIUM Managing the Settling Basin Who s Doing What!
More information3F. Hydrology and Water Quality
This section provides an analysis of potential hydrological and water quality impacts associated with implementation of the proposed project. The section also evaluates and describes the potential impacts
More informationsewers ANd storm drains Storm Drain Under Construction, 1916
sewers ANd storm drains Storm Drain Under Construction, 1916 A d o p t e d C A p I t A L I M p R o V e M e N t p R o G R A M F I s C A L Y e A R 2 1 9 FY 219-223 Capital Improvement Program FY 218 FY 219
More informationCharacterizing the Soap Lake Floodplain CHAPTER 2
Characterizing the Soap Lake Floodplain CHAPTER 2 CHAPTER 2 CHARACTERIZING THE SOAP LAKE FLOODPLAIN This chapter provides some background on Soap Lake including a general description of the Lake location,
More informationLittle Bear Brook Flood Hazard Assessment and Redevelopment Area Regional Stormwater Management Analysis. Progress Meeting
Little Bear Brook Flood Hazard Assessment and Redevelopment Area Regional Stormwater Management Analysis Progress Meeting June 30, 2014 Princeton Hydro, LLC and SWM Consulting, LLC Project Team West Windsor
More informationFLOOD WARNING - PREPAREDNESS PROGRAMS
Hydrologic Engineering Center Workshop on FLOOD WARNING - PREPAREDNESS PROGRAMS Davis, California Hydrologic Engineering Center WORKSHOP OBJECTIVES The Flood Warning - Preparedness Program (FW-P), sponsored
More informationSANTA ANA RIVER 1 LEVEE SYSTEM (UPSTREAM REACH) ORANGE COUNTY, CALIFORNIA NLD SYSTEM ID #
SANTA ANA RIVER 1 LEVEE SYSTEM (UPSTREAM REACH) ORANGE COUNTY, CALIFORNIA NLD SYSTEM ID # 3805010039 PERIODIC INSPECTION REPORT NO. 1 GENERALIZED EXECUTIVE SUMMARY FINAL SYSTEM RATING: MINIMALLY ACCEPTABLE
More information3.3 Acceptable Downstream Conditions
iswm TM Criteria Manual - = Not typically used or able to meet design criterion. 1 = The application and performance of proprietary commercial devices and systems must be provided by the manufacturer and
More informationIV. ENVIRONMENTAL IMPACT ANALYSIS H. HYDROLOGY AND WATER QUALITY
IV. ENVIRONMENTAL IMPACT ANALYSIS H. HYDROLOGY AND WATER QUALITY A Drainage Analysis, dated June 13, 2008, and a Debris Production Report, dated June 16, 2008 were prepared by Permco Engineering & Management
More informationSECTION III: WATERSHED TECHNICAL ANALYSIS
Trout Creek Watershed Stormwater Management Plan SECTION III: WATERSHED TECHNICAL ANALYSIS A. Watershed Modeling An initial step this study of the Trout Creek watershed was the selection of a stormwater
More information3.9 HYDROLOGY AND WATER QUALITY
3.9 HYDROLOGY AND WATER QUALITY 3.9.1 Introduction The Hydrology and Water Quality section evaluates the Program s impacts on water resources. The environmental setting provides a general overview of the
More informationc. Effects of the Project on Public Health, Safety and the Environment
INTRODUCTION a. Description of Proposed Activity This report is for the hydrologic and hydraulic analysis for the structure located at Sta.100+80.67 on S.R. 0978 in North Fayette Township, Allegheny County,