Tailoring PRINCE2 to the project environment

Size: px
Start display at page:

Download "Tailoring PRINCE2 to the project environment"

Transcription

1 1. The adoption of PRINCE 2 across an organisation is known as: A. Adapting B. Embedding C. Tailoring D. Reporting 2. Tailoring PRINCE 2 appropriately is: A. Implementing a portion of the method as the project does not need full PRINCE2 B. Implementing some of the principles of PRINCE2 as thought relevant to the project C. Implementing template-driven project management D. Implementing full PRINCE2 without omitting any element of the method 3. Embedding is done by the organization mainly to focus on: A. Process responsibilities, scaling rules/guidance, standards, training and development, process assurance, etc. B. Adaption of themes, revising Product Descriptions C. Incorporation of specific terms/language D. Adoption of the method to the context of a specific project 4. Embedding mainly focuses on all the following EXCEPT: A. Process responsibilities B. Revision of Product Descriptions C. Training and development D. Scaling rules/guidance 5. Tailoring PRINCE2 is a methodology performed by the project team mainly for the purpose of: A. Providing links from the managing product delivery process to the specialist product development B. Integrating any specialist roles into the project management team structure C. Adapting the method to the context of a specific project D. Aligning the management stages to the development lifecycle APMGstudy.com 1

2 6. Tailoring PRINCE2 focuses on all the following areas EXCEPT: A. Adapting the themes B. Integrating with business processes C. Revising the role descriptions for the PRINCE 2 project roles. D. Incorporating specific terms/language 7. Which of the following statements about Tailoring PRINCE2 is true? A. Tailoring consist of omitting irrelevant elements of PRINCE2 B. Tailoring refers to the abridged use of PRINCE2 on any given project C. Tailoring is done by the organization to adopt PRINCE2 D. Tailoring is done by the project management team to adapt the PRINCE2 method to the context of a specific project. 8. What is a programme? A. It is a temporary flexible organization structure created to coordinate, direct and oversee the implementation of a set of related projects and activities. B. It is a temporary flexible organization structure created to coordinate, direct and oversee the implementation of a set of portfolios and activities. C. It is a permanent flexible organization structure created to coordinate, direct and oversee the implementation of a set of related projects and activities. D. It is a temporary flexible organization structure created to coordinate, direct and oversee the implementation of a set of unrelated projects and activities. 9. For an organization that has embedded PRINCE2, the embedded version of the method requires: A. Modification B. Abridgement C. Tailoring D. Revision 10. Which of the following is typically used to help transform organizations? 2010 APMGstudy.com 2

3 A. Business Case B. Project Scale C. Programmes D. Project 11. For projects in a programme environment, benefits will be defined, tracked and managed by the [?] management team. Identify the missing word in this sentence? A. Project B. Corporate C. Team D. Programme 12. Who among the following is responsible for the set-up and day-to-day management and delivery of the programme on behalf of the programme SRO? A. Programme manager B. Executive C. Project Manager D. Team Leader 13. Who will confirm the appointment of the project Executive? A. Project Manager B. Project Board members C. Programme SRO D. Programme manager 14. Who is responsible for benefits definition and management throughout the programme? A. Programme management team B. Project Executive C. Programme SRO D. Business change manager 2010 APMGstudy.com 3

4 15. The Project s Quality Management Strategy is derived from which of the following strategies in the case of projects in a programme environment? A. Project s stakeholder engagement strategy B. Programme s Quality Management Strategy C. Project s Quality Control Strategy D. Programme s Quality Assurance strategy 16. In the case of projects in a programme environment, quality assurance and quality control activities are carried out by: A. Members of the programme management team B. Stakeholder groups C. Business change manager D. Programme s design authority 17. Which of the following is not a theme of PRINCE 2? A. Business Case B. Quality C. Project scale D. Organization 18. Which of the following themes is most affected by simple projects? A. Business Case theme B. Risk theme C. Quality theme D. Organization theme 19. Identify the missing words in the following sentence. [?] and cost tolerances will be defined by the programme. A. Project-level time 2010 APMGstudy.com 4

5 B. Programme level risks C. Portfolio-level risks D. Program-level time 20. Which of the following processes is most affected by working in a programme? A. Starting up a Project B. Directing a Project C. Initiating a Project D. Closing a Project 21. All the following are management products EXCEPT: A. Stage Plan B. Work Package C. Issue Report D. Project charter 22. PRINCE 2 is based on which of the following environments? A. Stakeholder/sponsor environment B. Sponsor/ customer environment C. Stakeholder/ supplier environment D. Customer/supplier environment 23. Who ensures that a programme will meet its objectives and deliver the projected benefits? A. Programme SRO B. Programme s design authority C. Project Manager D. Business change manager 2010 APMGstudy.com 5

6 24. All the following activities are involved when tailoring PRINCE 2 to work with specialist lifecycle models EXCEPT: A. Delegating role descriptions B. Integrating any specialist roles into the project management team structure C. Using tolerances to match the development focus D. Aligning the management stages to the development lifecycle 25. Gateway review aligning with PRINCE2 as regards Business justification focuses on which of the following activities? A. Creating a team plan for the work packages being assigned B. Accepting and checking authorized work packages from the Project Manager C. Obtaining approval for completed products from the authorities identified in the product description. D. Ensuring that business justification exists for the project prior to the key decision to approve project initiation 26. The principal objective of a gateway review is to: A. Finalize end stage assessment B. Avoid all project risks C. Reset cost and time tolerances D. Provide added assurance as input to assess project s viability 27. Which of the following is not a project factor? A. Solution complexity B. Team maturity C. Organization culture D. Scale 28. Programmes are driven by vision of [?]. Identify the missing words A. Deliverables B. End state C. Short timescales D. Benefits 2010 APMGstudy.com 6

7 ANSWERS Question No Answer 1 B 2 D 3 A 4 B 5 C 6 B 7 D 8 A 9 C 10 C 11 D 12 A 13 C 14 D 15 B 16 A 17 C 18 D 19 A 20 A 21 D 22 D 23 A 24 A 25 D 26 B 27 C 28 B 2010 APMGstudy.com 7

PASS4TEST. IT Certification Guaranteed, The Easy Way! We offer free update service for one year

PASS4TEST. IT Certification Guaranteed, The Easy Way!   We offer free update service for one year PASS4TEST \ http://www.pass4test.com We offer free update service for one year Exam : PRINCE2 Title : PRINCE2 Foundation Vendor : PRINCE2 Version : DEMO 1 / 4 Get Latest & Valid PRINCE2 Exam's Question

More information

Tailoring PRINCE2 to the Project Environment

Tailoring PRINCE2 to the Project Environment 1. refers to the appropriate use of PRINCE2 method on any given project. 2. The adoption of PRINCE2 across an organization is known as. 3. The danger of not tailoring PRINCE2 is that it can lead to project

More information

Pass4test Certification IT garanti, The Easy Way!

Pass4test Certification IT garanti, The Easy Way! Pass4test Certification IT garanti, The Easy Way! http://www.pass4test.fr Service de mise à jour gratuit pendant un an Exam : PRINCE2 Title : PRINCE2 Foundation Vendor : PRINCE2 Version : DEMO 1 / 4 Get

More information

1. You should attempt all 60 questions. Each question is worth one mark. 3. Mark your answers on the answer sheet provided. Use a pencil (NOT pen).

1. You should attempt all 60 questions. Each question is worth one mark. 3. Mark your answers on the answer sheet provided. Use a pencil (NOT pen). The PRINCE2 Foundation Examination Sample Paper 1 Question Booklet Multiple Choice Exam Duration: 1 hour Instructions 1. You should attempt all 60 questions. Each question is worth one mark. 2. There is

More information

PRINCE2 Sample Papers

PRINCE2 Sample Papers PRINCE2 Sample Papers The Official PRINCE2 Accreditor Sample Examination Papers Terms of use Please note that by downloading and/or using this document, you agree to comply with the terms of use outlined

More information

PRINCE2 - Project Initiation Documentation

PRINCE2 - Project Initiation Documentation Created/updated 05/11/17 PRINCE2 - Project Initiation Documentation Downloaded from stakeholdermap.com. Visit Prince2 Templates for more Prince2 downloads. Get a Mind Map Project Initiation Documentation

More information

FROM PRINCE TO 2009

FROM PRINCE TO 2009 FROM PRINCE2 2005 TO 2009 REFERENCE MANUALS The 2009 Refresh has brought about two new reference manuals: 1. Managing Successful Projects with PRINCE2 is written for those who manage or assist in the management

More information

III PMF MANAGEMENT SOLUTIONS. Course Number Project Management Course Overview

III PMF MANAGEMENT SOLUTIONS. Course Number Project Management Course Overview III PMF MANAGEMENT SOLUTIONS Course Number Project Management Course Overview House Keeping Beep beep (prepare to evacuate): Whoop whoop (evacuate): Follow the red hat (fire warden). Designated evacuation

More information

Managing Successful Programmes 2011 Glossary of Terms and Definitions

Managing Successful Programmes 2011 Glossary of Terms and Definitions Version 2, November 2011 This glossary: is subject to terms and conditions agreed to by downloading the glossary, uses international English which has been adopted to reflect and facilitate the international

More information

PROJECT BOARD TERMS OF REFERENCE. Roles and Responsibilities

PROJECT BOARD TERMS OF REFERENCE. Roles and Responsibilities PROJECT BOARD TERMS OF REFERENCE Roles and Responsibilities 1 DOCUMENT CONTROL Change Control Table Version Amendment Description Release Date Updated by 0.1 First draft Alignment with new governance framework

More information

Lisa Hodges Owner/Principal Consultant

Lisa Hodges Owner/Principal Consultant Lisa Hodges Owner/Principal Consultant Cornerstone Service Management unless otherwise stated. ITIL is a registered trademark of Axelos Limited. PRINCE2 is a registered trademark of Axelos Limited. PMBoK

More information

Principles PROJstudy.com. All rights reserved

Principles PROJstudy.com. All rights reserved PRINCE2 is a Registered Trade Mark of the Office of Government Commerce in the United Kingdom and other countries The Swirl logo is a Trade Mark of the Office of Government Commerce 2010 PROJstudy.com.

More information

- Not Protectively Marked - NOTTINGHAMSHIRE POLICE JOB DESCRIPTION

- Not Protectively Marked - NOTTINGHAMSHIRE POLICE JOB DESCRIPTION NOTTINGHAMSHIRE POLICE JOB DESCRIPTION Job title: Department/Location: Responsible to: Responsible for: Project Manager Business & Finance Head of Programme Management N/A Date: 10 th September 2012 Library

More information

PRINCE 2009 Edition Quick Reference Card

PRINCE 2009 Edition Quick Reference Card PRINCE 2009 Edition Quick Reference Card Defined Roles and Responsibilities Learn from Experience Continued Business Justification Progress Plans Business Case Manage by Stages Change Preproject stage

More information

PRINCE2 VS PMBOK FRIEND OR FOE LEARNING OBJECTIVES INTRODUCTIONS: PRINCE2 Management Overview. Page 1

PRINCE2 VS PMBOK FRIEND OR FOE LEARNING OBJECTIVES INTRODUCTIONS: PRINCE2 Management Overview. Page 1 PRINCE2 VS PMBOK FRIEND OR FOE Presented by: Julie Grabb PMP Prince2 Practitioner Prince2 Authorized Trainer LEARNING OBJECTIVES A definition of what PRINCE2 is and its key components. A comparison between

More information

NOT PROTECTIVELY MARKED

NOT PROTECTIVELY MARKED NOT PROTECTIVELY MARKED Meeting Audit Committee Date 24 July 2018 Location Pacific Quay, Glasgow Title of Paper Internal Audit Organisational Change Report Item Number 5.5 Presented By Campbell McLundie,

More information

ITdumpsFree. Get free valid exam dumps and pass your exam test with confidence

ITdumpsFree.   Get free valid exam dumps and pass your exam test with confidence ITdumpsFree http://www.itdumpsfree.com Get free valid exam dumps and pass your exam test with confidence Exam : P3OF Title : Portfolio, Programme and Project Offices Foundation Vendor : EXIN Version :

More information

CERA s Programme Management Office

CERA s Programme Management Office CERA s Programme Management Office Published 18 April 2016 Canterbury Earthquake Recovery Authority The Government established the Canterbury Earthquake Recovery Authority (CERA) in March 2011 to lead

More information

Investment Management The Art and Science of Executing an Investment Plan

Investment Management The Art and Science of Executing an Investment Plan Investment Management The Art and Science of Executing an Investment Plan RPIC Breakfast Session Ottawa 10 June 2014 Fred Hardy Regional Director Environmental Services & Contaminated Sites PWGSC Ontario

More information

Guidance on portfolio, programme and project management

Guidance on portfolio, programme and project management Guidance on portfolio, programme and project management The Standard for Infrastructure Procurement and Delivery Management (SIPDM) defines the following two generic terms: Portfolio: collection of projects

More information

Contents. List of figures. 4 Project Board activities 27. List of tables. Acknowledgements. 1 Introduction 1. 5 Programmes and portfolios 35

Contents. List of figures. 4 Project Board activities 27. List of tables. Acknowledgements. 1 Introduction 1. 5 Programmes and portfolios 35 Contents List of figures v 4 Project Board activities 27 List of tables Foreword Acknowledgements vi vii viii 1 Introduction 1 1.1 The purpose of this guide 3 1.2 Using the guide 3 1.3 About projects 3

More information

PRINCE Process Terms and Definitions Wizard. The Project Management. Framework. Dave Litten s PRINCE2 Definitions

PRINCE Process Terms and Definitions Wizard. The Project Management. Framework. Dave Litten s PRINCE2 Definitions PRINCE2 2017 Dave Litten s PRINCE2 Definitions Process Terms and Definitions Wizard The Project Management www.projex.com/prince2-masterclass Framework David Geoffrey Litten PMP Primer Contents Welcome

More information

PRINCE2 Foundation Booklet

PRINCE2 Foundation Booklet PRINCE2 Foundation Booklet PRINCE2 Foundation online course booklet By Frank Turley Ver 0.5 PRINCE2 2017 Foundation Booklet ii Colophon Title: Authors: Expert reviewers: PRINCE2 Foundation Booklet Frank

More information

(Student Lifecycle Improvement Project)

(Student Lifecycle Improvement Project) JOB DESCRIPTION Job Title: Department: Location: Grade: Salary: Tenure: Hours : Project Manager (Student Lifecycle Improvement Project) Business Improvement Services Llandaff Campus 7AB 39,609 44,559 per

More information

SESSION 308 Wednesday, November 2, 3:00 PM - 4:00 PM Track: The Specialist

SESSION 308 Wednesday, November 2, 3:00 PM - 4:00 PM Track: The Specialist SESSION 308 Wednesday, November 2, 3:00 PM - 4:00 PM Track: The Specialist Speaking the Same Language: Best Practice Project and Service Management Lisa Hodges Owner/Principal Consultant,Cornerstone Service

More information

Exam Questions PRINCE2-Foundation

Exam Questions PRINCE2-Foundation Exam Questions PRINCE2-Foundation PRINCE2 Foundation exam https://www.2passeasy.com/dumps/prince2-founda tion/ 1. - (Topic 1) Which two roles are linked by the Managing Product Delivery process? A. Corporate

More information

University of St Andrews Financial Operating Procedure Management of Business Transformation Initiatives

University of St Andrews Financial Operating Procedure Management of Business Transformation Initiatives University of St Andrews Financial Operating Procedure Management of Business Transformation Initiatives Updated: October 2017 1. Introduction This procedure exists to ensure operational adherence with

More information

PRINCE2-Foundation Exam Questions Demo PRINCE2-Exams. Exam Questions PRINCE2-Foundation

PRINCE2-Foundation Exam Questions Demo  PRINCE2-Exams. Exam Questions PRINCE2-Foundation PRINCE2-Exams Exam Questions PRINCE2-Foundation PRINCE2 Foundation exam Version:Demo 1. - (Topic 1) Which two roles are linked by the Managing Product Delivery process? A. Corporate or programme management

More information

Document Control Information

Document Control Information Document Control Information Document Details Document Name Purpose of Document Document Version Number 3.3 Document Status Document Owner Prepared By MSP Foundation Sample Paper Questions 3.3 track changes.doc

More information

Governing project, programme, portfolio performance and ROI

Governing project, programme, portfolio performance and ROI PMGlobal Symposium Canberra 6 May 2014 Governing project, programme, portfolio performance and ROI harold.petersen@uxcconsulting.com.au How much of the investments in IT projects are wasted? A recent study

More information

PRINCE2 FOUNDATION INSTRUCTOR LED TRAINING

PRINCE2 FOUNDATION INSTRUCTOR LED TRAINING FACT SHEET PRINCE2 FOUNDATION INSTRUCTOR LED TRAINING LEARN PRINCE2 AND GAIN FIRST CLASS PROJECT MANAGEMENT SKILLS GreyCampus provides PRINCE2 Foundation Instructor Led Training that helps professionals

More information

GE: PRINCE2 Pre Course Reading

GE: PRINCE2 Pre Course Reading Pre-course reading material purpose GE: PRINCE2 Pre Course Reading This Pre-Reading material has been designed to provide you with a background to PRINCE2 and its terminology. It provides some information

More information

Lisa Hodges Owner/Principal Consultant

Lisa Hodges Owner/Principal Consultant Lisa Hodges Owner/Principal Consultant ITIL is a registered trademark of Axelos Limited. PRINCE2 is a registered trademark of Axelos Limited. PMBoK is a registered trademark of Project Management Institute.

More information

III PMF MANAGEMENT SOLUTIONS. Course Number Project Management Course Overview

III PMF MANAGEMENT SOLUTIONS. Course Number Project Management Course Overview III PMF MANAGEMENT SOLUTIONS Course Number Project Management Course Overview House Keeping Beep beep (prepare to evacuate): Whoop whoop (evacuate): Follow the red hat (fire warden). Designated evacuation

More information

PRINCE2 COURSE FOUNDATION. 1 Powered by POeT Solvers Limited

PRINCE2 COURSE FOUNDATION. 1   Powered by POeT Solvers Limited PRINCE2 COURSE FOUNDATION 1 www.pmtutor.org Powered by POeT Solvers Limited Principles PRINCE2 2 www.pmtutor.org Powered by POeT Solvers Limited Objectives To understand SEVEN Principles of PRINCE2 methodology

More information

EAST SUSSEX FIRE AUTHORITY Job Description

EAST SUSSEX FIRE AUTHORITY Job Description EAST SUSSEX FIRE AUTHORITY Job Description Work Designation: Resources / Treasurer Location: Shared HQ Job Title ITG Manager Rank or Grade: Job Family 7 (subject to Job Evaluation) Responsible To: Assistant

More information

2017 SPOCE Project Management Ltd Managing Successful Projects with PRINCE2 :2017

2017 SPOCE Project Management Ltd Managing Successful Projects with PRINCE2 :2017 HO0483_1v3 Page 1 CONTENTS Contents... 1 Acknowledgements.... 2 Event Preparation Instructions Please Read And Follow Carefully... 3 PRINCE2 Primer... 7 PRINCE2 Principles... 9 PRINCE2 Themes... 11 PRINCE2

More information

Action to date: Recommendation 2: Response: Action to date:

Action to date: Recommendation 2: Response: Action to date: ANNEX C 360 Assurance Report Urgent and Emergency Care Centre Project 3rd Project Governance Assurance Report Response to recommendations Background: 360 Assurance were appointed by the CCG to provide

More information

Project Governance IT Services: Projects and Change Queen Mary University of London Protect 1

Project Governance IT Services: Projects and Change Queen Mary University of London Protect 1 Project Governance 1 DOCUMENT CONTROL Change Control Table Version Amendment Description Release Date Updated by 0.1 First Draft 15/10/215 Helen 0.2 Feedback Review feedback 21/10/2015 Shelim 0.3 Updated

More information

Transforming Health Improvement in Wales (THIW) Programme. Programme Definition Document

Transforming Health Improvement in Wales (THIW) Programme. Programme Definition Document Transforming Health Improvement in Wales (THIW) Programme Programme Definition Document Authors: February 2014 Revised Carly Western, Programme Support Officer Jonathan Watts, Senior Programme Manager

More information

SO Think P30 Make Up 14/11/08 11:15 Page 1 1 Introduction

SO Think P30 Make Up 14/11/08 11:15 Page 1 1 Introduction SO Think P30 Make Up 14/11/08 11:15 Page 1 Introduction 1 3 1 Introduction People have been talking about programmes and projects for many years, and there are lots of books, guidance, qualifications,

More information

Meeting Date 15 March 2018 Agenda Item 2d

Meeting Date 15 March 2018 Agenda Item 2d Meeting Date 15 March 2018 Agenda Item 2d Report Title Board Assurance Framework (BAF) Report Author Pam Wenger, Corporate Governance Report Sponsor Pam Wenger, Corporate Governance Presented by Pam Wenger,

More information

When is it appropriate to treat an initiative as a programme?

When is it appropriate to treat an initiative as a programme? 1 Programme Management Guide This guidance is for Senior Responsible Owners (SROs), Programme Managers and any others involved in delivering large-scale initiatives. It is designed to provide an overview

More information

APMP. Knowledge Evaluation

APMP. Knowledge Evaluation APMP Knowledge Evaluation The Project Context These questions test knowledge of APMP topics covering the Project Context. Correct answers are also provided to enable you to check your answers against the

More information

APPENDIX: GRI Cross-Reference Index

APPENDIX: GRI Cross-Reference Index APPENDIX: GRI Cross-Reference Index 1. Strategy and Analysis 1.1 Chairman s Message Chapter: Chairman s Message Chapter: Ethics and Corporate Governance»» Model Chapter: Strategy and Sustainability of

More information

Introduction to PM². Maarten Koens consultant & trainer

Introduction to PM². Maarten Koens consultant & trainer Introduction to PM² mkoens@supplychange.be Maarten Koens consultant & trainer Course Agenda Introduction & context Projects and project management PM² in a nutshell PM² Governance model PM² Artefacts PM²

More information

Managing Successful Bids with PRINCE2 2009

Managing Successful Bids with PRINCE2 2009 Managing Successful Bids with PRINCE2 2009 A road-map for successful business development David Warley. Bid to Win Ltd 1 After this workshop you will have: Knowledge Be able to apply PRINCE2 principles

More information

Role Profile. Franchise Change Manager. Commissioning, Programme and Project

Role Profile. Franchise Change Manager. Commissioning, Programme and Project Role Profile Franchise Change Manager Job Family: Grade: Contract: Reports to: Location: Commissioning, Programme and Project 5 Upper Full time, Permanent Commercial Manager Flexible across the North of

More information

Job Description and Person Specification

Job Description and Person Specification Job Description Directorate/Group: Corporate and Business Support (CBS) Location: Southampton Post Title: Grade: Project Delivery Lead NERC Band 4 Post responsible to: Chief Operating Officer Posts responsible

More information

EXAM - PRINCE2-Practitioner PRINCE2 Practitioner Exam TOTAL QUESTIONS: 191

EXAM - PRINCE2-Practitioner PRINCE2 Practitioner Exam TOTAL QUESTIONS: 191 PRINCE2 EXAM - PRINCE2-Practitioner PRINCE2 Practitioner Exam TOTAL QUESTIONS: 191 1 Question: 1 Which of the following principles describes this statement?" xxx defines tolerances for each project objective

More information

Benefits Management a strategic perspective on why benefits management is difficult!

Benefits Management a strategic perspective on why benefits management is difficult! Benefits Management a strategic perspective on why benefits management is difficult! Andy Murray, Director PRINCE2 Lead Author www.outperform.co.uk www.prince2author.com Doc No: 0927-01-09 / 1v5-APP Outperform

More information

PRINCE2 walkthrough and Roadmap. Dave Litten

PRINCE2 walkthrough and Roadmap. Dave Litten PRINCE2 walkthrough and Roadmap Dave Litten Step www.projex.com By Step Guide Copyright Copyright 2018 Projex Academy Cover and internal design Dave Litten https://www.projex.com/prince2-masterclass/ All

More information

JOB DESCRIPTION. Service Line Manager for [one of Education/Research/Business/Infrastructure] Job Family/Level: Professional Services, level 6

JOB DESCRIPTION. Service Line Manager for [one of Education/Research/Business/Infrastructure] Job Family/Level: Professional Services, level 6 JOB DESCRIPTION Job Title: Department/Division/Faculty: Campus location: Service Line Manager for [one of Education/Research/Business/Infrastructure] ICT (Information and Communication Technologies), South

More information

Closing date 30 April 2015

Closing date 30 April 2015 Campaign number Q10283 Closing date 30 April 2015 Job Description and Person Specification This job description lists the general tasks, functions and responsibilities of the role below, including the

More information

Head of Programmes and Performance Improvement

Head of Programmes and Performance Improvement Job details Job title: Head of Programmes & Performance Responsible to: Director of Business Effectiveness Responsible for: Posts in the Project Management Team and the Performance Team Location: Liverpool

More information

Senior Director Strategy Execution and Optimisation

Senior Director Strategy Execution and Optimisation Senior Director Strategy Execution and Optimisation Location: [Global] Category: Strategy, Collaboration, & Innovation *Only World Vision internal applicants will be considered. *Preferred location: within

More information

Moreover accountable to set and oversee the deliverable of release management process.

Moreover accountable to set and oversee the deliverable of release management process. Role Profile Job Description Job Title Change Manager Directorate or Region COO Department/Country GIS Location of post Warsaw/ Noida Pay Band PB 8/E Reports to Head of Service Transition Duration of job

More information

Duty Station (DS): Belgrade, Serbia One year, renewable subject to satisfactory performance and funds availability Closing Date: 1 May 2018

Duty Station (DS): Belgrade, Serbia One year, renewable subject to satisfactory performance and funds availability Closing Date: 1 May 2018 UNOPS helps its partners in the United Nations system meet the world s needs for building peace, recovering from disaster, and creating sustainable development. UNOPS is known for its ability to implement

More information

Head of Stakeholder Engagement and Communications

Head of Stakeholder Engagement and Communications Role Profile Head of Stakeholder Engagement and Communications Job Family: Grade: Contract: Reports to: Location: Professional Services 6 Lower Full time, permanent HR & Mobilisation Director Flexible

More information

Senior Technical Management & Assurance Officer. Principal Technical Management & Assurance Officer

Senior Technical Management & Assurance Officer. Principal Technical Management & Assurance Officer Role Profile Senior Technical Management & Assurance Officer Job Family: Salary: Contract: Reports to: Location: Technical 38,559-47,735 per annum 2 Year Fixed Term Contract Principal Technical Management

More information

SAMPLE Marketing Slides for Building a Compliance Program

SAMPLE Marketing Slides for Building a Compliance Program SAMPLE Marketing Slides for Building a Compliance Program Compliance Mission A central organization that integrates compliance programs and provides oversight to existing programs to provide a reasonable

More information

Summer 2014/2015. Grzegorz Karpiuk University of Information Technology and Management

Summer 2014/2015. Grzegorz Karpiuk University of Information Technology and Management Summer 2014/2015 Grzegorz Karpiuk University of Information Technology and Management gkarpiuk@wsiz.rzeszow.pl Project Management A project is a temporary endeavour undertaken to create a unique product,

More information

PRINCE2 - End Project Report

PRINCE2 - End Project Report Created/updated 05/11/17 PRINCE2 - End Project Report Downloaded from stakeholdermap.com. Visit Prince2 Templates for more Prince2 downloads. Get a Mind Map End Project Report template

More information

The Project Management Office (PMO) Introduction

The Project Management Office (PMO) Introduction The Project Management Office (PMO) Koos Taljaard October 2018 Our leaders are great thinkers. We need to take those ideas, make sure they are grounded and able to be executed. The PMO helps us do that.

More information

Introduction to PM². Laurent Kummer COEPM² Team

Introduction to PM². Laurent Kummer COEPM² Team Introduction to PM² laurent.kummer@ext.ec.europa.eu Laurent Kummer COEPM² Team Course Agenda Introduction & context Governance model Project lifecycle Processes & Artefacts Mindsets 2 Laurent Kummer PM²

More information

BBC Project Management Competency Framework. Overview

BBC Project Management Competency Framework. Overview BBC Management Competency Framework Overview Benefits of competency framework Why have we built the competency framework? Setting the standard of capability to drive the right skills into the most appropriate

More information

Initiating Planning Implementing Controlling Closing Develop project charter Develop project plans Direct project work

Initiating Planning Implementing Controlling Closing Develop project charter Develop project plans Direct project work and Introduction is a high level guide to project, very similar in structure to the Project Management Institute s (PMI ) Guide to the Project Management Body of Knowledge (PMBoK ). It is important to

More information

Passit4Sure.OG Questions. TOGAF 9 Combined Part 1 and Part 2

Passit4Sure.OG Questions. TOGAF 9 Combined Part 1 and Part 2 Passit4Sure.OG0-093.221Questions Number: OG0-093 Passing Score: 800 Time Limit: 120 min File Version: 7.1 TOGAF 9 Combined Part 1 and Part 2 One of the great thing about pass4sure is that is saves our

More information

Performance Improvement Team Charter. Business Process Improvement Charter. Financial and Business Services

Performance Improvement Team Charter. Business Process Improvement Charter. Financial and Business Services . Performance Improvement Team Charter Business Process Improvement Charter Financial and Business Services Contents Our Commitment to Business Process Improvement.....3 Roles and Responsibilities..3 BPI

More information

PRINCE2 Foundation Revision Notes. Introduction

PRINCE2 Foundation Revision Notes. Introduction PRINCE2 Foundation Revision Notes Introduction These revision notes are not designed to be your only revision, they are however designed to provide the key points in each area that the exam questions normally

More information

Programme Manager - Change

Programme Manager - Change Programme Manager - Page 1 of 5 About Post Office Management Services POMS is a customer focused organisation that relies on the Post Office Money brand, its network, customer data and marketing capabilities

More information

Glossary of Terms and Definitions

Glossary of Terms and Definitions Glossary of Terms and Definitions OGC Glossary v06, Mar 2008 Note for readers A) This glossary may be freely downloaded. B) This glossary uses international English which has been adopted to reflect and

More information

PSO Manager. Position Description

PSO Manager. Position Description Date: 07 th of May 2018 Job Title : Department : Portfolio Support Office (PSO) Location : Level 1, 1 Shea Terrace, Takapuna Reporting To : Capital & Operations Planning Manager Direct Reports : - PSO

More information

Foundation Sample Paper 1

Foundation Sample Paper 1 MSP Foundation and Practitioner training ACADEMY Foundation Sample Paper 1 Copyright exists in all of this material. Copying of any kind is not permitted. D a r e t o C h a l l e n g e Page 259 Quint Wellington

More information

Sample Material - Not for Reprint. Workbook with Exams FOR TRAINER FOUNDATION. Version 5.6

Sample Material - Not for Reprint. Workbook with Exams FOR TRAINER FOUNDATION. Version 5.6 PRINCE 2 FOUNDATION Workbook with Exams FOR TRAINER PRINCE2 is a Registered Trade Mark of the Offi ce of Government Commerce in the United Kingdom and other countries. Copyright 2011, ITpreneurs Nederland

More information

Manitoba Health, Seniors and Active Living Transformation Program Charter. February 16, 2018 Version 1.0

Manitoba Health, Seniors and Active Living Transformation Program Charter. February 16, 2018 Version 1.0 Manitoba Health, Seniors and Active Living Transformation Program Charter February 16, 2018 Version 1.0 Table of Contents 1 Purpose... 3 2 Background... 3 3 Scope of the Transformation Program... 5 3.1

More information

Decision Discussion Assurance Information X

Decision Discussion Assurance Information X Title of Meeting: Primary Care Commissioning Committee Date of Meeting: 1 March 2018 Paper Title: Data Quality Service Responsible PCCC Member Lead Dr Rick Sweeney Governing Body Member Purpose (this paper

More information

It s Time to Professionalise Project Governance

It s Time to Professionalise Project Governance It s Time to Professionalise Project Governance G J Rankins CPPD MApplSc MBA Abstract Many organisations appear to experience difficulty in extracting maximum organisational value from investments in projects,

More information

A CHECKLIST FOR PREPARING INITIAL AGREEMENT DOCUMENTS

A CHECKLIST FOR PREPARING INITIAL AGREEMENT DOCUMENTS Finance, ehealth & Pharmaceuticals Directorate Capital and Facilities Division Enquiries to: Steven Hanlon T: 0131-244 2139 E: steven.hanlon@scotland.gsi.gov.uk Chief Executives, NHS Boards and Special

More information

Programme Manager / Senior Project Manager, Strategy and Planning. Salary: Grade 8 ( 39,992 47,722 p.a. with flexibility to appoint up to 52,132)

Programme Manager / Senior Project Manager, Strategy and Planning. Salary: Grade 8 ( 39,992 47,722 p.a. with flexibility to appoint up to 52,132) CANDIDATE BRIEF Programme Manager / Senior Project Manager, Strategy and Planning Salary: Grade 8 ( 39,992 47,722 p.a. with flexibility to appoint up to 52,132) Two Year Fixed Term Contract (due to particular

More information

Latest date for receipt of comments: 31 December 2018 Project No. 2017/02433

Latest date for receipt of comments: 31 December 2018 Project No. 2017/02433 Draft for Public Comment PRIVATE CIRCULATION MS/2/-/4_18_0026 For comment - Action Due Date: 2018/12/31 Form 36 DPC: 18 / 30364031 DC BSI Group Headquarters 389 Chiswick High Road London W4 4AL Date: 29

More information

PRINCE Update. Changes to the manual. AXELOS.com. April 2017 PUBLIC

PRINCE Update. Changes to the manual. AXELOS.com. April 2017 PUBLIC PRINCE2 2017 Update s to the manual AXELOS.com April 2017 2 PRINCE2 2017 Update Contents 1 Introduction 3 2 Summary of changes 4 PRINCE2 2017 Update 3 1 Introduction This document provides a list of the

More information

Role Profile. Senior Project Manager Integrated and Smart Travel. Two Year Fixed-term / Secondment (public sector bodies only)

Role Profile. Senior Project Manager Integrated and Smart Travel. Two Year Fixed-term / Secondment (public sector bodies only) Role Profile Role: Directorate(s): Contract: Salary: Purpose: Reports to: Key Role Outputs(KROs) these set out what must be achieved for the post holder to be successful in the role 1. Applied understanding

More information

PRINCE2 Foundation. PRINCE2 is a registered trade mark of AXELOS Limited

PRINCE2 Foundation. PRINCE2 is a registered trade mark of AXELOS Limited PRINCE2 Foundation PRINCE2 is a registered trade mark of AXELOS Limited Foundation exam 75 questions in 1 hour (5 trial questions) Pass mark: 35/70 Objective test questions (multiple choice) Closed book

More information

London 2012 Learning Legacy. Olympic Delivery Authority Organisation and Governance

London 2012 Learning Legacy. Olympic Delivery Authority Organisation and Governance London 2012 Learning Legacy Olympic Delivery Authority Organisation and Governance Kenna Kintrea Head of Venues and Infrastructure Olympic Delivery Authority The ODA s task Transform 200 Hectares of Brownfield

More information

Corporate Governance and Assurance in NHS Lothian (Version 7-30 January 2017) 1. INTRODUCTION

Corporate Governance and Assurance in NHS Lothian (Version 7-30 January 2017) 1. INTRODUCTION 1. INTRODUCTION Why has this document been prepared? This document has been prepared to help Board members, management and other employees understand how NHS Lothian s system of corporate governance, risk

More information

Portfolio, Programme and Project Offices (P3O ) Online Repository. AXELOS.com PUBLIC

Portfolio, Programme and Project Offices (P3O ) Online Repository. AXELOS.com PUBLIC Portfolio, Programme and Online Repository AXELOS.com 2009 are registered trade marks of AXELOS Limited. The Swirl Logo is a registered trade mark of AXELOS Limited. Reproduction of this 2 Portfolio, Programme

More information

Exam Duration: 2 hours and 30 minutes

Exam Duration: 2 hours and 30 minutes The PRINCE2 Practitioner Examination Sample paper TR Question Booklet Multiple Choice Exam Duration: 2 hours and 30 minutes Instructions 1. You should attempt all 75 questions. Each question is worth one

More information

Project Management Framework. ITS Project Advisory Board. Project Advisory Board. DATE: 29/04/2016 RELEASE: Final. Sasenka Abeysooriya VERSION: V 2.

Project Management Framework. ITS Project Advisory Board. Project Advisory Board. DATE: 29/04/2016 RELEASE: Final. Sasenka Abeysooriya VERSION: V 2. Project Management Framework PROJECT NAME: Project Management Framework DATE: 29/04/2016 RELEASE: Final AUTHOR: OWNER: Sasenka Abeysooriya Project Advisory Board VERSION: V 2.02 Information Technology

More information

Aspire Europe Ltd. Rod Sowden Lead Author for MSP and P3M3. Slide 1 v4

Aspire Europe Ltd. Rod Sowden Lead Author for MSP and P3M3. Slide 1 v4 Aspire Europe Ltd Rod Sowden Lead Author for MSP and P3M3 Slide 1 v4 OGC Best Practice Common Glossary (updated) Models Guides In Development Updated 2008 Updated 2007 Updated 2007 Portfolio, Programme

More information

Project Execution Approach

Project Execution Approach Project Execution Approach July 2016 2016 Affinity Digital (Technology) Ltd 1 Project Execution Approach Affinity Project Management Affinity is in an excellent position with its multiple methodology offerings.

More information

CHAPTER 1 Introduction

CHAPTER 1 Introduction CHAPTER 1 Introduction The Standard for Program Management provides guidelines for managing programs within an organization. It defines program management and related concepts, describes the program management

More information

The Ecommerce Forum. Overall governance structure CORPORATE GOVERNANCE MOU (STATUTES)

The Ecommerce Forum. Overall governance structure CORPORATE GOVERNANCE MOU (STATUTES) The Ecommerce Forum CORPORATE GOVERNANCE MOU (STATUTES) The Board of directors recognises that the main objective of the Ecommerce Forum (hereafter the Forum) is to ensure all collaborative efforts to

More information

WILTSHIRE POLICE FORCE POLICY

WILTSHIRE POLICE FORCE POLICY Template v4 WILTSHIRE POLICE FORCE POLICY BUSINESS CONTINUITY MANAGEMENT SYSTEMS (BCMS) Date of Publication: January 2017 Version: 3.0 Next Review Date: January 2019 POLICY STATEMENT Wiltshire Police has

More information

CANDIDATE BRIEF. Purchase to Pay Delivery Officer, Purchasing. Salary: Grade 7 ( 32,548 38,833 p.a.) Reference: CSPUR1020

CANDIDATE BRIEF. Purchase to Pay Delivery Officer, Purchasing. Salary: Grade 7 ( 32,548 38,833 p.a.) Reference: CSPUR1020 CANDIDATE BRIEF Purchase to Pay Delivery Officer, Purchasing Salary: Grade 7 ( 32,548 38,833 p.a.) Reference: CSPUR1020 Fixed-term to 31 December 2019 Purchase to Pay Delivery Officer Purchasing, Corporate

More information

Project Management Success, on SharePoint

Project Management Success, on SharePoint Project Management Success, on SharePoint Project management is a vital business process, but many organizations find it a challenge to execute successfully. Frequently projects are managed using email

More information

PRINCE2 and the National and International Standards

PRINCE2 and the National and International Standards PRINCE2 and the National and International Standards Robert Buttrick, Project Workout Limited White Paper December 2012 2 PRINCE2 and the National and International Standards Contents 1 Introduction 3

More information

Project Management Processes A process is a set of interrelated actions and activities performed to create a product, service, or result

Project Management Processes A process is a set of interrelated actions and activities performed to create a product, service, or result HOLA Project Processes A process is a set of interrelated actions and activities performed to create a product, service, or result Each process is characterized by its inputs, the tools and techniques

More information

Better Business Cases. Guidance on Using the Five Case Model: An Overview

Better Business Cases. Guidance on Using the Five Case Model: An Overview Better Business Cases Guidance on Using the Five Case Model: An Overview 28 February 2014 Acknowledgements This document was created using material provided by Her Majesty s (HM) Treasury in the United

More information

Managing Successful Programmes Syllabus

Managing Successful Programmes Syllabus Managing Successful Programmes Syllabus 2011 1. Introduction The Managing Successful Programmes (MSP) guidance explains the programme management principles, governance themes and transformational flow

More information