Annex 1: The Joint Feasibility Assessment Framework and Toolkit

Size: px
Start display at page:

Download "Annex 1: The Joint Feasibility Assessment Framework and Toolkit"

Transcription

1 Annex 1: The Joint Feasibility Assessment Framework and Toolkit Introduction... 1 Methodological framework... 3 Assessment Process... 5 Terms of Reference... 7 Guidance for Content Planning and Development Market Functionality Capacity of Service Providers Acceptance & Protection Implementing Partner Capacity Analysis Framework and Report Outline Joint CBT Feasibility Study Report Outline Workshop Materials Introduction Being prepared to provide effective assistance in an emergency (whether cash, vouchers or in kind) requires understanding the feasibility and appropriateness of different response options, including the respective risks and potential mitigation measures for each option. In the case of cash based transfers (CBT) this also requires understanding both the capacity of existing markets and services, the national capacities and systems in place, the availability of financial service providers and the internal or partner capacity to implement cash programmes. It also requires consideration of how each agency s use of CBT might impact or complement the use of CBT by other partners. As such, a joint feasibility assessment gives UN Agencies and partners a common understanding of the feasibility and appropriateness of using cash transfer programmes as part of the humanitarian response. Having a common understanding of such aspects may facilitate inter-agency discussions on the most feasible and appropriate response modality, while also highlighting the potential for complementary approaches helping them better prepare individually and collectively to use cash, vouchers and in-kind aid transfers. To support such endeavors, UNICEF, WFP, UNHCR and OCHA collaborated on the development of a common set of cash feasibility criteria, analytical framework and associated training package, as part of the DFID-funded project to Strengthen Preparedness in High-Risk Countries. The resulting outputs are made available to interested humanitarian actors in this toolkit, together with a facilitator s guide and related training materials for a four-day workshop on how to undertake joint cash feasibility assessments, as also developed and piloted through the project. 1

2 Objective of the Toolkit This CBT feasibility study toolkit is intended to help country offices set common parameters across participating stakeholders to learn about, prepare for, and conduct a joint feasibility assessment to identify the most suitable transfer modalities for the delivery of assistance in case of emergencies. The package includes a methodological framework intended to guide participating stakeholders through the design, implementation and results interpretation of the assessment, a facilitated learning and road-map planning workshop to agree on specific plans for the joint feasibility assessment and tools to support the coordination and planning of the assessment. Specific objectives of the Toolkit Facilitate the joint planning, design and implementation of a CBT feasibility assessment Facilitate the joint interpretation of assessment results and formulation of recommendations for management Facilitate the identification of risks, opportunities and other considerations for possible joint responses and/or preparedness actions in the country 2

3 Joint CBT Feasibility Methodological framework To facilitate agreement on the key factors to be taken into consideration when assessing CBT feasibility in a joint manner, the project identified the minimum common denominators in the participating agencies policy around determining the appropriate transfer modality for intervention. These are summarized in the below table as: (a) prerequisites for CBT to even be considered as a transfer modality to meet identified needs, and for inter-agency collaboration to be relevant; (b) basic feasibility criteria, i.e. determining factors that indicate CBT as being the appropriate modality for response; (c) elements that should be included in the analysis and recommendation justification. These common denominators represent the basis for the design of the feasibility planning workshop, as well as all other tools or templates guiding the feasibility study team through the process of this joint initiative. PREREQUISITE FEASIBILITY CRITERIA # Category/Criteria 1 Relevant to Target Population Needs and Agency Mandates 1.01 Have agencies agreed on a joint target location & populations and identified their likely needs? 1.02 Could CBT where feasible be used by recipients to meet their needs for goods & services? 1.03 Are the needs that could be met by CBT if feasible relevant to agency mandates & funding? 1.04 Ability of agencies to use common targeting and joint or complementary CBT payments? 2 Market System Function 2.01 Market systems for relevant goods & services (policy/social factors, supply chain, inputs)? 2.02 Market capacity & trends (availability/seasonality of goods & services, inflation/volatility)? 2.03 Market actor behaviour (willingness/ability to supply, competition & price-setting, etc.)? 2.04 Affected population likely market access, participation and goods/services preferences? 2.05 Possible market support options to address likely bottlenecks or capacity gaps in a crisis? 2.06 Possible impact of CBT (positive/negative) on the local market/economy? 3 Acceptance and Protection 3.01 Govt. policy/legal environment & acceptance of CBT assistance, and opportunity for advocacy? 3.02 Fit with/impact on govt. social protection systems & other current/planned assistance? 3.03 Community/recipient familiarity, acceptance, preferences for CBT modalities & mechanisms? 3.04 Possible impacts (positive/negative) on gender, household & community relations? 3.05 Possible impact on safety & security of recipients, staff & partners (violence, exploitation, etc.)? 4 Service Provider Capacity & Transfer Mechanisms 4.01 Coverage & capacity of govt. social protection system as possible CBT delivery mechanism? 4.02 Coverage & capacity, beneficiary access, services and costs of financial & ICT service providers? 4.03 Ability of agencies to share service providers and/or act as service providers for each other? 4.04 Likely presence & functioning of infrastructure for e-transfers/mobile banking (internet, etc.)? 4.05 Ability to ensure privacy & protection of beneficiary data? 4.06 Possibility of diversion or loss of assistance (fraud, corruption, theft or loss)? 4.07 Possibility of exclusion of particular groups (lack ID/bank account, mobile phone)? 5 Implementing Partner Capacity 5.01 Presence & coverage of potential Implementing Partners (IP) to deliver or support CBT? 5.02 Staff/organizational capacity of IPs to effectively implement in compliance with agency policies? 3

4 5.03 Ability of agencies to share common IPs and/or act as implementing partner for each other? 5.04 Possibility of loss, failure or other problems causing reputational/financial damage to agencies? ANALYSIS 6 Risk & Opportunity Analysis 6.01 Likelihood & severity of each identified protection/other risk or negative impact? 6.02 How can risks/negative impacts be mitigated, and at what effort, cost or other consequence? 6.03 Likelihood & benefit of each identified protection/other opportunity or positive impact? 6.04 How can opportunities/positive impacts be taken advantage of, and at what effort, cost, etc.? 6.05 Individual & collective risks & opportunities of joint/complementary approach to CBT? 7 Cost-Benefit Analysis 7.01 How cost-efficient are different CBT modalities & mechanisms (set up, risk mitigation, delivery)? 7.02 How cost-effective are CBT modalities & mechanisms (objectives, speed, other + impacts)? 7.03 Individual & collective costs of joint/complementary approach to CBT preparedness/response? 8 Response Options Analysis 8.01 Advantages, disadvantages & overall feasibility of each CBT modality & delivery mechanism? 8.02 Can joint/complementary approaches improve speed, reach or impact, or reduce risks or costs? 4

5 Joint CBT Feasibility Assessment Process The below process description gives an overview of the different steps requiring engagement from the stakeholders involved: Stage Steps Tasks/Decisions Prepare Agree on the purpose of assessment Agree on the goal of the assessment i.e. from gaining a common understanding to informing planning for joint CBT responses Agree on the context or contingency to assess i.e. likely crises where the feasibility (or not) of (joint) CBT programming is not already well understood Agree on the scope of the assessment What populations are likely to be affected by the expected crisis? What post-crisis needs (by sector or basic needs basket) could be met by CBT if relevant & feasible? From existing reports/practice, where is it known that (joint) CBT programming would be feasible (or not), and where is it not known? Define resulting geographic areas, beneficiaries, sectors to assess Define what level of detail is good enough to meet goals Agree on the process of the assessment Decide on internal & govt./other external stakeholders to involve Establish the assessment coordination structures Agree on agency resources (financial, human, logistical) to be made available Review/adapt the Response Options Analysis framework Agree on roles & responsibilities for design, conduct, analysis, info sharing, decision-making and communication of results Agree to follow up steps expected to be done after the assessment Design & Plan Identify data needs & tools Review/agree on feasibility criteria & questions to answer Review existing secondary data & identify information gaps Identify communities, key informants, markets, service providers, and govt. social protection or other 3rd party systems to assess in order to fill known information gaps Define methods & tools for data collection, analysis & reporting Plan data collection Plan staffing/logistics/training & funding for data collection Plan timeline & deliverables for collection, analysis & reporting Assess Collect & analyse data Collect data on community/beneficiary & govt. acceptance, market function & capacity, service providers, partner capacity, social protection systems, risks, opportunities & costs 5

6 Response Options Analysis Weigh pros & cons of each possible modality & mechanism Conduct individual agency & collective risk & cost analysis Develop recommendations for senior management Agree on clearance & reporting of assessment results Decide Management review & decision Decision on CBT feasibly by population/need/sector Decision on use of social protection system & other partners Decision on CBT feasibly by individual agencies & collectively Decision on joint/complementary approaches as appropriate Follow Up Preparedness for response Incorporate into contingency plans & advanced preparedness actions jointly and/or by agency/sector, including how to update feasibility assessment after expected shock Adapt current response Incorporate learning into existing responses/approaches jointly and/or by agency/sector 6

7 Joint CBT Feasibility Assessment Terms of Reference Once agreement on the overall process and theoretical framework is achieved, more detailed Terms of Reference, tying outputs to timelines and roles and responsibilities of different actors provide more specific guidance through the different stages of the joint feasibility study. The Terms of Reference outlined below can be adapted to the specific context and requirements of each country team. Scope of work/ Joint Assessment Process: Task 1: Preparation Building from past in-country Cash Transfer experiences, agree on the assessment purpose and scope, defining geographical area to be covered and population numbers, vulnerable groups and programmatic sectors to cover. Agree on the assessment process, establishing coordination structures, nominating agency focal points, country assessment coordinator, decide external stakeholders to involve (and their type/level of involvement) Agree on roles & responsibilities for design, conduct, analysis, info sharing, decision-making and communication of results Task 2: Design & plan Review/agree on feasibility criteria & key questions to answer Conduct secondary data review to identify information gaps and data needs Revise existing assessment tools and adjust them for the joint assessment Review/agree Response Options Analysis framework and steps to follow after assessment Define methodology for data collection (and minimum standards to follow), analysis and reporting Identify communities, key informants, markets, service providers, and govt. social protection systems / programs / business processes or other 3rd party systems to assess in order to fill known information gaps Plan staffing/logistics/training/funding and timeframe for data collection, analysis and reporting. Task 3: Field Assessment Work & response options analysis Collect data on community/beneficiary & govt. acceptance, market function & capacity, service providers, partner capacity, social protection systems, risks, opportunities & costs Weigh pros & cons of each possible modality & mechanism Conduct individual agency & collective risk & cost analysis Develop recommendations for senior management Agree on clearance & reporting of assessment results 7

8 Task 4: Decide & follow up stage Management review and decision on joint/complimentary approaches as appropriate by population/need/sector, use of implementing partners & service providers (including Government systems). Incorporate into contingency plans & advanced preparedness actions, including how to update feasibility assessment after expected shock Joint Cash Based Transfer Feasibility Assessment Categories & Methodology The agreed joint CBI feasibility categories are the following: Category Lead Agency/Working Group members Acceptance and Protection Market systems function Service provider capacity Implementing partner capacity For each category a lead agency should be nominated that will oversee the secondary data review, identify information gaps, finalize the assessment tools and define the methodology to follow for the field data collection, data analysis and reporting. The other agencies will participate to the working group and provide support as required throughout this process. The lead agency is not necessarily in charge of the technical tasks assigned to the working group such as completing the literature review, adapting the assessment tools, carrying out the data collection and finalizing the analysis these tasks may be carried out by one or more of the participants of the working group. The lead agency and group coordinator s role is primarily to ensure that activities are being implemented according to plan and that the outputs are collectively being reached. An overall coordinator, aligning the work of each individual working group and bringing the different assessment results together in a single coherent conclusion and recommendation should also be appointed. This may be a coordinator from one of the participating agencies, or an ad hoc recruitment for the fulfilment of this function. Expected outputs/ deliverables No. List of deliverables 1 Joint Cash Based Transfer Feasibility Assessment Plan 2 Joint Cash Based Transfer Feasibility Assessment Report 8

9 Timeframe/ Work-plan Activities/Task Week 1 Week 2 Week 3 Week 4 Week 5 Week 6 Week 7 Week 8 Week 9 Week 10 Task 1: Preparation deciding scope, etc. Task 2: Design & planning workshop & finalization Task 3: Field work & response options analysis Task 4: Decision-making & follow up Work-plan The following template intends to facilitate the division of tasks and responsibilities across participants in detail. It also allows to keep track of activities and outputs as the feasibility study is implemented: Terms of Reference (TOR) Tasks T.1 Task 1: Preparation Status/Result T.1.1 T.1.2 T.1.3 Building from past in-country Cash Transfer experiences, agree on the assessment purpose & scope, defining geographical area to be covered and population numbers, vulnerable groups and programmatic sectors to cover. Once programmatic sectors to cover are agreed then an agency/group should be appointed to lead on each (e.g. UNHCR on protection, WFP on food security, etc.) Agree on assessment process, establishing coordination structures, nominating agency focal points Agreed purpose & scope is: Agreed sector leads are: Agreed focal points are: T.1.4 T.1.5 T.1.6 T.1.7 Nominate a country assessment coordinator to provide overall leadership in country for the project Begin to conduct secondary data review to identify information gaps & data needs Share & review existing cash based transfer feasibility assessment tools Agree roles & responsibilities of focal points, assessment coordinator and others as appropriate for design, conduct, analysis, info sharing, decision-making and communication of results. Nominated assessment coordinator is: Status of secondary data review: Status of existing tools: Agreed roles & responsibilities are: 9

10 Terms of Reference (TOR) Tasks T.2 Task 2: Design & plan Status/Result Responsible T.2.1 Review/agree feasibility criteria & questions to answer. T.2.2 Finalise secondary data review and agree on information gaps and data needs. T.2.3 Revise existing assessment tools and adjust them for the joint assessment. T.2.4 Define methodology for data collection, analysis and reporting. T.2.5 Communities, KIs, markets, service providers, and govt. social protection/other 3rd party systems to assess. T.2.6 Staffing, logistics, training, funding & timeframe for data collection, analysis & reporting. T.2.7 Agree Response Options Analysis framework and steps to follow after assessment. 10

11 Terms of Reference (TOR) Tasks T.3 Task 3: Field Assessment & Response Options Analysis Status/Result Responsible T.3.1 T.3.2 T.3.3 Community, beneficiary & govt. acceptance, market function & capacity, service provider & partner capacity, social protection systems, and respective risks, opportunities & costs. Lead agency oversees data analysis and drafting of report on respective section to be shared with all agencies. Based on results agencies: Conduct individual agency & collective risk & cost analysis Weigh pros & cons of each possible modality & mechanism (Workshop by coordinator & focal points is good method.) T.3.4 Compile findings, risk & cost analysis, and modality & mechanism options along with conclusions & recommendations into report for submission to & approval/clearance by management. T.4 Task 4: Decide & follow up T.4.1 T.4.2 Management review and decision on joint &/or complimentary approaches Incorporate into contingency plans & advanced preparedness actions 11

12 Guidance for Content Planning and Development In addition to the above templates, which can be adapted to individual country contexts to guide the coordination and implementation process of the feasibility assessment, the below checklists developed for each of the agreed feasibility criteria intend to facilitate discussion and a common understanding of the type and depth of information required for each of the assessments components. The Working Group Coordinators may use these as guidance for coordination of the secondary data review, identification of information gaps and basis for development of joint data collection tools. Market Functionality Stakeholder Point Traders and market authorities General characteristics: trading experience, sectors of trade and products traded, 3 most important items traded Volumes and flows of the required items: Number of customers per day/week, origin of important items, seasonality of prices, demand and supply Constraints and response capacity: Constraints and bottlenecks in the market supply chain to increase sale volumes. Number of traders/retailers for each important item Credit to customers Market rules and regulations. What do you need to do to get a licence, any limitations or restrictions on trade, any protection provided Market taxes Security issues/ crime Access to credit and stock strategy Impact of disasters & conflict on markets: Days the market closed after disaster, impact on volumes/prices and origin of products. Coping strategy for each change Use of technology: Number of traders/retailers that accept electronic payments, type of payments they accept. Community Market location for most important items. Distance from home. Changes in market access during seasons and reasons for the change Security issues/ crime to go to the market and at the market Level of credit provided by retailers, credit cycle of households Use of electronic payments Impact of disasters on markets, preparedness actions taken by households/communities to mitigate/avoid negative impact of disasters 12

13 Capacity of Service Providers Stakeholder Point Gov. regulatory bodies & key informants of international financial institutions Service providers (commercial banks, Ms, Money transfer companies and MFIs) Government supervision Ease of entry Competition Financial inclusion Consumer protection Registration Strategy/ Market share/ target groups Products offered to clients/ cost Geographical location of branches, ATMs, POs Any mobile services (e.g. mobile ATMs in vans, etc) ID requirements/ KYC Training to clients/ financial inclusion programmes Protection: Languages used, access for people with impairments; Protection at cash points, code of conduct for staff, complain mechanism Previous experience on CBI, capacity and interest Reporting History of previous disasters: Impact on the network, signal, internet, branches, ATMs, POs, staff. Disaster preparedness measures and contingency plans Data protection & privacy: Share beneficiary data with UN/NGOs, Government or private sector Community Languages spoken Literacy rates in each language Livelihoods/income sources Monthly expenditure/ Minimum expenditure basket/ seasonal and geographical variations ID documents in the community and their use Assistance received in the community, who benefits? Exclusion errors Inclusion errors 13

14 Coping strategies and financial services used by the community, remittances Mobile phone usage Bank account access / financial illiteracy Previous history of disasters on the community, most affected groups Disaster preparedness measures Acceptance & Protection Stakeholder Point Government at National level Transfer modalities already in use by the government as part of their emergency response mechanism or social protection (in-kind, cash or vouchers) Government authorities overall vision on cash transfers when used by them and when used by someone else (UN, civil society). Potential restrictions on certain groups or geographical areas Previous history of Government intervention stopping or restricting CBI done by someone else Local authorities Potential restrictions on certain groups or geographical areas Previous history of local authorities stopping or restricting CBI done by someone else Communities Previous experience of target communities with relief aid in general and CBI in particular. This information has to be collected for each community according to their ethnicity and religion. Theft and extortion Freedom of movements Intra-household relations/ cash movements Social relations Preference of Transfer modality Concerns over cash Impact of cash transfers on child protection: Child labour Child abuse Negligence on child care 14

15 Implementing Partner Capacity Stakeholder Criteria Implementing partner Governance/leadership: CBI included in organisational strategy, Senior staff understands and supports CBI. Organisational management: CBI into strategy and preparedness, CBI funded, organisational learning on CBI Human resources management: Staff think CBI from all departments Staff learning and development in line with CBI good practices CBI included in JDs and requested in recruitment processes Financial management: Financial rules and systems are adapted to CBI Cash reserved for preparedness for emergency response Programme/project management: Policies and procedures/ Tools developed for all steps of programme cycle M&E frameworks and SOPs for implementation which are in line with best practices in the CBI sector External relations: Advocacy, coordination and communication with donors, private sector and civil society. 15

16 Analysis Framework and Report Outline Finally, once the secondary information sources have been reviewed and the primary data is collected and analysed, the different working groups must come together to weigh the findings relating to each of the feasibility against each other. Each assessment component is going to provide answers to some of the key questions which will ultimately define whether (a) the participating agencies consider CBT as feasible response option in a given scenario, and (b) whether the context allows for exploring joint response options which go beyond pure information sharing. In addition to external feasibility factors, the analysis should also cover expected efficiencies, potential risks associated with different transfer modalities and advantages and disadvantages of planning joint interventions. 16

17 Joint CBT Feasibility Analysis Framework Could the affected populations meet their identified needs by buying goods & services? Consider use of non-cbt alternatives to meet needs YE Could local markets reliably meet the demand? Could regional/national markets meet demand? YES Is CBT modality acceptable to all stakeholders? YES YE Could market support help ensure consistent supply? YES Can service providers offer suitable CBT delivery mechanisms? YES Could all stakeholder concerns be addressed? Consider in-kind assistance or direct service provision Could agencies/partners manage direct delivery? Consider more acceptable modalities YES YES Are there enough CBT-experienced & capable Implementing Partners available to work with (including other agencies)? First build partner &/or internal capacity YES Are market, security, protection, loss & other risks acceptable? Can unacceptable risks be realistically mitigated? Consider lower risk options YES YES Is CBT modality/mechanism cost-efficient & cost-effective compared to other options? Do the benefits outweigh costs? Consider lower cost options YES YES Consider the overall advantages & disadvantages to determine or rank feasibility of each remaining modality/mechanism for CBT Consider whether joint/complementary CBT across agencies could improve the overall speed, reach & effectiveness of response, or reduce individual agency & collective risks & costs 17

18 Joint CBT Feasibility Study Report Outline 1. EXECUTIVE SUMMARY a. Overall assessment findings b. Outcome of the response option analysis c. Conclusions and key recommendations 2. INTRODUCTION 3. IDENTIFIED NEEDS FOR THE CONTINGENCY 4. SCOPE OF FEASIBILITY STUDY 5. METHODOLOGY 6. FINDINGS 6.1 Market Market systems (Which national policies are likely to affect the market functionality? Are markets integrated? What are the key supply chains servicing the identified markets? What are the infrastructure and services supporting the supply chain?) Market capacity (What is availability of identified items in the market? Are prices for identified items stable? How does this vary across seasons? How will it be affected by a sudden increase in demand? Key bottlenecks in scale up capacity and how could they be addressed?) Market behaviour (Traders willingness to expand supply? Competition and price setting?) Access to Market (Current and anticipated physical and/or social access, participation and preferences? How may this access be affected in case of shock? ) How may all of the above they be affected in case of shock? 6.2 Acceptance Government Acceptance (What are the relevant policies and/or government programmes which could be expanded complemented by an emergency cash transfer? Are there national programmes to which an emergency cash transfer scheme should align? What are the relevant government policies concerning cash and/or voucher transfers? What are the categories of beneficiaries under 18

19 existing social protection and cash transfer programmes? What are the legal considerations to take into account? (Tax policy? Market policy? Labour policy? Data privacy policy? Know Your Customer (KYC)? ) Is there a government-approved basic needs basket in place. Policies and/or government programmes to which emergency CBT programmes should align? Government position on cash and/or voucher transfers? Legal constraints that may affect cash programming (Tax policy? Market policy? Labour policy? Data privacy policy? Know Your Customer (KYC)?) Community Acceptance (What are the existing support (formal and informal) mechanisms in place at the community level? Are basic services (education, health services) readily available? Have cash transfers been implemented in this community before? What mechanisms were used? Has there been any client feedback from previous cash transfer schemes? Has there been an AGD (agegender-disability) analysis conducted of the proposed scheme? Has there been a gender analysis conducted? How will the participation of women and girls be safeguarded and promoted? Will these transfers displace other forms of support? Will they put children (of any age) at-risk? Can these risks be mitigated? (Familiarity and preference of target group with different transfer modalities? Familiarity and comfort with different payment mechanisms? What are the differences across target group profiles (gender groups, age groups, ethnic groups). Will anyone feel stigmatised by these transfers? How high is the risk of inclusion/exclusion errors? Are there underlying tensions in the community? How might these transfers affect them? How can feedback and complaints mechanisms be incorporated into the transfer design? What provision can we make for accountability to affected populations? 6.3 Financial Service Providers (Presence and geographical coverage, including urban/rural areas (beneficiary areas)? Acceptance and familiarity of target group with proposed mechanisms? Services provided? Data protection and management? Associated costs? Reporting capacity and transparency? KYC?) 6.4 IT Service Providers (Available technologies in country? Presence and geographical coverage, including urban/rural areas (beneficiary areas)? Services provided? Acceptance and familiarity of target group with proposed technology? Data protection and management? Associated costs?) 6.5 Gender, Protection and other impacts and opportunities (Might the choice of transfer modality and/or delivery mechanism affect intra-household or intra-community relations (positively or negatively)? Does the transfer modality and/or delivery mechanism expose beneficiaries to safety or security risks? Risk of exclusion of 19

20 particular groups due to enrolment requirements? Risks associated with beneficiary data protection? Risks of fraud or resource diversion?) 6.6 Partner Capacity Assessment Government Social Protection Systems (Social Safety Net with cash transfers already in place? Which target areas/target group? Flexibility to increase or decrease target group? Delivery mechanism? Is it reliable and transparent? ) Other implementing partners (Geographical coverage of target area? Experience/expertise with various stages of CBT programme implementation cycle? Possibility of pooling resources?) 7. RISK ANALYSIS (What are the likelihood and likely impacts of the main risks identified during each previous criteria for CBT in general and/or for each modality or mechanism considered? What could be done to mitigate the risks? Would you recommend the resulting residual risks and the mitigation costs/effort required as acceptable given the likely benefit? For each risk establish a responsible actor) 8. COSTING ESTIMATION (Include transfer value and associated costs) 9. RESPONSE OPTION ANALYSIS (Consider the broad range of CBT modalities and mechanisms that might be possible to use in principle to meet identified humanitarian needs. Not all will be feasible or relevant to needs and/or practical to implement with acceptable risks & costs compared to the likely positive impact. Using the analysis framework flowchart and/or similar tools, identify which of the sectors, modalities and mechanisms could be feasible in the given context, and consider how joint or complementary preparedness and/or responses could reduce risks or costs or improve impact or provide other benefits. Include considerations of associated risks and possible mitigation measures; considerations of efficiencies, benefits and effectiveness (in addition to the cost) of each option. Do the benefits of using cash-based transfer modalities outweigh the costs? Do the benefits of joint approaches to feasibility analysis and response outweigh the costs? It should help you to organize your arguments for you final recommendation) 20

21 10. CONCLUSIONS AND KEY RECOMMENDATIONS Key findings and conclusions (Based on the outcome of the response options analysis, identify key findings and conclusions in terms of the outcomes of the feasibility assessment and recommended response options in the areas covered. Include a note of any particular risks, as well as proposed mitigation measures essential for mitigating the risks and ensuring effective implementation. Include also the extent to which the results of the assessment may be relevant for other parts of the country.) Key recommendations to strengthen preparedness for joint response (Based on the outcome of the response options analysis, identify activities that will enhance the level of preparedness to implement joint responses. These may include further work to agree and establish Standard Operating Procedure with partner agencies on beneficiary selection, delivery mechanisms, transfer values, duration and frequency; as well as the development of SOPs and contracts with other key implementing stakeholders, including financial institutions, ICT companies, etc. - see e.g. list of Advance Preparedness Activities). Other recommendations (Based on the outcomes, consider any other key recommendations, including implications of results for the ongoing response, completing the assessment in additional geographical areas, etc.) 21

22 Workshop Materials The project package includes the materials necessary to plan and implement a four day Joint Feasibility Study Planning Workshop, aimed at seeking consensus on the assessment implementation among all participating stakeholders. Workshop Description The workshop is designed to accommodate up to 40 target country participants from different agencies and partners likely to be involved in the planning and analysis of the inter-agency Cash Based Transfer (CBT) feasibility assessments and response options. The workshop assumes that as agreed with country offices, the participants are already familiar with key principles & practice of CBT approaches per se, and therefore focuses directly on joint CBT feasibility assessment. Workshop Objectives By the end of the workshop, participants will have: 1. Understood key steps, criteria & tools for joint Cash Based Transfer (CBT) feasibility assessment 2. Identified the risks, opportunities & other considerations for possible joint CBT 3. Designed, planned & begun a joint assessment of CBT feasibility in their country Workshop Outline The workshop comprises both learning activities and actual design & planning exercises, involving a mix of plenary presentation /discussion & group work by table, agency, assigned working group, or inter-agency multi-functional team. Participants will address the key issues involved in joint CBT feasibility assessment as outlined in the following questions/topics: Day 1 CBT Feasibility Day 2 Design Day 3 Analysis Day 4 Planning What will this workshop achieve? What do we already know? What will we need to analyse? What do we need to plan for? Why a common view of CBT feasibility? What does joint CBT mean & look like? How can we prepare for joint CBT? What gaps do we need to fill? How to do joint risk analysis? Who, when & how will we do the joint CBT feasibility assessment? How to jointly assess CBT feasibility? What methods & tools can we use? What about costs & benefits? What answers do we need to get? How do we adapt our tools to fit? How to make recommendations? Decision-making & follow up? Summary &/or presentation to stakeholders Wrap Up & Closing 22

23 Materials Workshop materials include: Facilitator s Manual with project description, workshop outline, facilitator planning guidance & checklist, lesson plans & reference slides/hand-outs for each session, and list of resources PowerPoint slides for each session as needed to present content or prompt discussion Hand-outs of key guidance, analysis tools, templates and exercise materials & instructions, to be supplemented by updated assessment tools as developed Workshop evaluation form for participants & facilitators Lesson plans for each session outline the objectives/key topics, key messages, a session outline and preparation & resources required, and provide facilitator instructions/guidance and speaking notes for presenting content & managing exercises. All workshop materials are available in English and in French. 23

Terms of Reference: Inter-agency Joint Cash Study in Yemen

Terms of Reference: Inter-agency Joint Cash Study in Yemen Terms of Reference: Inter-agency Joint Cash Study in Yemen Final Version Approved 7 April 2017 SUMMARY BACKGROUND Emergency Natural Disaster Conflict Complex Emergency Country Yemen Humanitarian Lead Agency

More information

Core Humanitarian Standard

Core Humanitarian Standard Core Humanitarian Standard on Quality and Accountability Draft 2 for consultation & testing 17.06.2014 www.corehumanitarianstandard.org 1 Table of Contents i. Introduction... 3 Structure... 4 ii. The Eight

More information

Core Humanitarian Standard

Core Humanitarian Standard Core Humanitarian Standard on Quality and Accountability Version 3 - Final Draft 01.10.2014 www.corehumanitarianstandard.org 1 Table of Contents i.introduction... 3 ii. Structure of the Standard... 4 iii.

More information

UNITED NATIONS CHILDREN S FUND GENERIC JOB PROFILE

UNITED NATIONS CHILDREN S FUND GENERIC JOB PROFILE JOB TITLE: Health & Nutrition Officer JOB LEVEL: Level 2 REPORTS TO: Chief Health & Nutrition LOCATION: Myanmar Country Office PURPOSE OF THE JOB UNITED NATIONS CHILDREN S FUND JOB PROFLE NO.: CCOG CODE:

More information

Terms of Reference (ToR) Livelihood and Economic Recovery Specialist

Terms of Reference (ToR) Livelihood and Economic Recovery Specialist I. Position Information Post Title: Level: Project: Supervisor: Duty Station: Duration: Individual Consultant/Contract (IC) Capacity Strengthening of NRA for Resilient Reconstruction Income Generation

More information

Management response to the recommendations deriving from the evaluation of the Somalia country portfolio ( )

Management response to the recommendations deriving from the evaluation of the Somalia country portfolio ( ) Executive Board Second regular session Rome, 26 29 November 2018 Distribution: General Date: 22 October 2018 Original: English Agenda item 7 WFP/EB.2/2018/7-D/Add.1 Evaluation reports For consideration

More information

Evaluation Consultancy Terms of Reference

Evaluation Consultancy Terms of Reference Evaluation Consultancy Terms of Reference Title: Zimbabwe Humanitarian Response 2015/16 1. Background CARE International in Zimbabwe is implementing an Emergency Cash-First Response to Drought- Affected

More information

Protocol 1. Humanitarian System-Wide Scale-Up Activation: Definition and Procedures

Protocol 1. Humanitarian System-Wide Scale-Up Activation: Definition and Procedures INTER-AGENCY STANDING COMMITTEE REFERENCE DOCUMENT Protocol 1. Humanitarian System-Wide Scale-Up Activation: Definition and Procedures This reference document serves as guidance on implementing the Scale-Up

More information

JOB PROFLE NO.: CCOG CODE: FUNCTIONAL CODE: PC/P-3 JOB CLASSIFICATION 20075

JOB PROFLE NO.: CCOG CODE: FUNCTIONAL CODE: PC/P-3 JOB CLASSIFICATION 20075 JOB TITLE: Child Protection Specialist JOB LEVEL: Level - 3 REPORTS TO: Chief, Child Protection Specialist LOCATION: Nouakchott Mauritania JOB PROFLE NO.: 60000176 CCOG CODE: FUNCTIONAL CODE: PC/P-3 JOB

More information

Terms of Reference 1. BACKGROUND

Terms of Reference 1. BACKGROUND Terms of Reference Title: Capacity building, preventing and responding to Gender Based Violence Consultant Contract Type: Consultancy contract Duration: 5 months, starting immediately Duty Station: Geneva,

More information

Terms of Reference: CTP in challenging contexts: Case Study on CTP risks in Yemen

Terms of Reference: CTP in challenging contexts: Case Study on CTP risks in Yemen Terms of Reference: CTP in challenging contexts: Case Study on CTP risks in Yemen Commissioning Manager Additional technical support Stefan Bumbacher, CaLP Senior Technical Officer Yassmin Moor, Regional

More information

Funded by European Union Humanitarian Aid. The ECHO-funded Consortium for the uptake of collaborative, quality multi-purpose grants

Funded by European Union Humanitarian Aid. The ECHO-funded Consortium for the uptake of collaborative, quality multi-purpose grants The ECHO-funded Consortium for the uptake of collaborative, quality multi-purpose grants Project Overview Donor: ECHO s Enhanced Response Capacity Dates: May 2016 - April 2018 Members: Save the Children

More information

2. Humanitarian System-Wide Emergency Activation: definition and procedures

2. Humanitarian System-Wide Emergency Activation: definition and procedures INTER-AGENCY STANDING COMMITTEE TRANSFORMATIVE AGENDA REFERENCE DOCUMENT 2. Humanitarian System-Wide Emergency Activation: definition and procedures This series of reference documents has been produced

More information

TERMS OF REFERENCE FOR ENDLINE EVALUATION OF FOOD AND NUTRITION SECURITY PROJECT IN BORNO STATE, NIGERIA

TERMS OF REFERENCE FOR ENDLINE EVALUATION OF FOOD AND NUTRITION SECURITY PROJECT IN BORNO STATE, NIGERIA TERMS OF REFERENCE FOR ENDLINE EVALUATION OF FOOD AND NUTRITION SECURITY PROJECT IN BORNO STATE, NIGERIA Organizations Project Name Sector Position Short Assignment Position Location Reporting to Duration

More information

An Agenda for Cash. Part of CaLP s 100 days of cash initiative May Background and introduction

An Agenda for Cash. Part of CaLP s 100 days of cash initiative May Background and introduction An Agenda for Cash Part of CaLP s 100 days of cash initiative May 2016 The Agenda for Cash provides a snapshot of what more than 40 organisations believe needs to change in relation to cash transfer programming

More information

Republic of Malawi ANNEX 1: PUBLIC SECTOR MANAGEMENT POLICY IMPLEMENTATION PLAN

Republic of Malawi ANNEX 1: PUBLIC SECTOR MANAGEMENT POLICY IMPLEMENTATION PLAN Republic of Malawi ANNEX 1: PUBLIC SECTOR MANAGEMENT POLICY IMPLEMENTATION PLAN Policy Priority Area 1: Shared understanding of the vision, mission and functions of the public service Policy Statement

More information

TERMS OF REFERENCE Review of the Joint UNDP and UN Women programme Inclusive development and empowerment of Women in Rakhine State

TERMS OF REFERENCE Review of the Joint UNDP and UN Women programme Inclusive development and empowerment of Women in Rakhine State TERMS OF REFERENCE Review of the Joint UNDP and UN Women programme Inclusive development and empowerment of Women in Assignment Title Rakhine State International Consultant for Conflict Sensitivity National

More information

Asia: Earthquake and Tsunami Operation Evaluation Framework

Asia: Earthquake and Tsunami Operation Evaluation Framework Asia: Earthquake and Tsunami Operation Evaluation Framework International Federation of Red Cross and Red Crescent Societies Monitoring and Evaluation Department Introduction Following the Asia Earthquake

More information

Job Description Position Economic Empowerment Project Manager Grade D1

Job Description Position Economic Empowerment Project Manager Grade D1 Job Description Position Economic Empowerment Project Manager Grade D1 Department & Location Reports to (position): Purpose: How does this post support Plan s strategy and mission? Programs (Nairobi) Date

More information

WFP CORPORATE RESULTS FRAMEWORK ( )

WFP CORPORATE RESULTS FRAMEWORK ( ) WFP CORPORATE RESULTS FRAMEWORK (2017 2021) SECOND DRAFT Informal Consultation 9 May 2016 World Food Programme Rome, Italy INTRODUCTION 1. WFP is committed to attaining the highest standards of accountability.

More information

OXFAM CASH STRATEGY CONSULTANCY TERMS OF REFERENCE December 2016 Marta Valdés García

OXFAM CASH STRATEGY CONSULTANCY TERMS OF REFERENCE December 2016 Marta Valdés García OXFAM CASH STRATEGY CONSULTANCY TERMS OF REFERENCE December 2016 Marta Valdés García 1. Background and Rationale For more than 20 years, Oxfam has been using cash transfers in diverse contexts including

More information

Camp Manager. Location Cox s Bazar, Bangladesh Department International

Camp Manager. Location Cox s Bazar, Bangladesh Department International Camp Manager Location Cox s Bazar, Bangladesh Department International Reports to (Job Title) Emergency Response Manager Salary Band C Matrix manager (if applicable) Role definition Role purpose Regional

More information

Mapping of FS Country Clusters Cash Activities & Working Groups

Mapping of FS Country Clusters Cash Activities & Working Groups Mapping of FS Country Clusters Cash Activities & Working Groups Introduction The gfsc Cash & Markets WG (CMWG) main purpose is to support Food Security clusters through development of tools and guidance

More information

: Baseline Assessment for Cash-based Intervention. : Iraq, Erbil : IOM Consultant, equivalent P2 or P3. : 30 th June 2018 : CFCV2018/IRQ/107

: Baseline Assessment for Cash-based Intervention. : Iraq, Erbil : IOM Consultant, equivalent P2 or P3. : 30 th June 2018 : CFCV2018/IRQ/107 Call for CVs Position Title Duty Station Unit Classification Type of Appointment Duration of Appointment Estimated Start Date Closing Date Reference Code Open to Internal & External Candidates : Baseline

More information

Terms of Reference (TOR)

Terms of Reference (TOR) CONFÉRENCE DES NATIONS UNIES SUR LE COMMERCE ET LE DÉVELOPPEMENT UNITED NATIONS CONFERENCE ON TRADE AND DEVELOPMENT Terms of Reference (TOR) External Evaluation of Development Account Project 1415 AX Support

More information

The 2010 HAP Standard in Accountability and Quality Management

The 2010 HAP Standard in Accountability and Quality Management The 00 HAP Standard in Accountability and Quality Management The 00 HAP Standard in Accountability and Quality Management Contents The 00 HAP Standard in Accountability and Quality Management Foreword.

More information

POSITION DESCRIPTION

POSITION DESCRIPTION POSITION DESCRIPTION Title: Financial Capability and Emergency Relief Worker Division: Financial Wellbeing and Capability Program Duration: Contract from April 2015 until June 2017 Position status: 0.7

More information

TERMS OF REFERENCE. Independent Evaluation of the ILO Action Plan for Gender Equality

TERMS OF REFERENCE. Independent Evaluation of the ILO Action Plan for Gender Equality TERMS OF REFERENCE Independent Evaluation of the ILO Action Plan for Gender Equality 2010-15 1 Introduction The results-based ILO Action Plan for Gender Equality 2010-15 (the Action Plan) aims to operationalize

More information

Cash-based Transfers

Cash-based Transfers Cash-based Transfers Analytical Paper on WHS Self-Reporting on the Agenda for Humanity Executive Summary: This paper was prepared by: 1 Forty-three stakeholders reported on World Humanitarian Summit (WHS)

More information

External Evaluation - Terms of Reference An evaluation of the Rapid Response Mechanism from February 2015 to March 2017 UNICEF Iraq

External Evaluation - Terms of Reference An evaluation of the Rapid Response Mechanism from February 2015 to March 2017 UNICEF Iraq Page 1 of 9 External Evaluation - Terms of Reference An evaluation of the Rapid Response Mechanism from February 2015 to March 2017 UNICEF Iraq A. Background The fighting in Syria and in the west, north

More information

Cash and Shelter. a 4 hour workshop on using Cash Transfer Programming for emergency and early recovery shelter

Cash and Shelter. a 4 hour workshop on using Cash Transfer Programming for emergency and early recovery shelter Cash and Shelter a 4 hour workshop on using Cash Transfer Programming for emergency and early recovery shelter Aim To provide guidance to programme managers, programme implementers and programme support

More information

Terms of Reference (TOR) Project Manager. Annex

Terms of Reference (TOR) Project Manager. Annex Terms of Reference (TOR) Project Manager Annex A. Project Title: Achieving Kuwait 2035 Vision Towards Persons with Disability Project This assignment is under the framework of the Project: Achieving Kuwait

More information

VACANCY ANNOUNCEMENT Ref: Issued on: 16 August 2017 DUTY STATION: NOD Re-advertise. CLOSING DATE: 26 August 2017

VACANCY ANNOUNCEMENT Ref: Issued on: 16 August 2017 DUTY STATION: NOD Re-advertise. CLOSING DATE: 26 August 2017 United Nations Human Settlements Programme P.O. Box 30030, Nairobi 00100, KENYA Tel: +254-20 7623120, Fax: +254-20 7624266/7 infohabitat@unhabitat.org, www.unhabitat.org VACANCY ANNOUNCEMENT Ref: 2017-07-02

More information

Terms of Reference (TOR)

Terms of Reference (TOR) Annex 4 Terms of Reference (TOR) Conducting Simplified Economic Appraisals for proposed labour intensive public infrastructure projects contributing to local economic development. 1. Project title: Simplified

More information

TERMS OF REFERENCE (TOR) Title: Voices from the Underground: End-of-Project Evaluation Mozambique and South Africa

TERMS OF REFERENCE (TOR) Title: Voices from the Underground: End-of-Project Evaluation Mozambique and South Africa TERMS OF REFERENCE (TOR) Title: Voices from the Underground: End-of-Project Evaluation 201-2016 Period: May June 2017 Duration: Sites: Duty Station: 20 days Mozambique and South Africa IOM Maputo Background

More information

Management response to the recommendations deriving from the strategic evaluation of WFP s support for enhanced resilience

Management response to the recommendations deriving from the strategic evaluation of WFP s support for enhanced resilience Executive Board First regular session Rome, 25 27 February 2019 Distribution: General Date: 1 February 2019 Original: English * Reissued for technical reasons on 15 February 2019 Agenda item 7 WFP/EB.1/2019/7-A/Add.1*

More information

MITIGATING RISKS OF ABUSE OF POWER IN CASH ASSISTANCE IN THE DEMOCRATIC REPUBLIC OF CONGO

MITIGATING RISKS OF ABUSE OF POWER IN CASH ASSISTANCE IN THE DEMOCRATIC REPUBLIC OF CONGO A JOINT UNHCR-WFP PROJECT MITIGATING RISKS OF ABUSE OF POWER IN CASH ASSISTANCE IN THE DEMOCRATIC REPUBLIC OF CONGO UNHCR / Astrid de Valon This document outlines lessons learned from a joint UNHCR/WFP

More information

CALL FOR PROPOSALS FOR LOW VALUE GRANTS

CALL FOR PROPOSALS FOR LOW VALUE GRANTS CALL FOR PROPOSALS FOR LOW VALUE GRANTS JOINT PROGRAMME ON HUMAN RIGHTS: SEEKING CIVIL SOCIETY ORGANIZATION/CLUTERS ON PROTECTION AND PROMOTION FOR HUMAN RIGHTS A. Project Title: Joint Programme on Human

More information

UNHCR, June 2017 External version

UNHCR, June 2017 External version CASH FEASIBILITY AND RESPONSE ANALYSIS TOOLKIT UNHCR, June 2017 External version TABLE OF CONTENTS Introduction to the Toolkit...4 1 Market Access and Capacity 6 2 Protection Risks and Benefits 8 3 Financial

More information

REQUEST FOR PROPOSALS

REQUEST FOR PROPOSALS 1.0 RIGHT TO PLAY Right To Play is an international humanitarian organization that uses sport and play to promote holistic development of children and youth in the most disadvantaged areas of the world.

More information

TERMS OF REFERENCE - LRPS

TERMS OF REFERENCE - LRPS TERMS OF REFERENCE - LRPS-2017-9131824 UNICEF Mozambique Purpose of the Assignment: Institutional consultancy to develop and implement a Communication for Development Capacity Building Training package

More information

Terms of Reference. Feasibility Study & Expertise Support development of a Food Security Cash Based Intervention

Terms of Reference. Feasibility Study & Expertise Support development of a Food Security Cash Based Intervention Terms of Reference Feasibility Study & Expertise Support development of a Food Security Cash Based Intervention Project Title: Lifesaving integrated emergency health and nutrition response in the conflict

More information

Terms of Reference (ToR) End-of-the Programme Evaluation UNDP Support to Inclusive Participation in Governance May 2013

Terms of Reference (ToR) End-of-the Programme Evaluation UNDP Support to Inclusive Participation in Governance May 2013 Terms of Reference (ToR) End-of-the Programme Evaluation UNDP Support to Inclusive Participation in Governance May 2013 1. Introduction In April 2007, the United Kingdom, Department for International Development

More information

FAO actions to implement the IASC Transformative Agenda (December 2012)

FAO actions to implement the IASC Transformative Agenda (December 2012) Background FAO actions to implement the IASC Transformative Agenda (December 2012) Humanitarian and emergency operations to support livelihoods, food security and food and livestock production have grown

More information

TERMS OF REFERENCE. International Programmes & Advocacy Addis Abeba/Dire Dawa (Ethiopia) PEOPLE MANAGEMENT BUDGET MANAGEMENT

TERMS OF REFERENCE. International Programmes & Advocacy Addis Abeba/Dire Dawa (Ethiopia) PEOPLE MANAGEMENT BUDGET MANAGEMENT TERMS OF REFERENCE POSITION Project Manager AREA/DEPARTMENT International Programmes & Advocacy PLACE OF WORK Addis Abeba/Dire Dawa (Ethiopia) PEOPLE MANAGEMENT Yes BUDGET MANAGEMENT Yes TYPE OF CONTRACT

More information

14 May 2018 estimated start date. Total of 30 chargeable working days only.

14 May 2018 estimated start date. Total of 30 chargeable working days only. TERMS OF REFERENCE: UNICEF Office for the Eastern Caribbean Area (ECA) Process Review of the UNICEF-WFP Joint Emergency Cash Transfer (JECT) Programme Position Duration Duty Station Supervision Social

More information

Summary Findings. Feasibility Assessment of Cash-Based Interventions in Borno, Yobe and Adamawa states of Nigeria.

Summary Findings. Feasibility Assessment of Cash-Based Interventions in Borno, Yobe and Adamawa states of Nigeria. Summary Findings. Feasibility Assessment of Cash-Based Interventions in Borno, Yobe and Adamawa states of Nigeria. Objective. Linking Emergency Assistance to Recovery and Development - The role MPGs Abuja,

More information

POSITION DESCRIPTION. World Vision International Nepal

POSITION DESCRIPTION. World Vision International Nepal World Vision International Nepal Our Vision: Our Vision for every child, life in all its fullness. Our prayer for every heart, the will to make it so. Our Values: These core values are the fundamental

More information

Terms of Reference. Final Evaluation ALERT Project

Terms of Reference. Final Evaluation ALERT Project Terms of Reference Final Evaluation ALERT Project The ALERT consortium has designed technology for improving the way humanitarian agencies prepare for and respond to disasters. ALERT is a three-year initiative

More information

Baseline Survey WASH Telethon Project

Baseline Survey WASH Telethon Project Terms of Reference Baseline Survey WASH Telethon Project Name of Organization: Norwegian Church Aid (NCA) Introduction Norwegian Church Aid (NCA) is an independent humanitarian organization working for

More information

Terms of Reference for the National Consultant on Functional Analysis of the Ministry of Labour and Social Development

Terms of Reference for the National Consultant on Functional Analysis of the Ministry of Labour and Social Development Terms of Reference for the National Consultant on Functional Analysis of the Ministry of Labour and Social Development Location: Category: Bishkek, Kyrgyzstan (home-based) UN Women Application Deadline:

More information

Indicative content of evaluation final reports Draft, Jérémie Toubkiss, Evaluation Office, NYHQ (updated 4 February 2016)

Indicative content of evaluation final reports Draft, Jérémie Toubkiss, Evaluation Office, NYHQ (updated 4 February 2016) Indicative content of evaluation final reports Draft, Jérémie Toubkiss, Evaluation Office, NYHQ (updated 4 February 2016) 0. Opening pages - The first pages provides the key information on the programme

More information

Building on the recently adopted CEB Common Principles, the 2030 Agenda requires the UN Development System (UNDS) to:

Building on the recently adopted CEB Common Principles, the 2030 Agenda requires the UN Development System (UNDS) to: 23 June 2016 Summary of Key UNDG Proposals for a More Strategic and Dynamic QCPR Policy Response to an Ambitious and Transformative 2030 Sustainable Development Agenda The 2030 Agenda for Sustainable Development

More information

Introduction to Needs Assessment. TIME Training September 1-5, 2014

Introduction to Needs Assessment. TIME Training September 1-5, 2014 Introduction to Needs Assessment TIME Training September 1-5, 2014 In this session. When and why we do needs assessments Types of needs assessments Protection and participation principles Needs assessment

More information

Job Title: Administration Officer P2- FIT Pool All Locations

Job Title: Administration Officer P2- FIT Pool All Locations Job Title: Administration Officer P2- FIT Pool All Locations ABOUT WFP AND THE FIT POOL WFP seeks candidates of the highest integrity and professionalism who share our humanitarian principles. Selection

More information

6 th November

6 th November 6 th November 207 ACCOUNTABILITY FRAMEWORK FOR THE INTER-AGENCY STANDING COMMITTEE POLICY ON GENDER EQUALITY AND THE EMPOWERMENT OF WOMEN AND GIRLS IN HUMANITARIAN ACTION - A. PURPOSE AND RATIONALE The

More information

Education & Child Protection Manager, Somalia

Education & Child Protection Manager, Somalia Education & Child Protection Manager, Somalia Location: [Africa] [Somalia] Town/City: Garowe Category: Project Management PURPOSE OF POSITION: To provide management leadership and guidance to successfully

More information

Emergency preparedness and response handbook. Saving lives and protecting rights

Emergency preparedness and response handbook. Saving lives and protecting rights Emergency preparedness and response handbook Saving lives and protecting rights Thirteen-year-old Malik Aman practises using his loudspeaker to warn of fl oods as part of emergency preparedness training

More information

Call for Expressions of Interest - Consultancy Services

Call for Expressions of Interest - Consultancy Services Call for Expressions of Interest - Consultancy Services Project Title: Regional Event The Business of Women at Work Consultancy Title: Regional Event Consultant(s) Location: Cambodia (other locations may

More information

UNITED NATIONS CHILDREN S FUND GENERIC JOB PROFILE

UNITED NATIONS CHILDREN S FUND GENERIC JOB PROFILE JOB TITLE: Representative JOB LEVEL: D-1 REPORTS TO: Regional Director LOCATION: Field /Country Office PURPOSE OF THE JOB JOB PROFLE NO.:_60000255 CCOG CODE: 1.A.11_ FUNCTIONAL CODE: MR JOB CLASSIFICATION

More information

Cash-Based Transfers. Latest Developments and Emerging Opportunities. January 2017

Cash-Based Transfers. Latest Developments and Emerging Opportunities. January 2017 Cash-Based Transfers Latest Developments and Emerging Opportunities January 2017 1 FACTS AND FIGURES & ONGOING INITIATIVES Global Coverage WFP accounts for an estimated 60% of all cash transactions in

More information

Terms of Reference for Final Evaluation of Oxfam s Syria Crisis Response programme in Syria

Terms of Reference for Final Evaluation of Oxfam s Syria Crisis Response programme in Syria Terms of Reference for Final Evaluation of Oxfam s Syria Crisis Response programme in Syria Programme title: Oxfam s Syria Crisis Response in Syria Sector of intervention: Water, Sanitation and Hygiene

More information

UNICEF/EAPRO, Bangkok

UNICEF/EAPRO, Bangkok UNICEF/EAPRO, Bangkok TERMS OF REFERENCE - LONG TERM ARRANGEMENT ********************************************************************************** 1. Background As a joint contribution towards the achievement

More information

TERMS OF REFERENCE: CONSULTANCY FOR DEFINING ACTION AGAINST HUNGER POSITIONING, PRIORITIES AND PLAN OF ACTIONS ON SOCIAL PROTECTION IN WEST AFRICA

TERMS OF REFERENCE: CONSULTANCY FOR DEFINING ACTION AGAINST HUNGER POSITIONING, PRIORITIES AND PLAN OF ACTIONS ON SOCIAL PROTECTION IN WEST AFRICA TERMS OF REFERENCE: CONSULTANCY FOR DEFINING ACTION AGAINST HUNGER POSITIONING, PRIORITIES AND PLAN OF ACTIONS ON SOCIAL PROTECTION IN WEST AFRICA November 2018 BACKGROUND To achieve our vision of a world

More information

1. Inception Report The Consultant will produce an inception report within 1 week of commencement of the assignment.

1. Inception Report The Consultant will produce an inception report within 1 week of commencement of the assignment. Terms of Reference Development of a Specialised Cash Transfer Programming and Coordination Training for State Actors in the 4 counties on Kenya s Arid and Semi-Arid Areas Introduction The Cash Learning

More information

WFP CORPORATE RESULTS FRAMEWORK ( )

WFP CORPORATE RESULTS FRAMEWORK ( ) WFP CORPORATE RESULTS FRAMEWORK (2017 2021) FIRST DRAFT Informal Consultation 1 April 2016 World Food Programme Rome, Italy INTRODUCTION 1. WFP s performance management system currently comprises two frameworks:

More information

JOB DESCRIPTION. Job title: Programme Manager Location: Niger state, Department: Management Length of contract: 4 years. Role type: Grade: 10

JOB DESCRIPTION. Job title: Programme Manager Location: Niger state, Department: Management Length of contract: 4 years. Role type: Grade: 10 JOB DESCRIPTION Job title: Programme Manager Location: Niger state, Donor title: Project Manager Nigeria Department: Management Length of contract: 4 years Role type: Grade: 10 Travel involved: In-country

More information

Approach to Local Economic Development (LED) for newly liberated areas in South Central Somalia

Approach to Local Economic Development (LED) for newly liberated areas in South Central Somalia UN JPLG Approach to Local Economic Development (LED) for newly liberated areas in South Central Somalia 1. Rationale for LED Lasting peace and (post) crisis recovery in Somalia depends on a number of measures

More information

Terms of reference Evaluator for mid-term review of 4.5-year EuropeAid Grant Agreement

Terms of reference Evaluator for mid-term review of 4.5-year EuropeAid Grant Agreement Terms of reference Evaluator for mid-term review of 4.5-year EuropeAid Grant Agreement Forus (previously known as International Forum of National NGO Platforms or IFP) is seeking an external evaluator

More information

ANNEX A- TERMS OF REFERENCE MULTI-COUNTRY EMPLOYMENT OPPORTUNITY ASSESSMENT

ANNEX A- TERMS OF REFERENCE MULTI-COUNTRY EMPLOYMENT OPPORTUNITY ASSESSMENT ANNEX A- TERMS OF REFERENCE MULTI-COUNTRY EMPLOYMENT OPPORTUNITY ASSESSMENT 18 April 2016 Post Title: Posts: National Consultant: Employment Opportunity Assessment 1 National Consultant in Lebanon The

More information

UNICEF report on the recommendations of the Joint Inspection Unit

UNICEF report on the recommendations of the Joint Inspection Unit Distr.: General 1 April 2014 Original: English United Nations Children s Fund Executive Board Annual session 2014 3-6 June 2014 Item 3 of the provisional agenda* For information UNICEF report on the recommendations

More information

THE UNITED NATION S CHILDREN FUND IS SEEKING QUALIFIED HONDURAN CANDIDATES TO FILL THE FOLLOWING VACANCY: CHILD PROTECTION OFFICER

THE UNITED NATION S CHILDREN FUND IS SEEKING QUALIFIED HONDURAN CANDIDATES TO FILL THE FOLLOWING VACANCY: CHILD PROTECTION OFFICER THE UNITED NATION S CHILDREN FUND IS SEEKING QUALIFIED HONDURAN CANDIDATES TO FILL THE FOLLOWING VACANCY: CHILD PROTECTION OFFICER Purpose of the Post: Under the close supervision of the Child Protection

More information

Distribution Model. Detailed Scenarios. Process Flow and Inventory

Distribution Model. Detailed Scenarios. Process Flow and Inventory Distribution Model Detailed Scenarios Process Flow and Inventory Contents Introduction: Cash and Vouchers Core Responsibilities... 3 Programming Models for Cash and Vouchers... 6 Model 1: Cash-Account

More information

Organizational Capacity Assessment Tool (OCAT)

Organizational Capacity Assessment Tool (OCAT) Asia Regional Cash Working Group Bangkok, Thailand March 2016 Organizational Capacity Assessment Tool (OCAT) Self-assessing capacity for effective Cash Transfer Programming (CTP) CaLP Asia Regional Focal

More information

INDIVIDUAL CONSULTANT PROCUREMENT NOTICE National Consultant To support UNDAF Evaluation for Nepal

INDIVIDUAL CONSULTANT PROCUREMENT NOTICE National Consultant To support UNDAF Evaluation for Nepal INDIVIDUAL CONSULTANT PROCUREMENT NOTICE National Consultant To support UNDAF Evaluation for Nepal Date: 31 May 2016 Reference No.: UNDP/PN/23/2016 Country: Nepal Description of the assignment: The national

More information

Age and Disability Capacity Programme (ADCAP)

Age and Disability Capacity Programme (ADCAP) Terms of Reference Age and Disability Capacity Programme (ADCAP) Final Evaluation 1. BACKGROUND OF THE PROJECT The Age and Disability Capacity Programme (ADCAP) is led by HelpAge International and part

More information

E Distribution: GENERAL EVALUATION REPORTS. Agenda item 6

E Distribution: GENERAL EVALUATION REPORTS. Agenda item 6 Executive Board Second Regular Session Rome, 12 14 November 2012 EVALUATION REPORTS Agenda item 6 For consideration MANAGEMENT RESPONSE TO THE RECOMMENDATIONS OF THE SUMMARY EVALUATION REPORT GLOBAL LOGISTICS

More information

INTERNAL AUDIT DIVISION REPORT 2018/105. Audit of strategic support to the global humanitarian inter-agency coordination mechanisms

INTERNAL AUDIT DIVISION REPORT 2018/105. Audit of strategic support to the global humanitarian inter-agency coordination mechanisms INTERNAL AUDIT DIVISION REPORT 2018/105 Audit of strategic support to the global humanitarian inter-agency coordination mechanisms The Emergency Relief Coordinator needed to formulate a vision, mission

More information

Accountability, Monitoring, and Evaluation Advisor

Accountability, Monitoring, and Evaluation Advisor Accountability, Monitoring, and Evaluation Advisor Location: [Africa] [Sudan] Town/City: Nyala Category: Food Security & Livelihood PURPOSE OF POSITION: World Vision Sudan (WVS) delivers programmes sponsored

More information

TERMS OF REFERENCE. International Consultant-Gender and Program Development Advisor. 3 September 2018 and 20 February 2019

TERMS OF REFERENCE. International Consultant-Gender and Program Development Advisor. 3 September 2018 and 20 February 2019 TERMS OF REFERENCE Title: Duration of assignment: Location: Type of contract: Payment: Supervision: International Consultant-Gender and Program Development Advisor 3 September 2018 and 20 February 2019

More information

DRAFT FOR PUBLIC COMMENT Guidance Note for ESS10 Stakeholder Engagement and Information Disclosure

DRAFT FOR PUBLIC COMMENT Guidance Note for ESS10 Stakeholder Engagement and Information Disclosure The Guidance Notes provide guidance for the Borrower on the application of the Environmental and Social Standards (ESSs), which form part of the World Bank s 2016 Environmental and Social Framework. The

More information

Comparative Table of Humanitarian Market Analysis Tools

Comparative Table of Humanitarian Market Analysis Tools Comparative Table of Humanitarian Market Analysis Tools Introduction There is currently a general acceptance within the humanitarian sector that market analysis should form a core part of the assessment

More information

REQUIREMENTS AND BACKGROUND NOTE FOR CHS ALLIANCE BOARD ELECTIONS 2018 (approved by Board )

REQUIREMENTS AND BACKGROUND NOTE FOR CHS ALLIANCE BOARD ELECTIONS 2018 (approved by Board ) REQUIREMENTS AND BACKGROUND NOTE FOR CHS ALLIANCE BOARD ELECTIONS 2018 (approved by Board 19.01.2018) INTRODUCTION Thank you for your interest in becoming a board member of the CHS Alliance. This is a

More information

JOB PROFLE NO.: _ CCOG CODE: FUNCTIONAL CODE: EI/P-2 JOB CLASSIFICATION

JOB PROFLE NO.: _ CCOG CODE: FUNCTIONAL CODE: EI/P-2 JOB CLASSIFICATION JOB TITLE: Communication Officer Digital Communication JOB LEVEL: Level 2 Case No IDS13016 REPORTS TO: Chief Communication LOCATION: Jakarta/Indonesia PURPOSE OF THE JOB JOB PROFLE NO.: 60000260_ CCOG

More information

UNICEF Evaluation Office Evaluation of UNICEF s Policy Advocacy Work: Mapping and Scoping Exercise

UNICEF Evaluation Office Evaluation of UNICEF s Policy Advocacy Work: Mapping and Scoping Exercise UNICEF Evaluation Office Evaluation of UNICEF s Policy Advocacy Work: Mapping and Scoping Exercise The Evaluation Office is planning to evaluate UNICEF s policy advocacy work in Middle Income Countries

More information

Social Economy and the Roma community challenges and opportunities Situation Analysis Report CONCEPT NOTE POSDRU/69/6.1/S/34922

Social Economy and the Roma community challenges and opportunities Situation Analysis Report CONCEPT NOTE POSDRU/69/6.1/S/34922 Social Economy and the Roma community challenges and opportunities Situation Analysis Report CONCEPT NOTE I. PROJECT OVERVIEW Project title: Project number: Social Economy a solution for the development

More information

INTER-AGENCY CONTINGENCY PLANNING GUIDELINES FOR HUMANITARIAN ASSISTANCE. November 2007 IASC. Inter-Agency Standing Committee

INTER-AGENCY CONTINGENCY PLANNING GUIDELINES FOR HUMANITARIAN ASSISTANCE. November 2007 IASC. Inter-Agency Standing Committee INTER-AGENCY CONTINGENCY PLANNING GUIDELINES FOR HUMANITARIAN ASSISTANCE November 2007 IASC Inter-Agency Standing Committee INTER-AGENCY CONTINGENCY PLANNING GUIDELINES FOR HUMANITARIAN ASSISTANCE Endorsed

More information

Vacancy Consultant for a Cash/Voucher Assistance Feasibility & Appropriateness Study

Vacancy Consultant for a Cash/Voucher Assistance Feasibility & Appropriateness Study Vacancy Consultant for a Cash/Voucher Assistance Feasibility & Appropriateness Study People in Need (PIN) is seeking an enthusiastic, committed, experienced and reliable Consultant, with specific expertise

More information

VACANCY NOTICE OPEN TO INTERNAL & EXTERNAL CANDIDATES

VACANCY NOTICE OPEN TO INTERNAL & EXTERNAL CANDIDATES IOM International Organization for Migration VACANCY NOTICE OPEN TO INTERNAL & EXTERNAL CANDIDATES Title: Capacity Building Project Assistant (National Officer) Location: Ghazni Duration: 6 Months/with

More information

E Distribution: GENERAL EVALUATION REPORTS. Agenda item 5

E Distribution: GENERAL EVALUATION REPORTS. Agenda item 5 Executive Board First Regular Session Rome, 9 10 February 2015 EVALUATION REPORTS Agenda item 5 For consideration MANAGEMENT RESPONSE TO THE RECOMMENDATIONS OF THE SUMMARY EVALUATION REPORT OF INDONESIA

More information

Career Opportunity at CARE International in Uganda

Career Opportunity at CARE International in Uganda Career Opportunity at CARE International in Uganda About CARE International CARE International has been active in Uganda since 1969 and working in the country continuously since 1979, implementing a diverse

More information

Vacancy Announcement SUD P V

Vacancy Announcement SUD P V Advertisement Associate Experts (JPO) Programme Associate Humanitarian Financing Officer United Nations Secretariat, Office for the Coordination of Humanitarian Affairs (OCHA), Sudan Country Office Closing

More information

REQUEST FOR PROPOSALS

REQUEST FOR PROPOSALS 1.0 RIGHT TO PLAY *** DEADLINE EXTENDED *** Right To Play is an international humanitarian organization that uses the transformative power of sport and play to promote the holistic development of children

More information

Response Programmes Director

Response Programmes Director Response Programmes Director Location: [Global] Category: Exceptions Job Type: Fixed term, Full-time *Country location to be determined based on response. PURPOSE OF POSITION: The Response Programmes Director

More information

DETAILED TERMS OF REFERENCE FOR CONSULTANTS

DETAILED TERMS OF REFERENCE FOR CONSULTANTS Enhancing Agricultural Competitiveness in Viet Nam (KSTA Report VIE 50134) DETAILED TERMS OF REFERENCE FOR CONSULTANTS I. Objective of the Assignment 1. The Government of Viet Nam has received a grant

More information

UNESCO Dhaka Office Ref.:24/ED/2018/185

UNESCO Dhaka Office Ref.:24/ED/2018/185 UNESCO Dhaka Office House : 122, Road : 01, Block : F Banani, Dhaka-1213, Bangladesh Tel : 9873210, 9871695 FAX : 9871150 URL : www.unesco.org/dhaka Email : dhaka@unesco.org 28-11-2018 Ref.:24/ED/2018/185

More information

GLOBAL ANALYSIS OF OCHA S ANNUAL PARTNER SURVEY 2012

GLOBAL ANALYSIS OF OCHA S ANNUAL PARTNER SURVEY 2012 Global Analysis of OCHA s Annual Partner Survey 0 GLOBAL ANALYSIS OF OCHA S ANNUAL PARTNER SURVEY 2012 PARTNERS SAY OCHA IS PERFORMING WELL Global Analysis of OCHA s Annual Partner Survey 1 Analysis of

More information

Terms of Reference. Social Protection Consultant Evidence and Research. 1. Background:

Terms of Reference. Social Protection Consultant Evidence and Research. 1. Background: Terms of Reference Social Protection Consultant Evidence and Research 1. Background: As a global advocate for children, UNICEF is committed to seeing that the rights of all children are fulfilled. In light

More information

5th European Microfinance Award Microfinance and the Environment Application form

5th European Microfinance Award Microfinance and the Environment Application form Inclusive Finance Network Luxembourg 5th European Microfinance Award Microfinance and the Environment Application form The selection process consists of two primary components: - Component : Institutional

More information

Terms of Reference for a Terminal Evaluation of UNDP-Uganda Country Programme Action Plan (CPAP): ( /15)

Terms of Reference for a Terminal Evaluation of UNDP-Uganda Country Programme Action Plan (CPAP): ( /15) Annex A: Terms of Reference Country Programme Action Plan (CPAP): (2010-2014/15) 1.0 Background: The United Nations Development Programme (UNDP) in Uganda is supporting implementation of the Government

More information