Engineering Consultancy Services Punjab (Pvt.) Limited Work Experience

Size: px
Start display at page:

Download "Engineering Consultancy Services Punjab (Pvt.) Limited Work Experience"

Transcription

1 1 Clean Drinking Water Program HUD & PHE Construction 2 Activated Sludge Waste Disposal Plant HUD & PHE Not Applicable Study 3 Construction of Metro Bus Service (MBS) along Ferozpur Road (Package I) (Chungi Amar Sidhu to Kalma Chowk) TEPA, LDA Construction 4 Construction of 4 Nos. Medical Colleges in Gujranwala, DG Khan, Sahiwal & Sialkot C&W Deptt., Govt of 810, 810, 810, 650 Construction 5 Third Party Validation of roadside railing along canal bank, Lahore. C&W Deptt., Govt of Third Party Validation 6 Construction of Widening of Road from Ferozpur Road to Defence Road along Hadiara Drain City District Government Lahore 279 Vetting of Design & Construction 7 Consultancy Services for Design and Construction of Dual Carriageway Approach Road from Barki Road to Ashiana Housing Scheme, Lahore City District Government Lahore 241 Design & Construction 8 Feasibility studies for Development of Car Parking Facilities at General Bus Stand, Lower Topa and Bansara Gali, Murree C&W Deptt., Govt of 1040 Approx. Feasibility Studies 9 Construction of Churr Chowk Improvement and Misrial Bridge Extension, Rawalpindi C&W Deptt., Govt of 320 Construction 10 Consultancy Services for Design & Construction of Road Along Khaira Distributary from Package 17 of Lahore Ring Road to Ferozpur Road, Lahore Lahore Ring Road Authority Design & Construction 11 Consultancy Services for Construction of Commercial Cum Car Parking Plaza at Moon Market, Allama Iqbal Town, Lahore TEPA, LDA Construction 12 Consultancy Services for Third Party Validation / Top of District Development Schemes in Sheikhupura City District Government Sheikhupura Third Party Validation 13 Design of Remedial Measures for Dewal Landslides and Reconstruction of RMK Road Murree C&W Deptt., Govt of PC-ll cost Design 14 Consultancy Services for Re-Engineering / Re-alignment of Underpass including ancillary components at Jail Road and Design Review of 9 No. Junctions planned/designed by TEPA TEPA, LDA 4.5 Design

2 15 Strengthening/reinforcement of foundation of five bridges, Provincial Highway Circle, Rawalpindi C&W Deptt., Govt of Proposal Stage Design 16 Consruction Services for Construction of Sports Complex on Plot # 455 D2 to 466 D2, Johar Town, Lahore TEPA, LDA Construction 17 Construction Services on Construction of Hockey Stadium at Johar Town, Lahore TEPA, LDA 46 Construction 18 Construction Services on Rehabilitation / Imprevement of PECO Road (PECO Round About to Lahore Bridge, Ferozpur Road), Lahore TEPA, LDA Construction 19 Consultancy Services for Third Party Validation of Steel Silos at Multan Food Department, Govt of Third Party Validation 20 Construction of Metro Bus Service (MBS) along Ferozpur Road (Package 2A & 2B), Lahore TEPA, LDA 2A= B= Construction 21 Construction of Metro Bus Service (MBS) along Ferozpur Road (Package VII) TEPA, LDA Construction 22 Improvement / Widening of Sultan Ahmad Road from Naqsha Stop Wahdat Road to Malik Chowk, PP-148 City District Government Lahore 72 Design Review & Construction 23 Construction of Metro Bus Service (MBS) along Ferozpur Road (Package III & IV) TEPA, LDA lll= lv= Construction 24 Construction of Roads Network at Finance & Trade Centre, Johar Town, Lahore TEPA, LDA 330 Construction 25 Establishment of Fruit & Vegetable Market, Katcha, Lahore Administrator, Market Committee, Kot Lakhpat, Lahore Prepration of PC-l, Detailed Design of Road & WASA Componants, Resident 26 III Party audit of desilting work already done and III party monitoring of current desilting work of drains & sewers of WASA WASA Not Applicable Third Party Validation 27 III Party monitoring & validation of desilting work during rainy season in Lahore Lahore Waste Management Company Not Applicable Third Party Validation 28 Planning, Design & Construction of Ashiana-e-Iqbal, Lahore PLDC 16.2 Billion Design & Construction 29 Design & Construction supervision of Parking Plaza, Gujranwala CDG, Gujranwala Design & Construction

3 30 Construction of Metro Bus Service (MBS) along Ferozpur Road (Package V) TEPA, LDA Construction 31 Construction of Metro Bus Service (MBS) along Ferozpur Road (Package VIII) TEPA, LDA Construction 32 Designing of Bridge over Haria Drain on Mandi Bahauddin-Malikwaal Road C&W Deptt., Govt of Not Applicable Design 33 Topographic Survey of Miani Sahib Graveyard CDG, Lahore Survey Consultancy 34 Safety Assessment of Existing Shoring System & Design of Rehabilitation Measures at Mubarak Centre, Ferozpur Road, Lahore Taavun (Pvt) Limited 3.99 Design 35 Muhammad Nawaz Sharif Kidney Hospital, Swat, KPK Health Department, GOPB 230 Design & Construction 36 Design of Bridges on Buddi Nala & Huda Drain, Sargodha C&W Deptt., Govt of Not Applicable Design 37 Improvement / Rehabilitation of Circular Road, Lahore CDG, Lahore 3.84 Design 38 Construction of Flyover at Peshawar Road, Near Pirwdahi, Rawalpindi C&W Deptt., Govt of Construction 39 Widening & Improvement of Road from Bahawalpur Bypass to Chungi # 9 (Length 5.21 km) AND Multan City Section # 9 Khanewal Adda (Length 1.21 km Phase 1) C&W Deptt., Govt of Construction 40 W/I Tibba Sultan Laddan Road via Mitroo km No to & to 65.25=54.50 km in Distt. Vehar C&W Deptt., Govt of Construction 41 Dualization of Arifwala to Bahawalnagar Road (Length km) C&W Deptt., Govt of Construction 42 Dualization of different packages/groups (G- 1 to G-5) between Bahawalpur to Hasilpur (Length km) C&W Deptt., Govt of Construction 43 Widening & Improvement of road from Chishtian to Daharanwala - Fort Abbas Road (Length 20 km) C&W Deptt., Govt of Construction 44 Widening & Improvement of Alipur to Muzaffargarh Road, Section Alipur Shehar Sultan) (Length 21 kms) C&W Deptt., Govt of Construction

4 45 Widening & Improvement of road from Qaziabad MM Road to Nawakot Length km (G-II from 17 km to 33 km) C&W Deptt., Govt of Construction 46 Widening & Improvement of Kalarkahar to Choa Saidan Shah Road (Length kms) C&W Deptt., Govt of 612 Construction 47 Rehabilitation of Gujranwala - Hafizabad Road (Length kms) C&W Deptt., Govt of Construction 48 III Party Monitoring & Evaluation of Implementation of M&R Works F.Y Irrigation Deprtment 10 Billion Third Party Validation 49 MBS Bus Depot TEPA, LDA Construction 50 Detailed Design of Construction of Flyover on GT Road, Gujranwala C&W Deptt., Govt of Survey & Mapping Geo tech investigation 51 Verticle Expansion of TEPA Head Office Building, Lahore TEPA, LDA Construction 52 Resident for the Traffic Circulation plan at Lalpul intersection through widening and improvement of Canal Bank Road TEPA, LDA Construction 53 Construction of Road & Bridge (Length 900 RFT) Between District Mianwali and Jand (District Attock), Length of Approach Road on Attock Side = 5.0 KM C&W Deptt., Govt of 500 Construction 54 Resident of Construction of Flyover on G.T Road, Gujranwala C&W Deptt., Govt of Construction 55 MBS along Ferozpur Road Lahore(Kalma Chowk Vehicals Underpass) TEPA, LDA 1400 Construction 56 Construction of Esclators and PSD works at Bus Rapid Transit System (BRTS) along Ferozpur Road Lahore TEPA, LDA Construction 57 Construction of Road Between District Mianwali and Jand (District Attock), Length of Approach Road on Mianwali Side = 26.5 KM C&W Deptt., Govt of 806 Construction 58 Construction of Rehabilitation/Improvement of M.M.Alam Road (From Hussain Chowk to Main Bouleverd Gulberg Lahore) TEPA, LDA 230 Construction 59 Widening & Improvement of Metalled Road from Rawalpindi to Kahuta, Rawalpindi District (Length km) C&W Deptt., Govt of 425 Construction

5 60 Construction of Road E-Block to Doctors Hospital, Southern By pass along Khamba, (Flower Shop) to campus canal, al-madina Road from Barket Chowk TEPA, LDA 133, 110, 90, 161 Construction 61 Establishment of Institute of Urology & Transplatation at Rawalpindi C&W Deptt., Govt of 700 Design of Electrical System & Construction 62 Third Party Validation of Sewerage Scheme Rahim Yar Khan City with Treatment Plant HUD & PHE Not Applicable Third Party Validation 63 Restoration of Landslides at Jhika Gali, Murree C&W Deptt., Govt of Design 64 Third Party Validation of Different Schemes Including In The District Development Programme Gujranwala CDG, Gujranwala Third Party Validation 65 Resident of Rehabilitation of Sewerage System Along Metro Bus System (MBS) Route TEPA, LDA 160 Construction 66 Third Party Validation of Centre of excellence for Development of Sahiwal & Exotic Breed Livestock and Dairy Development Board 230 Third Party Validation 67 Third Party Validation of Infrastructure works at New Lahore City Zaitoon Group Third Party Validation 68 Design of 50 Thousand Gallons Over Head Water Reservoir in New Fruit And Vegetable Market at Katcha, Lahore ASK Construction 8.36 Design 69 Closing of Road Cuts and Relocation of U- turns on Lahore-Kasur Road from Elite Town to Kamal Chisti Lahore Ring Road Authority Design 70 Preliminary Master Planning of Knowledge Park at Rakh Dera Chahal, Lahore Higher Education Department, Government of Design 71 Consultancy Services for Exploration of Water Sources and Design of Water Supply Scheme for Transportation of Water from Distant Sources of Supply to the Project Area Chakri Road, Rawalpindi Fatima Jinnah Women University, Rawalpindi Not Applicable Study 72 Execution of Rehabilitation/Strengthening measures at Mubarak Centre Ferozepur Road, Lahore Taavun (Pvt) Limited 130 Analysis and Design 73 Construction of bridge on River Ravi at Qutab Shahana, District Sahiwal C&W Deptt., Govt of Construction

6 74 Resident of Rehabilitation of Sewerage System Along Metro Bus System (MBS) Route Segment - I (Gajjumata to Qartaba Chowk) TEPA, LDA Top 75 Resident of Rehabilitation of Sewerage System Along Metro Bus System (MBS) Route Segment - II (Qartaba Chowk to Shahdara) TEPA, LDA Top 76 Design & Resident of renovation works of "Information Technology University of " at Arfa Software Technology Park TEPA, LDA 61 Construction 77 Third Party Audit of Desilting already done and Verification of Current Desilting WASA Not Applicable Third Party Validation 78 Detailed Design of Dualization of Road along Cantt. Drain from LOS Ferozepur Road to Multan Road, Lahore TEPA, LDA 4581 Design 79 Construction of Dualization of Road along Cantt. Drain from LOS Ferozepur Road to Multan Road, Lahore TEPA, LDA same as above Construction 80 Preparation of Master Plan, Feasibility Study and PC-I for Development and Infrastructure of Quaid-e-Azam Solar Park, Lalsohanra Bahawalpur, Including Tender Documents For 100 MW Solar Power Plant Energy Department, Govt. of 150 Billion Design 81 Construction of Metaled Road from Bahawalpur - Hasilpur Road to Quaid-e- Azam Solar Park Lal Sohanra via Chak No.5/BC (Length 9.00 KM) District Bahawalpur 82 Construction of Signal Free Junctions at Azadi Chowk Lahore C&W Deptt., Govt of Construction TEPA, LDA 2599 Construction 83 Construction of Signal Free Junctions at Qainchi, Ghazi Road and Khaira on Ferozpur Road Lahore TEPA, LDA 3709 Construction 84 Consultancy Services for Feasibility Study of Athmuqam - Sharda - Kel - Taobat Section (118 Km) of Neelum Valley Road, Azad Jammu & Kashmir NHA 8100 Feasibility Study 85 Resident of Water Supply Scheme for Quaid-e-Azam Solar Park at Noor Sar, Cholistan, District Bahawalpur (Phase-1) HUD & PHE Construction 86 Construction of Alternate Route to Circular Road from New Azadi Chowk to Masti Gate TEPA, LDA 2599 Construction 87 Design of Overhead Water Tank and Apartments at Finance and Trade Centre, Johar Town, Lahore M/S Alam Khan & Brother 200 Design

7 88 Reconstruction Works in Raja Bazar, Rawalpindi Engineering Consultancy Services (Pvt.) Limited C&W Deptt., Govt of 313 Construction 89 Construction of Desiltation of 1100 No. Tobas in 7 No. Union Councils in Cholistan Area of District Bahawalpur and Rahim Yar Khan Cholistan Development Authority 465 Construction 90 Construction of RCC Precast Boundary Wall, Admin Building, Labor Residence, Overhead Tank and Warehouse at Quaid-e-Azam Solar Park, Cholistan Industrial Estate Construction 91 Design of Cold Storage on Plot No. 5 at Fruit & Vegetable Market, Katcha, Ferozpur Road, Lahore Mr. Sameeuddin 22 Design 92 Design of Cold Storage on Plot No. 4 at Fruit & Vegetable Market, Katcha, Ferozpur Road, Lahore Mr. Malik Mohsin Abbas 20 Design 93 Police Integrated Command, Control & Communication Center Police Department 9 Billion Preparation of Bidding Documents (RFP/PQ/EOI), of Civil/Electro- Mechanical Works 94 Construction of Access Road to Newly Developed Apparels Park, Sheikhupura LDA 34 Construction 95 Third Party Audit / Verification of Current Desilting WASA Third Party Validation 96 Solarization of 50 Government Offices Energy Department, Govt. of Bid Evaluation & Evaluation Report Preparation 97 Third Party Validation of Establishment of Emergency Services at 12 Tehsil in Emergency Services (Rescue 1122) 15 Third Party Validation MWp SPV Power Plant for Islamia University, Bahawalpur Energy Department, Govt. of Review/Preparation of Bidding Documents, Evaluation of Bids 99 Construction of Rawalpindi- Islamabad Metro Bus Service (MBS) (Package 5) Rawalpindi Development Authority (RDA) 2274 Construction 100 Elevated Expressway Along with Metro Bus Service from Main Boulevard Gulberg/Jail Road to Motorway (M-2) Lahore LDA Billion Design & Construction 101 Lahore Orange Line Metro Train Project The Metrobus Authority (PMA), Government of the Billion Evaluation of Bids & Award of Contract 102 Third Party Monitoring & Validation Consultancy Services for Solid Waste Collection, Transportation Within the Borders of Zone I & II of City Lahore Lahore Waste Management Company 33.6 Billion Third Party Validation

8 103 Third Party Validation of Provincial and District Roads in District Sheikhupra Planning and Development Department, Govt of Third Party Validation 104 Third Party Post Completion Evaluation of Quality of Construction Civil/Electrical and Allied Works of Murree Biodiversity Park (MBP) Environment Protection Agency 2.7 Third Party Validation 105 Third Party Assessment and Validation of Flood Rehabilitation Works in Faisalabad Division (Package-II) Planning and Development Department, Govt of 5387 Third Party Validation 106 Third Party Assessment and Validation of Flood Rehabilitation Works in Dera Ghazi Khan, Multan and Bahawalpur (Package- IV) Planning and Development Department, Govt of 1632 Third Party Validation 107 Environmental Impact Study for 300 MW Local Coal Fire Thermal Power Plant at Lillah-Pind Dadan Khan Road M/S China Machinery Engineering Corporation (CMEC) 3 Environmental Study 108 Preparation of Feasibility Reports of Cable Car System at Murree Tourism Development Corporation of (TDCP) Feasibility Study 109 Consulting Services for 50 MW Solar Power (PV) Plant at Chakwal Siddique Sons Feasibility Study 110 Technical Services for 100 MW Solar Bahawalpur, Pakistan (Block AB) Appollo Solar Development Billion Feasibility Study 111 Technical Services for 100 MW Solar Bahawalpur, Pakistan (Block CD) Best Green Energy Billion Feasibility Study 112 Technical Services for 100 MW Solar Bahawalpur, Pakistan (Block EF) Crest Energy Pakistan Billion Feasibility Study 113 Technical Services for 100 MW Solar Bahawalpur, Pakistan (Block NP) Elbel Green Energy Pakistan Billion Feasibility Study 114 Technical Services for 100 MW Solar Bahawalpur, Pakistan (Block QS) Flare Solar Development Pakistan Billion Feasibility Study 115 Technical Services for 100 MW Solar Bahawalpur, Pakistan (Block RT) Golden Eye Solar Development Pakistan Billion Feasibility Study 116 Technical Services for 100 MW Solar Bahawalpur, Pakistan (Block U1U2) High Flying Solar Development Pakistan Billion Feasibility Study 117 Technical Services for 100 MW Solar Bahawalpur, Pakistan (Block U3U4) Indigo Solar Development Billion Feasibility Study

9 118 Technical Services for 100 MW Solar Bahawalpur, Pakistan (Block U5U6) King Rider Solar Development Billion Feasibility Study 119 Consultancy Services for Environmental Impact Assessment (EIA) for Industrial Coal Mining in Salt Range, M/S China Machinery Engineering Corporation (CMEC) 20 Billion Environmental Impact Assessment 120 Third Party Validation of the New Block of Central Police Office (CPO) complex in Lahore Police Department, Govt. of Third Party Validation 121 Saaf Pani Project Package II (Bahawalpur, Bahawalnagar, Lodhran & Rahim Yar Khan) Saaf Pani Company 5000 Feasibility Study, Detailed Engineering Design & Construction 122 Third Party Validation of Development Scheme of Prison Department Prison Department Third Party Validation 123 Verification of data for new/extended rating areas included in urban immovable property tax Information Technology Board - Survey 124 Khadim-e- Road Programme C&W Deptt., Govt of Construction 125 Resident Construction of Roads (Tribal area development project D.G.Khan) Project Management Unit 1710 Construction 126 Resident Construction of Annual Development Program (New Scheme) in Provincial Highway Division Sahiwal C&W Deptt., Govt of Construction 127 Feasibility Study for Construction of Solar Plant for WASA Faisalabad WASA, Faisalabad Feasibility Study 128 Topographic Survey, Geotechnical Investigation, Initial Environmental Examination (IEE) and Grid Connection studies of 100 MWp Solar Power Plant in QA Solar Park Bahawalpur, Pakistan Storm Harbour Billion Feasibility Study 129 Identification and Reconstruction of Dangerous Schools Buildings in Province School Education Department, Govt. of 9 Billion Survey 130 Third Party Validation of Flood Rehabilitation Works in Faisalabad Division Planning and Development Department, Govt of 1297 Third Party Validation 131 Third Party Validation of Flood Rehabilitation Works in Dera Ghazi Khan, Multan and Bahawalpur Division Planning and Development Department, Govt of 412 Third Party Validation 132 Geotechnical Investigations and Initial Environmental Examination (IEE) for Block (G&J) 100 MWp Solar Power Plant in QA Solar Park Bahawalpur, Pakistan Solution de Energy (Pvt.) Ltd Geotechnical Investigations & Initial Environmental Examination for Feasibility Study

10 133 Third Party Validation of Feasibility Study for Provision of Extension of Water Supply in Cholistan including Evaluation of 04 No. Existing Pipe Line Engineering Consultancy Services (Pvt.) Limited Cholistan Development Board Third Party Validation 134 Master Planning, Architectural and Structural Design of New Schemes of Sports and Youth Affairs Department/Sports Board Sports Board, Govt. of Master Planning & Design 135 Consultancy Services for Preparation of Environment Impact Assessment (EIA) Report for Solid Waste Transfer Station & Recycling of Construction & Demolition waste at Thokar Niaz Baig, Lahore Lahore Waste Management Company 60 Environmental Impact Assessment 136 Master Planning and Detailed Design of Infrastructure Development Works for the establishment of Quaid-e-Azam Apparel Park, District Sheikhupura,, Pakistan Industrial Estates Development and Management Company (PIEDMC) 28 Billion Master Planning & Detailed Design 137 Third Party Validation of Works for Aitchison College, Lahore Aitchison College, Lahore Not Applicable Third Party Validation 138 Solid Waste Landfill Site at Bhinda Dakhli, Bahawalpur Bahawalpur Waste Management Company 8 Billion Environmental Assessment 139 Prequalification of MW Regasified Liquefied Natural Gas (RLNG) based Combined Cycle Power Plant at Bhikki, Quaid-e-Azam Thermal Power Co. Ltd. (QATPL), Govt. of Billion Evaluation of EOI 140 Prequalification of MW Regasified Liquefied Natural Gas (RLNG) based Combined Cycle Power Plant at Balloki & Haveli Bahadur Shah National Power Parks Management Company Limited (NPPMCL), Govt. of Pakistan Billion Evaluation of EOI 141 Rehabilitation of Building Defects of Malala Yousafzai Daanish School, Jand Daanish School Authority 57 Rehabilitation Works 142 Retainer Consultancy Services for Mubarak Center, Lahore Taavun (Pvt) Limited Retainership Consultancy Services 143 Third Party Monitoring & Validation for Solid Waste Management Services of Collection, Storage and Transportation of Waste, Mechanical Sweeping and Washing Outsourced to Turkish Companies in Lahore Lahore Waste Management Company 33.6 Billion Third Party Monitoring & Validation 144 Design of Bank Building at Fruit & Vegetable Market, Katcha, Ferozpur Road, Lahore Mr. Sameeuddin 19 Design 145 Design of Cold Storage on Plot No. 1 at Fruit & Vegetable Market, Katcha, Ferozpur Road, Lahore Mr. Naseer Ahmad 22 Design 146 Third Party Validation of Works for Reconstruction of Dangerous School Buildings & Providing Missing Facilities in Schools Project School Education Department, Govt. of 4906 Third Party Validation

11 147 Environmental & Social Impact Assessment for Diamer Basha Dam Project - Senior Transportation Engineering Services MWH Americas, Inc. (USAID) 0.48 Transportation Engineering 148 Construction of Roads in Highway Circle, D.G. Khan under KPRRP, Phase-II(Part-B) Project C&W Deptt., Govt of 4587 Construction 149 Consultancy Services for Design Review & Construction of New Islamabad International Airport Connecting Road Network NHA 2300 Design Review & Construction 150 Engineering Design and Construction of Bansara Gali Forest Park, Murree Building Department 125 Design & Construction 151 Feasibility Study For: 1) Construction of Flyover at G.T. Road from Sarwar Shaheed College to Gulyana Morr Tehsil Gujar Khan District Rawalpindi 2) Construction of Underpass at GT Road Dina District Jhelum Provincial Highway Circle Rawalpindi Feasibility Study 152 Implementation for Screening / Viability of Road for Khadam-e- Rural Roads Program, Phase-II (Part-B) in Bahawalpur Division for the Year C&W Deptt., Govt of Not Applicable Verification for Viability & Necessity 153 Resident Construction of Development of Playfields in District Lahore Sports Board, Govt. of Construction 154 Implementation for Screening / Viability of Road for Khadam-e- Rural Roads Program, Phase-II (Part-B) in Dera Ghazi Khan Division for the Year C&W Deptt., Govt of Not Applicable Verification for Viability & Necessity 155 Updation of Pre-Feasibility Study, Hydraulic Model Study and Riverine Survey for Construction of 4-Lane Bridge, Approach Roads (2 Lane) and Riverine Training Works Across River Indus Connecting Kallur Kot Downstream (D/S) or Upstream (U/S) with D.I. Khan 156 Resident Construction of Khadim- e- Rural Road program (Phase-III) in Provincial Highway Circle, Faisalabad. C&W Deptt., Govt of Updation of Pre-Feasibility Study C&W Deptt., Govt of 2503 Construction 157 Desilting of Drains & Sewers WASA, Lahore Not Applicable Third Party Monitoring 158 Resident Construction of Khadim- e- Rural Road program (Phase-III) in Provincial Highway Circle, Sahiwal. C&W Deptt., Govt of Construction 159 Third Party Audit/Verification of Current Desilting during the period from April 15, 2016 to June 15, 2016 WASA, Faisalabad 2 Third Party Validation 160 Consultancy Services as Assistant to Employer's Representative AER for Peshawar - Karachi Motorway PKM Sukkur - Multan Section (392 KM) NHA 3056 Construction

12 161 Environmental Approval for Operation phase of First Three Projects, each of 100MW Solar PV Project, QASP, Lal Sohanra, Bahawalpur Appollo Solar Development, Zonergy, Best Green, Crest Energy Environmental Monitoring 162 Consultancy Services to Assist Office of CEP for the Selection, Quality Assurance and Installation of the Contractor for the Project "Solar Solution For 24/7 Type BHU's In " 163 Owners's Consultants to Assist Client to Execute Design, Supply, Installation and O&M Contracts of Khadim-e- Saaf Pani Program in Rural Areas of Province, Pakistan 164 Construction of Khadim-e- Bahria Model School and College (KBMS&C), Gwadar, Balochistan Energy Department, Govt. of Saaf Pani Company School Education Department, Govt. of Owner's Consultant 170 Design 165 Feasibility Study, Design & Construction of Flyover From Kanju Bridge to Mingora District Swat Pakhtunkhwa Highway Authority, Govt. of Khyber Pakhtunkhwa Feasibility Study & Construction 166 Resident of Development Schemes of Counter Terrorism Department (CTD), Construction of Regional Office CTD, Sheikhupura 167 Resident of Development Schemes of Counter Terrorism Department (CTD), Construction of Regional Office CTD, D.G Khan Counter Terrorism Department (CTD), Government of the, Lahore Counter Terrorism Department (CTD), Government of the, Lahore 269 Construction 270 Construction 168 Resident Construction of Annual Development Program in Provincial Highways Circle, Rawalpindi Provincial Highway Circle, Communication & Works Department Rawalpindi 5096 Construction 169 The Design, Resident Construction and Technical Consultancy for Operationalizing Laboratories and of Agriculture, Food and Drug Laboratories for Agriculture, Food and Drug Authority Infrastructure Development Authority of Design Review & Construction 170 Testing and Investigation of 512 Multistoreyed Residential Flats in Faisalabad Workers Welfare Board 2.98 Third Party Validation 171 Resident Construction of Khadim-e- Rural Roads Programme (Phase-IV) Highway Circle D.G. Khan C&W Deptt., Govt of Construction 172 The Health Sector Reforms process (Hospitals Reform Program in ) Health Initiative Management Company (PHIMC) 173 Safety Audit of Lahore Ring Road (Southern Loop) Transport Department, Govt.of Safety Audit 174 Police Integrated Command, Control and Communication (PPIC3) Centres at Multan, Rawalpindi, Sargodha, Bahawalpur, Faisalabad and Gujranwala (MRSBFG) Safe Cities Authority (PSCA), Govt. of Overall Coordination & Construction

13 175 Resident of Enabling Works and Boundary Wall of Quaid-e-Azam Apparel Park, Sheikhupura Industrial Estates Development and Management Company (PIEDMC) Construction 176 Consultancy Services of Third Party Validation for Water Supply & Sewerage Schemes of PHED (South Zone) Costing from Rs. 10 million to Rs. 200 million (Group-IV PHE Circle Bahawalpur) HUD & PHE Third Party Validation 177 Consultancy Services of Third Party Validation for Sewerage Scheme Rahim Yar Khan with Treatment Plant Construction of Intermediate Sewerage Pumping Station near Niazi Colony and Installation of Force Main (South Zone) HUD & PHE Third Party Validation 178 Consultancy Services for Top of Water Supply & Sanitation Schemes of PHED (South Zone) Costing from Rs. 10 million to Rs. 200 million (Group-IV PHE Circle Bahawalpur) HUD & PHE Top 179 Geological and Geotechnical Studies for Construction of Fazaia Inter College, Lower Topa, Murree Fazaia Directorate of Schools & Colleges Air Headquarters, Peshawar 288 Geological & Geotechnical Studies 180 Engineering Management Consultancy for Implementation of Khadim-e- Saaf Pani Program in Rural Areas of, Pakistan Saaf Pani Company North Design 181 Development of Infrastructure Works of Quaid-e-Azam Apparel Park (QAAP) Industrial Estates Development and Management Company (PIEDMC) Engineering Management Consultancy 182 Survey of Schools for Khadim-e- Ujala Program Project Management Unit-Khadime- Ujala Program (Energy Department) Survey 183 Feasibility Study, Planning & Design of Pak- Italy University of Engineering and Technology Lahore Knowledge Park Company 184 Third Party /Validation & Verification for Desilting of Sewers and Drains WASA, Lahore WASA, Lahore Third Pary Validation 185 Third Party Validation for Desilting of Sewers and Drains WASA, Faisalabad WASA, Faisalabad Third Pary Validation 186 Third Party /Validation & Verification for Desilting of Sewers and Drains WASA, Gujranwala WASA, Gujranawala Third Pary Validation 187 Third Party Validation for Desilting of Sewers and Drains WASA, Multan WASA, Multan Third Pary Validation 188 Design Review Consultancy Services For (Dualization of Khanewal - Lodhran Road) in Highway Circle, Multan C&W Deptt., Govt of Design Review

14 189 Third Party Validation of WASA Laboratory, Lahore WASA, Lahore Third Pary Validation 190 Third Party Validation of WASA Laboratory, Faisalabad WASA, Faisalabad Third Pary Validation 191 Third Party Validation of WASA Laboratory, Gujranwala WASA, Gujranawala Third Pary Validation 192 Third Party Validation of Desilting of Sewers and Drains WASA, Rawalpindi WASA, Rawalpindi Third Pary Validation

LIST OF BRANCHES TO REMAIN OPENED ON SATURDAYS SR # BRANCH NAME BRANCH CODE

LIST OF BRANCHES TO REMAIN OPENED ON SATURDAYS SR # BRANCH NAME BRANCH CODE ANNEXURE A LIST OF BRANCHES TO REMAIN OPENED ON SATURDAYS SR # BRANCH NAME BRANCH CODE CONVENTIONAL BRANCHES 1. Karachi Main Branch 0005 2. North Karachi Industrial Area Branch 0009 3. Gulshan-e-551 Branch,

More information

ARSENIC CONTAMINATION OF GROUNDWATER AND ITS MITIGATION IN THE PROVINCE OF PUNJAB (PAKISTAN) IN THE LIGHT OF THE SITUATION IN SOUTH ASIA

ARSENIC CONTAMINATION OF GROUNDWATER AND ITS MITIGATION IN THE PROVINCE OF PUNJAB (PAKISTAN) IN THE LIGHT OF THE SITUATION IN SOUTH ASIA ARSENIC CONTAMINATION OF GROUNDWATER AND ITS MITIGATION IN THE PROVINCE OF PUNJAB (PAKISTAN) IN THE LIGHT OF THE SITUATION IN SOUTH ASIA M. Irshad Ramay - AIT, Thailand Tameez Ahmad - UNICEF Pakistan Oleg

More information

Proposal for Cash on Delivery Services For Online Merchants Submitted to Hassan

Proposal for Cash on Delivery Services For Online Merchants Submitted to Hassan Proposal for Cash on Delivery Services For Online Merchants Submitted to Hassan Dated: 13th Feb 2017 About MTM Logistics: MTM COURIER is a product of MTM Logistics an emerging company which is mainly focused

More information

CROP BULLETIN CONTENT

CROP BULLETIN CONTENT Crop Reporting Service, Punjab VOLUME-II, ISSUE-8, SERIAL #20 CONTENT Crop Situation Summary July, 2015 1 Normalized difference vegetation index (NDVI Graph) at Divisional Level, July, 2015 2 Normalized

More information

Research Output in Natural Sciences and Agriculture during 2010 ( ***revised 9/12/2011) University Name

Research Output in Natural Sciences and Agriculture during 2010 ( ***revised 9/12/2011) University Name Research Output in Natural Sciences and Agriculture during 2010 ( ***revised 9/12/2011) University Name Research Papers University of Karachi, Karachi 342 University of Agriculture, Faisalabad 299 Govt.

More information

GOVERNMENT OF THE PUNJAB MTDF DEVELOPMENT PROGRAMME

GOVERNMENT OF THE PUNJAB MTDF DEVELOPMENT PROGRAMME GOVERNMENT OF THE PUNJAB MTDF 2013-16 DEVELOPMENT PROGRAMME 2013-14 Page Sector Type Capital Revenue Total F. Aid Total Social Sectors School Education Higher Education Special Education Literacy Sports

More information

Pre-Feasibility Study. (Injection Molding Plastic Products)

Pre-Feasibility Study. (Injection Molding Plastic Products) Pre-Feasibility Study (Injection Molding Plastic Products) HEAD OFFICE Constitution Avenue, Sector G-5/2, ISLAMABAD Ph#. 051-9225393 PCSIR, Precision System Training Centre Lahore Ferozepur Road, Lahore

More information

Flood Related Activities:

Flood Related Activities: Flood Related Activities: A large-scale flood was experienced in July 2010 following heavy monsoon rains in Khyber Pakhtun Khwa, Sindh, Punjab, and Balochistan regions of Pakistan. The extensive flooding

More information

153(4) (ORDER TO GRANT / REFUSE REDUCED RATE OF WITHHOLDING ON SUPPLIES / SERVICES / CONTRACTS) (FOR PARTIES ADDITION)

153(4) (ORDER TO GRANT / REFUSE REDUCED RATE OF WITHHOLDING ON SUPPLIES / SERVICES / CONTRACTS) (FOR PARTIES ADDITION) Name: SYNTHETIC PRODUCTS ENTERPRISES The taxpayer is allowed to make supply of Molds, Dies, Automotive parts, Food packaging, FMCG packaging, and plastic products manufactured by him without tax deduction

More information

COMMUNITY PARTICIPATION IN DEVELOPMENT, OPERATION AND MAINTENANCE OF WATER SUPPLY AND SEWERAGE SERVICES

COMMUNITY PARTICIPATION IN DEVELOPMENT, OPERATION AND MAINTENANCE OF WATER SUPPLY AND SEWERAGE SERVICES World Water Day April-2011 73 COMMUNITY PARTICIPATION IN DEVELOPMENT, OPERATION AND MAINTENANCE OF WATER SUPPLY AND SEWERAGE SERVICES By Dr. Javed Iqbal and Abdul Qadeer Khan Abstract Access to safe drinking

More information

Water and Sanitation Situation in Pakistan

Water and Sanitation Situation in Pakistan Water and Sanitation Situation in Pakistan Mr. Abid Hussain Shah Hussainy, Senior Specialist - Strategic Management, Urban Sector Planning & Management Service Unit (Pvt.) Ltd. (the Urban Unit) Government

More information

ISSUES & FUTURE PROSPECTS

ISSUES & FUTURE PROSPECTS SMALL DAMS IN PUNJAB ISSUES & FUTURE PROSPECTS SMALL DAMS ORGANIZATION ISLAMABAD POTHOHAR REGION BACKGROUND Pothohar region consist of 4 No. of districts namely Rawalpindi, Attock, Chakwal, Jhelum. Total

More information

Prefeasibility Wise List of Experts/ Consultants / Institutions from Private Sector

Prefeasibility Wise List of Experts/ Consultants / Institutions from Private Sector Prefeasibility Wise List of Experts/ Consultants / Institutions from Private Sector Disclaimer This information is being provided by SMEDA for the benefit of SMEs on "as is where is" basis and without

More information

ANNEX 11 WATER SUPPLY, SANITATION AND SOLID WASTE MANAGEMENT

ANNEX 11 WATER SUPPLY, SANITATION AND SOLID WASTE MANAGEMENT ANNEX 11 WATER SUPPLY, SANITATION AND SOLID WASTE MANAGEMENT A. Introduction 1. The South Asia earthquake disaster significantly affected the water and sanitation sector in five districts of North West

More information

EIC Climate Change Technology Conference 2013

EIC Climate Change Technology Conference 2013 Flood Disaster and Risk Reduction through Adaptation Measures: A Case of Punjab, Pakistan CCTC 2013 Paper Number 1569692165 Sajid Noor 1 Munazza Fatima 2 1 Assistant Professor, Department of Geography,

More information

Crape silk embroidered shirt with diamante and pearls GP01

Crape silk embroidered shirt with diamante and pearls GP01 s i l k c o l l e c t i o n 2 0 1 2 Crape silk embroidered shirt with diamante and pearls GP01 GP02 Crinkle chiffon draped shirt with embroidered motif & metallic buttons along with pure charmeuse silk

More information

INFRASTRUCTURE PROJECTS IN PIPELINE

INFRASTRUCTURE PROJECTS IN PIPELINE Now Available INFRASTRUCTURE PROJECTS IN PIPELINE Sector Analysis and Outlook; Opportunities and Projections Report (PDF) Data-set (Excel) 3 Quarterly Updates India Infrastructure Research Table of Contents

More information

PAKISTAN STANDARDS AND QUALITY CONTROL AUTHORITY

PAKISTAN STANDARDS AND QUALITY CONTROL AUTHORITY PAKISTAN STANDARDS AND QUALITY CONTROL AUTHORITY STANDARDS DEVELOPMENT CENTRE (Electronics Division) MEMBER LIST OF THE TECHNICAL COMMITTEE FOR POWER ELECTRONICS. INDUSTRIAL-PROCESS MEASUREMENT AND CONTROL

More information

CHAIRMAN S MESSAGE AT A GALANCE OUR TRADEMARK

CHAIRMAN S MESSAGE AT A GALANCE OUR TRADEMARK AT A GALANCE Established in 1949, Pak Steel is justly proud of its well over 60 years of activities. From a small beginning, it has now become a major player in the steel industry. We are known in the

More information

EMPLOYMENT STRATEGY AND EQUITABLE GROWTH: A SOCIAL CAPITAL PERSPECTIVE FOR KPK

EMPLOYMENT STRATEGY AND EQUITABLE GROWTH: A SOCIAL CAPITAL PERSPECTIVE FOR KPK EMPLOYMENT STRATEGY AND EQUITABLE GROWTH: A SOCIAL CAPITAL PERSPECTIVE FOR KPK Syed Akther Hussain Shah Deputy Provincial Representative UNDP KPK & FATA Syed Tariq Shah Associate Professor, Mathematics

More information

CHAIRMAN S MESSAGE AT A GALANCE OUR TRADEMARK

CHAIRMAN S MESSAGE AT A GALANCE OUR TRADEMARK AT A GALANCE Established in 1949, Pak Steel is justly proud of its well over 60 years of activities. From a small beginning, it has now become a major player in the steel industry. We are known in the

More information

Quaid-e-azam solar park

Quaid-e-azam solar park Quaid-e-azam solar park Government of Punjab Quaid-e-Azam Solar Power (Pvt.) Limited Contact us for any questions and enquiries. 3rd Floor, 83-A E/1, Main Boulevard, Gulberg III, Lahore Pakistan. www.qasolar.com

More information

SANGUINE TECHNO - COMMERCIAL SOLUTIONS

SANGUINE TECHNO - COMMERCIAL SOLUTIONS SANGUINE TECHNO - COMMERCIAL SOLUTIONS Today s Challenges of Infrastructure Industry Developer Holistic feasibility study Optimum engineering management Workable EPC & EPCM concept International quality

More information

PAKISTAN BALOCHISTAN SMALL SCALE IRRIGATION PROJECT (SSIP) PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB1661 Project Name

PAKISTAN BALOCHISTAN SMALL SCALE IRRIGATION PROJECT (SSIP) PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB1661 Project Name PAKISTAN BALOCHISTAN SMALL SCALE IRRIGATION PROJECT (SSIP) PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB1661 Project Name Balochistan Small Scale Irrigation Project Region SOUTH ASIA

More information

Lahore Garment City Company A Project of the Ministry of Textile Industry Government of Pakistan 132 P, Gulberg II, Lahore Phone: Fax:

Lahore Garment City Company A Project of the Ministry of Textile Industry Government of Pakistan 132 P, Gulberg II, Lahore Phone: Fax: Lahore Garment City Company A Project of the Ministry of Textile Industry Government of Pakistan 132 P, Gulberg II, Lahore Phone: 35870657 9 Fax: 35872087 Email: info@lgcc.org.pk Web: www.lgcc.org.pk Thokar

More information

List of Allied Bank Branches Open on Saturday

List of Allied Bank Branches Open on Saturday List of Allied Bank Branches Open on Saturday Sr. # Region Name Branch Name Branch Code 1 BSG-Abbottabad Main Bazar Haripur 0106 2 BSG-Abbottabad Shinkiary Road Mansehra 0863 3 BSG-Bahawalpur Uch Gillani

More information

PRE-FEASIBILITY REPORT

PRE-FEASIBILITY REPORT PRE-FEASIBILITY REPORT For ToR of Proposed Project of MANUFACTURING OF SYNTHETIC ORGANIC DYES (5 f B IND II) By SHREEJI BAPA DYE CHEM PLOT NO 1319 & 1320, PHASE-III, GIDC, VATVA, AHEMADABAD-382445, GUJARAT,

More information

Pakistan Development Forum. Presentation by

Pakistan Development Forum. Presentation by Pakistan Development Forum Presentation by M. Ali Shah, Country Director, ADB Pakistan Resident Mission Islamabad 18 March 2004 Part 1 - An Overview of Pakistan Part 2 - The Water Perspective Part 3 -

More information

ECER Secretariat. Level 22, Menara 3, Kuala Lumpur City Centre, Kuala Lumpur. Tel : / 22 Fax :

ECER Secretariat. Level 22, Menara 3, Kuala Lumpur City Centre, Kuala Lumpur. Tel : / 22 Fax : ECER Secretariat Level 22, Menara 3, Kuala Lumpur City Centre, 50088 Kuala Lumpur Tel : +603 2035 0021 / 22 Fax : +603 2035 0020 Website : www.ecerdc.com.my Email: prequal@ecerdc.com.my CONSULTANT PRE-QUALIFICATION

More information

LIST OF SOME MAJOR PROJECTS

LIST OF SOME MAJOR PROJECTS 1973-2013 LIST OF SOME MAJOR PROJECTS ENERGY SECTOR Hydropower 1,450 MW Ghazi-Barotha Hydropower Project Pakistan Water and Power Development Authority/World Bank a b c d e f 2,417 969 MW Neelum-Jhelum

More information

PAKISTAN RAIN/FLOOD 2011

PAKISTAN RAIN/FLOOD 2011 2011 PAKISTAN RAIN/FLOOD 2011 Report on Flash floods, breaches in canals and damage to infrastructure & agriculture sectors in Sind Province (The period under report is from Aug 08 to Sep 20) September

More information

List of Branches Authorized for Same Day Clearing (Annexure - I) Sr. # Branch Code Branch Name City Name Branch Address

List of Branches Authorized for Same Day Clearing (Annexure - I) Sr. # Branch Code Branch Name City Name Branch Address 1 0001 Karachi Main Branch Karachi Show Room No. 1, Business & Finance Centre, Plot No. 7/3, Sheet No. S.R. 1, Serai Quarters, I.I. Chundrigar Road, Karachi 2 0002 Karachi Jodia Bazar Karachi Jodia Bazar,

More information

Post Crisis Needs Assessment (PCNA)

Post Crisis Needs Assessment (PCNA) Post Crisis Needs Assessment (PCNA) PROGRESS REVIEW Planning & Development Department Government of Khyber Pakhtunkhwa 27 TH April 2011 1 SEQUENCE Background Progress Milestones Achieved Government s Ongoing

More information

CORPORATE QUALITY MANUAL ISO 9001:2008 INTRODUCTION

CORPORATE QUALITY MANUAL ISO 9001:2008 INTRODUCTION Page No. 1 of 8 1 RITES PROFILE : 1.1 RITES Limited (RITES) was incorporated in 1974 for rendering consultancy services for Railways in India and abroad. RITES established itself as a leading international

More information

Workshop on enabling Inclusive Cities ADB 29 October PAKISTAN: Karachi Mass-Transit Project (KMTP)

Workshop on enabling Inclusive Cities ADB 29 October PAKISTAN: Karachi Mass-Transit Project (KMTP) Workshop on enabling Inclusive Cities ADB 29 October 2013 PAKISTAN: Karachi Mass-Transit Project (KMTP) Agenda 1. Karachi - Context 2. Rapid Project Description 3. Urban Transport and Inclusiveness: Different

More information

MUHAMMAD ASHFAQ, JAVARIA NASIR, ASAD NASEER, TAYYABA HINA, IRFAN AHMAD BAIG, ASIF NAQVI & ASHFAQ AHMAD

MUHAMMAD ASHFAQ, JAVARIA NASIR, ASAD NASEER, TAYYABA HINA, IRFAN AHMAD BAIG, ASIF NAQVI & ASHFAQ AHMAD PROCESS FOR THE DEVELOPMENT OF RAPs FOR COTTON WHEAT CROPPING SYSTEM IN PUNJAB, PAKISTAN INTERACTION WITH STAKEHOLDERS, CONSTRAINTS AND COPING STRATEGIES MUHAMMAD ASHFAQ, JAVARIA NASIR, ASAD NASEER, TAYYABA

More information

The principal Investment Promotion Agency of the province of Sindh to facilitate Foreign & Local Businesses

The principal Investment Promotion Agency of the province of Sindh to facilitate Foreign & Local Businesses Sindh The Land of Endless Opportunities SBI At a Glance SBI has been established as : The principal Investment Promotion Agency of the province of Sindh to facilitate Foreign & Local Businesses A bridge

More information

DEMAND FOR DISTRIBUTED RENEWABLE ENERGY GENERATION IN PAKISTAN

DEMAND FOR DISTRIBUTED RENEWABLE ENERGY GENERATION IN PAKISTAN Public Disclosure Authorized Public Disclosure Authorized DEMAND FOR DISTRIBUTED RENEWABLE ENERGY GENERATION IN PAKISTAN Main Report June 2016 Public Disclosure Authorized Public Disclosure Authorized

More information

Design-Build Capital Infrastructure Project

Design-Build Capital Infrastructure Project Design-Build Capital Infrastructure Project US$60 Million Project Duration 2012 Responsible for drainage systems and construction QA-QC oversight and project documentation and as-built review and acceptance.

More information

The Effect of Developing the Health Centers at Small Towns on the Economy of the Country: A case Study of District Muzaffargarh

The Effect of Developing the Health Centers at Small Towns on the Economy of the Country: A case Study of District Muzaffargarh The Effect of Developing the Health Centers at Small Towns on the Economy of the Country: A case Study of District Muzaffargarh Muhammad Farhan Amjad 1, Muhammad Aslam Asadi 2, Ahmad Tisman Pasha 3, Muhammad

More information

Study of Arsenic Concentration Levels in Pakistani Drinking Water

Study of Arsenic Concentration Levels in Pakistani Drinking Water Polish J. of Environ. Stud. Vol. 18, No. 5 (2009), 907-912 Original Research Study of Arsenic Concentration Levels in Pakistani Drinking Water I. A. Toor, S. N. A. Tahir* Directorate General of Local Government

More information

SITE IDENTIFICATION REPORT

SITE IDENTIFICATION REPORT Public Disclosure Authorized Public Disclosure Authorized Wind Resource Mapping in Pakistan SITE IDENTIFICATION REPORT FEBRUARY 2016 Public Disclosure Authorized Public Disclosure Authorized This report

More information

Rainwater Management. Dr. Iftikhar Ahmad. College of Earth and. University of The Punjab Lahore

Rainwater Management. Dr. Iftikhar Ahmad. College of Earth and. University of The Punjab Lahore Rainwater Management in Major Cities of Punjab Dr. Iftikhar Ahmad College of Earth and Environmental Sciences. University of The Punjab Lahore Need For Rainfall Harvesting in Urban Areas of Punjab Groundwater

More information

Careers List Professional Careers in Construction

Careers List Professional Careers in Construction Careers List Professional Careers in Construction Architect Designs buildings, including the preparation of detailed construction drawings and specifications, and advises on their construction. May specialize

More information

IVCC ENGINEERING (PVT) LTD. SUMMARY OF CIVIL WORKS COMPLETED

IVCC ENGINEERING (PVT) LTD.   SUMMARY OF CIVIL WORKS COMPLETED 1964 29 DARGAI POWER HOUSE. Repair to deteriorated and spalled concrete lining of long water conduits/channels, and spillway surfaces of the Dargai hydroelectric power house. 1966 47 HDERABAD KOTRI. Tower

More information

Measuring Water Poverty Index in Urban Areas of Punjab

Measuring Water Poverty Index in Urban Areas of Punjab University of Nebraska - Lincoln DigitalCommons@University of Nebraska - Lincoln Journal for the Advancement of Developing Economies Economics Department 212 Measuring Water Poverty Index in Urban Areas

More information

FIELD BASED ASSESSMENT OF RICE BACTERIAL LEAF BLIGHT IN MAJOR RICE GROWING ZONES OF PAKISTAN

FIELD BASED ASSESSMENT OF RICE BACTERIAL LEAF BLIGHT IN MAJOR RICE GROWING ZONES OF PAKISTAN Sarhad J. Agric. Vol.29, No.3, 2013 FIELD BASED ASSESSMENT OF RICE BACTERIAL LEAF BLIGHT IN MAJOR RICE GROWING ZONES OF PAKISTAN ABDUL RAFI 1 *, ABDUL HAMEED 2, MUHAMMAD AFZAL AKHTAR 3, SYED MEHER ALI

More information

XI. Thornton Planning Area

XI. Thornton Planning Area XI. A. OVERVIEW The covers 120 square miles in the northwest corner of San Joaquin County. It consists primarily of low-lying Delta islands, sloughs, and large farms. The town of Thornton, a small agriculturally-based

More information

Component-Sharing: Up-Scaling Demand-Responsive Approaches in Rural Water Supply and Sanitation Sector in Pakistan

Component-Sharing: Up-Scaling Demand-Responsive Approaches in Rural Water Supply and Sanitation Sector in Pakistan The Water and Sanitation Program is an international partnership for improving water and sanitation sector policies, practices, and capacities to serve poor people Swiss Agency for Development and Cooperation

More information

Khyber International (Communication and IT division)

Khyber International (Communication and IT division) Khyber International (Communication and IT division) Khyber International is focusing on providing business process out sourcing (BPO) solutions to its customers. Our assets are our full time talented

More information

Niagara s Transportation Strategy 1. Introduction:

Niagara s Transportation Strategy 1. Introduction: Niagara s Transportation Strategy May 8, 2002 Niagara s Transportation Strategy 1. Introduction: Transportation is of pivotal importance in the development of Niagara. This, Niagara s first comprehensive

More information

2059 PAKISTAN STUDIES

2059 PAKISTAN STUDIES CAMBRIDGE INTERNATIONAL EXAMINATIONS Cambridge Ordinary Level www.xtremepapers.com MARK SCHEME for the October / November 2014 series 2059 PAKISTAN STUDIES 2059/02 Paper 2 (Environment of Pakistan), maximum

More information

NATIONAL SANITATION POLICY

NATIONAL SANITATION POLICY NATIONAL SANITATION POLICY (Revised Draft, 06 March 2006) 1. PREAMBLE The National Sanitation Policy, framed by the government of Pakistan, is intended to guide and support the provincial and district

More information

Pakistan: Monsoon Floods

Pakistan: Monsoon Floods Pakistan Red Crescent Society (PRCS) Operations Update Pakistan: Monsoon Floods Operations Update No. 6 Wednesday, 18 August 2010 Period covered by this update: 21 st July to 18 th August, 2010 Pakistan

More information

SECURED LAND RIGHTS, HOUSEHOLD WELFARE AND AGRICULTURAL PRODUCTIVITY: EVIDENCE FROM RURAL PAKISTAN

SECURED LAND RIGHTS, HOUSEHOLD WELFARE AND AGRICULTURAL PRODUCTIVITY: EVIDENCE FROM RURAL PAKISTAN Pak. J. Agri. Sci., Vol. 55(1), 243-247; 2018 ISSN (Print) 0552-9034, ISSN (Online) 2076-0906 DOI: 10.21162/PAKJAS/18.5063 http://www.pakjas.com.pk SECURED LAND RIGHTS, HOUSEHOLD WELFARE AND AGRICULTURAL

More information

Lower San Joaquin River Feasibility Study PLAN FORMULATION ADDENDUM

Lower San Joaquin River Feasibility Study PLAN FORMULATION ADDENDUM PLAN FORMULATION ADDENDUM Non-Structural Measure Descriptions Elevate Critical Infrastructure This measure would raise at-risk critical structures above the design inundation level. Elevation would be

More information

Appendix VII Bank Wise ATMs Locations As on 31st December 2008

Appendix VII Bank Wise ATMs Locations As on 31st December 2008 Allied Bank Limited (489) Abbottabad (8) -Bara Towers Jinnahabad -Bise Muree Road -Hazara University -Mirpur Branch -Pine View Road -Shinkiary Road -Supply Bazar -The Mall Ahmedpur East Arifwala Attockcity

More information

EMPLOYMENT RESEARCH BRIEF EMPLOYMENT IMPACT OF INFRASTRUCTURE INVESTMENTS IN MOROCCO

EMPLOYMENT RESEARCH BRIEF EMPLOYMENT IMPACT OF INFRASTRUCTURE INVESTMENTS IN MOROCCO EMPLOYMENT RESEARCH BRIEF EMPLOYMENT IMPACT OF INFRASTRUCTURE INVESTMENTS IN MOROCCO This country brief provides insights into the various employment outcomes of European Investment Bank (EIB)- financed

More information

Quality Workmanship. Safely. On Time. Within Budget.

Quality Workmanship. Safely. On Time. Within Budget. With a focus on delivering exceptional quality workmanship, VEA is a multi-disciplinary construction group that has established a sound reputation for project completion safely, on time and within budget

More information

GOVERNMENT OF THE PUNJAB MTDF VOL-I DEVELOPMENT PROGRAMME

GOVERNMENT OF THE PUNJAB MTDF VOL-I DEVELOPMENT PROGRAMME GOVERNMENT OF THE PUNJAB MTDF 2017-20 VOL-I DEVELOPMENT PROGRAMME 2017-18 Medium Term Development Framework (MTDF) 2017-20 Sector Allocation 2017-18 Allocation Allocation Social Sector 201,636 221,799

More information

Pakistan International Freight Forwarders Association (PIFFA ) Country report

Pakistan International Freight Forwarders Association (PIFFA ) Country report Pakistan International Freight Forwarders Association (PIFFA ) Country report Presented by Moin Malik - Immediate past chairman June 2012 Pakistan Capital Population Time zone Currency GDP Size of the

More information

M/s. SAL STEEL LTD Survey no.245/p, Village:-Bharapar, Taluka:- Gandhidham, District:-Kutch, Gujarat.

M/s. SAL STEEL LTD Survey no.245/p, Village:-Bharapar, Taluka:- Gandhidham, District:-Kutch, Gujarat. Pre-Feasibility Study Report For Proposed Fly Ash Co-processing clinker grinding cement Unit of 40,000 MT/month Production capacity within our Existing Premises for M/s. SAL STEEL LTD Survey no.245/p,

More information

PROJECT PROPOSAL. Drinking Water Supply Project for village Ganderi Ditt Charsadda KP. Submitted to: Association for Development of Pakistan

PROJECT PROPOSAL. Drinking Water Supply Project for village Ganderi Ditt Charsadda KP. Submitted to: Association for Development of Pakistan PROJECT PROPOSAL Drinking Water Supply Project for village Ganderi Ditt Charsadda KP Submitted to: Association for Development of Pakistan Submitted By Participatory Rural Development Society (PRDS) 7-B,

More information

Project Type: Drainage and Storm Systems

Project Type: Drainage and Storm Systems 580 Dakin Avenue Box Culvert & Utility Improvements Project $944,952 Improvements to approx. 3,000 lf of existing 4'x5' concrete box culvert; clean interior, patch surface, fill joints/cracks; install

More information

Nova Scotia Lands Inc. Crown Corporation Province of Nova Scotia Business Plan

Nova Scotia Lands Inc. Crown Corporation Province of Nova Scotia Business Plan Nova Scotia Lands Inc. Crown Corporation Province of Nova Scotia Business Plan 2010 2011 1 Message from the Minister and President Since its establishment in 2006, Nova Scotia Lands Inc. (NSLI) has achieved

More information

Pakistarn Sustainable Transport Project (PAKSTRAN) Annual Review Report January December 2012

Pakistarn Sustainable Transport Project (PAKSTRAN) Annual Review Report January December 2012 Pakistarn Sustainable Transport Project (PAKSTRAN) Annual Review Report January December 2012 1 Copyright 2012 United Nations Development Programme, Pakistan/Ministry of Water & Power, Govt. of Pakistan

More information

Lessons [being] learnt 2016 Flood in Cedar Rapids. Sandy Pumphrey Project Engineer II Flood Mitigation

Lessons [being] learnt 2016 Flood in Cedar Rapids. Sandy Pumphrey Project Engineer II Flood Mitigation Lessons [being] learnt 2016 Flood in Cedar Rapids Sandy Pumphrey Project Engineer II Flood Mitigation 319 286 5363 s.pumphrey@cedar-rapids.org Agenda 2008 Flood Event 2016 Flood Event [Long Term] Flood

More information

Federal Gas Tax Reporting Data Requirements 2017 Annual Expenditure Report

Federal Gas Tax Reporting Data Requirements 2017 Annual Expenditure Report Data Requirements Recipients are required to provide the following data for all Gas Tax funded projects: Project Title Project Description Project Category Project Start Date Estimated Project End Date

More information

The Development of a Master Plan for Public Transport: The Riyadh Example

The Development of a Master Plan for Public Transport: The Riyadh Example UITP Workshop Public Transport Organization Authorities Riyadh, Kingdom of Saudi Arabia 28 th 29 th November 2010 The Development of a Master Plan for Public Transport: The Riyadh Example Ulrich Luedtke

More information

CDM in Urban Railway Sector and JICA s Cooperation

CDM in Urban Railway Sector and JICA s Cooperation CDM in Urban Railway Sector and JICA s Cooperation February 25, 29 The 4th Regional EST Forum in Asia Seoul, Republic of Korea Tomonori SUDO, Ph.D., Office for Climate Change Japan International Cooperation

More information

PAKISTAN RAIN/FLOOD 2011

PAKISTAN RAIN/FLOOD 2011 2011 PAKISTAN RAIN/FLOOD 2011 (Interim Report IV) Report on Flash floods, breaches in canals and damage to infrastructure & agriculture sectors in Sind Province (The period under report is from Aug 08

More information

Pre-Feasibility Study-Guava Pulping & Squash Making Unit

Pre-Feasibility Study-Guava Pulping & Squash Making Unit Pre-Feasibility Study-Guava Pulping & Squash Making Unit 2010 Table of Contents 1.0 OVERVIEW OF GUAVA SECTOR... 1 1.1 Guava Production... 1 1.2 Guava Exports... 2 2.0 POTENTIAL INVESTMENT PROJECTS IN GUAVA

More information

5.3 Flood Protection Plan

5.3 Flood Protection Plan 5.3 Flood Protection Plan 5.3.1 Existing Conditions (1) Land Elevation The majority of land in the study area is characterized as undeveloped land such as agricultural, unused land and forests which have

More information

PRECAST CEMENT PRODUCTS

PRECAST CEMENT PRODUCTS Profile No.: 30 NIC Code: 23959 PRECAST CEMENT PRODUCTS 1. INTRODCUTION: Reinforced cement concrete products are becoming popular as modular house and apartment buildings are based on standard designs.

More information

Summary of Preparatory Study

Summary of Preparatory Study Summary of Preparatory Study 1. Title of the Cooperation Project, Relevant Project Report Preparatory Survey on the Project for the Establishment of Rural Water Supply System in Kambia Town in the Republic

More information

AN OVERVIEW OF FORESTS IN PAKISTAN

AN OVERVIEW OF FORESTS IN PAKISTAN World Environment Day 16th June-2011 88 Background AN OVERVIEW OF FORESTS IN PAKISTAN By Engr. Saeed Iqbal Bhatti 1 Pakistan is a forest deficient country, mainly due to arid and semi-arid climate in large

More information

International Bank for Reconstruction and Development International Development Association

International Bank for Reconstruction and Development International Development Association International Bank for Reconstruction and Development International Development Association PROGRESS REPORT TO THE BOARD OF EXECUTIVE DIRECTORS ON THE IMPLEMENTATION OF THE MANAGEMENT ACTION PLAN IN RESPONSE

More information

THERMAL AND NUCLEAR POWER

THERMAL AND NUCLEAR POWER THERMAL AND NUCLEAR POWER 1.0 POWER GENERATION CAPACITY OF PAKISTAN The total power generation capacity in Pakistan is of the order of 17,457 MW. This includes the hydropower generation capacity of 5,013

More information

Alberta Transportation Gas Tax Fund and Public Transit Fund Outcomes Report December 2009

Alberta Transportation Gas Tax Fund and Public Transit Fund Outcomes Report December 2009 Alberta Transportation Gas Tax Fund and Public Transit Fund Outcomes Report December 2009 FINAL 1 Table of Contents Slide Number Executive Summary 3 Understanding the Outcomes Report 5 Measuring results

More information

Name of the Bank Address City Alpha Numeric Branch ID on Eid-ul-Fitr 2017 Al Baraka Bank Ltd East Circular Road,Fawara Chowk D.I.

Name of the Bank Address City Alpha Numeric Branch ID on Eid-ul-Fitr 2017 Al Baraka Bank Ltd East Circular Road,Fawara Chowk D.I. Name of the Bank Address City Alpha Numeric Branch ID on Eid-ul-Fitr 2017 Al Baraka Bank Ltd East Circular Road,Fawara Chowk D.I.Khan DIK015 Al Baraka Bank Ltd Pda Building Phase 5 Peshawar PEW013 Al Baraka

More information

Prospectives and Limits of Groundwater Use in Pakistan

Prospectives and Limits of Groundwater Use in Pakistan Prospectives and Limits of Groundwater Use in Pakistan International Waterlogging and Salinity Research Institute, Lahore, Pakistan Abstract Groundwater use in Pakistan has increased due to increased demand

More information

Factors Affecting Cotton Production in Pakistan: Empirical Evidence from Multan District

Factors Affecting Cotton Production in Pakistan: Empirical Evidence from Multan District Volume V, Issue I1, Dec, 2009, pg. 91-100 Factors Affecting Cotton Production in Pakistan: Empirical Evidence from Multan District Imran Sharif Chaudhry, Muhammad Bashir Khan Department of Economics, Bahauddin

More information

Challenges of Sustainable Infrastructure AAEES UCI

Challenges of Sustainable Infrastructure AAEES UCI Challenges of Sustainable Infrastructure AAEES UCI Sam Ali, PE, LEED AP sam.ali@ocpw.ocgov.com January 16, 2013 Sustainable Infrastructure Defining Sustainable Infrastructure Sustainable Systems Sustainable

More information

Pre-Feasibility Study

Pre-Feasibility Study Pre-Feasibility Study (Semi-Intensive Tilapia Aquaculture) Small and Medium Enterprises Development Authority Ministry of Industries & Production Government of Pakistan www.smeda.org.pk HEAD OFFICE 4th

More information

Developing Infrastructure in Bihar

Developing Infrastructure in Bihar Developing Infrastructure in Bihar Vision Creating with passion and innovation, world class infrastructure to make human life comfortable. Mission Profitable growth through superior project management,

More information

FY CAPITAL IMPROVEMENT PROGRAM MID-YEAR STATUS REPORT

FY CAPITAL IMPROVEMENT PROGRAM MID-YEAR STATUS REPORT FY 15-20 CAPITAL IMPROVEMENT PROGRAM MID-YEAR STATUS REPORT Department of Public Works Robert B. Boxer, Director PROJECT MODEL PROFESSIONAL SERVICES STUDIES FEASIBILITY CLAIMS 1- PROJECT DEFINITION 2-

More information

WATER AND ENERGY INPUTS FOR WHEAT PRODUCTION UNDER PERMANENT RAISED BEDS

WATER AND ENERGY INPUTS FOR WHEAT PRODUCTION UNDER PERMANENT RAISED BEDS Sarhad J. Agric. Vol. 23, No. 3, 2007 WATER AND ENERGY INPUTS FOR WHEAT PRODUCTION UNDER PERMANENT RAISED BEDS Muhammad Azam Khan *, Muhammad Shafeeq ** and Inayat Ullah Awan * ABSTRACT A study was performed

More information

APPENDIX VIII. Form 1 M APPLICATION FOR MINING OF MINOR MINERALS UNDER CATEGORY B2 FOR LESS THAN AND EQUAL TO FIVE HECTARE

APPENDIX VIII. Form 1 M APPLICATION FOR MINING OF MINOR MINERALS UNDER CATEGORY B2 FOR LESS THAN AND EQUAL TO FIVE HECTARE APPENDIX VIII Form 1 M APPLICATION FOR MINING OF MINOR MINERALS UNDER CATEGORY B2 FOR LESS THAN AND EQUAL TO FIVE HECTARE (I) Basic Information S.No. Particulates Details 1. Name of the Mining Lease site

More information

Delhi Mumbai Industrial Corridor (DMIC) Project

Delhi Mumbai Industrial Corridor (DMIC) Project Delhi Mumbai Industrial Corridor (DMIC) Project 1. Delhi Mumbai Industrial Corridor (DMIC) project is a flagship programme of Government of India with the aim to create futuristic industrial cities by

More information

BACKGROUND INFORMATION DEVELOPMENT COST CHARGE BYLAW REVIEW & UPDATE

BACKGROUND INFORMATION DEVELOPMENT COST CHARGE BYLAW REVIEW & UPDATE BACKGROUND INFORMATION DEVELOPMENT COST CHARGE BYLAW REVIEW & UPDATE On April 29, 2013 the District of North Vancouver adopted a new DCC bylaw containing new rates that become effective November 1, 2013.

More information

Study on performance evaluation of. sustainability

Study on performance evaluation of. sustainability Study on performance evaluation of STPs in Lucknow and dissue of wastewater t sustainability REGIONAL WORKSHOP Sustainable Water and Sanitation: Best management Practices Potential and Challenges May 1,

More information

Pre-Feasibility Study

Pre-Feasibility Study COLD STORAGE (FRUIT & VEGETABLE) Small and Medium Enterprises Development Authority Ministry of Industries & Production Government of Pakistan www.smeda.org.pk HEAD OFFICE 4th Floor, Building No. 3, Aiwan-e-Iqbal

More information

Circular No. 10/2013/TT-BXD of July 25, 2013, on construction quality management THE MINISTRY OF CONSTRUCTION

Circular No. 10/2013/TT-BXD of July 25, 2013, on construction quality management THE MINISTRY OF CONSTRUCTION THE MINISTRY OF CONSTRUCTION Circular No. 10/2013/TT-BXD of July 25, 2013, on construction quality management Pursuant to the Government s Decree No. 63/2012/ND-CP of August 31, 2012, defining the functions,

More information

PROJECT FEASIBILITY REPORT

PROJECT FEASIBILITY REPORT PROJECT FEASIBILITY REPORT FOR OBTAINING PRIOR ENVIRONMENT CLEARANCE For PROPOSED CHEMICAL MANUFACTURING UNIT From M/s. MORADIA BROTHERS CHEM PVT LTD LOCATED AT: Block No.: 45, JalBhumi Industrial Estate,

More information

Three Gorges Project. A Project with Tremendous Benefits and in Favour of Environmental Improvement. By Cao Guangjing May 22, 2004

Three Gorges Project. A Project with Tremendous Benefits and in Favour of Environmental Improvement. By Cao Guangjing May 22, 2004 Three Gorges Project A Project with Tremendous Benefits and in Favour of Environmental Improvement By Cao Guangjing May 22, 2004 Contents 1. Brief Introduction 2. Why Should TGP Be Built? 3. Investment

More information

PROPOSED STORMWATER PROJECT IMPLEMENTATION PLAN. o Execution of New and Expanded Flood Control Projects o Program Options

PROPOSED STORMWATER PROJECT IMPLEMENTATION PLAN. o Execution of New and Expanded Flood Control Projects o Program Options PROPOSED STORMWATER PROJECT IMPLEMENTATION PLAN o Execution of New and Expanded Flood Control Projects o Program Options PHILLIP A. DAVENPORT DIRECTOR OF PUBLIC WORKS APRIL 25, 2017 FLOOD CONTROL PROJECTS

More information

We re going to look at why earlier consideration is better.

We re going to look at why earlier consideration is better. 1 2 3 4 We re going to look at why earlier consideration is better. Another way to think of this is exploiting the comparison of analysis and goals to find synergies, but nobody wants to think like that.

More information

PAKISTAN POWER SECTOR. A Profile & Opportunities

PAKISTAN POWER SECTOR. A Profile & Opportunities PAKISTAN POWER SECTOR A Profile & Opportunities February, 2010 1 Pakistan Power Sector A Profile 2 2 Pakistan Power Sector a Profile Pakistan Power Sector is organized into nine Distribution Companies

More information

FLOOD EMERGENCY RECONSTRUCTION AND RESILIENCE PROJECT TABLE OF CONTENTS

FLOOD EMERGENCY RECONSTRUCTION AND RESILIENCE PROJECT TABLE OF CONTENTS FLOOD EMERGENCY RECONSTRUCTION AND RESILIENCE PROJECT TABLE OF CONTENTS Section Description Page 1 PC-I Form 2 2 Project Overview & Summary of Cost 18 3 Roads & Communication Works 39 4 Irrigation, Drainage

More information

Transportation demand management: a case study of Ahmedabad city

Transportation demand management: a case study of Ahmedabad city Urban Transport 641 Transportation demand management: a case study of Ahmedabad city S. Mistry India Abstract The city is one of the most important centers of 4500 years of Indus valley civilization. This

More information