Nanogate Jay Systems

Similar documents
HARLEY-DAVIDSON MOTOR COMPANY ( H-D ) SUPPLIER QUALITY REQUIREMENTS MANUAL

Supplier Specific Requirements Manual 2015

PROCEDURE ORIGINATION DATE 1/31/2018. Approved By: Procurement Leadership

Revision Date: May Paragraph Table of Contents Page. 1.0 Scope Purpose Overview of Steps Approving an MRA Document 5

SOFTWARE QUALITY HANDBOOK

Procedure for Approval, Purchase, Payment and Inventory of Wireless Communication Devices (WCD*) and Services

MEVION SOURCING STRATEGY SUPPLIER CODE OF CONDUCT

9 Chaldicott Barns, Semley, Shaftesbury, SP7 9AW Direct Reports Yes / No: Yes

NEW LAWS REGARDING BUILDING PRODUCTS (QLD)

GLOBAL AEROSPACE PROCEDURE

Digital Advisory Services Professional Service Description Software Defined Networking Strategy and Roadmap

MEDICINES CONTROL COUNCIL

Disaster Recovery Planning Guide

Application Process: Customer Service

DIRECTV POLICY Corrective Action Home Services Workforce Management

VENDOR DISPLAY SERVICE LEVEL AGREEMENT

EAGLE SCOUT CANDIDATE PREPARATION GUIDE. The Eagle Scout Service Project

Request for Proposals. Develop a New Personnel Policy Manual. for the. Red Wing Housing and Redevelopment Authority

Alumni and Supporters Privacy Notice

Executive Summary European Union s General Data Protection Regulation (EU GDPR) January 2018

New Product Approval Process

Effective Date: 21 Aug 2018 Issued: 06 Aug 2018 Issue: 3 SI No: P3282 Prepared: K. Osborne. Reviewed by: G. Ostacchini

Craw-Kan Telephone Cooperative Inc. CPNI / Privacy Policy

ida Certification Services IEC Functional Safety Assessment Project: Series 20/30 Butterfly Valves Customer: Bray International, Inc.

A method of securing cellular services information is being implemented under the

ICP Linking and Fusing Service Enquiry Procedure

Isetan Personal Data Protection Policy (PDPP)

The BLOOM Performance Review Decision Guide

Best Practice Quick Base Platform Governance

Health Safety and Environment Management System (HSE-MS)

St Albans Musical Theatre Company

Procurement Gateway & I Want Doc User Guide

SCOPE/APPLICABILITY...

GKN Driveline Newton

CORPORATE. Freedom to Speak Up Standard Operating Procedure. Document Control Summary Status:

DRAFT Sampling Protocol For the LEED Canada for Homes Program Applicable to production builders (Balloted Version)

ABLE Commission Q&A Q&A Regarding Licensing and Application

Oracle Project Portfolio Management Integration Pack for Primavera P6 and Oracle E-Business Suite Release Notes

1 The types of personal information we collect

Vendor Routing and Compliance Guide 2015

BRITISH COLUMBIA VEGETABLE MARKETING COMMISSION STORAGE CROP NEW ENTRANT PROGRAM POLICY

Release Notes for SAP enhancement package 7 for SAP ERP 6.0, Support Package 2

Company Policy Buying Additional Annual Leave

MSCM Logistics Services Limited

Family Support Service Provider Quick Reference Guide to CYBER

For additional information contact: Robert Devin (806)

ECNG Energy Group. Performance Review Plan

Model Drought Contingency Plan for Irrigation Districts

LOCATION AND DESIGN DIVISION

MEDICAID SERVICES UPDATE: August 8, 2014

Safety and Security Checks for Tank Container HSE CoP 613. Safety and Security Checks for Tank Container. HSE Code of Practice 613

2. Fill Out All the Fields Including: Account Number ( ) A) The Drop Down Menu (It holds the last 15 receivers you ve shipped to.

Thailand Shipping Guide Overview 2

Appendix 2.3 One-Year Tactical Plan

SAFETY & SECURITY COORDINATOR

Epicor Commerce Connect (ECC) Services Specification

THIS DOCUMENT CONTAINS PROPRIETARY INFORMATION.

USER MANUAL Magento Australia Post eparcel Extension

Used Oil Processors and Re-Refiners

Data Protection Officer: Phil Oakman

HEALTH AND SAFETY POLICY MISSION STATEMENT

Efficiency Bulletin: Further Streamline the Work Management Process

HEALTH AND SAFETY POLICY MISSION STATEMENT

Verification Summary Report (VSR) Instructions

STUDENT INFORMATION GUIDE BSB51315 Diploma of Work Health and Safety

Company Vision Our vision is to be valued as a digital, customer-focused, centre of excellence.

Job and Person Specification

Packaging regulations

TOWN OF PAYSON WATER DEPARTMENT BACKFLOW PREVENTION PROGRAM CUSTOMER INFORMATION PACKAGE

AAM Direct Suppliers AAM Supplier Portal Basic External Pull Usage

Data Protection Officer: David Parkes

CDM Plan Submission and Review Criteria Rules

Regulations Amending the Food and Drug Regulations (1475 Good Manufacturing Practices)

Data Protection Officer: Tracy Landon

Management of Supplier Complaints and Feedback Procedure

OPM RFC PRIVACY NOTICE

GM In-Dealership Digital Network (IDDN)

Washington County Public Health and Environment

3.0 Vendor Ticketing & Labeling Requirements (DSW Retail)

Sustainability Policy. Bupa Enterprise Policy

BACKGROUND THE PCA S EFFECT ON THE FOODSERVICE INDUSTRY

Privacy Notice. Read more. What information do we collect from you?

Quality Management System Manual

Extension of the Senior Managers and Certification Regime by the UK s FCA

ADMINISTRATIVE GUIDELINES POLICY 6714 DISTRICT CREDIT CARD USE. Blue Valley School District Purchasing Card Program Overview

Policy and Procedures Date: February 26, Subject: Interviewing and Selection Guidelines for Off-Campus Wage and Salaried Classified Positions

SAMPLE PROPOSAL. You are invited to submit a presentation proposal that addresses the Symposium theme:

Call for Bids. No. PROC-B IS Security and Authorization concept for ERP

Lions Ski Club Privacy Policy (Version 1: 23/05/2018)

Shipper asset details reconciliation

Specification Dry Good Packaging and Delivery Requirements SU-009 version 1

July 2013 and Paralympic games 2012 Policy 0.2 Title change and tracked changes removed

Managing Supply Chain with Third Party Logistics Provider an Overview of the Integration

OLA Privacy Policy for Australia

Human Resource Management

ORGANISATIONAL CONTEXT

European Code of Practice For Feed Additive and Premixture operators

Records Management Policy

Extended Inventory Items

Attn: Dealer Principal/General Manager/ Parts & Service Managers Parts & Service Advertising Support Programs (DAS & RMF)

Transcription:

Nangate Jay Systems Revisin: H Page 1 1.0 Purpse The purpse f this prcedure is t prvide fr a system and instructins t give each supplier the necessary tls t prvide prduct and services that meet the expectatins f Nangate Jay Systems. 2.0 Applicatin This prcedure applies t suppliers wh prvide materials, cmpnents r services used in the manufacture f prducts at Nangate Jay Systems. 3.0 Supplier Quality System Requirements Nangate Jay Systems requires that applicable suppliers be third party registered t either ISO/TS 16949:2009 r ISO 9001:2008. Suppliers that are nt registered t the ISO/TS 16949:2009 standard must fill ut the entire supplier self assessment that is prvided. Cmpanies that are ISO/TS 16949:2009 certified need nly t fill ut sectins A & B f the supplier assessment. The intentin f the survey is t determine whether the supplier has systems in place, which wuld meet the requirements f the ISO/TS 16949:2009 standard. As applicable based upn prduct shipped t Jay the belw CQI audits must be submitted annually. CQI-9- Heat Treat System Assessment CQI-11- Plating System Assessment CQI-12- Cating System Assessment CQI-23 Mlding System Assessment Nte: Current revisins f CQI audits can be fund @ www.aiag.rg 4.0 Prductin Part Apprval Prcesses (PPAP) Requirements Nangate Jay Systems requires its suppliers t utilize the prcess and frms referenced in the AIAG (Autmtive Industry Actin Grup) manuals t demnstrate prduct and prcess cnfrmance t prduct specificatins Suppliers are expected t meet all requirements f the custmer print, unless a written waiver is received frm Nangate Jay Systems. If it is necessary fr a supplier t make significant prcess changes (i.e. changes affecting materials, cmpnents, suppliers, tling equipment and/r prductin prcess), the supplier must submit a Ppap package fr apprval demnstrating cnfrmance f the new prcess t all requirements. The supplier may nt ship prduct frm the revised prcesses with ut Ppap apprval, unless interim apprval is btained frm the Nangate Jay Systems quality dept. The supplier Ppap checklist prvided may be utilized t ensure that all applicable requirements are met. 5.0 Advanced Prduct Quality Planning (APQP) Suppliers are respnsible fr utilizing a multidisciplinary team apprach when preparing fr prductin f a prduct fr Nangate Jay Systems. This team apprach shuld include: Develpment f Prcess Flws, Cntrl Plans, & Prductin FMEA s Mnitring f special characteristics TS2/ISO 14001 prcedures manual/purchasing

Nangate Jay Systems Revisin: H Page 2 Mistake Prfing Actins t reduce ptential failure mdes 6.0 Reprting Requirements If requested the supplier will supply data with each shipment (r at an agreed upn frequency) demnstrating nging cnfrmance t prduct requirements. 7.0 Nn-cnfrming Prduct If a prblem is fund with the prducts r services prvided by a supplier, then a Supplier Ntice f Nn-Cnfrmance (SNN) will be issued t the supplier. Immediate actin shuld be taken by the supplier t cntain all defects already prduced and stp any further defective prduct frm being prduced. All suppliers are expected t ntify Nangate Jay Systems f any shipments in transit that may have suspect material. Csts incurred as a result f nn-cnfrming prduct will be assessed and frwarded t supplier. Man hurs, dwntime, qty impacted, investigatin cst and administrative csts will be used t determine charge back. The initial respnse including the cntainment plan is due within 24 hurs. This initial respnse shuld clearly state hw certified material will be identified and when Nangate Jay Systems will receive the certified shipment. The certificatin f prduct shuld remain in effect until after implementatin and verificatin f the crrective actin. The supplier has a maximum f 10 days t respnd with the permanent crrective actins. If an extensin f time is needed the supplier shuld cntact the quality department t request an extensin. Nangate Jay Systems reserves the right t debit suppliers fr all csts assciated with defective prduct fr which the supplier is respnsible. Csts that are debited will be detailed as part f the SNN. Suppliers have 3 business days t reply with the dispsitin f rejected material. Supplier must issue a RMA and make arrangements fr material t be returned within 3 business day r material will be scrapped at Suppliers expense and apprpriate debt taken. 8.0 Supplier Perfrmance Reprt Nangate Jay Systems prvides a Quality Mnthly Reprt t applicable suppliers in rder t cmmunicate hw well yur cmpany is perfrming t ur expectatins. This reprt tracks yur PPM & Delivery perfrmance and shuld be used as a tl t identify prblem areas and fcus n the apprpriate cunter measures. Nangate Jay Systems expects its suppliers t deliver prduct and services as scheduled 100% f the time. 9.0 Packaging Nangate Jay Systems expects its suppliers t use packaging that effectively prtects prducts during shipment. If the supplier is utilizing packaging prvided by Nangate Jay Systems, then the supplier is respnsible fr use f the apprpriate packaging in the prper manner. If damage results frm incrrect use f packaging r if the wrng packaging is used, the supplier is respnsible and the damaged parts will be cnsidered defects. 10.0 Labeling TS2/ISO 14001 prcedures manual/purchasing

Nangate Jay Systems Revisin: H Page 3 Labels shuld be used that clearly identify the prduct and include at a minimum, the belw listed barcde label requirements. 1. Label Size: 4 x 6 r 4 x 6.5 preferred. Any smaller size must be apprved by Nangate Jay Systems 2. Label Material: Returnable Cntainers - Plyester label with an adhesive side affixed t cntainer. Label shuld be easily remved frm the cntainer with minimal adhesive residue. Expendable Cntainers Paper r Plyester label with adhesive side affixed t cntainer. 3. Label Print Orientatin: Landscape preferred. 4. Barcde Type: Cde 39 r Cde 128. Barcdes must be readable by scanner frm a range f 10+ feet. 5. Label Required Infrmatin: Part Number (As prvided by Nangate Jay Systems) Part Descriptin Supplier Name Maximum field length is 40 characters. Bar-cded with prefix f 'P' Cntainer Quantity Serial Number Bar-cded with a prefix f Q Length f 9 digits. The serial number shuld begin with a twdigit supplier cde number (assigned by Nangate Jay Systems) fllwed by an additinal seven digits. Each supplier serial number must unique t the supplier s inventry system and nn-repeating t Nangate Jay Systems Bar-cded with a prefix f S fllwed by the supplier s unique 9 digit serial number. Cntainer Weight (in kg) Only needed if the Nangate Jay Systems purchase rder unit is kilgrams Bar-cded with a prefix f 2Q TS2/ISO 14001 prcedures manual/purchasing

Nangate Jay Systems Revisin: H Page 4 Heat Number (if applicable) - Length t 14 characters. Bar-cded with a prefix f 1T Batch Tracking Number -Length t 14 characters (If Applicable) Bar-cded with a prefix f 32T 6. Optinal Label Infrmatin: Purchase Order Number (Prvided by Nangate Jay Systems) Bar-cded with a prefix f K Date f Prductin f Parts Supplier Label Apprval Prcess: 1. Each supplier shuld use the abve guidelines t check current labels, which are being sent in n prduct t Jay t ensure full cmpliance t the requirements listed abve. If supplier s existing labels prve t be nn-cnfrming t any f the abve requirements the supplier will create a sample barcde label fr a single part number and submit it t Nangate Jay Systems fr preliminary testing. (Nte: Supplier Specific Prefix will need t be added t Serial Number field as defined abve and a sample label will need validated and apprved by Nangate Jay Systems.) 2. Upn preliminary apprval by Nangate Jay Systems, the supplier will create a sample label fr all Nangate Jay Systems part numbers and submit it t Nangate Jay Systems fr final testing and apprval. 11.0 Custmer Owned Tling & Equipment Suppliers that use tling r equipment wned by Nangate Jay Systems r it s custmers must have a system in place t maintain and prtect the tling. This system shuld include the fllwing activities: Maintenance & Repair TS2/ISO 14001 prcedures manual/purchasing

Nangate Jay Systems Revisin: H Page 5 Preservatin f tling/equipment Strage & Recvery Setup Dcumentatin f tling/equipment mdificatins N changes / mdificatins t tling r equipment is permissible unless written authrizatin is received frm the engineering department at Nangate Jay Systems. The supplier shuld retain the dcumentatin cncerning any changes r mdificatins that are authrized. 12.0 Recrds & Dcumentatin Each supplier is expected t maintain recrds f all SPC charts, testing, measurement and inspectin required t demnstrate cnfrmance t the requirements f Nangate Jay Systems and its custmers. The recrds must be legible, stred in a manner t prevent deteriratin and readily available. Suppliers must retain all Ppap dcumentatin fr the life f the prgram (including service) plus a minimum f 1 year. 13.0 Cnfidentiality Suppliers are expected t maintain cnfidentiality regarding custmer specific designs, prints, math data and prpriety prcesses supplied r used by Nangate Jay Systems. 14.0 Purchase Orders A purchase rder is issued t a supplier at the time f qutatin acceptance. The purchase rder defines and describes material r services in terms f part number, engineering revisin level, quantity, price, delivery and cmpliance t gvernmental standards and regulatins, as applicable. The supplier is ntified in the event that a revisin t the purchase rder becmes necessary, such as a design change. TS2/ISO 14001 prcedures manual/purchasing

Nangate Jay Systems Revisin: H Page 6 Revisin: Nature f Change: By: Date: A Initial Creatin in MS wrd P. Oswalt 5/25/06 B Revised Outline Numbering changing 10.0 Recrds and Dcumentatin t 12.0, 11.0 Cnfidentiality t 13.0, and 12.0 Purchase Orders t 14.0 because f duplicate utline numbers. Revised 12.0 Recrds and Dcumentatin retentin f PPAP dcumentatin frm 50 years t 1 year per revised GM Custmer Specificatins. D. Miller 4/29/08 C Mdified 7.0 t include 3 business day limit fr defective material P. Oswalt 1/26/10 D Mdified 3.0 t include ISO/TS 16949:2009 P. Oswalt 7/21/10 And ISO 9001:2008 Mdified 7.0 t include nncnfrming Material charges E Mdified dcument t capture Plex System K.Oswalt 11/20/13 Upgrade F updated 3.0 t include annual CQI audits, K.Oswalt 10/17/14 updated 10.0 fr Batch tracking # G Updated t include CQI-23 based ff GM K.Oswalt 12/19/14 Custmer Specifics update H Updated with new Cmpany name K.Oswalt 12/13/16 Nangate Jay Systems Apprved By: Paul Bggs 12/13/16 Vice President/COO Date TS2/ISO 14001 prcedures manual/purchasing