Developed and monitored by : the Ministry of Ecology (also in charge of transports) ADEME (Public agency for the Environment and Energy Management)

Similar documents
ECNG Energy Group. Performance Review Plan

Task Force on Emission Inventories and Projections and EEA activities on emissions from transport

Operating Year(s):

Corporate Value Chain (Scope 3) Accounting & Reporting Standard. Summary of Changes

VENTISQUEROS IS A PROUD MEMBER OF THE GLOBAL SALMON INITIATIVE (GSI)

PROTON ENERGY LIMITED HEALTH, SAFETY & ENVIRONMENT POLICY

Strategic Project Manager

Project document. HWTS Promotion in schools

Centennial Management System

United Nations Statistics Division Programme in Support of the 2020 Round of Population and Housing Censuses

Centennial Management System

Network Services and Their Distributors Data Synchronization Initiative Frequently Asked Questions for Suppliers

Greenhouse Gas Reduction Plan

Standards for Smart and Sustainable Cities

Research Officer / Data Analyst

Chapter 1: Purchasing & Supply Management January :10 PM

Large Building Energy and Water Reporting and Benchmarking. LEED Breakfast Meeting

EUROPEAN COMMISSION DIRECTORATE-GENERAL JOINT RESEARCH CENTRE Directorate B Growth and Innovation Circular Economy and Industrial Leadership

Neil Savery. National President Planning Institute of Australia

PMs for Prosperity A Call to Action. A GPM Global Stakeholder Initiative

Panel Project Solicitation

Monitoring and. Prof. Jay Aronson

HEALTH AND SAFETY POLICY MISSION STATEMENT

OPTIMIZE 2009 TOC Optimize and its affiliates. All rights reserved. Page 1 of 10

ITIL FOUNDATION SUMMARY NOTES. Sessions

A Case for Component Based Software Engineering. Maurizio Morisio, Michel Ezran and Colin Tully IEEE Transactions on Software Engineering, May 2003

Platforms Master Plan. Alan Duncan Version 1.1, 4 December N2Africa. Putting nitrogen fixation to work for smallholder farmers in Africa

NREL and the Quality Assurance Framework for Minigrids

Kootenai River Restoration Master Plan: Master Plan Overview

Guidelines on Use of Electronic Data Collection in Censuses: Decision-making in the Adoption of Electronic Data Collection

Fact Sheet: The Global Net Zero Carbon Buildings Commitment in Australia

Innovative Procurement Models for Renewable Electricity

HEALTH AND SAFETY POLICY MISSION STATEMENT

Institutional Knowledge Management: Leveraging Your Firm's Most Valuable Asset

ESD implementation in the Netherlands

BIRMINGHAM CITY COUNCIL STRATEGY FOR OPEN DATA

Diversity & Inclusion A Strategic Imperative Celebrating 10 years

Project Status Report

EXPERIENCE OF LITHUANIA IMPLEMENTING QUALITATIVE WORK PLACEMENTS. dr. Jolanta Vaičiūnaitė Lithuanian Employers Confederation

Framework for Safe and Ethical International Service Work

PM Trends that Sizzle Team: Nino Clarkin Edward Jones Vicki Schumacher - Scottrade Angela Triplett Joyce Meyer Ministries

B&B Food Distributors Data Synchronization Initiative

IMPLEMENTING THE HR STRATEGY FOR RESEARCH (HRS4R)

Reregistration of voluntarily deregistered CDM project activities

The agreement consists of three key elements: a framework agreement, Action Plans for different subsectors or branches and accession documents.

SYSTEM FOR MEASUREMENT AND IMPROVEMENT OF PRODUCTIVITY SYMAPRO

EPESUS LAYMAN S REPORT

Kast Distributors Data Synchronization Initiative

Empowered Workgroups. A process area at Level 4: Predictable

Job description. Monitoring Evaluation and Manager. 1 Yr. For starters but eventually for Five Years

Human Resource Management

2017 Climate Action Finance Report

Certificate in Construction Project Management

Certificate in Construction Project Management

Voluntary Principles Initiative Guidance on Certain Roles and Responsibilities of Governments

Fiji s NDC Energy Sector Implementation Roadmap ( ) 11 th October 2017

Pollution Prevention in Enforcement POLLUTION PREVENTION SUPPLEMENTAL ENVIRONMENTAL PROJECTS (P2 SEPs) -Information for companies-

THE INDUSTRIAL AND TECHNOLOGICAL BENEFITS POLICY. AeroMontreal 2017

Smarter Work Zones SWZ Program DLM Systems. Efficiency through technology and collaboration

Work Session 1 for decision and policy makers Conference on Sustainable Tourism in Protected Areas Opatija, 23 October 2018

Participants Guide to the ALGARVE NATURE WEEK 2018 B2B EVENT

Position Description

POSITION DESCRIPTION. Position Number: Job Evaluation Number: Manager Asset Management Strategy. Position Title: Manager Network Strategy.

` Job Description. Hotel Operations Support Manager (People)

Case Study: How Enovos International S. A. Transformed Its Recruitment Process in 3 Months

Policy Approved by: Site Head and Leadership Team, February 2012

Communications White Paper

SAP standard PS: issues with project lifecycle management

Landlocked Developing Countries: Challenges and Priority Areas for Action

Target Data Synchronization Initiative

Project Tracker Implementation Plan

professional bodies. Management an advantage. position.

The BLOOM Performance Review Decision Guide

EICC s New Strategy IMPLEMENTATION PROPOSAL

Energy Storage Ontario Submission to the Standing Committee on General Government Bill 172, Climate Change Mitigation and Low-Carbon Economy Act

JOB ANNOUNCEMENT. Program Officer, Landscape Standard. Washington, DC strongly preferred. Manager, Landscape Standard

WORK PLAN FOR PILOT PROJECT

APPENDIX A SURVEY QUESTIONNAIRES

Earth Observation at Agriculture and Agri-Food Canada: Research to Operations

SEA TERMINALS. Smart, Energy Efficient and Adaptive Port Terminals

Summary for the Open Call

MINISTRY OF TRANSPORT OF THE RUSSIAN FEDERATION

Customer & Stakeholder Engagement

Introduction. Specific Comments. Compliance Scenario. Submission RE: Low Carbon Fuels Compliance Pathway Assessment

Trade-offs and/or synergies?

IMPLEMENTING THE HR STRATEGY FOR RESEARCH (HRS4R)

VI. ALTERNATIVES TO THE MASTER PLAN A. INTRODUCTION

Forest Stewardship Council

L&D Network Meeting. 5 th September Sarah Artist, Senior Manager Innovation & Capacity

PRINCIPLES OF PRTR AND AER REPORTING OF ANNUAL ENVIRONMENTAL INFORMATION

Examiner Tip Sheet Independent Review

Three priority issues have been identified. They are supported by joint projects presented in more detail online at

Appendix C: Country Case Study Methodology

9707 BUSINESS STUDIES

Sustainability Policy. Bupa Enterprise Policy

A Rational Approach of SAP ERP Based HR Module for an Educational Institute

Manufacturing Sustainably Isn t Just a Goal. At Aurora, It s an Ongoing, Daily Focus.

Producer Demonstration Sites (PDS) Monitoring, Evaluation and Reporting (MER) Guidelines

Project 12: Environmentally Sound Management of Selected End-of-Life Vehicle Batteries, Including Spent Lead-Acid Batteries (SLABs), in North America

REACHING THE TARGETS. Figure 16 Guidebook Overview Map: Reaching targets and objectives. Coalition for Energy Savings

Transcription:

The French vluntary cmmitments prgram t reduce CO 2 emissins f the rad freight transprt peratrs Prgram launched in December 2008 5 years return f experiences Develped and mnitred by : the Ministry f Eclgy (als in charge f transprts) ADEME (Public agency fr the Envirnment and Energy Management) in cllabratin with : the hle French carriers representative rganizatins All represented in the natinal steering cmmittee that validate the main rientatins f the prgram 1/16

The main principles f the prgram Dedicated t rad carriers and shippers fr there wn-accunt fleets Whatever the size r transprt activities f the cmpanies Wrk n CO 2 perfrmance f the transprt cmpanies Allws cmpanies t cmmit themselves n : a persnalized actin plan a reductin target f there CO 2 perfrmance indicatrs (gco 2 /km and gco 2 /t.km) fr 3 years Free t jin 2/16

Glbal and structured apprach Imprve the CO 2 efficiency / perfrmance f rad freight transprt 88% flw (t.km) in France Fcus n reducing CO 2 emissins, directly related t fuel cnsumptin Pllutants are already gverned by eurs standards Help transprt cmpany t reduce their fuel cnsumptin Ecnmic and Envirnment efficiency = same fight Prvide a cmmn framewrk with an harmnized methdlgy Reliable guides and tl Natinally recgnized Methdlgy f CO 2 calculatin harmnized with French legislatin fr CO 2 infrmatin f transprt services (well t wheel emissin factrs) Allw transprt cmpany t value their cmmitments Internally : management and mtivatin tl Invlvement f emplyees is essential Externally : meet the demand f shippers fr imprving the CO 2 perfrmance f transprt 3/16

Stage 1 The charter f vluntary cmmitments Apprach in 4 stages Prepare the prject What is the maturity f the cmpany? Check if it is the mment t implement the prcess (need t cntrl and mnitr several peratinal data) What human, financial and rganizatinal needs? Stage 2 Making the diagnsis CO 2 and define the baseline. That means t : Knw peratinal data (fuel cnsumptin in liter, number f vehicles, distances in km, tnnage ), in the perimeter and the baseline reference perid chsen (12 mnths) Define a specific actin plan (at least 4 actins = 1 per axes) with the help f the guide Fiches actins Evaluate the ptential savings in fuel cnsumptin, CO 2 emissins and return n investment by the implementatin f actins Define a reductin target f CO 2 perfrmance indicatrs (gco 2 /km and gco 2 /t.km) t be achieved in a perid f 3 years time Fill in all the data required in the Web tl : www.bjectifc2.fr Stage 3 Sign the charter f cmmitment Validatin f the data and the cmmitments by ADEME and the reginal steering cmmittee Sign the fficial charter reginally This give the pssibility t use the Objectif CO 2 lg Stage 4 Reprt n the prgress Reprt annually during the next 3 years using the same Web tl (evaluatin f prgress) Respect the cmmitments (pssibility t exclude cmpanies that d nt) 4/16

Fiches actins Actin Frms Help cmpanies in chsing their wn actin plan Freight best practices catalgue with 54 technlgical, rganizatinal and behaviral slutins prpsed Take in accunt the diversity f transprt activities Slutins rganized arund 4 axes : Vehicle Fuel Driver Organizatin f transprt flws Cmplete descriptin f each slutin with : the ptential savings in CO 2 and fuel return f investment feasibility degree t implement The actin plan needs t have at least 1 actin per axe (bligatin t wrk glbally) Usally cmpanies implement mre than 6 actins 5/16

Fiches actins Actin Frms Axis 1 Vehicle Axis 2 Fuel Axis 3 Driver Axis 4 rganizatin f transprt flws Mdernizatin and adjustment f the vehicle fleet t its use Clamping engine t reduce the maximum speed f vehicles Reduce the use f engine idling Using energy saving lubricants Using accessries t reduce aerdynamic drag Imprved maintenance f vehicles (excluding tires) Park management f tires (lw resistance tires, regrving and recapping tires, inflatin, ptimizing the gemetry) Air cnditining Lighter vehicles Optimizatin f cnsumptin related t auxiliary equipments New temperature cntrlled technlgy slutins Maintenance and specific equipments t reduce the lss f cld Chice f prpulsin (stp & start, hybrid and electric vehicles) Alternative fuel (Bidiesel 30) Imprve mnitring f cnsumptin Implementatin f an ec-driving prgram Gd practice specific t temperature cntrlled transprt (limit the pening f the bx) Increase the use f nn-rad mdes (rail, waterways, sea) IT tls fr ptimizing rutes Optimizatin f lading vehicles (Imprved lad factr and limitatin f empty runs) Cllabrative wrk with shippers t better ptimized vehicles Raising awareness amng rad subcntractrs 6/16

Example : synthesis part f the Ec-driving actin Frms 7/16

4 categries f vehicles cnsidered Vehicle size Main use cnsidered Max Grss Weight Pictgrams LCV Light Cmmercial Vehicle Urban 3.5 tnnes Rigid Small Truck Urban 3.6-12 tnnes Rigid Large Truck Reginal > 12 tnnes Semitrailer Lng Distance 40 tnnes 8/16

Key figures Mre than 800 cmpanies have already jined the prgram Objectif CO 2 invlve mre than: 94 000 vehicles (20% f the French fleet) 105 000 drivers With the ptential f : 630 000 tnnes f CO 2 avided per year 220 millin liters f fuel saved 9,3% f gains ver the 3 years f cmmitment 9/16

www.bjectifc2.fr - The dedicated web site & tl 10/16

The Web tl www.bjectifc2.fr Objectif CO 2 prgram relies n a specific tl develped by ADEME Used by cmpanies during the 3 years f cmmitment Permits, after the input f peratinal data (fuel cnsumptin, tnnage, Km, type f vehicles ) t: Evaluate and mnitr its CO 2 emissins n the perimeter chsen Estimate the ptential gains in terms f fuel cnsumptin and CO 2 emissins and the return n investment (ROI) f the actins chsen Fllw the prgress f bjectives Fllw the evlutin f there CO 2 efficiency indicatrs (gco 2 /km and gco 2 /t.km) during the 3 years f cmmitment Per categry f vehicle Per activity 11/16

The tl Operatinal data 12/16

The tl Actin plan 13/16

The tl Savings (ptential and real) 14/16

Tl and all dcuments in www.bjectifc2.fr User s guide f the tl 15/16

Thank yu fr yur attentin Gérald Lalevée ADEME Department Transprt & Mbility FRANCE gerald.lalevee@ademe.fr www.ademe.fr 16/16