COUNTRY REPORT: Germany

Similar documents
GERMANY Status Regulations

COUNTRY REPORT: Albania

Apprenticeship ERR Workbook

BIRMINGHAM CITY COUNCIL STRATEGY FOR OPEN DATA

Executive Summary European Union s General Data Protection Regulation (EU GDPR) January 2018

Project Completion by PIMS

Understanding and Testing Compressed Gases

Understanding and Testing Compressed Gases

Country profiles: Iceland

Summary AB 1739 (Dickinson), SB 1168 (Pavley) and SB 1319 (Pavley)

EUROPEAN COMMISSION DIRECTORATE-GENERAL JOINT RESEARCH CENTRE Directorate B Growth and Innovation Circular Economy and Industrial Leadership

Juniper Networks Product End-of-Life

Asbestos Policy. Inmind Reference CO20. Version 1.2 Policy Review Team Group Operations Director Director of Nursing and Quality Hospital Directors

Participants Guide to the ALGARVE NATURE WEEK 2018 B2B EVENT

BUSINESS PLAN CEN/TC 144 TRACTORS AND MACHINERY FOR AGRICULTURE AND FORESTRY

Greenhouse Gas Reduction Plan

Guidance on the Privacy and Electronic Communications (EC Directive) Regulations

ESD implementation in the Netherlands

IMI2 PROPOSAL TEMPLATE FIRST STAGE PROPOSAL

Fact Sheet: The Global Net Zero Carbon Buildings Commitment in Australia

Birmingham Airport Response REDACTED (for external use)

Release Notes for SAP enhancement package 7 for SAP ERP 6.0, Support Package 2. Information Lifecycle Management

Making your self build self sufficient with ground source heat pumps

Guidance notes for completing the International Start-up Form

PROMOTION OF HIGHER EFFICIENCY ROOM AIR CONDITIONERS IN VIETNAM: NATIONAL POLICY ROADMAP. Endorsed by

Pollution Prevention in Enforcement POLLUTION PREVENTION SUPPLEMENTAL ENVIRONMENTAL PROJECTS (P2 SEPs) -Information for companies-

NEW LAWS REGARDING BUILDING PRODUCTS (QLD)

Packaging regulations

Avoiding Microbiological Media Related Failures

Flaw indications in the reactor pressure vessels of Doel 3 and Tihange 2

Inquiry processing. 1. Purpose. 2. Scope. 3. Description

The agreement consists of three key elements: a framework agreement, Action Plans for different subsectors or branches and accession documents.

MSCM Logistics Services Limited

Independent scientific review of claims by qualified bodies;

Initial Draft: National Water Resources Policy for the Fiji Islands

CONTRACT OPPORTUNITY ANNOUNCEMENT Professional Service Contract Construction Contract Service Contract Material Requirement Other

Release Notes for SAP enhancement package 7 for SAP ERP 6.0, Support Package 2

North Hockey Umpiring Association (NHUA) PRIVACY NOTICE FOR OUR MEMBERS

Heat Pump KEYMARK. Date Description of modification Revision number Initial version 1

Records Management Policy

Repton Hockey Club PRIVACY NOTICE FOR OUR JUNIOR MEMBERS

Cochrane Statistical Methods Training Course. Minutes and actions from the session: Statistical contribution to CRGs

Evaluation of Auditor V1.0 By the HERS BESTEST Software Simulation Testing Protocol

JOB TITLE: LOGISTICS MANAGER

Regulations Amending the Food and Drug Regulations (1475 Good Manufacturing Practices)

Nuclear Energy and Renewables: System Effects in Low-Carbon Electricity Systems

Business Administration Department. o Work Experience, General. o Open Entry/Exit. Distance (Hybrid Online) for online supported courses

Empowered Workgroups. A process area at Level 4: Predictable

Version 4.0 LineDesign Engineering 11/1/04

Neil Savery. National President Planning Institute of Australia

Procedures C o r e Theme 4

WITH EXAMPLES FROM THE WINDWARD ISLANDS. Andrew Bartlett. Keynote Presentation. 1st National Workshop on Development Communications.

End of Year Planning and Checklists

Delivering World Class Support Services

OSPAR Regional Action Plan for Prevention and Management of Marine Litter in the North-East Atlantic

REMI - Outline performance and technical specifications

2018 FEC Energy. Woodco. 25 th September 2018

Isetan Personal Data Protection Policy (PDPP)

Making the move from Sage Abra Suite (FoxPro) to Sage HRMS (SQL)

EMISSION REDUCTIONS UNDER CAP-AND-TRADE PROPOSALS IN

MEDICAL DEVICE ASSESSMENT IN KAZAKHSTAN. by Alexander Kostyuk, MD, PhD BACKGROUND

Creating Car-Part Pro Search Profiles

B Asset Evaluation

CPA P2 Audit Practice & Assurance Services

JOB DESCRIPTION. Senior Project Manager Proposed band

Induction Policy for New Staff

United Nations Statistics Division Programme in Support of the 2020 Round of Population and Housing Censuses

Induction Policy for New Staff

Request for Proposals. Develop a New Personnel Policy Manual. for the. Red Wing Housing and Redevelopment Authority

PRINCIPLES OF PRTR AND AER REPORTING OF ANNUAL ENVIRONMENTAL INFORMATION

American Reinvestment & Recovery Act (ARRA) Solar Projects Progress at the Energy Commission

Mersham Sports Club Flood Street, Mersham, Ashford, Kent, TN25 6NX

Transportation and Infrastructure Working Group Meeting #3. April 28, 2016; 10:00 am 12:00 pm. Meeting Summary 1

BROCHURE # 50 DOES MY BUILDING DESIGN NEED ENGINEERING?

ADVERTISEMENT. HUMAN RESOURCES CONSULTING SERVICES FOR THE DEVELOPMENT OF A STRATEGIC HUMAN RESOURCES PLAN MSI 005/ November 2017

Guidelines on Use of Electronic Data Collection in Censuses: Decision-making in the Adoption of Electronic Data Collection

INTEC-High Pressure Steam Generator for closed circuits Series inook

REACHING THE TARGETS. Figure 16 Guidebook Overview Map: Reaching targets and objectives. Coalition for Energy Savings

Implementation of MedDRA industry perspective

MEDICINES CONTROL COUNCIL

Oracle Project Portfolio Management Integration Pack for Primavera P6 and Oracle E-Business Suite Release Notes

1. Ernst & Young / Intern in ITRA Department/ Astana

TOWN OF PAYSON WATER DEPARTMENT BACKFLOW PREVENTION PROGRAM CUSTOMER INFORMATION PACKAGE

NREL and the Quality Assurance Framework for Minigrids

EAGLE SCOUT CANDIDATE PREPARATION GUIDE. The Eagle Scout Service Project

Pay policy programme for Lund University

BSc (Hons) Civil Engineering Part-time Course content

Sage 300 ERP Payroll Sage HRMS Link Integration Guide. April 2014

ICP Linking and Fusing Service Enquiry Procedure

DRAFT Sampling Protocol For the LEED Canada for Homes Program Applicable to production builders (Balloted Version)

What You Should Know About GDPR. What is the GDPR?

What You Should Know About GDPR. What is the GDPR?

Best Practice Checklist for EPC

Call for Expression of Interest

9 Things QuickBooks Users Should Know About Microsoft Dynamics 365

ASBESTOS ROOF INSPECTION REPORT OF MARSHALL COURT th STREET NEWPORT NEWS, VIRGINIA MCS JOB #13-031S

Total Potential Bonus

Certificate in Construction Project Management

Certificate in Construction Project Management

P2ware Portfolio Management 2018 The P2ware Portfolio Management 2018 software supports project, programme and portfolio management.

Transcription:

COUNTRY REPORT: Germany Prepared by: ITW Sebastian Bnk Versin 1.1 Date: 10.09.2010 Address: Pfaffenwaldring 6, 70550 Stuttgart, Germany Tel. : +49 (0)711/685-63595 Fax : +49 (0)711/685-63503 E-mail: bnk@itw.uni-stuttgart.de QAiST is supprted by: Prject IEE/08/593/SI2.529236

This shrt reprt includes a brief descriptin f the mst imprtant elements in German regulatins and certificatin/subsidy schemes related t slar thermal prducts. The descriptin is valid fr 09-2010 1. Regulatry Framewrk Building Regulatin (general) There are n special rules/regulatins fr slar thermal systems/cmpnents in the building regulatin. The general regulatins fr buildings and installatins shall f curse be fllwed. Sme examples f these regulatins are listed in the fllwing: Building aspects standardisatin in DIN 1055 series (Einwirkungen auf Tragwerke) Rf tightness (Regeln für Dacheindeckungen des deutschen Dachdeckerhandwerks) Prtectin against lightning regulatins related t drinking water quality (e. g. DVGW- Arbeitsblätter) regulatins related t the prtectin f histrical mnuments Requirements related t the energy demand/use f the building are defined in the energy saving directive (Energieeinsparverrdnung - EnEV). This directive cvers all kinds f energy cnsumed by the building. This directive was revised in 2009 and cntains the fllwing mst imprtant changes: definitin f unifrm calculatin scheme and bundary cnditins fr a reference building new buildings must at least meet the requirements fr energy demand f the reference building f same size and gemetry Since the 1 st January 2009 there is an additinal regulatin fr the heat demand f new buildings: the renewable energy heat statute (Erneuerbare Energien Wärmegesetz EEWärmeG). It dictates that new buildings must cver a given part f the heat demand by using renewable energy technlgies. In case f using thermal slar energy the fllwing fractin is required: 1 The riginal reprt was published in 2007 and was develped in the framewrk f the prject Slar Keymark II with the supprt f the Intelligent Energy Eurpe prgramme. Prject IEE/08/593/SI2.529236 Cuntry Reprt: Germany Page 2 f 5

In huses with ne r tw living units 0.04 m² cllectr area must be installed per m² heated useable area. In huses with mre than tw living units 0.03 m² cllectr area must be installed per m² heated useable area. Nn-residential buildings must cver at least 15% f the verall heat demand by thermal slar energy. Cmbinatins f different renewable energy technlgies are allwed. If a building cvers nly 10% f its heating demand by thermal slar energy (2/3 f the required amunt) it may cver the rest f it fr example by cvering 17% f the required heat demand by wd pellets (1/3 f 50% verall heat demand). Registratin Registratin f a slar thermal system is nt necessary, if the builder is nt interested in any subsidies r similar advantages. In case f using subsidies, smetimes a registratin is required (depending n the subsidy scheme) Safety cntrl General rules related t this kind f prducts such as pressure directive, electrical safety etc. Public Incentives (subsidies, rdinances r ther) Relevant incentives: The German subsidy scheme n natinal level is called Marktanreiz-prgramm (MAP) and is administrated by BAFA. This prgram was shrtened during the year 2010 and prvides nw nly incentives fr slar thermal cmbi systems. The system cnfiguratin must fulfil the fllwing requirements: minimum cllectr area f 9 m² fr flat plate cllectrs (7 m² fr vacuum tube cllectrs) minimum stre vlume f 40 l per m² installed cllectr area fr flat plate cllectrs (50 l per m² fr vacuum tube cllectrs) Prgram cvers nly systems installed in existing buildings (new buildings are frced t use renewable energy anyway (EEWärmeG)) The amunt f mney paid by the prgram depends mainly n the installed cllectr area. Prject IEE/08/593/SI2.529236 Cuntry Reprt: Germany Page 3 f 5

Additinal smaller bnus payments fr using efficient technlgy (efficient pumps and bilers, large buffer stre, usage f bi mass r heat pumps, additinal insulatin f the building) Requirements fr supprt schemes: Requirements t cllectrs: Slar Keymark Calculated minimum energy yield f 525 kwh/m² System must be available n the market (n prttypes r self made systems) Testing Five test institutes are accredited t perfrm EN testing (f slar thermal prducts). These institutins are ITW/TZS, ISFH, TÜV Rheinland, FhG-ISE, IZES Certificatin Prduct certificatin: The fllwing certificatin schemes are available: Slar Keymark Blauer Engel (RAL UZ 73) Installer certificatin: Labels frm smaller installer rganisatins (such as SHK/IHK- Zert) T benefit frm incentive prgrams the installatin must be perfrmed by qualified persnal. An installer certificate eases the verificatin prcedure fr being qualified. Insurance In mst cases the slar cllectr is included in the insurance f the huse The mst damages caused by the slar thermal cmpnents (e.g. parts falling dwn frm the rf) are cvered by a liability insurance. There are different insurance plicies fr slar thermal systems nt part f a living building r plicies fr damages nt cvered by the insurance f the huse Prject IEE/08/593/SI2.529236 Cuntry Reprt: Germany Page 4 f 5

Other relevant infrmatin The prgress n energy labelling fr buildings is quite gd fr new buildings and existing buildings which are nt used by their wner. Since the ldger has the right t see the energy label f a living unit befre signing the lease cntract, landlrds are frced t get the label. The energy labelling fr existing buildings used by the wner is nt very cmmn. There is n required labelling fr slar thermal cmpnents Trade Barriers The mst imprtant trade barrier is the calculated energy yield f slar thermal cllectrs. The manufacturer is frced t retain the energy yield calculatin frm a German test lab, even if Slar Keymark testing was perfrmed by a different Eurpean test labratry. Actins needed A unifrm energy yield calculatin fr slar thermal cllectrs must be defined and standardised t enable all test labs t prvide the results n energy yield. This will lwer the main trade barrier t the German market. The renewable energy heat statute frces building wner t cver 15% f the heat demand by slar thermal. Since tday s slar thermal technlgy makes it pssible t cver much mre than this, a discussin abut this value shuld be started and a revisin f this statute is needed. Prject IEE/08/593/SI2.529236 Cuntry Reprt: Germany Page 5 f 5