FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING THE FOREST PROTECTION AND REFORESTATION PROJECT

Similar documents
)~--~ L' q608 K? OFFICIAL 7 or- 3 DOCUMENTSi

The World Bank. Key Dates. Project Development Objectives. Components. Public Disclosure Authorized. Implementation Status & Results Report

IMPLEMENTATION COMPLETION AND RESULTS REPORT (IBRD TF-55731) ON A LOAN IN THE AMOUNT OF US$30.0 MILLION AND A

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF

FOR OFFICIAL USE ONLY

The World Bank Private Sector Competitiveness (P130091)

RESTRUCTURING PAPER ON A

Implementation Status & Results Benin Support to Protected Areas Management (P122419)

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING SUSTAINABLE PROD. IN AREAS PREVIOUSLY CONVERTED TO AGRICULTURAL USE APPROVED ON JULY 18, 2014

ON A PROPOSED PROJECT RESTRUCTURING IN PUNJAB RURAL WATER AND SANITATION SECTOR IMPROVEMENT PROJECT DEPARTMENT OF ECONOMIC AFFAIRS REPUBLIC OF INDIA

Implementation Status & Results Serbia CORRIDOR X HIGHWAY PROJECT (P108005)

The World Bank Nepal Agriculture and Food Security Project (P128905)

The World Bank Pernambuco Rural Economic Inclusion (P120139)

The World Bank Sudan Statistical Capacity Building Project (P152016)

Implementation Status & Results Brazil BR Municipal APL: Teresina Enhancing Municipal Governance and Quality of Life Project (P088966)

DOCUMENT OF THE WORLD BANK RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING VIETNAM NEW MODEL UNIVERSITY PROJECT APPROVED ON JUNE 24, 2010

Implementation Status & Results Serbia CORRIDOR X HIGHWAY PROJECT (P108005)

Implementation Status & Results Brazil Pelotas - Rio Grande do Sul Integrated Municipal Development Program (APL) (P094199)

INTEGRATED SAFEGUARDS DATA SHEET APPRAISAL STAGE

Implementation Status & Results Mozambique Market led Smallholder Development in the Zambezi Valley (P093165)

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF KARNATAKA WATERSHED DEVELOPMENT PROJECT II IDA CR.NO.

The World Bank Ethiopia: Supporting Open Data Initiative (P156400)

Implementation Status & Results Brazil Pelotas - Rio Grande do Sul Integrated Municipal Development Program (APL) (P094199)

RUSSIA FOREST FIRE RESPONSE PROJECT (P123923)

Implementation Status & Results Indonesia Third Water Supply and Sanitation for Low Income Communities Project (P085375)

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE

Implementation Status & Results Indonesia Integrating Environment and Forest Protection into the Recovery and Future Development of Aceh (P098052)

Implementation Status & Results Indonesia Statistical Capacity Building-Change and Reform for the Development of Statistics (STATCAP-CERDAS) (P106384)

Implementation Status & Results Benin Support to Protected Areas Management (P122419)

Implementation Status & Results Haiti Disaster Risk Management and Reconstruction (P126346)

Implementation Status & Results Mozambique Market led Smallholder Development in the Zambezi Valley (P093165)

FOR OFFICIAL USE ONLY

The World Bank Improving Quality and Efficiency of Public Sector Audit (P161359)

Implementation Status & Results Mexico Mexico Forests and Climate Change Project (P123760)

Implementation Status & Results Indonesia Aceh-Nias Livelihoods and Economic Development Program (LEDP) (P110635)

Implementation Status & Results Georgia Kakheti Regional Roads Improvement Project (P117152)

Implementation Status & Results Indonesia Western Indonesia National Roads Improvement Project (P090990)

INTEGRATED SAFEGUARDS DATA SHEET ADDITIONAL FINANCING

INTEGRATED SAFEGUARDS DATA SHEET APPRAISAL STAGE

Implementation Status & Results Brazil Second National Environmental Project - Phase II (P099469)

Implementation Status & Results Brazil Rio de Janeiro Mass Transit Project II (P111996)

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF INTEGRATED SANITATION & SEWERAGE INFRASTRUCTURE PROJECT (LOAN 7512 EGT) March 20, 2008

The World Bank. Key Dates. Project Development Objectives. Components. Public Disclosure Authorized. Implementation Status & Results Report

Financing (In USD Million) Financing Source

Implementation Status & Results Azerbaijan Highway 2 (P094488)

Implementation Status & Results Brazil Bahia Integrated State Highway Management Project (P095460)

Public Disclosure Copy

The World Bank Upgrading and Greening the Rio de Janeiro Urban Rail System (P111996)

Report No.: ISDSA1037

Implementation Status & Results Indonesia Geothermal Power Generation Development (P099757)

Implementation Status & Results Indonesia Barefoot Engineers III (P131387)

Implementation Status & Results Uzbekistan Uzbekistan Bukhara and Samarkand Sewerage Project (P112719)

Implementation Status & Results Vietnam URBAN WATER SUPPLY AND WASTEWATER (P119077)

Implementation Status & Results Ghana Ghana: Statistics Development Program (MDTF) (P118585)

Implementation Status & Results Brazil Pelotas - Rio Grande do Sul Integrated Municipal Development Program (APL) (P094199)

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: AB7310 Project Name

Implementation Status & Results Philippines ARMM Social Fund Project (P073488)

The World Bank. Key Dates. Project Development Objectives. Components. Public Disclosure Authorized. Implementation Status & Results Report

Implementation Status & Results Peru Water Resources Management Modernization (P107666)

Implementation Status & Results Africa Nyika Transfrontier Conservation Area Project (P108879)

Public Disclosure Copy. Implementation Status & Results Report Rural Environmental Cadastre and Fire Prevention in Bahia State Project (P143376)

Implementation Status & Results Serbia CORRIDOR X HIGHWAY PROJECT (P108005)

Implementation Status & Results Panama Rural Productivity Project (GEF) (P083045)

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE

Implementation Status & Results Mauritania MAURITANIA: TRANSPORT SECTOR INSTITUTIONAL DEVELOPMENT AND TECHNICAL ASSISTANCE PROJECT (P089672)

Project Name. PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: AB6411 Additional Financing to the Poverty Alleviation Fund II

INTEGRATED SAFEGUARDS DATA SHEET APPRAISAL STAGE. Project ID:

The World Bank Mexico (CRL) Integrated Energy Services (P088996)

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE

Implementation Status & Results Haiti Haiti Transport and Territorial Development Project (P095523)

Implementation Status & Results Macedonia, former Yugoslav Republic of Second Trade and Transport Facilitation Project (P091723)

Implementation Status & Results Vietnam Customs Modernization Project (P085071)

The World Bank Djibouti: Governance for Private Sector Development and Finance Project (P146250)

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE

Implementation Status & Results Indonesia Geothermal Power Generation Development (P099757)

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE. 10-Oct-2014

Implementation Status & Results Botswana Northern Botswana Human Wildlife Coexistence Project (P095617)

Implementation Status & Results Africa NELSAP Regional Agricultural Trade and Productivity TA (Phase II) (P115414)

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE

Implementation Status & Results China SECOND SHANDONG ENVIRONMENT PROJECT (P077752)

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF

US$M): Sector Board : Public Sector (US$M US$M): Cofinancing (US$M. ICR Review

Implementation Status & Results Paraguay Paraguay Sustainable Agriculture & Rural Development Project (P088799)

INDONESIA: IMPROVING TEACHER PERFORMANCE AND ACCOUNTABILITY (KIAT GURU)

Implementation Status & Results Colombia Disaster Vulnerability Reduction First Phase APL (P082429)

Implementation Status & Results Iraq IQ-TF EMERG. WATER, SANITATION & URBAN (P087910)

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A

Implementation Status & Results India Andhra Pradesh Road Sector Project (P096021)

Implementation Status & Results Panama Rural Productivity Project (GEF) (P083045)

FOR OFFICIAL USE ONLY INTERNATIONAL DEVELOPMENT ASSOCIATION RESTRUCTURING PAPER ON A

Statistical Capacity Building-Change and Reform for the Development of Statistics (STATCAP-CERDAS) (P106384)

The World Bank Increased Access to Modern Energy (P110075)

Implementation Status & Results Brazil Sustainable Cerrado Initiative (P091827)

L/C/TF Number(s) Closing Date (Original) Total Project Cost (USD) TF Oct ,500,000.00

Public Disclosure Copy. Implementation Status & Results Report Second Sustainable and Participatory Energy Management (PROGEDE II) (P120629)

Implementation Status & Results Indonesia Western Indonesia National Roads Improvement Project (P090990)

Implementation Status & Results Bosnia and Herzegovina QUALITY PROTECT (GEF) (P085112)

Implementation Status & Results Samoa Samoa Agriculture & Fisheries Cyclone Response Project (P145938)

Implementation Status & Results Philippines Climate Change Adaptation Program (P101076)

Transcription:

Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE FOREST PROTECTION AND REFORESTATION PROJECT IBRD LOAN NO. 4808-KZ GEF GRANT NO. TF055731 11/29/2005 TO THE REPUBLIC OF KAZAKHSTAN 11/28/2013 SUSTAINABLE DEVELOPMENT DEPARTMENT EUROPE AND CENTRAL ASIA REGION Report No: RES12546 This document has a restricted distribution and may be used by recipients only in the performance of their official duties. Its contents may not otherwise be disclosed without World Bank authorization.

ABBREVIATIONS AND ACRONYMS DAS FFCIS FHC GEF GEO IBRD IPF PDO TF Dry Aral Seabed Forest Fire Control Information System Forest and Hunting Committee Global Environmental Facility Global Environmental Objective International Bank for Reconstruction and Development Irtysh Pine Forest Project Development Objective Trust Fund Regional Vice President: Country Director: Sector Manager: Task Team Leader: Laura Tuck Saroj Kumar Jha Kulsum Ahmed Angela Armstrong 2

KAZAKHSTAN Forest Protection and Reforestation Project CONTENTS Page A. SUMMARY 5 B. PROJECT STATUS 6 C. PROPOSED CHANGES 6 ANNEX 1: RESULTS FRAMEWORK AND MONITORING 9 3

DATA SHEET Kazakhstan Forest Protection & Reforestation Project (P078301) EUROPE AND CENTRAL ASIA ECSEN Report No: RES12546 Basic Information Project ID: P078301 Lending Instrument: Specific Investment Loan Regional Vice President: Laura Tuck Original EA Category: Partial Assessment (B) Country Director: Saroj Kumar Jha Current EA Category: Partial Assessment (B) Sector Director: Laszlo Lovei Original Approval Date: 29-Nov-2005 Sector Manager: Kulsum Ahmed Current Closing Date: 28-Nov-2014 Team Leader: Angela G. Armstrong GEF Focal Area: Land degradation Borrower: Responsible Agency: Republic of Kazakhstan Forest and Hunting Committee Restructuring Type Form Type: Full Restructuring Paper Decision Authority: Country Director Approval Restructuring Level: Level 2 Financing ( as of 26-Nov-2013 ) Key Dates Project Ln/Cr/TF Status Approval Date Signing Date Effectiveness Date Original Closing Date Revised Closing Date P078301 IBRD-48080 Effective 29-Nov-2005 06-Nov-2006 12-Jul-2007 30-Nov-2012 28-Nov-2014 P087485 TF-55731 Effective 06-Nov-2006 06-Nov-2006 12-Jul-2007 30-Nov-2012 31-May-2014 Disbursements (in Millions) Project Ln/Cr/TF Status Currency Original Revised Cancelle d Disburse d Undisbur sed % Disburse d P078301 IBRD-48080 Effective USD 30.00 30.00 0.00 23.98 6.02 80 P087485 TF-55731 Effective USD 5.00 5.00 0.00 4.81 0.19 96 4

Policy Waivers Does the project depart from the CAS in content or in other significant respects? Yes [ ] No [ X ] Does the project require any policy waiver(s)? Yes [ ] No [ X ] A. Summary of Proposed Changes This proposal seeks approval to reallocate proceeds among disbursement categories from the loan (Loan No. 4808-KZ) and grant (GEF Grant No. TF055731) for the Kazakhstan Forest Protection and Reforestation Project, and to modify a few of the project's outcome indicators to better reflect anticipated project achievements. Change in Implementing Agency Yes [ ] No [ X ] Change in Project's Development Objectives Yes [ ] No [ X ] Change in Project's Global Environmental Objectives Yes [ ] No [ X ] Change in Results Framework Yes [ X ] No [ ] Change in Safeguard Policies Triggered Yes [ ] No [ X ] Change of EA category Yes [ ] No [ X ] Other Changes to Safeguards Yes [ ] No [ X ] Change in Legal Covenants Yes [ ] No [ X ] Change in Loan Closing Date(s) Yes [ ] No [ X ] Cancellations Proposed Yes [ ] No [ X ] Change to Financing Plan Yes [ ] No [ X ] Change in Disbursement Arrangements Yes [ ] No [ X ] Reallocation between Disbursement Categories Yes [ X ] No [ ] Change in Disbursement Estimates Yes [ ] No [ X ] Change to Components and Cost Yes [ ] No [ X ] Change in Institutional Arrangements Yes [ ] No [ X ] Change in Financial Management Yes [ ] No [ X ] Change in Procurement Yes [ ] No [ X ] Change in Implementation Schedule Yes [ ] No [ X ] Other Change(s) Yes [ ] No [ X ] Appraisal Summary Change in Economic and Financial Analysis Yes [ ] No [ X ] Appraisal Summary Change in Technical Analysis Yes [ ] No [ X ] Appraisal Summary Change in Social Analysis Yes [ ] No [ X ] Appraisal Summary Change in Environmental Analysis Yes [ ] No [ X ] Appraisal Summary Change in Risk Analysis Yes [ ] No [ X ] 5

B. Project Status The project is at a mature stage of implementation, with many project activities already successfully completed, and the project development objective of developing cost-effective and sustainable environmental rehabilitation and management of forest lands and associated rangelands is achievable. To date, the project has supported the environmental rehabilitation of approximately 33,000 ha of Irtysh Pine forest and revegetation of 48,000 ha in the Dry Aral Seabed, which is impressive given the areas' harsh climatic conditions. In addition, it is supporting sustainable resource-led grazing management in 168,000 ha of saxaul rangelands (surpassing the end of project target of 156,000 ha). Significant progress has also been achieved in enhancing firefighting capacity in Semey Ormany, with comprehensive fire protection/management investments that include a state-of-the-art forest fire control information system (FFCIS), enabling faster forest fire detection as well as much quicker response times. Participatory Forest Management as well as Saxaul Rangelands Management have been piloted for the first time in Kazakhstan under the project. To date, US$23.9 million (80%) of the US$30.0 million loan proceeds have been disbursed, and US$4.6 million (93%) of the US$5.0 million in GEF grant proceeds have been disbursed. The project underwent a Level 2 restructuring in 2010 to extend the project closing date from November 30, 2012 to May 31, 2014, due to initial startup delays, and to reallocate loan proceeds to support a turn-key contract for the construction of a seed complex and containerized nursery in Semey. Construction of the Semey nursery and seed complex is the only project activity that continues to experience delay. This planned, state-of-the-art nursery will allow Semey to expand its yearly planting several times and improve seedling survival rates post planting. Following lengthy delays in the original turnkey contract's implementation, which was signed in April 2010, the implementing agency terminated the contract on November 21, 2012. Nursery construction was retendered this calendar year and construction began in August 2013. The project underwent a second Level 2 restructuring in July 2013 to extend the loan closing date to November 28, 2014. This extension helps compensate for project activity delays related to the Government's reorganization earlier this calendar year and also supports adequate equipping and operation of the Semey nursery and seed complex prior to the project's completion. Development Objectives/Results Project Development Objectives (P078301 - Forest Protection & Reforestation Project) Original PDO The project objective is to develop cost effective and sustainable environmental rehabilitation and management of forest landsandas sociated rangelands, with a focus on the Irtysh pine forest, the dry Aral Seabed, and saxaul rangelands. Global Environmental Objectives (P087485 - FOREST PROTECTION & REFORESTATION) Original GEO The development objective is both local and global in nature; therefore the GEO is the same as the PDO. C. Proposed Changes Change in Results Framework Explanation: Revisions to the Results Framework. The proposed restructuring includes modifications to some of the Project's indicators to better reflect anticipated project achievements. These modifications are mostly due to natural factors outside the control of Government or forestry authorities. Specifically, modifications to two of the project's five outcome indicators and three of the project's eight intermediate indicators are proposed: 6

a. The original project outcome indicator of 48,000 ha to be rehabilitated in Irtysh Pine Forest (IPF) was to be partly achieved with 20,000 ha of direct seeding, a highly experimental technology that was planned to be trialed during the project. Several trials under the project have shown that the technology of pelleting seeds is inadequate to ensure a reasonable survival rate in the project area's harsh climatic conditions. The survival rate of seeds was poor and the Forest and Hunting Committee (FHC) made the decision to discontinue this activity. The planting program, which was carried out with state reserve funds but greatly facilitated by the project, however, has progressed well and already surpassed (by about 50%) the original project targets of 21,000 ha. The area planted, however, is insufficient to fully compensate for direct seeding's lack of success and it is proposed to reduce the target area to be rehabilitated from 48,000 ha to 41,000 ha. Direct seeding on the Dry Aral Seabed (DAS), with even harsher climatic conditions has also had a low success rate, and it is proposed to downscale the target of 100,000 ha to be rehabilitated to 61,000 ha. b. The infeasibility of continuing direct seeding has also had an impact on the number of people employed under the project (another project outcome indicator). Since the project primarily helps facilitate the work of state reserves, the number of people to be employed by the project is expected to be reduced from 6,000 to 3,000. Similarly, in the DAS the number of people employed is expected to be reduced from 4,500 to 2,000. c. With respect to the project's intermediate results indicators, the expected survival rate targets also need to be revised to better reflect local conditions. Although the current target is to increase survival in the IPF from a baseline of 60% to an end of project target of 85%, it is important to note that the survival rate of plantings in the IPF was not 60% at the baseline but rather in the order of 30%. As such, it is proposed to modify the end of project survival rate from a baseline of 30% to an end of project target of 55%. d. Similarly, the expected, end of project survival rate in the DAS will be corrected to 25%. e. Another intermediate results indicator measures the number of demonstration plots developed under the Rangelands subcomponent in Kyzylorda oblast. It is proposed to modify the number of demo plots developed from 30 to 20, given the lack of appropriate sites on forest fund lands in the project area, resulting in a reduction in the cumulative area of participatory saxaul rangeland restoration demonstrations sites from 6,000 ha to 4,000 ha. However, it is important to also note that the total area of improved pastures is larger than originally planned due to a wider area of lands adjoining demo plots (representing an average increase from 156,000 ha, as originally planned, to 168,000 ha). Reallocations Explanation: Financing Reallocation of Loan and GEF Grant proceeds among categories. Although the Semey nursery and seed complex was originally procured under a single turnkey contract for the nursery s design, construction, and equipping, with the re-tendering of the nursery's construction and supply of equipment earlier this calendar year these elements have now been contracted separately. With the nursery's design, construction, and equipping now divided into individual contracts, these contracts will no longer be fully funded from the infrastructure construction category, but from the goods category as well. As such, it is proposed that US$2.6 million be reallocated from the loan's infrastructure construction category to the goods category. An additional proposed reallocation reflects the state budget's provision of significant financial resources to Semey and Irytish Ormanies to carry out their planting programs. Given that these planned project activities are now being financed with government resources, loan proceeds allocated to forestry related civil works under the IPF component (Part A of the Project) would be reallocated to forestry related civil works being carried out under the DAS component (Part B of the Project). Lastly, the proposed changes to GEF grant category allocations are minor and reflect changes over time in the cost of services procured. It should also be noted that the Government s request for a reallocation of GEF Grant proceeds contained a US$1,000 discrepancy. This discrepancy was clarified in an email from FHC on October 25, 2013, which requested that this US$1,000 be added to Category 2, Technical services. 7

Ln/Cr/TF IBRD-48080 USD Currency Current Category of Expenditure (1) Goods under Parts A and B of the Project (2) Infrastructure construction and rehabilitation civil works under: Allocation Disbursement % (Type Total) Current Proposed Current Proposed 11,300,000.00 13,900,000.00 80.00 80.00 (a) Part A of the Project 10,300,000.00 8,400,000.00 80.00 80.00 (b) Part B of the Project 2,300,000.00 1,600,000.00 80.00 80.00 (3) Forestry related civil works under: (a) Part A of the Project 3,600,000.00 2,200,000.00 60.00 60.00 (b) Part B of the Project 2,500,000.00 3,900,000.00 60.00 60.00 Total: 30,000,000.00 30,000,000.00 TF-55731 USD (1) Training 1,700,000.00 1,554,000.00 80.00 80.00 (2) Technical services 2,000,000.00 1,772,000.00 35.00 35.00 (3) Remote sensing and mapping under Part C.1 of the Project (4) Grants under Part C.2 of the Project 500,000.00 842,000.00 80.00 80.00 800,000.00 832,000.00 33.00 33.00 Total: 5,000,000.00 5,000,000.00 8

ANNEX 1. RESULTS FRAMEWORK Republic of Kazakhstan Forest Protection and Reforestation Project Performance Monitoring Indicators Vision 2025 1 Outcome indicators 2025 Use of outcome information Forest lands and associated rangelands rehabilitated and well managed Land degradation (specifically, deterioration or lack of trees or other vegetative cover) prevented, reduced, or ameliorated in Set project outcomes in context of long-term vision Irtysh pine forests: 180,000 ha burned or deforested area replanted and 650,000 ha good condition Dry Aral Seabed: 800,000 ha covered with vegetation (through planning and natural spread) Effective interventions underway to maintain public saxaul rangelands in good condition Organizational and procedural arrangements facilitating sustainable and cost-effective results applied to the management other forest lands and other public expenditure investment programs Project Development Objective Development and initiation of cost effective and sustainable ways of environmental rehabilitation and management of forest lands and associated rangelands, with a focus on the Irtysh pine forest, dry Aral Seabed, and saxaul Outcome Indicators (End of Project) Land degradation (specifically deterioration or lack of tree or other vegetative cover) prevented, reduced, or ameliorated in Irtysh pine forest including 41,000 ha rehabilitated forest and reversal of fire degradation trends on 650,000 ha Use of outcome information Gauge Scale of coverage and extent of changes in land degradation and associated environmental and economic impacts, in relationship to overall magnitude of land degradation problem and in comparison to projections of 1 The 2025 vision is indicative only and does not represent a formal view of the Government. It will be further considered and refined under the policy subcomponent of the Project. 9

rangelands Dry Aral Seabed: more than 61,000 ha of current total 2.2 mln. ha dry seabed area covered by vegetation (from pre-project coverage, project planting, and natural spread) 168,000 ha of saxaul and adjoining rangelands with sustainable resource-led grazing management Capacity and decision to upscale investment programs for forest lands based on improved knowledge of performance, costs, and impacts as demonstrated by Decisions to scale up Irtysh pine reforestation program Decisions to scale up vegetative planting of dry Aral seabed, and Replication of saxaul rangeland restoration program with own funds Application of lessons learned from competitive grant subprojects and reflected in replication plan Number of people employed under the project, or otherwise benefited as a result of the project Irtysh pine: 3,000 employed Dry Aral Seabed: 2,000 employed Saxaul rangelands: 1,500 employed Improved knowledge of modern planting and fire management technologies and of natural resource dynamics and management, as well as capacity of cost effective and results oriented public expenditure on forest lands Project reputation for integrity and public support for improved forest and associated rangeland management as reflected in public opinion surveys what would happen in absence of project; Realism of projections and adjust project design or expectations if necessary; Success of new incentive frameworks which will help prevent future degradation and thus make mitigation worthwhile and inform decision-making on future public investment programs in project areas Gauge success of new operational arrangements and analytic capacities which promote ongoing research and learning culture, responsive adaptation, and improved accountability Gauge magnitude of social and poverty impacts of project Gauge extent of institutional impact Gauge reputation for integrity and effectiveness 10

Intermediate Results Component IA: Irtysh pine forest: Improved reforestation through re-establishment of seed production areas to ensure quality, applied research on cost effective nursery and planting technologies (e.g. greenhouses, containers, seeding), and expansion of program to enable completion of reforestation of 180,000 ha by 2025. Component IB: Irtysh pine forest: Development and implementation of improved forest fire management through improved fire prevention, improved fire detection, fire suppression to reverse long-term trends in degradation of forest lands from fire. Component I С: Irtysh pine forest: Forest Partnership development Component II A: Dry Aral Seabed: Vegetative planting: Increased afforestation through upgraded facilities, improved contracting arrangements, applied research on improved planting methods, expansion of program to achieve planting rates of at least 31,000 ha per Results Indicators for Each Component Component IA: 41,000 ha replanted during project period, and by year 6 unit costs of replanting reduced from US$240 per ha to less than US$190 per ha with survival rate increased from 30% to 55% Component IB: 650,000 ha under improved fire management comprising: (i) effective fire breaks and fuel reduced buffer zones accompanied by public education campaigns; (ii) more effective fire detection information system with obsolete towers replaced and new towers where needed; (iii) improved fire suppression capability through better equipment, fast-attach vehicles, replacement of obsolete fire trucks and improvement of key forest roads; and (iv) annual program of thinning and cleaning where necessary, integrated pest management support provided Component IC: PFM framework designed and reflected in operational manual and then under implementation, initially in 4 villages and then in 12 villages Component II A: 52,000 ha planted and 9,000 ha direct seeded during project period, with year 6 unit costs reduced from US$207 to less than US$175 per ha with survival rate no less than 25% and using revised arrangements for flexible, performance based budgeting and contracting Use of Results Monitoring Component IA: YR 1 YR 6: Low Year 1 Year 6: Low levels may flag constraints in fund flow, methodologies, or unrealistic expectations Component IВ: Year 1 Year 6: Low levels may flag constraints in fund flow, methodologies, unrealistic expectations Component I С: Year 1 Year 6: Low levels may flag constraints in fund flow, methodologies, or unrealistic expectations Component II A: Year 1 Year 6: Low levels may flag constraints in fund flow, methodologies, or unrealistic expectations 11

year by 2011. Component II В: Participatory saxaul rangelands rehabilitation: Herder agreements to enable restoration of degraded saxaul rangelands, and provision of water resources for compensatory rangelands Component IIIА: Improvements in policy information, and human resource capacity Component IIIB: Competitive grant fund for pilot demonstration investments (e.g. timber usufruct sharing) Component IIIС: Project administration is satisfactory Component II В: 20 demonstrations covering a total of approximately 4,000 ha covered by planting with seedlings and seeds with survival rates no less than 25% and at least 168,000 ha rangelands provided with increased access to water for grazing animals Component IА: (i) analytical studies on policy and public expenditure; (ii) expansion of information facilities and development of information system; (iii) HRD plan and in-service training program Component IIIB: Operational manual approved, and 35 grants approved and then implemented with well monitored results Component IIIС: Bank supervision ratings Component II В: Year 1 Year 6: Low levels may flag constraints in fund flow, methodologies, or unrealistic expectations Component IА: Year 1 Year 6: Low levels may flag constraints or unrealistic expectations Component IIIB: Year 1 Year 6: Numbers indicate that this component is functioning Component IIIС: Year 1 Year 6: Flags administrative and communication problems 12