1 Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Mauritania MAURITANIA: TRANSPORT SECTOR INSTITUTIONAL DEVELOPMENT AND TECHNICAL ASSISTANCE PROJECT (P089672) Operation Name: MAURITANIA: TRANSPORT SECTOR INSTITUTIONAL Project Stage: Implementation Seq.No: 8 Status: ARCHIVED Archive : 10-Jul-2011 DEVELOPMENT AND TECHNICAL ASSISTANCE PROJECT (P089672) Country: Mauritania Approval FY: 2009 Product Line: IBRD/IDA Region: AFRICA Lending Instrument: Technical Assistance Loan Implementing Agency(ies): Ministry of Transport Key s Board Approval 31-Jul-2008 Original Closing 30-Sep-2012 Planned Mid Term Review 05-Jun-2011 Last Archived ISR 10-Jul-2011 Effectiveness 29-Dec-2009 Revised Closing 30-Sep-2012 Actual Mid Term Review 15-May-2011 Project Development Objectives Project Development Objective (from Project Appraisal Document) The Project Development Objective is to: Improve land, maritime, and air transport sector management. Has the Project Development Objective been changed since Board Approval of the Project? Yes No Component(s) losure Authorized Public Disclosure Authorized Component Name Component Cost Institutional Support and Capacity Building for the Land Transport Sub-sector 1.07 Support to Institutional and Technical Capacity Building for the Maritime Transport Sub-sector 1.02 Support to Air Transport System Reorganization and Technical Capacity building 0.65 Support to the Ministry's Coordination role and Project Activities Coordination 1.44 Overall Ratings Previous Rating Current Rating Progress towards achievement of PDO Satisfactory Satisfactory Overall Implementation Progress (IP) Satisfactory Satisfactory Overall Risk Rating Substantial Implementation Status Overview The overall project implementation status remains satisfactory. The disbursement s rate is at 62% ( SDR 1,740, out of a total amount of SDR2,800,000) and significant progress has been made with regards to the implementation of the activities of components 1 (land transport) and 2 (maritime transport) that were lagging behind. For example, for Page 1 of 5

2 component 1: (a) the preliminary draft of the road safety curricula has been completed; (b) the draft final report for the Road safety strategy has been prepared and is currently under review before formal approval; and (c) the action plan for the road safety awareness campaign has been approved. Regarding component 2, the Government has scheduled a workshop for mid-february 2012 to review and comment on the draft report for the merchant maritime code, before further processing and approval by the Government. As far as component 3 (air transport) is concerned, the draft report for the detailed engineering study for Nouakchott international airport (existing) development plan is available. The project has also developed a comprehensive sector wide tool to monitor the sectors performance. Consequently, the overall implementation progress of the project is considered as satisfactory. Locations Country First Administrative Division Location Planned Actual Mauritania District de Nouakchott Nouakchott Mauritania Wilaya de Dakhlet Nouadhibou Nouadhibou Mauritania Not Entered Islamic Republic of Mauritania Results Project Development Objective Indicators Indicator Name Core Unit of Measure Baseline Current End Target Road Safety strategy Text Value Scattered responsibilities among several agencies without a coordinatedframework Improvement of the legal and regulatory framework and operations in the merchant marine sub-sector (i) merchant shipping code and regulations, including ISPS code provisions Civil Aviation Code in compliance with ICAO standards Road Safety data is available. the draft final report of the national road safety strategy is completed and is under review before formal approval. Road Safety Strategy defined and action plan implementation approved. Text Value Merchant marine code Draft report of the study to Merchant marine code and outdated update the merchant shipping regulations, including ISPS code is available. provisions completed and disseminated. Text Value Civil aviation code outdated Achieved. Revised Civil Civil aviation code in force Aviation code in force. Page 2 of 5

3 Letter of sector Policy Text Value Preliminary study done Letter of Sector Policy Letter approved finalized but needs to be approved. Road safety prevention curriculaimplemented by the Ministry of Education in pilot schools Text Value Lack of road safety sensitization in primary education curricula 30-Jun-2008 Preliminary draft of the road safety curriculum in elementary school is available. 31-Dec-2011 Launch of curricula in pilot schools Intermediate Results Indicators Indicator Name Core Unit of Measure Baseline Current End Target Improvement in efficiency of road safety M & E (data base producing: ie number of accident in Nouakchott per inhabitants) Improvement in port safety and security issues: ISPS and MARPOL conventions monitoring by DMM Improvement in airport management operation (i) Investment plan is approved for the airport sector Action plan for road safety strategy in Nouakchott Text Value Lack of road safety data base Road safety data reports are available. The data on accidents is published monthly. M&E system available (data base produced yearly) Text Value ISPS convention monitoring Achieved. DMM is monitoring started the enforcement of ISPS and MARPOL conventions in Mauritanian ports. M&E system available (yearly reports produced) Text Value ToRs of the study drafted Draft detailed engineering Airport Investment Plan study report available early approved and implementation December 2011 and is now started under review. Text Value Lack of plan Action plan of the road safety awareness campaign in Nouakchott is completed and actual implementation is scheduled for end of January Action plan drafted, adopted, and implementation started Page 3 of 5

4 DMM staffing Text Value Recruitment of 16 staff DMM restructuring completed and staff training is underway. Two staff members have now completed a graduate program. Local training in office software and English Procurement schedule Text Value Procurement plan established Procurement Plan Annual adjustment established. Data on Financial Performance (as of 11-Jan-2012) Financial Agreement(s) Key s Project Loan No. Status Approval Signing Effectiveness Closing P IDA Effective 31-Jul Oct Dec Sep-2012 Disbursements (in Millions) Project Loan No. Status Currency Original Revised Cancelled Disbursed Undisbursed % Disbursed P IDA Effective XDR Disbursement Graph Page 4 of 5

5 Key Decisions Regarding Implementation Project implementation status remains satisfactory and the project is still on track towards achieving the Development objectives. The activity that is still lagging behind is the finalization of the merchant maritime code and the launch of the process for its adoption. Restructuring History There has been no restructuring to date. Related Projects There are no related projects. Page 5 of 5

Implementation Status & Results Pakistan Water Sector Capacity Buildling and Advisory Services Project (WCAP) (P110099)

Implementation Status & Results Pakistan Water Sector Capacity Buildling and Advisory Services Project (WCAP) (P110099) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Pakistan Water Sector Capacity Buildling and Advisory Services Project (WCAP) (P110099) Operation

More information

Implementation Status & Results Brazil Second National Environmental Project - Phase II (P099469)

Implementation Status & Results Brazil Second National Environmental Project - Phase II (P099469) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Brazil Second National Environmental Project - Phase II (P099469) Operation Name: Second National

More information

Implementation Status & Results Honduras Barrio-Ciudad Project (P088319)

Implementation Status & Results Honduras Barrio-Ciudad Project (P088319) Public Disclosure Authorized Public Disclosure Authorized losure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Honduras Barrio-Ciudad Project (P88319) Operation

More information

Implementation Status & Results Africa NELSAP Regional Agricultural Trade and Productivity TA (Phase II) (P115414)

Implementation Status & Results Africa NELSAP Regional Agricultural Trade and Productivity TA (Phase II) (P115414) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Africa NELSAP Regional Agricultural Trade and Productivity TA (Phase II) (P115414) Operation Name:

More information

Implementation Status & Results Africa Central African Backbone - APL2 (P117652)

Implementation Status & Results Africa Central African Backbone - APL2 (P117652) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Africa Central African Backbone - APL2 (P117652) Operation Name: Central African Backbone - APL2

More information

Implementation Status & Results Benin Support to Protected Areas Management (P122419)

Implementation Status & Results Benin Support to Protected Areas Management (P122419) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Benin Support to Protected Areas Management (P122419) Operation Name: Support to Protected Areas

More information

Implementation Status & Results Mozambique Market led Smallholder Development in the Zambezi Valley (P093165)

Implementation Status & Results Mozambique Market led Smallholder Development in the Zambezi Valley (P093165) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Mozambique Market led Smallholder Development in the Zambezi Valley (P093165) Operation Name: Market

More information

Implementation Status & Results Tanzania Development of a National Statistical System for Tanzania (P107722)

Implementation Status & Results Tanzania Development of a National Statistical System for Tanzania (P107722) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Tanzania Development of a National Statistical System for Tanzania (P107722) Operation Name: Development

More information

Implementation Status & Results Azerbaijan Highway 2 (P094488)

Implementation Status & Results Azerbaijan Highway 2 (P094488) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Azerbaijan Highway 2 (P094488) Operation Name: Highway 2 (P094488) Project Stage: Implementation

More information

Implementation Status & Results Haiti Disaster Risk Management and Reconstruction (P126346)

Implementation Status & Results Haiti Disaster Risk Management and Reconstruction (P126346) losure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Haiti Disaster Risk Management and Reconstruction

More information

Implementation Status & Results Tanzania Development of a National Statistical System for Tanzania (P107722)

Implementation Status & Results Tanzania Development of a National Statistical System for Tanzania (P107722) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Tanzania Development of a National Statistical System for Tanzania (P107722) Operation Name: Development

More information

Implementation Status & Results Bangladesh Bangladesh Central Bank Strengthening Project (P062916)

Implementation Status & Results Bangladesh Bangladesh Central Bank Strengthening Project (P062916) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Bangladesh Bangladesh Central Bank Strengthening Project (P062916) Operation Name: Bangladesh Central

More information

Implementation Status & Results Ghana Ghana: Statistics Development Program (MDTF) (P118585)

Implementation Status & Results Ghana Ghana: Statistics Development Program (MDTF) (P118585) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Ghana Ghana: Statistics Development Program (MDTF) (P118585) Operation Name: Ghana: Statistics Development

More information

Implementation Status & Results Georgia Kakheti Regional Roads Improvement Project (P117152)

Implementation Status & Results Georgia Kakheti Regional Roads Improvement Project (P117152) Public Disclosure Authorized Public Disclosure Authorized losure Authorized Public Disclosure Authorized Implementation Status & Results Georgia Kakheti Regional Roads Improvement Project (P117152) Operation

More information

Implementation Status & Results Indonesia ID-Urban Water Supply and Sanitation (P090991)

Implementation Status & Results Indonesia ID-Urban Water Supply and Sanitation (P090991) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Indonesia ID-Urban Water Supply and Sanitation (P090991) Operation Name: ID-Urban Water Supply and

More information

Implementation Status & Results Serbia CORRIDOR X HIGHWAY PROJECT (P108005)

Implementation Status & Results Serbia CORRIDOR X HIGHWAY PROJECT (P108005) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Serbia CORRIDOR X HIGHWAY PROJECT (P108005) Report : ISR1437 Operation Name: CORRIDOR X HIGHWAY

More information

Implementation Status & Results Colombia Disaster Vulnerability Reduction First Phase APL (P082429)

Implementation Status & Results Colombia Disaster Vulnerability Reduction First Phase APL (P082429) losure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Colombia Disaster Vulnerability Reduction First Phase

More information

Implementation Status & Results Cameroon Agricultural Competitiveness Project (P112635)

Implementation Status & Results Cameroon Agricultural Competitiveness Project (P112635) Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Cameroon Agricultural Competitiveness Project (P112635) o C Operation

More information

Implementation Status & Results Brazil BR São Paulo Trains and Signalling (P106038)

Implementation Status & Results Brazil BR São Paulo Trains and Signalling (P106038) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Brazil BR São Paulo Trains and Signalling (P106038) Operation Name: BR São Paulo Trains and Signalling

More information

Implementation Status & Results Brazil Bahia Integrated State Highway Management Project (P095460)

Implementation Status & Results Brazil Bahia Integrated State Highway Management Project (P095460) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Brazil Bahia Integrated State Highway Management Project (P095460) Operation Name: Bahia Integrated

More information

Implementation Status & Results Serbia CORRIDOR X HIGHWAY PROJECT (P108005)

Implementation Status & Results Serbia CORRIDOR X HIGHWAY PROJECT (P108005) Public Disclosure Authorized Public Disclosure Authorized Implementation Status & Results Serbia CORRIDOR X HIGHWAY PROJECT (P108005) Operation Name: CORRIDOR X HIGHWAY PROJECT (P108005) Project Stage:

More information

Implementation Status & Results Indonesia Sustainable Management of Agricultural Research and Technology Dissemination (SMARTD) (P117243)

Implementation Status & Results Indonesia Sustainable Management of Agricultural Research and Technology Dissemination (SMARTD) (P117243) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Indonesia Sustainable Management of Agricultural Research and Technology Dissemination (SMARTD)

More information

Implementation Status & Results Indonesia Statistical Capacity Building-Change and Reform for the Development of Statistics (STATCAP-CERDAS) (P106384)

Implementation Status & Results Indonesia Statistical Capacity Building-Change and Reform for the Development of Statistics (STATCAP-CERDAS) (P106384) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Indonesia Statistical Capacity Building-Change and Reform for the Development of Statistics (STATCAP-CERDAS)

More information

Implementation Status & Results Uzbekistan Uzbekistan Bukhara and Samarkand Sewerage Project (P112719)

Implementation Status & Results Uzbekistan Uzbekistan Bukhara and Samarkand Sewerage Project (P112719) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Uzbekistan Uzbekistan Bukhara and Samarkand Sewerage Project (P112719) Operation Name: Uzbekistan

More information

Implementation Status & Results Africa WAPP APL 2 - OMVS Felou Hydroelectric Project (P094916)

Implementation Status & Results Africa WAPP APL 2 - OMVS Felou Hydroelectric Project (P094916) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Africa WAPP APL 2 - OMVS Felou Hydroelectric Project (P094916) Operation Name: WAPP APL 2 - OMVS

More information

Implementation Status & Results Mozambique Health Commodity Security Project (P121060)

Implementation Status & Results Mozambique Health Commodity Security Project (P121060) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Mozambique Health Commodity Security Project (P121060) Operation Name: Health Commodity Security

More information

Implementation Status & Results Peru Water Resources Management Modernization (P107666)

Implementation Status & Results Peru Water Resources Management Modernization (P107666) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Peru Water Resources Management Modernization (P107666) Operation Name: Water Resources Management

More information

Implementation Status & Results Serbia CORRIDOR X HIGHWAY PROJECT (P108005)

Implementation Status & Results Serbia CORRIDOR X HIGHWAY PROJECT (P108005) Public Disclosure Authorized Public Disclosure Authorized Implementation Status & Results Serbia CORRIDOR X HIGHWAY PROJECT (P108005) Operation Name: CORRIDOR X HIGHWAY PROJECT (P108005) Project Stage:

More information

Implementation Status & Results Morocco MA-Modernization of Irrigated Agriculture in the Oum Er Rbia Basin (P093719)

Implementation Status & Results Morocco MA-Modernization of Irrigated Agriculture in the Oum Er Rbia Basin (P093719) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Morocco MA-Modernization of Irrigated Agriculture in the Oum Er Rbia Basin (P093719) Operation Name:

More information

Implementation Status & Results Morocco MA-Modernization of Irrigated Agriculture in the Oum Er Rbia Basin (P093719)

Implementation Status & Results Morocco MA-Modernization of Irrigated Agriculture in the Oum Er Rbia Basin (P093719) losure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Morocco MA-Modernization of Irrigated Agriculture

More information

Implementation Status & Results Benin Support to Protected Areas Management (P122419)

Implementation Status & Results Benin Support to Protected Areas Management (P122419) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Benin Support to Protected Areas Management (P122419) Operation Name: Support to Protected Areas

More information

Implementation Status & Results Philippines ARMM Social Fund Project (P073488)

Implementation Status & Results Philippines ARMM Social Fund Project (P073488) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Philippines ARMM Social Fund Project (P073488) Operation Name: ARMM Social Fund Project (P073488)

More information

Implementation Status & Results Brazil Pelotas - Rio Grande do Sul Integrated Municipal Development Program (APL) (P094199)

Implementation Status & Results Brazil Pelotas - Rio Grande do Sul Integrated Municipal Development Program (APL) (P094199) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Brazil Pelotas - Rio Grande do Sul Integrated Municipal Development Program (APL) (P094199) Operation

More information

Implementation Status & Results India Rajasthan Rural Livelihoods Project (RRLP) (P102329)

Implementation Status & Results India Rajasthan Rural Livelihoods Project (RRLP) (P102329) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results India Rajasthan Rural Livelihoods Project (RRLP) (P102329) Operation Name: Rajasthan Rural Livelihoods

More information

Implementation Status & Results Mongolia MONSTAT: Strengthening the National Statistical System of Mongolia (P113160)

Implementation Status & Results Mongolia MONSTAT: Strengthening the National Statistical System of Mongolia (P113160) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Mongolia MONSTAT: Strengthening the National Statistical System of Mongolia (P113160) Operation

More information

Implementation Status & Results Paraguay Paraguay Sustainable Agriculture & Rural Development Project (P088799)

Implementation Status & Results Paraguay Paraguay Sustainable Agriculture & Rural Development Project (P088799) Public Disclosure Authorized Public Disclosure Authorized losure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Paraguay Paraguay Sustainable Agriculture & Rural

More information

Implementation Status & Results Armenia Public Sector Modernization Project (P060786)

Implementation Status & Results Armenia Public Sector Modernization Project (P060786) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Armenia Public Sector Modernization Project (P060786) Operation Name: Public Sector Modernization

More information

Implementation Status & Results Indonesia Third Water Supply and Sanitation for Low Income Communities Project (P085375)

Implementation Status & Results Indonesia Third Water Supply and Sanitation for Low Income Communities Project (P085375) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Indonesia Third Water Supply and Sanitation for Low Income Communities Project (P085375) Operation

More information

Implementation Status & Results India Andhra Pradesh Road Sector Project (P096021)

Implementation Status & Results India Andhra Pradesh Road Sector Project (P096021) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results India Andhra Pradesh Road Sector Project (P096021) Operation Name: Andhra Pradesh Road Sector Project

More information

Implementation Status & Results Haiti Haiti Transport and Territorial Development Project (P095523)

Implementation Status & Results Haiti Haiti Transport and Territorial Development Project (P095523) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Haiti Haiti Transport and Territorial Development Project (P095523) Operation Name: Haiti Transport

More information

Implementation Status & Results Brazil BR Municipal APL: Teresina Enhancing Municipal Governance and Quality of Life Project (P088966)

Implementation Status & Results Brazil BR Municipal APL: Teresina Enhancing Municipal Governance and Quality of Life Project (P088966) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Brazil BR Municipal APL: Teresina Enhancing Municipal Governance and Quality of Life Project (P088966)

More information

Implementation Status & Results Chile Ministry of Public Works Institutional Strengthening TAL (P102931)

Implementation Status & Results Chile Ministry of Public Works Institutional Strengthening TAL (P102931) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Chile Ministry of Public Works Institutional Strengthening TAL (P102931) Operation Name: Ministry

More information

Implementation Status & Results Africa West Africa Agricultural Productivity Program (WAAPP) (P094084)

Implementation Status & Results Africa West Africa Agricultural Productivity Program (WAAPP) (P094084) losure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Africa West Africa Agricultural Productivity Program

More information

Implementation Status & Results Indonesia Geothermal Power Generation Development (P099757)

Implementation Status & Results Indonesia Geothermal Power Generation Development (P099757) losure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Indonesia Geothermal Power Generation Development

More information

Implementation Status & Results Vietnam Customs Modernization Project (P085071)

Implementation Status & Results Vietnam Customs Modernization Project (P085071) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Vietnam Customs Modernization Project (P085071) Operation Name: Customs Modernization Project (P085071)

More information

Implementation Status & Results Vietnam URBAN WATER SUPPLY AND WASTEWATER (P119077)

Implementation Status & Results Vietnam URBAN WATER SUPPLY AND WASTEWATER (P119077) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Vietnam URBAN WATER SUPPLY AND WASTEWATER (P119077) Operation Name: URBAN WATER SUPPLY AND WASTEWATER

More information

Implementation Status & Results Uzbekistan Uzbekistan Bukhara and Samarkand Sewerage Project (P112719)

Implementation Status & Results Uzbekistan Uzbekistan Bukhara and Samarkand Sewerage Project (P112719) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Uzbekistan Uzbekistan Bukhara and Samarkand Sewerage Project (P112719) Operation Name: Uzbekistan

More information

Urban Local Government Strengthening Program

Urban Local Government Strengthening Program losure Authorized Tab 1: Overview and Performance Basic Information Urban Local Government Strengthening Program Operation Name Urban Local Government Strengthening Program (ULGSP) Project Stage Implementation

More information

Implementation Status & Results Africa WAPP APL 1 (1st Phase - COASTAL TRANSMISSION BACKBONE) (P075994)

Implementation Status & Results Africa WAPP APL 1 (1st Phase - COASTAL TRANSMISSION BACKBONE) (P075994) Public Disclosure Authorized Public Disclosure Authorized Implementation Status & Results Africa WAPP APL 1 (1st Phase - COASTAL TRANSMISSION BACKBONE) (P075994) Operation Name: WAPP APL 1 (1st Phase -

More information

The World Bank Geothermal Clean Energy Investment Project (P113078)

The World Bank Geothermal Clean Energy Investment Project (P113078) Public Disclosure Authorized EAST ASIA AND PACIFIC Indonesia Energy & Extractives Global Practice IBRD/IDA Investment Project Financing FY 2012 Seq No: 11 ARCHIVED on 05-Nov-2017 ISR29890 Implementing

More information

Implementation Status & Results Samoa Samoa Agriculture & Fisheries Cyclone Response Project (P145938)

Implementation Status & Results Samoa Samoa Agriculture & Fisheries Cyclone Response Project (P145938) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Samoa Samoa Agriculture & Fisheries Cyclone Response Project (P145938) Operation Name: Samoa Agriculture

More information

Implementation Status & Results Indonesia Western Indonesia National Roads Improvement Project (P090990)

Implementation Status & Results Indonesia Western Indonesia National Roads Improvement Project (P090990) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Indonesia Western Indonesia National Roads Improvement Project (P090990) Operation Name: Western

More information

Implementation Status & Results Brazil Pelotas - Rio Grande do Sul Integrated Municipal Development Program (APL) (P094199)

Implementation Status & Results Brazil Pelotas - Rio Grande do Sul Integrated Municipal Development Program (APL) (P094199) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Brazil Pelotas - Rio Grande do Sul Integrated Municipal Development Program (APL) (P094199) Operation

More information

Implementation Status & Results India Andhra Pradesh Road Sector Project (P096021)

Implementation Status & Results India Andhra Pradesh Road Sector Project (P096021) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results India Andhra Pradesh Road Sector Project (P096021) Operation Name: Andhra Pradesh Road Sector Project

More information

Implementation Status & Results Africa West Africa Agricultural Productivity Program (WAAPP) (P094084)

Implementation Status & Results Africa West Africa Agricultural Productivity Program (WAAPP) (P094084) losure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Africa West Africa Agricultural Productivity Program

More information

Implementation Status & Results India Uttar Pradesh Water Sector Restructuring Project (P050647)

Implementation Status & Results India Uttar Pradesh Water Sector Restructuring Project (P050647) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results India Uttar Pradesh Water Sector Restructuring Project (P050647) Operation Name: Uttar Pradesh Water

More information

The World Bank Geothermal Clean Energy Investment Project (P113078)

The World Bank Geothermal Clean Energy Investment Project (P113078) Public Disclosure Authorized EAST ASIA AND PACIFIC Indonesia Energy and Mining Global Practice IBRD/IDA Specific Investment Loan FY 2012 Seq No: 6 ARCHIVED on 17-Jun-2015 ISR18126 Implementing Agencies:

More information

Implementation Status & Results Honduras Honduras Education Quality, Governance, & Institutional Strengthening (P101218)

Implementation Status & Results Honduras Honduras Education Quality, Governance, & Institutional Strengthening (P101218) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Honduras Honduras Education Quality, Governance, & Institutional Strengthening (P101218) Operation

More information

Implementation Status & Results Indonesia Integrating Environment and Forest Protection into the Recovery and Future Development of Aceh (P098052)

Implementation Status & Results Indonesia Integrating Environment and Forest Protection into the Recovery and Future Development of Aceh (P098052) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Indonesia Integrating Environment and Forest Protection into the Recovery and Future Development

More information

Implementation Status & Results Brazil Rio de Janeiro Mass Transit Project II (P111996)

Implementation Status & Results Brazil Rio de Janeiro Mass Transit Project II (P111996) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Brazil Rio de Janeiro Mass Transit Project II (P111996) Operation Name: Rio de Janeiro Mass Transit

More information

Implementation Status & Results Indonesia Aceh-Nias Livelihoods and Economic Development Program (LEDP) (P110635)

Implementation Status & Results Indonesia Aceh-Nias Livelihoods and Economic Development Program (LEDP) (P110635) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Indonesia Aceh-Nias Livelihoods and Economic Development Program (LEDP) (P110635) Operation Name:

More information

Implementation Status & Results Mozambique Market led Smallholder Development in the Zambezi Valley (P093165)

Implementation Status & Results Mozambique Market led Smallholder Development in the Zambezi Valley (P093165) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Mozambique Market led Smallholder Development in the Zambezi Valley (P093165) Operation Name: Market

More information

Implementation Status & Results Ghana Ghana Urban Transport Project (P100619)

Implementation Status & Results Ghana Ghana Urban Transport Project (P100619) Public Disclosure Authorized Public Disclosure Authorized Implementation Status & Results Ghana Ghana Urban Transport Project (P100619) Operation Name: Ghana Urban Transport Project (P100619) Project Stage:

More information

The World Bank Bangladesh Weather and Climate Services Regional Project (P150220)

The World Bank Bangladesh Weather and Climate Services Regional Project (P150220) Public Disclosure Authorized SOUTH ASIA Bangladesh Social, Urban, Rural and Resilience Global Practice Global Practice IBRD/IDA Investment Project Financing FY 2016 Seq No: 4 ARCHIVED on 15-Jun-2018 ISR32873

More information

Implementation Status & Results Macedonia, former Yugoslav Republic of Second Trade and Transport Facilitation Project (P091723)

Implementation Status & Results Macedonia, former Yugoslav Republic of Second Trade and Transport Facilitation Project (P091723) Public Disclosure Authorized Public Disclosure Authorized Implementation Status & Results Macedonia, former Yugoslav Republic of Second Trade and Transport Facilitation Project (P091723) Operation Name:

More information

Implementation Status & Results Nicaragua Nicaragua Rural Telecom (P089989)

Implementation Status & Results Nicaragua Nicaragua Rural Telecom (P089989) losure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Implementation Status & Results Nicaragua Nicaragua Rural Telecom (P089989) Operation Name: Nicaragua

More information

Implementation Status & Results Jordan Promotion of a Wind Power Market (P093201)

Implementation Status & Results Jordan Promotion of a Wind Power Market (P093201) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Jordan Promotion of a Wind Power Market (P9321) Operation Name: Promotion of a Wind Power Market

More information

Implementation Status & Results Iraq IQ-TF EMERG. WATER, SANITATION & URBAN (P087910)

Implementation Status & Results Iraq IQ-TF EMERG. WATER, SANITATION & URBAN (P087910) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Iraq IQ-TF EMERG. WATER, SANITATION & URBAN (P087910) Operation Name: IQ-TF EMERG. WATER, SANITATION

More information

Implementation Status & Results Mexico Mexico Forests and Climate Change Project (P123760)

Implementation Status & Results Mexico Mexico Forests and Climate Change Project (P123760) Public Disclosure Authorized Public Disclosure Authorized Implementation Status & Results Mexico Mexico Forests and Climate Change Project (P123760) Operation Name: Mexico Forests and Climate Change Project

More information

Implementation Status & Results Brazil Pelotas - Rio Grande do Sul Integrated Municipal Development Program (APL) (P094199)

Implementation Status & Results Brazil Pelotas - Rio Grande do Sul Integrated Municipal Development Program (APL) (P094199) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Brazil Pelotas - Rio Grande do Sul Integrated Municipal Development Program (APL) (P094199) Operation

More information

Implementation Status & Results Indonesia Geothermal Power Generation Development (P099757)

Implementation Status & Results Indonesia Geothermal Power Generation Development (P099757) losure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Implementation Status & Results Indonesia Geothermal Power Generation Development (P099757) Operation

More information

Implementation Status & Results Colombia Justice Services Strenghtening (P083904)

Implementation Status & Results Colombia Justice Services Strenghtening (P083904) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Colombia Justice Services Strenghtening (P083904) Operation Name: Justice Services Strenghtening

More information

The World Bank Stormwater Mgt. and Climate Change Adaptation Project (P122841)

The World Bank Stormwater Mgt. and Climate Change Adaptation Project (P122841) Public Disclosure Authorized AFRICA Senegal Social, Urban, Rural and Resilience Global Practice Global Practice IBRD/IDA Specific Investment Loan FY 2012 Seq No: 9 ARCHIVED on 30-Jun-2017 ISR26846 Implementing

More information

Implementation Status & Results Benin Benin Emergency Urban Env. Project (P113145)

Implementation Status & Results Benin Benin Emergency Urban Env. Project (P113145) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Benin Benin Emergency Urban Env. Project (P113145) Operation Name: Benin Emergency Urban Env. Project

More information

Public Disclosure Copy. Implementation Status & Results Report BD: Leveraging ICT Growth, Employment and Governance Project (P122201)

Public Disclosure Copy. Implementation Status & Results Report BD: Leveraging ICT Growth, Employment and Governance Project (P122201) Public Disclosure Authorized SOUTH ASIA Bangladesh Transport & ICT Global Practice IBRD/IDA Investment Project Financing FY 2013 Seq No: 10 ARCHIVED on 06-Nov-2017 ISR30072 Implementing Agencies: Bangladesh

More information

Public Disclosure Copy

Public Disclosure Copy Public Disclosure Authorized EAST ASIA AND PACIFIC Lao People's Democratic Republic Trade & Competitiveness Global Practice IBRD/IDA Specific Investment Loan FY 2008 Seq No: 11 ARCHIVED on 08-Sep-2015

More information

Implementation Status & Results Montenegro Montenegro Institutional Development and Agriculture Strengthening (MIDAS) (P107473)

Implementation Status & Results Montenegro Montenegro Institutional Development and Agriculture Strengthening (MIDAS) (P107473) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Montenegro Montenegro Institutional Development and Agriculture Strengthening (MIDAS) (P107473)

More information

Implementation Status & Results Panama Rural Productivity Project (GEF) (P083045)

Implementation Status & Results Panama Rural Productivity Project (GEF) (P083045) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Panama Rural Productivity Project (GEF) (P083045) Operation Name: Rural Productivity Project (GEF)

More information

Implementation Status & Results Vietnam VIETNAM WATER RESOURCES ASSISTANCE (P065898)

Implementation Status & Results Vietnam VIETNAM WATER RESOURCES ASSISTANCE (P065898) Public Disclosure Authorized Public Disclosure Authorized Implementation Status & Results Vietnam VIETNAM WATER RESOURCES ASSISTANCE (P065898) Operation Name: VIETNAM WATER RESOURCES ASSISTANCE (P065898)

More information

Implementation Status & Results Indonesia Western Indonesia National Roads Improvement Project (P090990)

Implementation Status & Results Indonesia Western Indonesia National Roads Improvement Project (P090990) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Indonesia Western Indonesia National Roads Improvement Project (P090990) Operation Name: Western

More information

Implementation Status & Results Brazil Rio de Janeiro Public Sector Modernization (P106768)

Implementation Status & Results Brazil Rio de Janeiro Public Sector Modernization (P106768) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Brazil Rio de Janeiro Public Sector Modernization (P106768) Operation Name: Rio de Janeiro Public

More information

RUSSIA FOREST FIRE RESPONSE PROJECT (P123923)

RUSSIA FOREST FIRE RESPONSE PROJECT (P123923) EUROPE AND CENTRAL ASIA Russian Federation Environment & Natural Resources Global Practice IBRD/IDA Investment Project Financing FY 2013 Seq No: 14 ARCHIVED on 28-Dec-2018 ISR35669 Implementing Agencies:

More information

Implementation Status & Results Bosnia and Herzegovina QUALITY PROTECT (GEF) (P085112)

Implementation Status & Results Bosnia and Herzegovina QUALITY PROTECT (GEF) (P085112) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Bosnia and Herzegovina QUALITY PROTECT (GEF) (P085112) Operation Name: QUALITY PROTECT (GEF) (P085112)

More information

Public Disclosure Copy. Public Disclosure Copy. The World Bank

Public Disclosure Copy. Public Disclosure Copy. The World Bank Public Disclosure Authorized Public Disclosure Authorized losure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Brazil Rio de Janeiro Sustainable Integrated Ecosystem

More information

KENYA: NATIONAL URBAN TRANSPORT IMPROVEMENT PROJECT (P126321)

KENYA: NATIONAL URBAN TRANSPORT IMPROVEMENT PROJECT (P126321) Public Disclosure Authorized AFRICA Kenya Transport & Digital Development Global Practice IBRD/IDA Investment Project Financing FY 2013 Seq No: 10 ARCHIVED on 07-Sep-2018 ISR33423 Implementing Agencies:

More information

The World Bank Stormwater Mgt. and Climate Change Adaptation Project (P122841)

The World Bank Stormwater Mgt. and Climate Change Adaptation Project (P122841) Public Disclosure Authorized AFRICA Senegal Social, Urban, Rural and Resilience Global Practice Global Practice IBRD/IDA Investment Project Financing FY 2012 Seq No: 10 ARCHIVED on 26-Dec-2017 ISR30717

More information

Implementation Status & Results Indonesia ID-Domestic Gas Market Development Project (P077175)

Implementation Status & Results Indonesia ID-Domestic Gas Market Development Project (P077175) losure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Indonesia ID-Domestic Gas Market Development Project

More information

Implementation Status & Results Albania Energy Community of South East Europe APL Program - APL 5 for Albania DAM SAFETY (P110481)

Implementation Status & Results Albania Energy Community of South East Europe APL Program - APL 5 for Albania DAM SAFETY (P110481) losure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Albania Energy Community of South East Europe APL

More information

Implementation Status & Results Botswana Northern Botswana Human Wildlife Coexistence Project (P095617)

Implementation Status & Results Botswana Northern Botswana Human Wildlife Coexistence Project (P095617) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Botswana Northern Botswana Human Wildlife Coexistence Project (P95617) Report No: ISR618 o o Operation

More information

Implementation Status & Results Montenegro Montenegro Institutional Development and Agriculture Strengthening (MIDAS) (P107473)

Implementation Status & Results Montenegro Montenegro Institutional Development and Agriculture Strengthening (MIDAS) (P107473) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Montenegro Montenegro Institutional Development and Agriculture Strengthening (MIDAS) (P107473)

More information

AR B.A.URB.TSP (P039584)

AR B.A.URB.TSP (P039584) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Argentina AR B.A.URB.TSP (P39584) Operation Name: AR B.A.URB.TSP (P39584) Project Stage: Implementation

More information

Implementation Status & Results Indonesia Barefoot Engineers III (P131387)

Implementation Status & Results Indonesia Barefoot Engineers III (P131387) losure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Indonesia Barefoot Engineers III (P131387) Operation

More information

Implementation Status & Results Peru Peru First Progrmmatic Environmental Development Policy Loan /DDO (P101471)

Implementation Status & Results Peru Peru First Progrmmatic Environmental Development Policy Loan /DDO (P101471) Public Disclosure Authorized Public Disclosure Authorized losure Authorized Public Disclosure Authorized The World Bank Project Name: Implementation Status & Results Peru Peru First Progrmmatic Environmental

More information

Public Disclosure Copy. Implementation Status & Results Report Second Sustainable and Participatory Energy Management (PROGEDE II) (P120629)

Public Disclosure Copy. Implementation Status & Results Report Second Sustainable and Participatory Energy Management (PROGEDE II) (P120629) Public Disclosure Authorized AFRICA Senegal Energy & Extractives Global Practice IBRD/IDA Investment Project Financing FY 2010 Seq No: 13 ARCHIVED on 12-Jan-2018 ISR31048 Implementing Agencies: Government

More information

The World Bank Vietnam Renewable Energy Development Project (P103238)

The World Bank Vietnam Renewable Energy Development Project (P103238) Public Disclosure Authorized EAST ASIA AND PACIFIC Vietnam Energy & Extractives Global Practice IBRD/IDA Investment Project Financing FY 2009 Seq No: 15 ARCHIVED on 14-Feb-2018 ISR29615 Implementing Agencies:

More information

Implementation Status & Results China SECOND SHANDONG ENVIRONMENT PROJECT (P077752)

Implementation Status & Results China SECOND SHANDONG ENVIRONMENT PROJECT (P077752) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results China SECOND SHANDONG ENVIRONMENT PROJECT (P077752) Operation Name: SECOND SHANDONG ENVIRONMENT

More information

Implementation Status & Results Armenia Yerevan Water & Wastewater Project (P087641)

Implementation Status & Results Armenia Yerevan Water & Wastewater Project (P087641) losure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Armenia Yerevan Water & Wastewater Project (P087641)

More information

Implementation Status & Results Indonesia Third Water Supply and Sanitation for Low Income Communities Project (P085375)

Implementation Status & Results Indonesia Third Water Supply and Sanitation for Low Income Communities Project (P085375) Public Disclosure Authorized Public Disclosure Authorized Implementation Status & Results Indonesia Third Water Supply and Sanitation for Low Income Communities Project (P085375) Operation Name: Third

More information

Implementation Status & Results Africa Nyika Transfrontier Conservation Area Project (P108879)

Implementation Status & Results Africa Nyika Transfrontier Conservation Area Project (P108879) losure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Africa Nyika Transfrontier Conservation Area Project

More information

Implementation Status & Results Panama Rural Productivity Project (GEF) (P083045)

Implementation Status & Results Panama Rural Productivity Project (GEF) (P083045) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Panama Rural Productivity Project (GEF) (P083045) Operation Name: Rural Productivity Project (GEF)