BUILDING THEFUTURE Southeastern Pennsylvania Transportation Authority 1234 Market Street Philadelphia, PA 19107-3780 March 8,2017 Dear Sir/Madam: Subject: Sealed Bid No. 17-00010-AMZK Enclosed please find Addendum No. 3 to SEPTA's Sealed Bid No. 17-00010-AMZK 103 Victory Avenue. Addendum No. 3 must be acknowledged by inserting the date of Addendum on the Bid Addenda Acknowledgement Form. The bid opening is scheduled for Tuesday, March 14,2017 at 10:00 AM. Any inquiries regarding this bid must be directed to Marian Keating, ofthe Procurement, Supply Chain & DBE Division, at (215) 580-8320 or mkeating@septa.org. Thank you for your interest in the Authority. Very truly yours, Marian Keating Contract Administrator Procurement & SCM mzk Enclosure
March 8, 2017 Addendum No. 3 Sealed Bid No. 17-00010-AMZK 103 Victory Avenue Project The following constitutes Addendum No. 3 to SEPTA's Sealed Bid No. 17-00010- AMZK. This Addendum must be acknowledged by inserting the date of the Addendum on the Bid Addenda Form (page 17 in Instructions to Bidders) to be submitted with your Bid. Failure to do so may render the Bidder's proposal as nonresponsive. The bid opening is scheduled for Tuesdav. March 14. 2017 at 10:00 AM at PTA Headqi SEPTA Headquarters, 1234 Market Street, Philadelphia, PA, 11*'* Floor A. General 1. Questions and Answers, Addendum No. 3, dated 3/8/17, (attached) are hereby incorporated by reference and are made a part ofthe Contract Documents. jb. Specifications 1. Delete: Section 01011 Add: Section 01011, Addendum No. 2, dated 3-8-17 (attached) Reason: Added to 1.05, C. 2. "Section 15190 - Facility Natural Gas Piping"
Addendum No. 3 3/8/17 QUESTIONS AND ANSWERS 17-00010-amzk/103 VICTORY AVENUE NOTE: Q3. through Q29. Addendum No. 2 3/2/17 Q30. The addendum 2 says that the Gas pipe is in the general contractor scope ofwork but the spec are listed in the mechanical section 15190. Can you confirm that the gas main work is by the general contractor & not the mechanical or the utility company? A30. The gas installation is the GC's scope up to 5' from the building. From that point it is the MC's work. All of the gas installation is on SEPTA property and will connect to SEPTA infrastructure. The utility company will not be involved in the installation. See Addendum No. 3, revised Specification Section 01011, dated 3/8/17. Q31. Where do I find the AGES BORING REPORT? A31. Uploaded to http://www.septa.0rg/business/bid/l OOk/17-00010-AMZK. 3/8/17. This is for informational purposes only.
103 Victory Avenue Addendum No. 3 Revised 3/8/17 SECTION 01011 SUMMARY OF PROJECT PART 1 - GENERAL 1.01 DESCRIPTION OF WORK A. The work of this Contract consists of the construction of the 103 Victory Avenue Administration Buildings and associated construction, as shown on the contract drawings and specifications. This work includes demolition of the existing building, paved areas, utilities, and related items. Construction includes recommendations in the geotechnical reports, earth moving, foundations, stormwater management, building construction, fire protection, fire alarm, plumbing, mechanical, architectural features and finishes, and all associated work contained in the contract documents. 1.02 RELATED WORK A. Section 01010: Summary of Work B. Section 01041: Project Coordination 1.03 ADMINISTRATIVE AND PROCEDURAL SECTIONS A. Agreement and Exhibit III scheduling requirements. 1. Document #3005 - Management Program for Soils, Construction and Demolition Debris Generated from SEPTA Property 2. Section 01025: Measurement and Payments 3. Section 01060: Regulatory Requirements and Safety 4. Section 01200: Project Progress Meetings 5. Section 01300: Submittals 6. Section 01305: Requests for Information 7. Section 01400: Inspection and Test Plan 8. Section 01410: Testing and Inspection Services 9. Section 01500: Construction Facilities and Temporary Controls 10. Section 01600: Material and Equipment 11. Section 01700: Contract Close Out 1.04 TEMPORARY FACILITIES AND SERVICES A. Section 01510: Maintenance, Support and Restoration Of Existing Utility Facilities B. Section 01570: Maintenance and Protection of Vehicles, Pedestrians and Passengers C. Section 01580: Project Identification Signs and Other Construction Signage D. Section 01590: SEPTA Field Office. 1.05 GENERAL CONTRACTOR (GC) Summary of Project 01011-1
103 Victory Avenue Addendum No. 3 Revised 3/8/17 A. The General Construction Contract includes architectural and general construction operations traditionally recognized as General Construction. It also includes administrative and coordination responsibilities. B. Other specific responsibilities of the General Construction Contractor include but are not limited to: 12. Coordination of the project in accordance v\/ith Section 01041. 13. Section 01380: Construction Photographs 14. Section 01500: Construction Facilities & Temporary Controls 15. Section 01590: Septa Field Office. C. The work under this Prime Contract includes: 1. Work described on the following drawings: All G-Series Drawings, General AllA-Series Drawings, Architectural All C series drawings - Civil Geotechnical report recommendations AllS series drawings - Structural All FP Series Drawings - Fire Protection 2. The Work required by the following specifications: Division 1 Division 2: Site Work Division 3: Concrete Division 4: Masonry Division 5: Metal Fabrications Division 6: Wood and Plastics Division 7: Thermal and Moisture Protection Division 8: Doors and Windows Division 9: Finishes Division 10: Specialties Division 11: Projection Screens Division 12: Furnishings Division 13: Special Construction Division 14: Elevators Section 15190 - Facility Natural Gas Piping D. Maintenance: Provide the required maintenance for all materials installed under the General construction contract in "like-new" condition until date of final payment. 1.06 MECHANICAL CONTRACTOR (MC) A. The work under this Prime Contract includes: 1. Work described on the following drawings: All M series drawings - Mechanical All P series drawings - Plumbing 2. The Work required by the following specifications: Division 15: Mechanical Summary of Project 01011-2
103 Victory Avenue Addendum No. 3 Revised 3/8/17 1.07 ELECTRICAL CONTRACTOR (EC) A. The work under this Prime Contract Includes: 1. Work described on the following drawings: All E series drawings - Electrical All FA series drawings - Fire Alarm a. The Work required by the following specifications: Division 16: Electrical Section 13852: Digital Addressable Fire Alarm System END OF SECTION Summary of Project 01011-3