1 Enterprise GIS Implementation for Thailand Electric Utilities Siriwit Marukapitak Senior Utilities Solution Manager, esri Thailand July 2, 2014

2 Agenda About esri Thailand The ArcFM Enterprise GIS Solution MEA Enterprise GIS PEA Enterprise GIS

3 Agenda Project Management Lesson Learned What s Next? Q&A

4 About esri Thailand

5 ESRI (Thailand) Co., Ltd Be Distributor of ESRI s Products in Thailand A CDG Group Company 1991 Founded in Cooperation with ESRI Inc, Redlands, California Products & Services Focused Strictly on Geomatics: GIS, GPS, Remote Sensing, Surveying, Mapping, and GIS System Integration

6 ESRI (Thailand) Co., Ltd. One Stop Services One-Stop Service for GIS/Mapping Solution #1 Leader A Pioneer and #1 Leader in GIS and Mapping Technology in Indochina Guarantee More than 1,000 Installations in Thailand Proven Track of Records of Small, Medium, and Large-Scale GIS Project Implementation

7 ESRI (Thailand) s Business GIS Software GIS Software from ESRI GIS Products Professional Services Utility GIS Software Utility GIS Software from Schneider Electric GPS Tracking NOSTRA LOGISTICS Tracking system From Globetech

8 Customers - Utilities PEA MWA MEA EGAT

9 The ArcFM Enterprise GIS Solution

10 ArcFM is the Solution Asset Management Planning & Analysis Field Mobility Operations A Complete Integrated Enterprise System Smart Network Data Model: Single Version of the Truth

11 MEA Enterprise GIS

12 MEA (Metropolitan Electric Authority) Area: 3 Provinces (Bangkok, Nontaburi, Samutprakarn), 3,196 km 2 Customers: 3 millions

13 MEA Enterprise GIS GIS Data Base Map - 3 provinces (3,196 km 2 ) - 1:1,000 map scale Street Centerline Road Edge Landmark, Land Edge Hydrology Building

14 MEA Enterprise GIS GIS Data Electric Distribution Network - High Voltage Network (69, 115 kv) - Medium Voltage Network (12, 24 kv) - Low Voltage Network (220/380 V) Conductor Equipment - Switch - Fuse - Transformer - Capacitor - Etc. Pole Underground Structure Meter

15 MEA Enterprise GIS - Applications ArcFM (63) Designer (75) Conduit Manager (4) Trouble Call Power Flow Modelling Locator EIS Web Map Service MEA Smart Life Desktop Web Mobile Electric Distribution Network & Base map GIS Database

16 MEA Enterprise GIS - Applications Fiber Manager (8) ArcFM Server (2) Custom App Desktop Web Fiber Cable Network GIS Database Mobile

17 MEA Enterprise GIS - Applications

18 PEA Enterprise GIS

19 PEA (Provincial Electric Authority) Area: 74 provinces, 510,000 km 2, 99% of Thailand Customers: 17.3 millions

20 PEA Enterprise GIS GIS Data Base Map - 74 provinces (510,000 km 2 ) - 1:4,000 map scale Street Centerline POI Hydrology

21 PEA Enterprise GIS GIS Data Electric Distribution Network - High Voltage Network (69, 115 kv) - Medium Voltage Network (22, 33 kv) - Low Voltage Network (220/380 V) Conductor Equipment - Switch - Fuse - Transformer - Capacitor Pole Meter

22 PEA Enterprise GIS - Applications ArcFM (202) Designer (209) ArcFM Viewer (147) Power Flow Modelling Web Viewing PEA Map One Touch PEA Map Desktop Web Mobile GIS Database

23 MEA Enterprise GIS - Applications

24 Project Management

25 Project Stages Initiation Planning Execution Closeout Monitoring and Control

26 Initiation

27 GIS Project Team Project Manager Steering Committee Data Application System Integration Implementation Electrical Engineer Users Hardware Software Network GIS Training Survey Engineer IT GIS SAP Helpdesk System DMS/SCADA OMS 27

28 Planning

29 Break It into Small Tasks Define tasks detail - Task - Start/End Date - Owner - Predecessor - Critical Path Communicate overall plan - MS Project

30 Execute

31 Manage Project Execution Perform project activities Create deliverables

32 Communications - Team PM provides Vision Objective Assignments Coordination Team provides Status Issues escalated early

33 Communications - Management Regular status and reviews In depth when needed No surprises

34 Control

35 Control Track Monitor Control Quality Scope

36 Scope Management Ensure team understands scope in detail No unauthorized changes unless - They have good intentions - They are small

37 Schedule Management Work to the schedule - Must be kept up to date - Communicate to team often Adjustments - Resources, OT, parallel work

38 Change Management Change must be managed - Be clear about the consequences - Uncontrolled change can derail a project

39 Change Management Contract changes Scope Change? Yes Project Baseline Change? Yes Internal Baseline Change? Yes Internal replanning No No Yes Formal reprogramming No Yes Yes

40 Quality Management Testing Release Management

41 Risks The hardware hasn t arrived. The technical solution is unworkable. The actual data is different than the sample. The user expected a different user interface The subcontractor can t deliver on time. We didn t budget for the integration with ERP.

42 Risk Management Identify Risks Handle Risks - Avoidance - Mitigation - Transfer - Acceptance Contingency Plan

43 Closeout

44 Closeout Verify stakeholder acceptance Assess stakeholder satisfaction Document lessons learned

45 Lesson Learned

46 Lesson Learned Application - Design application base on business requirements not users requirements. - Use standard software functions when possible. - Be prepared for integration with other enterprise systems (CIS, ERP, DMS/SCADA, OMS etc.).

47 Lesson Learned GIS Data - Start with a pilot area. - Use a good (accuracy) base map as reference. - Design data model base on application requirements, not data requirements - Phasing - Start with medium voltage network, then low voltage network, meters and poles. - Network connectivity is the key.

48 Lesson Learned Involve IT Team early - Understand policy and standards - Identify hardware and network impacts - Consider security model and impacts - Identify who will support system

49 Lesson Learned Embed in Core Business Processes - Customer Service - Planning - Design & Cost Estimation - Analysis - Operations & maintenance

50 Lesson Learned Investment - Size of budget depends on requirements. - Investment is small compare to revenue and cost saving - Reduce revenue lost from power outage - Reduce labor cost - Reduce transportation cost

51 What s Next?

52 Smart Grid Substation Distribution Generation Transmission/ Subtransmission ITU AGC EMS Energy Trading SCADA OMS/DMS DA AMI ` Digital Network

53 Collect ing syst em layer Smart Grid Is Not a Single Application AMR platform AMR platform GIS AMI Substation Automation SCADA OMS DMS

54 The Smart Grid Needs Smart Data GIS is the data store for spatial assets Smart Grid needs a workflow that supports timeliness of the data GIS Enterprise Integration Bus Spatial Database OMS DMS SCADA Subst Autom Real-Time Integration Bus

55 GIS is the Key for

56 Q & A

57

Smart Grid Program. Andres Carvallo, CIO. Austin Energy. November Austin Energy All Rights Reserved

Smart Grid Program. Andres Carvallo, CIO. Austin Energy. November Austin Energy All Rights Reserved Austin Energy Smart Grid Program Andres Carvallo, CIO Austin Energy November 2008 1 Agenda About Austin Energy About IT at AE What is the Smart Grid? Why do we need the Smart Grid? AE Smart Grid Austin

More information

ENGINEERING. Denton Municipal Electric

ENGINEERING. Denton Municipal Electric Denton Municipal Electric Introductions Denton, Texas and Denton Municipal Electric Information Technology & Operational Technology 2016 Innovation Plan Background Accomplishments Identified GIS Innovation

More information

John J. Simmins Senior Project Manager IntelliGrid Program October 5, 2012

John J. Simmins Senior Project Manager IntelliGrid Program October 5, 2012 A Monetization of Missing and Inaccurate GIS Data for the Purpose of Justifying Investment in GIS Data Improvement Initiatives Smart Grid Information Sharing Webcast GIS Interest Group John J. Simmins

More information

Smart Grid Concept, Applications and Lessons Learned from Recent Deployments

Smart Grid Concept, Applications and Lessons Learned from Recent Deployments GE Energy POWERING POTENTIA L Smart Grid Concept, Applications and Lessons Learned from Recent Deployments Gagan KAKKAR General Manager India Region GE Energy What is Smart Grid P O W E R I N G P O T E

More information

Smart Grid s ADMS Implementations: Lessons Learned

Smart Grid s ADMS Implementations: Lessons Learned Smart Grid s ADMS Implementations: Lessons Learned Rafael Ochoa September 21, 2015 1 Copyright 2015 Accenture All rights reserved. Presenter Rafael Ochoa Managing Director @ Accenture since January 2015

More information

CLICK HERE TO KNOW MORE

CLICK HERE TO KNOW MORE CLICK HERE TO KNOW MORE The First Smart Grid Project in Thailand, Pattaya City By Mr.Pongsakorn Yuthagovit Deputy Director of System Planning Department and Project Manager of the Smart Grid Pilot Project

More information

Advanced Metering Infrastructure for Seattle City Light

Advanced Metering Infrastructure for Seattle City Light Advanced Metering Infrastructure for Seattle City Light May 10, 2007 Linda Lockwood Seattle City Light 7 th Largest US Municipal Utility Customers kw Hours Residential 336,363 2,954,848 Non-Residential

More information

Using the Intelligrid Methodology to Support Development of a Smart Grid Roadmap

Using the Intelligrid Methodology to Support Development of a Smart Grid Roadmap Using the Intelligrid Methodology to Support Development of a Smart Grid Roadmap Mark McGranaghan, Don Von Dollen, Paul Myrda, Joe Hughes Electric Power Research Institute Knoxville, TN 37932 mmcgranaghan@epri.com

More information

The Smart Grid Choice

The Smart Grid Choice The Smart Grid Choice Location-Enabled Smart Grid Integration and Information Management Strategy Bradley R. Williams, VP Product Strategy, Oracle Utilities Oracle Spatial User Conference, Phoenix, AZ

More information

AMI information. for improved outage management

AMI information. for improved outage management Utilities the way we see it AMI information for improved outage management The information contained in this document is proprietary. 2013 Capgemini. All rights reserved. Rightshore is a trademark belonging

More information

Enabling GIS in Distribution Utility for Energy Audit and Load flow analysis

Enabling GIS in Distribution Utility for Energy Audit and Load flow analysis Enabling GIS in Distribution Utility for Energy Audit and Load flow analysis Jayant Sinha Associate Vice President (Power/ IT) Spanco Ltd. Abstract: About the Author: In the nationwide implementation of

More information

n Real-world Case Study of how LIPA are using a Model-Driven approach, leveraging an Enterprise Semantic Model (ESM) to:

n Real-world Case Study of how LIPA are using a Model-Driven approach, leveraging an Enterprise Semantic Model (ESM) to: Topics! Real-world Case Study of how LIPA are using a Model-Driven approach, leveraging an Enterprise Semantic Model (ESM) to: Implement Semantic Integration Implement Persistent Data Stores (e.g. for

More information

Utility Case Studies. Florian Brandi-Dohrn, AED-SICAD

Utility Case Studies. Florian Brandi-Dohrn, AED-SICAD Utility Case Studies Florian Brandi-Dohrn, AED-SICAD ESRI User Conference 2010 Overview Brabant Water, Netherlands Westland Infra, Netherlands EDB, Belgrade, Serbia PBE, Belgium Company Structure 20% udies

More information

Smart Water Technology. Creating the Cities of Tomorrow. Brought to you by Clevest

Smart Water Technology. Creating the Cities of Tomorrow. Brought to you by Clevest Smart Water Technology Creating the Cities of Tomorrow Brought to you by Clevest Creating the cities of tomorrow Smart water technology is revolutionizing the water utility industry, enabling the leap

More information

Advanced Analytics. and IoT for Energy Utilities: The Path to a Profitable Future

Advanced Analytics. and IoT for Energy Utilities: The Path to a Profitable Future Advanced and IoT for Energy Utilities: The Path to a Profitable Future TABLE OF CONTENTS I. TODAY S UTILITY INFRASTRUCTURE vs. FUTURE USE CASES...1 II. MARKET & PLATFORM REQUIREMENTS...2 III. COMPLEMENTING

More information

Trends in the water industry Towards a Smart Water Network

Trends in the water industry Towards a Smart Water Network Trends in the water industry Towards a Smart Water Network Agenda 1. Market Context 2. Smart Water Networks 3. Some Examples 4. The Road Ahead 5. Conclusions 2 Why are we here today? Reduce leakages Regulation

More information

MANAGING ENTERPRISE INFORMATION FOR SMART METERS AND SMART GRID

MANAGING ENTERPRISE INFORMATION FOR SMART METERS AND SMART GRID MANAGING ENTERPRISE INFORMATION FOR SMART METERS AND SMART GRID Hahn Tram, PE Vice President, Enterprise Quanta Technology 4020 Westchase Blvd, Suite 300 Raleigh, NC 27607 Email: htram@quanta-technology.com

More information

Pillsbury & UtiliPoint AMI/MDM Webinar. Jon Brock, Utilipoint Michael Murphy, Pillsbury. September 17, 2008

Pillsbury & UtiliPoint AMI/MDM Webinar. Jon Brock, Utilipoint Michael Murphy, Pillsbury. September 17, 2008 Pillsbury & UtiliPoint AMI/MDM Webinar Jon Brock, Utilipoint Michael Murphy, Pillsbury September 17, 2008 0 SmartGrid Technologies Presenting Today Jon Brock Jon Brock is the President and COO of Utilipoint.

More information

The Internet of Energy A Strong Smart Grid Platform as Key Enabler

The Internet of Energy A Strong Smart Grid Platform as Key Enabler The Internet of Energy A Strong Smart Grid Platform as Key Enabler siemens.com/energy-management Today s grid Built around centralized generation with unidirectional power flow A centralized, unidirectional

More information

Meter Data Management Systems. Position. Vice President, Product Management. November 29 December 1, 2010 Santo Domingo Dominican Republic

Meter Data Management Systems. Position. Vice President, Product Management. November 29 December 1, 2010 Santo Domingo Dominican Republic Meter Data Management Systems Speakers Andy Zetlan name Position Company Aclara Country USA Vice President, Product Management November 29 December 1, 2010 Santo Domingo Dominican Republic Welcome Thank

More information

CHAPTER 4 ELECTRIC TRANSMISSION AND DISTRIBUTION SYSTEM BENEFITS

CHAPTER 4 ELECTRIC TRANSMISSION AND DISTRIBUTION SYSTEM BENEFITS Application of San Diego Gas & Electric Company (U-0-E) for Adoption of an Advanced Metering Infrastructure Deployment Scenario and Associated Cost Recovery and Rate Design. Application 0-0-01 Exhibit

More information

ENGINEERING. About Denton & DME Business Need Design, Development & Configuration Integrations Project Challenges Project Successes Questions

ENGINEERING. About Denton & DME Business Need Design, Development & Configuration Integrations Project Challenges Project Successes Questions About Denton & DME Business Need Design, Development & Configuration Integrations Project Challenges Project Successes Questions University of North Texas Texas Woman s University Denton Arts & Jazz

More information

ISGF Advanced Distribution R-APDRP STUDY REPORT - ADDENDUM ISGF ADVANCED DISTRIBUTION

ISGF Advanced Distribution R-APDRP STUDY REPORT - ADDENDUM ISGF ADVANCED DISTRIBUTION ISGF Advanced Distribution R-APDRP STUDY REPORT - ADDENDUM ISGF ADVANCED DISTRIBUTION R-APDRP STUDY REPORT - ADDENDUM Introduction This addendum is to provide clarifications to some of the points raised

More information

Creating New Channels for Outage Reporting. October 19, Esri GeoConX Conference

Creating New Channels for Outage Reporting. October 19, Esri GeoConX Conference Creating New Channels for Outage Reporting October 19, 2016 2016 Esri GeoConX Conference Abstract Connexus Energy needed to find a new way to report outages to their Responder OMS beyond traditional IVR.

More information

Santa Clara 2008 PG&E. Associate Project Manager Energy Information Network

Santa Clara 2008 PG&E. Associate Project Manager Energy Information Network PG&E SmartMeter Program Overview Megan O Brien Associate Project Manager Energy Information Network The PG&E SmartMeter Program Automated meter reading for all customers 10 Million meter upgrades A network

More information

Service Business Plan

Service Business Plan Service Business Plan Service Name Information Technology Service Type Internal Service Owner Name Christine Swenor Budget Year 2017 Service Owner Title Service Description Director of IT Services An internal

More information

ESRI ROADMAP FOR UTILITIES AND TELECOMMUNICATIONS COMPANIES

ESRI ROADMAP FOR UTILITIES AND TELECOMMUNICATIONS COMPANIES ESRI ROADMAP FOR UTILITIES AND TELECOMMUNICATIONS COMPANIES Introduction Over the last several years, the ArcGIS has emerged as a true IT platform. According to Phil Simon, the author of the acclaimed

More information

Empower your field technicians. A smarter approach to managing field assets using mobile tools

Empower your field technicians. A smarter approach to managing field assets using mobile tools Empower your field technicians A smarter approach to managing field assets using mobile tools Empower your field technicians A smarter approach to managing field assets For many organizations, the workforce

More information

Siemens Power Technologies International. Bridging the Gap Enterprise Model Management for Operation and Planning

Siemens Power Technologies International. Bridging the Gap Enterprise Model Management for Operation and Planning Siemens Power Technologies International Bridging the Gap Enterprise Model for Operation and Planning Answers for infrastructure and cities. Contents Models Operations Planning Unified EMM The need and

More information

Automating LV Distribution networks using sensor technologies

Automating LV Distribution networks using sensor technologies Automating LV Distribution networks using sensor technologies Jayant Sinha Lead Consultant (Smart Networks) Enzen Global Ltd, UK 1 Managing the last mile Growing pressure on DNOs to improve LV network

More information

Fixed Network Solution Overview. Chris Bernardi Sr. Product Manager Itron User s Conference October 20, 2008

Fixed Network Solution Overview. Chris Bernardi Sr. Product Manager Itron User s Conference October 20, 2008 Fixed Network Solution Overview Chris Bernardi Sr. Product Manager Itron User s Conference October 20, 2008 Agenda What do you really need? The cash register analogy Business Drivers What is ChoiceConnect

More information

SmartGrid Applied Systems For Oncor Electric Delivery Session Networks and Grids

SmartGrid Applied Systems For Oncor Electric Delivery Session Networks and Grids SmartGrid Applied Systems For Oncor Electric Delivery Session 1.2.2 Networks and Grids Ron Hewlett Customer Systems Manager Oncor Electric Delivery Dallas, Texas USA April 21, 2008 Agenda Who s doing SmartGrid

More information

HxGN LIVE Smart Infrastructure Sessions

HxGN LIVE Smart Infrastructure Sessions HxGN LIVE Smart Infrastructure Sessions The HxGN Live Smart Infrastructure sub-track will open your eyes to new possibilities for planning, designing, improving, and repairing your critical infrastructure

More information

Seven-Year Electric Service Reliability Statistics Summary

Seven-Year Electric Service Reliability Statistics Summary Oregon Investor-owned Utilities Seven-Year Electric Service Reliability Statistics Summary 2010-2016 June 2017 Report available at http://www.puc.state.or.us (Click on Safety, then click on Reports ) Information

More information

Information Document Service Proposals and Cost Estimating ID # R

Information Document Service Proposals and Cost Estimating ID # R Information Documents are not authoritative. Information Documents are for information purposes only and are intended to provide guidance. In the event of any discrepancy between an Information Document

More information

May 5, ABB acquires Ventyx. ABB Group. May 5, 2010

May 5, ABB acquires Ventyx. ABB Group. May 5, 2010 ABB acquires Ventyx Safe-harbor statement This presentation includes forward-looking information and statement s including statements concerning the outlook for our businesses. These statements are based

More information

E(Orlando, Florida, U.S.), knocking

E(Orlando, Florida, U.S.), knocking Fleet Tracking Enables Efficient Crew Dispatch Progress Energy Florida integrates OMS, AVL to create mobile outage management system. By Claude Pitts, Progress Energy Florida arlier this year, a violent

More information

FP_C.3_EGAT_ Thai-Laos Cross Border Energy and Environment: Case study on Hong Sa Lignite Power Plants in Lao PDR.

FP_C.3_EGAT_ Thai-Laos Cross Border Energy and Environment: Case study on Hong Sa Lignite Power Plants in Lao PDR. FP_C.3_EGAT_ Thai-Laos Cross Border Energy and Environment: Case study on Hong Sa Lignite Power Plants in Lao PDR. Cherid Kalayanamitr, Project Environment Division Electricity Generating Authority of

More information

BALANCING, MEASURING, AND IMPROVING COST AND RELIABILITY PERFORMANCE FOR ELECTRIC DISTRIBUTION UTILITIES

BALANCING, MEASURING, AND IMPROVING COST AND RELIABILITY PERFORMANCE FOR ELECTRIC DISTRIBUTION UTILITIES EUCI Presents a Course on: BALANCING, MEASURING, AND IMPROVING COST AND RELIABILITY PERFORMANCE FOR ELECTRIC DISTRIBUTION UTILITIES Westin Westminster Denver, CO EUCI is authorized by IACET to offer 1.0

More information

SUBNET IoT to the PI System: A Bridge to Support Business Use Cases

SUBNET IoT to the PI System: A Bridge to Support Business Use Cases SUBNET IoT to the PI System: A Bridge to Support Business Use Cases Presented by Alan Lytz Ben Smith PPL Electric Utilities PPL Corp Parent Company of PPL EU, LGE-KU, and WPD (UK) PPL Electric Utilities

More information

MDM Integration with CIS. Itron User s Conference September 29, 2009

MDM Integration with CIS. Itron User s Conference September 29, 2009 MDM Integration with CIS Itron User s Conference September 29, 2009 Southern Company Southern Company is one of the nations largest generators of electricity. 4.5 million retail customers across 120,000

More information

TOWARDS THE MODERNIZATION OF THE SCADA SYSTEMS OF THE HELLENIC ELECTRICITY DISTRIBUTION NETWORK OPERATOR CONSIDERATIONS AND STEPS FORWARD

TOWARDS THE MODERNIZATION OF THE SCADA SYSTEMS OF THE HELLENIC ELECTRICITY DISTRIBUTION NETWORK OPERATOR CONSIDERATIONS AND STEPS FORWARD TOWARDS THE MODERNIZATION OF THE SYSTEMS OF THE HELLENIC ELECTRICITY DISTRIBUTION NETWORK OPERATOR CONSIDERATIONS AND STEPS FORWARD Nikos Hatziargyriou Vasilis Kleftakis Foivos Palaiogiannis HEDNO Greece

More information

CHAPTER 10 INFORMATION TECHNOLOGY SYSTEMS

CHAPTER 10 INFORMATION TECHNOLOGY SYSTEMS Application of San Diego Gas & Electric Company (U-0-E) for Adoption of an Advanced Metering Infrastructure Deployment Scenario and Associated Cost Recovery and Rate Design. Application 0-0-01 Exhibit

More information

Distribution Network Planning for Mumbai

Distribution Network Planning for Mumbai Newsletter Issue 98 January 2006 Distribution Network Planning for Mumbai Carsten Böse Project Manager Siemens AG, PTD SE PT carsten.boese@siemens.com Introduction The Indian utility Reliance Energy Ltd.

More information

Bridging the Gap between AMI and the Enterprise with MDM

Bridging the Gap between AMI and the Enterprise with MDM Bridging the Gap between AMI and the Enterprise with MDM Wendy Lohkamp Director, Product Marketing, Itron Kevin Walsh Industry Principal, SAP for Utilities Itron s History More than,00 customers in over

More information

Research and Application Study on Accident-Based 3D Power Station Simulation Technology

Research and Application Study on Accident-Based 3D Power Station Simulation Technology International Conference on Electromechanical Control Technology and Transportation (ICECTT 2015) Research and Application Study on Accident-Based 3D Power Station Simulation Technology Tie Li, Xiaoming

More information

Transmission Competitive Solicitation Questions Log Question / Answer Matrix Delaney to Colorado River 2014

Transmission Competitive Solicitation Questions Log Question / Answer Matrix Delaney to Colorado River 2014 No. Comment Submitted ISO Response Date Q&A Posted 1 Can the CAISO provide a line rating methodology (similar to a NERC FAC-008 standard) or include a requirement of using any The ISO does not provide

More information

AMT-SYBEX and National Grid. Case Study. Copyright AMT SYBEX 2011.

AMT-SYBEX and National Grid. Case Study. Copyright AMT SYBEX 2011. AMT-SYBEX and National Grid Case Study 1 ABOUT NATIONAL GRID National Grid Plc is an international gas and electricity company, and, with a turnover in excess of 9.4billion, is one of the largest investor-owned

More information

Eversource - Building a More Resilient Grid for Our Customers

Eversource - Building a More Resilient Grid for Our Customers Eversource - Building a More Resilient Grid for Our Customers A Better City Panel Event: Protecting Critical Infrastructure Boston MA, November 6, 2015 Safety First and Always Agenda About Eversource Our

More information

Advanced Enterprise Work and Asset Management for Performance-Driven Utilities

Advanced Enterprise Work and Asset Management for Performance-Driven Utilities Advanced Enterprise Work and Asset Management for Performance-Driven Utilities Asset & Resource Management (ARM) 2 CGI s Asset & Resource Management (ARM) 2 suite is a solution designed to streamline the

More information

Distribution System Operator (DSO) Construct as a Bridge for End-to-End Transactive Operation

Distribution System Operator (DSO) Construct as a Bridge for End-to-End Transactive Operation Distribution System Operator (DSO) Construct as a Bridge for End-to-End Transactive Operation Farrokh Rahimi, Ph.D. Senior Vice President Market Design and Consulting Ali Ipakchi, Ph.D. Senior Vice President

More information

Utility Data Integration Operational Data Store (ODS) 2.0 Paradigm

Utility Data Integration Operational Data Store (ODS) 2.0 Paradigm Utility Data Integration Operational Data Store (ODS) 2.0 Paradigm MKARLICIC@UTILISMARTCORP.COM About Utilismart Made in Ontario solution Established in 2000 >35 employees and growing Focused heavily on

More information

Esri Roads and Highways An Introduction

Esri Roads and Highways An Introduction Esri International User Conference San Diego, California Technical Workshops July 24, 2012 Esri Roads and Highways An Introduction William Isley Majunu Seran Agenda Product Overview Desktop - Demo: Network

More information

Modernization of National Statistical Organization (NSO) Business Processes Using GIS. An Esri White Paper November 2015

Modernization of National Statistical Organization (NSO) Business Processes Using GIS. An Esri White Paper November 2015 Modernization of National Statistical Organization (NSO) Business Processes Using GIS An Esri White Paper November 2015 Copyright 2015 Esri All rights reserved. Printed in the United States of America.

More information

Process Redesign: The marriage of technology and processes. Wednesday February 23, 2015 Mark Johnson

Process Redesign: The marriage of technology and processes. Wednesday February 23, 2015 Mark Johnson Process Redesign: The marriage of technology and processes Wednesday February 23, 2015 Mark Johnson Process Redesign is a critical element in adoption of the technology project Solution Architecture Project

More information

SP Energy Networks Business Plan

SP Energy Networks Business Plan SP Energy Networks 2015 2023 Business Plan Updated March 2014 Annex Non-Operational IT and Telecoms Strategy SP Energy Networks 26 February 2014 Non-Operational IT and Telecoms Strategy February 2014 Issue

More information

March Bridging IT and OT for the Connected Asset Lifecycle Management Era

March Bridging IT and OT for the Connected Asset Lifecycle Management Era March 2016 Bridging IT and OT for the Connected Asset Lifecycle Management Era Executive summary More assets, more sensors, more data and more analysis are bringing asset-intensive industries into a new

More information

Energy Management System (EMS)

Energy Management System (EMS) Energy Management System (EMS) Comprehensive Power Quality Analysis Customer Billing and Invoicing at a Glance ExpertPower software solution provides comprehensive energy management, billing, demand response,

More information

Performance Reporting Criteria

Performance Reporting Criteria Revision Date: February 2012 Revision No.: 2 Document No.: DOC-131102-ADV Status: Approved by CER Date: 01/03/2012 ESB Networks Ltd. Contents 1. Background... 3 2. Report Headings... 4 3. Criteria... 5

More information

SAN FRANCISCO PUBLIC UTILITIES COMMISSION INFRASTRUCTURE CONSTRUCTION MANAGEMENT PROCEDURES

SAN FRANCISCO PUBLIC UTILITIES COMMISSION INFRASTRUCTURE CONSTRUCTION MANAGEMENT PROCEDURES SAN FRANCISCO PUBLIC UTILITIES COMMISSION INFRASTRUCTURE CONSTRUCTION MANAGEMENT PROCEDURES SECTION: SFPUC INFRASTRUCTURE CONSTRUCTION MANAGEMENT PROCEDURE NO: 018 TITLE: SYSTEM TESTING AND START-UP APPROVED:

More information

SurvalentONE Outage Management System

SurvalentONE Outage Management System SurvalentONE Outage Management System Efficiently & Effectively Manage Outages to Reduce Downtime SurvalentONE ADMS The SurvalentONE ADMS platform is a fully integrated SCADA, OMS, and DMS solution that

More information

MAUI SMART GRID PROJECT

MAUI SMART GRID PROJECT MANAGING DISTRIBUTION SYSTEM RESOURCES FOR IMPROVED SERVICE QUAILTY AND RELIABILTY, TRANSMISSION CONGESTION RELIEF, AND GRID SUPPORT FUNCTIONS MAUI SMART GRID PROJECT or Hawaii Natural Energy Institute

More information

AKTIVOV Asset Management System

AKTIVOV Asset Management System AKTIVOV Asset System Aktivov means Assets We provide core expertise, business knowledge, and tools on Enterprise Asset, and Operations & Maintenance Strategies, while you concentrate on your core competence.

More information

Enterprise Web Portal for Outage and Reliability Reporting

Enterprise Web Portal for Outage and Reliability Reporting W H I T E P A P E R Enterprise Web Portal for Outage and Reliability Reporting Gain Visibility into All Aspects of Your Electric Utility Operations to Increase Efficiency, Productivity, and Customer Satisfaction

More information

Distribution GIS & Grid Model Data Management

Distribution GIS & Grid Model Data Management Distribution GIS & Grid Data Management Pat Brown EPRI OGC Energy & Utilities Summit June 28, 2017 Pat Brown works in EPRI s Information and Communication Technology program. She is currently engaged in

More information

INTELLIGENT TRANSPORTATION SYSTEMS FACILITY MANAGEMENT AS-BUILT DELIVERABLES

INTELLIGENT TRANSPORTATION SYSTEMS FACILITY MANAGEMENT AS-BUILT DELIVERABLES INTELLIGENT TRANSPORTATION SYSTEMS FACILITY MANAGEMENT AS-BUILT DELIVERABLES ITSFM AS-BUILT DELIVERABLES Agenda History of the ITSFM What ITSFM is and is not System Benefits As-built Data Collection As-built

More information

GIS-Based Grid Electricity Trade System. The National CIMS of THU

GIS-Based Grid Electricity Trade System. The National CIMS of THU GIS-Based Grid Electricity Trade System The National CIMS of THU Main Content GIS and ArcGIS Adobe Flex GIS-Based Grid Electricity Trade System GIS and ArcGIS A geographic information system (GIS) is a

More information

SOLUTION OUTAGE AND DISTRIBUTION MANAGEMENT

SOLUTION OUTAGE AND DISTRIBUTION MANAGEMENT SOLUTION OUTAGE AND DISTRIBUTION MANAGEMENT THE SMART GRID importance of customer Service and reliability Increasing or maintaining power reliability is the fundamental charter for utility companies,

More information

OPERATION ANALYSIS OF LARGE SCALE SOLAR POWER GENERATION IN THAILAND

OPERATION ANALYSIS OF LARGE SCALE SOLAR POWER GENERATION IN THAILAND Sept.4-6, 2013, Guangzhou, China OPERATION ANALYSIS OF LARGE SCALE SOLAR POWER GENERATION IN THAILAND Presented by Worrapong Wonglimamornlert Electricity Generating Authority of Thailand (EGAT) 1 QUESTIONS

More information

The PI System and SAP HANA: Operating at the Speed of Business

The PI System and SAP HANA: Operating at the Speed of Business The PI System and SAP HANA: Operating at the Speed of Business Trusted Analytics in near Real-Time March 2017 Varun Garg "Marathon Oil", the blue wave and combinations thereof are registered trademarks

More information

Analyzing Event Impacts using PI Event Frames and Versify

Analyzing Event Impacts using PI Event Frames and Versify Analyzing Event Impacts using PI Event Frames and Versify Presented by Devon Yates NaturEner USA Copyr i ght 2014 O SIs oft, LLC. NaturEner Overview Wind plant operator, owner, and developer NaturEner

More information

Jemena Electricity Networks (Vic) Ltd

Jemena Electricity Networks (Vic) Ltd Jemena Electricity Networks (Vic) Ltd 2016-20 Electricity Distribution Price Review Regulatory Proposal User-requested services explanatory statement Public 30 April 2015 TABLE OF CONTENTS TABLE OF CONTENTS

More information

Drue Merkle BUILDING A SMART UTILITY BY INTEGRATING TECHNOLOGY

Drue Merkle BUILDING A SMART UTILITY BY INTEGRATING TECHNOLOGY Drue Merkle BUILDING A SMART UTILITY BY INTEGRATING TECHNOLOGY Reshaping the Smart Grid enabling utilities to deploy advanced capabilities and connected solutions that transform operations, improve asset

More information

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB5800 Project Name. EGAT And PEA Advancing Clean Energy Investment - CTF Region

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB5800 Project Name. EGAT And PEA Advancing Clean Energy Investment - CTF Region Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB5800 Project Name EGAT

More information

Transforming the GIS Landscape to Empower Utilities

Transforming the GIS Landscape to Empower Utilities Transforming the GIS Landscape to Empower Utilities Abstract Geographic Information Systems (GIS) offer the ability to capture and process large amounts of spatial data, integral to the success of utility

More information

When is the Timing Right to Migrate from PLC to Wireless AMI?

When is the Timing Right to Migrate from PLC to Wireless AMI? When is the Timing Right to Migrate from PLC to Wireless AMI? By Power System Engineering, Inc. (PSE) Assessing all the options, and considering new, enhanced customer programs, will enable the utility

More information

2015 Sensus Reach Conference Session Descriptions

2015 Sensus Reach Conference Session Descriptions 2015 Sensus Reach s Advanced Applications Supported by FlexNet Attendees will learn about advanced applications that will be supported by the FlexNet communication network. Advanced Cathodic Protection

More information

Unleash the Power of Your GIS

Unleash the Power of Your GIS 998-2095-MM-DD-YYAR0 Unleash the Power of Your GIS by Bill Meehan, director utility solutions, Esri Matt Zimmerman, director of product management, Schneider Electric Executive summary You ve invested

More information

Proven Approach for Complex Technology Procurement

Proven Approach for Complex Technology Procurement Proven Approach for Complex Technology Procurement By Power System Engineering, Inc. (PSE) Mitigate costly procurement missteps by establishing a clearly defined process. Introduction The procurement of

More information

CALL FOR ABSTRACTS JAN , 2013 :: SAN DIEGO CONVENTION CENTER :: SAN DIEGO, CALIF. HOST UTILITY: SUPPORTING PUBLICATIONS:

CALL FOR ABSTRACTS JAN , 2013 ::  SAN DIEGO CONVENTION CENTER :: SAN DIEGO, CALIF. HOST UTILITY: SUPPORTING PUBLICATIONS: CALL FOR ABSTRACTS JAN. 29-31, 2013 :: HTTP://DISTRIBUTECH.COM SAN DIEGO CONVENTION CENTER :: SAN DIEGO, CALIF. OWNED & PRODUCED BY: PRESENTED BY: SUPPORTING PUBLICATIONS: MEDIA SPONSOR: HOST UTILITY:

More information

A day in the life of a smart meter Enabling the future with current policy

A day in the life of a smart meter Enabling the future with current policy A day in the life of a smart meter Enabling the future with current policy Koustuv Ghoshal, Kevin Smith, Chaith Kommamuri, Prashant Gupta, Frank Fata Koustuv Ghoshal Panel discussion What does Smart Metering

More information

TRANSFORMING DATA INTO ACTION

TRANSFORMING DATA INTO ACTION TRANSFORMING DATA INTO ACTION Ankit Takle Adityan Sainath Tata Power TATA POWER India s largest integrated private power utility. 8521 MW Installed capacity (Thermal, Hydro, DG, Solar and Wind) Presence

More information

Asset Management and Maintenance in Transmission and Distribution Networks

Asset Management and Maintenance in Transmission and Distribution Networks Asset and Maintenance in Transmission and Distribution Networks S. Surender Reddy Department of Railroad and Electrical System Engineering, Woosong University 171 Dongdaejeon-ro, Jayang-dong, Dong-gu,

More information

Contact Voltage at Toronto Hydro

Contact Voltage at Toronto Hydro Contact Voltage at Toronto Hydro Detection, Mitigation, Prevention Presented by: Ben La Pianta, P.Eng., MBA Vice President Distribution Grid Management 2009 Jodie Lane National Conference Stray Voltage

More information

Extending the Value of Maximo Solutions

Extending the Value of Maximo Solutions Extending the Value of Maximo Solutions Mobile, Spatial, and other technologies that extend support for asset and service management best practices Agenda Service Management World Tour The The purpose

More information

Asset Risk Assessment Through Advanced Analytics. Cop yri g h t 2014 OSIso f t, LLC.

Asset Risk Assessment Through Advanced Analytics. Cop yri g h t 2014 OSIso f t, LLC. Asset Risk Assessment Through Advanced Analytics Presented by Richard Wernsing Contacts Public Service Electric & Gas Richard Wernsing Cell: 973-303-889 Email: Richard.wernsing@pseg.com OSIsoft Kevin Walsh

More information

Power Technologies International. Industry Perspective on GIS Integration: Challenges, Solutions, Benefits and Case Studies

Power Technologies International. Industry Perspective on GIS Integration: Challenges, Solutions, Benefits and Case Studies Power Technologies International Industry Perspective on GIS Integration: Challenges, Solutions, Benefits and Case Studies siemens.com/power-technologies Industry Perspective on GIS Integration Table of

More information

Industry Innovations with SAP Leonardo: Mill Products Industry

Industry Innovations with SAP Leonardo: Mill Products Industry Industry Innovations with SAP Leonardo: Mill Products Industry Stefan Soeller, Industry Business Unit Mill Products & Mining, SAP PUBLIC Agenda Digitalization in Mill Products Mill Products Use Cases for

More information

Energy Industry Challenges

Energy Industry Challenges Energy Industry Challenges Global economic crisis; severe hurdles to capital-raising Extreme energy price volatility and uncertainty Backlash from energy consumers Urgent need to achieve energy independence

More information

Enterprise Value: How APS Creates Corporate Wide Benefits

Enterprise Value: How APS Creates Corporate Wide Benefits Enterprise Value: How APS Creates Corporate Wide Benefits Presented by 22 March 2017 Ravi Nair, APS Pat Kelly, Industrial Knowledge APS by the Numbers Arizona s largest and longest serving utility Serving

More information

Take control of your water future.

Take control of your water future. siemens.com/smartwater Take control of your water future. Siemens Smart Grid Contents Introduction Address Critical Infrastructure Needs Maximize Operational Efficiency Create a More Predictable Revenue

More information

Grid Modernization Strategy in Macao. 11/Oct/2012, Amsterdam Benjamin Yue, Senior Manager Companhia de Electricidade de Macau-CEM, S.A.

Grid Modernization Strategy in Macao. 11/Oct/2012, Amsterdam Benjamin Yue, Senior Manager Companhia de Electricidade de Macau-CEM, S.A. Grid Modernization Strategy in Macao 11/Oct/2012, Amsterdam Benjamin Yue, Senior Manager Companhia de Electricidade de Macau-CEM, S.A. Contents 1. Introduction to CEM and Macao 2. Power Network Master

More information

Digital Oilfield: - EMC Upstream Information Management. - Aramco Records Management Strategy

Digital Oilfield: - EMC Upstream Information Management. - Aramco Records Management Strategy Digital Oilfield: - EMC Upstream Information Management - Aramco Records Management Strategy EMC Consulting Rammiz Omar Saudi Aramco Abdullah Al-Humaidy TRANSFORMATION GATEWAY 1 Upstream Information Management

More information

Utility Vegetation Management & GIS

Utility Vegetation Management & GIS Utility Vegetation Management & GIS Designing A Mobile Geospatial application to streamline field collection & recordkeeping Joshua DeWees Spoon River Electric Cooperative Agenda I. Background II. Case

More information

VIRGIN ISLANDS WATER & POWER AUTHORITY

VIRGIN ISLANDS WATER & POWER AUTHORITY VIRGIN ISLANDS WATER & POWER AUTHORITY Gregory Rhymer, Chief Operating Officer 2013 ECONOMIC DEVELOPMENT SUMMIT 1 Government Owned Utility GENERAL BACKGROUND Primary Source of Water & Power Production

More information

GTI s Asset Lifecycle Tracking Program

GTI s Asset Lifecycle Tracking Program GTI s Asset Lifecycle Tracking Program > Northeast Gas Association s Fall Operations Conference October 4, 2012 > Paul Armstrong Gas Technology Institute GTI Overview > Not-for-profit research, with 70

More information

Ben Mallen, Trimble Energy Business Area Director. Trimble Enterprise Solutions for Energy Utilities

Ben Mallen, Trimble Energy Business Area Director. Trimble Enterprise Solutions for Energy Utilities Ben Mallen, Trimble Energy Business Area Director Trimble Enterprise Solutions for Energy Utilities Key Customer Groups in the Utilities sector Electric Utilities Gas Utilities District Heating Multi-Utilities

More information

Communications & Situational Awareness

Communications & Situational Awareness Communications & Situational Awareness This morning s program 1. Processing Weather and Power Grid Data using advanced Data analytics and GIS framework 2. Advanced visualisation strategies for network

More information

Maximizing AMI Investment in Australia with Data Analytics

Maximizing AMI Investment in Australia with Data Analytics UNITED ENERGY CASE STUDY Maximizing AMI Investment in Australia with Data Analytics How much benefit can a utility derive from the analysis of AMI data? United Energy is finding out. BUILDING ON A MANDATE

More information