1 FP_C.3_EGAT_ Thai-Laos Cross Border Energy and Environment: Case study on Hong Sa Lignite Power Plants in Lao PDR. Cherid Kalayanamitr, Project Environment Division Electricity Generating Authority of Thailand (EGAT) 53 Moo 2 Bangkruai, Nonthaburi, 11130, Thailand Tel: Fax: cherid.k@egat.co.th ABSTRACT The EGAT, a state enterprise under the Ministry of Energy, is authorized with missions mainly focusing on the generation and distribution of electric energy to two other state enterprises i.e. Metropolitan Electricity Authority (MEA) and Provincial Electricity Authority (PEA), and procurement/distribution of electricity to neighboring countries. Presently, the national total capacity is 37,612 MW. According to the Power Development Plan 2015 (PDP, ), the power purchase from foreign electricity will be at 11,016 MW installed capacity by the end of In case of the Hong Sa Lignite Power Plant, 626X3 MW (1,878 MW installed capacity) in Lao PDR is recently one of the power transboundary purchase in this plan, COD in 2015 and There are 2 sides of transmission line in Laos PDR, 67 km. of 500 KV to Thai border and 115 km. of 115 to Electricity Du Laos (EDL), and the transmission line of 500 KV in Thailand. The EIA and IEE had to be done and approved by National Environment Board (ONEP) and the Thailand Cabinet before construction. The Hong Sa Project and transmission lines of 2 countries are also environmental concerns to ensure that there is no cross border environmental impact of energy development. The outcomes of EGAT environmental performance which includes all of these activities not only satisfied the authorized government sectors but also the community and local government office acceptances. EGAT aims to serve the energy by Thai-Laos cross border as PPA schedule and PDP And also to be a main hub for the region s energy interconnection grid to facilitate electric energy trade and exchange among Asian Economic Countries (AECs) and help enhance energy as well as economic security of the region. Key Words: Power Purchase Agreement (PPA), Commercial of Date (COD), Cross Border, Environmental Impact Assessment (EIA), Initial Environmental Evaluation (IEE) 1

2 I. INTRODUCTION EGAT is Thailand s leading state-owned power utility under the Ministry of Energy (MOE), responsible for electric power generation and transmission for the whole country as well as bulk electric energy sales. EGAT is the largest power producer in Thailand, owning and operating power plants of different types and sizes which are located in 39 sites across Thailand. EGAT also owns and operates high voltage transmission networks, which covers all parts of the country. Under the enhanced single buyer model of Thailand s electricity supply industry, EGAT is the single buyer, purchasing bulk electricity from private power producers and neighbouring countries and sells wholesale electric energy to two distributing authorities and a small number of direct industrial customers as well as neighbouring utilities. EGAT is the national system operator, managing and controlling, via the National Control Centre and five regional control centres, the dispatch of power generation both from EGAT's own power plants and from private power plants to meet the country's demand in the most efficient, reliable, and environmentally-responsible way. It also owns and operates the national transmission network, which includes transmission lines and substations of various high voltage levels which covers all parts of Thailand. (Transmission system in Thailand as showed in the Figure 1) Figure 1 Transmission system in Thailand (as in March 2013) EGAT has conducted business in an environmentally responsible manner to ensure sound environmental practices in full compliance with all applicable laws and regulations. EGAT has observed in particular the environmental principles as outlined in the International Standard ISO titled Guidance on Social Responsibility, which includes the environmental responsibility, the precautionary approach, the environmental risk management, and the polluter pays principle. Key environmental issues taken into consideration are prevention of pollution, sustainable resources, climate change mitigation, and protection and promotion of the natural habitats. For decades, the Thai Government has continuously promoted private sector investment for electricity generation, through bid solicitations for power purchase. As of September 2012, Thai Government has purchasing agreement with the neighbouring countries (Lao PDR and Malaysia) 2,184.6 MW, large-scale independent power producers (IPPs) 12,741.7 MW and Small Power Producers (SPPs) 2,263.8 MW with EGAT being the single buyer of bulk electricity, under terms and regulations set by the Energy Regulatory Commission (ERC) to ensure 2

3 the best interests of public consumers, energy resource optimization and fairness to all. More over, EGAT is responsible for providing electric energy for the whole kingdom by generating, transmitting and selling electricity to Metropolitan Electricity Authority (MEA) 4,017 MW, Provincial Electricity Authority (PEA) 9,650 MW, number of direct customers prescribed by law 146 MW, and neighbouring countries (Lao PDR, Malaysia and Cambodia) 80.8 MW. II. ENVIRONMENTAL TOOLS Environmental Impact Assessment (EIA) is one of the environmental management tool used in project decision making. It is applied especially to some activities under the Ministerial Mandate. The main objective of EIA in Thailand, as in other countries, is to prevent and reduce environmental problems from major development projects in order to achieve sustainable development goals. The first mandatory notification for EIA requirement was issued in Presently, it is mandated under the Section 46 of the Enhancement and Conservation of National Environmental Quality Act The Minister of Natural Resources and Environment with the approval of National Environment Board (NEB) has the power to notify the type and size of projects or activities requiring EIA. For large scale projects which will cause significant impacts, the EIA reports must be submitted to the Office of Natural Resources and Environmental Policy and Planning (ONEP) to be considered and provide recommendations to permitting agencies or cabinet. EIA reports have to be prepared by a consulting firm which is registered with ONEP. Environmental Impact Evaluation Bureau, Office of Natural Resources and Environmental Policy and Planning has prepared a guidance on EIA, titled Environmental Impact Assessment in Thailand. This guidance is useful for the general public, consulting firms, developers and government agencies to understand the law, regulations, and guidelines for EIA in Thailand. The purpose of EIA is for forecasting the environmental impacts, both negative and positive impacts from development projects or significant activities. EIA in Thailand has been used to identify impacts of the projects as well as to establish the appropriate mitigation measures so that natural resources are used in a sustainable way for the economic development of the country. For transmission line projects or in specific cases where the radial expansion of the security of right of way are within the National Forest Conservation Areas or within the Environmentally Protected Areas and or may affect wetlands of international and national importance. Transmission Line Projects that require EIA report: transmission line project (for power plant under section 46 of the National Environmental Quality Act 1992), in National Forest Conservation area (located in the areas classified as Class 1 Watershed area by the cabinet resolution) are need to report together with that power. Transmission Line Projects that require specific (Initial Environmental Examination) IEE report or the specific case of the radial expansion of the security of right of way in National Forest Conservation area. Transmission Line Projects that require Environmental Checklists with environmental impact mitigation and preventive measures and environmental impact monitoring measures. All projects excluded from EIA and IEE requirements, projects need to provide environmental checklist with environmental impact mitigation and preventive measures and environmental impact monitoring measures. III. EGAT ENVIRONMENTAL CONCERNS FOR TRANSMISSION SYSTEM For the National Grid Planning, currently EGAT not only considers the environment related Acts and Laws but also all key principles under the environmental criteria and uses them in the organization s transmission system planning. The impacts on communities, health, social sectors, and natural resources are taken into account as first priority besides the transmission line engineering design and economic feasibility consideration for the route selection. Moreover, the project public participation processes required under the Act and associated Laws have been strictly followed to ensure the public and stakeholders participation in the project planning and management. In recent times, EGAT has conducted 20 environmental studies for transmission systems according to the scope and requirements of the stated Act. The paragraph below presents a case example of how EGAT handled a recent project in terms of its environmental performance. In June 2013, the National Environment Board approved the EIA and IEE reports of Hongsa-Lignite 500 KV project, power purchase from Hongsa-Lignite Power Plant (with installed capacity 2x491 MW) in Lao PDR (Figure 2 and Figure 3). The length of this TL is 42 kilometers with a 60 meters right of way. The TL passes 3

4 directly from Lao-Thai border into the Northern Thailand 1.4 kilometers into the national forest conservation within the Environmentally Protected Areas and or may affect wetlands of international and national importance and passes through 3 provinces (Nan, Prae and Lampang province) within 23 sections of national forest conservation area. EGAT approaches on environmental concerns, public involvements and stakeholder participations, throughout the course of EIA and IEE studies. The scope of the environmental study included physical environment, biological environment, human use value and quality of life. Public involvement and stakeholder participation were an important part of the process. The direct and indirect, short and long term of the environmental impacts in the construction and operation phase of the project were assessed and included in the final report. The main impact was predicted for the 60-month construction period. Impact included impacts on ecology, erosion and transportation. One of the mitigation measures required was plantations in 3 times the area of the forest that the project would destroy in 3 provinces with a 12 years maintenance requirement. Figure 2 and Figure 3: The Hongsa-Lignite 500 KV project, power purchase from Hongsa-Lignite Power Plant, Lao PDR, the activities during the operation period were predicted to have potential impacts on local environmental resources and well-being of communities nearby the transmission line. The project considered environmental action plans such as surface and groundwater quality, forest ecology, transportation, waste management, socio-economic conditions, public health, occupational health and safety to mitigate the impacts. VI. CONCLUSIONS EGAT not only considers the concerned Acts and Laws but also all key principles under the environmental criteria and using them in conjunction with the organization s transmission system planning. The mitigation of impacts on communities, health, social sectors, and natural resources are taken into account as first 4

5 priority as well as project engineering design and economic worthiness consideration for transmission route selection. The outcomes of EGAT environmental performance which includes all of these activities not only satisfied the authorized government sectors but also the community and local government office acceptances. EGAT aims to be a main hub for the region s transmission interconnection grid to facilitate electric energy trade and exchange among Asian Economic Countries (AECs) and help enhance energy as well as economic security of the region. REFERENCES [1] Enhancement and Conservation of the National Environmental Quality Act, B.E (1992) [2] Types and Sizes of Projects or Activities requiring preparation of Environmental Impact Assessment reports, 20 June 2012 [3] Types and Sizes of Projects or Activities which may seriously affect community with respect to Quality of Environment, Natural Resources and Health, 2012 [4] Projects within the Environmentally Protected Areas (EPA), April, B.E (2011) [5] Types and Sizes of Projects in Forest Conservation Area that required EIA report, IEE report, Environmental Checklist [6] National Public Health Act. B.E (2007) [7] Rule of the Office of the Prime Minister on Public Consultation B.E (2005) [8] The Environmental Impact Assessment Report on 500 KV Thai-Lao borders for Hongsa Lignite Power Plant Lao PDR. Project, January, 2010 [9] The Initial Environmental Examination Report on 500 KV Thai-Lao borders for Hongsa-Lignite Power Plant Lao PDR. Project, June,

Chapter 1. Coal-fired Power Plants in Thailand. October 2017

Chapter 1. Coal-fired Power Plants in Thailand. October 2017 Chapter 1 Coal-fired Power Plants in Thailand October 2017 This chapter should be cited as ERIA (2017), Coal-fired Power Plants in Thailand, in Murakami, T. (ed.), Creating Better Social Acceptance for

More information

Key Statistical Data

Key Statistical Data Key Statistical Data System Installed Generating Capacity Type of Power Plant 2012 2011 Increase MW Percentage MW Percentage Percentage EGAT s Power Plants Thermal 4,699.00 14.41 4,699.00 14.94 - Combined

More information

Increase Type of Power Plant MW Percentage MW Percentage Percentage

Increase Type of Power Plant MW Percentage MW Percentage Percentage Key Statistical Data System Installed Generating Capacity 2013 2012 Increase Type of Power Plant MW Percentage MW Percentage Percentage EGAT s Power Plants Thermal 4,699.00 13.95 4,699.00 14.41 - Combined

More information

Rural Electrification Situation in Lao PDR

Rural Electrification Situation in Lao PDR Rural Electrification Situation in Lao PDR CAP-REDEO MEETING 4 th April 2007. Vientiane, LAO PDR Department of Electricity, Ministry of Energy and Mines LAO PDR Tel: 856-21 21-415714 Fax; 856-21 21-415388

More information

Project Location Fuel Contractual Scheduled (Province) Capacity Commercial (MW) Operational Date (SCOD)

Project Location Fuel Contractual Scheduled (Province) Capacity Commercial (MW) Operational Date (SCOD) Power Development and Future Plan The current official Thailand Power Development Plan (PDP) is PDP 2010 : 3 rd Revision (2012-2030) endorsed by the Cabinet on June 19, 2012. Consequently on March 19,

More information

12 A Leader of Clean Energy Technology. Operations. Generation System. Power Generation and Purchase. Fuel Utilization

12 A Leader of Clean Energy Technology. Operations. Generation System. Power Generation and Purchase. Fuel Utilization Operations Generation System In 2013, EGAT s power plants had a total installed generating capacity of 15,010.13 MW accounting for 44.57 percent of the country s gross energy generation. The purchased

More information

Environmental Impact Assessment (Executive Report) Muang Rayong Combined Heat and Power Project

Environmental Impact Assessment (Executive Report) Muang Rayong Combined Heat and Power Project 1. Introduction Environmental Impact Assessment (Executive Report) Muang Rayong Combined Heat and Power Project Located at IRPC Industrial Park Cheongneon, Muang, Rayong Province *********************************************************************

More information

the Future De carbonized Power Systems in Thailand

the Future De carbonized Power Systems in Thailand Emerging Smart Grid Technologies for the Future De carbonized Power Systems in Thailand Ms. Titiporn Sangpetch, PhD Head of Distribution System Connection Planning Section System Planning Division Electricity

More information

Small Hydropower Development and Legal Limitations in Thailand

Small Hydropower Development and Legal Limitations in Thailand Small Hydropower Development and Legal Limitations in Thailand Thanaporn Supriyasilp 1,*, Kobkiat Pongput 2, Challenge Robkob 3 1 Department of Civil Engineering, Faculty of Engineering, Chiang Mai University.

More information

Project Location (Province) Operation Schedule

Project Location (Province) Operation Schedule Power Development EGAT had formulated a national power development plan for the period of 2007 2021, known as PDP 2007, within the framework of the Ministry of Energy s policies. The PDP 2007 plan, which

More information

Thailand Power Development Plan ( ) TANONGSAK WONGLA

Thailand Power Development Plan ( ) TANONGSAK WONGLA Thailand Power Development Plan (2010-2030) TANONGSAK WONGLA August 2013 GOV. POLICY Structure of Thailand Power Sector Regulators EGAT (44%) IPPs (38%) Imports (7%) SPPs (10%) VSPPs (

More information

Thailand Power Development Plan (PDP 2007)

Thailand Power Development Plan (PDP 2007) Thailand Power Development Plan (PDP 2007) By Mr. Prutichai Chonglertvanichkul Assistant Governor - Planning Electricity Generating Authority of Thailand (EGAT) Presented to High Level Forum on Lao-Thai

More information

Updates on the feed-in Tariff scheme in Thailand

Updates on the feed-in Tariff scheme in Thailand Updates on the feed-in Tariff scheme in Thailand Monday 29 April, 2013 Bangkok Convention Centre at Central World Bangkok, THAILAND Prof. Emeritus Dr. Direk Lavansiri Chairman of the Energy Regulatory

More information

Current status and Development plan for Grid Small Hydro Power in Thailand

Current status and Development plan for Grid Small Hydro Power in Thailand Current status and Development plan for Grid Small Hydro Power in Thailand Krittiya Petsee Plan and Policy Analyst Department of Alternative Energy Development and Efficiency Thailand 4, April 2013 Hanoi,

More information

Report of Energy Reform Committee, National Reform Council Quick Win Proposal for Solar PV Rooftops for Residential and General Buildings

Report of Energy Reform Committee, National Reform Council Quick Win Proposal for Solar PV Rooftops for Residential and General Buildings Unofficial GIZ Translation of the Report of Energy Reform Committee, National Reform Council Quick Win Proposal for Solar PV Rooftops for Residential and General Buildings Original legal document: http://library2.parliament.go.th/giventake/content_nrc2557/d010558-01.pdf

More information

Incentives and Barriers for Decentralised Power Generation in Finland and in Thailand

Incentives and Barriers for Decentralised Power Generation in Finland and in Thailand Incentives and Barriers for Decentralised Power Generation in Finland and in Thailand Greenfield Consulting Ltd PHONE: +358 40 502 8300 Reelinki 30, 01100 Itäsalmi, Finland FAX: +358 9 8683 6980 www.greenfieldconsulting.fi

More information

Preliminary Feasibility Assessment of Selected Routes

Preliminary Feasibility Assessment of Selected Routes Chapter 2 Preliminary Feasibility Assessment of Selected Routes December 2015 This chapter should be cited as Fukawasa, K., I. Kutani, Y. Li (2015), Preliminary Feasibility Assessment of Selected Routes,

More information

Clean Development Mechanism CDM

Clean Development Mechanism CDM Workshop on Improving the Regional Distribution of CDM Projects in Asia and the Pacific 8-9 September 2010, ADB Headquarters, Manila, Philippines Clean Development Mechanism CDM Xeset 2 Hydropower Project

More information

Comparing Thai EIA with those of Japan and China

Comparing Thai EIA with those of Japan and China Comparing Thai EIA with those of Japan and China KULTIP SUWANTEEP Murayama and Nishikizawa Laboratory Department of Environmental Science and Technology, Interdisciplinary Graduate School of Science and

More information

SPP at a Glance. Located in Little Rock. Approximately 600 employees

SPP at a Glance. Located in Little Rock. Approximately 600 employees SPP at a Glance Located in Little Rock Approximately 600 employees Primary jobs electrical engineering, operations, settlements, and IT 24 x 7 operation Full redundancy and backup site 2 Regulatory Environment

More information

AEC + BIMSTEC EC : ASEAN Economic Community + Bay of Bengal Initiative for Multi-sectoral Technical and Economic Cooperation

AEC + BIMSTEC EC : ASEAN Economic Community + Bay of Bengal Initiative for Multi-sectoral Technical and Economic Cooperation AEC + BIMSTEC EC : ASEAN Economic Community + Bay of Bengal Initiative for Multi-sectoral Technical and Economic Cooperation 11 2556 2 (GDP) 3 - - 7 - - 4 Low Carbon Economy: 450 ppm scenario 5 2,000 1,800

More information

Solar PV in ASEAN Challenges and Opportunities. Peerapat Vithayasrichareon Centre for Energy and Environmental Markets (CEEM), UNSW Australia

Solar PV in ASEAN Challenges and Opportunities. Peerapat Vithayasrichareon Centre for Energy and Environmental Markets (CEEM), UNSW Australia Solar PV in ASEAN Challenges and Opportunities Peerapat Vithayasrichareon Centre for Energy and Environmental Markets (CEEM), UNSW Australia ESI Workshop on the value of PV in Singapore 18 February 2016

More information

SOLAR ENERGY DEVELOPMENT IN THAILAND

SOLAR ENERGY DEVELOPMENT IN THAILAND 4 April 2017 SOLAR ENERGY DEVELOPMENT IN THAILAND OVERVIEW As of 4 April 2017: Number of Solar Projects The current number of solar projects which have achieved COD in Thailand is 518 projects, with a

More information

By Bot Sosani HAPUA Secretarat. Sustainable Energy Training, Bangkok 25 th November 2013

By Bot Sosani HAPUA Secretarat. Sustainable Energy Training, Bangkok 25 th November 2013 ASEAN Power Grids Interconnection Projects for Energy Efficiency and Security Supply HAPUA s perspective and analysis on Regional electricity systems and sustainability By Bot Sosani HAPUA Secretarat Sustainable

More information

SOLAR ENERGY DEVELOPMENT IN THAILAND

SOLAR ENERGY DEVELOPMENT IN THAILAND 11 September 2017 SOLAR ENERGY DEVELOPMENT IN THAILAND OVERVIEW On 7 September 2017, the government announced that it will lift the ban to sell electric power generated by solar rooftop PV in the fourth

More information

Thailand Solar Energy Overview

Thailand Solar Energy Overview Thailand Solar Energy Overview Kulwaree Buranasajjawaraporn Director, Innovation Group, Bureau of Solar Energy Development Department of Alternative Energy Development and Efficiency (DEDE) Seminar: Ilalian

More information

Current Government Policy on the Usage of Coal in Thailand

Current Government Policy on the Usage of Coal in Thailand Current Government Policy on the Usage of Coal in Thailand Mr. Paramaet Payattapin Chief, Coal Management Department Fuel Management Division September 6 th, 2017 Agenda 1. Introduction to EGAT 2. The

More information

SECTOR BRIEFING. number. DBS Asian Insights DBS Group Research July Thai Power. Excess Supply Lingers

SECTOR BRIEFING. number. DBS Asian Insights DBS Group Research July Thai Power. Excess Supply Lingers 46 number SECTOR BRIEFING DBS Asian Insights DBS Group Research July 2017 Thai Power Excess Supply Lingers 02 Thai Power Excess Supply Lingers Chaipat THANAWATTANO Equity Analyst DBS Group Research Thailand

More information

The Impact of Renewable Energy Pricing Incentive Policies in Thailand

The Impact of Renewable Energy Pricing Incentive Policies in Thailand The Impact of Renewable Energy Pricing Incentive Policies in Thailand Pasapong Gamonwet, Shobhakar Dhakal, and Koranat Thammasiri Abstract Since 2006, renewable energy integration level in Thailand has

More information

Thailand - Improvement of Power Transmission and Distribution

Thailand - Improvement of Power Transmission and Distribution Thailand - Improvement of Power Transmission and Distribution Ex post evaluation report OECD sector 23040 - Electricity transmission and distribution BMZ project ID 1992 65 687 Project executing agency

More information

Understanding Utility Revenue and Customer Tariffs Impact of DPV Deployment: Thailand Case Study

Understanding Utility Revenue and Customer Tariffs Impact of DPV Deployment: Thailand Case Study PHOTO CREDIT: ISTOCK.COM Understanding Utility Revenue and Customer Tariffs Impact of DPV Deployment: Thailand Case Study Alexandra Aznar, National Renewable Energy Laboratory Sopitsuda Tongsopit, USAID

More information

Developing a Regional Roadmap on Energy Connectivity. China Electric Power Planning & Engineering Institute Bangkok

Developing a Regional Roadmap on Energy Connectivity. China Electric Power Planning & Engineering Institute Bangkok Developing a Regional Roadmap on Energy Connectivity China Electric Power Planning & Engineering Institute 2017.12 Bangkok Outline 1. Current Status of Energy Connectivity 2. Potential Analysis in the

More information

Current Status of Thailand s Nuclear Power Program. Electricity Generating Authority of Thailand Power for Thai Happiness

Current Status of Thailand s Nuclear Power Program. Electricity Generating Authority of Thailand Power for Thai Happiness Current Status of Thailand s Nuclear Power Program Electricity Generating Authority of Thailand Power for Thai Happiness Outline Status of Electricity of Thailand NPP Plan NPP Infrastructure Development

More information

HAPUA Heads of ASEAN Power Utilities/Authorities

HAPUA Heads of ASEAN Power Utilities/Authorities HAPUA Heads of ASEAN Power Utilities/Authorities Somchai Kokkamhaeng Director of Alternative Energy Development Division Electricity Generating Authority of Thailand ( EGAT ) HAPUA Under the Organization

More information

SOLAR ENERGY DEVELOPMENT IN THAILAND

SOLAR ENERGY DEVELOPMENT IN THAILAND 12 January 2016 SOLAR ENERGY DEVELOPMENT IN THAILAND OVERVIEW As of 26 October 2015: Number of Solar Projects The current number of solar projects which have achieved COD in Thailand is 295 projects, with

More information

Dr. Twarath Sutabutr

Dr. Twarath Sutabutr New and Renewable Energy Policy and Investment in Thailand Dr. Twarath Sutabutr Deputy Director-General Department of Alternative Energy Development and Efficiency Thailand Renewable Energy Asia 2013 :

More information

AORC Technical meeting 2014

AORC Technical meeting 2014 http : //www.cigre.org C5-1036 AORC Technical meeting 2014 Solar PV Rooftop System Connection to MEA s Distribution Network: Technic and Economic Aspects Tosak Thasananutariya Metropolitan Electricity

More information

!" #$%&'( $&!)*"*+,-./ :;:<=9

! #$%&'( $&!)**+,-./ :;:<=9 !" #$%&'( $&!)*"*+,-./0 1234567895:;:

More information

Thailand s Solar Energy Policy and New Alternative Energy Development Plan ( )

Thailand s Solar Energy Policy and New Alternative Energy Development Plan ( ) Thailand s Solar Energy Policy and New Alternative Energy Development Plan (2015-2036) Ms. Thidarat Sawai Bureau of solar energy development Department of Alternative Energy Development and Efficiency

More information

Presentation on current status of or plan for nuclear HRD programs Country: Lao PDR

Presentation on current status of or plan for nuclear HRD programs Country: Lao PDR Presentation on current status of or plan for nuclear HRD programs Country: Lao PDR By: Mr Chansaveng Boungnong Deputy Director General Department of Energy Policy and Planning, Ministry of Energy and

More information

FOR DISCUSSION ONLY. (A) ADB Safeguard Policy Statement. (C) Extent of Equivalence 2

FOR DISCUSSION ONLY. (A) ADB Safeguard Policy Statement. (C) Extent of Equivalence 2 Comparative Analysis of Lao PDR s Legal Framework and Environment Safeguards in the Environmental Safeguards Objectives: To ensure the environmental soundness and sustainability of projects and to support

More information

SUMMARY OF DISTRIBUTION BUSINESS

SUMMARY OF DISTRIBUTION BUSINESS Filed: 0-0- EB-0-0 Schedule Page of SUMMARY OF DISTRIBUTION BUSINESS.0 INTRODUCTION Hydro One Networks Inc. is licensed by the Ontario Energy Board (the Board ) to own, operate and maintain electricity

More information

UNMIK REGULATION NO. 2004/22 ON THE PROMULGATION OF A LAW ADOPTED BY THE ASSEMBLY OF KOSOVO ON ELECTRICITY

UNMIK REGULATION NO. 2004/22 ON THE PROMULGATION OF A LAW ADOPTED BY THE ASSEMBLY OF KOSOVO ON ELECTRICITY UNITED NATIONS United Nations Interim Administration Mission in Kosovo UNMIK NATIONS UNIES Mission d Administration Intérimaire des Nations Unies au Kosovo UNMIK/REG/2004/22 30 June 2004 REGULATION NO.

More information

OPERATION ANALYSIS OF LARGE SCALE SOLAR POWER GENERATION IN THAILAND

OPERATION ANALYSIS OF LARGE SCALE SOLAR POWER GENERATION IN THAILAND Sept.4-6, 2013, Guangzhou, China OPERATION ANALYSIS OF LARGE SCALE SOLAR POWER GENERATION IN THAILAND Presented by Worrapong Wonglimamornlert Electricity Generating Authority of Thailand (EGAT) 1 QUESTIONS

More information

4 March 2014 Grid-Connected Photovoltaic (PV) in Indonesia and Thailand Berlin, Germany

4 March 2014 Grid-Connected Photovoltaic (PV) in Indonesia and Thailand Berlin, Germany Mrs. Kulwaree Buranasajjawaraporn Bureau of Solar Energy Development Department of Alternative Energy Development and Efficiency (DEDE) Ministry of Energy 4 March 2014 Berlin, Germany Vision Knowledge

More information

Thailand s Energy 4.0

Thailand s Energy 4.0 How LAO PDR benefits from Thailand s ENERGY4.0 : Policy towards Innovative Technologies and Smart Community Thailand s Energy 4.0 EPPO ASEAN Energy Forum ASEAN Sustainable Energy Week BITEC Bangkok 8 June

More information

CK Power Public Company Limited (CKP) Stable Income, Diversified Portfolio and High Growth Company

CK Power Public Company Limited (CKP) Stable Income, Diversified Portfolio and High Growth Company CK Power Public Company Limited (CKP) Stable Income, Diversified Portfolio and High Growth Company 0 1 COMPANY STRUCTURE 1 1 Company and Shareholding Structure Current Shareholding Structure Bangpa-in

More information

Ratchaburi Electricity Generating. Asean & India Conference

Ratchaburi Electricity Generating. Asean & India Conference Ratchaburi Electricity Generating Holding PCL. Asean & India Conference 1-3 September 2010 Table of Contents o RATCH Overview o RATCH Highlights o RATCH Growth Strategies Appendix RATCH Overview Company

More information

2.6 NAM FA HYROPOWER PROJECT

2.6 NAM FA HYROPOWER PROJECT 2.6 NAM FA HYROPOWER PROJECT The Nam Fa Project is located in Bokeo Province on the Nam Fa (Nam Pha). The layout of the Project is shown in the attached plan. The project configuration developed for the

More information

Potential of Distributed Generation (DG) in Thailand and a Case Study of Very Small Power Producer (VSPP) Cogeneration

Potential of Distributed Generation (DG) in Thailand and a Case Study of Very Small Power Producer (VSPP) Cogeneration Potential of Distributed Generation (DG) in Thailand and a Case Study of Very Small Power Producer (VSPP) Cogeneration POWERGEN ASIA 2015 Nicolas Leong, Business Development Manager, South East Asia, Power

More information

Power Development and Future Plan

Power Development and Future Plan Power Development and Future Plan To cope with the forecasted increasing power demand, the Power Development Plan (PDP) was revised by the Ministry of Energy as PDP 2010: third revision (2012-2030). The

More information

The data contained several inconsistencies and the following procedure was used to identify and rectify readings that appeared erroneous:

The data contained several inconsistencies and the following procedure was used to identify and rectify readings that appeared erroneous: 4.0 LAO POWER MARKET 4.1 Load Analysis 4.1.1 Analysis of System Load Data Load data from EdL substations was collected analyzed and, after some adjustments, used as a basis for the development of dimensionless

More information

I C E M - I n ternat i o n a l C e n tre fo r E n v i ro n m e n t a l Manage m e n t

I C E M - I n ternat i o n a l C e n tre fo r E n v i ro n m e n t a l Manage m e n t 1 MRC SEA OF HYDROPOWER ON THE MAINSTREAM MEKONG OVERVIEW OF FINDINGS & RECOMMENDATIONS. 1 S T M E E T I N G O F C S C A P S T U DY G R O U P O N WA T E R R E S O U R C E S S E C U R I T Y HANOI, VIET

More information

Airport Noise Assessment in Thailand

Airport Noise Assessment in Thailand Airport Noise Assessment in Thailand Krittika Lertsawat Legal Researcher, Project on the Development on Draft Law of Environmental Judicial Process 24/9 m.6, Khlongsong, Khlongluang, Pathumthani 12120

More information

Wholesale Electricity Markets. New England Independent System Operator. Commissioner Mark Vannoy Maine Public Utilities Commission

Wholesale Electricity Markets. New England Independent System Operator. Commissioner Mark Vannoy Maine Public Utilities Commission Wholesale Electricity Markets and New England Independent System Operator Commissioner Mark Vannoy Maine Public Utilities Commission March 26, 2014 Overview and Background 2 Wholesale Electricity Markets

More information

List of training courses on electrical power system for Cambodia, Laos, Vietnam and Thailand (CLVT) countries

List of training courses on electrical power system for Cambodia, Laos, Vietnam and Thailand (CLVT) countries List of training courses on electrical power system for Cambodia, (Responsible and coordinator : Dr. Tuan Nguyen, t.nguyen@ied-sa.fr) 1. TRAINING COURSE 1 CUSTOMER SERVICE METERING AND BILLING 2. TRAINING

More information

Overcoming Barriers to Power Purchasing from Very Small Renewable Energy Producers

Overcoming Barriers to Power Purchasing from Very Small Renewable Energy Producers from Very Small Renewable Energy Producers W. *, W. Limpananwadi**, B. Kamonsin** and P. Sripattananon** * Department of Electrical Engineering, Chiang Mai University, Chiang Mai 50200 THAILAND Email:worawit@doe1.eng.cmu.ac.th

More information

ICEM and MRC - SEA of hydropower on mainstream Mekong River 1

ICEM and MRC - SEA of hydropower on mainstream Mekong River 1 1 1. PURPOSE OF THE SEA 2. WHAT IS AN SEA? 3. SEA SYSTEMS IN THE REGION 4. THE PLAN THE SEA IS ASSESSING 5. THE SEA APPROACH 6. INITIAL REVIEW OF KEY ISSUES Jeremy Carew-Reid, Team Leader MRC SEA of hydropower

More information

VIETNAM ENGAGEMENT IN TRANSBOUNDARY WATER COOPERATION IN MEKONG RIVER BASIN

VIETNAM ENGAGEMENT IN TRANSBOUNDARY WATER COOPERATION IN MEKONG RIVER BASIN VIETNAM ENGAGEMENT IN TRANSBOUNDARY WATER COOPERATION IN MEKONG RIVER BASIN MEKONG RIVER Length: 4,900 km (10) Catchment: 795,000 Km2 (21) Ave Discharge: 15,000 m3/s (8) Contribution to flow China 16%

More information

Potential of ASEAN Power Market Integration and Its Progress

Potential of ASEAN Power Market Integration and Its Progress Potential of ASEAN Power Market Integration and Its Progress Prof. Suthiphand Chirathivat Executive Director ASEAN Studies Center, Chulalongkorn University Nepal Power Investment Summit Nepal 2018 Power

More information

TRADE, SERVICES AND DEVELOPMENT

TRADE, SERVICES AND DEVELOPMENT UNCTAD Multi-year Expert Meeting on TRADE, SERVICES AND DEVELOPMENT Water and Sanitation, Energy and Food-related Logistics Services Geneva, 7-8 May 2018 Energy Connectivity and Trade Promote the Achievement

More information

ELECTRICITY SUPPLY INDUSTRY OF SOUTH AFRICA

ELECTRICITY SUPPLY INDUSTRY OF SOUTH AFRICA ELECTRICITY SUPPLY INDUSTRY OF SOUTH AFRICA General Information for Potential Investors May 2008 This publication was produced for review by the United States Agency for International Development. It was

More information

18 23 Oct., Provincial Electricity Authority (PEA), Thailand

18 23 Oct., Provincial Electricity Authority (PEA), Thailand Department of Industrial and Management Engineering Indian Institute of Technology Kanpur Forum of Regulators 5 th Capacity Building Programme for Officers of Electricity Regulatory Commissions 18 23 Oct.,

More information

Integration New and Renewable Energy into the grid. Breakfast Seminar, 10 May 2013 St. Regis Hotel, Bangkok, Thailand

Integration New and Renewable Energy into the grid. Breakfast Seminar, 10 May 2013 St. Regis Hotel, Bangkok, Thailand Integration New and Renewable Energy into the grid Dr. Twarath Sutabutr Deputy Director-General Department of Alternative Energy Development and Efficiency Thailand Breakfast Seminar, 10 May 2013 St. Regis

More information

MOIT FiT Circular No. 02 Decision No. 39

MOIT FiT Circular No. 02 Decision No. 39 Renewable Energy Vietnam Client Alert January 2019 For further information, please contact: Fred Burke +84 28 3520 2628 frederick.burke@bakermckenzie.com Dang Chi Lieu +84 24 3936 9341 chilieu.dang@bakermckenzie.com

More information

Site photograph: Substation equipment installed through this project. Map of project area: Bangkok Metropolitan area

Site photograph: Substation equipment installed through this project. Map of project area: Bangkok Metropolitan area Thailand Metropolitan Power Distribution Project External Evaluator: Atsushi Hashimoto (Maenam Advisory, Co. Ltd.) Field Survey: January 2006 1. Project Profile and Japan s ODA Loan Bangladesh Myanmar

More information

Chapter 1 Primary Energy Data

Chapter 1 Primary Energy Data Chapter 1 Primary Energy Data The primary energy sources of the Lao People s Democratic Republic (Lao PDR) consist of coal, oil, hydro, and biomass. The country imports oil products to meet its domestic

More information

CDM Policy in Thailand

CDM Policy in Thailand CDM Policy in Thailand The Fifteen Asia-Pacific Seminar on Climate Change Yokohama, Kanagawa, Japan Office of Natural Resources & Environmental Policy and Planning (ONEP) Ministry of Natural Resources

More information

Study on Effective Power Infrastructure Investment through Power Grid Interconnections in East Asia

Study on Effective Power Infrastructure Investment through Power Grid Interconnections in East Asia Study on Effective Power Infrastructure Investment through Power Grid Interconnections in East Asia edited by Kazutaka Fukasawa Ichiro Kutani Yanfei Li September 2015 Economic Research Institute for ASEAN

More information

THAILAND 1. Overview. National Qualifications Framework. Quality assurance mechanisms

THAILAND 1. Overview. National Qualifications Framework. Quality assurance mechanisms Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized THAILAND 1 Overview The formal education qualification system of Thailand is divided into three parts Basic Education

More information

Asian Environmental Compliance and Enforcement Network (AECEN)

Asian Environmental Compliance and Enforcement Network (AECEN) Assessing Environmental Impact Assessment (EIA) in Thailand: Implementation Challenges and Opportunities for Sustainable Development Planning (Working Paper) Asian Environmental Compliance and Enforcement

More information

Presentation Transboundary water cooperation in Mekong Countries, key issues, challenges and intervention to address

Presentation Transboundary water cooperation in Mekong Countries, key issues, challenges and intervention to address Regional Workshop on Transboundary Water Cooperation in the context of the SDGs in South Asia and beyond Pokhara, Nepal 23-24 May 2017 Presentation Transboundary water cooperation in Mekong Countries,

More information

Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Report No.

Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Report No. Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name Region Sector Project ID Borrower Implementing Agency Report No. PID6033

More information

Thailand s Past Success and Future outlook of its Solar Energy Policy. Mr. Phongkarn Piamsuttitam 15 th June 2015

Thailand s Past Success and Future outlook of its Solar Energy Policy. Mr. Phongkarn Piamsuttitam 15 th June 2015 Thailand s Past Success and Future outlook of its Solar Energy Policy Mr. Phongkarn Piamsuttitam 15 th June 2015 Content Past Success Policy, Regulations and Plan in Thailand Solar Farm Proposed and COD

More information

ERC s Role to Enhance Power Supply Security

ERC s Role to Enhance Power Supply Security ERC s Role to Enhance Power Supply Security Prof. Dr. Direk Lavansiri Chairman, Energy Regulatory Commission (ERC) of Thailand For Capacity Building India Regulatory 2014, 12 February 2014, Holiday Inn

More information

Sector Report. Power Sector. Thailand

Sector Report. Power Sector. Thailand Sector Report Power Sector Thailand Produced by: Vanchai Tanasoontararat, Trade & Investment Manager, British Embassy Bangkok Last revised: 3 September 2009 Whereas every effort has been made to ensure

More information

ENERGY AND POWER SUMMARY (Avoidance, mitigation and enhancement considerations)

ENERGY AND POWER SUMMARY (Avoidance, mitigation and enhancement considerations) ENERGY AND POWER SUMMARY (Avoidance, mitigation and enhancement considerations) 1 What issues are addressed in each SEA stage? From an energy and power perspective Baseline Assessment Impact Assessment

More information

Coal Demand/Supply Outlook in Thailand

Coal Demand/Supply Outlook in Thailand 2009 APEC Clean Fossil Energy Technical and Policy Seminar Cleaner Coal: Moving towards Zero Emissions October 12-14, 2009 Songdo Convesia, Inchon, Korea Coal Demand/Supply Outlook in Thailand Viroj Sivavong

More information

Implementation of Previous PNPCA Processes and Lessons Learnt

Implementation of Previous PNPCA Processes and Lessons Learnt The 5 th Regional Stakeholder Forum First Regional Information Sharing on Pak Lay Prior Consultation Process 20-21 September 2018 Landmark Hotel, Vientiane, Lao PDR Implementation of Previous PNPCA Processes

More information

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB5800 Project Name. EGAT And PEA Advancing Clean Energy Investment - CTF Region

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB5800 Project Name. EGAT And PEA Advancing Clean Energy Investment - CTF Region Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB5800 Project Name EGAT

More information

SECTOR ASSESSMENT (SUMMARY): ENERGY (ELECTRICITY TRANSMISSION AND DISTRIBUTION)

SECTOR ASSESSMENT (SUMMARY): ENERGY (ELECTRICITY TRANSMISSION AND DISTRIBUTION) Southwest Transmission Grid Expansion Project (RRP BAN 51137) SECTOR ASSESSMENT (SUMMARY): ENERGY (ELECTRICITY TRANSMISSION AND DISTRIBUTION) Sector Road Map 1. Sector Performance, Problems, and Opportunities

More information

Japanese ODA Loan. Ex-Ante Evaluation

Japanese ODA Loan. Ex-Ante Evaluation Japanese ODA Loan Ex-Ante Evaluation 1. Name of the Project Country: People s Republic of Bangladesh Project: Dhaka-Chittagong Main Power Grid Strengthening Project Loan Agreement: December 13, 2015 Loan

More information

ICEM and MRC - SEA of hydropower on mainstream Mekong River 1

ICEM and MRC - SEA of hydropower on mainstream Mekong River 1 1 1. PURPOSE OF THE SEA 2. WHAT IS AN SEA? 3. SEA SYSTEMS IN THE REGION 4. THE PLAN THE SEA IS ASSESSING 5. THE SEA APPROACH 6. INITIAL REVIEW OF KEY ISSUES Jeremy Carew-Reid, Team Leader MRC SEA of hydropower

More information

Santoy 8 Satellite Mine at the Seabee Gold Mine. Technical Review Comments. on the. Environmental Impact Statement.

Santoy 8 Satellite Mine at the Seabee Gold Mine. Technical Review Comments. on the. Environmental Impact Statement. Environmental Impact Assessment Technical Review Comments on the Environmental Impact Statement as submitted by Claude Resources Inc. Saskatchewan Ministry of Environment December, 2009 1. INTRODUCTION

More information

Case Studies from Thailand: International Experience on Rooftop Solar PV Development

Case Studies from Thailand: International Experience on Rooftop Solar PV Development PHOTO CREDIT: ISTOCK.COM USAID CLEAN POWER ASIA Case Studies from Thailand: International Experience on Rooftop Solar PV Development Supawan Saelim, Renewable Energy Policy Specialist Sopitsuda Tongsopit,

More information

SPP Hybrid Firm and VSPP Semi-Firm Feed-in Tariff (FiT) policy

SPP Hybrid Firm and VSPP Semi-Firm Feed-in Tariff (FiT) policy SPP Hybrid Firm and VSPP Semi-Firm Feed-in Tariff (FiT) policy 1 1. NEPC s resolution on 17 FEB 2017 Approved FiT rate for SPP Hybrid Firm, and Semi-Firm and assigned ERC to announced regulations of SPP

More information

Chapter 1 Introduction

Chapter 1 Introduction Chapter 1 Introduction 1.1 Programme rationale and objective 1.1.1 Programme Rationale Provincial Electricity Authority (PEA) is a state enterprise established under Provincial Electricity Authority Act

More information

Chapter 2.3: National Legislation 1

Chapter 2.3: National Legislation 1 Chapter 2.3: National Legislation 1 Module 2: Policy and Legislation Chapter 2.3: National Legislation Legislation is an important element of the institutional framework for watershed management. This

More information

Lebanese National Renewable Energy Grid Code

Lebanese National Renewable Energy Grid Code Technical Study and Development of Renewable Energy Grid Interconnection Guidelines for Lebanon Lebanese National Renewable Energy Grid Code ZAKARIA RAMMAL National Energy Consultant September 23 rd 2016

More information

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE. Rural Electrification and Transmission Interconnection Project (RETP) Region

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE. Rural Electrification and Transmission Interconnection Project (RETP) Region PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.:45460 Project Name Rural Electrification and Transmission Interconnection Project (RETP) Region EAST ASIA AND PACIFIC Sector Energy Project ID

More information

Enterprise GIS Implementation for Thailand Electric Utilities. Siriwit Marukapitak Senior Utilities Solution Manager, esri Thailand July 2, 2014

Enterprise GIS Implementation for Thailand Electric Utilities. Siriwit Marukapitak Senior Utilities Solution Manager, esri Thailand July 2, 2014 Enterprise GIS Implementation for Thailand Electric Utilities Siriwit Marukapitak Senior Utilities Solution Manager, esri Thailand July 2, 2014 Agenda About esri Thailand The ArcFM Enterprise GIS Solution

More information

Renewable energy: Investing in Africa

Renewable energy: Investing in Africa 1. Who is responsible for energy policy? 2. To what extent have generation, transmission and distribution activities been unbundled? 3. Who owns and operates the (grid-connected) generation, transmission

More information

Thailand Alternative Energy Development Plan (AEDP 2015) and Progress

Thailand Alternative Energy Development Plan (AEDP 2015) and Progress Thailand Alternative Energy Development Plan (AEDP 2015) and Progress Miss Jariya Budnard Engineer Professional Level, Bureau of Energy Research The 49th Meeting of APEC Expert Group on New and Renewable

More information

Senior Minister, Minister of Environment

Senior Minister, Minister of Environment Unofficial Translation by Mr. DANH Serey, EIA Department KINGDOM OF CAMBODIA Nation Religion King MINISTRY of ENVIRONMENT N. 376 BRK.BST Phnom Penh, 02 September 2009 - - - - - - - PRAKAS (DECLARATION)

More information

The Role of EWURA in Renewable Energy in Tanzania

The Role of EWURA in Renewable Energy in Tanzania THE ENERGY AND WATER UTILITIES REGULATORY AUTHORITY (EWURA) The Role of EWURA in Renewable Energy in Tanzania Presentation to NARUC 1st Mission Anastas P. Mbawala Director of Electricity - EWURA 12 August,

More information

TECHNICAL ASSISTANCE DESCRIPTION, COST ESTIMATES AND OUTLINE TERMS OF REFERENCE

TECHNICAL ASSISTANCE DESCRIPTION, COST ESTIMATES AND OUTLINE TERMS OF REFERENCE Greater Mekong Subregion Nam Ngum 3 Hydropower Project (RRP LAO 41385) Supplementary Appendix 5 TECHNICAL ASSISTANCE DESCRIPTION, COST ESTIMATES AND OUTLINE TERMS OF REFERENCE Strengthening Biodiversity

More information

Rescaling the Energy Label No.5: 2006 version in Thailand

Rescaling the Energy Label No.5: 2006 version in Thailand ก ก 2 27-29 ก ก 2549 Rescaling the Energy Label No.5: 2006 version in Thailand Srinual Soksod and Panu Suwicharcherdchoo Appliances Efficiency Improvement Project, Demand Side Implementation Division,

More information

Dispatch Data Exchange Manual. June, 2012

Dispatch Data Exchange Manual. June, 2012 Dispatch Data Exchange Manual June, 2012 Table of Content Page No. 1 Introduction...1 2 Overview of the NITS...2 3 Major Transmission lines...2 4 Existing Generating Plants...4 5 Responsibility of the

More information

Energy and Mining Policies in Laos and National Budget

Energy and Mining Policies in Laos and National Budget 1 Energy and Mining Policies in Laos and National Budget Dr. PHANHPAKIT ONPHANHDALA NATIONAL UNIVERSITY OF LAOS Lower Mekong Public Policy Initiative Ho Chi Minh City, 29 th November 2016 Outline 2 Introduction

More information

SEA FOR STRATEGIC GRID PLANNING IN SOUTH AFRICA: Enabling the efficient and effective roll out of strategic electricity transmission infrastructure

SEA FOR STRATEGIC GRID PLANNING IN SOUTH AFRICA: Enabling the efficient and effective roll out of strategic electricity transmission infrastructure SEA FOR STRATEGIC GRID PLANNING IN SOUTH AFRICA: Enabling the efficient and effective roll out of strategic electricity transmission infrastructure Abstract ID: 409 Authors: Marshall Mabin (1), Paul Lochner

More information