RE: HWY 63:02 HIGHWAY EMBANKMENT REPAIR NORTH OF LABICHE RIVER BRIDGE COMPLETION REPORT

Size: px
Start display at page:

Download "RE: HWY 63:02 HIGHWAY EMBANKMENT REPAIR NORTH OF LABICHE RIVER BRIDGE COMPLETION REPORT"

Transcription

1 THURBER ENGINEERING LTD. Suite 200, st Avenue EDMONTON, Alberta T6E 6A5 Phone (780) Fax [780) I \ DO THURBER February 2, 1999 File: Alberta Transportation & Utilities Unit #2, Street Athabasca, Alberta T9S 1A9 Attention: Mr. Andy Brown, P.Eng. RE: HWY 63:02 HIGHWAY EMBANKMENT REPAIR NORTH OF LABICHE RIVER BRIDGE COMPLETION REPORT Dear Sir: This letter provides a summary of work undertaken for an embankment repair on Highway 63:02, located approximately 1.5 km north of the Labiche River Bridge northeast of Grassland, Alberta. Thurber Engineering Ltd. (TEL) provided the geotechnical design, prepared drawings for construction, and carried out geotechnical inspection services during construction for the project. The project manager for the project was Mr. Don Law, P.Eng. of TEL. The work was authorized by Mr. Andy Brown, P.Eng. of Alberta Transportation and Utilities (AT&U) and was coordinated by Mr. Nick Bucyk, P.Eng. of AT&U (Athabasca). 1. BACKGROUND The five metre high embankment fill flanking an oxbow feature to the west had been experiencing distress since Subsidence has historically occurred in the roadway surface over a 60 m length, with some minor surface cracking occurring in the pavement surface to the north and south of this zone of major distress (1 00 m length total). Inclinometers and piezometers have been installed at the site by others to monitor slope movements and pore water pressures. GEOTECHNICAL AND GEOLOGICAL ENGINEERING CALGARY /EDMONTON/TORONTO/VANCOUVER/VICTORIA/FT. McMURRAY

2 THURBER ENGINEERING ~ Alberta Transportation -2- February 2, 1999 The roadway embankment was originally constructed through an extensive area of muskeg. From review of aerial photography and site inspection it appears that the embankment likely acts as a long dam between the muskeg area to the east and the Labiche River to the west. Prior to construction in 1997, surface water from the region to the east was directed through two culverts in the immediate vicinity of the embankment failure into the oxbow lake to the west of the highway. A failure in the embankment occurred near the end of June 1997 which formed a scarp extending a distance of 45 m along the southbound lane. The failure movement was in a westerly direction, toward the oxbow feature. It is understood that granular fill material was placed in the area of subsidence and the speed limit was reduced to maintain trafficability through the area. The rate of subsidence increased during the summer of 1997 such that maintenance was required on a weekly and sometimes daily basis to maintain safe driving conditions. 2. PROJECT ACTIVITIES Project activities prior to the initiation of construction included the following: Site inspection and engineering assessment Review of existing information (AT&U geotechnical files and GAEA Report) Initial survey undertaken by Spyglass Consulting Ltd. and EXH Engineering Ltd. Slope stability analysis Clay borrow investigation Pre-construction meeting (on-site August 20, 1997, record attached in Appendix A) Survey layout and borrow area pick-up (EXH Engineering Ltd.) Due to the requirement to get the highway back in service in a timely manner the work was not tendered. Pine-West Maintenance Ltd. (Pine-West), the highway maintenance contractor for the area, was selected by AT&U to undertake the work under their existing contract with AT&U. It is understood that work items not covered under the maintenance contract were dealt with under a separate agreement between AT&U and the contractor. Superintendent duties for the project were provided by Mr. Terry Colosimo, P.Eng. of Pine-West. A fibre optic line located at the toe of the embankment on the west side of the highway was located within the slide mass and was relocated away from the problem area prior to the commencement of construction activities.

3 THURBER ENGINEERING~ Alberta Transportation -3- February 2, 1999 Construction inspection was initiated on September 2, 1997 with some initial site grading undertaken by the contractor prior to this time. The embankment repair and ditch regrading work undertaken by the contractor is described below. Substantial completion of the project was achieved on October 30, Final acceptance was provided by Mr. Bucyk of AT&U on October 30, 1997 as recommended by Mr. Law of TEL, subject to final grading and clean-up in the spring of It is understood that final grading and clean-up operations have been completed by the contractor. Construction supervision was provided by Mr. Brian Gilliatt of TEL. Geotechnical inspection of clay borrow during excavation was undertaken by TEL personnel and load checking for granular haul was performed by a local hire under the direction of Mr. Gilliatt. Asphaltic concrete pavement inspection was undertaken by Mr. Jim Palmer of TEL. Engineering support and site visits during construction were undertaken by Mr. Law. Survey and quantity measurements during construction were provided by EXH Engineering Ltd. New slope inclinometer instrumentation was installed by TEL on October 15, 1997 to replace instrumentation destroyed during construction. Existing inclinometers were extended through the toe berm fill where required. 3. EMBANKMENT REPAIR AND DITCH REGRADING The cause of the roadway embankment failure was determined to be a combination of slope instability due to weak foundation soils below the embankment and high pore water pressures within the embankment. The repair and stabilization design is shown on the attached site plan and crosssection, Drawing No.'s A and -2A respectively (Appendix A). The design drawings correspond in general with the as-built dimensions. The embankment repair consisted of the following major components; A 1 00 m long section of the roadway was cut out to a depth of approximately 3.5 m and was replaced with compacted clay and granular backfill materials. The clay was obtained from a borrow area located 6 km east of the site on the ALPAC road. The granular material was obtained from an AT&U stockpile located 58 km south of the site near Boyle, Alberta. Road crush was obtained from an AT&U stockpile near Wandering River, Alberta. Excavation and backfill operations were staged to allow traffic to pass the site at all times during construction. 08\0:\15\ et Continued...

4 THURBER ENGINEERING Alberta Transportation -4- February 2, 1999 A 600 mm thick granular drainage layer was placed below the fill in this road section to reduce the likelihood of pore pressure buildup in the embankment. A geotextile separation layer was placed above and below the granular layer. A toe berm was constructed along the west flank of the roadway embankment with a width of approximately 15 m beyond the original embankment toe. The berm extends over a length of approximately 230 m. Waste material from the excavation was used as toe berm fill. The surface water flow was directed north of the site to prevent the flow of surface water to the oxbow on the west side of the highway. This work consisted of east ditch regrading and installation of a new 900 mm diameter culvert across the ALPAC road to the north of the site. The centreline culverts crossing the highway at this location were abandoned by constructing a clay plug at the inlet end of each culvert to prevent flow from the east ditch to the oxbow. Selected photographs taken during the project are attached in Appendix B. Daily inspection reports filled out by the TEL inspector are attached in Appendix C. 4. QUALITY CONTROL AND QUANTITY MEASUREMENTS Compaction testing was undertaken on clay fill and granular base course material. The compaction test results are provided in Appendix D and indicate the clay was compacted to at least 95o/o of Standard Proctor maximum dry density and was typically 2o/o to 3% above optimum moisture content. The 20 mm crushed gravel base course was compacted to a minimum density of 1 00 /o of Standard Proctor. Density testing was undertaken on cores taken from the asphaltic concrete pavement. The results of three test cores indicated an average density of 94.9o/o as compared with the Marshall design density. The density is low likely as a result of lower than ideal placement temperatures resulting from the length of haul and cold air temperatures (approximately 0 C). The low density was accepted by AT&U and TEL based on the knowledge that an overlay was planned in early summer It is understood that the overlay design through this area takes into account the potentially weaker pavement through this section of roadway. The asphaltic concrete testing results are included in Appendix D. Table 1 in Appendix A provides a summary of final quantities of excavation, clay borrow, granular fill and miscellaneous items (geotextile, culvert, etc.) which were used by AT&U as a basis of payment for the contract. The quantities of pit run and granular base course were higher than initially estimated due to the requirement to use granular backfill in place of clay when access to the clay borrow source via the ALPAC haul road was shut down due to wet weather.

5 THURBER ENGINEERING Alberta Transportation - 5- February 2, SLOPE MOVEMENTS Instrumentation monitoring is ongoing at the site under TEL's Instrumentation Monitoring Contract with AT&U for the North Central Region. Some minor movement at depth was measured between October 1997 and June 1998 in two of the slope inclinometers. Recent readings (November 1998) indicate that the rate of movement in the two inclinometers has slowed. Continued instrumentation monitoring is recommended at this site. 6. CONTRACTOR EVALUATION The quality of the product produced by the contractor was considered satisfactory, however the contractor was not organized and did not follow his proposed work plan. It was originally anticipated that the project would be completed in a three week period, however a late start by the contractor and inefficiencies in utilization of equipment led to a lack of progress during late August and early September when the weather was favourable. The project was delayed in mid September and early October (Sept. 13 through 21, 1997 and Oct. 8 through 14, 1997) due to wet weather which hampered clay placement and ultimately forced the use of granular fill material to complete the embankment backfill. As a result of the delay the asphaltic concrete pavement was delayed until the weather was cold, resulting in a marginal product subsequently corrected for during overlay. It is expected that the contract could have been administered in a more efficient manner had a contract specific to this work been drawn up. A clear definition of the methods of measurement for payment would likely have averted misunderstanding regarding payment at the end of the contract. 7. CLOSURE We trust this information satisfies your requirements. If questions or concerns arise, please contact the undersigned. Yours very truly, Thurber Engineering Ltd. D. Papanicolas, P.Eng. ~t! D.J. Law, P.Eng. Project Engineer attachments 08\D:\ 15\ et

Central Region GeoHazard Assessment Site C8 SH597:02 East of Blackfalds May 2007 Site Assessment and Instrumentation Monitoring Report

Central Region GeoHazard Assessment Site C8 SH597:02 East of Blackfalds May 2007 Site Assessment and Instrumentation Monitoring Report Alberta Infrastructure & Transportation Central Region #401, 4902 51 Street Red Deer, Alberta T4N 6K8 May 18, 2007 Mr. Alain Momedi, P.Eng. Project Engineer Dear Mr. Momedi: Central Region GeoHazard Assessment

More information

Central Region GeoHazard Assessment H597:02, km Slide May 2011 Site Inspection and Instrumentation Monitoring Report

Central Region GeoHazard Assessment H597:02, km Slide May 2011 Site Inspection and Instrumentation Monitoring Report Alberta Transportation Central Region #401, 4902 51 Street Red Deer, Alberta T4N 6K8 July 14, 2011 Mr. Dennis Grace, P.Eng. Construction Engineer Dear Mr. Grace: Central Region GeoHazard Assessment H597:02,

More information

SITE C14: H771:04 Slide and Culvert Distress

SITE C14: H771:04 Slide and Culvert Distress SITE C14: H771:04 Slide and Culvert Distress LEGAL LOCATION: NW34-45-1-W5 REFERENCE LOCATION ALONG HIGHWAY: UTM COORDINATES (NAD 83): N 5,868,192 E 696,622 AT FILE: H771:04 AT PLAN & PROFILE: Date of Initial

More information

CW 3170 EARTHWORK AND GRADING TABLE OF CONTENTS

CW 3170 EARTHWORK AND GRADING TABLE OF CONTENTS CW 3170 EARTHWORK AND GRADING TABLE OF CONTENTS 1. GENERAL CONDITIONS...1 3. DESCRIPTION...1 5. MATERIALS...1 5.1 General...1 5.2 Handling and Storage of Materials...1 5.3 Testing and Approval...1 5.4

More information

APPLICATION PROCEDURES FOR PLACEMENT OF UNDERGROUND TELECOMMUNICATION CABLES IN THE VICINITY OF TRANSPORTATION FACILITIES

APPLICATION PROCEDURES FOR PLACEMENT OF UNDERGROUND TELECOMMUNICATION CABLES IN THE VICINITY OF TRANSPORTATION FACILITIES APPLICATION PROCEDURES FOR PLACEMENT OF UNDERGROUND TELECOMMUNICATION CABLES IN THE VICINITY OF TRANSPORTATION FACILITIES UNDER THE JURISDICTION OF ALBERTA TRANSPORTATION 1.0 Application Procedures 2.0

More information

Inuvik to Tuktoyaktuk Highway EIRB Technical Sessions: Granular Resources August 2012

Inuvik to Tuktoyaktuk Highway EIRB Technical Sessions: Granular Resources August 2012 Inuvik to Tuktoyaktuk Highway EIRB Technical Sessions: Granular Resources August 2012 There is sufficient material to build and maintain the Highway for 50 years or more. Source Construction Embankment

More information

INDEX Warrant for Reclaiming Asphalt Pavement - Partial Depth Warrant for Reclaiming Asphalt Pavement - Full Depth

INDEX Warrant for Reclaiming Asphalt Pavement - Partial Depth Warrant for Reclaiming Asphalt Pavement - Full Depth 399-2 - INDEX 399-2.1 GENERAL 399-2.1.1 Tender Items 399-2.1.2 Traffic Warrant 399-2.1.3 Reference Publication 399-2.1.4 Warrant for Reclaiming Asphalt Pavement - Partial Depth 399-2.1.5 Warrant for Reclaiming

More information

APPLICATION PROCEDURES FOR PLACEMENT OF UNDERGROUND WATER AND SEWER PIPELINES IN THE VICINITY OF TRANSPORTATION FACILITIES UNDER THE

APPLICATION PROCEDURES FOR PLACEMENT OF UNDERGROUND WATER AND SEWER PIPELINES IN THE VICINITY OF TRANSPORTATION FACILITIES UNDER THE APPLICATION PROCEDURES FOR PLACEMENT OF UNDERGROUND WATER AND SEWER PIPELINES IN THE VICINITY OF TRANSPORTATION FACILITIES UNDER THE JURISDICTION OF ALBERTA TRANSPORTATION 1.0 Application Procedures 2.0

More information

November 6,

November 6, November 6, 2012 12-1376-0017 Jon Lee, EIT Alberta Transportation 2nd Floor, Provincial Building 111-54 Street Edson, AB, T7E 1T2 North Central Region Edson Area NC76 Hwy 658:02 Bridge File 72273 at Bull

More information

City of Brandon Division 2 Standard Construction Specifications Section January 2007(Revision 1) Page 1 of 8 ROADWAY EXCAVATION AND GRADING

City of Brandon Division 2 Standard Construction Specifications Section January 2007(Revision 1) Page 1 of 8 ROADWAY EXCAVATION AND GRADING January 2007(Revision 1) Page 1 of 8 PART 1 GENERAL 1.01 OTHER CONTRACT DOCUMENTS 1.02 DESCRIPTION OF WORK 1.03 RELATED WORK 1.04 CLASSIFICATION OF THE WORK 1.05 QUALITY ASSURANCE PART 2 PRODUCTS 2.01

More information

2.1 Backfill - General

2.1 Backfill - General 2.1 Backfill - General Excavations are made for the purpose of constructing bridge substructure elements, and consequently requiring competent backfill material. The backfill material must be adequately

More information

Surface Infrastructure Restoration for Utility Cuts DIVISION 14 Shallow Buried Utilities Section _Mar29_2016.pdf Page 1 of 20 INDEX

Surface Infrastructure Restoration for Utility Cuts DIVISION 14 Shallow Buried Utilities Section _Mar29_2016.pdf Page 1 of 20 INDEX 14001_Mar29_2016.pdf Page 1 of 20 INDEX 14001-0 REQUEST TO CUT CITY SURFACE INFRASTRUCTURE 2 14001-1 COST SCHEDULE FOR WORK PERFORMED BY CITY FORCES 2 14001-2 SPECIFICATIONS FOR WORK PERFORMED BY EXTERNAL

More information

Based on conversations with WSP personnel, the following items require Paterson s review:

Based on conversations with WSP personnel, the following items require Paterson s review: consulting engineers memorandum to: 2015-2017 RR Ltd - Mr. Jonah Bonn - jbonn@firstbay.ca to: WSP - Mr. James Johnston - james.johnston@wsp.com re: Parking Lot Rehabilitation Pavement Structure Recommendations

More information

SECTION 14 EMBANKMENT

SECTION 14 EMBANKMENT SECTION 14 EMBANKMENT 14.1 DESCRIPTION A. General: This work consists of constructing roadway embankments, including preparation of the areas upon which embankments are to be placed; the construction of

More information

SECTION EARTHWORK

SECTION EARTHWORK SECTION 02200 EARTHWORK PART 1 - GENERAL 1.01 WORK INVOLVED A. Provide all labor, materials and equipment as required for all excavation, grading, providing borrow materials, hauling, placing and compacting

More information

DIVISION 2 - EARTHWORKS

DIVISION 2 - EARTHWORKS DIVISION 2 - EARTHWORKS Section 02005 Excavation and Embankment Construction 02005_Dec22_2009.pdf Section 02010 Area Grading 02010_Dec22_2009.pdf Section 02015 Sub-grade Compaction 02015_Jan12_2016.pdf

More information

CONSTRUCTION SPECIFICATION FOR CONCRETE BARRIERS

CONSTRUCTION SPECIFICATION FOR CONCRETE BARRIERS ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 553 FEBRUARY 1991 CONSTRUCTION SPECIFICATION FOR CONCRETE BARRIERS 553.01 SCOPE 553.02 REFERENCES 553.03 DEFINITIONS TABLE OF CONTENTS 553.04 SUBMISSION

More information

NANISIVIK MINE Closure Design and Performance Monitoring

NANISIVIK MINE Closure Design and Performance Monitoring NANISIVIK MINE Closure Design and Performance Monitoring Jim Cassie, M.Sc., P.Eng. Principal Geotechnical Engineer BGC Engineering Inc. 2015 RPIC FEDERAL CONTAMINATED SITES REGIONAL WORKSHOP OUTLINE SITE

More information

1.02 RELATED WORK: Refer to the following sections for related work: Section 4000-Concrete Materials and Methods

1.02 RELATED WORK: Refer to the following sections for related work: Section 4000-Concrete Materials and Methods SECTION 2000- EARTHWORK PART 1- GENERAL 1.01 SCOPE: This Section covers excavation, fill, and compaction of earth and rock for roadway, embankments, structural foundations, and planted areas. Topics include

More information

Township of McNab/Braeside Reconstruction/Rehabilitation of Goshen Road

Township of McNab/Braeside Reconstruction/Rehabilitation of Goshen Road Township of McNab/Braeside Reconstruction/Rehabilitation of Goshen Road Prepared for: Mr. Ryan Frew, P. Eng. Township of McNab/Braeside 2508 Russett Drive Arnprior, ON K7S 3G8 Prepared by: McIntosh Perry

More information

VISUAL SITE INSPECTION REPORT 2018

VISUAL SITE INSPECTION REPORT 2018 VISUAL SITE INSPECTION REPORT 2018 SOUTHERN INDIANA GAS AND ELECTRIC A. B. BROWN GENERATING STATION TYPE III RESTRICTED WASTE LANDFILL WEST FRANKLIN, IN ATC PROJECT NO. 170LF00614 January 9, 2019 PREPARED

More information

Creek East Hill Slide Area, AMEC report submitted to AIT, October 2006, AMEC project number CG25239.

Creek East Hill Slide Area, AMEC report submitted to AIT, October 2006, AMEC project number CG25239. 4.20 S23 HIGHWAY 507:02 EAST OF MILL CREEK Site Description and Background This site is located on Highway 507, immediately east of the bridge across Mill Creek and approximately 5 km eastbound (measured

More information

REPORT OF GEOTECHNICAL EXPLORATION WEST MARJORY AVENUE TAMPA, FLORIDA

REPORT OF GEOTECHNICAL EXPLORATION WEST MARJORY AVENUE TAMPA, FLORIDA REPORT OF GEOTECHNICAL EXPLORATION WEST MARJORY AVENUE TAMPA, FLORIDA AREHNA PROJECT NO. B-15-008 March 11, 2015 Prepared For: City of Tampa Stormwater Division 306 W. Jackson Street, 6N Tampa, Florida

More information

SECTION ASPHALT CONCRETE

SECTION ASPHALT CONCRETE SECTION 02740 ASPHALT CONCRETE PART 1. GENERAL 1.01 SECTION INCLUDES A. Work includes but is not limited to the following: 1.02 RELATED SECTIONS 1. Provide all material, labor, and equipment to prepare

More information

SPECIFICATIONS FOR BRIDGE CONSTRUCTION SECTION 2 BACKFILL. 2.1 General...2-1

SPECIFICATIONS FOR BRIDGE CONSTRUCTION SECTION 2 BACKFILL. 2.1 General...2-1 SPECIFICATIONS FOR BRIDGE CONSTRUCTION SECTION 2 BACKFILL TABLE OF CONTENTS 2.1 General...2-1 2.2 Materials...2-1 2.2.1 Compacted Non-granular Material...2-1 2.2.2 Gravel Material and Crushed Aggregate

More information

Special Provision No. 405F03 March 2005

Special Provision No. 405F03 March 2005 PIPE SUBDRAINS - Item No. VIDEO CAMERA INSPECTION Item No. Special Provision No. 405F03 March 2005 OPSS 405, February 1990, Construction Specification for Pipe Subdrains is deleted in its entirety and

More information

MOUNT POLLEY MINING CORPORATION MOUNT POLLEY MINE TAILINGS STORAGE FACILITY

MOUNT POLLEY MINING CORPORATION MOUNT POLLEY MINE TAILINGS STORAGE FACILITY MOUNT POLLEY MINING CORPORATION MOUNT POLLEY MINE TAILINGS STORAGE FACILITY REPORT ON STAGE 3C CONSTRUCTION (REF.NO. VA-101-1/5-1) Rev. No. Revision Date Approved 0 Issued in Final September 23, 2005 AMEC010485_0001

More information

EARTH EXCAVATION (GRADING) - OPSS 206 INDEX

EARTH EXCAVATION (GRADING) - OPSS 206 INDEX 206-1.1 GENERAL 206-1 - - OPSS 206 INDEX 206-1.1.1 Classification of Earth Materials a) Earth Overburden b) Boulders and Fragmented Rock in Earth Cuts c) Fragmented Rock and Weathered Rock d) Granular

More information

B512 - GABIONS - OPSS 512

B512 - GABIONS - OPSS 512 B512 - - OPSS 512 512.1 GENERAL Gabions are contained rectangular units made of steel wire mesh and filled with stone. The double twisted wire mesh is galvanized and PVC (polyvinyl chloride) coated. Gabions

More information

Section 5 Specification 5.22 Supply and Install Smooth Wall Steel Pipes TABLE OF CONTENTS

Section 5 Specification 5.22 Supply and Install Smooth Wall Steel Pipes TABLE OF CONTENTS TABLE OF CONTENTS 5.22 SUPPLY AND INSTALL SMOOTH WALL STEEL PIPES... 1 5.22.1 GENERAL... 1 5.22.2 MATERIALS... 1 5.22.2.1 Culvert Material... 1 5.22.2.2 Material for Bedding, Backfill and Sealing... 1

More information

Mount Polley Mining Corporation IMPERIAL METALS CORPORATION

Mount Polley Mining Corporation IMPERIAL METALS CORPORATION Mount Polley Mining Corporation IMPERIAL METALS CORPORATION 1--\Poo l4 ;;L- February 16, 2006 Nick Rose, P. Eng. Piteau Associates Engineering Ltd. 215-260 West Esplanade North Vancouver, BC V7M3G7 Dear

More information

Construction Requirements for Installation of Utilities in the Public Right-of-way of McPherson County, Kansas October 2011

Construction Requirements for Installation of Utilities in the Public Right-of-way of McPherson County, Kansas October 2011 Construction Requirements for Installation of Utilities in the Public Right-of-way of McPherson County, Kansas October 2011 General Provisions and Specifications - These provisions and specifications shall

More information

313-1 HOT MIX ASPHALT - OPSS.PROV 313

313-1 HOT MIX ASPHALT - OPSS.PROV 313 313-1 - OPSS.PROV 313 313-1.1 GENERAL Hot mix asphalt consists of several mix types, which are grouped into two categories: Stone Mastic Asphalt and Superpave as detailed below. The type of hot mix asphalt

More information

DATE: $ FEE: DUE AT TIME OF APPLICATION

DATE: $ FEE: DUE AT TIME OF APPLICATION PERMIT # LA GRANGE PUBLIC WORKS DEPARTMENT 307 W. JEFFERSON STREET LA GRANGE, KY 40031 PHONE (502) 222-1433 FAX (502) 222-5875 APPLICATION FOR RESIDENTIAL UTILITIES ENCROACHMENT PERMIT DATE: $100.00 FEE:

More information

MICRO-SURFACING - OPSS 336

MICRO-SURFACING - OPSS 336 - OPSS 336 336.1 GENERAL 336.1.1 Definitions Micro-surfacing is recommended by the Regional Geotechnical Section on a work project specific basis. It is generally used as a preventive maintenance treatment

More information

Geotechnical Exploration and Evaluation Report

Geotechnical Exploration and Evaluation Report Geotechnical Exploration and Evaluation Report Pavement Coring and Evaluation UNF Parking Lot 3 Jacksonville, Florida CSI Geo Project No.: 71-18-135-23 Prepared by CSI Geo, Inc. 2394 St. Johns Bluff Road

More information

Design and Performance of Lightweight Fill Embankment on Sensitive Soils at Willingdon Interchange

Design and Performance of Lightweight Fill Embankment on Sensitive Soils at Willingdon Interchange Design and Performance of Lightweight Fill Embankment on Sensitive Soils at Willingdon Interchange Kazunori Fujita, B.Sc. Project Manager, GeoPacific Consultants Ltd., Vancouver, BC. Matt Kokan, M.A.Sc.,

More information

313-1 HOT MIX ASPHALT - OPSS.PROV 313

313-1 HOT MIX ASPHALT - OPSS.PROV 313 313-1 - OPSS.PROV 313 313-1.1 GENERAL Hot mix asphalt consists of several mix types, which are grouped into two categories: Stone Mastic Asphalt and Superpave as detailed below. The type of hot mix asphalt

More information

CITY OF LETHBRIDGE SECTION Construction Specifications Page 1 of 7 BACKFILL REGULATIONS FOR PUBLIC RIGHT-OF-WAYS

CITY OF LETHBRIDGE SECTION Construction Specifications Page 1 of 7 BACKFILL REGULATIONS FOR PUBLIC RIGHT-OF-WAYS Construction Specifications Page 1 of 7 1. GENERAL 1.1 The following specifications apply to compaction of all water, sewer and shallow utility service cuts, repairs, replacements, mainbreaks, extensions,

More information

TOWN OF LAFAYETTE SPECIFICATIONS FOR HIGHWAY CONSTRUCTION. June 1984

TOWN OF LAFAYETTE SPECIFICATIONS FOR HIGHWAY CONSTRUCTION. June 1984 1 TOWN OF LAFAYETTE SPECIFICATIONS FOR HIGHWAY CONSTRUCTION June 1984 1. DEFINITIONS APPROVAL, APPROVED, ACCEPTED OR WORDS OR TERMS OF SIMILAR MEANING: Written approval of the Highway Superintendent. BASE

More information

The Standards referred to shall be the most recent edition.

The Standards referred to shall be the most recent edition. Page 1 of 7 Part 1 General 1.1 DESCRIPTION OF WORK.1 The work described hereunder shall consist of the excavation of trenches and tunnels; the supply and installation of pipe and/or encasement pipe; the

More information

TERMS OF REFERENCE PROJECT EDINBURGH ROAD FROM SPEEDVALE AVENUE TO LONDON ROAD

TERMS OF REFERENCE PROJECT EDINBURGH ROAD FROM SPEEDVALE AVENUE TO LONDON ROAD TERMS OF REFERENCE PROJECT EDINBURGH ROAD FROM SPEEDVALE AVENUE TO LONDON ROAD OBJECTIVES/PURPOSE The City of Guelph intends to upgrade the underground services to current standards and carry out complete

More information

Ohio Department of Transportation Division of Production Management Office of Geotechnical Engineering. Geotechnical Bulletin

Ohio Department of Transportation Division of Production Management Office of Geotechnical Engineering. Geotechnical Bulletin Ohio Department of Transportation Division of Production Management Office of Geotechnical Engineering Geotechnical Bulletin GB 2 SPECIAL BENCHING AND SIDEHILL EMBANKMENT FILLS Geotechnical Bulletin GB2

More information

THE REGIONAL MUNICIPALITY OF PEEL STANDARD SPECIFICATIONS FOR RESTORATION

THE REGIONAL MUNICIPALITY OF PEEL STANDARD SPECIFICATIONS FOR RESTORATION THE REGIONAL MUNICIPALITY OF PEEL STANDARD SPECIFICATIONS FOR RESTORATION Standard Specifications for Restoration INDEX PAGE R.1 GENERAL...1 R.2 SCOPE...1 R.3 MATERIALS...1 R.4 CONSTRUCTION...2 R.4.1 General...2

More information

APPENDIX I APPENDIX I SAMPLE COST ESTIMATES AND SUMMARY

APPENDIX I APPENDIX I SAMPLE COST ESTIMATES AND SUMMARY APPENDIX I SAMPLE COST ESTIMATES AND SUMMARY May 7, 2002 This page left blank intentionally. May 7, 2002 Preliminary Cost Estimate Summary ESTIMATE TYPE A ABC Consulting Hwy 99:06 ABC Project No. 1234-01-56789

More information

VISUAL SITE INSPECTION REPORT 2017 HOOSIER ENERGY REC MEROM GENERATING STATION AREA 3 RESTRICTED WASTE LANDFILL MEROM, INDIANA

VISUAL SITE INSPECTION REPORT 2017 HOOSIER ENERGY REC MEROM GENERATING STATION AREA 3 RESTRICTED WASTE LANDFILL MEROM, INDIANA VISUAL SITE INSPECTION REPORT 2017 HOOSIER ENERGY REC MEROM GENERATING STATION AREA 3 RESTRICTED WASTE LANDFILL MEROM, INDIANA ATC PROJECT NO. 170LF00459 FEBRUARY 7, 2018 PREPARED FOR: HOOSIER ENERGY REC

More information

Re: T.4992 Westminster Hwy from Gilley Rd to #23591 Westminster Hwy Road Construction Addendum No. 1

Re: T.4992 Westminster Hwy from Gilley Rd to #23591 Westminster Hwy Road Construction Addendum No. 1 October 9 2013 File: 10-6340-20-P.12202-Vol 01 Finance and Corporate Services Department Finance Division Telephone: 604-276-4218 Fax: 604-276-4162 Attention: To All Tenderers Dear Sir/Madame: Re: T.4992

More information

210 Prescott Street, Unit 1 (613) P.O. Box 189 Kemptville, Ontario K0G 1J0 FAX: (613) May 5,

210 Prescott Street, Unit 1 (613) P.O. Box 189 Kemptville, Ontario K0G 1J0 FAX: (613) May 5, Civil Geotechnical Structural Environmental Hydrogeology 210 Prescott Street, Unit 1 (613) 860-0923 P.O. Box 189 Kemptville, Ontario K0G 1J0 FAX: (613) 258-0475 May 5, 2014 140208 Alium Investments Ltd.

More information

Palomino Road Repair Project Using Tire-Derived Aggregate

Palomino Road Repair Project Using Tire-Derived Aggregate Palomino Road Repair Project Using Tire-Derived Aggregate Palomino Road Slide Repair Project Background and Timeline Original Construction Privately constructed roadway acquired subsequently by County

More information

INDEX DESCRIPTION MATERIALS APPROVAL FOR BASE COURSE CONSTRUCTION MEASUREMENT PAYMENT 6

INDEX DESCRIPTION MATERIALS APPROVAL FOR BASE COURSE CONSTRUCTION MEASUREMENT PAYMENT 6 03005_Jan31_2018.pdf Page 1 of 6 INDEX Page 03005-1 DESCRIPTION 2 03005-2 MATERIALS 2 03005-3 APPROVAL FOR BASE COURSE 3 03005-4 CONSTRUCTION 3 03005-5 MEASUREMENT 6 03005-6 PAYMENT 6 03005_Jan31_2018.pdf

More information

DIVISION 4100 SITEWORK

DIVISION 4100 SITEWORK DIVISION 4100 SITEWORK SECTION 4115 EARTHWORK PART 1 - GENERAL 1.01 SCOPE This section covers the grading and compaction of excavations, embankments, structural foundations, and planted areas. 1.02 REFERENCES

More information

DRAFT 1 GENERAL. June 15, Alberta Transportation 2 nd Floor, 803 Manning Road NE Calgary, Alberta T2E 7M8

DRAFT 1 GENERAL. June 15, Alberta Transportation 2 nd Floor, 803 Manning Road NE Calgary, Alberta T2E 7M8 2 nd Floor, 83 Manning Road NE Calgary, Alberta T2E 7M8 Ross Dickson Project Services Technologist Dear Mr. Dickson: CON1769 Southern Region GRMP Instrumentation Monitoring Site S2; H22:14, km 12.95 Priddis

More information

Chapter 3: Permit Procedures and Requirements

Chapter 3: Permit Procedures and Requirements Chapter 1: General Provisions 1 1 Short Title 1 2 Jurisdiction 1 3 Amendments and Revisions 1 4 Enforcement Responsibility 1 5 Review Process 1 6 Prior Approval 1 7 Relationship to Other Standards 1 8

More information

Add: D3.1(k) Engineer for the purposes of this Project shall have the same meaning as Contract Administrator.

Add: D3.1(k) Engineer for the purposes of this Project shall have the same meaning as Contract Administrator. Corporate Finance epartment Materials Management ivision 342-2013 AENUM 1 Page 1 of 5 PLESSIS ROA TWINNING AN GRAE SEPARATION AT CN REITT SUBIVISION: RAIL SHOOFLY GRAE PREPARATION AN MISCELLANEOUS WASTEWATER

More information

Invitation to Tender No. T170523EN. lump sum $ days $1,500 $ ha 0.4 $ $ m 3 18,000 $ $ m 3 31,000 $ $ m 3 1,175 $ $ m 130 $ $ t 210 $ $

Invitation to Tender No. T170523EN. lump sum $ days $1,500 $ ha 0.4 $ $ m 3 18,000 $ $ m 3 31,000 $ $ m 3 1,175 $ $ m 130 $ $ t 210 $ $ Addendum No. 1 TOWNSHIP ROAD 510 RECONSTRUCTION Invitation to Tender No. T170523EN Amendment 1. Bidders shall note the following: a) Revised Section 3.3.2 Unit Price Table : REVISED Schedule A : Invitation

More information

406 - PIPE SEWERS - MTC FORM 406

406 - PIPE SEWERS - MTC FORM 406 406 - - MTC FORM 406 INDEX 406.1 GENERAL Types of Pipe Pipe Strength, Rigid Pipes Polyethylene Pipe Strength - Rigid or Flexible Pipe Strength and Treatment, Flexible Pipes Selection of Type, Strength

More information

Materials and Surfacing - Organization and Functions

Materials and Surfacing - Organization and Functions Materials and Surfacing - Organization and Functions Organization & Functions Page 1 Materials and Surfacing. Organization: Chief Materials and Surfacing Engineer 1. Materials 2. Pavement Design 3. Surfacing

More information

APPENDIX "H" 4127 Roper Road, Edmonton, AB T6B 3S5 T: F: thurber.ca

APPENDIX H 4127 Roper Road, Edmonton, AB T6B 3S5 T: F: thurber.ca APPENDIX "H" 4127 Roper Road, Edmonton, AB T6B 3S5 T: 780 438 1460 F: 780 437 7125 thurber.ca TABLE OF CONTENTS 1. INTRODUCTION... 1 1.2 Project Details... 1 2. FIELD INVESTIGATIVE WORK... 1 2.1 Site Reconnaissance...

More information

Annual Inspection Report Jeffrey Energy Center Flue Gas Desulfurization (FGD) Landfill

Annual Inspection Report Jeffrey Energy Center Flue Gas Desulfurization (FGD) Landfill Annual Inspection Report Jeffrey Energy Center Flue Gas Desulfurization (FGD) Landfill Prepared for: Westar Energy Jeffrey Energy Center St. Marys, Kansas Prepared by: APTIM Environmental & Infrastructure,

More information

Construction Specification for General Excavation

Construction Specification for General Excavation Engineering & Construction Services Division Standard Specifications for Road Works TS 2.10 September 2018 for General Excavation Table of Contents TS 2.10.01 SCOPE... 2 TS 2.10.02 REFERENCES... 2 TS 2.10.03

More information

2. BACKGROUND INFORMATION

2. BACKGROUND INFORMATION May 30, 2017 WSP Reference No: 171-05352-00 City of Surrey Engineering Department / Operations Division 6651 148 Street Surrey, BC V3S 3C7 Attention: Mr. Matthew Brown Subject: Geotechnical Review of Large

More information

COUNTY OF SUTTER ENCROACHMENT PERMIT

COUNTY OF SUTTER ENCROACHMENT PERMIT COUNTY OF SUTTER ENCROACHMENT PERMIT PERMIT No. Development Services Dept. Engineering Division 1130 Civic Center Blvd Yuba City, CA 95993 (530) 822-7400 Hours: 8 AM - 5 PM Upon completion, submit application

More information

Active Coal Combustion Residuals Landfill Annual Inspection Escalante Generating Station

Active Coal Combustion Residuals Landfill Annual Inspection Escalante Generating Station REPORT Active Coal Combustion Residuals Landfill Annual Inspection Escalante Generating Station Submitted to: Tri-State Generation and Transmission Association, Inc. 1100 West 116th Avenue Westminster,

More information

Section 2 Specification 2.3 Grading TABLE OF CONTENTS

Section 2 Specification 2.3 Grading TABLE OF CONTENTS TABLE OF CONTENTS 2.3 GRADING... 1 2.3.1 GENERAL... 1 2.3.1.1 Description... 1 2.3.1.2 Dimensions of Excavations and Embankments... 1 2.3.2 MATERIALS... 1 2.3.2.1 Approval of Materials... 1 2.3.2.2 Unsuitable

More information

VICINITY MAP AND SITE MAP. Page 1 of 9

VICINITY MAP AND SITE MAP. Page 1 of 9 INTRODUCTION... 2 1. Background Information of West Bottom Ash Pond (BAP)... 2 1.1 Facility Location Description...2 1.2 Description of West BAP CCR Unit...2 1.2.1 Embankment Configuration...2 1.2.2 Construction

More information

DRUMHELLER & DISTRICT SOLID WASTE MANAGEMENT ASSOCIATION SPECIFICATIONS FOR SLIDE REHABILITATION AND RIP RAP REHABILITATION

DRUMHELLER & DISTRICT SOLID WASTE MANAGEMENT ASSOCIATION SPECIFICATIONS FOR SLIDE REHABILITATION AND RIP RAP REHABILITATION DRUMHELLER & DISTRICT SOLID WASTE MANAGEMENT ASSOCIATION SPECIFICATIONS FOR SLIDE REHABILITATION AND RIP RAP REHABILITATION SEPTEMBER, 2017 INVITATION TO BID The Drumheller & District Solid Waste Management

More information

EXCAVATION & BACKFILLING GUELPH TRANSIT OPERATIONS & MAINTENANCE SECTION WATSON ROAD FACILITY PAGE 1 OF 6 WATER RECLAMATION PROJECT JUNE 2013

EXCAVATION & BACKFILLING GUELPH TRANSIT OPERATIONS & MAINTENANCE SECTION WATSON ROAD FACILITY PAGE 1 OF 6 WATER RECLAMATION PROJECT JUNE 2013 GUELPH TRANSIT OPERATIONS & MAINTENANCE SECTION WATSON ROAD FACILITY PAGE 1 OF 6 PART 1 GENERAL 1.1 Description The Work of this Section shall be all labour, materials, equipment and supervision necessary

More information

York County Engineering Department Roadway Inspection Requirements

York County Engineering Department Roadway Inspection Requirements York County Engineering Department Roadway Inspection Requirements The following is a list, in order, of the roadway inspections that are required to be passed by York County before a subdivision can receive

More information

Select Subgrade Material, Compacted

Select Subgrade Material, Compacted 314.1 GENERAL B314 SHOULDER, SELECTED SUBGRADE, AND STOCKPILING OPSS.PROV 314 Granular materials meeting the requirements of OPSS.PROV 1010 are obtained from pits and quarries, and recycled materials.

More information

January 2008 No. 700

January 2008 No. 700 January 2008 No. 700 INDEX FOR SPECIFICATIONS FOR GRANULAR BASE COURSE Page 700. 1 SCOPE...1 1.1 Pre-Construction Meeting...1 1.2 Mobilization of Equipment...1 700. 3 MATERIALS 3.1 Granular Base Course

More information

TABLE OF CONTENTS. Chapter 3 - WATER MAIN, VALVES, HYDRANTS AND APPURTENANCES. Chapter 4 - SANITARY SEWER. Chapter 5 - STORM SEWER

TABLE OF CONTENTS. Chapter 3 - WATER MAIN, VALVES, HYDRANTS AND APPURTENANCES. Chapter 4 - SANITARY SEWER. Chapter 5 - STORM SEWER Chapter 3 - WATER MAIN, VALVES, HYDRANTS AND APPURTENANCES Chapter 4 - SANITARY SEWER Chapter 5 - STORM SEWER Chapter 6 - EXCAVATION, TRENCING, BACKFILLING, AND BEDDING Chapter 11 - CONCRETE CURBS, CURB

More information

2016 DAM AND DIKE INSPECTION REPORT CCR PONDS COMPLEX

2016 DAM AND DIKE INSPECTION REPORT CCR PONDS COMPLEX 2016 DAM AND DIKE INSPECTION REPORT CCR PONDS COMPLEX GERS-16-168 OKLAUNION POWER STATION VERNON, TEXAS PREPARED BY AEP SERVICE CORPORATION CIVIL ENGINEERING DIVISION GEOTECHNICAL ENGINEERING SECTION 1

More information

Ground Improvement of Titanium Dioxide Waste Spoils and Compressible Organics with In-Situ Mixing with Portland Cement and Surcharging

Ground Improvement of Titanium Dioxide Waste Spoils and Compressible Organics with In-Situ Mixing with Portland Cement and Surcharging Ground Improvement of Titanium Dioxide Waste Spoils and Compressible Organics with In-Situ Mixing with Portland Cement and Surcharging James J. Serpico (&) Geotechnical Services, Maser Consulting P.A.,

More information

Mr. Michael Malone CPS Energy 145 Navarro Street San Antonio, Texas Project No

Mr. Michael Malone CPS Energy 145 Navarro Street San Antonio, Texas Project No Environmental Resources Management January 13, 2017 Mr. Michael Malone 145 Navarro Street San Antonio, Texas 78205 Project No. 0352436 CityCentre Four 840 West Sam Houston Parkway North, Suite 600 Houston,

More information

CONSTRUCTION SPECIFICATION FOR PRECAST REINFORCED CONCRETE BOX CULVERTS AND BOX SEWERS IN OPEN CUT

CONSTRUCTION SPECIFICATION FOR PRECAST REINFORCED CONCRETE BOX CULVERTS AND BOX SEWERS IN OPEN CUT ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 422 APRIL 2004 CONSTRUCTION SPECIFICATION FOR PRECAST REINFORCED CONCRETE BOX CULVERTS AND BOX SEWERS IN OPEN CUT TABLE OF CONTENTS 422.01 SCOPE 422.02

More information

York County Engineering Department Roadway Inspection Requirements

York County Engineering Department Roadway Inspection Requirements York County Engineering Department Roadway Inspection Requirements The following is a list, in order, of the roadway inspections that are required to be passed by York County before a subdivision can receive

More information

2) Providing input into the design to review/confirm our design is in accordance with the recommendations; and

2) Providing input into the design to review/confirm our design is in accordance with the recommendations; and R. F. Binnie & Associates Ltd. 205-4946 Canada Way Burnaby, BC V5G 4H7 Via email: eballarin@binnie.com Attention: Mr. Edoardo Ballarin, P.Eng., PTOE, PMP Highway Design Division Manager, Associate Dear

More information

Yellowstone National Park. Cold Regions Engineering

Yellowstone National Park. Cold Regions Engineering Yellowstone National Park Cold Regions Engineering June 2002 WORLD HERITAGE SITE Picture1 Picture2 Yellowstone National Park Road Program 20-year program to upgrade roads $12 million per year budget Both

More information

1.01 The work shall consist of spreading and compacting crushed and pugmilled aggregate on a prepared surface.

1.01 The work shall consist of spreading and compacting crushed and pugmilled aggregate on a prepared surface. 3505 - SPECIFICATION FOR GRANULAR BASE COURSE 3505 - l DESCRIPTION 1.01 The work shall consist of spreading and compacting crushed and pugmilled aggregate on a prepared surface. 1.02 The following definitions

More information

Electrical Work. NOV Embankments Over Swamps and Compressible Soils

Electrical Work. NOV Embankments Over Swamps and Compressible Soils GENERAL & CONSTRUCTION S OPS GENERAL CONDITIONS OF CONTRACT NOV 2006 100 OPS General Conditions of Contract DIVISION 1 - GENERAL S 106 Electrical Work 120 180 The Use of Explosives General Specification

More information

Municipal Inspection and Construction Guidelines Section I Roadworks SECTION I ROADWORKS I-1 GENERAL

Municipal Inspection and Construction Guidelines Section I Roadworks SECTION I ROADWORKS I-1 GENERAL I-1 GENERAL SECTION I ROADWORKS The Consultant Engineer is to monitor all specified asphalt, granular materials and sub-grade preparation to ensure all road and curb construction is undertaken as outlined

More information

It is the CONTRACTORS RESPONSIBILITY to use OSHA approved shoring

It is the CONTRACTORS RESPONSIBILITY to use OSHA approved shoring PERMIT# EXCAVATION/RIGHT OF WAY PERMIT ATE: NOTE: No permit shall be issued \vithout CURRENT Montana Contractors License, Insurance and Bonding on file with the Public Works epartment. It is the CONTRACTORS

More information

Peter Lighthall, P.Eng. Consulting Geotechnical Engineer

Peter Lighthall, P.Eng. Consulting Geotechnical Engineer Peter Lighthall, P.Eng. Consulting Geotechnical Engineer Cassiar Gold Corp. China Minerals Mining Corporation Suite 1100 1111 Melville Street Vancouver, BC V6E 3V6 Attn: Re: Ms. Patricia Fong Independent

More information

Review of the 2014 Annual Dam Safety Inspection Report, 2-North Pit Tailings Disposal Facility, Quinsam Coal Mine

Review of the 2014 Annual Dam Safety Inspection Report, 2-North Pit Tailings Disposal Facility, Quinsam Coal Mine November 24, 2014 Quinsam Coal Corporation Hillsborough Resources Limited PO BOX 5000 Campbell River BC V9W 8A3 ISSUED FOR USE FILE: V15103102-01 via Email: gbg@hillsboroughresources.com Attention: Subject:

More information

To receive future notification of specification revisions, provide your address to Bruce Peters at:

To receive future notification of specification revisions, provide your  address to Bruce Peters at: PUBLIC WORKS DEPARTMENT SERVICE DES TRAVAUX PUBLICS Engineering Division Division de l ingénierie To all Standard Construction Specification Holders: March 10, 2003 Specification book holders are responsible

More information

Table of Contents 5.1 GENERAL Overview Investigation and Engineering Information

Table of Contents 5.1 GENERAL Overview Investigation and Engineering Information Table of Contents Section Page 5.1 GENERAL... 5.1-1 5.1.1 Overview... 5.1-1 5.1.2 Investigation and Engineering Information... 5.1-2 5.2 PRELIMINARY GEOTECHNCIAL REPORTS... 5.2-1 5.2.1 Preliminary Geotechnical

More information

2017 ANNUAL DAM AND DIKE INSPECTION REPORT

2017 ANNUAL DAM AND DIKE INSPECTION REPORT 2017 ANNUAL DAM AND DIKE INSPECTION REPORT ASH PONDS WELSH POWER PLANT CASON, TEXAS November, 2017 Prepared by: American Electric Power Service Corporation 1 Riverside Plaza Columbus, OH 43215 GERS-17-067

More information

File No Supplemental November Geotechnical and Environmental Consulting Engineers

File No Supplemental November Geotechnical and Environmental Consulting Engineers Supplemental Information & Geotechnical Recommendations Proposed New Solar Valley Location B (East of Building No. 7) Cañada Community College 4200 Farm Hill Boulevard Submitted to: Mr. Peter Hempel Construction

More information

SECTION TRENCHING & BACKFILLING

SECTION TRENCHING & BACKFILLING SECTION 02225 - TRENCHING & BACKFILLING 1.0 GENERAL 1.1 Work included in this Section includes trenching and backfilling for underground pipelines and related structures only. 1.2 Reference Specifications

More information

USER S VIEW POINT: WHY WE USED THESE PRODUCTS

USER S VIEW POINT: WHY WE USED THESE PRODUCTS GEOSYNTHETICS & STEEL MESHES FOR LONGER LASTING ROADS SCI HQ, London Thursday, 12 May 2011 USER S VIEW POINT: WHY WE USED THESE PRODUCTS John Howe Lincs Laboratory Highways & Transportation www.lincolnshire.gov.uk/lincslab

More information

SECTION SITE GRADING. Part 1 - General Work Included Related Requirements Reference Standards...

SECTION SITE GRADING. Part 1 - General Work Included Related Requirements Reference Standards... SECTION 02210 - SITE GRADING CONTENTS: Part 1 - General... 1 1.01 Work Included... 1 1.02 Related Requirements... 1 1.03 Reference Standards... 1 1.04 Quality Assurance... 1 1.05 Measurement and Payment...

More information

Highland Gate Developments Inc. (SUB ) Construction Impact Mitigation Plan No. 1 (Phase 1 Site Alteration Works) February 2017.

Highland Gate Developments Inc. (SUB ) Construction Impact Mitigation Plan No. 1 (Phase 1 Site Alteration Works) February 2017. Highland Gate Developments Inc. (SUB-2015-01) Construction Impact Mitigation Plan No. 1 (Phase 1 Site Alteration Works) February 2017 Submitted by: SCS Consulting Group Ltd 30 Centurian Drive, Suite 100

More information

AMERICAN ELECTRIC POWER (SWEPCO)

AMERICAN ELECTRIC POWER (SWEPCO) 2016 DAM & DIKE INSPECTION REPORT ASH PONDS GERS-16-163 WELSH POWER PLANT AMERICAN ELECTRIC POWER (SWEPCO) CASON, TEXAS NATIONAL INVENTORY NO. TX4357 PREPARED BY GEOTECHNICAL ENGINEERING AEP SERVICE CORPORATION

More information

APPENDIX "B" ASPHALT CONCRETE PAVEMENT FOR STREET AND DRIVEWAY CONSTRUCTION

APPENDIX B ASPHALT CONCRETE PAVEMENT FOR STREET AND DRIVEWAY CONSTRUCTION APPENDIX "B" ASPHALT CONCRETE PAVEMENT FOR STREET AND DRIVEWAY CONSTRUCTION The work covered by these specifications consists of furnishing all labor, equipment and materials and in performing all operations

More information

SECTION EXCAVATION AND EMBANKMENT. B. Subbase Grading A samples for gradation analysis.

SECTION EXCAVATION AND EMBANKMENT. B. Subbase Grading A samples for gradation analysis. PART 1 GENERAL 1.1 DESCRIPTION A. The WORK under this Section includes providing all labor, materials, tools and equipment necessary for excavation and embankment construction to the lines, grades and

More information

TOWN OF HOLLIS, NEW HAMPSHIRE

TOWN OF HOLLIS, NEW HAMPSHIRE TOWN OF HOLLIS, NEW HAMPSHIRE ROAD and DRIVEWAY SPECIFICATIONS APPENDIX (Adopted 10/7/08) APPENDIX A A. Road Design Standards 1. Pavement and drainage facilities, curbs and sidewalks, when required, shall

More information

Dry structural excavation is usually done with front-end loaders, bulldozers or backhoes.

Dry structural excavation is usually done with front-end loaders, bulldozers or backhoes. 1.1 Excavation - General Excavation is the removal of all material (including ice, water, etc.) required for the construction of foundations or substructures as indicated on the drawings or as determined

More information

VISUAL SITE INSPECTION REPORT

VISUAL SITE INSPECTION REPORT VISUAL SITE INSPECTION REPORT - 2016 SOUTHERN INDIANA GAS AND ELECTRIC A. B. BROWN GENERATING STATION TYPE III RESTRICTED WASTE LANDFILL WEST FRANKLIN, IN ATC PROJECT NO. 170LF00318 DECEMBER 20, 2016 PREPARED

More information

Contract Administration Manual. Appendix 9

Contract Administration Manual. Appendix 9 Contract Administration Manual Appendix 9 Appendix 9 Contractor Forms o Highway Maintenance Work Record Form o Highway Maintenance Work Record Guidelines o Highway Work Identification Form o Highway Work

More information