1 Exhibit A DRAFT Scope of Work and Deliverables 11/21/2016 MnDOT Contract No. XXXXXX 1 Table of Contents 2 General Statement of Scope of Work Targeted Group Business and Vet Owned Business Cooperation Co-location 5 3 Current Letting of TH 35 Design-Build Project FTP Site Project Layout and Limits Additional Project Information and files 6 6 Verification Team Organization Chart Estimating hours for price proposal Verification Consultant Project Management and Design-Build Contract Management Staffing Requirements Verification Consultant Project Manager and Design-Build Contract Manager Co-location Flexible Workforce Items Provided by the State Items Provided by Contractor Web Based Teleconferencing Tasks DBVC Staffing Approval Weekly Verification Team Meetings Performance of the Contractor Reviews Monthly Progress Report Meetings Change Order Management Preparation for Dispute Resolution or Litigation 12 9 Design Verification Management Staffing Requirements Deputy Project Manager and Design Manager Co-location Tasks Design Review Design Quality Manual Design Quality Management and Auditing As-Built Documents State Document Control System Roadway Design Review Staffing Requirements Roadway Design Engineer Co-location Tasks Design Review State Document Control System 17

2 Page 2 of Structures Design Review Staffing Requirements Structures Design Engineer Co-location Tasks Design Review State Document Control System Utility Coordination Staffing Requirements Utility Coordinator Co-location Tasks State Document Control System Utility Coordination21 13 Drainage Design Verification Staffing Requirements Drainage Engineer Co-location Tasks Drainage Engineer Design Review State Document Control System CPM Schedule Reviewer Staffing Requirements CPM Schedule Reviewer Co-location Tasks CPM Schedule Reviewer Base line schedule review Monthly invoice and schedule review Time Impact Analysis review Recovery Schedule review Environmental Compliance Management Environmental Compliance Manager SWPPP Designer Permitting Specialist Co-location Tasks Design Review Construction Inspection State Document Control System Project Support Staff Staffing Requirements Support Staff Co-location Tasks Support Design Build Verification Team Roles 31

3 Page 3 of TGB Support Staff Uniform Bid for Hours Summary... 31

4 Page 4 of 32 2 General Statement of Scope of Work The Contractor will work with State as the Design-Build Verification Consultant (DBVC) for the SP TH 35 Design-Build Project (Project). Contractor will provide design verification and contract administration for the Project. The goal of the DBVC contract is that State receives assistance in performing the tasks necessary to verify that the Design-Build (DB) Contractor is meeting all requirements of the designbuild conformed contract for the Project. Attend conferences or meetings necessary for close coordination during day-to-day progress of the work or as required to carry out the Project. Notify State s Project Manager immediately of any unanticipated project conditions. Maintain a record of design submittals, approvals, changes, and modifications using State s Document Control System Microsoft SharePoint (DCS). Collect, properly label or identify, and deliver to State all original calculations, drawing and sketches, electronic design files, records, reports, and other documents prepared by Contractor in the performance of the work as described in this Contract upon completion or termination of the Project. Provide interpretations of the plans, specifications and contract provisions. Contractor will consult with State s Project Manager when an interpretation involves complex issues or may have an impact on the cost of performing the work. When warranted, State s Project Manager may request an interpretation from Contractor. 2.1 Targeted Group Business and Vet Owned Business Cooperation MnDOT has identified increasing participation of Targeted Group Businesses and Veteran Owned Businesses (both hereby referred to as TGB) as a statewide goal in an effort to create broader opportunities for historically under-represented groups to contract with the State of Minnesota. As such, the State will be contracting with TGB s to perform some of the roles on the Design-Build Verification team. TGB Performance Goal: The performance goal for the TGB is that they will be able to perform the duties of their role with minimal to no supervision from the Contractor while delivering a high quality product. Contractor Performance Goal: The performance goal for the Contractor is that at the beginning of the Contract they will train and mentor the TGB as often as needed to ensure they are capable of meeting their performance goal. Then as the Contract progresses the Contractor should minimize interaction with the TGB to allow them to lead and do their role independently, and during this time the Contractor will perform quality assurance checks to verify that the TGB is delivering a high quality product. The TGB s selected will have prior experience performing similar roles as those that they will perform on the DBVT. However, it is likely that the TGB s selected will not have prior design-build experience or much MnDOT project experience and will need time to become familiar with how the State expects the DBVT to function. It is therefore expected that the Contractor will need to mentor and train the TGB s in learning their roles to the satisfaction of both the Contractor and the State. The Contractor will be responsible for training and mentoring the State selected TGB s so that they can be a productive member of the DBVT. This will take some resources on the part of the Contractor, as acknowledged in the role description within this Scope of Work. Training the TGB may involve assisting in submittal review, quality assurance by the Contractor of work produced by the TGB, regular meetings between the TGB and the Contractor s in house subject matter expert and any other methods deemed necessary to help the TGB become self-sufficient at that role. The contracts for each State selected TGB is limited to $100, The Contractor will have the TGB do the work expected of the assigned role until the TGB has reached the $100, limit. The expected workload for the TGB Consultant can be found within this scope of work. It is important to note that the TGB will be on the Project until the TGB contract reaches $100,000.00, and the expected workload is not meant to indicate a contract end point for the TGB. During the timeframe of the TGB s active contract, the Contractor will be able to bill for reasonable time spent mentoring and training the TGB, but should not

5 Page 5 of 32 expect to bill for any work performing the role assigned to the TGB. As the TGB approaches the billable limit of the contract, it will be important for the Contractor to be ready to transition a new team member into that role that has been vacated by the TGB. Once the TGB reaches the $100, contract limit, it will be the responsibility of the Contractor to seamlessly take over the duties of that TGB s role. 2.2 Co-location Throughout this scope of work, some roles are designated as being co-located and others are not. Colocated personnel are expected to be physically located in the project office for a minimum of either the: a) amount of hours as described in the Uniform Bid for Hours section of the roles that will not initially be staffed by a TGB, or b) amount of hours as described in the Expected Workload Prime Contractor section of the roles that will be initially staffed by a TGB. Personnel that are not to be co-located at the project office can perform their role from their home office. However, non-co-located personnel are required to report to the project office or project site as needed for specific meetings or inspections in a timely and efficient manner to fulfill the obligations of their roles on the DBVT. 3 Current Letting of TH 35 Design-Build Project Currently the letting for the Design-Build Project is May 3, FTP Site When this scope refers to using FTP sites, the Contractor must use the following procedures: Contractor placing files on the State FTP site 1) On your computer create a folder that contains all the information you want to transmit. Name the folder as follows: YYYYMMDD_SPXXXX-XX. For example: _SP ) Open Windows Explorer (not Internet Explorer) 3) Type or copy/past the following URL in the Address Box (the URL is case sensitive): ftp://ftp2.dot.state.mn.us/pub/incoming/metrowatersedge 4) The folder will appear empty, and no contents will be visible. Copy/Paste the desired folder to this location. Once the folder is uploaded, an internal, State user can download the folder. 5) Notify the intended recipient by that the folder has been uploaded and provide the folder name. Note: Once the file(s) are uploaded to the site, they will disappear. This is an automatic process to hide the files from outside users. Troubleshooting: Sometimes the files will not upload and error messages will occur. Often it is only one file that is being rejected by the system. Try uploading only the large files and ing the small files and see if that works. Contractor retrieving files on the State FTP site

6 Page 6 of 32 The State employee will send an to the Contractor stating that they uploaded a folder or file and they will provide the name of the folder or file. It is possible to locate files that have been placed on State Metro District s FTP site using the following directions: 1) Open Internet Explorer or Windows Explorer 2) Type or copy/paste the following URL in the Address Box (note that this is case sensitive): ftp://ftp2.dot.state.mn.us/pub/outbound/metrowatersedge 3) To open files: Double (left) click a file to open it. If a menu pops up, select OK without supplying a password. 4) To save files either: Save a file as would be normal for the program while it is open, or Right click a file in the menu and select Save Target As. Troubleshooting: If you are unable to view files you may need to change a setting within Internet Explorer. To do this open the Tools pull-down menu, select Internet Options, then click on the Advanced tab at the top of the new window. Click and place a checkmark besides Enable FTP folder view (outside of Internet Explorer) under the Browsing header. Click the Apply button at the bottom of the window, then close the window. If this does not solve the problem, turn on Compatibility View by opening the Tools pull-down menu and selecting Compatibility View. 5 Project Layout and Limits The approximately $58 million Design-Build project involves pavement rehabilitation, bridge replacement, and interchange improvement. The project limits generally include I35W from 0.1 mile south of CSAH 54 to North junction I35E, I35E from 0.6 mile north of CR 140 (80th Street) to north junction I35W, I35 from north junction I35W/I35E to Washington/Chisago County line at 240th Street North in the Cities of Lino Lakes, Columbus, and Forest Lake. Three bridges will be removed and replaced with the following new structures as part of this project: Bridge #2826, northbound I35W over southbound I35E Bridge #2818, TH 97 over I35 Bridge #82871, TH 8 over I35 The new bridge at TH 97 will accommodate a future Diverging Diamond Interchange, but the current interchange will remain a regular diamond at the conclusion of the project. There is still some discussion on whether the TH 97 bridge will be 3-lanes wide or 4-lanes wide at the conclusion of this project. Conversion to the future DDI interchange would require possible widening of bridge and installation of concrete medians and sidewalks. The TH 8 interchange will be converted to a Trumpet Interchange by installing only the westbound loop ramp on this project, and accommodating the missing I35 southbound exit and northbound entrance ramps for future installation. Replacement of some or all concrete median barrier to accommodate UBOL is a possibility. Drainage structures will be adjusted and repaired for all median structures and there will be new storm water treatment facilities installed. 5.1 Additional Project Information and files To find additional project information related to the I35 Design-Build project, refer to the project website located here:

7 Page 7 of 32 Project information such as design files, layouts and more can be found on the project FTP site, which is found on the project website. Download and review all files on the project FTP site. Refer to the _ _RFP_notes.docx file in the _RFP-notes folder on the FTP site which describes the various files and different configurations of this project. Also, unsigned project layouts can be found by selecting the folder _Survey&DesignFiles and then selecting Predesign. 6 Verification Team Organization Chart Exhibit B is the verification team organization chart, and shows how the State will staff the verification team for this project. It graphically shows the chain of command. It also shows how the Contractor staff described in this contract interacts with the State staff. 7 Estimating hours for price proposal The nature of verification contracts is that it is very difficult to estimate the effort needed and the hours to bid, because no one knows if the DB Contractor will turn in a high quality or poor quality product, and how much verification effort is required as a result. This scope of work will estimate the hours needed for Contractor staff working under this contract, refer to the sections labeled Uniform Bid for Hours for each role. This uniform hours for bid are also summarized in Section 17 herein. The bidding teams will use those exact hours to estimate their price proposal. The bidding teams must not use more hours or less hours in their bid, or bid more or fewer people. State will not score a proposal higher if a Contractor says they can combine two jobs, reduce hours worked and ultimately reduce the price of the Contract. State will encourage the Contractor to minimize costs after Contract Execution while maintaining a high quality product. Additionally, the Uniform Bid for Hours that are listed and will be bid by the Contractor represent the work load needed as if the Contractor was self-performing all of the work, and does not subtract the amount of work that the direct select TGB contracts will be performing, nor does it add in the amount of time the Contractor would perform to mentor and train the TGBs. It is not implied that the TGB work load hours and the Contractor mentor and training hours would cancel each other out. The intent is that it is cleanest for the Contractor to bid the work as if they are self-performing it and that will set a reasonable budget to work within to accomplish this Contract s goals. Also, the Contractor is not bidding the hours of work or using the pay grades for the support staff to each position. They are to use the pay grade of the one person they select for each position and bid those hours for that one person. This creates a baseline budget to work within on the Contract, and the requirements of the Flexible Workforce section, herein, will be used to negotiate reduced or increased contract costs. This is being done to ensure that all price proposals are based on the same exact amount of work, so an accurate comparison of prices can be made. However, this section does not supersede the requirements of the Flexible Workforce section. 8 Verification Consultant Project Management and Design-Build Contract Management Perform all work necessary to manage this verification consultant contract and its personnel, and assist State s Project Manager with all work related to managing and processing claims and disputes involving the design-build contract, including but not limited to change orders and litigation. 8.1 Staffing Requirements

8 Page 8 of Verification Consultant Project Manager and Design-Build Contract Manager The Contractor will supply one person, in total, to perform the duties of the Verification Consultant Project Manager and Design-Build Contract Manager Uniform Bid for Hours This person will work part time, 32 hours per week, from July 1, 2017 to November 1, This person will work part time, 24 hours per week, from November 2, 2017 to April 1, This person will work part time, 16 hours per week, from April 2, 2018 to November 1, This person will work part time, 4 hours per week, from November 2, 2018 to April 1, This person will work part time, 16 hours per week, from April 2, 2019 to November 1, This person will work part time, 4 hours per week, from November 2, 2019 to April 1, Co-location The Verification Consultant Project Manager and Design-Build Contract Manager will be co-located with the State s Project Manager. At this time the location of the office is unknown, but is expected to be within two miles of the project. 8.2 Flexible Workforce DBVC personnel approved by the State s Project Manager are considered by the State to be committed to performing services for the durations listed in this scope of work. Any changes will require written approval from the State s Project Manager and include both adding additional staff and/or reducing staff. The Contractor will be advised of the official notice of award of the Design-Build Contract and will be ready to fully staff all personnel for the project within one week after notification. No personnel will be assigned until written notification by the State Project Manager has been issued. If the Design-Build Contract is suspended for any reason, the Contractor s forces will be adjusted to correspond with the type of cessation, either complete or partial suspension. Contractor will continuously look ahead to fully understand what type of staff are needed and in what numbers. The Contractor s schedule will be dictated by the Design-Builder s schedule. Contractor will provide a flexible work force so that only those staff that can be fully utilized during any given project activity are present and billing hours to the contract. Contractor will continuously monitor all activity to ensure that all work carried out is within the agreed scope and completed with resources that can complete the work as budgeted. In the event it becomes necessary to complete work outside the original scope of work, the Contractor s Project Manager will notify State s Project Manager immediately before proceeding. No work outside the original scope will be done without written authorization from State s Project Manager. Throughout the course of the Project, it may become evident that two or more Contractor roles would be more efficiently staffed by a single qualified person. If this situation arises, the Contractor can make a request to the State s Project Manager to modify the staff by combining roles. The State s Project Manager will evaluate the experience and workload of the remaining staff member and will make a determination of whether the roles should be combined. If multiple roles are allowed to be staffed by a single person, the State Project Manager may reverse that decision at a later date if circumstances call for more attention to those roles than the single person can effectively handle. When the Design-Build Contractor s operations on the Project diminish, the Design-Build Verification Contractor will reduce the number of its personnel assigned to the project as appropriate. Any adjustment of DBVC forces as recommended by the State s Project Manager will be accomplished within one week after notification. The State s Project Manager will provide said notification to the DBVC in writing, and the DBVC will provide confirmation of notification in writing.

9 Page 9 of Items Provided by the State State will provide office space, phone, computer, basic furniture, and access to State servers and printers. Expendable office supplies will be paid for by State, and will be ordered by the Contractor through the State supply system. Expendable office supplies are defined as items that generally are used one time and then discarded and include, but are not limited to: staples, rubber bands, note pads, paper, folders, pens, and clips. 8.4 Items Provided by Contractor Contractor will provide durable office supplies for their own employees as needed. Durable office supplies are defined as items that can be reused and include, but are not limited to: staplers, tape dispensers, scissors, rulers, three hole punches, staple removers, and mechanical pencils. Contractor will provide, service, and maintain a sufficient number of clearly identifiable vehicles to maintain the necessary coverage of the Project and to adequately transport personnel and equipment. The vehicles will have the necessary safety features to be within the work zone. Contractor will be solely responsible for risk of loss of or damage to vehicles, and will replace or repair vehicles at its own cost. Contractor will be required to obtain adequate insurance coverage for such loss or damage. Contractor will provide service and maintain cellular phones for all Contractor field personnel assigned to the Project. A list of these phone numbers will be available to State s Project Manager. Contractor will be solely responsible for risk of loss of or damage to cellular phones, and will replace or repair cellular phones at its own cost. 8.5 Web Based Teleconferencing The Contractor shall provide the means for the project team to meet via web based teleconferencing. Such a system will allow participants to log into a website to view the desktop of the meeting organizer. Participants will be able to take control of the virtual desktop as needed to point out things on the file being displayed. Voice communication will occur via phone teleconferencing. 8.6 Tasks DBVC Staffing Approval The Contractor will utilize only personnel who are qualified by experience and education. The Contractor will submit, in writing, to the State s Project Manager the names of all personnel to be considered for assignment to the project, together with detailed resumes with respect to education, experience (including specific durations) and qualification of each individual. Minimum qualifications for the Contractor personnel are set forth in this RFP. The State may require that these minimum qualifications be altered in instances when the unique nature of the work requires specific specialized skills. No personnel will be assigned to this project by the Contractor until the qualifications of each person proposed have been reviewed and approved in writing by the State s Project Manager. The Contractor s personnel approval request will be submitted at least two weeks prior to the date an individual is scheduled to report to work. An individual previously approved by the State s Project Manager whose performance is later determined by the State to be unsatisfactory will be replaced by the Contractor. The Contractor will be responsible for obtaining proper licenses for equipment and personnel operating equipment when licenses are required. (A) Deliverable: DBVC Personnel Approval Request. One request may include multiple people.

10 Page 10 of 32 (B) Format: Electronic Microsoft Word 2010 document (docx extension). Deliver to State s Project Manager electronically either by or FTP site. (C) Due: At least two weeks prior to the date an individual is scheduled to report to work. (D) Standard: Written as a letter/ . (E) State Review: Five business days. (F) Contractor Update: Update and resubmit the deliverable to State within five business days of receiving State review comments Weekly Verification Team Meetings Contractor s Project Manager will schedule and if requested facilitate weekly meetings with State s Project Manager and the entire State Verification Team. Meetings will be held at the co-housed facility. Any personnel not co-housed may attend the meeting via conference call or web based teleconference. The MnDOT conference call system may be used to reduce costs if web based teleconferencing is not required for a particular meeting. (A) Deliverable: A weekly verification team meeting. Meeting minutes are not required. (B) Format: Meet in co-housed office conference room. (C) Due: Weekly. (D) Standard: Intentionally left blank. Minutes are not required Performance of the Contractor Reviews During the life of the Project, the State s Project Manager may conduct reviews of the various phases of the Contractor s performance and operations. Reviews will be to determine compliance and the sufficiency with which procedures are being effectively applied to assure that this Contract s scope of work is being performed in substantial conformity with State policies, plans, specifications, and Design-Build conformed contract requirements. The Contractor will cooperate and assist the State s Project Manager, or his representative(s), in the conduct of the reviews. When deficiencies are indicated in a review, remedial action will be immediately implemented by the Contractor in conformance with the State s Project Manager s recommendations. The State s Project Manager s remedial recommendations and the Contractor s actions will be properly documented by the Contractor in a Performance of the Contractor Review Report. In general, remedial action will be required commensurate with the degree and nature of the deficiencies cited. Additional compensation will not be allowed for remedial action taken to correct deficiencies by the Contractor. Remedial actions may include any or all of, but are not necessarily limited to, the following actions: 1) Further subdivide assigned design review or construction verification responsibilities, reassign design review or construction verification personnel or assign additional personnel. The Contractor will comply with this action within 24 hours of notification by the State s Project Manager. 2) Replace personnel whose performance has been determined by the State s Project Manager to be inadequate. When directed by the State s Project Manager, any person whose performance has been determined to be unsatisfactory will be immediately removed. (A) Deliverable: Performance of the Contractor Review Report. (B) Format: Electronic Microsoft Word 2010 document (docx extension) delivered via or FTP site (C) Due: Within five business days of the reviews occurrence. (D) Standard: A formal business report. (E) State Review: Within five business days.

11 Page 11 of 32 (F) Contractor Update: Five business days of receipt of State review of deliverable Monthly Progress Report Meetings Contractor s Project Manager, when requested, will meet with State s Project Manager to review the monthly progress reports and invoices. Contractor s Project Manager will solicit feedback from State s Project Manager to assess whether all services meet or exceed the requirements of the project. If needed, Contractor will direct changes to personnel and/or procedures to correct identified deficiencies and implement opportunities for improvements. (A) Deliverable: An informal meeting with the monthly progress reports, invoices, and s-curves supplied. (B) Format: See requirements in Contract and in this Scope of Work. (C) Due: Monthly at the same time as the contract progress reports and invoices. (D) Standard: Intentionally left blank. Meeting minutes are not required. (E) State Review: During the meeting. (F) Contractor Update: Update progress reports, invoices, and s-curves as needed within five business days of State review Contract S-Curve In addition to the monthly progress reports and invoices the Contractor will create a contract s-curve to graphically depict a summary of the budget status. The contract s-curve shows how the project budget is projected to be used over the life of the project and compares actual expenditure versus the budget. Use this information to determine if the project can be completed within budget or if amendments are needed to complete the work load. (A) Deliverable: Monthly contract s-curve. (B) Format: The s-curve analysis can be created in any program, but the final printout delivered to the State must be in Adobe PDF format. (C) Due: Monthly at the same time as the contract progress reports and invoices. (D) Standard: Intentionally left blank. (E) State Review: At monthly progress report meeting. (F) Contractor Update: Five business days of receipt of State review of deliverable Change Order Management Assist the Construction Manager as needed in the creation, management, and investigation of designbuild contract change order documents. Track the status of each change order, and send documents to the correct recipients as the process dictates. Inform the State s Project Manager if the due dates at each step in the process are not being met. Review and investigate all change orders. Review and investigation includes all work necessary to confirm that the change order is accurate and may involve, review of plans, review of site conditions, review of calculations, review of DB Contractor allegations and claims, and etc. May also need to verify the claims being made or provide an alternative solution. This verification will be done by creating independent cost estimates to be used as a comparison to the DB Contractor s claims. The Contractor will use all Contractor staff described in this contract as needed to assist with this work. (A) Deliverable: Change Orders. (B) Format: Electronic Microsoft Word 2010 document (docx extension), hard copies, and Adobe PDF.

12 Page 12 of 32 (C) Due: As needed. (D) Standard: Conformed Contract and MnDOT Contract Administration Manual. (E) State Review: Five business days of receipt of Contractor deliverable. (F) Contractor Update: Five business days of receipt of State review of deliverable Preparation for Dispute Resolution or Litigation Assist State in preparing for dispute resolution or litigation regarding the Project. This may require assembling documents for review by others and tracking status of dispute or litigation and writing letters as needed. Review and investigate all disputes or litigation. Review and investigation includes all work necessary to confirm that the dispute or litigation is accurate and may involve, review of plans, review of site conditions, review of calculations, review of DB Contractor allegations and claims, and etc. May also need to verify the claims being made or provide an alternative solution. This verification will be done by creating independent cost estimates to be used as a comparison to the DB Contractor s claims. The Contractor will use all Contractor staff described in this contract as needed to assist with this work. (A) Deliverable: Assembled documents with letters with independent cost estimates. (B) Format: Electronic Microsoft Word 2010 document (docx extension), hard copies, and Adobe PDF. (C) Due: As needed as determined by the State. (D) Standard: Conformed Contract and MnDOT Contract Administration Manual. (E) State Review: Five business days. (F) Contractor Update: Five business days. 9 Design Verification Management The Deputy Project Manager and Design Manager s role is to manage the verification of the DB Contractor s design by making sure the right specialized engineers are reviewing the relevant plans, making sure designs are well coordinated across all disciplines, maintaining a consistent and predictable enforcement of the DB conformed contract, meeting all verification responsibilities of the DB conformed contract and assisting State with the implementation of the quality management system on the Project. 9.1 Staffing Requirements Deputy Project Manager and Design Manager The Contractor will supply one person, in total, to perform the duties of Deputy Project Manager and Design Manager. This person is assigned the overall responsibility for verifying that the DB Contractor is meeting all requirements of the DB s Quality Management System (QMS) and requirements of the DB Conformed Contract and will: 1) Verify that the DB Contractor is training workers in the operation of the QMS, 2) Monitor that the QMS is being properly implemented and used, 3) Report to the State Project Manager on the QMS effectiveness and performance, and Identify problems with the QMS and make recommendations to the State Project Manager for revisions to improve the QMS Uniform Bid for Hours This person will work full time, 40 hours per week, from July 1, 2017 to November 1, This person will work part time, 32 hours per week, from November 2, 2017 to April 1, This person will work part time, 24 hours per week, from April 2, 2018 to November 1, This person will work part

13 Page 13 of 32 time, 8 hours per week, from November 2, 2018 to April 1, This person will work part time, 16 hours per week, from April 2, 2019 to November 1, This person will work part time, 6 hours per week, from November 2, 2019 to April 1, Co-location The Deputy Project Manager and Design Manager will be co-located with the State s Project Manager. At this time the location of the office is unknown, but is expected to be within two miles of the project. 9.2 Tasks Design Review Review and check the Design-Builder s plans for conformance with the DB Contract. The Contractor will use the procedures for checking plans and calculations described in the DB Conformed Contract Book 2, section 2, exhibit A Quality Management Template, and Vol. II Design Quality Management Plan. Contractor will coordinate their review with the relevant external stakeholders with the requirement of obtaining the stakeholders acceptance of the design and plans. Stakeholders include City of Columbus, City of Forest Lake, Anoka County and permitting agencies. Perform coordination with all project participants, maintenance of records, interpretations of plans and specifications, and recommendations regarding dispute resolution. The Contractor will have general familiarity with the DB Conformed Contract. The Contractor must have general familiarity in understanding the requirements of MnDOT manuals, standards and specifications related to all disciplines. Attend all conferences or meetings as needed. Manage the review and checking of the Design-Builder s plans for conformance to the design concept upon which the preliminary plans were prepared. The Contractor shall pay special attention to making sure that the Roadway Plans are well coordinated with the Bridge Plans. Contractor will verify that the final plans are prepared in accordance with the Design-Build conformed contract including current State standards and practices. These reviews will include over-the-shoulder plans, release for construction plans, notice of design changes (NDC), field design changes (FDC), and as-built plans. The Design Manager reviews all comments in the DCS for consistency and conformance to the DB contract, does a cursory review of plans sets, but leaves the detailed checking of plans and calculations to the specialized engineers. Contractor will use the following criteria to check and review the plans: 1) Review A comparative analysis for agreement with standard practice, conformance to the contract requirements, agreement with similar structures, all with application of professional judgment. Mathematical analysis is not specifically required, but may be necessary where a discrepancy appears likely. Work will include an analysis of the Design-Build Contractor s methods, assumptions, and calculations. 2) Check Contractor will check mathematical computations provided by the Design-Build Contractor and provide independent calculations when an issue occurs during the check. (A) Deliverable: Hardcopy plan sets that show checked, corrected, and verified redlines corrections. (B) Format: Hardcopy plans and calculations. (C) Due: Continuous throughout project and as described in the DB conformed contract. Final delivery occurs when DBVC contract ends. (D) Standard: DB Conformed Contract.

14 Page 14 of Design Quality Manual Review DB Contractor s Quality Manual (QM). (A) Deliverable: Hardcopy QM that show checked, corrected, and verified redlines corrections with comments entered into Microsoft SharePoint. (B) Format: Hardcopy QM. (C) Due: Continuous throughout project. Final delivery occurs when DBVC contract ends. (D) Standard: DB Conformed Contract Design Quality Management and Auditing Audit design quality process. Contractor s Quality Management staff is not responsible for reviewing the design release for construction packages for technical compliance with the conformed contract requirements. Contractor s Quality Management staff is responsible for auditing the DB Contractor s Design Quality Management processes and that the DB Contractor is following those processes. Audit the DB Contractor s quality management system to determine whether quality activities are being carried out and are implemented effectively, which includes quality activities related to both design and construction. All documentation of quality activities, tests, and inspections will be entered into State s DCS. Duties for this position also include following and managing quality management processes and procedures for State staff, training State s verification staff on design quality management processes and procedures, reviewing quality manuals, overseeing the implementation of State s quality processes Perform design auditing and Acceptance of Released for Construction documents, and auditing of the DB Contractor s quality management system by fulfilling all of State s roles for Quality Management as described in the DB conformed contract. Auditing will entail the collection and documentation of objective evidence to verify whether requirements have been met. The results of auditing will be documented on standardized audit report forms. Non-conformances will be communicated and tracked in separate reports. The audit results will also be recorded in a database, and regular summary and status reports will be provided. The timing, frequency, and depth of auditing will be at State s discretion. (A) Deliverable: Two mandatory audit reports. The first will cover the first three design packages, and the second will cover a random selection of packages. Additional audit reports will be completed on an as needed basis if the DB Contractor s design quality process is not satisfactory to the State Project Manager. (B) Format: Electronic Microsoft Word 2010 document (docx extension) and hard copies. (C) Due: The first audit report is due one week after the third design package is received from the DB Contractor. A second audit report will be completed within 2 months of the first design package submittal. Additional reports continuous throughout project as-needed and within one week of being requested by the Project Manager. Final delivery occurs when DBVC contract ends. (D) Standard: Intentionally left blank. (E) State Review: Five business days. (F) Contractor Update: Five business days As-Built Documents Within 15 calendar days of the DB Contract Award, the Contractor will hold an As-Built Document coordination meeting with the DB Contractor. At this meeting the DB Contractor will explain how they will

15 Page 15 of 32 meet the conformed contract requirements for delivering As-Built Documents. The Contractor will audit the as-built plans upon their delivery for conformance to the conformed contract. (A) Deliverable: A meeting to determine DB Contractor s proposal for as-built documents. Contractor will provide a write-up explaining how the DB Contractor will organize the as-built documents. (B) Format: Electronic Microsoft Word 2010 document (docx extension) and hard copies. (C) Due: Meeting to occur 15 calendar days after DB Contract Award and write-up is due within 15 calendar days of the meeting. (D) Standard: Intentionally left blank. (E) State Review: Five business days. (F) Contractor Update: Five business days State Document Control System Thoroughly understand the Submittal Control methods for using the Microsoft SharePoint Document Control System (DCS). They will be responsible for entering comments, and reviewing and tracking responses in the DCS for all design related issues. State will perform the DCS training. (A) Deliverable: Enter comments, review and track responses in DCS. (B) Format: Microsoft SharePoint (C) Due: Continuous throughout project. Final delivery occurs when DBVC contract ends. (D) Standard: State Training and DB Conformed Contract. (F) Contractor Update: Continuous 10 Roadway Design Review The role of the Roadway Design Engineer will be performed by a separate contractor using the State s Targeted Group Business program up to the contract limit of $100,000, refer to Section 2.1 of this scope for more information. The Contractor will be responsible for training and mentoring the TGB as needed so that the TGB will be a productive member of the Design-Build Verification Team. Once the TGB has reached the limit of their contract, the Contractor will need to seamlessly transition a new qualified team member into this role to fulfill these duties. Perform all verification tasks related to roadway design, which includes all requirements covered under the DB Conformed Contract, Book 2. Duties include coordination with all project participants, maintenance of records, interpretations of plans and specifications, and recommendations regarding dispute resolution. The Contractor will have general familiarity with the DB Conformed Contract. The Contractor must be an expert in understanding the requirements of the DB Conformed Contract, Book 2, Section 1, 2, 5, 7, 9, 10, 11, 14, 20; and MnDOT manuals, standards and specifications related to roadway design. Attend all conferences or meetings as needed. Review and check the Design-Builder s plans for conformance to the design concept upon which the preliminary plans were prepared. Contractor will verify that the final plans are prepared in accordance with the Design-Build conformed contract including current State standards and practices. These reviews will include over-the-shoulder reviews, release for construction plans, notice of design changes (NDC), field design changes (FDC), and as-built plans. Contractor will use the following criteria to check and review the plans:

16 Page 16 of 32 1) Review A comparative analysis for agreement with standard practice, conformance to the contract requirements, agreement with similar structures, all with application of professional judgment. Mathematical analysis is not specifically required, but may be necessary where a discrepancy appears likely. Work will include an analysis of the Design-Build Contractor s methods, assumptions, and calculations. 2) Check Contractor will check mathematical computations provided by the Design-Build Contractor and provide independent calculations when an issue occurs during the check Staffing Requirements Roadway Design Engineer The Contractor will supply one person, in total, to perform the duties of Roadway Design Engineer Expected Workload TGB Consultant The expected workload for the state s TGB consultant that will perform the role of the Roadway Design Engineer during the early part of the Project is provided here for information only. While the TGB consultant is on the project, it is expected that the Contractor will be committing time to train and mentor the TGB consultant as needed so that they are a productive member of the verification team. The TGB will work part time, 32 hours per week, from July 1, 2017 to November 1, This person will work part time, 24 hours per week, from November 2, 2017 to January 10, Expected Workload Prime Contractor The prime Contractor will be required to dedicate some resources to fulfill the obligation of training and mentoring the TGB Consultant while the TGB Consultant is on the project. The following expected workload hours reflect this need in the early part of the contract until the point that the TGB Consultant leaves the project and the Prime Contractor takes over that role. Do not use the hours listed in this section to generate a bid. Use only the hours shown in Uniform Bid for Hours for each role, as summarized in Section 17 within this scope of work. This person will work part time, 8 hours per week, from July 1, 2017 to November 1, This person will work part time, 4 hours per week, from November 2, 2017 to January 10, This person will work part time, 24 hours per week, from January 11, 2018 to April 1, This person will work part time, 16 hours per week, from April 2, 2018 to November 1, This person will work part time, 4 hours per week, from November 2, 2018 to April 1, Uniform Bid for Hours This person will work part time, 32 hours per week, from July 1, 2017 to November 1, This person will work part time, 24 hours per week, from November 2, 2017 to April 1, This person will work part time, 16 hours per week, from April 2, 2018 to November 1, This person will work part time, 4 hours per week, from November 2, 2018 to April 1, Co-location The Roadway Design Engineer will be co-located with the State s Project Manager. At this time the location of the office is unknown, but is expected to be within two miles of the project Tasks

17 Page 17 of Design Review Review and check the Design-Builder s plans for conformance with the DB Contract. The Contractor will use the procedures for checking plans and calculations described in the DB Conformed Contract Book 2, Section 2, Exhibit A Quality Management Template, and Vol. II Design Quality Management Plan. (A) Deliverable: Hardcopy plan sets that show checked, corrected, and verified redlines corrections. (B) Format: Hardcopy plans and calculations. (C) Due: Continuous throughout project and as described in the DB conformed contract. Final delivery occurs when DBVC contract ends. (D) Standard: DB Conformed Contract State Document Control System Thoroughly understand the Submittal Control methods for using the Microsoft SharePoint Document Control System (DCS). They will be responsible for entering comments, and reviewing and tracking responses in the DCS for all design related issues. State will perform the DCS training. (A) Deliverable: Enter comments, review and track responses in DCS. (B) Format: Microsoft SharePoint (C) Due: Continuous throughout project. Final delivery occurs when DBVC contract ends. (D) Standard: State Training and DB Conformed Contract. 11 Structures Design Review The role of the Structures Design Engineer will be performed by a separate contractor using the State s Targeted Group Business program up to the contract limit of $100,000, refer to Section 2.1 of this scope for more information. The Contractor will be responsible for training and mentoring the TGB as needed so that the TGB will be a productive member of the Design-Build Verification Team. Once the TGB has reached the limit of their contract, the Contractor will need to seamlessly transition a new qualified team member into this role to fulfill these duties. Perform verification tasks related to bridge design, which includes all requirements covered under the DB Conformed Contract, Book 2. Duties include close coordination with State Structures Design Manager, coordination with all project participants, maintenance of records, interpretations of plans and specifications, and recommendations regarding dispute resolution as assigned. The Contractor will have general familiarity with the DB Conformed Contract. The Contractor must be an expert in understanding the requirements of the DB Conformed Contract, Book 2, Section 8, 13, and 15; and MnDOT manuals, standards and specifications related to structural design. Attend all conferences or meetings as needed. Assist the Structures Design Manager with reviewing and checking the Design-Builder s plans for conformance with the Contract Documents. Contractor will assist in verifying that the final plans are prepared in accordance with the Design-Build conformed contract including current State standards and practices. These reviews will include over-the-shoulder reviews, release for construction plans, notice of design changes (NDC), field design changes (FDC), and as-built plans. Contractor will use the following criteria to check and review the plans:

18 Page 18 of 32 1) Review A comparative analysis for agreement with standard practice, conformance to the contract requirements, agreement with similar structures, all with application of professional judgment. Mathematical analysis is not specifically required, but may be necessary where a discrepancy appears likely. Work will include an analysis of the Design-Build Contractor s methods, assumptions, and calculations. 2) Check Contractor will check mathematical computations provided by the Design-Build Contractor and provide independent calculations when an issue occurs during the check Staffing Requirements Structures Design Engineer The Contractor will supply one person, in total, to perform the duties of Structures Design Engineer. Structures Design Engineer may be required to use various special bridge computation programs, and MicroStation and GEOPAK to review structure designs and create quantities and cost estimates to counter any claims made by the DB Contractor Expected Workload TGB Consultant The expected workload for the state s TGB Consultant that will perform the role of the Structures Design Engineer during the early part of the Project is provided here for information only. While the TGB Consultant is on the project, it is expected that the Contractor will be committing time to train and mentor the TGB Consultant as needed so that they are a productive member of the verification team. The TGB will work part time, 32 hours per week, from July 1, 2017 to November 1, This person will work part time, 24 hours per week, from November 2, 2017 to January 10, Expected Workload Prime Contractor The prime Contractor will be required to dedicate some resources to fulfill the obligation of training and mentoring the TGB Consultant while the TGB Consultant is on the project. The following hours reflect this need in the early part of the contract until the point that the TGB Consultant leaves the project and the Prime Contractor takes over that role. Do not use the hours listed in this section to generate a bid. Use only the hours shown in Uniform Bid for Hours for each role, as summarized in Section 17 within this scope of work. This person will work part time, 8 hours per week, from July 1, 2017 to November 1, This person will work part time, 4 hours per week, from November 2, 2017 to January 10, This person will work part time, 24 hours per week, from January 11, 2018 to April 1, This person will work part time, 16 hours per week, from April 2, 2018 to November 1, This person will work part time, 4 hours per week, from November 2, 2018 to April 1, This person will work part time, 8 hours per week, from April 2, 2019 to November 1, This person will work part time, 4 hours per week, from November 2, 2019 to April 1, Uniform Bid for Hours This person will work part time, 32 hours per week, from July 1, 2017 to November 1, This person will work part time, 24 hours per week, from November 2, 2017 to April 1, This person will work part time, 16 hours per week, from April 2, 2018 to November 1, This person will work part time, 4 hours per week, from November 2, 2018 to April 1, This person will work part time, 8 hours per week, from April 2, 2019 to November 1, This person will work part time, 4 hours per week, from November 2, 2019 to April 1, 2020.

Exhibit A Scope of Work and Deliverables

Exhibit A Scope of Work and Deliverables Table of Contents 1 Introduction and Background Information... 3 1.1 General Statement of Scope of Work 3 1.2 Co-location 3 1.3 Project Letting 4 1.4 File Transfer Protocol (FTP) Site 5 1.5 Project Scope

More information

Exhibit A Scope of Work and Deliverables

Exhibit A Scope of Work and Deliverables DRAFT SUBJECT TO CHANGE MnDOT Contract No. xxxx Exhibit A Scope of Work and Deliverables Table of Contents 1 General Statement of Scope of Work... 4 1.1 Co-location 4 2 Project Letting... 4 3 FTP Site...

More information

Exhibit A Scope of Work and Deliverables. 2 General Statement of Scope of Work Co-location... 3

Exhibit A Scope of Work and Deliverables. 2 General Statement of Scope of Work Co-location... 3 Exhibit A Scope of Work and Deliverables 1 Table of Contents 2 General Statement of Scope of Work... 3 2.1 Co-location... 3 3 Current Letting of the Design-Build Projects... 3 4 FTP Site... 3 5 Project

More information

Exhibit A Mn/DOT Contract No SCOPE OF WORK AND DELIVERABLES

Exhibit A Mn/DOT Contract No SCOPE OF WORK AND DELIVERABLES SCOPE OF WORK AND DELIVERABLES Construction Oversight for US 52 & CSAH 9 Interchange Design-Build Project in Goodhue County State Project (SP) 2506-72 PROJECT OVERVIEW The State of Minnesota has identified

More information

Exhibit A Scope of Work

Exhibit A Scope of Work Exhibit A Scope of Work Mn/DOT Contract No. 05497 PROJECT OVERVIEW The Minnesota Department of Transportation (MnDOT) requires the services of a Contractor for construction lead inspection, materials testing

More information

Exhibit A Scope of Work

Exhibit A Scope of Work 1.0 Purpose: The purpose of the contract is to provide a Construction Project Engineer, Senior Inspector Roadway, and two certified G&B inspectors, as needed, to assist State staff on S.P. 0120-24 during

More information

ATTACHMENT D SCOPE OF SERVICES

ATTACHMENT D SCOPE OF SERVICES ATTACHMENT D SCOPE OF SERVICES OBJECTIVE Owner s Capital Improvement Program (major capital, minor construction, repair, and rehabilitation projects) includes numerous construction and renovation projects.

More information

SECTION CONTRACTOR QUALITY CONTROL

SECTION CONTRACTOR QUALITY CONTROL SECTION 01 40 00 PART 1 - GENERAL 1.1 SUMMARY A. This section covers the establishment and operation of the Contractor s Quality Control (CQC) system as specified by the General Conditions of the Contract.

More information

Proposers are encouraged to view background information on the RICWS Design Build project at the following website:

Proposers are encouraged to view background information on the RICWS Design Build project at the following website: MnDOT Contract No. 02665 RICWS Oversight The State of Minnesota, through its Department of Transportation (MnDOT), requests proposals to assist the Department with design, testing, and construction oversight

More information

SCOPE 1.0 General Requirements

SCOPE 1.0 General Requirements SCOPE 1.0 General Requirements This section outlines a general list of the responsibilities and requirements for the GEC. It is anticipated that the GEC will be used to support and supplement MnDOT staff

More information

TH 25 Bituminous Mill, Full Depth Reclamation and Overlay SP &

TH 25 Bituminous Mill, Full Depth Reclamation and Overlay SP & TH 25 Bituminous Mill, Full Depth Reclamation and Overlay SP 4910-29 & 0504-14 Contract No. 1002252 Project Overview is in need of professional and technical assistance to provide detail design for State

More information

DRAFT SCOPE 1.0 General Requirements

DRAFT SCOPE 1.0 General Requirements DRAFT SCOPE 1.0 General Requirements This section outlines a general list of the responsibilities and requirements for the GEC. It is anticipated that the GEC will be used to support and supplement MnDOT

More information

SECTION QUALITY CONTROL

SECTION QUALITY CONTROL SECTION 01 45 00 QUALITY CONTROL PART 1 - GENERAL 1.1 DESCRIPTION This section specifies requirements for Contractor Quality Control (CQC) for Design-Bid-Build (DBB) or Design-Build (DB) construction projects.

More information

EXHIBIT A SCOPE OF SERVICES MAINTENANCE PERSONNEL SUPPORT

EXHIBIT A SCOPE OF SERVICES MAINTENANCE PERSONNEL SUPPORT EXHIBIT A SCOPE OF SERVICES I. PURPOSE: MAINTENANCE PERSONNEL SUPPORT The Department is requesting Personnel Support Services to augment the Department s Maintenance personnel in the administration of

More information

ADDENDUM #1 Construction Support Services for the Water Treatment Plant Project PW

ADDENDUM #1 Construction Support Services for the Water Treatment Plant Project PW January 31, 2018 To Whom It May Concern: I. INSTRUCTIONS ADDENDUM #1 Construction Support Services for the Water Treatment Plant Project 18-0018PW A. The following additions, deletions, revisions, and/or

More information

Request for Proposals (RFP) Information Technology Independent Verification and Validation RFP No IVV-B ADDENDUM NO.

Request for Proposals (RFP) Information Technology Independent Verification and Validation RFP No IVV-B ADDENDUM NO. Request for Proposals (RFP) Information Technology Independent Verification and Validation ADDENDUM NO. 2 Questions and Answers RFP Amendments September 2015 Contained herein are the responses to the questions

More information

Exhibit A Scope of Work and Deliverables

Exhibit A Scope of Work and Deliverables General Statement of Scope of Work Perform steps 1 through 9 of the State Utility Coordination Manual (UCM). Conduct all work necessary to meet the requirements for creating certified Subsurface Utility

More information

CONTRACT ADMINISTRATION STANDARD OPERATING PROCEDURES

CONTRACT ADMINISTRATION STANDARD OPERATING PROCEDURES CONTRACT ADMINISTRATION STANDARD OPERATING PROCEDURES SOP #.004 Title: MONITORING OF CONTRACT PERFOMANCE AND DELIVERABLES Version: 1 Approval Date: May 10, 2018 1. Purpose. The purpose of a contract monitoring

More information

Maine Turnpike Authority Construction Resident Engineer/Inspector SCOPE OF WORK July 14, 2014

Maine Turnpike Authority Construction Resident Engineer/Inspector SCOPE OF WORK July 14, 2014 Maine Turnpike Authority Construction Resident Engineer/Inspector SCOPE OF WORK July 14, 2014 A. GENERAL DESCRIPTION The Consultant, acting as an independent contractor will serve to supplement the Authority

More information

CONSTRUCTION MANAGEMENT SERVICES

CONSTRUCTION MANAGEMENT SERVICES DrAFTDRAFTdd EXHIBIT 1 CONSTRUCTION MANAGEMENT SERVICES REQUEST FOR QUALIFICATIONS () SELECTION PROCESS School District of Lee County, Florida TABLE OF CONTENTS 1. INTRODUCTION 1 Lobbying 2 2. REQUEST

More information

Definitions Definitions used in this document are taken from TNI SOP 7-100, and may be found there.

Definitions Definitions used in this document are taken from TNI SOP 7-100, and may be found there. Request for Proposal (RFP) Evaluating Non-Governmental Accreditation Bodies BACKGROUND The NELAC Institute (TNI) is a 501(c)(3) non-profit organization whose mission is to foster the generation of environmental

More information

REQUEST FOR PROPOSALS

REQUEST FOR PROPOSALS REQUEST FOR PROPOSALS FOR COMPENSATION STUDY Proposals Due: November 3, 2016, 4:00 PM 1.0 OBJECTIVE SECTION 1 SUBMITTAL PROCEDURES & DEADLINE The City of Signal Hill is seeking proposals from qualified

More information

REQUEST FOR PROPOSAL: Construction Management at Risk Services Hamilton International Air Cargo Logistics Facility. RFP Components

REQUEST FOR PROPOSAL: Construction Management at Risk Services Hamilton International Air Cargo Logistics Facility. RFP Components REQUEST FOR PROPOSAL: Construction Management at Risk Services Hamilton International Air Cargo Logistics Facility RFP Components CLIENT: TradePort International Corporation, Operators of John C. Munro

More information

Exhibit A Scope of Work. 0.0 Separation of work Types and Cost Estimate

Exhibit A Scope of Work. 0.0 Separation of work Types and Cost Estimate 0.0 Separation of work Types and Cost Estimate Exhibit A Scope of Work 0.1 Prepare scope of work and cost estimate for MnDOT efforts relating to all items numbered less than 20.0. 0.2 Prepare scope of

More information

DeFoe Corp. 800 South Columbus Ave. Mount Vernon, NY QUALITY ASSURANCE MEASUREMENT ANALYSIS AND IMPROVEMENT

DeFoe Corp. 800 South Columbus Ave. Mount Vernon, NY QUALITY ASSURANCE MEASUREMENT ANALYSIS AND IMPROVEMENT DeFoe Corp. 800 South Columbus Ave. Mount Vernon, NY 10550 QUALITY ASSURANCE TABLE OF CONTENTS SECTION I SECTION 2 SECTION 3 SECTION 4 SECTION 5 QUALITY MANAGEMENT SYSTEM MANAGEMENT RESPONSIBILITY RESOURCE

More information

ARKANSAS STATE HIGHWAY AND TRANSPORTATION DEPARTMENT CONSULTANT SELECTION PROCEDURES FOR ENGINEERING AND DESIGN RELATED SERVICES

ARKANSAS STATE HIGHWAY AND TRANSPORTATION DEPARTMENT CONSULTANT SELECTION PROCEDURES FOR ENGINEERING AND DESIGN RELATED SERVICES ARKANSAS STATE HIGHWAY AND TRANSPORTATION DEPARTMENT CONSULTANT SELECTION PROCEDURES FOR ENGINEERING AND DESIGN RELATED SERVICES Section I Application (These procedures do not apply to Design-Build Contracts.)

More information

REQUEST FOR QUALIFICATIONS AND QUOTES 1716 VEHICLE WRAPS AND DECALS

REQUEST FOR QUALIFICATIONS AND QUOTES 1716 VEHICLE WRAPS AND DECALS OLYMPIA, WASHINGTON REQUEST FOR QUALIFICATIONS AND QUOTES 1716 VEHICLE WRAPS AND DECALS REQUEST FOR QUALIFICATIONS AND QUOTES (RFQQ) RELEASE DATE: April 13, 2017 PRE-PROPOSAL MEETING: Date: April 24, 2017

More information

REQUEST FOR OFFER RFO: For: Business Continuity Program Development Consultant Services. For: Covered California

REQUEST FOR OFFER RFO: For: Business Continuity Program Development Consultant Services. For: Covered California REQUEST FOR OFFER RFO: 2017-04 For: Business Continuity Program Development Consultant Services For: Covered California Date: Tuesday, September 19, 2017 You are invited to review and respond to this Request

More information

SADDLE CREEK CSD LANDSCAPE ARCHITECT REQUEST FOR PROPOSALS. (Boilerplate language, map and other contract language to be added on approval of Board)

SADDLE CREEK CSD LANDSCAPE ARCHITECT REQUEST FOR PROPOSALS. (Boilerplate language, map and other contract language to be added on approval of Board) October 17, 2017 SADDLE CREEK CSD LANDSCAPE ARCHITECT REQUEST FOR PROPOSALS (Boilerplate language, map and other contract language to be added on approval of Board) PROPOSAL SUBMITTALS DUE NOVEMBER 17,

More information

City of San Mateo Clean Water Program Programmable Logic Controller (PLC) and Human Machine Interface (HMI) Programming Services

City of San Mateo Clean Water Program Programmable Logic Controller (PLC) and Human Machine Interface (HMI) Programming Services ATTACHMENT A SAMPLE SCOPE OF SERVICES PLC & HMI PROGRAMMING City of San Mateo Clean Water Program Programmable Logic Controller (PLC) and Human Machine Interface (HMI) Programming Services December, 2017

More information

Request For Proposal Of Printing and Design Services. Marketing Department

Request For Proposal Of Printing and Design Services. Marketing Department Request For Proposal Of Printing and Design Services Marketing Department Released on June 3, 2016 Mosaic Youth Theatre of Detroit Printing and Design Services REQUEST FOR PROPOSAL (RFP) BACKGROUND Mosaic

More information

REQUEST FOR PROPOSAL FOR CONSTRUCTION MANAGEMENT SERVICES NOT AT RISK FOR THE. St. Charles County Ambulance District

REQUEST FOR PROPOSAL FOR CONSTRUCTION MANAGEMENT SERVICES NOT AT RISK FOR THE. St. Charles County Ambulance District REQUEST FOR PROPOSAL FOR CONSTRUCTION MANAGEMENT SERVICES NOT AT RISK FOR THE St. Charles County Ambulance District Base 3 & Training Facility Construction 4169 Old Mill Parkway St. Peters, MO 63376 September

More information

Table of Contents. Project Agreement Schedule 14

Table of Contents. Project Agreement Schedule 14 Table of Contents PART 1 DEFINITIONS... 3 PART 2 INTEGRATED MANAGEMENT SYSTEM REQUIREMENTS... 6 2.1. Introduction... 6 2.2. Overview... 6 2.2.1 Management System Requirements... 7 2.2.2 Certification...

More information

This topic focuses on how to prepare a customer for support, and how to use the SAP support processes to solve your customer s problems.

This topic focuses on how to prepare a customer for support, and how to use the SAP support processes to solve your customer s problems. This topic focuses on how to prepare a customer for support, and how to use the SAP support processes to solve your customer s problems. 1 On completion of this topic, you will be able to: Explain the

More information

CHAPTER AUXILIARY SERVICES. Prequalification of Contractors for Educational Facilities Construction 8.272

CHAPTER AUXILIARY SERVICES. Prequalification of Contractors for Educational Facilities Construction 8.272 Prequalification of Contractors for Educational Facilities Construction 8.272 The School Board shall prequalify contractors for a one (1) year period or for a specific project in accordance with the following:

More information

Missoula County Public Schools Missoula, Montana REQUEST FOR PROPOSALS FOR LARGE COMMERCIAL COPY MACHINES FOR THE MISSOULA COUNTY PUBLIC SCHOOLS

Missoula County Public Schools Missoula, Montana REQUEST FOR PROPOSALS FOR LARGE COMMERCIAL COPY MACHINES FOR THE MISSOULA COUNTY PUBLIC SCHOOLS Missoula County Public Schools Missoula, Montana REQUEST FOR PROPOSALS FOR LARGE COMMERCIAL COPY MACHINES FOR THE MISSOULA COUNTY PUBLIC SCHOOLS PRINT SHOP JULY 2016 REQUEST FOR PROPOSALS FOR PRINT SHOP

More information

SPECIFICATION NO. TxDOT * REVISED: AUGUST 2017 CRIMINAL BACKGROUND CHECKS

SPECIFICATION NO. TxDOT * REVISED: AUGUST 2017 CRIMINAL BACKGROUND CHECKS SPECIFICATION NO. TxDOT 961-30-16 * REVISED: AUGUST 2017 CRIMINAL BACKGROUND CHECKS PUBLICATION This specification is a product of the Texas Department of Transportation (TxDOT). This specification may

More information

Proprietary Document Disclosure Restricted To Employees and Authorized Holders

Proprietary Document Disclosure Restricted To Employees and Authorized Holders Revision Level: A Page 1 o f 33 Revision Level: A Page 2 o f 33 (This page left blank intentionally.) Revision Level: A Page 3 o f 33 S i g n a t u r e P a g e Reviewed By Management Representative: 1

More information

Ground Transportation Management Services

Ground Transportation Management Services ONE (1) HARDCOPY ORIGINAL AND ONE (1) ELECTRONIC COPY FLASH DRIVE MUST BE SUBMITTED REQUEST FOR INFORMATION - RFI #PGT-2018-002 Ground Transportation Management Services Department of Ground Transportation

More information

EXHIBIT A SCOPE OF SERVICES FOR. FINANCIAL PROJECT ID(S). Various Projects DISTRICT 2 VARIOUS COUNTIES

EXHIBIT A SCOPE OF SERVICES FOR. FINANCIAL PROJECT ID(S). Various Projects DISTRICT 2 VARIOUS COUNTIES EXHIBIT A SCOPE OF SERVICES FOR FINANCIAL PROJECT ID(S). Various Projects DISTRICT 2 VARIOUS COUNTIES 1 PURPOSE... 3 2 PROJECT DESCRIPTION... 5 3 PROJECT COMMON AND PROJECT GENERAL TASKS... 6 4 ROADWAY

More information

Internal Audit Report - Contract Compliance Cycle Audit Department of Technology Services: SHI International Corporation Contract Number

Internal Audit Report - Contract Compliance Cycle Audit Department of Technology Services: SHI International Corporation Contract Number Internal Audit Report - Contract Compliance Cycle Audit Department of Technology Services: SHI International Corporation Contract Number- 582-14 TABLE OF CONTENTS Transmittal Letter... 1 Executive Summary

More information

Request for Proposals CONTRACTED LANDSCAPE ARCHITECTURE SERVICES

Request for Proposals CONTRACTED LANDSCAPE ARCHITECTURE SERVICES Request for Proposals CONTRACTED LANDSCAPE ARCHITECTURE SERVICES Issued October 18, 2017 DEADLINE Noon Wednesday, November 15, 2017 CONTACT: KRISTINA HANDT CITY ADMINISTRATOR 3800 Laverne Ave N Lake Elmo,

More information

COST LOADED CONSTRUCTION SCHEDULES PART 1 - GENERAL

COST LOADED CONSTRUCTION SCHEDULES PART 1 - GENERAL SECTION 01310 COST LOADED CONSTRUCTION SCHEDULES PART 1 - GENERAL 1.01 SCOPE: A. COST LOADED CONSTRUCTION SCHEDULE (Construction Schedule): The WORK under this Contract shall be planned, scheduled, executed,

More information

Ohio s Qualifications-Based Selection Law (as amended by Sub. H.B. 153, 129 th Ohio General Assembly, effective Sept. 28, 2011)

Ohio s Qualifications-Based Selection Law (as amended by Sub. H.B. 153, 129 th Ohio General Assembly, effective Sept. 28, 2011) Ohio s Qualifications-Based Selection Law (as amended by Sub. H.B. 153, 129 th Ohio General Assembly, effective Sept. 28, 2011) Sec. 153.65. As used in sections 153.65 to 153.73 of the Revised Code: (A)(1)

More information

Town of Bennington, Vermont Pleasant Street and School Street Sidewalk Installation STP EH08(11)

Town of Bennington, Vermont Pleasant Street and School Street Sidewalk Installation STP EH08(11) , Vermont Pleasant Street and School Street Sidewalk Installation STP EH08(11) Request for Qualifications Construction Inspection and Testing Services Issued: January 3, 2017 Due: January 24, 2017 I. INTRODUCTION

More information

SECTION 50 CONTROL OF WORK

SECTION 50 CONTROL OF WORK SECTION 50 CONTROL OF WORK 50-01 AUTHORITY OF THE ENGINEER. The Engineer shall decide any and all questions which may arise as to the quality and acceptability of materials furnished, work performed, and

More information

Request for Proposal For: 2018 American Bar Association Temporary Services

Request for Proposal For: 2018 American Bar Association Temporary Services Table of Contents Bid Timetable [2] 1.0 General Bid Information [3] 2.0 Proposal Requirements [5] 3.0 Criteria for Selection [7] 4.0 Specifications and Work Statement [7] Appendix A: Bidder Response Sheet

More information

NOTICE TO DESIGN PROFESSIONALS / CONTRACTORS REQUEST FOR LETTERS OF INTEREST S.R. 408/ S.R. 417 INTERCHANGE IMPROVEMENTS PHASE 2 PROJECT NO.

NOTICE TO DESIGN PROFESSIONALS / CONTRACTORS REQUEST FOR LETTERS OF INTEREST S.R. 408/ S.R. 417 INTERCHANGE IMPROVEMENTS PHASE 2 PROJECT NO. NOTICE TO DESIGN PROFESSIONALS / CONTRACTORS REQUEST FOR LETTERS OF INTEREST S.R. 408/ S.R. 417 INTERCHANGE IMPROVEMENTS PHASE 2 PROJECT NO. 253G, CONTRACT NO. 001266 The Central Florida Expressway Authority

More information

Long Beach City Auditor s Office

Long Beach City Auditor s Office Long Beach City Auditor s Office Contract Administration Audit Limited Scope Review Report 7 of 10 Utiliworks Consulting, LLC July 1, 2016 Laura L. Doud City Auditor Audit Team: Deborah K. Ellis Assistant

More information

EXHIBIT 2-2-C SCHEDULES

EXHIBIT 2-2-C SCHEDULES EXHIBIT 2-2-C SCHEDULES PART 1 GENERAL 1.01 SUMMARY A. The Work specified in this section consists of furnishing transportation, labor, materials, equipment, and incidentals necessary for preparation,

More information

CITY OF KOTZEBUE REQUEST FOR PROPOSAL ADMINISTRATION IT SERVICES FOR FY18 REQUEST FOR PROPOSAL INFORMATION TECHNOLOGY SUPPORT SERVICES

CITY OF KOTZEBUE REQUEST FOR PROPOSAL ADMINISTRATION IT SERVICES FOR FY18 REQUEST FOR PROPOSAL INFORMATION TECHNOLOGY SUPPORT SERVICES CITY OF KOTZEBUE REQUEST FOR PROPOSAL 18-01 ADMINISTRATION IT SERVICES FOR FY18 REQUEST FOR PROPOSAL INFORMATION TECHNOLOGY SUPPORT SERVICES Vendors are required to provide as much detail as possible in

More information

ADDENDUM No. 1. FLORIDA DEPARTMENT OF ENVIRONMENTAL PROTECTION Procurement Section 3800 Commonwealth Boulevard, MS#93 Tallahassee, Florida

ADDENDUM No. 1. FLORIDA DEPARTMENT OF ENVIRONMENTAL PROTECTION Procurement Section 3800 Commonwealth Boulevard, MS#93 Tallahassee, Florida ADDENDUM No. 1 FLORIDA DEPARTMENT OF ENVIRONMENTAL PROTECTION Procurement Section 3800 Commonwealth Boulevard, MS#93 Tallahassee, Florida 32399-3000 December 22, 2015 Addendum To: DEP Solicitation No.

More information

C. Requirements of this Section relate to customized fabrication and installation procedures, not production of standard products.

C. Requirements of this Section relate to customized fabrication and installation procedures, not production of standard products. SECTION 01400 QUALITY CONTROL SERVICES PART 1 - GENERAL 1.01 RELATED DOCUMENTS A. Drawings and general provisions of Contract, including General and Supplementary Conditions and other Division-1 Specification

More information

SC341 Umoja Requesting Services of Consultants and Individual Contractors

SC341 Umoja Requesting Services of Consultants and Individual Contractors SC341 Umoja Requesting Services of Consultants and Individual Contractors Umoja Requesting Services of Consultants and Individual Contractors Version 18 Last Modified: 20 November 2013 1 Agenda Course

More information

REQUEST FOR PROPOSAL. Construction Management Services Not at Risk

REQUEST FOR PROPOSAL. Construction Management Services Not at Risk REQUEST FOR PROPOSAL Construction Management Services Not at Risk The St. Charles County Ambulance District proposes to retain a qualified firm/team for the Construction Management Services Not at Risk

More information

FACILITIES MANAGEMENT

FACILITIES MANAGEMENT FACILITIES MANAGEMENT Design & Construction August 18, 2017 Re: Request for Proposals- Third Party Testing and Special Inspections University of Iowa The University of Iowa, located in Iowa City, Iowa,

More information

Ensemble Business Software ClientFirst Product Support. November 4, 2008

Ensemble Business Software ClientFirst Product Support. November 4, 2008 November 4, 2008 The ClientFirst Product Support Program includes Telephone Support Services covering the day-to-day issues associated with the use of Ensemble and MAS 90 modules. A one-year subscription

More information

This is EXHIBIT A, consisting of [ ] pages, referred to in and part of the Task Order dated [ ]. Engineer's Services for Task Order

This is EXHIBIT A, consisting of [ ] pages, referred to in and part of the Task Order dated [ ]. Engineer's Services for Task Order This is EXHIBIT A, consisting of [ ] pages, referred to in and part of the Task Order dated [ ]. Engineer's Services for Task Order [Introductory Note to User: The following text as published describes

More information

2017 Archaeology Audit Program Procedure Manual. April 2017

2017 Archaeology Audit Program Procedure Manual. April 2017 2017 Archaeology Audit Program Procedure Manual April 2017 Table of Contents Contents Table of Contents... 2 1.0 Introduction and Scope... 3 2.0 Audit Objectives... 3 3.0 Audit Procedures... 4 3.1 Audit

More information

SECTION CONTRACTOR QUALITY CONTROL

SECTION CONTRACTOR QUALITY CONTROL SECTION 01451 CONTRACTOR QUALITY CONTROL PART 1 GENERAL 1.1 REFERENCES The publications listed below form a part of this specification to the extent referenced. The publications are referred to within

More information

Quad Cities Chamber of Commerce. Request for Proposals for HUMAN RESOURCES MANAGED SERVICES

Quad Cities Chamber of Commerce. Request for Proposals for HUMAN RESOURCES MANAGED SERVICES Quad Cities Chamber of Commerce Request for Proposals for HUMAN RESOURCES MANAGED SERVICES Project Manager: Leslie Anderson, Vice President Finance landerson@quadcitieschamber.com 1601 River Dr., Suite

More information

GENERAL REQUIREMENTS

GENERAL REQUIREMENTS CITY OF BRAMPTON LANDSCAPE SPECIFICATIONS SECTION 01001-1 PART 1 GENERAL 1.1 Work Covered By Contract Documents.1 Work covers, in general terms: demolition, removals, site preparation and complete construction

More information

LAKELAND AREA MASS TRANSIT DISTRICT (LAMTD) Office of Purchasing and Contracts P.O. Box 1687, Lakeland Florida AMENDMENT OF SOLICITATION

LAKELAND AREA MASS TRANSIT DISTRICT (LAMTD) Office of Purchasing and Contracts P.O. Box 1687, Lakeland Florida AMENDMENT OF SOLICITATION LAKELAND AREA MASS TRANSIT DISTRICT (LAMTD) Office of Purchasing and Contracts P.O. Box 1687, Lakeland Florida 33802 AMENDMENT OF SOLICITATION 1. SOLICITATION No. 12-006 2. AMENDMENT No. 1 3. EFFECTIVE

More information

ISO 9001: 2008 Engineering Design Construction Quality Management System Sample - Selected pages (not a complete plan)

ISO 9001: 2008 Engineering Design Construction Quality Management System Sample - Selected pages (not a complete plan) ISO 9001: 2008 Engineering Design Construction Quality Management System Sample - Selected pages (not a complete plan) Part 1: Project-Specific Quality Plan Part 2: Company Quality Manual Part 3: Submittal

More information

I. Project Overview and Limits. Project Goal

I. Project Overview and Limits. Project Goal Scope of Work and Deliverables for Subsurface Utility Engineering (SUE) for both Underground and Overhead Utilities on T.H. 10, and its Connecting Roads under S.P. 8001-40 I. Project Overview and Limits

More information

Highway / Utility Guide

Highway / Utility Guide Oregon Department of Transportation Highway Division Right of Way Section Highway / Utility Guide Railroad & Utilities Unit Right of Way Section STATEMENT OF PURPOSE It is important to understand that

More information

P-196 MARINE CORPS RESERVE VEHICLE MAINTENANCE FACILITY NWS CHARLESTON, SC SECTION DESIGN AND CONSTRUCTION QUALITY CONTROL 11/07

P-196 MARINE CORPS RESERVE VEHICLE MAINTENANCE FACILITY NWS CHARLESTON, SC SECTION DESIGN AND CONSTRUCTION QUALITY CONTROL 11/07 PART 1 GENERAL 1.1 REFERENCES SECTION 01 45 00.05 20 DESIGN AND CONSTRUCTION QUALITY CONTROL 11/07 The publications listed below form a part of this specification to the extent referenced. The publications

More information

Request for Quote (RFQ) Information Technology Department Review

Request for Quote (RFQ) Information Technology Department Review Request for Quote (RFQ) Information Technology Department Review The Clerks of Court Operations Corporation ( CCOC ) is a legislatively created corporate entity, created under Section 28.35, Florida Statutes.

More information

Department of Public Works Division of Engineering. Nassau County, New York

Department of Public Works Division of Engineering. Nassau County, New York TOWN OF OYSTER BAY Department of Public Works Division of Engineering Nassau County, New York REQUEST FOR PROPOSALS FOR CONSULTANT SERVICES SOLICITATION NO. 2017-12 NOTES: 1. ISSUANCE DATE: Thursday, October

More information

Request for Qualifications (Design-Build Contract) State of Ohio Standard Forms and Documents

Request for Qualifications (Design-Build Contract) State of Ohio Standard Forms and Documents Request for Qualifications (Design-Build Contract) State of Ohio Standard Forms and Documents Administration of Project: Local Agency Project Name Stadium Project Response Deadline 1/9/14 12 pm local time

More information

TEXAS DEPARTMENT OF TRANSPORTATION GENERAL SERVICES DIVISION

TEXAS DEPARTMENT OF TRANSPORTATION GENERAL SERVICES DIVISION TEXAS DEPARTMENT OF TRANSPORTATION GENERAL SERVICES DIVISION PREPARED BY: KAREN LEWIS, CPPO, C.P.M., CTPM SPECIFICATION FAX NO.: (512) 374-5480 NO: 958-77-20 E-MAIL: klewis@dot.state.tx.us DATE: FEBRUARY

More information

Township of Severn REQUEST FOR PROPOSAL. Architectural & Professional Services Fire Station Replacement

Township of Severn REQUEST FOR PROPOSAL. Architectural & Professional Services Fire Station Replacement Township of Severn REQUEST FOR PROPOSAL Architectural & Professional Services Fire Station Replacement Deadline for proposal submission is June 15, 2017 at 2:00 p.m. Contact Person: Tim Cranney Director

More information

Florida Cleanroom Systems

Florida Cleanroom Systems Florida Cleanroom Systems Design Build Projects / Project Quality Control Plan (PQCP) Quality Control / Quality Assurance Manual May 2010 1 TABLE OF CONTENTS Section 1: Introduction 3 1.1 Defining Plan

More information

MICHIGAN DEPARTMENT OF TECHNOLOGY, MANAGEMENT AND BUDGET IT SERVICES for FileNet Enterprise Content Management (ECM) STATEMENT OF WORK

MICHIGAN DEPARTMENT OF TECHNOLOGY, MANAGEMENT AND BUDGET IT SERVICES for FileNet Enterprise Content Management (ECM) STATEMENT OF WORK MICHIGAN DEPARTMENT OF TECHNOLOGY, MANAGEMENT AND BUDGET IT SERVICES for FileNet Enterprise Content Management (ECM) STATEMENT OF WORK Michigan Commission on Law Enforcement Standards The FileNet Enterprise

More information

Table of Contents HSA Bank, a division of Webster Bank, N.A. ER_Guide_HSA_Only_EV1_FNL_071017

Table of Contents HSA Bank, a division of Webster Bank, N.A. ER_Guide_HSA_Only_EV1_FNL_071017 I 1 P a g e Table of Contents Introduction to Your New Benefits Program... 3 The Employer Administration Site Getting Started... 4 Logging In... 4 Managing Your Password... 4 Navigating... 5 Enrollment

More information

QUALITY MANAGEMENT SYSTEM POLICIES AND PROCEDURES

QUALITY MANAGEMENT SYSTEM POLICIES AND PROCEDURES Your Company Name QUALITY MANAGEMENT SYSTEM POLICIES AND PROCEDURES Origination Date: XXXX Document Identifier: Date: Document Revision: QMS-00 QMS Policies and Procedures Latest Revision Date Abstract:

More information

Town of Brandon, Vermont Brandon Union St. Sidewalk STP EH 05 (4) Request for Qualifications Construction Inspection and Testing Services

Town of Brandon, Vermont Brandon Union St. Sidewalk STP EH 05 (4) Request for Qualifications Construction Inspection and Testing Services , Vermont Brandon Union St. Sidewalk STP EH 05 (4) Request for Qualifications Construction Inspection and Testing Services Issued: March 13, 20192 Due: April 3, 2019 I. INTRODUCTION The, Vermont, herein

More information

REQUEST FOR QUALIFICATIONS CITY ENGINEERING SERVICES

REQUEST FOR QUALIFICATIONS CITY ENGINEERING SERVICES REQUEST FOR QUALIFICATIONS CITY ENGINEERING SERVICES QUALIFICATION SUBMITTAL DATE: Monday, February 18, 2019 RFQ Number 2019-01 City of McLendon-Chisholm 1371 W. FM 550 McLendon-Chisolm, Texas 75032 972-524-2077

More information

FACILITIES MANAGEMENT

FACILITIES MANAGEMENT FACILITIES MANAGEMENT Design & Construction REQUEST FOR PROPOSAL Third Party Testing and Special Inspections Parking Lots and Ramps Arts Campus Parking Reconfiguration Phase 2 Project #0674501 Addendum

More information

BOROUGH OF BERLIN. Municipal Planning Board Engineer. Term: January 1, 2018 to December 31, 2018.

BOROUGH OF BERLIN. Municipal Planning Board Engineer. Term: January 1, 2018 to December 31, 2018. BOROUGH OF BERLIN REQUEST FOR QUALIFICATIONS FOR MUNICIPAL ATTORNEY, MUNICIPAL AUDITOR, MUNICIPAL BOND COUNSEL, MUNICIPAL ENGINEER, MUNICIPAL WATER & SEWER ENGINEER, MUNICIPAL PROSECUTOR, MUNICIPAL PUBLIC

More information

EXHIBIT A SCOPE OF SERVICES FOR DISTRICTWIDE CONSULTING ENGINEERNG SERVICES STRUCTURES DESIGN

EXHIBIT A SCOPE OF SERVICES FOR DISTRICTWIDE CONSULTING ENGINEERNG SERVICES STRUCTURES DESIGN EXHIBIT A SCOPE OF SERVICES FOR DISTRICTWIDE CONSULTING ENGINEERNG SERVICES STRUCTURES DESIGN Financial Project ID: 417069-1-32-04 Work Program Item No.: N/A Federal Aid Project ID: County/Section No.:

More information

PROFESSIONAL SERVICES DESCRIPTION FOR THE POSITION OF: Building Commissioning Services

PROFESSIONAL SERVICES DESCRIPTION FOR THE POSITION OF: Building Commissioning Services PROFESSIONAL SERVICES DESCRIPTION FOR THE POSITION OF: Building Commissioning Services SUBMISSION DEADLINE: October 23, 2009 11:00am FAIR AND OPEN PUBLIC SOLICITATION PROCESS FOR PROFESSIONAL SERVICES

More information

Chapter 4 State Requirements for Educational Facilities Section 4.1

Chapter 4 State Requirements for Educational Facilities Section 4.1 providential cause, other impending danger to life safety, or pursuant to Section 1013.46(1)(b), F.S., the board can declare an emergency, can negotiate a contract with a design-build firm, design professional,

More information

PUBLIC NOTICE MARYLAND DEPARTMENT OF TRANSPORTATION NOTICE ARCHITECTS & ENGINEERS TRANSPORTATION PROFESSIONAL SERVICES SELECTION BOARD

PUBLIC NOTICE MARYLAND DEPARTMENT OF TRANSPORTATION NOTICE ARCHITECTS & ENGINEERS TRANSPORTATION PROFESSIONAL SERVICES SELECTION BOARD PUBLIC NOTICE MARYLAND DEPARTMENT OF TRANSPORTATION NOTICE TO ARCHITECTS & ENGINEERS TRANSPORTATION PROFESSIONAL SERVICES SELECTION BOARD REQUEST FOR PROFESSIONAL SERVICES The Secretary of the Maryland

More information

Office of Federal Contract Compliance Programs (OFCCP)

Office of Federal Contract Compliance Programs (OFCCP) Page 1 of 9 Office of Federal Contract Compliance Programs (OFCCP) TRANSMITTAL U.S. DEPARTMENT OF LABOR Office of Federal Contract Compliance Programs Number: Date: OFCCP Order No. ADM Notice/Functional

More information

Quality Management System

Quality Management System Quality Management System ZYQ Testing Laboratory 11111 Testing Avenue Testing Town, Alaska 22222 (555) 555-5555 Date Prepared: January 19, 2009 1 Please note that this Quality Management System (QM) was

More information

STRS Ohio Employer Self Service (ESS) Instructions Table of Contents

STRS Ohio Employer Self Service (ESS) Instructions Table of Contents STRS Ohio Employer Self Service (ESS) Instructions Table of Contents Log in to ESS... 1 Account Settings... 2 Navigating ESS... 3 Additional Tips and Suggestions... 4 New Hire Information... 6 Reemployed

More information

SUSQUEHANNA AREA REGIONAL AIRPORT AUTHORITY

SUSQUEHANNA AREA REGIONAL AIRPORT AUTHORITY SUSQUEHANNA AREA REGIONAL AIRPORT AUTHORITY REQUEST FOR QUALIFICATIONS Professional Construction Management Services Harrisburg International Airport Rehabilitate Runway 13-31 Susquehanna Area Regional

More information

4/7/09 I. PURPOSE OF AGREEMENT

4/7/09 I. PURPOSE OF AGREEMENT 4/7/09 HEART OF TEXAS PARTNERSHIP AGREEMENT Between The Heart of Texas Workforce Development Board, Inc. and Chief Elected Officials For The Heart of Texas Workforce Development Area WHEREAS, the Heart

More information

Date: Telephone: Company Name: Address: City: State: Zip Code: Contact Person: Title: Authorized Signature:

Date: Telephone: Company Name: Address: City: State: Zip Code: Contact Person: Title: Authorized Signature: SUBMISSION INFORMATION Kenton County Fiscal Court P.O. Box 792 303 Court Street, Room 207 Covington, Kentucky 41012-0792 QUALIFICATION: Radio Project Phase II RFQ OPENING DATE: December 7, 2015 TIME: 2:00

More information

DOTD Form January 1, By Rhonda F. Braud, P.E. Contract Advertisement Engineer

DOTD Form January 1, By Rhonda F. Braud, P.E. Contract Advertisement Engineer DOTD Form 24-102 January 1, 2018 By Rhonda F. Braud, P.E. Contract Advertisement Engineer Major Changes in Scoring Changes affect any advertisements posted as of 1/1/2018 None have been posted yet. In

More information

Business Analysis Services Healthcare Workforce Clearinghouse Project, Phase III

Business Analysis Services Healthcare Workforce Clearinghouse Project, Phase III Request for Offer (RFO # 12-4774) For: IT Consulting Services Business Analysis Services Healthcare Workforce Clearinghouse Project, Phase III You are invited to review and respond to this RFO. To submit

More information

Technology Services RFP Town of Hooksett. Administration Department Dr. Dean Shankle May 2, 2019

Technology Services RFP Town of Hooksett. Administration Department Dr. Dean Shankle May 2, 2019 Town of Hooksett Administration Department Dr. Dean Shankle May 2, 2019 REQUEST FOR PROPOSAL Proposal for TECHNOLOGY SERVICES Bid #18-05 Invitation to Bid Acceptance Date: 10:00 am, June 4th, 2018 Sealed

More information

AudaInvoice Repairer User Guide. Version 7.3

AudaInvoice Repairer User Guide. Version 7.3 AudaInvoice Repairer User Guide Version 7.3 AudaInvoice Repairer User Guide Contents Contents 2 1. Overview 3 2. AudaInvoice - Step By Step 4 3. Getting Started 5 3.1 Login 5 3.2 Invoice Search tab Overview

More information

APPENDIX A - TECHNICAL SPECIFICATIONS. JEA Fleet Services Light Duty Equipment Maintenance and Repair

APPENDIX A - TECHNICAL SPECIFICATIONS. JEA Fleet Services Light Duty Equipment Maintenance and Repair APPENDIX A - TECHNICAL SPECIFICATIONS JEA Fleet Services Light Duty Equipment Maintenance and Repair 1. GENERAL SCOPE OF WORK This scope of work is looking for a Respondent(s) to provide JEA Fleet Services

More information

LEADER ICT System User Guide Project Claim

LEADER ICT System User Guide Project Claim LEADER ICT System Guide Project Claim Index Project Claim... 1 Overview... 1 Roles... 2 Claim Rules... 3 Claim Approval... 4 Claim Stages... 5 Stage 01 Create New Claim... 6 Stage 02 or Check... 24 Stage

More information

REQUEST FOR PROPOSALS: AUDIT AND TAX SERVICES

REQUEST FOR PROPOSALS: AUDIT AND TAX SERVICES GOODWILL INDUSTRIES OF CENTRAL EAST TEXAS, INC. REQUEST FOR PROPOSALS: AUDIT AND TAX SERVICES Issue Date: April 4, 2018 Due Date: April 20, 2018 Goodwill Industries of Central East Texas, Inc. 1 Index

More information

CONSTRUCTION MANAGEMENT SERVICES

CONSTRUCTION MANAGEMENT SERVICES DrAFTDRAFTdd EXHIBIT 1 CONSTRUCTION MANAGEMENT SERVICES REQUEST FOR QUALIFICATIONS (RFQ) SELECTION PROCESS School District of Lee County, Florida TABLE OF CONTENTS 1. INTRODUCTION 1 Lobbying 2 2. 3 A.