AGENDA REQUEST AGENDA ITEM NO: VI.2. Unfinished Business. June 15, 2015 BY Utilities Mitt Tidwell Utilities Director Tidwell SUBJECT:
|
|
- Thomasine Barker
- 5 years ago
- Views:
Transcription
1 AGENDA HEADING: Unfinished Business AGENDA REQUEST COMMISSION MEETING DATE: June 15, 2015 BY Utilities Mitt Tidwell Utilities Director Tidwell AGENDA ITEM NO: VI.2. Originating Department SUBJECT: Department Head Presenter Continued Discussion Re: Lift Station No Construction Alternatives and Funding Options COMMISSION PRIORITIES: Infrastructure EXPLANATION: City staff seeks direction on the Lift Station No. 87 project in terms of the selection of one of the construction alternatives and funding options. ADMINISTRATION'S RECOMMENDATION: Utility Staff will be seeking direction on the design, cost schedule and funding options for the Lift Station No. 87 project. APPROVAL SUMMARY: Approval Department Head Approval Deputy City Manager Approval City Manager Approval City Auditor and Clerk Approval Required Date Completed Y 06/10/2015 Y 06/10/2015 Y 06/10/2015 Y 06/10/2015 Completed By Mitt Tidwell Marlon Brown Marlon Brown Pamela Nadalini Status APPROVED APPROVED APPROVED APPROVED
2 ADDITIONAL EXPLANATION: AGENDA REQUEST ADDITIONAL ADMIN RECOMMENDATION: FUNDING SOURCE: AMOUNT: HOUSING IMPACT (Per House): NEW CONSTRUCTION: REHABILITATION: SUPPORT DEPARTMENTS: $ 0 $ 0 City Auditor and Clerk - Pamela M. Nadalini City Attorney - Robert Fournier Financial Administration - John Lege City Manager - Thomas Barwin COMMISSION ACTION: Final Action Motion: Motion By: AGENDA DISPOSITION Second By: Vote: 2
3 PROJECT UPDATE June 8, 2015
4 Agenda: What led to this point? Project Background Latest Findings Risk Management Alternate Routes Next Steps 2
5 PROJECT BACKGROUND Goals, design process, preliminary work 3
6 Project Goals: Trust & Transparency Environmental stewardship Fiscally responsible approach Manage project risks Minimize impacts to the public 4
7 Project history to date Malcolm Pirnie April 2006 Relocate to former high school parking lot Stantec April 2007 Luke Wood Park and inverted siphon under Hudson Bayou Bridge Boyle AECOM April 2009 Luke Wood Park and microtunnel under Hudson Bayou Bridge 5
8 Project Status U.S Construction begins 2012 Work stops due to microtunnel issues AECOM terminated November 2012 McKim & Creed retained August 2013 Lift Station Issues Operational Structural Osprey Ave. Safety 6
9 New Successor Engineer of Record Review existing design Perform supplemental investigations Create technical memorandums Present to city and public Restart project time of the essence 7
10 Hudson Bayou Crossing Phases Phase I Scope of Work Microtunnel under existing bridge as designed or at revised elevations Horizontal Directional Drill under the existing bridge as inverted siphon Microtunnel under bayou on either side of bridge (alternate alignment) McKim & Creed Recommendation Microtunnel under bridge within the right of way Approved by City Commission Jan. 21,
11 Hudson Bayou Crossing Phases Phase II Scope of Work Finalize microtunnel design (-16.5 feet) Redesign Lift Station 87 McKim & Creed Recommendation Hurricane storm surge protection City Commission direction April 21,
12 Current Design Route U.S. 41 Microtunnel receiving pit Microtunnel jacking pit Current alignment Microtunnel jacking pit Benefits Alternate alignment Maintenance of Traffic Access to Businesses Less US 41 Impacts Hudson Bayou Osprey Ave. 10
13 Hudson Bayou Crossing Microtunnel under bridge Developed by Staheli Trenchless Peer reviewed by Atkins Approved by City Commission Alternate alignment accepted by Staff 11
14 LATEST FINDINGS New studies, inspection data and analysis 12
15 Comprehensive Geotechnical Review borings bathymetric survey, geophysical borings borings survey, concrete cores/testing 13
16 Assessment of Bridge Abutment NORTHWEST CORNER NORTHEAST CORNER SOUTHWEST CORNER SOUTHEAST CORNER 8.75' Original 36" pipe 8.0' Original 36" pipe Proposed 36" microtunnel Proposed 36" microtunnel 8' Concrete core Concrete abutment (surveyed) Concrete abutment (interpreted)
17 Geotechnical Summary North to Mound St. Original pipe Top of pipe elevation: -8.5' Proposed microtunnel Top of pipe elevation: -16.5' 15
18 RISK MANAGEMENT Designs, data and assessments 16
19 Risk Assessment of Designs Original design Lessons learned McKim & Creed design Before bridge investigation McKim & Creed design After bridge investigation 17
20 Risk Register and Criteria IMPACT Low Medium High Probability PROBABILITY Low Medium High 1: 0 20% 2: 20 40% 3: 40 60% 4: 60 80% 5: % Impact 1: < $100 K 2: $100 K $250 K 3: $250K $500K 4: $500 K $1M 5: > $1M 18
21 What is a Risk Register? Identify Issues Risk Score Mitigation Plan Potential Risks Estimate Probability of Occurrence Estimate Impact ($) Probability times Impact Lower the Better Additional Field Work Modify Design Monitor During Construction 19
22 Analysis of microtunneling High jacking force i.e. stuck machine Environmental impact to Hudson Bayou Mixed face conditions hard soils on part of machine, soft on another Unexpected geotechnical conditions Line and grade deviations outside of tolerances Pipe breaking Differing Site Conditions claims Damage to the bridge 20
23 Risk Example: High Jacking Force Mitigation Plan Extensive geotechnical investigations Prescriptive specifications Monitor during construction Probability & Impact Probability reduced from 5 to 1 Impact remains at 5 Risk Score Reduced from 25 to 5 Contingency reduced from $900K to $100K Probability x Impact = Risk Score Note: High Jacking Force happened twice during initial construction. 21
24 Risk Management Results Current design reduces risk significantly from original design Relative Risk score (total) Original design 120 McKim & Creed design Prior to bridge inspection McKim & Creed design Post bridge inspection
25 Additional factors considered Bathymetric Surveys Nettles (2013) Forensic/Hyatt (2014) 6-8 feet 7 feet Geotechnical Borings Foundation Material Phase 1 Report 7-10 feet (each side of bridge) Bridge Inspection (2014) 9 feet (mid Bayou) Reclaimed Water Main (1997) East of Bridge (ROW) Centerline (-16 feet) 23
26 ALTERNATE ROUTES Methods, plans and other considerations 24
27 Open Cut vs. Microtunneling Evaluate options to re-use existing wetwell Open Cut Microtunneling 25
28 Alternate Routes: Control Elevations U.S. 41 Top of Foundation Material (-9.0) Influent MH Invert (-13.08) Wetwell Invert (-13.52) Hudson Bayou Osprey Ave. 26
29 Regulatory Considerations Subaqueous Crossing Regulations Florida Department of Environmental Protection (FDEP) 3 Feet Cover U.S. Army Corps of Engineers (USACE) 6 Feet Cover Top of Pipe El Open cut 27
30 Alternate Route Lincoln Drive U.S " Disrupts condos Permits needed New easement 0 Manhole Osprey Ave. Disrupts home 30" 28
31 Alternate Route Lincoln Drive U.S " Disrupts condos Permits needed New acquisition Hudson Bayou New easement 0 Manhole 24" 30" 29
32 Alternate Route 3 East of Bridge Disrupts park U.S " Permits needed Disrupts home Hudson Bayou New easement 0 Manhole 24" 30" 30
33 Open Cut Considerations Easements and land acquisition required Regulatory permits - FDEP/Sarasota County - Sovereign Submerged Lands - Environmental Resource Permit - FDEP/ACOE Variances Environmental Documented Lead Contamination (2001 Boyle Report) Geotechnical Investigations Borings/Bathymetric Schedule 31
34 Operational Impacts Period submergence of sewer system - Reduced conveyance capacity - More frequent pipeline cleaning - Increased odor potential in neighborhood Hydraulic Institute Standards not met - Un-even flow patterns - Increased frequency of wet well cleaning - Increased wear on one pumping unit - Air entrainment/cavitation - Reduced pumping capacity - Less energy efficiency - Reduced life expectancy for pumps Additional operational and maintenance costs 32
35 Normal Operating Conditions Open Cut Odor Control Elevation ft. Odors Gravity Sewer Overflow hazard Wetwell 33
36 Surcharge Conditions Existing Wetwell Design -TBD ft. Odors Elevation ft. Gravity Sewer Overflow hazard Manhole Existing Wetwell 34
37 Upgrades will still be required Wet Well Slab Modification required to withstand Cat 3 Storm Surge Stand-by Pump Reliability required 35
38 Planning level comparable costs Microtunnel Open Cut current est. 36 Inch (Phase 1) $11.0 M $6.5 M Lift Station 87 (Phase 2) $16.0 M $13.3 M 24 Inch (Phase 3) $5.0 M $5.0 M Land Acquisition - $4.0 M & Legal Environmental - $6.2 M Luke Wood Park - $1.0 M Restoration Total Estimate $32.0 M $36.0 M Open Cut notes: Hudson Bayou crossing assumes variance from state and federal regulation requirements; Land Acquisition & Legal estimated based on city input; Environmental from 2001 Hudson Bayou Stormwater Study 36
39 Analysis of project costs Previous Bid January 2011 Previous Bid indexed to 2015 Current estimate Difference 36 Inch (Phase 1) $1.5 M $1.7 M $11.0 M $9.3 M Lift Station 87 (Phase 2) $5.4 M $6.1 M $16.0 M $9.9 M 24 Inch (Phase 3) $2.7 M $3.0 M $5.0 M $2.0 M Total Estimate $9.6 M $10.8 M $32.0 M $21.2 M Note: 2011 bid indexed to 2015 dollars based on industry-standard methodology. 37
40 Analysis of differences $9.3 M: 36 Inch (Microtunnel) Quotes from recent negotiation attempts $3.0 M: Project Enhancements Replacement of asbestos cement water mains* Installation of reclaimed water mains* Installation of new sewer mains (Pomelo Place) Installation of new water main (Alta Vista to Bahia Vista) Full roadway restoration Landscaped Lift Station 7 site * Osprey, Alta Vista, Pomelo, and/or Pomelo Place 38
41 Analysis of differences $8.9 M: Upgrades Category 3 storm surge protection Operating redundancies Totally enclosed for all operation & maintenance activities Safe working environment for staff Climate change provisions Deeper wetwell/operational efficiencies Site preparation 39
42 NEXT STEPS Resolving design issues, communicating challenges 40
43 Sequencing of Construction U.S. 41 Additional Advantages Risk Management Minimize Disruption to Existing Utilities Cost Controls Hudson Bayou Maintenance of Traffic 41
44 Construction Plan Three Phases Phase 1 36 inch pipe Phase 2 LS 87 construction Demolition of Lift Station 7 and park restoration Phase 3 24 inch pipe Lift Station 7 42
45 Construction Challenges Limited site access Construction zone restrictions Minimize impacts to Luke Wood Park Maintenance of traffic Minimize service disruptions 43
46 Microtunneling Work Zone Receiving shaft work zone U.S. 41 LS site driveway Jacking shaft work zone Construction support work zone Jacking shaft work zone Hudson Bayou 44
47 Microtunnel Work Zone (Osprey) MICROTUNNEL ALIGNMENT HUDSON BAYOU MICROTUNNEL JACKING SHAFT WORK ZONE 45
48 Microtunneling Work Zone (LS 87) JACKING SHAFT EQUIPMENT PIPE STORAGE AREA LS SITE DRIVEWAY OFFICE TRAILER MICROTUNNEL ALIGNMENT 46
49 Building Work Zone APPROXIMATE EXCAVATION LIMITS APPROVED SITE PLAN 47
50 Scheduling and Timeframes Estimates subject to final engineering decisions Bid Phase Start Finish Q 1/2 Q 3/4 Q 1/2 Q 3/4 Q 1/2 Q 3/4 Q 1/2 Q 3/4 Q 1/2 Q 3/4 Q 1/2 Q 3/4 Current Design 36 inch (Phase 1) Lift Station (Phase 2) 24 inch (Phase 3) July 2015 Sept Jan June 2017 June 2019 Aug
51 Project Goals Environmental stewardship - Improve service and system reliability - Storm protection (Category 3 hurricane) - Offset potable water demands with reclaimed water Fiscally responsible approach - Complete Hudson Bayou crossing first - Obtain competitive bid packages - Salvage existing equipment Manage project risks - Pre-qualify microtunneling contractors - Use experienced construction specialists Minimize impacts to the public - Develop detailed MOT plans - Construction updates on project website 49
52 Path to the Next Phase Design Team conclusion Utility Department support Administrative acceptance City Commission direction 50
53 City Commission Direction Actions to move the project forward Pre-qualify specialty contractors Microtunnel under the bridge Pursue alternate alignment Easements will be necessary 51
54 Discussion
55 Lift Station 87 Funding Options 2014 Rate Sufficiency Analysis Annual Rate Increase 53
56 Option 1 Cash while maintaining CIP funding level Defers $20 million of Infrastructure projects Between 2015 and
57 Option 2 Bond debt while maintaining CIP funding level One time rate increase in 2017 In addition to planned 4% No infrastructure projects deferred Rate increase to fund debt service 55
58 Option 3 Bond debt while maintaining CIP funding level No rate increase related to Lift Station 87 Annual 4% rate increase is necessary Defer some infrastructure projects $1.8 million per year until loan is satisfied 56
59 Staff Recommendation Option 3 Bond debt while maintaining CIP funding level No rate increase related to Lift Station 87 Annual 4% rate increase is necessary Defer some infrastructure projects $1.8 million per year until loan is satisfied Finance and Utility Departments will review with rate sufficiency consultant Identify and develop best value option Present to Commission 57
60 Discussion
PUBLIC MEETING. December 18, 2013
PUBLIC MEETING December 18, 2013 Hudson Bayou Crossing Tools: Advanced Geotechnical Techniques Soil Borings/Tests Water Level Monitoring Geophysical Surveys Seismic Surveys Sound Engineering Practices
More informationAGENDA REQUEST. Approval Re: Work Assignment #1_RFP #15-72_GIS and Geocoding Services_Stantec. (see next page for additional explanation)
AGENDA HEADING: Consent Agenda No. 1 AGENDA REQUEST COMMISSION MEETING DATE: April 18, 2016 BY Utilities Mitt Tidwell Utilities Director Tidwell AGENDA ITEM NO: IV.A.7. Originating Department SUBJECT:
More informationReplacing Critical Force Mains Using HDD Methods in Coastal Areas of the City of Sarasota
North American Society for Trenchless Technology (NASTT) NASTT s 2014 No-Dig Show Orlando, Florida April 13-17, 2014 Paper TM2-T2-04 Replacing Critical Force Mains Using HDD Methods in Coastal Areas of
More informationPUBLIC MEETING. City Hall City Commission Chambers 1565 First Street, Sarasota. September 19, :00pm to 8:00pm
PUBLIC MEETING City Hall City Commission Chambers 1565 First Street, Sarasota September 19, 2013 6:00pm to 8:00pm Agenda Team Overview Scope of Work Community Outreach Program Project Schedule Protecting
More informationCOLLIER COUNTY Growth Management Department
COLLIER COUNTY Growth Management Department July 07, 2015 Josh Fruth Davidson Engineering, Inc Suite 201 4365 Radio Rd Naples, FL 34104 EMAIL - Josh@DavidsonEngineering.Com; jessica@davidsonengineering.com
More informationCutting-Edge Trenchless Technology Proposed for Challenging CSO Project
North American Society for Trenchless Technology (NASTT) NASTT s 2013 No-Dig Show Sacramento, California March 3-7, 2013 TM1-T2-03 Cutting-Edge Trenchless Technology Proposed for Challenging CSO Project
More informationReason for Acceptance or Rejection
Value Engineering Approval Form Project: 25th Avenue & Union Pacific Grade Separation #6 VE Study Date: January 28 through February 1, 2013 Form updated: 5/7/2013 (Final) FHWA Functional ENV 1 ROW 1 The
More informationPermit for Construction of an Extension to a JEA Drinking Water Distribution System and/or JEA Wastewater Collection/Transmission System
Permit for Construction of an Extension to a JEA Drinking Water Distribution System and/or JEA Wastewater Collection/Transmission System INSTRUCTIONS: This form shall be completed and submitted (in duplicate)
More informationRowlett Cottonwood Transfer Sewer: 60" RCP Sanitary Sewer Rehabilitation Project. TACWA Meeting
Rowlett Cottonwood Transfer Sewer: 60" RCP Sanitary Sewer Rehabilitation Project TACWA Meeting September 25, 2009 North Texas Municipal Water District Project Background 1. Rowlett-Cottonwood Transfer
More informationWilmette - Background
Reducing Basement Backups through Intergovernmental Cooperation and Design-Build Presented By Michael N. Young, P.E. Brigitte Ann Berger, P.E. Wilmette - Background North Shore Suburb of Chicago 5 Square
More informationA Sigh of Relief: Completion of the San Mateo El Cerrito Relief Line. Kourosh Iranpour, PE
A Sigh of Relief: Completion of the San Mateo El Cerrito Relief Line Kourosh Iranpour, PE Presentation Outline Background information Selection of preferred alignment Primary project challenges Selection
More informationDRAFT. Technical Memorandum. Whitney Road Drainage & Safety Enhancements Phase III Hydraulic Update. Prepared For:
DRAFT Technical Memorandum Whitney Road Drainage & Safety Enhancements Phase III Hydraulic Update Prepared For: Pinellas County Department of Environment and Infrastructure Division of Engineering and
More informationCost Estimating Framework
Cost Estimating Framework Water and Wastewater Master Study Prepared by: GM BluePlan Engineering for: Project No. 717022 TABLE OF CONTENTS 1 Introduction... 1 2 Cost Estimation Framework... 2 2.1 Approach
More informationIndex to Technical Specifications
Index to Technical Specifications Item Number Subject I II EXCAVATION 1.01 Trenching and Excavation Regulations 1.02 Site Grading or General Excavation 1.03 Structural Excavation 1.04 Trench Excavation
More informationChapter 3: Permit Procedures and Requirements
Chapter 1: General Provisions 1 1 Short Title 1 2 Jurisdiction 1 3 Amendments and Revisions 1 4 Enforcement Responsibility 1 5 Review Process 1 6 Prior Approval 1 7 Relationship to Other Standards 1 8
More informationPROJECT SCOPE OF WORK CITY OF TOWN AND COUNTRY STORMWATER PROGRAM
PROJECT SCOPE OF WORK CITY OF TOWN AND COUNTRY STORMWATER PROGRAM Project Name: 194 Muir Woods Ln Project ID Number: 216-2 Problem: At 194 Muir Woods Lane, nearly two acres of watershed flow through the
More informationTOWN OF MOUNT PLEASANT WESTCHESTER COUNTY, NEW YORK
TOWN OF MOUNT PLEASANT WESTCHESTER COUNTY, NEW YORK COST EVALUATION FOR ROLLING HILLS AREA WATER MAIN EXTENSION PROFESSIONAL CONSULTING, LLC. Octagon 10, Office Center 1719 Route 10, Suite 225 Parsippany,
More informationPublic Hearing December 12, 2013
Public Hearing December 12, 2013 Commission s Water Transmission System Finished Water Transmission System South Transmission Main South Transmission Main Route South Main Replacement Route from Provin
More informationSanitary Sewer Service Alternatives. Presented by Paul Dietz, III, PE PD Cubed LLC Prepared in cooperation with Value Engineering Inc
Sanitary Sewer Service Alternatives Presented by Paul Dietz, III, PE PD Cubed LLC Prepared in cooperation with Value Engineering Inc Discussion of Sanitary Sewer Options for the proposed Melbourne Hill
More informationA Trenchless Approach to Lift Station Elimination
A Trenchless Approach to Lift Station Elimination PRESENTED BY: SCOTT MAUGHN, P.E. DANIEL HUFFINES, P.E. FSAWWA Fall Conference November 27, 2018 1 AGENDA Project Background Preliminary Investigations
More informationKathryn Wallin Bennett Trenchless. Bo Botteicher Underground Solutions. Pipe Users Group Sharing Technologies Seminar Berkeley, CA February 18, 2016
www.norcalpug.com Pipe Users Group Sharing Technologies Seminar Berkeley, CA February 18, 2016 Kathryn Wallin Bennett Trenchless Bo Botteicher Underground Solutions Project Area Existing Sewers 66-inch
More informationSOUTH COAST WATER DISTRICT CAPITAL PROJECT SUMMARY SHEET Project Name: LS-2 PUMP STATION UPGRADE CIP No.: Project Manager: Rick Shintaku
Project Name: LS-2 PUMP STATION UPGRADE CIP No.: 7700 Project Manager: Rick Shintaku The project will consist of two phases: () preliminary and final design in FY 6; and (2) construction in FY 8. Preliminary
More information6 Preliminary Assessment of Construction Method and Constructability Issues
6 Preliminary Assessment of Construction Method and Constructability Issues 6.1 Construction Approach Appendix C includes conceptual designs of the alternatives discussed below. Generally, the conceptual
More informationBRIDGE CONSTRUCTION USING SELF-PROPELLED MODULAR TRANSPORTERS (SPMT)
SPECIAL PROVISION August 31, 2009 PROJECT # S-R399(42) PROJECT # S-R399(59) PIN # 6697/7236 SECTION 03253S BRIDGE CONSTRUCTION USING SELF-PROPELLED MODULAR TRANSPORTERS (SPMT) Add Section 03253S: PART
More informationAPPENDIX A TECHNICAL SPECIFICATIONS. Engineering Services for the East Grid - Pump Station Upgrade Program DESCRIPTION OF SCOPE OF SERVICES
159-18 APPENDIX A TECHNICAL SPECIFICATIONS Engineering Services for the East Grid - Pump Station Upgrade Program DESCRIPTION OF SCOPE OF SERVICES GENERAL CONSULTANT agrees to provide Engineering Services
More informationSection 8 System Evaluation and Capacity Assurance Plan (SECAP)
System Evaluation and Capacity Assurance Plan (SECAP) The WDR requires owners and operators of sewer collection systems to have a (SECAP). This component involves preparing and implementing a Capital Improvement
More informationTRENCHLESS CONSTRUCTION (BORING, JACKING, AND TUNNELING)
PART 1 - GENERAL TRENCHLESS CONSTRUCTION (BORING, JACKING, AND TUNNELING) 1.01 SECTION INCLUDES A. Trenchless Installation of Carrier Pipe with Casing Pipe B. Trenchless Installation of Carrier Pipe without
More informationStantec LAKEW OD RANCH STEWARDSHIP DISTRICT MASTER ENGINEER'S REPORT FOR NORTHEAST SECTOR AT LAKEWOOD RANCH INFRASTRUCTURE IMPROVEMENTS
LAKEW OD RANCH STEWARDSHIP DISTRICT MASTER ENGINEER'S REPORT FOR NORTHEAST SECTOR AT LAKEWOOD RANCH INFRASTRUCTURE IMPROVEMENTS Stantec Prepared for: Lakewood Ranch Stewardship District 14400 Covenant
More informationSECTION BORING AND/OR JACKING PIPE
02910-1 of 6 SECTION 02910 BORING AND/OR JACKING PIPE 02910.01 GENERAL A. Description Boring and/or jacking pipe shall include, but not necessarily be limited to, furnishing and installing carrier pipe
More informationGoals of today s presentation
Fast-tracked Fircrest Pipe Bursting Project Leads to Success Darrel Frame, P.E. - Civil Engineer - Murray, Smith and Associates, Inc. Goals of today s presentation Review of City of Fircrest Pipe Bursting
More informationFoundations for the new pumps have been constructed. Contractor is constructing emergency connection to LADWP system.
Water Projects Pump Station No. 8 Rehabilitation (CIP No. 0796) Scope of Work: Rehabilitation of aging mechanical equipment and the associated piping at the existing pump station adjacent to Reservoir
More informationCITY OF PANAMA CITY BEACH Utilities Administration & Engineering Offices 116 South Arnold Road Panama City Beach, FL 32413
Page: 1 of 5 CITY OF PANAMA CITY BEACH Utilities Administration & Engineering Offices 116 South Arnold Road Panama City Beach, FL 32413 COMMERCIAL/RESIDENTIAL UTILITY PLAN COMPLETENESS CHECK LIST Updated
More informationChallenges and results of Using hand mining to tunnel the mcalpine creek relief sewer
96 th Annual NC AWWA-WEA Conference Chuck Shue, PE McKim & Creed, Inc. Senior Project Manager Challenges and results of Using hand mining to tunnel the mcalpine creek relief sewer OUTLINE Project overview
More informationGo Big, Go Fast, Trenchless Emergency Response to the City of Fort Lauderdale. Murphy Pipeline Contractors, Inc.
Go Big, Go Fast, Trenchless Emergency Response to the City of Fort Lauderdale Presentation Outline 1. About the Team 2. Project Background 3. The Challenges 4. Planning & Phasing Trenchless Technologies
More informationQuestions from Heritage Hunt Grounds Committee Received on 7/7/16
Questions from Heritage Hunt Grounds Committee Received on 7/7/16 1. What specific areas are going to be dug up? Portions of the northeast side of the property will require some level of disturbance for
More informationSanitary Sewer 101. Jan. 12, 2016 Keith Fisher, P.E. Director of Public Works
Sanitary Sewer 101 Jan. 12, 2016 Keith Fisher, P.E. Director of Public Works What We Will Cover -What is Sanitary Sewer? -Components -History -What types of systems are there? -What types of materials
More informationEngineer s Report Infrastructure Improvements
Gulfstream Polo Community Development District Engineer s Report Infrastructure Improvements Prepared for: Gulfstream Polo Community Development District Board of Supervisors Palm Beach County, Florida
More information8. Vertical Alignment (Profiles).
8. Vertical Alignment (Profiles). a. Cover Over Pipeline. 1) Normal depth for sewer pipelines is eight (8) to ten (10) feet measured from the lowest profile grade or ground line. 2) Provide a minimum of
More informationTo: From: Date: Subject: Sherwood Lakes Drainage Alternatives Analysis 1
To: From: The City of Virginia Beach Lewis White and Rachael Johnson on behalf of WSP Date: June 6, 2017 Subject: s Drainage Alternatives Analysis This memorandum represents the summary of findings from
More informationMINIMUM STANDARDS AND CONSTRUCTION SPECIFICATIONS FOR WATER AND WASTEWATER SYSTEMS PREFACE
MINIMUM STANDARDS AND CONSTRUCTION SPECIFICATIONS FOR WATER AND WASTEWATER SYSTEMS PREFACE The Citrus County Water Resources Department, Utilities Division is committed to providing cost effective, quality
More informationCONSTRUCTION PLAN CHECKLIST
CONSTRUCTION PLAN CHECKLIST The design engineer is responsible for ensuring that plans submitted for city review are in accordance with this checklist. It is requested that the executed checklist be submitted
More informationAPPENDIX I. Conceptual Design - Salem Road and McKay Road Trunk Watermain and Sanitary Sewer
APPENDIX I Conceptual Design - Salem Road and McKay Road Trunk Watermain and Sanitary Sewer THE CITY OF BARRIE PROJECT NO. 15M-00594-01 CONCEPTUAL DESIGN SALEM ROAD AND MCKAY ROAD TRUNK WATERMAIN AND SANITARY
More informationSECTION MEASUREMENT AND PAYMENT
SECTION 01026 PART 1 GENERAL 1.1 SECTION INCLUDES A. Explanation and Definitions B. Measurement C. Payment D. Schedule of Values E. Application for Payment 1.2 EXPLANATION AND DEFINITIONS A. The following
More informationSTANDARD DETAILS. Revised January Bonita Springs Utilities, Inc East Terry Street (239)
STANDARD DETAILS Revised January 2018 Bonita Springs Utilities, Inc. 11900 East Terry Street Bonita Springs, FL 34135 (239) 992-0711 DETAIL SHEET INDEX WATER DETAILS W-1 CONSTRUCTION JUMPER ASSEMBLY W-2
More informationHow to Apply the Virginia Underground Utility Damage Prevention Act to a Jack and Bore Operation: A Case Study. Jessica M. W. Hou, P.E.
How to Apply the Virginia Underground Utility Damage Prevention Act to a Jack and Bore Operation: A Case Study Jessica M. W. Hou, P.E., BCEE Agenda What is a jack and bore? What is does the Underground
More informationGRAVITY SEWERS. Performance & Cost for Decentralized Unit Processes. Fact Sheet C1 COLLECTION SERIES. Wastewater source. Road
Fact Sheet C1 Performance & Cost for Decentralized Unit Processes COLLECTION SERIES DECENTRALIZED WASTEWATER SYSTEMS What is a Gravity Sewer System? A gravity sewer system is used to collect wastewater
More informationCurrent Construction Projects in Progress. Thru January 31, 2016
Current Construction Projects in Progress Thru January 31, 2016 Orange Ave Pump Station Improvements Before After Project consist of the removal of the existing pumps, housing and piping. Remove and replace
More informationCECIL COUNTY, MARYLAND. ADDENDUM #2 Bid ; Marley Road Sewer Extension
Office of the County Executive Alan J. McCarthy County Executive Department of Finance Purchasing Division Ken Jackson Purchasing/Fleet/Leasing Mgr. Alfred C. Wein, Jr. Purchasing Office Director of Administration
More information5G. Consider Approval of 50% Plans for Northwood Lake Improvement Project (NL-1), New Hope
Memorandum To: Bassett Creek Watershed Management Commission Subject: Item 5G. Consider Approval of 50% Plans for Northwood Lake Improvement Project (NL- 1), New Hope BCWMC September 17, 2015 Meeting Agenda
More informationTRENCHLESS CONSTRUCTION (BORING, JACKING, AND TUNNELING)
PART 1 - GENERAL TRENCHLESS CONSTRUCTION (BORING, JACKING, AND TUNNELING) 1.01 SECTION INCLUDES A. Trenchless Installation of Carrier Pipe with Casing Pipe B. Trenchless Installation of Carrier Pipe without
More informationEL PASO WATER - PUBLIC SERVICE BOARD REQUEST FOR SUBMITTALS RFS June 27, 2017
EL PASO WATER - PUBLIC SERVICE BOARD REQUEST FOR SUBMITTALS RFS 21-17 June 27, 2017 TO: RE: Invited Firms Request for Submittals to El Paso Water - Public Service Board (EPWater) Statement of Work Professional
More informationEngineering Standard Minimum Checklist
Collier County Planning and Zoning Engineering Standard Minimum Checklist Engineering Stormwater, Utilities, and Engineering Transportation Engineering Stormwater Standard Minimum Checklist Please be advised:
More informationThis is a digital document from the collections of the Wyoming Water Resources Data System (WRDS) Library.
This is a digital document from the collections of the Wyoming Water Resources Data System (WRDS) Library. For additional information about this document and the document conversion process, please contact
More informationPump Station Improvements. Outreach Meeting. June 27, Menlo Park Pump Station. Redwood City Pump Station. Belmont Pump Station
Pump Station Improvements Regional Environmental Sewer Conveyance Upgrade Outreach Meeting June 27, 2018 Menlo Park Pump Station Belmont Pump Station Redwood City Pump Station Agenda Introduction (Kim)
More informationAddendum Geotechnical Report Dewatering and Settlement Sanitary Sewer Improvements at Bush IAH, Project No. 699 HVJ Project No.
Memorandum Firm Registration No. F-646 Date: To: From: Subject: Broutin Sherrill, P.E. RS&H, Inc. Michael Hasen, P.E. Addendum Geotechnical Report Dewatering and Settlement HVJ Associates, Inc. was requested
More informationCHECKLIST FOR STREETS, INLETS, AND STORM SEWER DESIGN
CHECKLIST FOR STREETS, INLETS, I. STREET CLASSIFICATION AND DESIGN CRITERIA A. Determine drainage classification for the roadway section using Table 7-1 or Table 7-2. B. Determine the allowable flow depth
More informationUSING DESIGN-BUILD TO MITIGATE RISK TO A MAJOR WATER DELIVERY SYSTEM ROCKY MOUNTAIN DBIA PRESENTATION MAY 20, 2016
USING DESIGN-BUILD TO MITIGATE RISK TO A MAJOR WATER DELIVERY SYSTEM ROCKY MOUNTAIN DBIA PRESENTATION MAY 20, 2016 PRESENTATION OVERVIEW Utilities / Water System Overview Project Requirements Team Selection
More informationCHAPTER 8 CAPITAL IMPROVEMENT PLAN
INTRODUCTION CHAPTER 8 CAPITAL IMPROVEMENT PLAN This chapter presents a 10-year Capital Improvement Plan (CIP). Wastewater capital improvements have been scheduled and prioritized on the basis of growth,
More information2.1.4 PROJECT CONSTRUCTION
Alignment 2C Alignment 2C is the preferred alternative. The new 36-inch force mains would follow the existing alignment along the existing utility road within the OCSD easement from the Bitter Point Pump
More informationEXHIBIT A FEE SCHEDULE
EXHIBIT A FEE SCHEDULE PERMIT FEE WORKSHEET INSTRUCTIONS: Each application for a new permit or change in status shall be accompanied by the appropriate fee as indicated below. NO PERMIT APPLICATION WILL
More informationCHALLENGES AND SUCCESSES OF OPEN SHIELD PIPE JACKING CONSTRUCTION IN A CONGESTED NEIGHBORHOOD
North American Society for Trenchless Technology (NASTT) No-Dig Show 2012 Nashville, TN Paper A-2-04 CHALLENGES AND SUCCESSES OF OPEN SHIELD PIPE JACKING CONSTRUCTION IN A CONGESTED NEIGHBORHOOD Christopher
More informationENVIRONMENTAL ASSESSMENT
ENVIRONMENTAL ASSESSMENT Project Identification Project: Cleveland E. 185 th Street & Marcella Road Relief Sewer (Phase 1) Applicant: Robert L Davis, Director of Public Utilities City of Cleveland 12302
More informationAppendix A EXAMPLE COLLECTION SYSTEM PERFORMANCE INDICATOR DATA COLLECTION FORM
Appendix A EXAMPLE COLLECTION SYSTEM PERFORMANCE INDICATOR DATA COLLECTION FORM EXAMPLE COLLECTION SYSTEM PERFORMANCE INDICATOR DATA COLLECTION FORM I. General Information A. Agency Name B. Agency Address
More informationCCU Engineering Specifications. Section PIPE REMOVAL, DISPOSAL, ALTERATION, MODIFICATION OR PIPE ABANDONMENT
CCU Engineering Specifications Section 002310 PIPE REMOVAL, DISPOSAL, ALTERATION, MODIFICATION OR PIPE ABANDONMENT Effective Date: Nov. 1st, 2011 Page 1 of 5 PART 1 - GENERAL The following specification
More informationTask Order Authorization
Task Order Authorization Task Order Number: 6 Task Order Name: 2017 Small Drainage Program Hourly Rate: See attached Exhibit B Budget Not To Exceed: $79,795.00 This Task Order pertains to the On-Call Agreement
More informationDesign Criteria for Greenland WRF Pipelines: Water, Reclaimed Water and Sanitary Sewer Force mains Jacksonville, FL
Design Criteria for Greenland WRF Pipelines: Water, Reclaimed Water and Sanitary Sewer Force mains Jacksonville, FL PREPARED FOR: JEA PREPARED BY: FOUR WATERS ENGINEERING, INC. DATE: FRIDAY, DECEMBER 21,
More informationCured-in-Place Pipe (CIPP) for Pressure Pipe. Presented by: Mike Moore
Cured-in-Place Pipe (CIPP) for Pressure Pipe Presented by: Mike Moore CIPP Proven Technology Introduced over 45 years ago Most used trenchless technology for the rehabilitation of gravity flow pipeline
More informationCAPITAL IMPROVEMENT PLAN ($ Thousands) CITY OF HOUSTON - STORM DRAINAGE SYSTEM. M - Page 25 of 37. Proposed CIP
20142018 CAPITAL IMPROVEMENT PLAN ( Thousands) CITY OF HOUSTON STORM DRAINAGE SYSTEM Project: Gulf Terrace Sec 1, Acre Homes Area M410007 Drainage and Paving Project Description Provides ROW acquisition,
More informationBuilt to Last Rehabilitating 5 Miles of Sewer Force Main in Newport Beach, CA September 30, 2014
87 th Annual WEFTEC Conference Built to Last Rehabilitating 5 Miles of Sewer Force Main in Newport Beach, CA September 30, 2014 Dan Bunce, P.E., PMP and Victoria Pilko, PMP Orange County Sanitation District
More informationPROGRAM OVERVIEW... 3 REAR YARD DRAINAGE COST SHARE PROGRAM... 3 REAR YARD DRAINAGE PROGRAM PROCEDURE... 4 RULES AND RESTRICTIONS...
Village of Franklin Park Cost Share Program The Village of Franklin Park Cost Share Program includes a Rear Yard Drainage Program and an Overhead Sewer Program. Both programs have been created to assist
More informationMartha Lake Gateway Sewer. An Introduction to Trenchless Methods and Evaluation for the Installation of New Pipelines
Trenchless Crossing Evaluation on the Martha Lake Gateway Sewer An Introduction to Trenchless Methods and Evaluation for the Installation of New Pipelines Introduction Purpose Provide engineers and owners
More informationThere are several types of trenchless technology applications for new installations. The following are some of the most prominent applications.
Applications for New Installations There are several types of trenchless technology applications for new installations. The following are some of the most prominent applications. Note that some specifications
More informationSOUTH FLORIDA WATER MANAGEMENT DISTRICT. Question 13: Wetlands
SOUTH FLORIDA WATER MANAGEMENT DISTRICT Question 13: Wetlands 1. The wetland responses and topographical data provided in the ADA for the 520- acre project site are conceptual in nature. The referenced
More informationRFB for Wastewater Force Main #3. October 2, Addendum 3: Clarifications and Questions from Pre-Bid Meeting Answered
RFB for Wastewater Force Main #3 October 2, 2015 Addendum 3: Clarifications and Questions from Pre-Bid Meeting Answered The proposed force main will be required to transmit up to 1000 gallons of wastewater
More informationDRAINAGE STUDY PHASE 2 REPORT HORRY COUNTY STORMWATER DEPARTMENT HIGHWAY 9 & 57 HORRY COUNTY, SC PREPARED FOR: APRIL 07, 2016 J
DRAINAGE STUDY PHASE 2 REPORT FOR: HIGHWAY 9 & 57 HORRY COUNTY, SC PREPARED FOR: HORRY COUNTY STORMWATER DEPARTMENT APRIL 07, 2016 Prepared by: Savannah, GA Charleston, SC Myrtle Beach, SC Brunswick, GA
More informationCHAPTER 11: WALLS.
CHAPTER 11: WALLS MODULAR BLOCK WALL (DRY CAST) Rather than being pre-approved as systems, the components of Modular block walls (dry cast) are pre-approved separately. The approved MBW components are
More informationTECHNICAL SPECIFICATIONS FOR INTERCEPTOR AND SIPHON INSPECTION/CLEANING
A. GENERAL TECHNICAL SPECIFICATIONS FOR INTERCEPTOR AND SIPHON INSPECTION/CLEANING Contractor shall furnish all labor, materials, equipment, traffic control, transportation, and supervision necessary for
More informationSECTION 1 GENERAL NOTES
ISSUE DATE NOVEMBER 1st, 2011 SECTION 1 Page List Page Number Page Title COVER COVER GN-01 PAGE 1 GN-02 PAGE 2 GN-03 PAGE 3 GN-04 PAGE 4 GN-05 PAGE 5 GN-06 PAGE 6 GN-07 PAGE 7 : 1. (CCU) STANDARD SPECIFICATIONS
More informationAppendix E Description of Cost Estimating Assumptions
Appendix E Description of Cost Estimating Assumptions EXCERPT FROM TECH MEMO 2 AUGUST 29th, 2016 COST ESTIMATING ASSUMPTIONS [WITH CHANGES AND ADDITIONS SUBSEQUENT TO TECH MEMO 2] For purposes of capital
More informationPlessis Road Twinning and Grade Separation at CN Redditt Subdivision: Design Challenges and Innovative Solutions
Plessis Road Twinning and Grade Separation at CN Redditt Subdivision: Design Challenges and Innovative Solutions Tanya D. Worms, P.Eng. M.Sc., Project Manager, M.D. Steele Construction Ltd. Paper prepared
More informationCS-13 TRENCHLESS TECHNOLOGY TABLE OF CONTENTS
TABLE OF CONTENTS CS-13.0 Trenchless Technology... 1 CS-13.1 Location of Existing Services... 1 CS-13.2 Alignment... 1 CS-13.3 Directional Drilling... 1 CS-13.4 Pipe Thrusting... 2 CS-13.5 Guided Boring/Auger
More informationPipe Jacking/Microtunnelling. Dr. Mark Knight. Centre for Advancement of Trenchless Technologies (CATT) University of Waterloo.
Pipe Jacking/Microtunnelling Dr. Mark Knight Centre for Advancement of Trenchless Technologies (CATT) University of Waterloo 1 New Installations New Installations Non-Steering Methods Steering Methods
More informationClay County Utility Authority Utilization of Trenchless Water & Wastewater Pipeline Installation
North American Society for Trenchless Technology (NASTT) NASTT s 2014 No-Dig Show Orlando, Florida April 13-17, 2014 TA-T2-04 Clay County Utility Authority Utilization of Trenchless Water & Wastewater
More informationSTAFF REPORT. To: Planning Commission Meeting date: December 14, 2016 Item: UN Prepared by: Robert Eastman. To allow a vehicle impound yard
# 6 ) UN-79-16 ABC TOWING, TITAN TOWING, AND TOW GUY TOWING SPECIAL USE PERMIT PUBLIC HEARING STAFF REPORT To: Planning Commission Meeting date: December 14, 2016 Item: UN-79-16 Prepared by: Robert Eastman
More informationTunnel Works. How we got here - Fort Wayne s Consent Decree. Tunnel Works Program Frequently Asked Questions
City Utilities operates the largest municipally-owned wastewater collection and treatment system in Indiana. The system serves 161 square miles and includes 1,014 miles of sanitary sewer lines, 365 miles
More informationSewer Modeling of Near- Term Development Technical Memorandum
Sewer Modeling of Near- Term Development City of Reedley, CA March 8, 2018 Page Intentionally Blank The City of Reedley (City) is anticipating near-term developments to the north of the City s currently
More informationAppendix A - Technical Specifications Engineering Services for the Ponte Vedra Blvd 6 CI WM Replacement Project
Appendix A - Technical Specifications Description of Scope of Services GENERAL Consultant agrees to provide Engineering Services for the above project as outlined herein. SCOPE OF SERVICES The Scope of
More informationCHAPTER 17: STORM SEWER STANDARDS Introduction Administration Standards 17.1
CHAPTER 17: STORM SEWER STANDARDS 17.00 Introduction 17.01 Administration 17.02 Standards 17.1 17.00 INTRODUCTION The purpose of this chapter is to provide guidance for the design and construction of storm
More informationPipe Jacking Association: Introduction Presentation. Lecture notes. Slide 1. Slide 2
Slide 1 PIPE JACKING An introduction to pipe jacking prepared by the Pipe Jacking Association This introduction to pipe jacking has been prepared by the Pipe Jacking Association as an aid to engineers
More informationPUMPING STATION CONSOLIDATION AND TRENCHLESS INSTALLATION CASE STUDY
PUMPING STATION CONSOLIDATION AND TRENCHLESS INSTALLATION CASE STUDY New River Street Pump Station - Bridgeport CT May 1, 2017 NEWEA Sustainability and Collection Systems Conference Tim McDonald, PE NEW
More informationPROJECT SCOPE OF WORK CITY OF TOWN AND COUNTRY STORMWATER PROGRAM
PROJECT SCOPE OF WORK CITY OF TOWN AND COUNTRY STORMWATER PROGRAM Project ID Number: 2- Problem: Storm runoff from the park flows overland through a gap in a berm and then into the neighboring subdivision
More informationThe Beckett s Run Experience. Fort Wayne, Indiana
The Beckett s Run Experience Fort Wayne, Indiana Introductions Charlie Cochran City of Fort Wayne, Wet Weather Storm & Sewer Engineering Jason Durr, PE Christopher B. Burke Engineering, LLC 2 A Little
More informationGLENWOOD ROAD BRIDGE REPLACEMENT
Wood County, Ohio, Construction Administration and Observation Project Cost $.92 million Professional Services 2014 Construction: 2015 GLENWOOD ROAD BRIDGE REPLACEMENT PDG was hired by the Wood County
More informationInterlake Tunnel Project
Interlake Tunnel Project February 26,2015 Updated 3/19/15 Presentation at the Heritage Ranch Rec Barn 1 Agenda Introductions Project description and background Feasibility and hydraulic modeling San Antonio
More informationTwo-Phase Project Adds Capacity, Reliability, and Redundancy to 80-year-old Pump Station in Saint Paul
Two-Phase Project Adds Capacity, Reliability, and Redundancy to 80-year-old Pump Station in Saint Paul Project Overview Minnesota s state capital, Saint Paul, is built around the Mississippi and Minnesota
More informationSilicon Valley Clean Water Tunnels Sewer Tunnel Innovation in Silicon Valley
Silicon Valley Clean Water Tunnels Sewer Tunnel Innovation in Silicon Valley Bruce Burnworth, Project Manager Breakthroughs in Tunneling Short Course Chicago August 2017 Regional Environmental Sewer Conveyance
More informationF. Provide at least 2 feet of vertical separation between a water line and any utility or stormdrain crossing it.
Section 3 F. Provide at least 2 feet of vertical separation between a water line and any utility or stormdrain crossing it. 3.8 Highway Crossings The design engineer shall, prior to the design of any highway
More informationEASTERN MUNICIPAL WATER DISTRICT August 1, 2014
EASTERN MUNICIPAL WATER DISTRICT August 1, 2014 ADDENDUM NO. 2 TO SPECIFICATION NO. 1235S Wine Country Infrastructure Project Loma Ventoso Lift Station This addendum to the specifications is for the purpose
More informationThe City of Sergeant Bluff, IA Chooses Pilot Tube Microtunneling over Open Trench Construction
North American Society for Trenchless Technology (NASTT) NASTT s 2013 No-Dig Show Sacramento, California March 3-7, 2013 Paper MM-T4-02 The City of Sergeant Bluff, IA Chooses Pilot Tube Microtunneling
More information