1 Additional Guidelines for Structural Requirements (i) (ii) (iii) (iv) (v) (vi) (vii) (viii) The Tenant s contractor shall ensure that no structural integrity and components are affected. If any structural components are affected, the contractor shall stop work and inform the Landlord. The Tenant s contractor has to make good and rectify any damages at its own cost. No hacking is allowed on the building structure for the laying of building services. However, a maximum hacking depth of 25mm is allowed through the finishes provided that the structure beneath the finishes is not damaged. No hacking/drilling is permitted on pre-stressed structure, joints and waterproofed membranes. The Tenant s contractor's Structural/Civil PE is to certify that the works will not affect the structural integrity when it is required to hack or drill through the floor or ceiling slabs for installation of partitions/false ceilings, etc. All imposed loads on the floors of the Passenger Terminal Building shall not exceed the maximum safe weight load of 5 KN/m2. The Tenant shall inform the Landlord once work has been completed. IMPORTANT: If the premise given to the Tenant is an open empty space, Tenant must adopt an open concept design for this outlet to allow maximum flow-through and visibility without any closures (unless approved exemption from CAG is received). In addition, the Tenant shall ensure that the boundary of the Premises shall not be built-up, with for example, back walls/partitions/glass, to preserve the transparency as well as the visibility of the surrounding retail concessions.
2 GENERAL GUIDELINES FOR STRUCTURAL INSTALLATION ITEM GUIDELINES / REQUIREMENTS 1. Knocking down of Load bearing walls and partitions cannot be removed unless the loads carried walls / partitions of adjoining floor areas are fully transferred to other parts of the structure without effecting the structural integrity, stability and strength. Such proposal shall be designed by Structural / Civil P.E* & subject to the relevant authorities approval. Any demolition works shall be done in accordance to SS557:2010 Code of Practice for Demolition. 2. Additional Load / Installation Details of ** Permanent additional loads ( e.g racking systems, safes, weighing machines, additional ducts, services, projectors, etc) proposed to be placed onto the floor area or structural members must be submitted to CAG(S) for approval. Prior to submission, the Successful Tenderer is to ensure that the proposed loads / installation for that floor or structural member does not exceed its design live load+ and this should be verified by the Successful Tenderer s Structural / Civil P.E s. * Sub-note: Steel plate spreaders are to be provided to evenly distribute the load onto the structure where high concentration of point-loads is anticipated. The spreader is to be designed by the Successful Tenderer s Structural / Civil P.E *, steel plate spreader designs must not impose too much of its self-weight onto the existing structure. 2.1 Change of use Any change of use for the area must be made known to CAG(S). 3. Hacking of floor / coring / Walls/ columns or ceiling No hacking or coring is allowed on the structural members for the laying of building services. However, a maximum trimming depth of 25mm is allowed through finishes provided the structure beneath the finishes is not damaged. Groove lines should be cut to prevent over spalling of adjacent concrete along the line of trimming. Any trimmed areas are to be patched back using nonshrink grout. Beams and webs of hollow core slabs shall be avoided during coring. Coring on Pre- Stressed beams should be carried out only upon further inspection and certification by a PE. Fibre wrap materials used for slab/beam/column strengthening & waterproofing membrane used for RC flat roof /planter box area shall not be disturbed/affected. Sub Note: For any openings at fire rated wall due to their services penetrations, contractors are to seal off with Approved fire materials and endorsed by the fire PE 4. Erection of partitions / false ceilings The following should be submitted for approval : a) Specifications of proposed partitions / false ceiling b) Drawings to show the proposed locations of partitions/false ceiling c) Details of the methods of installation of partitions / false ceiling d) PE calculations to design to Code of Practice for Dead and Imposed Loads BS6399: Part 1 for lateral/impact loads onto partitions The Successful Tenderer s Structural / Civil P.E is to certify that the work will not affect the structural integrity when it is required to carry out hacking / drilling on structure members. (Supervising PE must made known of areas of Post Tension Beams, Prestressed Planks/Tee-beams and Precast Prestressed Precast Beams (PSPC) under its care)
3 * Structural / Civil P.E to certify statements / calculations / necessary documents to state that renovations work / other works do not affect the structural integrity. * Carry out pre-con dilapidation survey (Pre-con survey) if renovation works involving hacking/demolition of structure. * Provide instrumentation plan for our approval (demolition/hacking): - Noise Meter - Settlement Markers (Building/Ground) - Vibration Meter * Impact assessment report to be submitted for our record (For hacking/demolition works only) ** Permanent additional loads refer to under hanging as well as top resting loads. + Refer to Annex A for Loading Criteria
4 Annex A: Loading Criteria for all PTB S/N Facilities Designed Live Load ( KN/M²) 1 Typical Floors (Floor uses that are not specified on 5 KN/M² plan), Supermarket, Refuse Centre and Service Mezzanine 2 Equipment, plant and motor rooms and workshop, To design to *** actual weights of AHS/AHU Rooms, Stored Rooms, Arrival & equipment but not less than 7.5 KN/M² Departure Halls. 3. Injector Plant Rooms and HT/LT Rooms To design to *** actual weights of equipment but not less than 15 KN/M² 4. Stores, Auditorium and Multi purpose Hall (Similar Min 7.5 KN/M² to Arrival & Departure Halls) 5. Telecoms Plant Rooms, Computers Floor Min10 KN/M² 6. Baggage Handling Area (BHA), M&E Fan Rooms, Electrical Load Centre, Baggage Ramp, /Inbound & Outbound Areas, Equipment Parking Areas and TGFS Rooms. 7. Chiller plant rooms, Transformer Room and Generator Room 8. Bus Station, Basement Ramp, Basement Roadways, Service/Loading Bays, Vehicular Ramps/underpass, Electrical sub-station, Bus Gates 9. Landscape Courtyard, Planter area /Landscape area (Excluded Soil) 10. Engineering Parking Areas and SATS Elect Tow Tug Recharging Area, Elevated Driveway/Ramps Min10 KN/M² on 1 st storey floor for baggage belts, equipment, actual location of BHA etc. To design to *** actual weights of equipment but not less than 30 KN/M² for equipment transportation path. 20 KN/M² for actual location 12.5 KN/M² 3 KN/M² 50 tonnes vehicle with four wheels spaced at 2.74m * 3.6m (HA loading, 45 units of HB loading and footway crowd loading in accordance with BCA Forth Scheme-Loading) 30 KN/ M² 11. Diesel Tank Room, Domestic Water Tank, Sprinkler Tank Rooms, Water tank at 4m 12. Cooling Towers To design to *** actual weights of plants with special consideration for vibration and deflection 13. Concrete roof 1.5 KN/M² 14. Steel roof 0.5 KN/M² 15. Main Roof 0.75 KN/M² If actual weights of materials are not available, weights of materials can to be made with reference to BS 648.
5 Common Renovation Queries Civil Loading Queries of Terminal Buildings Knocking down/removal of partition Any installation which requires Hacking/Coring/Dr illing of walls, floors Drawings doesn t correspond to the site Hanging Loads to Ceiling PE Calculations & Endorsement Submit to Civil for Assessment Any Installation which imposes load to the building Floor Loading of Terminal Buildings General Floor Loading Plan/Floor loading Criteria Load-Bearing Wall Arrange for a Site Inspection PE to study the wall on-site and endorse PE to carry out precon survey & provide instrumentation plan and impact assessment report Non load bearing/nonstructural wall Can be removed Should not reach the rebar s (only 25mm through finishes allowed) Structural Members cannot be altered. Existing fibrewrap & waterproofing membrane shall not be affected. Division to gather info for any A&A works in that area Tenants should provide the drawings for A&A works
SPECIFICATION FOR PRECAST/ COMPOSITE CONCRETE FLOORS/ ROOF DECKS SECTION E60
SPECIFICATION FOR SECTION E60 A 2007-09-26 S.W. Revision Date Issue Authorised By Approved for Issue SW Date 24.09.07 clarkebond Page 1 of 6 To be read with Preliminaries/ General Conditions. GENERAL 10
More informationThe designer shall also submit additional information required by the University as described and underlined below.
I. Structural Engineering Submissions The designer shall submit all information required by the State Construction Office (SCO) as described in the State Construction Manual Chapter 300 - Project Design
More informationFUNCTIONAL REQUIREMENTS
FUNCTIONAL REQUIREMENTS FUNCTIONAL REQUIREMENTS 7.6 BALCONIES Workmanship i. All workmanship must be within the tolerances defined in Chapter 1 of this manual. ii. All work is to be carried out by a technically
More informationAPPLICATION FOR RENOVATION WORKS (to be completed by Owners)
I APPLICATION FOR RENOVATION WORKS (to be completed by Owners) PARTICULARS OF OWNER Name of Owner Unit No. Contact No. Home: H/P: Office: Fax: II PARTICULARS OF CONTRACTOR (if more than one contractor
More informationSPECIAL INSPECTION AND OBSERVATION PROGRAM City of Walnut Creek Building Division. Project Address:
SPECIAL INSPECTION AND OBSERVATION PROGRAM City of Walnut Creek Building Division Permit Application #: Project Address: Purpose: To meet the requirements of City of Walnut Creek Municipal Code Section
More informationLevel 1 Level 2 Level 3 Level 4 Level 5 Level 6 1 1.1 Construction Schedule of TCS-IT SEZ Park Issue of LOI 1.2 Pre-Construction Stage 1.2.1 Approvals 1.2.1.1 Approval from SWID/HIDCO for borewell 1.2.1.2
More informationTECHNICAL REPORT II STRUCTURAL STUDY OF ALTERNATE FLOOR SYSTEMS
TECHNICAL REPORT II STRUCTURAL STUDY OF ALTERNATE FLOOR SYSTEMS Chris Vanaskie Structural Peninsula Regional Medical Center Salisbury, MD December 22, 2008 TABLE OF CONTENTS Executive Summary... 3 Introduction...
More informationDivision 03 - Concrete Section New Westminister Multi-Use Civic Facility & Office Building Project No Page 1
Project No. 210022 Page 1 PART 1 GENERAL 1.7 Documents.1 The General Conditions of the Canadian Standard Construction Document CCDC-2, together with all amendments and supplements and Division 1 General
More informationK.L. Fashion Ltd. (10982) 75/1, Master Bari, Tongi, Gazipur ( N, E) 01.July.2014
K.L. Fashion Ltd. (10982) 75/1, Master Bari, Tongi, Gazipur (+23.903394N, +90.369739E) 01.July.2014 Identified Priority 1 Concerns None Identified Priority 2 Concerns The building does not contain any
More informationStatement of Special Inspections Michigan Building Code 2012 (MBC 2012)
Gaines Charter Township 8555 Kalamazoo Ave SE Caledonia MI 49316 PH: 616 698-6640 Fax: 616 698-2490 www.gainestownship.org Building Department Statement of Special Inspections Michigan Building Code 2012
More informationNew Era Fashions Mfrs (BD) Ltd
New Era Fashions Mfrs (BD) Ltd Ltd Plot 10,11 & 12 Sector 8, Road 3, CEPZ, Chittagong (22.279298N, 91.776438E) 21 st June 2014 1 2 Observations Safety Hazard Water ingress through unsealed expansion joint
More informationThe HKIE Structural Examination Written Examination. Section 2: Design Questions (80% of the Written Examination)
The HKIE Structural Examination Written Examination Section 2: Design Questions (80% of the Written Examination) Date: 17 November 2011 (Thursday) Time: 12:00 nn - 06:00 pm Answer ONE question only Page
More informationResponsibility Check List Sheet Item Description Responsibility Additional
Responsibility Check List Sheet Item Description Responsibility Additional A B C Sketch Brief Layout for the position of the mezzanine. Advise whether requirement to remove intermediate columns to provide
More informationTOWN OF GREENVILLE APPLICATION FOR PERMIT
TOWN OF GREENVILLE APPLICATION FOR PERMIT Date Received: Date Issued: Permit: Location (Street Name & Number) Tax Map Number: Section Block Lot Zone Nature of Work New Construction Addition Demolition
More informationSection 6 - Bill of Quantities Bill Nr. 1 Preliminaries
Bill Nr. 1 Preliminaries Bill Nr. 1 PRELIMINARIES NOTES : (1) The work shall be done during day time and night time according to CAM/ADA requirements. (2) If CAM decides to cancel any s listed in the Bills
More informationVienna International Airport Renovation of Checkin
Vienna International Airport Renovation of Checkin 1 & Check-in 2 The comprehensive renovation of the suspended roof constructions, the check-in counters and ticket sales areas as well as the renovation
More informationHollowcore Floors. The ideal structural floor solution for all building types in all sectors.
Hollowcore Floors Hollowcore Floors The ideal structural floor solution for all building types in all sectors. 2 3 System Overview Prestressed hollowcore units form part of the comprehensive range of precast
More informationAIR BARRIER DESIGN PRINCIPLES AN OVERVIEW.
AIR BARRIER DESIGN PRINCIPLES AN OVERVIEW www.stromatech.com AIR BARRIER DESIGN PRINCIPLES Building Regulations Approved Document Parts L1A & L2A currently requires that new buildings have to achieve a
More informationSheet 1 of 9 10 Rev A
JJI-JOIST TECHNICAL BULLETIN SUBJECT: Alternative JJI-Joist Span Tables Bulletin Number: Date Issued: Sheet 1 of 9 10 Rev A 06.10.2004 Introduction The aim of this Technical Bulletin is to provide the
More informationINSPECTION TIMING CHECKLIST FOR RESIDENTIAL FRAME BUILDING PRIOR TO INSPECTION REQUEST
Village of Vernon Hills Community Development Department - Building Division 290 Evergreen Drive, Vernon Hills, IL 60061 Phone 847-367-3704 - Fax 847-367-2541 - http://www.vernonhills.org INSPECTION TIMING
More informationConstruction of the Manulife Tower Redevelopment of the previous Lee Gardens Hotel in Causeway Bay
Construction of the Manulife Tower Redevelopment of the previous Lee Gardens Hotel in Causeway Bay External view of Manulife Tower from various location Block plan showing the building layout of the new
More information(Old examination format for reference only)
The Institution of Structural Engineers Associate-Membership Examination 11 APRIL 2003 INSTRUCTIONS TO CANDIDATE 1. The examination comprises two sessions separated by a lunch break of 1 2 hour, during
More informationPossible solution to past CM exam question. Question 2 July New city centre office block. by Rajavel Inbarajan
Possible solution to past CM exam question Question 2 July 2015 New city centre office block by Rajavel Inbarajan The information provided should be seen as an interpretation of the brief and a possible
More informationEnsuring Building Safety In An Urbanised Environment Singapore s Perspective. Ong See Ho Deputy CEO & Commissioner of Building Control
Ensuring Building Safety In An Urbanised Environment Singapore s Perspective Ong See Ho Deputy CEO & Commissioner of Building Control Outline BUILDING CONTROL ECO-SYSTEM WHAT DRIVES OUR STRUCTURAL SAFETY
More informationAppendix J - Custom Uniformat for EDU Migration
Appendix J - Custom Uniformat for EDU Migration Nr. MTC Uniformat for VFA.facility Life (Years) Weight (1-100) Out of Scope Cost Y/N 1 A Substructure 150 N 2 A10 Foundations 150 N 3 A1010 Standard Foundations
More informationCommercial Remodel Permit
Commercial Remodel Permit Zoning requirements Staff recommends always verifying the zoning requirements for your project before deciding to build. Warrensburg has eleven separate zoning districts, each
More informationConstruction Measurement III SBQ3314. Precast Pre stressed Concrete Works. Dr. Sarajul Fikri Mohamed
Construction Measurement III SBQ3314 Precast Pre stressed Concrete Works Dr. Sarajul Fikri Mohamed Table of Contents 1. Pre stressed concrete in bridgeworks: technological aspects 2. SMM2 measurement rules
More informationSUMMARY SPECIFICATION
Seventy St. Mary Axe has been designed with the most exacting of occupiers in mind. The result is a world-class building with a robust specification and the highest quality finishes. Occupancy ratio of
More informationStar Garments (Pvt Ltd.)
Star Garments (Pvt Ltd.) Sha-23, Middle Badda, Dhaka. (23.780094N, 90.426299E) 02 July 2014 1 2 Observations 3 Inconsistencies between the drawings and the as constructed building Irregularities on drawings
More informationGAUTENG DEPARTMENT OF INFRUSTRUCTURE DEVELOPMENT
GAUTENG DEPARTMENT OF INFRUSTRUCTURE DEVELOPMENT BUILDING ASSESSMENT REPORT STRUCTURAL FOR CORNER HOUSE AUG 2014 i P a g e Table of Contents 1. INTRODUCTION... 3 1.1 Design Criteria and Specifications...
More informationVolume 1. Barts Square, London EC1 Retail 9 Information Pack. Retail 9. March 2017
Volume 1 Retail 9 Barts Square, London EC1 Retail 9 Information Pack March 2017 2 BARTS SQUARE, LONDON EC1 - RETAIL 9 INFORMATION PACK Contents 1. DESIGN CRITERIA 4 1.1 THE DEVELOPMENT 4 1.2 STRUCTURE
More informationThesis Proposal. Matthew R Peyton
This Document is for 5th year senior thesis in the Architectural Engineering Departments at The Pennsylvania State University. S t r u c t u r a l O p t i o n P r o f e s s o r B e h r H o s p i t a l
More informationARCHITECTUS FEBRUARY 2010
ARCHITECTUS PEDESTRIAN AND TRAFFIC MANAGEMENT PLAN FOR DEMOLITION, EXCAVATION AND CONSTRUCTION OF COLLEGE OF FINE ARTS CAMPUS, PADDINGTON FEBRUARY 2010 COLSTON BUDD HUNT & KAFES PTY LTD ACN 002 334 296
More informationGUIDE SPECIFICATIONS For STRUCTURAL PRECAST HOLLOW CORE SLABS SECTION 03410
GUIDE SPECIFICATIONS For STRUCTURAL PRECAST HOLLOW CORE SLABS SECTION 03410 Note to user: These guide specifications are provided by Mid- States Concrete Products as a service to you; they are NOT specific
More informationShin Shin Apparels Ltd. (9615) Dag RS. 228, JL 73, Gorat, East Norshinghapur, Zirabo, Savar ( N, E) 27.MAY.2014
Shin Shin Apparels Ltd. (9615) Dag RS. 228, JL 73, Gorat, East Norshinghapur, Zirabo, Savar (+23.94071N, 90.30929E) 27.MAY.2014 Identified Priority 1 Concerns 1 st Priority 1 Concern Based on the Detail
More informationBonner Bridge Replacement Update:
Bonner Bridge Replacement Update: Jerry D. Jennings, PE - NCDOT Division 1 Engineer Pablo A. Hernandez, - NCDOT Resident Engineer September 18, 2017 Bonner Bridge Replacement Timeline Refresher Bonner
More informationUNDP Operations Service Center, Erbil Iraq
UNDP Operations Service Center, Erbil Iraq Reference: ITB 037/17 - The Renovation of Ramadi Maternity and Children's Hospital, Anbar Governorate, Iraq Clarification to Bidders Responses 1 Requested for
More informationSPECIAL INSPECTION AGREEMENT
PART 1 STATEMENT OF SPECIAL INSPECTIONS When special inspection is required to be performed in accordance with International Building Code Chapter 17, a building permit cannot be issued until a statement
More informationTHE TREASURE TOWER PROGRESS REPORT
THE TREASURE TOWER PROGRESS REPORT About the Project: Project Developer Title of Project Project Reference Design & Supervision Consultant Interior Design Consultant Main Contractor Bin Faqeeh Real Estate
More informationAnnex to the Accreditation Certificate D-ZE according to DIN EN ISO/IEC 17065:2013
Deutsche Akkreditierungsstelle GmbH Annex to the Accreditation Certificate D-ZE-11267-01-00 according to DIN EN ISO/IEC 17065:2013 Period of validity: 17.08.2018 to 01.10.2022 Holder of certificate: Materialprüfanstalt
More informationComparative Study on Post - Tensioned and Reinforced Concrete flat Slab Systems for a Multistory Building
Comparative Study on Post - Tensioned and Reinforced Concrete flat Slab Systems for a Multistory Building Thayapraba M Civil Department, NIT Trichy, (India) ABSTRACT Designers have a huge number of choices
More informationStructural Tests and Special Inspections Form. Inspection of Fabricators (1704.2)
Inspection of Fabricators (1704.2) Furnish inspection reports (1704.2.1) - Fabricators that have not been approved Provide a Certificate of Compliance (1704.2.2) - Approved Fabricators Steel Construction
More informationThe HKIE Structural Examination Written Examination
The HKIE Structural Examination Written Examination Section 2: Design Questions (80% of the Written Examination) Date: 28 November 2014 (Friday) Time: 12:00 nn - 06:00 pm Answer ONE question only Question
More informationCode Compliance and Product Selection
Code Compliance and Product Selection PT Blink Ltd are the owners of the intellectual property, patents, designs, concepts and know-how depicted in these drawings, images, plans and specifications. This
More informationSTEEL INSIGHT #10 KEY FRAME COST DRIVERS
STEEL INSIGHT #10 KEY FRAME COST DRIVERS steel insight MAy 2014 steel insight Key frame cost drivers The latest article in the series focuses on the key cost drivers that have to be identified at the elemental
More informationHollowcore Slabs. Hollowcore slabs are used mainly for flooring and roofing, but can also be used for wall purposes.
Hollowcore Slabs Hollowcore Slabs One of the most advanced precast products. Millions of square meters of hollowcore slabs are used every year in the building constructions all over the world (villas,
More informationREQUEST FOR PROPOSALS March 4, 2010 PROJECT OVERVIEW:
Police Headquarters Project REQUEST FOR PROPOSALS March 4, 2010 PROJECT OVERVIEW: General description The objective is to renovate an approximately 18 x 24 section of the two-bay attached garage at Town
More information11. Construction processes and materials Power House Maintenance Building Fuel Treatment Building...
Contents 11. Construction processes and materials... 11-2 11.1 Power House... 11-2 11.2 Maintenance Building... 11-2 11.3 Fuel Treatment Building... 11-3 11.4 Roads & Paths... 11-3 11.5 Fencing... 11-3
More informationRENOVATION OF THE VIA BUILDING FOR THE GUELPH TRANSIT TERMINAL FROM THE PRE- QUALIFIED GENERAL CONTRACTORS Reference Number:
RENOVATION OF THE VIA BUILDING FOR THE GUELPH TRANSIT TERMINAL FROM THE PRE- QUALIFIED GENERAL CONTRACTORS Reference Number: 13-146 A D D E N D U M NO. 1 The following shall form part of the tender documents
More informationModular Wood Framing Goes Vertical
Modular Wood Framing Goes Vertical By: Troy Bean, P.E., S.E. DCI Engineers January 2013 The Wood Products Council is a Registered Provider with. Credit(s) earned on completion of this program will be reported
More informationSAFE WORK METHOD STATEMENT
SWMS 002 Erect / Dismantle Single Bay Towers and/or Multiple Bay Towers Page of 9 ABN: 40 088 478 399 This SWMS has been prepared and authorised by OLDFIELDS ACCESS PTY LTD ACN: 088 478 399 Date: Issue
More informationExamination paper, both A3 plain and A3 tracing, are provided. Use as appropriate.
Candidate Number : Room Number : Seat Number : HKIA / ARB Professional Assessment 2008 Paper 7a CONSTRUCTION DETAILS & DOCUMENTATION (20 marks out of 100 marks of Paper 7) 18 December 2008 4:00 pm 6:00
More informationGMS Composite Ltd. Shardagonj, Kashimpur,Gazipur,Bangladesh ( , ) 22 March 2014
GMS Composite Ltd. Shardagonj, Kashimpur,Gazipur,Bangladesh (23.968661, 90.296963) 22 March 2014 1 2 Observations 3 Highly stressed columns Cursory calculations indicate that the working stresses of columns
More informationTable of Contents.2. Introduction...3 Gravity Loading and Deflections..4. Existing Structural System..8
WISCONSIN PLACE RESIDENTIAL TECHNICAL ASSIGNMENT 2 OCTOBER 29, 2007 KURT KRASAVAGE THE PENNSYLVANIA STATE UNIVERSITY STRUCTURAL OPTION FACULTY ADVISOR: DR. ALI MEMARI 1 Table of Contents Table of Contents.2
More informationPAGE 415. Part 9. External works. 9.1 Garages. 9.2 Drives, paths and landscaping
PAGE 415 Part 9 External works 9.2 Drives, paths and landscaping Part 9 External works Chapter CONTENTS SCOPE Clause DESIGN Design standards D1 1 Statutory requirements D2 1 Garage foundations D3 1 Garage
More informationCork Institute of Technology. Summer 2006 Structural Design & Detailing I (Time: 4 Hours)
Cork Institute of Technology Bachelor of Engineering (Honours) in Structural Engineering Stage 2 (NFQ Level 8) Summer 2006 Structural Design & Detailing I (Time: 4 Hours) Instructions: 1. The examination
More informationVolume 1. Barts Square, London EC1 Retail 8 Information Pack. Retail Unit 8. March 2017
Volume 1 Retail Unit 8 Barts Square, London EC1 Retail 8 Information Pack March 2017 2 BARTS SQUARE, LONDON EC1 - RETAIL 8 INFORMATION PACK Contents 1. DESIGN CRITERIA 4 1.1 THE DEVELOPMENT 4 1.2 STRUCTURE
More informationSPECIAL INSPECTION AND OBSERVATION PROGRAM CITY OF CONCORD BUILDING DIVISION. Project Address:
SPECIAL INSPECTION AND OBSERVATION PROGRAM CITY OF CONCORD BUILDING DIVISION Permit Application #: Project Address: Purpose: To meet the requirements of CBC Section 1704.3 this form may be used as a statement
More informationBOOTH DESIGN REGULATIONS & HALL DESCRIPTIONS
VERY IMPORTANT By signing the registration form, the Exhibitor agrees to abide by all the clauses mentioned in the general regulations and to ensure that any decorators, installers or contractors also
More informationABA Fashions Ltd. Plot #9, Block F, Tongi, Gazipur-1710 ( N, E) 08 MARCH 2014
ABA Fashions Ltd. Plot #9, Block F, Tongi, Gazipur-1710 (23.885176N, 90.399821E) 08 MARCH 2014 1 2 Observations 3 Highly stressed columns Cursory calculations indicate column at a high working stress.
More informationInstalling DELTABEAM. Installation of DELTABEAM. Deliveries. Storage on-site
Installing DELTABEAM Installation of DELTABEAM These DELTABEAM installation instructions are intended to complement the project s erection plan. Peikko s technical support can help with the erection plan
More informationCassiopea Fashions Ltd. Cassiopea Apparels Ltd.
1 Cassiopea Fashions Ltd. Cassiopea Apparels Ltd. Bokran, Monipur, Vabanipur, Gazipur. (24.127427, 90.399544) 15 April 2014 2 Observations Made 3 No apparent stability system Steel Building 6 th floor
More informationBUILDING INTEGRITY SUMMARY REPORT
BUILDING INTEGRITY SUMMARY REPORT SUPPLIER NAME SUPPLIER ADDRESS AUDIT DATE January 2014 AUDIT PERFORMED BY Cosmopolitan Industries Pvt Ltd Khejur Bagan, Bara Ashulia, Savar, Dhaka, Bangladesh Department
More informationBuilding Standards Department. Guide to Building Permits Understanding the Different Building Permit Types and their Submission Requirements
Guide to Building Permits Understanding the Different Building Permit Types and their Submission Requirements Building Standards March 2018 CONTENTS BUILDING PERMIT APPLICATIONS... 2 GENERAL INFORMATION...
More informationA-BEAM S Erection Manual 2
2 A-BEAM S Revision 6/2017 Finland 3 TABLE OF CONTENTS 1 ERECTION INSTRUCTIONS... 4 1.1 A-BEAM S... 4 1.2 Codes and standards to be followed during erection work... 4 1.3 Structural plans to be followed
More informationTEST REPORT. Lucideon Reference: (QT44718/2/RK)/Ref. 8
TEST REPORT Lucideon Reference: 173446 (QT44718/2/RK)/Ref. 8 101 Project Title: Client: For the Attention of: Author(s): Balustrade Testing of FH Brundle's Elegance Romeo Balcony Rail in Accordance with
More informationSimplified Building Schematic for Typical Floor (Levels 9 through 22):
Introduction to Structural System Simplified Building Schematic for Typical Floor (Levels 9 through 22): Key: - Tower Columns - Tower Shear Walls - Parking Garage Columns - Parking Garage Shear Walls Solid
More informationFloor Insulation Underlayment Section Sound Control Matting
Floor Insulation Underlayment Section 09618 Sound Control Matting Part I General 1.1 Summary A. Section includes a sound control material for achieving an STC and IIC rating in excess of 50 to meet building
More informationAIRWAYS CROSSING PHASE II BUILDING INFORMATION 5305 McCall Way N.E. T2E 7N7
AIRWAYS CROSSING PHASE II BUILDING INFORMATION 5305 McCall Way N.E. T2E 7N7 www.airwayscrossing.ca Excellent access to Barlow Trail/McKnight Blvd. Bays starting at 4,000 sq. ft. Surface loading T5 lighting
More information151 First Side. Technical Assignment 2 November 16 th, William J. Buchko. AE 481w Senior Thesis The Pennsylvania State University
November 16 th, 2007 William J. Buchko AE 481w Senior Thesis The Pennsylvania State University Thesis Advisor: Kevin Parfitt Table of Contents Executive Summary... 3 Structural System Overview Foundation...
More informationSTATE UNIVERSITY CONSTRUCTION FUND
STATE UNIVERSITY CONSTRUCTION FUND The following checklist show the general items required by the Agreement and the Program Directives. Unless included in the lump sum fee or the Schedule B of the Consultant
More informationSECTION PRE-ENGINEERED EXTRUDED ALUMINUM DECKING WALKWAY COVERS SPECIFICATION
Awning Works Inc Aluminum Decking Walkway Cover Specification CSI- Division 10 SECTION 10530 PRE-ENGINEERED EXTRUDED ALUMINUM DECKING WALKWAY COVERS SPECIFICATION PART 1 GENERAL 1.01 DESCRIPTION OF WORK
More informationSchendt Engineering Corporation 2912 Beacon Street (719)
Schendt Engineering Corporation 2912 Beacon Street (719) 637-8850 Colorado Springs, CO 80907-9207 www.secengr.com ADDENDUM NUMBER 1 DATE: 5 July 2017 OWNER: PROJECT: University of Colorado Colorado Springs
More informationTEST REPORT. Lucideon Reference: (QT44718/2/RK)/Ref. 6
TEST REPORT Lucideon Reference: 173446 (QT44718/2/RK)/Ref. 6 101 Project Title: Client: For the Attention of: Author(s): Balustrade Testing of FH Brundle's Infinity Juliet Balcony in Accordance with BS
More informationC. Type of Selective Demolition Work: Demolition requires the selective removal and subsequent off-site disposal of:
02070 - SELECTIVE DEMOLITION PART 1 - GENERAL 1.1 STIPULATIONS A. The specifications sections " General Conditions of the Construction Contract ", "Special Conditions", and "Division 1 - General Requirements"
More informationAmendments to the Approved Documents
The Building Regulations 2010 Amendments to the Approved Documents This document contains amendments to the following Approved Documents: A, B vol 1, B vol 2, C, D, E, F, G, H, J, L1A, L1B, L2A, L2B and
More informationconcrete Precast car park The Avenue MSCP, Bracknell Sustainability by the sea Colwyn Bay seafront Clean water Treating hydro-demolition waste
concrete THE MAGAZINE OF THE CONCRETE SOCIETY Volume 51 November 2017 Issue09 Visit: www.concrete.org.uk Precast car park The Avenue MSCP, Bracknell Clean water Treating hydro-demolition waste Sustainability
More informationElite Garments Ind. Ltd.
Elite Garments Ind. Ltd. Bade Kalmeswer, Board Bazar, Gazipur, Bangladesh (23.954199, 90.380240) 5th April 2014 8th April 2015 1 2 Observations Made 3 Building 5 - Steel Portal Frame Main span varies from
More informationHale Allen Jones The Institution of Structural Engineers East Anglian Branch Award for Structural Excellence Submission
The Institution of Structural Engineers East Anglian Branch Award for Structural Excellence - 2003 Submission Details of Project Location Jarrold Whitefriars Office Development Whitefriars, Norwich. Project
More informationLevel 6 Graduate Diploma in Engineering Structural analysis
9210-111 Level 6 Graduate Diploma in Engineering Structural analysis Sample Paper You should have the following for this examination one answer book non-programmable calculator pen, pencil, ruler, drawing
More informationCivil Engineering Construction Chapter 5
Civil Engineering Construction Chapter 5 Introduction to Floor Dr Mohamad Syazli Fathi Department of Civil Engineering UTM RAZAK School of Engineering & Advanced Technology UTM International Campus August
More information2015 IBC Exit Systems
Objectives 2015 IBC Exit Systems Based on the 2015 International Building Code Upon completion, participants will be better able to: Determine those means of egress components that are defined as exits
More informationSOUTHWARK COUNCIL. St. Michael s College. Fire Compartmentation Survey Report. 24 September 2013
SOUTHWARK COUNCIL Document Status Revision Date Status or Comment Prepared by Checked by Authorised by 24/09/13 First issue S Hogg P Humphrey P Humphrey DISCLAIMER This document and its contents have been
More informationCity of Westerville Guide to Commercial Inspections
City of Westerville Guide to Commercial Inspections FOOTINGS - After the excavation, with the form work and any required reinforcing steel in place. All footings shall have loose soil removed, reinforcing
More informationArcelorMittal Europe - Long Products Sections and Merchant Bars. Office Building ArcelorMittal in Esch Alzette
ArcelorMittal Europe - Long Products Sections and Merchant Bars Office Building ArcelorMittal in Esch Alzette Location the country, at the heart of the iron and steel region. It has good access to the
More informationStatement of Special Inspections 2013 CBC
BUILDIG & SAFET DIVISIO 2729 Prospect Park Drive Rancho Cordova, CA 95670 Phone: (916) 851-8760 Fax: (916) 851-8762 Statement of Special Inspections 2013 CBC PERMIT #: PROJECT ADDRESS: This Statement of
More informationAmendments to the Approved Documents
The Building Regulations 2010 Amendments to the Approved Documents This document contains amendments to the following Approved Documents: A, B vol 1, B vol 2, C, D, E, F, G, H, J, L1A, L1B, L2A, L2B and
More informationSchool Assessment Report
School Assessment Report School: KIPP Vision Report: Dec 15, 14 Condition Assessment: Suitability Assessment: Generated: 12/15/14 12:33:33 PM Final School Assessment Report - Charter Schools, KIPP Vision
More informationSTRUCTURAL CONDITION ASSESSMENT
STRUCTURAL CONDITION ASSESSMENT ALLEN JAY ROCK GYM 1201 FAIRFIELD ROAD HIGH POINT, NC Prepared for: Prepared by: Guilford County Schools 617 West Market Street Greensboro, NC Adrian S. Durham, PE, SE,
More informationSTRUCTURAL TECHNICAL REPORT 2
Technical Report 2 Page 1 David Lee AE 481W Structural Option Advisor: Andres Lepage URS Office Building October 27, 2006 STRUCTURAL TECHNICAL REPORT 2 Pro-Con Structural Study of Alternate Floor System
More informationTanzila Textile Ltd.
1 Tanzila Textile Ltd. Baroypara, Ashulia, Savar, Dhaka. (24.017986, 90.243410) 12 April 2014 2 Observations 3 Highly Stressed Columns (Building 03) Cursory calculations indicate column at high working
More informationAlif Apparels Ltd. (9813) Goldstar Garments Ltd. (9844)
Alif Apparels Ltd. (9813) Goldstar Garments Ltd. (9844) 23/8 B&C, Holding #24/2, Khilje Road, Shyamoli Cinema Complex Building (2 nd Floor), Shyyamoli, Dhaka-1207 (+ 23.774489N, 90.365164E) 16.AUGUST.2014
More informationEXTERNAL DECKING Guide To Preliminary Joist and Beam Design For Domestic Decking
EXTERNAL DECKING Guide To Preliminary Joist and Beam Design For Domestic Decking Table 01 - Timber species and grades meeting the strength classes in the span tables Standard Name Marking Code Visual Strength
More informationUnderstanding Consultants Needed for Your Building Project By Amy Green, Owner, Architect, Interior Designer & LEED AP of amy green design 579 W
Understanding Consultants Needed for Your Building Project By Amy Green, Owner, Architect, Interior Designer & LEED AP of amy green design 579 W 177th St. #51, NYC, NY 10033 amy@amygreendesign.com 503.438.5411
More informationShoring and Reshoring Fundamentals
Shoring and Reshoring Fundamentals by Mary Bordner Tanck, PE SHORING AND RESHORING FUNDAMENTALS Because it has such a significant impact on schedule and material movements, it is important for everyone
More informationTechnical Report II. The Office Building. Rendering courtesy of DAVIS. Brett Miller. Dr. Gannon Construction
Technical Report II The Office Building Rendering courtesy of DAVIS Brett Miller Dr. Gannon Construction 10/16/2013 Executive Summary This technical report analyzes key features of The Office Building
More informationShow how a KM database impacts: cost, time, and quality. Demonstrate how Parametric Design could be used to save time, money, and improve quality
Executive Summary: Thesis Proposal Final Draft The following pages contain a final draft of the thesis proposal for the South Baltimore District Court House. The basic layout consists of focusing on Knowledge
More informationPark Potomac Office Building E
Kyle Wagner (IP) Advisor: Professor Kevin Parfitt 12/11/2009 Table of Contents I. Executive Summary. 3 II. Introduction / Material Strengths. 4 III. Codes and Design Standards.. 5 IV. Existing Structural
More informationBS 6180: 1999: Barriers in and about buildings Code of practice - Domestic Use Clause 6.4.1
RICHARD BURBIDGE LIMITED Our Ref: Whittington Road Date: 23 rd December 2009 Oswestry Delivery Date: 21 st December 2009 Shropshire Test Dates: 22 nd December 2009 SY11 1HZ For the attention of Tony Jones
More informationPENTABLOCK Technical Information 190mm Series
PENTABLOCK Technical Information 190mm Series The PENTABLOCK Walling System was developed in consultation with masonry construction stakeholders with an aim of reducing labor time and material costs required
More information