Additional Guidelines for Structural Requirements

Size: px
Start display at page:

Download "Additional Guidelines for Structural Requirements"

Transcription

1 Additional Guidelines for Structural Requirements (i) (ii) (iii) (iv) (v) (vi) (vii) (viii) The Tenant s contractor shall ensure that no structural integrity and components are affected. If any structural components are affected, the contractor shall stop work and inform the Landlord. The Tenant s contractor has to make good and rectify any damages at its own cost. No hacking is allowed on the building structure for the laying of building services. However, a maximum hacking depth of 25mm is allowed through the finishes provided that the structure beneath the finishes is not damaged. No hacking/drilling is permitted on pre-stressed structure, joints and waterproofed membranes. The Tenant s contractor's Structural/Civil PE is to certify that the works will not affect the structural integrity when it is required to hack or drill through the floor or ceiling slabs for installation of partitions/false ceilings, etc. All imposed loads on the floors of the Passenger Terminal Building shall not exceed the maximum safe weight load of 5 KN/m2. The Tenant shall inform the Landlord once work has been completed. IMPORTANT: If the premise given to the Tenant is an open empty space, Tenant must adopt an open concept design for this outlet to allow maximum flow-through and visibility without any closures (unless approved exemption from CAG is received). In addition, the Tenant shall ensure that the boundary of the Premises shall not be built-up, with for example, back walls/partitions/glass, to preserve the transparency as well as the visibility of the surrounding retail concessions.

2 GENERAL GUIDELINES FOR STRUCTURAL INSTALLATION ITEM GUIDELINES / REQUIREMENTS 1. Knocking down of Load bearing walls and partitions cannot be removed unless the loads carried walls / partitions of adjoining floor areas are fully transferred to other parts of the structure without effecting the structural integrity, stability and strength. Such proposal shall be designed by Structural / Civil P.E* & subject to the relevant authorities approval. Any demolition works shall be done in accordance to SS557:2010 Code of Practice for Demolition. 2. Additional Load / Installation Details of ** Permanent additional loads ( e.g racking systems, safes, weighing machines, additional ducts, services, projectors, etc) proposed to be placed onto the floor area or structural members must be submitted to CAG(S) for approval. Prior to submission, the Successful Tenderer is to ensure that the proposed loads / installation for that floor or structural member does not exceed its design live load+ and this should be verified by the Successful Tenderer s Structural / Civil P.E s. * Sub-note: Steel plate spreaders are to be provided to evenly distribute the load onto the structure where high concentration of point-loads is anticipated. The spreader is to be designed by the Successful Tenderer s Structural / Civil P.E *, steel plate spreader designs must not impose too much of its self-weight onto the existing structure. 2.1 Change of use Any change of use for the area must be made known to CAG(S). 3. Hacking of floor / coring / Walls/ columns or ceiling No hacking or coring is allowed on the structural members for the laying of building services. However, a maximum trimming depth of 25mm is allowed through finishes provided the structure beneath the finishes is not damaged. Groove lines should be cut to prevent over spalling of adjacent concrete along the line of trimming. Any trimmed areas are to be patched back using nonshrink grout. Beams and webs of hollow core slabs shall be avoided during coring. Coring on Pre- Stressed beams should be carried out only upon further inspection and certification by a PE. Fibre wrap materials used for slab/beam/column strengthening & waterproofing membrane used for RC flat roof /planter box area shall not be disturbed/affected. Sub Note: For any openings at fire rated wall due to their services penetrations, contractors are to seal off with Approved fire materials and endorsed by the fire PE 4. Erection of partitions / false ceilings The following should be submitted for approval : a) Specifications of proposed partitions / false ceiling b) Drawings to show the proposed locations of partitions/false ceiling c) Details of the methods of installation of partitions / false ceiling d) PE calculations to design to Code of Practice for Dead and Imposed Loads BS6399: Part 1 for lateral/impact loads onto partitions The Successful Tenderer s Structural / Civil P.E is to certify that the work will not affect the structural integrity when it is required to carry out hacking / drilling on structure members. (Supervising PE must made known of areas of Post Tension Beams, Prestressed Planks/Tee-beams and Precast Prestressed Precast Beams (PSPC) under its care)

3 * Structural / Civil P.E to certify statements / calculations / necessary documents to state that renovations work / other works do not affect the structural integrity. * Carry out pre-con dilapidation survey (Pre-con survey) if renovation works involving hacking/demolition of structure. * Provide instrumentation plan for our approval (demolition/hacking): - Noise Meter - Settlement Markers (Building/Ground) - Vibration Meter * Impact assessment report to be submitted for our record (For hacking/demolition works only) ** Permanent additional loads refer to under hanging as well as top resting loads. + Refer to Annex A for Loading Criteria

4 Annex A: Loading Criteria for all PTB S/N Facilities Designed Live Load ( KN/M²) 1 Typical Floors (Floor uses that are not specified on 5 KN/M² plan), Supermarket, Refuse Centre and Service Mezzanine 2 Equipment, plant and motor rooms and workshop, To design to *** actual weights of AHS/AHU Rooms, Stored Rooms, Arrival & equipment but not less than 7.5 KN/M² Departure Halls. 3. Injector Plant Rooms and HT/LT Rooms To design to *** actual weights of equipment but not less than 15 KN/M² 4. Stores, Auditorium and Multi purpose Hall (Similar Min 7.5 KN/M² to Arrival & Departure Halls) 5. Telecoms Plant Rooms, Computers Floor Min10 KN/M² 6. Baggage Handling Area (BHA), M&E Fan Rooms, Electrical Load Centre, Baggage Ramp, /Inbound & Outbound Areas, Equipment Parking Areas and TGFS Rooms. 7. Chiller plant rooms, Transformer Room and Generator Room 8. Bus Station, Basement Ramp, Basement Roadways, Service/Loading Bays, Vehicular Ramps/underpass, Electrical sub-station, Bus Gates 9. Landscape Courtyard, Planter area /Landscape area (Excluded Soil) 10. Engineering Parking Areas and SATS Elect Tow Tug Recharging Area, Elevated Driveway/Ramps Min10 KN/M² on 1 st storey floor for baggage belts, equipment, actual location of BHA etc. To design to *** actual weights of equipment but not less than 30 KN/M² for equipment transportation path. 20 KN/M² for actual location 12.5 KN/M² 3 KN/M² 50 tonnes vehicle with four wheels spaced at 2.74m * 3.6m (HA loading, 45 units of HB loading and footway crowd loading in accordance with BCA Forth Scheme-Loading) 30 KN/ M² 11. Diesel Tank Room, Domestic Water Tank, Sprinkler Tank Rooms, Water tank at 4m 12. Cooling Towers To design to *** actual weights of plants with special consideration for vibration and deflection 13. Concrete roof 1.5 KN/M² 14. Steel roof 0.5 KN/M² 15. Main Roof 0.75 KN/M² If actual weights of materials are not available, weights of materials can to be made with reference to BS 648.

5 Common Renovation Queries Civil Loading Queries of Terminal Buildings Knocking down/removal of partition Any installation which requires Hacking/Coring/Dr illing of walls, floors Drawings doesn t correspond to the site Hanging Loads to Ceiling PE Calculations & Endorsement Submit to Civil for Assessment Any Installation which imposes load to the building Floor Loading of Terminal Buildings General Floor Loading Plan/Floor loading Criteria Load-Bearing Wall Arrange for a Site Inspection PE to study the wall on-site and endorse PE to carry out precon survey & provide instrumentation plan and impact assessment report Non load bearing/nonstructural wall Can be removed Should not reach the rebar s (only 25mm through finishes allowed) Structural Members cannot be altered. Existing fibrewrap & waterproofing membrane shall not be affected. Division to gather info for any A&A works in that area Tenants should provide the drawings for A&A works

SPECIFICATION FOR PRECAST/ COMPOSITE CONCRETE FLOORS/ ROOF DECKS SECTION E60

SPECIFICATION FOR PRECAST/ COMPOSITE CONCRETE FLOORS/ ROOF DECKS SECTION E60 SPECIFICATION FOR SECTION E60 A 2007-09-26 S.W. Revision Date Issue Authorised By Approved for Issue SW Date 24.09.07 clarkebond Page 1 of 6 To be read with Preliminaries/ General Conditions. GENERAL 10

More information

The designer shall also submit additional information required by the University as described and underlined below.

The designer shall also submit additional information required by the University as described and underlined below. I. Structural Engineering Submissions The designer shall submit all information required by the State Construction Office (SCO) as described in the State Construction Manual Chapter 300 - Project Design

More information

FUNCTIONAL REQUIREMENTS

FUNCTIONAL REQUIREMENTS FUNCTIONAL REQUIREMENTS FUNCTIONAL REQUIREMENTS 7.6 BALCONIES Workmanship i. All workmanship must be within the tolerances defined in Chapter 1 of this manual. ii. All work is to be carried out by a technically

More information

APPLICATION FOR RENOVATION WORKS (to be completed by Owners)

APPLICATION FOR RENOVATION WORKS (to be completed by Owners) I APPLICATION FOR RENOVATION WORKS (to be completed by Owners) PARTICULARS OF OWNER Name of Owner Unit No. Contact No. Home: H/P: Office: Fax: II PARTICULARS OF CONTRACTOR (if more than one contractor

More information

SPECIAL INSPECTION AND OBSERVATION PROGRAM City of Walnut Creek Building Division. Project Address:

SPECIAL INSPECTION AND OBSERVATION PROGRAM City of Walnut Creek Building Division. Project Address: SPECIAL INSPECTION AND OBSERVATION PROGRAM City of Walnut Creek Building Division Permit Application #: Project Address: Purpose: To meet the requirements of City of Walnut Creek Municipal Code Section

More information

Level 1 Level 2 Level 3 Level 4 Level 5 Level 6 1 1.1 Construction Schedule of TCS-IT SEZ Park Issue of LOI 1.2 Pre-Construction Stage 1.2.1 Approvals 1.2.1.1 Approval from SWID/HIDCO for borewell 1.2.1.2

More information

TECHNICAL REPORT II STRUCTURAL STUDY OF ALTERNATE FLOOR SYSTEMS

TECHNICAL REPORT II STRUCTURAL STUDY OF ALTERNATE FLOOR SYSTEMS TECHNICAL REPORT II STRUCTURAL STUDY OF ALTERNATE FLOOR SYSTEMS Chris Vanaskie Structural Peninsula Regional Medical Center Salisbury, MD December 22, 2008 TABLE OF CONTENTS Executive Summary... 3 Introduction...

More information

Division 03 - Concrete Section New Westminister Multi-Use Civic Facility & Office Building Project No Page 1

Division 03 - Concrete Section New Westminister Multi-Use Civic Facility & Office Building Project No Page 1 Project No. 210022 Page 1 PART 1 GENERAL 1.7 Documents.1 The General Conditions of the Canadian Standard Construction Document CCDC-2, together with all amendments and supplements and Division 1 General

More information

K.L. Fashion Ltd. (10982) 75/1, Master Bari, Tongi, Gazipur ( N, E) 01.July.2014

K.L. Fashion Ltd. (10982) 75/1, Master Bari, Tongi, Gazipur ( N, E) 01.July.2014 K.L. Fashion Ltd. (10982) 75/1, Master Bari, Tongi, Gazipur (+23.903394N, +90.369739E) 01.July.2014 Identified Priority 1 Concerns None Identified Priority 2 Concerns The building does not contain any

More information

Statement of Special Inspections Michigan Building Code 2012 (MBC 2012)

Statement of Special Inspections Michigan Building Code 2012 (MBC 2012) Gaines Charter Township 8555 Kalamazoo Ave SE Caledonia MI 49316 PH: 616 698-6640 Fax: 616 698-2490 www.gainestownship.org Building Department Statement of Special Inspections Michigan Building Code 2012

More information

New Era Fashions Mfrs (BD) Ltd

New Era Fashions Mfrs (BD) Ltd New Era Fashions Mfrs (BD) Ltd Ltd Plot 10,11 & 12 Sector 8, Road 3, CEPZ, Chittagong (22.279298N, 91.776438E) 21 st June 2014 1 2 Observations Safety Hazard Water ingress through unsealed expansion joint

More information

The HKIE Structural Examination Written Examination. Section 2: Design Questions (80% of the Written Examination)

The HKIE Structural Examination Written Examination. Section 2: Design Questions (80% of the Written Examination) The HKIE Structural Examination Written Examination Section 2: Design Questions (80% of the Written Examination) Date: 17 November 2011 (Thursday) Time: 12:00 nn - 06:00 pm Answer ONE question only Page

More information

Responsibility Check List Sheet Item Description Responsibility Additional

Responsibility Check List Sheet Item Description Responsibility Additional Responsibility Check List Sheet Item Description Responsibility Additional A B C Sketch Brief Layout for the position of the mezzanine. Advise whether requirement to remove intermediate columns to provide

More information

TOWN OF GREENVILLE APPLICATION FOR PERMIT

TOWN OF GREENVILLE APPLICATION FOR PERMIT TOWN OF GREENVILLE APPLICATION FOR PERMIT Date Received: Date Issued: Permit: Location (Street Name & Number) Tax Map Number: Section Block Lot Zone Nature of Work New Construction Addition Demolition

More information

Section 6 - Bill of Quantities Bill Nr. 1 Preliminaries

Section 6 - Bill of Quantities Bill Nr. 1 Preliminaries Bill Nr. 1 Preliminaries Bill Nr. 1 PRELIMINARIES NOTES : (1) The work shall be done during day time and night time according to CAM/ADA requirements. (2) If CAM decides to cancel any s listed in the Bills

More information

Vienna International Airport Renovation of Checkin

Vienna International Airport Renovation of Checkin Vienna International Airport Renovation of Checkin 1 & Check-in 2 The comprehensive renovation of the suspended roof constructions, the check-in counters and ticket sales areas as well as the renovation

More information

Hollowcore Floors. The ideal structural floor solution for all building types in all sectors.

Hollowcore Floors. The ideal structural floor solution for all building types in all sectors. Hollowcore Floors Hollowcore Floors The ideal structural floor solution for all building types in all sectors. 2 3 System Overview Prestressed hollowcore units form part of the comprehensive range of precast

More information

AIR BARRIER DESIGN PRINCIPLES AN OVERVIEW.

AIR BARRIER DESIGN PRINCIPLES AN OVERVIEW. AIR BARRIER DESIGN PRINCIPLES AN OVERVIEW www.stromatech.com AIR BARRIER DESIGN PRINCIPLES Building Regulations Approved Document Parts L1A & L2A currently requires that new buildings have to achieve a

More information

Sheet 1 of 9 10 Rev A

Sheet 1 of 9 10 Rev A JJI-JOIST TECHNICAL BULLETIN SUBJECT: Alternative JJI-Joist Span Tables Bulletin Number: Date Issued: Sheet 1 of 9 10 Rev A 06.10.2004 Introduction The aim of this Technical Bulletin is to provide the

More information

INSPECTION TIMING CHECKLIST FOR RESIDENTIAL FRAME BUILDING PRIOR TO INSPECTION REQUEST

INSPECTION TIMING CHECKLIST FOR RESIDENTIAL FRAME BUILDING PRIOR TO INSPECTION REQUEST Village of Vernon Hills Community Development Department - Building Division 290 Evergreen Drive, Vernon Hills, IL 60061 Phone 847-367-3704 - Fax 847-367-2541 - http://www.vernonhills.org INSPECTION TIMING

More information

Construction of the Manulife Tower Redevelopment of the previous Lee Gardens Hotel in Causeway Bay

Construction of the Manulife Tower Redevelopment of the previous Lee Gardens Hotel in Causeway Bay Construction of the Manulife Tower Redevelopment of the previous Lee Gardens Hotel in Causeway Bay External view of Manulife Tower from various location Block plan showing the building layout of the new

More information

(Old examination format for reference only)

(Old examination format for reference only) The Institution of Structural Engineers Associate-Membership Examination 11 APRIL 2003 INSTRUCTIONS TO CANDIDATE 1. The examination comprises two sessions separated by a lunch break of 1 2 hour, during

More information

Possible solution to past CM exam question. Question 2 July New city centre office block. by Rajavel Inbarajan

Possible solution to past CM exam question. Question 2 July New city centre office block. by Rajavel Inbarajan Possible solution to past CM exam question Question 2 July 2015 New city centre office block by Rajavel Inbarajan The information provided should be seen as an interpretation of the brief and a possible

More information

Ensuring Building Safety In An Urbanised Environment Singapore s Perspective. Ong See Ho Deputy CEO & Commissioner of Building Control

Ensuring Building Safety In An Urbanised Environment Singapore s Perspective. Ong See Ho Deputy CEO & Commissioner of Building Control Ensuring Building Safety In An Urbanised Environment Singapore s Perspective Ong See Ho Deputy CEO & Commissioner of Building Control Outline BUILDING CONTROL ECO-SYSTEM WHAT DRIVES OUR STRUCTURAL SAFETY

More information

Appendix J - Custom Uniformat for EDU Migration

Appendix J - Custom Uniformat for EDU Migration Appendix J - Custom Uniformat for EDU Migration Nr. MTC Uniformat for VFA.facility Life (Years) Weight (1-100) Out of Scope Cost Y/N 1 A Substructure 150 N 2 A10 Foundations 150 N 3 A1010 Standard Foundations

More information

Commercial Remodel Permit

Commercial Remodel Permit Commercial Remodel Permit Zoning requirements Staff recommends always verifying the zoning requirements for your project before deciding to build. Warrensburg has eleven separate zoning districts, each

More information

Construction Measurement III SBQ3314. Precast Pre stressed Concrete Works. Dr. Sarajul Fikri Mohamed

Construction Measurement III SBQ3314. Precast Pre stressed Concrete Works. Dr. Sarajul Fikri Mohamed Construction Measurement III SBQ3314 Precast Pre stressed Concrete Works Dr. Sarajul Fikri Mohamed Table of Contents 1. Pre stressed concrete in bridgeworks: technological aspects 2. SMM2 measurement rules

More information

SUMMARY SPECIFICATION

SUMMARY SPECIFICATION Seventy St. Mary Axe has been designed with the most exacting of occupiers in mind. The result is a world-class building with a robust specification and the highest quality finishes. Occupancy ratio of

More information

Star Garments (Pvt Ltd.)

Star Garments (Pvt Ltd.) Star Garments (Pvt Ltd.) Sha-23, Middle Badda, Dhaka. (23.780094N, 90.426299E) 02 July 2014 1 2 Observations 3 Inconsistencies between the drawings and the as constructed building Irregularities on drawings

More information

GAUTENG DEPARTMENT OF INFRUSTRUCTURE DEVELOPMENT

GAUTENG DEPARTMENT OF INFRUSTRUCTURE DEVELOPMENT GAUTENG DEPARTMENT OF INFRUSTRUCTURE DEVELOPMENT BUILDING ASSESSMENT REPORT STRUCTURAL FOR CORNER HOUSE AUG 2014 i P a g e Table of Contents 1. INTRODUCTION... 3 1.1 Design Criteria and Specifications...

More information

Volume 1. Barts Square, London EC1 Retail 9 Information Pack. Retail 9. March 2017

Volume 1. Barts Square, London EC1 Retail 9 Information Pack. Retail 9. March 2017 Volume 1 Retail 9 Barts Square, London EC1 Retail 9 Information Pack March 2017 2 BARTS SQUARE, LONDON EC1 - RETAIL 9 INFORMATION PACK Contents 1. DESIGN CRITERIA 4 1.1 THE DEVELOPMENT 4 1.2 STRUCTURE

More information

Thesis Proposal. Matthew R Peyton

Thesis Proposal. Matthew R Peyton This Document is for 5th year senior thesis in the Architectural Engineering Departments at The Pennsylvania State University. S t r u c t u r a l O p t i o n P r o f e s s o r B e h r H o s p i t a l

More information

ARCHITECTUS FEBRUARY 2010

ARCHITECTUS FEBRUARY 2010 ARCHITECTUS PEDESTRIAN AND TRAFFIC MANAGEMENT PLAN FOR DEMOLITION, EXCAVATION AND CONSTRUCTION OF COLLEGE OF FINE ARTS CAMPUS, PADDINGTON FEBRUARY 2010 COLSTON BUDD HUNT & KAFES PTY LTD ACN 002 334 296

More information

GUIDE SPECIFICATIONS For STRUCTURAL PRECAST HOLLOW CORE SLABS SECTION 03410

GUIDE SPECIFICATIONS For STRUCTURAL PRECAST HOLLOW CORE SLABS SECTION 03410 GUIDE SPECIFICATIONS For STRUCTURAL PRECAST HOLLOW CORE SLABS SECTION 03410 Note to user: These guide specifications are provided by Mid- States Concrete Products as a service to you; they are NOT specific

More information

Shin Shin Apparels Ltd. (9615) Dag RS. 228, JL 73, Gorat, East Norshinghapur, Zirabo, Savar ( N, E) 27.MAY.2014

Shin Shin Apparels Ltd. (9615) Dag RS. 228, JL 73, Gorat, East Norshinghapur, Zirabo, Savar ( N, E) 27.MAY.2014 Shin Shin Apparels Ltd. (9615) Dag RS. 228, JL 73, Gorat, East Norshinghapur, Zirabo, Savar (+23.94071N, 90.30929E) 27.MAY.2014 Identified Priority 1 Concerns 1 st Priority 1 Concern Based on the Detail

More information

Bonner Bridge Replacement Update:

Bonner Bridge Replacement Update: Bonner Bridge Replacement Update: Jerry D. Jennings, PE - NCDOT Division 1 Engineer Pablo A. Hernandez, - NCDOT Resident Engineer September 18, 2017 Bonner Bridge Replacement Timeline Refresher Bonner

More information

UNDP Operations Service Center, Erbil Iraq

UNDP Operations Service Center, Erbil Iraq UNDP Operations Service Center, Erbil Iraq Reference: ITB 037/17 - The Renovation of Ramadi Maternity and Children's Hospital, Anbar Governorate, Iraq Clarification to Bidders Responses 1 Requested for

More information

SPECIAL INSPECTION AGREEMENT

SPECIAL INSPECTION AGREEMENT PART 1 STATEMENT OF SPECIAL INSPECTIONS When special inspection is required to be performed in accordance with International Building Code Chapter 17, a building permit cannot be issued until a statement

More information

THE TREASURE TOWER PROGRESS REPORT

THE TREASURE TOWER PROGRESS REPORT THE TREASURE TOWER PROGRESS REPORT About the Project: Project Developer Title of Project Project Reference Design & Supervision Consultant Interior Design Consultant Main Contractor Bin Faqeeh Real Estate

More information

Annex to the Accreditation Certificate D-ZE according to DIN EN ISO/IEC 17065:2013

Annex to the Accreditation Certificate D-ZE according to DIN EN ISO/IEC 17065:2013 Deutsche Akkreditierungsstelle GmbH Annex to the Accreditation Certificate D-ZE-11267-01-00 according to DIN EN ISO/IEC 17065:2013 Period of validity: 17.08.2018 to 01.10.2022 Holder of certificate: Materialprüfanstalt

More information

Comparative Study on Post - Tensioned and Reinforced Concrete flat Slab Systems for a Multistory Building

Comparative Study on Post - Tensioned and Reinforced Concrete flat Slab Systems for a Multistory Building Comparative Study on Post - Tensioned and Reinforced Concrete flat Slab Systems for a Multistory Building Thayapraba M Civil Department, NIT Trichy, (India) ABSTRACT Designers have a huge number of choices

More information

Structural Tests and Special Inspections Form. Inspection of Fabricators (1704.2)

Structural Tests and Special Inspections Form. Inspection of Fabricators (1704.2) Inspection of Fabricators (1704.2) Furnish inspection reports (1704.2.1) - Fabricators that have not been approved Provide a Certificate of Compliance (1704.2.2) - Approved Fabricators Steel Construction

More information

The HKIE Structural Examination Written Examination

The HKIE Structural Examination Written Examination The HKIE Structural Examination Written Examination Section 2: Design Questions (80% of the Written Examination) Date: 28 November 2014 (Friday) Time: 12:00 nn - 06:00 pm Answer ONE question only Question

More information

Code Compliance and Product Selection

Code Compliance and Product Selection Code Compliance and Product Selection PT Blink Ltd are the owners of the intellectual property, patents, designs, concepts and know-how depicted in these drawings, images, plans and specifications. This

More information

STEEL INSIGHT #10 KEY FRAME COST DRIVERS

STEEL INSIGHT #10 KEY FRAME COST DRIVERS STEEL INSIGHT #10 KEY FRAME COST DRIVERS steel insight MAy 2014 steel insight Key frame cost drivers The latest article in the series focuses on the key cost drivers that have to be identified at the elemental

More information

Hollowcore Slabs. Hollowcore slabs are used mainly for flooring and roofing, but can also be used for wall purposes.

Hollowcore Slabs. Hollowcore slabs are used mainly for flooring and roofing, but can also be used for wall purposes. Hollowcore Slabs Hollowcore Slabs One of the most advanced precast products. Millions of square meters of hollowcore slabs are used every year in the building constructions all over the world (villas,

More information

REQUEST FOR PROPOSALS March 4, 2010 PROJECT OVERVIEW:

REQUEST FOR PROPOSALS March 4, 2010 PROJECT OVERVIEW: Police Headquarters Project REQUEST FOR PROPOSALS March 4, 2010 PROJECT OVERVIEW: General description The objective is to renovate an approximately 18 x 24 section of the two-bay attached garage at Town

More information

11. Construction processes and materials Power House Maintenance Building Fuel Treatment Building...

11. Construction processes and materials Power House Maintenance Building Fuel Treatment Building... Contents 11. Construction processes and materials... 11-2 11.1 Power House... 11-2 11.2 Maintenance Building... 11-2 11.3 Fuel Treatment Building... 11-3 11.4 Roads & Paths... 11-3 11.5 Fencing... 11-3

More information

RENOVATION OF THE VIA BUILDING FOR THE GUELPH TRANSIT TERMINAL FROM THE PRE- QUALIFIED GENERAL CONTRACTORS Reference Number:

RENOVATION OF THE VIA BUILDING FOR THE GUELPH TRANSIT TERMINAL FROM THE PRE- QUALIFIED GENERAL CONTRACTORS Reference Number: RENOVATION OF THE VIA BUILDING FOR THE GUELPH TRANSIT TERMINAL FROM THE PRE- QUALIFIED GENERAL CONTRACTORS Reference Number: 13-146 A D D E N D U M NO. 1 The following shall form part of the tender documents

More information

Modular Wood Framing Goes Vertical

Modular Wood Framing Goes Vertical Modular Wood Framing Goes Vertical By: Troy Bean, P.E., S.E. DCI Engineers January 2013 The Wood Products Council is a Registered Provider with. Credit(s) earned on completion of this program will be reported

More information

SAFE WORK METHOD STATEMENT

SAFE WORK METHOD STATEMENT SWMS 002 Erect / Dismantle Single Bay Towers and/or Multiple Bay Towers Page of 9 ABN: 40 088 478 399 This SWMS has been prepared and authorised by OLDFIELDS ACCESS PTY LTD ACN: 088 478 399 Date: Issue

More information

Examination paper, both A3 plain and A3 tracing, are provided. Use as appropriate.

Examination paper, both A3 plain and A3 tracing, are provided. Use as appropriate. Candidate Number : Room Number : Seat Number : HKIA / ARB Professional Assessment 2008 Paper 7a CONSTRUCTION DETAILS & DOCUMENTATION (20 marks out of 100 marks of Paper 7) 18 December 2008 4:00 pm 6:00

More information

GMS Composite Ltd. Shardagonj, Kashimpur,Gazipur,Bangladesh ( , ) 22 March 2014

GMS Composite Ltd. Shardagonj, Kashimpur,Gazipur,Bangladesh ( , ) 22 March 2014 GMS Composite Ltd. Shardagonj, Kashimpur,Gazipur,Bangladesh (23.968661, 90.296963) 22 March 2014 1 2 Observations 3 Highly stressed columns Cursory calculations indicate that the working stresses of columns

More information

Table of Contents.2. Introduction...3 Gravity Loading and Deflections..4. Existing Structural System..8

Table of Contents.2. Introduction...3 Gravity Loading and Deflections..4. Existing Structural System..8 WISCONSIN PLACE RESIDENTIAL TECHNICAL ASSIGNMENT 2 OCTOBER 29, 2007 KURT KRASAVAGE THE PENNSYLVANIA STATE UNIVERSITY STRUCTURAL OPTION FACULTY ADVISOR: DR. ALI MEMARI 1 Table of Contents Table of Contents.2

More information

PAGE 415. Part 9. External works. 9.1 Garages. 9.2 Drives, paths and landscaping

PAGE 415. Part 9. External works. 9.1 Garages. 9.2 Drives, paths and landscaping PAGE 415 Part 9 External works 9.2 Drives, paths and landscaping Part 9 External works Chapter CONTENTS SCOPE Clause DESIGN Design standards D1 1 Statutory requirements D2 1 Garage foundations D3 1 Garage

More information

Cork Institute of Technology. Summer 2006 Structural Design & Detailing I (Time: 4 Hours)

Cork Institute of Technology. Summer 2006 Structural Design & Detailing I (Time: 4 Hours) Cork Institute of Technology Bachelor of Engineering (Honours) in Structural Engineering Stage 2 (NFQ Level 8) Summer 2006 Structural Design & Detailing I (Time: 4 Hours) Instructions: 1. The examination

More information

Volume 1. Barts Square, London EC1 Retail 8 Information Pack. Retail Unit 8. March 2017

Volume 1. Barts Square, London EC1 Retail 8 Information Pack. Retail Unit 8. March 2017 Volume 1 Retail Unit 8 Barts Square, London EC1 Retail 8 Information Pack March 2017 2 BARTS SQUARE, LONDON EC1 - RETAIL 8 INFORMATION PACK Contents 1. DESIGN CRITERIA 4 1.1 THE DEVELOPMENT 4 1.2 STRUCTURE

More information

SPECIAL INSPECTION AND OBSERVATION PROGRAM CITY OF CONCORD BUILDING DIVISION. Project Address:

SPECIAL INSPECTION AND OBSERVATION PROGRAM CITY OF CONCORD BUILDING DIVISION. Project Address: SPECIAL INSPECTION AND OBSERVATION PROGRAM CITY OF CONCORD BUILDING DIVISION Permit Application #: Project Address: Purpose: To meet the requirements of CBC Section 1704.3 this form may be used as a statement

More information

BOOTH DESIGN REGULATIONS & HALL DESCRIPTIONS

BOOTH DESIGN REGULATIONS & HALL DESCRIPTIONS VERY IMPORTANT By signing the registration form, the Exhibitor agrees to abide by all the clauses mentioned in the general regulations and to ensure that any decorators, installers or contractors also

More information

ABA Fashions Ltd. Plot #9, Block F, Tongi, Gazipur-1710 ( N, E) 08 MARCH 2014

ABA Fashions Ltd. Plot #9, Block F, Tongi, Gazipur-1710 ( N, E) 08 MARCH 2014 ABA Fashions Ltd. Plot #9, Block F, Tongi, Gazipur-1710 (23.885176N, 90.399821E) 08 MARCH 2014 1 2 Observations 3 Highly stressed columns Cursory calculations indicate column at a high working stress.

More information

Installing DELTABEAM. Installation of DELTABEAM. Deliveries. Storage on-site

Installing DELTABEAM. Installation of DELTABEAM. Deliveries. Storage on-site Installing DELTABEAM Installation of DELTABEAM These DELTABEAM installation instructions are intended to complement the project s erection plan. Peikko s technical support can help with the erection plan

More information

Cassiopea Fashions Ltd. Cassiopea Apparels Ltd.

Cassiopea Fashions Ltd. Cassiopea Apparels Ltd. 1 Cassiopea Fashions Ltd. Cassiopea Apparels Ltd. Bokran, Monipur, Vabanipur, Gazipur. (24.127427, 90.399544) 15 April 2014 2 Observations Made 3 No apparent stability system Steel Building 6 th floor

More information

BUILDING INTEGRITY SUMMARY REPORT

BUILDING INTEGRITY SUMMARY REPORT BUILDING INTEGRITY SUMMARY REPORT SUPPLIER NAME SUPPLIER ADDRESS AUDIT DATE January 2014 AUDIT PERFORMED BY Cosmopolitan Industries Pvt Ltd Khejur Bagan, Bara Ashulia, Savar, Dhaka, Bangladesh Department

More information

Building Standards Department. Guide to Building Permits Understanding the Different Building Permit Types and their Submission Requirements

Building Standards Department. Guide to Building Permits Understanding the Different Building Permit Types and their Submission Requirements Guide to Building Permits Understanding the Different Building Permit Types and their Submission Requirements Building Standards March 2018 CONTENTS BUILDING PERMIT APPLICATIONS... 2 GENERAL INFORMATION...

More information

A-BEAM S Erection Manual 2

A-BEAM S Erection Manual 2 2 A-BEAM S Revision 6/2017 Finland 3 TABLE OF CONTENTS 1 ERECTION INSTRUCTIONS... 4 1.1 A-BEAM S... 4 1.2 Codes and standards to be followed during erection work... 4 1.3 Structural plans to be followed

More information

TEST REPORT. Lucideon Reference: (QT44718/2/RK)/Ref. 8

TEST REPORT. Lucideon Reference: (QT44718/2/RK)/Ref. 8 TEST REPORT Lucideon Reference: 173446 (QT44718/2/RK)/Ref. 8 101 Project Title: Client: For the Attention of: Author(s): Balustrade Testing of FH Brundle's Elegance Romeo Balcony Rail in Accordance with

More information

Simplified Building Schematic for Typical Floor (Levels 9 through 22):

Simplified Building Schematic for Typical Floor (Levels 9 through 22): Introduction to Structural System Simplified Building Schematic for Typical Floor (Levels 9 through 22): Key: - Tower Columns - Tower Shear Walls - Parking Garage Columns - Parking Garage Shear Walls Solid

More information

Floor Insulation Underlayment Section Sound Control Matting

Floor Insulation Underlayment Section Sound Control Matting Floor Insulation Underlayment Section 09618 Sound Control Matting Part I General 1.1 Summary A. Section includes a sound control material for achieving an STC and IIC rating in excess of 50 to meet building

More information

AIRWAYS CROSSING PHASE II BUILDING INFORMATION 5305 McCall Way N.E. T2E 7N7

AIRWAYS CROSSING PHASE II BUILDING INFORMATION 5305 McCall Way N.E. T2E 7N7 AIRWAYS CROSSING PHASE II BUILDING INFORMATION 5305 McCall Way N.E. T2E 7N7 www.airwayscrossing.ca Excellent access to Barlow Trail/McKnight Blvd. Bays starting at 4,000 sq. ft. Surface loading T5 lighting

More information

151 First Side. Technical Assignment 2 November 16 th, William J. Buchko. AE 481w Senior Thesis The Pennsylvania State University

151 First Side. Technical Assignment 2 November 16 th, William J. Buchko. AE 481w Senior Thesis The Pennsylvania State University November 16 th, 2007 William J. Buchko AE 481w Senior Thesis The Pennsylvania State University Thesis Advisor: Kevin Parfitt Table of Contents Executive Summary... 3 Structural System Overview Foundation...

More information

STATE UNIVERSITY CONSTRUCTION FUND

STATE UNIVERSITY CONSTRUCTION FUND STATE UNIVERSITY CONSTRUCTION FUND The following checklist show the general items required by the Agreement and the Program Directives. Unless included in the lump sum fee or the Schedule B of the Consultant

More information

SECTION PRE-ENGINEERED EXTRUDED ALUMINUM DECKING WALKWAY COVERS SPECIFICATION

SECTION PRE-ENGINEERED EXTRUDED ALUMINUM DECKING WALKWAY COVERS SPECIFICATION Awning Works Inc Aluminum Decking Walkway Cover Specification CSI- Division 10 SECTION 10530 PRE-ENGINEERED EXTRUDED ALUMINUM DECKING WALKWAY COVERS SPECIFICATION PART 1 GENERAL 1.01 DESCRIPTION OF WORK

More information

Schendt Engineering Corporation 2912 Beacon Street (719)

Schendt Engineering Corporation 2912 Beacon Street (719) Schendt Engineering Corporation 2912 Beacon Street (719) 637-8850 Colorado Springs, CO 80907-9207 www.secengr.com ADDENDUM NUMBER 1 DATE: 5 July 2017 OWNER: PROJECT: University of Colorado Colorado Springs

More information

TEST REPORT. Lucideon Reference: (QT44718/2/RK)/Ref. 6

TEST REPORT. Lucideon Reference: (QT44718/2/RK)/Ref. 6 TEST REPORT Lucideon Reference: 173446 (QT44718/2/RK)/Ref. 6 101 Project Title: Client: For the Attention of: Author(s): Balustrade Testing of FH Brundle's Infinity Juliet Balcony in Accordance with BS

More information

C. Type of Selective Demolition Work: Demolition requires the selective removal and subsequent off-site disposal of:

C. Type of Selective Demolition Work: Demolition requires the selective removal and subsequent off-site disposal of: 02070 - SELECTIVE DEMOLITION PART 1 - GENERAL 1.1 STIPULATIONS A. The specifications sections " General Conditions of the Construction Contract ", "Special Conditions", and "Division 1 - General Requirements"

More information

Amendments to the Approved Documents

Amendments to the Approved Documents The Building Regulations 2010 Amendments to the Approved Documents This document contains amendments to the following Approved Documents: A, B vol 1, B vol 2, C, D, E, F, G, H, J, L1A, L1B, L2A, L2B and

More information

concrete Precast car park The Avenue MSCP, Bracknell Sustainability by the sea Colwyn Bay seafront Clean water Treating hydro-demolition waste

concrete Precast car park The Avenue MSCP, Bracknell Sustainability by the sea Colwyn Bay seafront Clean water Treating hydro-demolition waste concrete THE MAGAZINE OF THE CONCRETE SOCIETY Volume 51 November 2017 Issue09 Visit: www.concrete.org.uk Precast car park The Avenue MSCP, Bracknell Clean water Treating hydro-demolition waste Sustainability

More information

Elite Garments Ind. Ltd.

Elite Garments Ind. Ltd. Elite Garments Ind. Ltd. Bade Kalmeswer, Board Bazar, Gazipur, Bangladesh (23.954199, 90.380240) 5th April 2014 8th April 2015 1 2 Observations Made 3 Building 5 - Steel Portal Frame Main span varies from

More information

Hale Allen Jones The Institution of Structural Engineers East Anglian Branch Award for Structural Excellence Submission

Hale Allen Jones The Institution of Structural Engineers East Anglian Branch Award for Structural Excellence Submission The Institution of Structural Engineers East Anglian Branch Award for Structural Excellence - 2003 Submission Details of Project Location Jarrold Whitefriars Office Development Whitefriars, Norwich. Project

More information

Level 6 Graduate Diploma in Engineering Structural analysis

Level 6 Graduate Diploma in Engineering Structural analysis 9210-111 Level 6 Graduate Diploma in Engineering Structural analysis Sample Paper You should have the following for this examination one answer book non-programmable calculator pen, pencil, ruler, drawing

More information

Civil Engineering Construction Chapter 5

Civil Engineering Construction Chapter 5 Civil Engineering Construction Chapter 5 Introduction to Floor Dr Mohamad Syazli Fathi Department of Civil Engineering UTM RAZAK School of Engineering & Advanced Technology UTM International Campus August

More information

2015 IBC Exit Systems

2015 IBC Exit Systems Objectives 2015 IBC Exit Systems Based on the 2015 International Building Code Upon completion, participants will be better able to: Determine those means of egress components that are defined as exits

More information

SOUTHWARK COUNCIL. St. Michael s College. Fire Compartmentation Survey Report. 24 September 2013

SOUTHWARK COUNCIL. St. Michael s College. Fire Compartmentation Survey Report. 24 September 2013 SOUTHWARK COUNCIL Document Status Revision Date Status or Comment Prepared by Checked by Authorised by 24/09/13 First issue S Hogg P Humphrey P Humphrey DISCLAIMER This document and its contents have been

More information

City of Westerville Guide to Commercial Inspections

City of Westerville Guide to Commercial Inspections City of Westerville Guide to Commercial Inspections FOOTINGS - After the excavation, with the form work and any required reinforcing steel in place. All footings shall have loose soil removed, reinforcing

More information

ArcelorMittal Europe - Long Products Sections and Merchant Bars. Office Building ArcelorMittal in Esch Alzette

ArcelorMittal Europe - Long Products Sections and Merchant Bars. Office Building ArcelorMittal in Esch Alzette ArcelorMittal Europe - Long Products Sections and Merchant Bars Office Building ArcelorMittal in Esch Alzette Location the country, at the heart of the iron and steel region. It has good access to the

More information

Statement of Special Inspections 2013 CBC

Statement of Special Inspections 2013 CBC BUILDIG & SAFET DIVISIO 2729 Prospect Park Drive Rancho Cordova, CA 95670 Phone: (916) 851-8760 Fax: (916) 851-8762 Statement of Special Inspections 2013 CBC PERMIT #: PROJECT ADDRESS: This Statement of

More information

Amendments to the Approved Documents

Amendments to the Approved Documents The Building Regulations 2010 Amendments to the Approved Documents This document contains amendments to the following Approved Documents: A, B vol 1, B vol 2, C, D, E, F, G, H, J, L1A, L1B, L2A, L2B and

More information

School Assessment Report

School Assessment Report School Assessment Report School: KIPP Vision Report: Dec 15, 14 Condition Assessment: Suitability Assessment: Generated: 12/15/14 12:33:33 PM Final School Assessment Report - Charter Schools, KIPP Vision

More information

STRUCTURAL CONDITION ASSESSMENT

STRUCTURAL CONDITION ASSESSMENT STRUCTURAL CONDITION ASSESSMENT ALLEN JAY ROCK GYM 1201 FAIRFIELD ROAD HIGH POINT, NC Prepared for: Prepared by: Guilford County Schools 617 West Market Street Greensboro, NC Adrian S. Durham, PE, SE,

More information

STRUCTURAL TECHNICAL REPORT 2

STRUCTURAL TECHNICAL REPORT 2 Technical Report 2 Page 1 David Lee AE 481W Structural Option Advisor: Andres Lepage URS Office Building October 27, 2006 STRUCTURAL TECHNICAL REPORT 2 Pro-Con Structural Study of Alternate Floor System

More information

Tanzila Textile Ltd.

Tanzila Textile Ltd. 1 Tanzila Textile Ltd. Baroypara, Ashulia, Savar, Dhaka. (24.017986, 90.243410) 12 April 2014 2 Observations 3 Highly Stressed Columns (Building 03) Cursory calculations indicate column at high working

More information

Alif Apparels Ltd. (9813) Goldstar Garments Ltd. (9844)

Alif Apparels Ltd. (9813) Goldstar Garments Ltd. (9844) Alif Apparels Ltd. (9813) Goldstar Garments Ltd. (9844) 23/8 B&C, Holding #24/2, Khilje Road, Shyamoli Cinema Complex Building (2 nd Floor), Shyyamoli, Dhaka-1207 (+ 23.774489N, 90.365164E) 16.AUGUST.2014

More information

EXTERNAL DECKING Guide To Preliminary Joist and Beam Design For Domestic Decking

EXTERNAL DECKING Guide To Preliminary Joist and Beam Design For Domestic Decking EXTERNAL DECKING Guide To Preliminary Joist and Beam Design For Domestic Decking Table 01 - Timber species and grades meeting the strength classes in the span tables Standard Name Marking Code Visual Strength

More information

Understanding Consultants Needed for Your Building Project By Amy Green, Owner, Architect, Interior Designer & LEED AP of amy green design 579 W

Understanding Consultants Needed for Your Building Project By Amy Green, Owner, Architect, Interior Designer & LEED AP of amy green design 579 W Understanding Consultants Needed for Your Building Project By Amy Green, Owner, Architect, Interior Designer & LEED AP of amy green design 579 W 177th St. #51, NYC, NY 10033 amy@amygreendesign.com 503.438.5411

More information

Shoring and Reshoring Fundamentals

Shoring and Reshoring Fundamentals Shoring and Reshoring Fundamentals by Mary Bordner Tanck, PE SHORING AND RESHORING FUNDAMENTALS Because it has such a significant impact on schedule and material movements, it is important for everyone

More information

Technical Report II. The Office Building. Rendering courtesy of DAVIS. Brett Miller. Dr. Gannon Construction

Technical Report II. The Office Building. Rendering courtesy of DAVIS. Brett Miller. Dr. Gannon Construction Technical Report II The Office Building Rendering courtesy of DAVIS Brett Miller Dr. Gannon Construction 10/16/2013 Executive Summary This technical report analyzes key features of The Office Building

More information

Show how a KM database impacts: cost, time, and quality. Demonstrate how Parametric Design could be used to save time, money, and improve quality

Show how a KM database impacts: cost, time, and quality. Demonstrate how Parametric Design could be used to save time, money, and improve quality Executive Summary: Thesis Proposal Final Draft The following pages contain a final draft of the thesis proposal for the South Baltimore District Court House. The basic layout consists of focusing on Knowledge

More information

Park Potomac Office Building E

Park Potomac Office Building E Kyle Wagner (IP) Advisor: Professor Kevin Parfitt 12/11/2009 Table of Contents I. Executive Summary. 3 II. Introduction / Material Strengths. 4 III. Codes and Design Standards.. 5 IV. Existing Structural

More information

BS 6180: 1999: Barriers in and about buildings Code of practice - Domestic Use Clause 6.4.1

BS 6180: 1999: Barriers in and about buildings Code of practice - Domestic Use Clause 6.4.1 RICHARD BURBIDGE LIMITED Our Ref: Whittington Road Date: 23 rd December 2009 Oswestry Delivery Date: 21 st December 2009 Shropshire Test Dates: 22 nd December 2009 SY11 1HZ For the attention of Tony Jones

More information

PENTABLOCK Technical Information 190mm Series

PENTABLOCK Technical Information 190mm Series PENTABLOCK Technical Information 190mm Series The PENTABLOCK Walling System was developed in consultation with masonry construction stakeholders with an aim of reducing labor time and material costs required

More information