1 Bonner Bridge Replacement Update: Jerry D. Jennings, PE - NCDOT Division 1 Engineer Pablo A. Hernandez, - NCDOT Resident Engineer September 18, 2017

2 Bonner Bridge Replacement Timeline Refresher Bonner Bridge opened in Many projects to maintain & protect existing bridge. Design build contract for replacement was awarded to PCL Civil Constructors, Inc., in July HDR Engineering, Inc. of the Carolinas lead design firm. Settlement agreement reached to replace bridge in Original bid was $215.8 million. Contract adjustments due to delays & enhancements $250 million. 2

3 Bonner Bridge Replacement (B-2500 Phase I) 3

4 Comparison of Existing Bridge to the New Bridge Old New Bridge length (miles) Number of bents Number of spans in navigation zone 3 11 Navigation zone width (ft.) Navigation channel width (ft.) Design lifespan (years)

5 Design Visualization Becoming Reality Notice To Proceed: Oct 14, Onsite Activities Begin: March Substantial Completion: November Contract Completion: September Total Contract Expenditures to Date: $149.7 Million Approximately 60% Complete Design & Construction Support = $35 Million Large Percentage of Precast Concrete Members Fabricated Offsite. Construction Activities Approx. 50% Complete. 5

6 Materials & Work Activities Needed for New Bridge 20" Sq Pile 54" Cyl Pile 36" Sq Pile Footings Cast InPlace & Precast Caps Column Segments 45 Girders 96" Girders Cast In Place Decks Box Segments Plan (each) Approx. Length 18,800 FT 68,000 FT 46,711 FT 3,450 FT 6

7 Work Areas of Project Approach South Navigation Zone Approach North Approaches: 71 spans,160 ft. to 182 ft. wide. 72 bents: 2 styles of foundations: 54 cylinder pile with precast cap & 36 square pile with cast in place footing, precast columns & cap. Navigation Zone: 11 spans 200 ft. to 350 ft. wide. 11 bents: 36 square pile with cast in place footing, precast columns & cap. 7

8 Pile Driving: 36 Square Precast Prestressed Piles In Navigation Zone & Transition Approaches 338 of 532 piles installed to date. Ave Length 130ft. (weight 60 to 65 tons or approx. 1,050lbs/LF) 17 of 37 bents completed with 10 to 30 piles/bent. Three more bents with large cluster of piles should be completed in November. 8

9 Pile Driving: 54 Cylinder Precast Prestressed Piles In Approaches to High Rise. 86 of 138 piles installed to date. Weigh 55 to 62 tons, 110 to 130 ft. long. (hollow with 6 walls) 28 of 44 bents completed. 3 to 4 piles/bent. 9

10 Precast Caps: Approaches 33 of 83 caps set. Caps are voided (hollow) to engage with a rebar cage that is cast into top of cylinder piles. Once cap is set, concrete is cast into voids in top of cap make a solid connection to the piles. Largest precast cap for NCDOT. 10

11 Cast In Place Footings: Navigation Zone & Approaches 14 of 37 footings cast. Largest are 300 to 640 CY. Total 8,045 CY Smaller footings are 110 to 260 CY. Cast in place concrete is supported by a precast slab that is left in place. 11

12 Cast In Place Footings: Navigation Zone Utilize stainless steel reinforcing. Up to 8 ft. thick. Concrete delivered to existing bridge deck and discharged into 8CY bucket. Ocean water circulated inside concrete to cool the mass. Largest approx. 50ft x 50ft 6 to 16 hours to place concrete. 12

13 Cast In Place Footings: Approaches Smaller footings 36ft x 36ft and 21ft x 36ft. 6 ft. thick. 13

14 Columns: Navigation Zone & Approaches 23 of 48 sections set. Post Tensioned with 2.5 inch diameter stainless steel and plain steel bars. Grout pumped in PT ducts. 14

15 Columns: Navigation Zone & Approaches Cast in Place Column Stub Precast sections: 11ft x16ft 4ft to 12 ft. tall 18inch thick walls Smaller sizes in approaches: 5ft x 5ft. 15

16 Columns: Navigation Zone & Approaches 16

17 Girders: Approaches Prestressed Precast Concrete Girders: 106 of 303 girders set. 26 of 71 spans set. 96 tall. 160 to 182 ft. long. 100 tons (approx. 50 CY of concrete per girder). Delivered by truck and barge. Truck has 13 to 16 axels 17

18 Girders: Approaches Two cranes to erect. Largest precast girders in NCDOT. Very large & heavy hardware for temporary bracing. 18

19 Girders: Approaches Girders span land, marsh & water. Access for setting girders is challenging due to narrow work site and adjacent traffic. Braced for 110mph to 140mph until deck is cast. 19

20 Cast In Place Decks: Approaches 23 of 71 Decks cast. 160ft to 182 ft. long. 42 ft. wide. Stainless steel reinforcing. 20

21 Cast In Place Decks: Approaches Approx. 225CY per deck. (Total 18,000 CY) Lightweight Concrete weighs 20% less than normal concrete. Cast In Place Deck Area = 480,950 SF or acres. 21

22 Cast In Place Decks: Approaches Finished with burlap drag and covered with felt lined plastic for wet cure. Formwork for bridge rail that is cast in place. 22

23 Cast In Place Decks: Approaches Clear deck is 40ft wide: Two 12ft lanes and two 8ft shoulders. Deck will be ground and/or grooved for skid texture. 23

24 Cast In Place Decks: Approaches Clear deck is 40ft wide: Two 12ft lanes and two 8ft shoulders. Bridge rail is bicycle safe: 54 tall. 24

25 Box Segments: Navigation Zone 90 of 264 box segments set. Segments cast in Chesapeake VA. Shoring Tower needed for temporary support of the box segments. Two bearings assemblies per bent i.e. 22 bearings (approx. 5ft x 5ft) 25

26 Box Segments: Navigation Zone Barge strategically loaded for unloading. Segments are large & match cast. 8 to 19 ft. tall. 5 to 14 ft. long. 100 tons Pier segments set against frame on shore tower. Bolted and epoxy for the connection to each other. 26

27 Box Segments: Navigation Zone Set additional segments with crane for form Pier Table. Jacks and tie downs position and secure Pier Table. 27

28 Box Segments: Navigation Zone Segment lifters positioned on Pier Table. Shuttle Barge spudded below lifter, segment is lifted & connected to alternating sides. Balanced Cantilever Erection. 28

29 Box Segments: Navigation Zone Segments temporarily post tensioned to previous segments in upper corners and floor. Permanent threaded rods and cables (i.e. Tendons) installed at each pair of segments. Continue erecting cantilevers. 29

30 Box Segments: Navigation Zone Tendons installed though all each stage (12 stages i.e. 12 segments each side of the pier segments). 18 to 22 5/8 diameter strand bundled into a Tendon. Tendons are stressed to approx. 900,000 lbs. 30

31 Box Segments: Navigation Zone Construct two adjoining cantilevers with an approx. 4ft gap for cast in place Closure Pour. Once Closure Pour gains strength, stress interior Tendons. 31

32 Box Segments: Navigation Zone Interior accessible at ends of the navigation zone and underside doors. Also provides access to hollow columns for inspection. 32

33 Channel Width: Navigation Zone ~80 ft. ~70 ft. ~300 ft. Seven spans with horizontal & vertical clearances for navigation. 33

34 Box Segments: Navigation Zone 34

35 Under Construction Stay Tuned 35

36 Under Construction Stay Tuned 36

37 Under Construction Stay Tuned 37

38 Under Construction Stay Tuned 38

39 Under Construction Stay Tuned Questions? 39

Ironton Russell Bridge Project

Ironton Russell Bridge Project Construction Update January 1, 2016 Rendering by URS Responsible for Construction Inspection & Engineering Prepared by: Brian Davidson, P.E. Project Overview The Ironton Russell Bridge Project entails

More information

Ironton Russell Bridge Project

Ironton Russell Bridge Project Construction Update October 1, 2014 Rendering by URS Responsible for Construction Inspection & Engineering Prepared by: Brian Davidson, P.E. Ironton Russell Bridge Project Project Summary: October 1, 2014

More information

Ironton Russell Bridge Project

Ironton Russell Bridge Project Construction Update March 1, 2014 Rendering by URS Responsible for Construction Inspection & Engineering Prepared by: Brian Davidson, P.E. Ironton Russell Bridge Project Project Summary: March 1, 2014

More information

PROJECT UPDATE SOUTH NORFOLK JORDAN BRIDGE CITIES OF PORTSMOUTH AND CHESAPEAKE, VIRGINIA. April 2012

PROJECT UPDATE SOUTH NORFOLK JORDAN BRIDGE CITIES OF PORTSMOUTH AND CHESAPEAKE, VIRGINIA. April 2012 PROJECT UPDATE Rendering View from the City of Chesapeake Elizabeth River Boat Landing and Park looking across the Elizabeth River at Portsmouth CITIES OF PORTSMOUTH AND CHESAPEAKE, VIRGINIA The new 5,375

More information

Ironton Russell Bridge Project

Ironton Russell Bridge Project Construction Update September 1, 2014 Rendering by URS Responsible for Construction Inspection & Engineering Prepared by: Brian Davidson, P.E. Ironton Russell Bridge Project Project Summary: September

More information

Ironton Russell Bridge Project

Ironton Russell Bridge Project Construction Update July 1, 2015 Rendering by URS Responsible for Construction Inspection & Engineering Prepared by: Brian Davidson, P.E. Project Overview The entails the construction of a cast in place

More information

Grade Separation Systems. Single-Span Rail Bridge Construction Procedure. An innovation from art engineering inc.

Grade Separation Systems. Single-Span Rail Bridge Construction Procedure. An innovation from art engineering inc. Grade Separation Systems Single-Span Rail Bridge Construction Procedure An innovation from art engineering inc. GSS Single-Span Example Shown: An existing railroad grade crossing. Existing railroad Existing

More information

Ironton Russell Bridge Project

Ironton Russell Bridge Project Construction Update January 1, 2015 Rendering by URS Responsible for Construction Inspection & Engineering Prepared by: Brian Davidson, P.E. Project Overview The Ironton Russell Bridge Project entails

More information

Ironton Russell Bridge Project

Ironton Russell Bridge Project Construction Update October 1, 2015 Rendering by URS Responsible for Construction Inspection & Engineering Prepared by: Brian Davidson, P.E. Ironton Russell Bridge Project Project Summary: October 1, 2015

More information

Ironton Russell Bridge Project

Ironton Russell Bridge Project Construction Update October 1, 2013 Rendering by URS Responsible for Construction Inspection & Engineering Prepared by: Brian Davidson, P.E. Project Overview The Ironton Russell Bridge Project entails

More information

Tilikum Crossing Transit Bridge. Portland, OR

Tilikum Crossing Transit Bridge. Portland, OR Tilikum Crossing Transit Bridge Portland, OR Technical Information Size of Project: The Tilikum Crossing Transit Bridge is 1,720 ft. long and required 24,000 cy total concrete Strength Requirements: The

More information

John James Audubon Bridge

John James Audubon Bridge John James Audubon Bridge Cable-Stayed Main Span Over the Mississippi River Johns Hopkins University Whiting School of Engineering September 10, 2008 The Project Scheduled Time to Complete Estimated Number

More information

SUNSHINE SKYWAY BRIDGE

SUNSHINE SKYWAY BRIDGE SUNSHINE SKYWAY BRIDGE Retrofit of the Post-Tensioned Precast Transition Pier Columns on the Sunshine Skyway Bridge Presented by: Antonio Ledesma, P.E. May 7, 2012 SUNSHINE SKYWAY BRIDGE, FLORIDA Presentation

More information

Lesner Bridge Replacement

Lesner Bridge Replacement Lesner Bridge Replacement Rendering of the Completed Lesner Bridge Structure Construction Camera A Construction Camera has been installed to view images of the bridge construction. Images are updated on

More information

2016 ACEC/PA ANNUAL MEETING

2016 ACEC/PA ANNUAL MEETING 2016 ACEC/PA ANNUAL MEETING z I-49 North, Segment K (I-220 to Martin Luther King Drive) Interchange Project Durk Krone, P.E., TRC Engineers Inc., Baton Rouge, La 1 I-49 North Segment K Project 2 AGENDA

More information

Design and Construction of the SH58 Ramp A Flyover Bridge over IH70. Gregg A. Reese, PE, CE, Summit Engineering Group, Inc.

Design and Construction of the SH58 Ramp A Flyover Bridge over IH70. Gregg A. Reese, PE, CE, Summit Engineering Group, Inc. Design and Construction of the SH58 Ramp A Flyover Bridge over IH70 Gregg A. Reese, PE, CE, Summit Engineering Group, Inc., Littleton, CO ABSTRACT: The SH58 Ramp A bridge in Golden, CO is the latest on

More information

Miami Marlins Baseball Park

Miami Marlins Baseball Park Miami Marlins Baseball Park Roof Support Track Beams Construction by Incremental Lifting Project Owner Miami Dade County General Contractor Hunt-Moss JV Frame Contractor Formworks-Baker Concrete JV Engineer

More information

Lecture 13 CONCRETE WORKS

Lecture 13 CONCRETE WORKS Lecture 13 TSP-308 MPK Ferdinand Fassa CONCRETE WORKS Concrete works Concrete is a man-made (rock) construction material, which is a mixture of portland cement, water, aggregates, and in some cases, admixtures.

More information

Long Key Bridge, a spectacular example. Design Features and Prestressing Aspects of Long Key Bridge

Long Key Bridge, a spectacular example. Design Features and Prestressing Aspects of Long Key Bridge Design Features and Prestressing Aspects of Long Key Bridge { i Thomas M. Gallaway* Principal Cutler-Gallaway Services, Inc. Consulting Engineers San Antonio, Texas Long Key Bridge, a spectacular example

More information

2. Outline of the bridge 3-span continuous deck extradosed bridge Bridge length

2. Outline of the bridge 3-span continuous deck extradosed bridge Bridge length Construction of Extradosed Bridge in the Government Financed Section EUI-NAM PARK, PM, Incheon Bridge Section 5, Doosan Construction & Engineering corporation KYUNG-KUK JUNG, GM, Incheon Bridge Section

More information

Accelerated Bridge Construction (ABC) webinar Thursday, October 24, 2013 ABC Center at Florida International University (FIU) presents

Accelerated Bridge Construction (ABC) webinar Thursday, October 24, 2013 ABC Center at Florida International University (FIU) presents Accelerated Bridge Construction (ABC) webinar Thursday, October 24, 2013 ABC Center at Florida International University (FIU) presents Washington State s Skagit River Bridge Emergency Slide Bijan Khaleghi

More information

Lesner Bridge Replacement

Lesner Bridge Replacement Lesner Bridge Replacement Rendering of the Completed Lesner Bridge Structure Construction Camera A Construction Camera has been installed to view images of the bridge construction. Images are updated on

More information

Construction of Long Key Bridge

Construction of Long Key Bridge Construction of Long Key Bridge ^G1 '4 Jean Muller Chairman of the Board and Technical Director Figg and Muller Engineers, Inc. Tallahassee, Florida MARATHON Conch Key Duck Key Long Key Fig. 7. Location

More information

Gilmerton Bridge Replacement Project Virginia Society of Professional Engineers (VSPE) March 27, 2013

Gilmerton Bridge Replacement Project Virginia Society of Professional Engineers (VSPE) March 27, 2013 1 Gilmerton Bridge Replacement Project Virginia Society of Professional Engineers (VSPE) March 27, 2013 PRESENTERS: Marc Papini Parsons Brinckerhoff, Project Manager Jim Holtje, P.E. PCL Civil Constructors,

More information

Economical Design / Case Studies

Economical Design / Case Studies Economical Design / Case Studies Alabama Technology Transfer Center Workshop Michael Barker, PE University of Wyoming & SSSBA Bridge Technology Center Outline of Today s Presentation Competitiveness of

More information

SPECIAL SPECIFICATION 4584 Segmental Concrete Bridge Unit

SPECIAL SPECIFICATION 4584 Segmental Concrete Bridge Unit 2004 Specifications CSJ: 0028-09-111 SPECIAL SPECIFICATION 4584 Segmental Concrete Bridge Unit 1. Description. Construct cast-in-place segmental concrete box girder superstructure according to the plans,

More information

Accelerated Bridge Construction in USA

Accelerated Bridge Construction in USA Accelerated Bridge Construction in USA Abstract Rush hour traffic is a common daily occurrence in the USA. Highway and bridge construction further aggravates the situation. The Federal Highway Administration

More information

KEYWORDS: Barge Stability, Steel Truss Erection, Horizontal Sliding of Steel Trusses

KEYWORDS: Barge Stability, Steel Truss Erection, Horizontal Sliding of Steel Trusses Replacement of the BNSF Approach Spans over the Mississippi River DAVID ROGOWSKI, P.E. AND JOSH CRAIN, Genesis Structures Inc., Kansas City, Missouri and DAN SIEVE AND KEVIN BECKER, Walsh Construction

More information

Prestressing of Carbon Fiber Elements in Virginia

Prestressing of Carbon Fiber Elements in Virginia Prestressing of Carbon Fiber Elements in Virginia Tuesday, August 11, 2015, 1:30 PM 3:00 PM E. Alan Saunders, PE, CCM VDOT Assistant State Construction Engineer Corrosion Damaged Bridges One of the leading

More information

Lecture 13: Practical Design, The Future of Prestressed Concrete, and Concluding Thoughts...

Lecture 13: Practical Design, The Future of Prestressed Concrete, and Concluding Thoughts... Lecture 13: Practical Design, The Future of Prestressed Concrete, and Concluding Thoughts... LECTURE 13 May 17, 2005 May 17, 2005 1 Where we have been Basics Allowable Stress Ultimate Strength Shear Camber

More information

Progressive Erection Applied to Box Girder with Strutted Wing Slab

Progressive Erection Applied to Box Girder with Strutted Wing Slab Progressive Erection Applied to Box Girder with Strutted Wing Slab Koji Osada 1, Taketo Kanamoto 1, Kimito Saito 2, Takahiro Arai 2 1 Introduction The Uchimaki Viaduct is a multi-span continuous box girder

More information

PRESENTATION PLAN A MODEL COMPARISON FLOOR CONSTRUCTION

PRESENTATION PLAN A MODEL COMPARISON FLOOR CONSTRUCTION PRESENTATION PLAN A MODEL COMPARISON FLOOR CONSTRUCTION An overview of costing strategies for wood framed construction elements CREATING A PROJECT ENDLESS POSSIBILITIES COMPATORS LIST A FLOOR Cast in Place

More information

Florida DOT efforts toward improving Post Tension Durability

Florida DOT efforts toward improving Post Tension Durability Florida DOT efforts toward improving Post Tension Durability By William Nickas 1 (C) COPYRIGHT POST-TENSIONING INSTITUTE, ALL RIGHTS RESERVED Page 1 of 73 Post-Tensioning Strategies Enhanced PT Systems

More information

Seven Wonders of the Ancient World

Seven Wonders of the Ancient World Seven Wonders of the Ancient World Pyramid of Meidum shed 250,000 tons of limestone outer casings Typical Pyramid Pyramid at Meidum Mexico Alameda buildings Palace of Fine Arts National Theater

More information

Construction Measurement III SBQ3314. Precast Pre stressed Concrete Works. Dr. Sarajul Fikri Mohamed

Construction Measurement III SBQ3314. Precast Pre stressed Concrete Works. Dr. Sarajul Fikri Mohamed Construction Measurement III SBQ3314 Precast Pre stressed Concrete Works Dr. Sarajul Fikri Mohamed Table of Contents 1. Pre stressed concrete in bridgeworks: technological aspects 2. SMM2 measurement rules

More information

Civil Engineering Construction I (CBE5031)

Civil Engineering Construction I (CBE5031) Civil Engineering Construction I (CBE5031) Precast Concrete 1 Definition of Precast Concrete Precasting means casting a concrete member at a place other than where it will be used and then moving it to

More information

US-131 Over the Muskegon River. Corey Rogers, P.E. Bridge Construction Engineer

US-131 Over the Muskegon River. Corey Rogers, P.E. Bridge Construction Engineer US-131 Over the Muskegon River Corey Rogers, P.E. Bridge Construction Engineer NB and SB US-131 Each bridge is a three-span, 580 foot long, cast-in-place, post-tensioned concrete box girder structure resting

More information

NATIONAL HARBOR BUILDING M

NATIONAL HARBOR BUILDING M NATIONAL HARBOR BUILDING M 120 Waterfront St. Oxon Hill, Maryland Ryan Sarazen Structural Option Senior Thesis Presentation Spring 2008 Faculty Consultant Dr. Lepage BUILDING LOCATION BUILDING M SITE PLAN

More information

The North Carolina Department of Transportation awarded a

The North Carolina Department of Transportation awarded a Form+Function NEWS & INFORMATION FROM HAMILTON FORM SUMMER 2016 Project Spotlight The Herbert C. Bonner Bridge CYLINDRICAL PILE FORM Coastal Precast Systems, Chesapeake, Virginia The North Carolina Department

More information

The Hashemite University Department of Civil Engineering. Dr. Hazim Dwairi. Dr. Hazim Dwairi 1

The Hashemite University Department of Civil Engineering. Dr. Hazim Dwairi. Dr. Hazim Dwairi 1 Department of Civil Engineering Lecture 2.1 Methods of Prestressing Advantages of Prestressing Section remains uncracked under service loads Reduction of steel corrosion (increase durability) Full section

More information

Pushing the Envelope For 100 Years

Pushing the Envelope For 100 Years Pushing the Envelope For 100 Years Tunneling under the Chesapeake Bay The Parallel Thimble Shoal Highway Tunnel Presented by: Kevin Abt, PE Chesepeake Bay Bridge and Tunnel District Mike Kling, PE, PTOE

More information

APPENDIX G WHITTIER BRIDGE TYPE STUDY EVALUATION OF BRIDGE ALTERNATIVES

APPENDIX G WHITTIER BRIDGE TYPE STUDY EVALUATION OF BRIDGE ALTERNATIVES APPENDIX G WHITTIER BRIDGE TYPE STUDY EVALUATION OF BRIDGE ALTERNATIVES Massachusetts Department of Transportation Highway Division I-95 / Whittier Bridge Replacement Type Study Report 6. Evaluation of

More information

Well Road Project Accelerated Bridge Construction Using Self-Propelled Modular Transporters (SPMT s) By: Mark Bucci, P.E.

Well Road Project Accelerated Bridge Construction Using Self-Propelled Modular Transporters (SPMT s) By: Mark Bucci, P.E. Well Road Project Accelerated Bridge Construction Using Self-Propelled Modular Transporters (SPMT s) By: Mark Bucci, P.E. Presentation Outline Project History Project Scope Construction Alternatives Plan

More information

Introduction.» Demolition Concepts» Concept Design» Final Design» Construction» Health Monitoring

Introduction.» Demolition Concepts» Concept Design» Final Design» Construction» Health Monitoring Location of Project Introduction» Demolition Concepts» Concept Design» Final Design» Construction» Health Monitoring Existing Bridge» Built in 1928» 255-foot Open Spandrel Concrete Arch Bridge» 24-foot

More information

Anchor bolts ASTM F1554, Gr. 36 Wide flange beams ASTM A992, Fy = 50 ksi Misc. structural steel ASTM A36, Fy = 36 ksi

Anchor bolts ASTM F1554, Gr. 36 Wide flange beams ASTM A992, Fy = 50 ksi Misc. structural steel ASTM A36, Fy = 36 ksi STRUCTURAL NOTES MATERIAL STRENGTHS Structural Steel Reinforcing Steel Concrete Masonry Structural Lumber Anchor bolts ASTM F1554, Gr. 36 Wide flange beams ASTM A992, Fy = 50 ksi Misc. structural steel

More information

Challenging Skew: Higgins Road Bridge over I-90

Challenging Skew: Higgins Road Bridge over I-90 Challenging Skew: Higgins Road Bridge over I-90 Lance Peterman, P.E.,S.E. 13th Annual Midwest Bridge Symposium April 28, 2016 2014 HDR, all rights reserved. Presentation Outline Project Overview Design

More information

Requirements for Measuring and Pricing of Structural Concrete

Requirements for Measuring and Pricing of Structural Concrete Requirements for Measuring and Pricing of Structural Concrete October 2016 TRANSPORT INFRASTRUCTURE IRELAND (TII) PUBLICATIONS About TII Transport Infrastructure Ireland (TII) is responsible for managing

More information

Critical Structures Construction Issues

Critical Structures Construction Issues Critical Structures Construction Issues FLORIDA DEPARTMENT OF TRANSPORTATION STATE CONSTRUCTION OFFICE Specification 1-3: Definitions Contractor s Engineer of Record Specialty Engineer CLASS OF CONTRACTOR

More information

I-70 over SR 121 Bridge Slide Construction and Engineering

I-70 over SR 121 Bridge Slide Construction and Engineering I-70 over SR 121 Bridge Slide Construction and Engineering March 6, 2018 Kevin Gorak, American Structurepoint Pete Jerrell, Walsh Construction Project Overview Project Location I-70 in Richmond, IN Project

More information

2014 HDR, all rights reserved.

2014 HDR, all rights reserved. 2014 HDR, all rights reserved. That s No Ordinary Bridge Ben Zeman, P.E. Lance Peterman, P.E.,S.E. Caahlen McAtee, P.E. 2014 HDR, all rights reserved. Presentation Outline Project Overview Design Behavior

More information

Learning Objectives. A Brief History

Learning Objectives. A Brief History Slide 1 Precast Structures and Frames Miles L. Blackman, P.E. Slide 2 Learning Objectives Discuss precast concrete characteristics, advantages and benefits, typical construction methods and construction

More information

SR 0136-G10 ABC BRIDGE REPLACEMENT in Eighty Four, PA

SR 0136-G10 ABC BRIDGE REPLACEMENT in Eighty Four, PA ASHE NATIONAL PROJECT OF THE YEAR SR 0136-G10 ABC BRIDGE REPLACEMENT in Eighty Four, PA For the PENNSYLVANIA DEPARTMENT OF TRANSPORTATION Engineering District 12-0 Submitted By: January 29, 2018 AMERICAN

More information

PARTIAL-DEPTH PRECAST DECK PANEL DESIGN AND CONSTRUCTION IN TEXAS

PARTIAL-DEPTH PRECAST DECK PANEL DESIGN AND CONSTRUCTION IN TEXAS PARTIAL-DEPTH PRECAST DECK PANEL DESIGN AND CONSTRUCTION IN TEXAS Gregg Freeby, P.E., Leon Flournoy, P.E. & Sara Watts, E.I.T TxDOT Bridge Division Prefabricated Elements TxDOT s primary technique for

More information

Bridge Construction Methods

Bridge Construction Methods Bridge Construction Methods Mr. K F TAM, MHKIE, MCIHT Gammon Construction Limited Abstract In Hong Kong, bridge is one of the main transportation accesses. Gammon has responded with resourcefulness, innovation

More information

RESEARCH PROJECT AT UNIVERSITY OF NEVADA, RENO

RESEARCH PROJECT AT UNIVERSITY OF NEVADA, RENO RESEARCH PROJECT AT UNIVERSITY OF NEVADA, RENO QUARTERLY REPORT October 1, 2017 to December 31, 2017 Period Year 2 Project Shake Table Studies of a Bridge System with ABC Connections Submitted by M. Saiidi,

More information

SINGLE STEEL BOX GIRDER BRIDGES FOR THE TERMINAL DEVELOPMENT PROJECT AT TORONTO PEARSON INTERNATIONAL AIRPORT. Srdjan Brasic, M.Sc., P.Eng.

SINGLE STEEL BOX GIRDER BRIDGES FOR THE TERMINAL DEVELOPMENT PROJECT AT TORONTO PEARSON INTERNATIONAL AIRPORT. Srdjan Brasic, M.Sc., P.Eng. SINGLE STEEL BOX GIRDER BRIDGES FOR THE TERMINAL DEVELOPMENT PROJECT AT TORONTO PEARSON INTERNATIONAL AIRPORT Srdjan Brasic, M.Sc., P.Eng. UMA Engineering Ltd. Paper prepared for presentation at the Technical

More information

CONCRETE SPLICED GIRDERS IN TEXAS. Nicholas Nemec, P.E. TxDOT-BRG

CONCRETE SPLICED GIRDERS IN TEXAS. Nicholas Nemec, P.E. TxDOT-BRG CONCRETE SPLICED GIRDERS IN TEXAS Nicholas Nemec, P.E. TxDOT-BRG October 15, 2014 What is a Concrete Spliced Girder? 2 What is a Concrete Spliced Girder? What it is NOT : Continuous For Live Load 3 What

More information

RESEARCH PROJECT AT UNIVERSITY OF NEVADA, RENO

RESEARCH PROJECT AT UNIVERSITY OF NEVADA, RENO RESEARCH PROJECT AT UNIVERSITY OF NEVADA, RENO QUARTERLY REPORT July 1, 2017 to September 30, 2017 Period Year 2 Project Shake Table Studies of a Bridge System with ABC Connections Submitted by M. Saiidi,

More information

7 Bridges in 74 Days. NC 12 Detour

7 Bridges in 74 Days. NC 12 Detour 7 Bridges in 74 Days (Or Less) NC 12 Detour Ocracoke NC 12 Bridges Ocracoke NC 12 Bridges Existing 7 bridges built in 1950's Timber structures w/ ACP Clear width 22.5 ft. 36 to 152 ft. long Limited redirective

More information

COURTYARD INFILL STRUCTURE DESIGN

COURTYARD INFILL STRUCTURE DESIGN COURTYARD INFILL STRUCTURE DESIGN Executive Summary The existing design for the courtyard within the G wing is for a cast-in-place concrete structure. The design being proposed within this analysis is

More information

SPECIAL INSPECTION AGREEMENT

SPECIAL INSPECTION AGREEMENT PART 1 STATEMENT OF SPECIAL INSPECTIONS When special inspection is required to be performed in accordance with International Building Code Chapter 17, a building permit cannot be issued until a statement

More information

DESIGN OF THE MAIN SPANS OF THE CHONGQING CAIYUANBA BRIDGE

DESIGN OF THE MAIN SPANS OF THE CHONGQING CAIYUANBA BRIDGE Design of the Main Spans of the Chongqing Caiyuanba Bridge ARCH 04 M.C. Tang and J. Sun @CIMNE, Barcelona, 2004 DESIGN OF THE MAIN SPANS OF THE CHONGQING CAIYUANBA BRIDGE Man-Chung Tang* and John Sun+

More information

DESIGN AND LAUNCHING OF A REDUNDANT TRUSS OVER RAILROAD YARD

DESIGN AND LAUNCHING OF A REDUNDANT TRUSS OVER RAILROAD YARD 2018 Purdue Road School Transportation Conference Rendering by Touchstone Architecture Martin Furrer, PE, SE March 6, 2018 DESIGN AND LAUNCHING OF A REDUNDANT TRUSS OVER RAILROAD YARD Project Location

More information

With several years of detailing experience and a vast range of knowledge, we have successfully helped clients with numerous projects, including:

With several years of detailing experience and a vast range of knowledge, we have successfully helped clients with numerous projects, including: EXCELLENCE IS IN THE DETAIL CMU & Masonry Our Company Prothious Engineering Services is one of the largest and most successful detailing companies in the world. Founded in 2002 as a subsidiary of JSL,

More information

Introduction -- Tsing Ma Bridge

Introduction -- Tsing Ma Bridge Introduction The Lantau Fixed Crossing, or sometimes called the Lantau Link, is one of the Airport Core Projects for the construction of the new international airport of Hong Kong located in Chek Lap Kok.

More information

Structural Tests and Special Inspections Form. Inspection of Fabricators (1704.2)

Structural Tests and Special Inspections Form. Inspection of Fabricators (1704.2) Inspection of Fabricators (1704.2) Furnish inspection reports (1704.2.1) - Fabricators that have not been approved Provide a Certificate of Compliance (1704.2.2) - Approved Fabricators Steel Construction

More information

Precast Prestressed Segmental Elevated Urban Motorway in Italy

Precast Prestressed Segmental Elevated Urban Motorway in Italy Precast Prestressed Segmental Elevated Urban Motorway in Italy Bruno Gentilini Lino Gentilini Consulting Engineers Trento, Italy Bruno Gentilini Lino Gentilini The authors, who were responsible for the

More information

Installing DELTABEAM. Installation of DELTABEAM. Deliveries. Storage on-site

Installing DELTABEAM. Installation of DELTABEAM. Deliveries. Storage on-site Installing DELTABEAM Installation of DELTABEAM These DELTABEAM installation instructions are intended to complement the project s erection plan. Peikko s technical support can help with the erection plan

More information

Rt. 15/29 (SBL) Bridge Superstructure Replacement and Roadway Widening

Rt. 15/29 (SBL) Bridge Superstructure Replacement and Roadway Widening Rt. 15/29 (SBL) Bridge Superstructure Replacement and Roadway Widening March 5, 2009 Nicholas J. Roper NOVA District Bridge Engineer Robert F. Price Resident Administrator of Loudoun/ Prince William Construction

More information

MARTA Rapid Transit Bridges

MARTA Rapid Transit Bridges MARTA Rapid Transit Bridges his precast segmental post-tensioned concrete project for the T Metropolitan Atlanta Rapid Transit Authority demonstrates the ability of the segmental technique to economically

More information

1/26/2015 DETAILS CIP DETAIL EXAMPLES WHY SIMPLIFY DETAILS? CIP DETAIL EXAMPLES DETAILING FOR SIMPLICITY

1/26/2015 DETAILS CIP DETAIL EXAMPLES WHY SIMPLIFY DETAILS? CIP DETAIL EXAMPLES DETAILING FOR SIMPLICITY Detailing of ABC Bridges for Simplicity and Durability Michael P. Culmo, P.E. CME Associates, Inc. East Hartford, CT DETAILS This presentation contains many preferred details My favorite details will be

More information

Management of Half Joints in RTA Bridges Amie Nicholas, Project Engineer, NSW Roads and Traffic Authority

Management of Half Joints in RTA Bridges Amie Nicholas, Project Engineer, NSW Roads and Traffic Authority Management of Half Joints in RTA Bridges Amie Nicholas, Project Engineer, NSW Roads and Traffic Authority SYNOPSIS In recent years, there has been heightened concern over the performance of half joints

More information

Concrete Framing Systems - Walls and Columns

Concrete Framing Systems - Walls and Columns Concrete Framing Systems - Walls and Columns Casting a Concrete Wall Wall Footing Reinforcing Wall Forms Pouring Concrete Finishing the Concrete Controlling Cracking Insulating Concrete Forms (ICF) Tilt-Up

More information

Construction Techniques of The 3 rd Bosphorus Bridge in Istanbul, Turkey

Construction Techniques of The 3 rd Bosphorus Bridge in Istanbul, Turkey International Symposium on Industrial Chimneys and Cooling Towers, Prague, Oct 8-11, 2014 Construction Techniques of The 3 rd Bosphorus Bridge in Istanbul, Turkey M. Orçun TOKUÇ 1 and Tamer TUNCA 2 1 Engineer

More information

Get In, Get Out, Stay Out!

Get In, Get Out, Stay Out! Get In, Get Out, Stay Out! FHWA Accelerated Bridge Construction Program By Gary Jakovich, P.E. Senior Bridge Engineer, FHWA Virginia Concrete Conference Richmond, VA March 6-7, 2007 Federal Highway Administration

More information

HARRY H. EDWARDS INDUSTRY ADVANCEMENT AWARD. The Chesapeake and Delaware Canal Bridge Design-Construction Highlights

HARRY H. EDWARDS INDUSTRY ADVANCEMENT AWARD. The Chesapeake and Delaware Canal Bridge Design-Construction Highlights HARRY H. EDWARDS INDUSTRY ADVANCEMENT AWARD The Chesapeake and Delaware Canal Bridge Design-Construction Highlights Denney Pate, P.E. Regional Bridge Engineer Figg Engineering Group Tallahassee, Florida

More information

John James Audubon Bridge. Introduction

John James Audubon Bridge. Introduction John James Audubon Bridge Introduction The Project Why build the bridge? The bridge--proposed to be the longest cable-stayed bridge in America--will replace an existing ferry between the communities of

More information

Precast Segmental Bridge Construction Part 4 - Balanced Cantilever Erection Method

Precast Segmental Bridge Construction Part 4 - Balanced Cantilever Erection Method Precast Segmental Bridge Construction by John E. Kristensen PE., PLS., PMP. Introduction The popularity of precast concrete segmental bridge construction has grown worldwide in the last few decades. A

More information

Design, fabrication and construction of Railway Bridge over Södertälje canal

Design, fabrication and construction of Railway Bridge over Södertälje canal NSCC2009 Design, fabrication and construction of Railway Bridge over Södertälje canal Michael B. Thulstrup 1, Mattias Nilsson 2, Robert Hällmark 3 & Jens P. Nielsen 4 1 Project Manager, MT Højgaard a/s,

More information

PAN PAC PULPMILL TREATMENT TANK

PAN PAC PULPMILL TREATMENT TANK PAN PAC PULPMILL TREATMENT TANK B. PENG 1, M. ROMANES 2, P. GABY 1 1 Holmes Consulting Group 2 Concrete Structures (NZ) Ltd ABSTRACT The recently completed MBBR and AS tank is part of a multi-million dollar

More information

NSBA. Prize Bridge. Awards

NSBA. Prize Bridge. Awards NSBA 2016 Prize Bridge Awards THE COUNTRY S BEST STEEL BRIDGES have been honored in this year s Prize Bridge Awards competition. Conducted every two years by the National Steel Bridge Alliance (NSBA),

More information

Special Considerations for Maintenance of the Sunshine Skyway Bridge

Special Considerations for Maintenance of the Sunshine Skyway Bridge Florida Department of TRANSPORTATION Special Considerations for Maintenance of the Sunshine Skyway Bridge 2014 NATIONAL BRIDGE PRESERVATION PARTNERSHIP CONFERENCE James J. Jacobsen, P.E. District Structures

More information

CHEF MENTEUR BRIDGE REPLACEMENT

CHEF MENTEUR BRIDGE REPLACEMENT CHEF MENTEUR BRIDGE REPLACEMENT Gumbo Engineers, Inc. Lucy Farrar, Travis Honore, Jeremy Vezina, Thomas Harrison PRELIMINARY DESIGN Fall 2016 Semester CE 4750 Professional Issues Mr. Miles Williams INTRODUCTION

More information

Smarter. Safer. Leaner.

Smarter. Safer. Leaner. Smarter. Safer. Leaner. Fast Installation and Removal Decrease Leading Edge Exposure by 87% OSHA Compliant Versatile and Reusable Use Perimeter Protection Posts During Construction: At Building Perimeter

More information

Structural Technical Report #2 Pro/Con Study of Alternate Floor Systems

Structural Technical Report #2 Pro/Con Study of Alternate Floor Systems Christopher McCune Structural Option Eight Tower Bridge Faculty Advisor: Dr. Hanagan October 31 st, 2005 Structural Technical Report #2 Pro/Con Study of Alternate Floor Systems Executive Summary This technical

More information

Statement of Special Inspections

Statement of Special Inspections Statement of Special Inspections SUCF Project No: Project Title: Registered Design Professionals in Responsible Charge: (Name) (Address) Architect: Structural Engineer: Mechanical Engineer: Identification

More information

Structural - Engineering Review Checklist

Structural - Engineering Review Checklist Structural - Engineering Review Checklist Project: List Corridor Criteria ID Review Priority (H,M,L) TOPICS S-_-## Structural Design Codes, Manuals and Specifications 6.1.0 REFERENCES DESIRED Criteria

More information

Launching technique for the Viaduc de Millau

Launching technique for the Viaduc de Millau Launching technique for the Viaduc de Millau Introduction The Viaduc de Millau is part of the A75 linking Paris with Barcelona (Figure 1). It is currently the highest bridge in the world at 343m high with

More information

Lowering a Cofferdam: Alternate Means to Constructing a Cofferdam

Lowering a Cofferdam: Alternate Means to Constructing a Cofferdam SIXTEENTH BIENNIAL SYMPOSIUM September 19-22, 2016 Lowering a Cofferdam: Alternate Means to Constructing a Cofferdam Tyler D. VanderLinden, P.E.; PCL Civil Constructors, Inc. Tom Petray, P.E.; Bittner-Shen

More information

Teglvaerks Bridge, Copenhagen - Denmark Kjeld Thomsen, Civil Engineer, MSc - CEO ISC Consulting Engineers A/S

Teglvaerks Bridge, Copenhagen - Denmark Kjeld Thomsen, Civil Engineer, MSc - CEO ISC Consulting Engineers A/S SIXTEENTH BIENNIAL SYMPOSIUM September 19-22, 2016 Teglvaerks Bridge, Copenhagen - Denmark Kjeld Thomsen, Civil Engineer, MSc - CEO ISC Consulting Engineers A/S TAMPA MARRIOTT WATERSIDE HOTEL AND MARINA

More information

Replacing the Aging US 52 Mississippi River Bridge

Replacing the Aging US 52 Mississippi River Bridge 2019 TRANSPORTATION & HIGHWAY ENGINEERING CONFERENCE F. Duncan, PE, G. Hasbrouck, PE and A. Dour, PE Replacing the Aging US 52 Mississippi River Bridge February 26, 2019 Project Overview US 52 / IL 64

More information

Development Island Vehicle Access

Development Island Vehicle Access Elizabeth Quay Water Front Development Island Vehicle Access Bridge Small Bridges Conference - 23 rd November 2015 Presentation Outline Project Overview Key Challenges Description of Island Vehicle Access

More information

SUMMARY SHEETS OF HYBRID CONNECTIONS

SUMMARY SHEETS OF HYBRID CONNECTIONS APPENDIX E SUMMARY SHEETS OF HYBRID CONNECTIONS NCHRP 12-88 Connection Evaluations Appendix E E-1 APPENDIX E SUMMARY SHEETS OF HYBRID CONNECTIONS NCHRP 12-88 Connection Evaluations Appendix E E-2 Location:

More information

1. Cast-in-place concrete is specified in Section

1. Cast-in-place concrete is specified in Section SECTION 03 38 00 PART 1 - GENERAL 1.01 DESCRIPTION A. This Section describes the requirements for furnishing and installing post-tensioned slabs, jacks, jacking and anchors at Parking Structure, and record

More information

This precast prestressed concrete pedestrian

This precast prestressed concrete pedestrian The Rockach Boulevard Pedestrian Bridge by ELIEZER SHAMIR Partner, E. Shamir - H. Posner Consulting Engineers Tel-Aviv, Israel This precast prestressed concrete pedestrian bridge crosses the Rockach Boulevard,

More information

715 - PRESTRESSED CONCRETE MEMBERS SECTION 715 PRESTRESSED CONCRETE MEMBERS

715 - PRESTRESSED CONCRETE MEMBERS SECTION 715 PRESTRESSED CONCRETE MEMBERS SECTION 715 PRESTRESSED CONCRETE MEMBERS 715.1 DESCRIPTION Manufacture, cure, handle and install prestressed concrete bridge beams and panels to the dimensions specified on the Contract Documents. Manufacture

More information

PAUL ZICK, PE NORTH SHORE CONSTRUCTORS JV

PAUL ZICK, PE NORTH SHORE CONSTRUCTORS JV NORTH SHORE CONNECTOR TUNNELS AND STATION SHELL LIGHT RAIL PROJECT PAUL ZICK, PE NORTH SHORE CONSTRUCTORS JV North Shore Connector Alignment 7300 lf Extension to existing 25 mile system 18 Contracts $435

More information

CONCRETE & MASONRY SAFETY

CONCRETE & MASONRY SAFETY CONCRETE & MASONRY SAFETY Safety and Quality Relationship REINFORCING MISS-PLACED IN CONCRETE RESULTS IN WEAKEN STRUCTURE IMPROPER PLACEMENT OF LINTEL BEAMS INCORRECT MASONRY CEMENT OR GROUT MIX DESIGN

More information

PHASING CONSIDERATIONS FOR BRIDGES

PHASING CONSIDERATIONS FOR BRIDGES PHASING CONSIDERATIONS FOR BRIDGES Christopher Miller, P.E. 6/11/18 Table of contents 1 What Not to Do 3 2 Span Arrangement 4-9 3 4 5 6 Superstructure Geometric Considerations Superstructure Structural

More information

CONSTRUCTION SPECIFICATION FOR CONCRETE BARRIERS

CONSTRUCTION SPECIFICATION FOR CONCRETE BARRIERS ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 553 FEBRUARY 1991 CONSTRUCTION SPECIFICATION FOR CONCRETE BARRIERS 553.01 SCOPE 553.02 REFERENCES 553.03 DEFINITIONS TABLE OF CONTENTS 553.04 SUBMISSION

More information