1 MEKSIS A.Ş. INSTALLATION GUIDE Prismatic Sectional Water Tank MEKSIS Mekanik Sistemler İmalat ve Müh. San. A.Ş. ASO 2.SANAYİ BÖLGESİ 2009.CAD.NO:6 TEMELLİ TÜRKOBASI KÖYÜ SİNCAN ANKARA Telefon : Faks : E-Posta : MEKSIS@MEKSIS.com.tr

2 TABLE OF CONTENTS 1. INTRODUCTION IMPORTANT NOTICES BEFORE ASSEMBLY PRISMATIC SECTIONAL WATER TANK ASSEMBLY CONCRETE BASEMENT ASSEMBLY OF BASES SIDE PANELS ASSEMBLY INSTALLATION OF REINFORCING RIBS ASSEMBLY OF ROOF ASSEMBLY OF THE ACCESSORIES TEST AND TIGHTENING BOTTOM LEAKAGE TEST: TANK SIDE PANELS TEST: FINAL TEST: IMPORTANT NOTICES AFTER ASSEMBLY MAINTENANCE SUMMARY OF SECTIONAL WATER TANK ASSEMBLY MEKSIS AFTER SALES SERVICE MAKING A SERVICE AGREEMENT: TECHNICAL SUPPORT UPGRADE AND REFURBISHMENT REPAIR AND MAINTENANCE INTRODUCTION Thank you for buying our sectional water tanks. Please follow these instructions carefully. The Prismatic Sectional Bolted Tank is a modular, constructed from separated panels which are pressed steel sheets (Figure 1) and bolted together on site to create a larger water tank. There is no welding operation used during the panels manufacturing (Figure 2). Figure 1. Star type prismatic sectional tanks panel MEKSIS A.Ş. Page 1

3 Modular design provides ease of transport and flexibility. Panels are rigidly supported by an internal combination of horizontal and vertical reinforcing ribs and supports. Figure 2. Graphical view of a prismatic sectional water tank 2. IMPORTANT NOTICES BEFORE ASSEMBLY Before assembly, please notice the following procedures: a. Analyze the water prior to store and chose the correct material or coating system for your tank. b. Utmost care shall be taken during assembly not to damage the panel surfaces, and proper and clean shoes should be worn to avoid damage to the tank base or walls. c. Provide 220V electricity supply and adequate construction site lighting. d. To allow access to bolts, minimum space of 350 mm shall be provided all around the tank. Detailed space range is shown in Figure 3. Figure 3. Minimum space requirements around sectional tank e. Tank foundation must be at the same dimensions which were provided to the customer by MEKSIS. MEKSIS A.Ş. Page 2

4 f. Check the all required components (tank sections, nuts, bolts, washers, sealant and other requested accessories shown in Figure 4). Figure 4. Summary of a prismatic sectional water tank s accessories g. There must be enough water for leakage test after the installation. h. Provide all necessary test equipments such as valves, flanges, blind flange and etc. i. For the tanks which are aimed to be filled with oil or gasoline, water can also be used for leakage test. 3. PRISMATIC SECTIONAL WATER TANK ASSEMBLY 3.1. Concrete Basement NOT: The foundation should be done by the construction project owner. Tank must be assembled on a flat and level concrete basement and it must exceed the nominal tank dimensions by a minimum of 700 mm. Concrete basement shall have the following specifications: a. Concrete quality should be at least C25. Other specifications and mixture ratio are as bellow: Cement: 340 kg/m 3 Water: 200 kg/m 3 Small Aggregate: 757 kg/m 3 Thick Aggregate: 1,135 kg/m 3 Concrete Strong: 300 kg/m 2 b. Concrete thickness must be minimum 50 mm. If it possible 100 mm is recommended. c. Under normal ambient conditions (20ºC), the concrete curing time is 28 hours. If you have the opportunity to steam the concrete, curing time MEKSIS A.Ş. Page 3

5 will decrease to 8 hours. Chemical materials shall also be used at cold winter conditions. NOT: Do not assembly tank before this time. d. If a higher strength is needed Dramix steel fibers with dosage o 35 kg/m³ can also be added to the concrete. e. Foundation surface shall be flat and without slope. If the base is sloping, it should be flatted using the concrete. f. Be noted that the concrete basement alone may not provide the sufficient resistance and soil mechanics are also needed to be considered. Foundation should be sited on firm/solid ground. Sites on made up ground, i.e. filled ground should be avoided. g. Dimensions of the foundation shall be as given information in drawings. Foundation with larger or smaller dimensions may lead to miss-assemblies. NOT: The space between the tank and walls must be definitely filled with concrete Assembly of Bases If you have ordered the plastic footings, first place them on concrete basement and then lay the bottom panels on them as shown in the Figure 5. Figure 5. Placing plastic footings If there is no plastic footing, first place the reinforcement plates and their sealing gasket on the concrete basement, then place and push the EPDM sealant strip around the flange of bottom panels and then lay out them with drilled flange uppermost. You can use a podger for cutting bolt holes on sealant and align the panels, then insert bolts you maybe push the bolts through the sealant strip when bolting the panels together (Figure 6 and 7). NOT: Don t forget to wipe clean the faces, such that, the sealant strip can t come into contact with dust from the floor area. MEKSIS A.Ş. Page 4

6 Figure 6. Assembly of bases Figure 7. Aligning the bottom panels using a podger MEKSIS A.Ş. Page 5

7 3.2. Side Panels Assembly The next stage in the tank assembly is the installation of side panels. First, like previous stage, place and push the EPDM around the periphery of assembled bottom panels and similarly apply EPDM sealant to the horizontal and vertical faces of the side panels (Figure 8). NOT: Ensure that all side faces of the panel are covered by sealant strips. Figure 8. Applying sealant strip around the side panels Then, place the Star Sealant Gasket (T shape) between the panels at the cross joints. Place 2 stars, back to back, where the 4 panels are connected (Figure 9). Don t forget to put a star seal between two side panels and bottom panel (Figure 10). Then bolt the row panels together with M10 bolts and nuts, and finish the side walls assembling. Figure 9. Placing the star seals between panels MEKSIS A.Ş. Page 6

8 Figure 10. Placing one star seals between side panels and bottom panel After assembly of the side panels, commence installation of 4 corner angels and ensure that the corner sealant gasket to be placed properly, as shown in Figure 11. Figure 11. Placing the corner sealant gasket 3.3. Installation of Reinforcing Ribs Proper installation of the reinforcing ribs is the most critical step in the tank assembly. Connect the reinforcing ribs to the side panels by bolting to the special end stiffener plates which are inserted between two side panels (Figure11 and 12). NOT: Use the same M10 bolts for reinforcing parts, and use washers for both sides. Also, ensure that the bolts and nuts are connected as shown in Figure 11 and. MEKSIS A.Ş. Page 7

9 Figure 11. Reinforcing ribs and end stiffener plates connections-inside view Figure 12. Reinforcing ribs and end stiffener plates connections-outside view 3.4. Assembly of Roof After the side panels assembly is completed, commence the installation of the roof panels. But before that, ensure that vertical supports are installed and tightened to the bottom panels (Figure14). Like bottom and side panels, first place and push the sealant strips to the flange faces of the top panels. Then, commence the assembly from side panels and proceed to the center. Finally, tighten the vertical support top to the roof (Figure15). MEKSIS A.Ş. Page 8

10 Figure 14. Vertical support assembly Figure 15. Assembly of roof and vertical support IMPORTANT NOT: During the tightening please consider the following: 1. All bolts must be fitted hand tight only at first. After the whole tank assembly is complete, tighten the bolts mechanically. 2. For mechanical tightening, tighten the nut with a nut-runner (i.e. impact wrench) and keep the bolt from the opposite side by a box end wrench, and be sure that the bolt head does not turn while the nut is turned. Before the tightening, proper tightening torque must be measured with a torque wrench (Figure16). 3. Maximum tightening torque shall be as follow: M10 M12 M14 45 (Nm) 60 (Nm) 80 (Nm) MEKSIS A.Ş. Page 9

11 NOT: During the tightening, ensure that the bolt holes are perfectly aligned (i.e. coaxial). Figure 16. Proper bolt tightening method 3.5. Assembly of the Accessories After the tank has been completely assembled, before filling, proceed to install the tank accessories which have been shown in Figure 4. Assemble of the inlet/outlet nipples and other connections shall be fitted to the positions, which have been agreed at the time of order (Figure 17). Figure 17. Inlet and outlet connection details Ensure that the manhole is fully sealed and cover is securely closed (Figure 18). MEKSIS A.Ş. Page 10

12 4. TEST AND TIGHTENING Figure 18. Manhole cover installation The final stage of sectional water tank assembly is leakage test. After filling, if any leakage occurs, carefully retighten bolts around the area until it stops. The following steps should be followed in the testing: 4.1. Bottom Leakage Test: First, fill the tank by test water up to 100 mm. After filling, tank shall be controlled for at least 4 hour Tank Side Panels Test: Tank shall be controlled from outside and inside by adding 500 mm water at each time. In case of any problem (e.g. Leakage, deformation, etc.), stop the filling and re-tension the bolts around the leaked area. After the solving the problem(s), test can be continued Final Step: Finally, tank shall be completely filled and left for at least 6 hours. If there is no sign of any leakage, tank test is completed. NOT: During the test, sometimes, it is needed to reduce the water level. In all water tank tests, there is a risk of discharging of averagely %25 of the tank capacity. In order to reusing the discharged water, it is recommended to provide another space (e.g. another small tank) to save the discharged water. MEKSIS A.Ş. Page 11

13 If there is no chance of such an extra space, the manufacturer is not responsible for cost of the discharged water. 5. IMPORTANT NOTICES AFTER ASSEMBLY Please consider the following note after the assembly of your tank: a. If possible, implement a filtration or a treatment system prior to the tank, for preventing unexpected corrosions. b. Depend on the stored water quality; corrosion may take place inside the tank, causing some health problems. For preventing this problem, it is strongly recommended that at least every one year, clean the tank. c. Do not clean your tank by unknown chemicals; they may cause damage at tank materials. d. Check bolts for unclench every one year and retighten any unclench bolts. e. All inlet/outlet connections shall be independently supported and shall not impose any point load on the tank body. f. Do not step or walk on the top of the tank. Also placing any heavy weights may result in deformations and leakages on the tanks. NOT: Entry into the tank should only be made by persons who are trained and equipped for entry into spaces. NOT: if the assembly of the tank has been made by untrained or unsupervised staff, no responsibility can be accepted by the MEKSIS for the installation. 6. MAINTENANCE Please review the related product Operations & Maintenance manuals for detailed information. MEKSIS A.Ş. Page 12

14 7. SUMMARY OF SECTIONAL WATER TANK ASSEMBLY MEKSIS A.Ş. Page 13

15 8. MEKSIS AFTER SALES SERVICE MEKSIS A.Ş. after sales service department provides comprehensive inspection, maintenance, cleaning and repair services on all its products. Our trained technical staffs are fully dedicated to ensure all works are carried out in compliance with relevant legislation and guidance. MEKSIS service includes the following: 8.1. Making a Service Agreement: Our service agreement includes monthly/annually preventive maintenances Technical Support Adding insulation in an existing tank Applying protective coating Implementation water treatment/softener Applying of electronic equipments for water level control or freeze alarm indicator Upgrade and Refurbishment Increasing or decreasing the tank capacities Complete removal and replacement tanks 8.4. Repair and Maintenance Tank cleaning Sealants and retightening the bolts Panel repairs or replacements Re-coating an existing tank MEKSIS Service Tel: MEKSIS Service E-Posta: servis@meksis.com.tr MEKSIS A.Ş. Page 14

Preventing Water Leakage through Construction Joints using SYNKOFLEX Preformed Compressible Waterstop

Preventing Water Leakage through Construction Joints using SYNKOFLEX Preformed Compressible Waterstop Preventing Water Leakage through Construction Joints using SYNKOFLEX Preformed Compressible Waterstop Introduction A typical problem in most Water Retaining Structures is the leakage of water through Construction

More information

Division 07 Thermal and Moisture Protection Thermal Protection Blanket Insulation Page 1 of 17

Division 07 Thermal and Moisture Protection Thermal Protection Blanket Insulation Page 1 of 17 07 21 16 Blanket Insulation Page 1 of 17 Design Number UNI/BI 120-03 FIRE RESISTANT GREASE DUCT Unifrax I LLC FyreWrap Elite 1.5 Duct Insulation CAN/ULC S144 Fire Resistance Rating 2 hours Fire Inside

More information

Division 07 Thermal and Moisture Protection Thermal Protection Blanket Insulation Page 1 of 11

Division 07 Thermal and Moisture Protection Thermal Protection Blanket Insulation Page 1 of 11 07 21 16 Blanket Insulation Page 1 of 11 Unifrax I LLC Design No. UNI/BI 120-14 FIRE RESISTANT GREASE DUCT FyreWrap Elite 1.5 Duct Insulation ASTM E 2336-16 and ICC-ES Acceptance Criteria for Grease Duct

More information

MATHIS WALL-MOUNT FAUCET

MATHIS WALL-MOUNT FAUCET SKU(s): 931725 BEFORE YOU BEGIN We recommend consulting a professional if you are unfamiliar with installing bathroom fixtures and plumbing. Signature Hardware accepts no liability for any damage to the

More information

PVC Stub Flanges & Backing Rings

PVC Stub Flanges & Backing Rings PVC Stub Flanges & Backing Rings Australian Made for the pressure pipe market Quick Alignment No Pre-drilling of Holes Easier Installation Australian Made Manufactured to Class 18 Quality ISO 9001 Lic

More information

CONCRETE FORMWORK CHECKLIST AT SITE

CONCRETE FORMWORK CHECKLIST AT SITE CONCRETE FORMWORK CHECKLIST AT SITE Concrete formwork is a temporary supporting structure for concrete when it is placed at the construction site to keep the concrete in position and shape till it gets

More information

IMPORTANT: Levelness of the walk-in floor is critical. If the floor is not level, vertical panels cannot be aligned properly.

IMPORTANT: Levelness of the walk-in floor is critical. If the floor is not level, vertical panels cannot be aligned properly. Floor panels INSTALLATION This section is applicable only if your walk-in has a floor. If not, proceed with next section. These are probably the most important panels you will install. To install the floor

More information

G U T T E R SY S T E M

G U T T E R SY S T E M GUTTER SYSTEM Why should I buy steel gutters? A guttering system is a roof accessory that is used to quickly discharge hundreds of liters of water during a downpour. The Struga steel guttering system is

More information

SECTION MANUFACTURED ROOF EXPANSION JOINTS

SECTION MANUFACTURED ROOF EXPANSION JOINTS SECTION 07 71 29 - MANUFACTURED ROOF EXPANSION JOINTS PART 1 -GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division

More information

Date of update January 25, 2018 Valid until

Date of update January 25, 2018 Valid until CERTIFICATE PRODUCT APPLICATION VTT-C-4805-09 Date of update January 25, 2018 Valid until 12.10.2020 U Protect fire insulation solutions for ventilation ducts MANUFACTURER Saint-Gobain Finland Oy / ISOVER

More information

Architectural Roof and Wall Products Guide Specifications

Architectural Roof and Wall Products Guide Specifications Architectural Roof and Wall Products Guide Specifications Western States Metal Roofing 901 W. Watkins St. Phoenix, AZ 85007 PH: 602-495-0048 FX: 602-261-7726 FORMED METAL WALL PANELS This Guide Specification

More information

SECTION COLD-FORMED METAL TRUSSES

SECTION COLD-FORMED METAL TRUSSES SECTION 054400 COLD-FORMED METAL TRUSSES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification

More information

Installation & maintenance instructions

Installation & maintenance instructions One piece, KD & 2 part cold water storage tanks Installation & maintenance instructions Nicholson Plastics Ltd. GRP Specialist since 1968 Table of contents 1. Guidelines for locating water tanks... 1 2.

More information

Architectural Wall Products Guide Specifications

Architectural Wall Products Guide Specifications Western States Metal Roofing 901 W. Watkins St. Phoenix, AZ 85007 PH: 602-495-0048 FX: 602-261-7726 Architectural Wall Products Guide Specifications FORMED METAL WALL PANELS This Guide Specification is

More information

Infinity - Century Combination Installation Instructions Gelcoat & Solid Surface Bathware

Infinity - Century Combination Installation Instructions Gelcoat & Solid Surface Bathware Tools and materials you might need for proper installation: Level Caulking gun Drill Scissors Jig saw or router Wood file or 180 grid sand paper 100% silicone caulking Clamps Galvanized screws (8) 1 bolts

More information

VAREC SERIES 2010B/2020B/3500B PRESSURE AND VACUUM RELIEF VALVE INSTRUCTION, OPERATION AND MAINTENANCE MANUAL

VAREC SERIES 2010B/2020B/3500B PRESSURE AND VACUUM RELIEF VALVE INSTRUCTION, OPERATION AND MAINTENANCE MANUAL Before installation these instructions must be fully read and understood 2010B 3500B 2020B The VAREC Vapor Control Inc. 2010B/2020B/3500B Series pressure and/or vacuum relief valves have not been tested

More information

PSI Compakt Seals and Wall Sleeves with Fixed / Loose Flange

PSI Compakt Seals and Wall Sleeves with Fixed / Loose Flange Pipeline Accessories PSI Compakt Seals and Wall Sleeves with Fixed / Loose Flange General Information Sectional View Technical Data 1 PSI Compakt Seals and Wall Sleeves with Fixed / Loose Flange General

More information

SECTION ACOUSTICAL PANEL CEILINGS

SECTION ACOUSTICAL PANEL CEILINGS SECTION 095113 ACOUSTICAL PANEL CEILINGS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and General Provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification

More information

Description Unit Quantity Rate Kshs. Amount Kshs.

Description Unit Quantity Rate Kshs. Amount Kshs. BILL No.1 40m3 MASONRY STORAGE TANK No. Description Unit Quantity Rate Kshs. Amount Kshs. 1 SETTING OUT AND EARTH WORKS 1.1 General site clearance and setting out 1.2 Excavate over site 200mm to remove

More information

TAMDID PIPES ABOVE GROUND FIBERGLASS STORAGE TANKS

TAMDID PIPES ABOVE GROUND FIBERGLASS STORAGE TANKS TAMDID PIPES ABOVE GROUND FIBERGLASS STORAGE TANKS Tamdid Pipes Fiberglass tanks provide an excellent vessel for drinking water, waste water and fire protection water needs. These tanks are made from Polyester

More information

Architectural Roof and Wall Products Guide Specifications

Architectural Roof and Wall Products Guide Specifications Architectural Roof and Wall Products Guide Specifications 901 W. Watkins St. Phoenix, AZ 85007 PH: 602-495-0048 FX: 602-261-7726 FORMED METAL ROOF AND WALL PANELS This Guide Specification is to be used

More information

SECTION HANGERS AND SUPPORTS FOR PLUMBING

SECTION HANGERS AND SUPPORTS FOR PLUMBING SECTION 22 05 29 HANGERS AND SUPPORTS FOR PLUMBING PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division

More information

SECTION COMMON WORK RESULTS FOR FIRE SUPPRESSION

SECTION COMMON WORK RESULTS FOR FIRE SUPPRESSION Page 210500-1 SECTION 210500 - PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections,

More information

" RISKS ASSOCIATED WITH THE INSTALLATION OF THE SYSTEM

 RISKS ASSOCIATED WITH THE INSTALLATION OF THE SYSTEM PALLET RACK 85-110 installation, use and maintenance instructions Shelving made entirely of first grade certified steel sheet and cold-profiled steel with galvanized steel according to SENDZIMIR process

More information

WARNING- THIS EQUIPMENT IS DESIGNED FOR ADULTS ONLY. ONLY HEALTHY PEOPLE AGES 13 AND UP SHOULD USE THE EQUIPMENT.

WARNING- THIS EQUIPMENT IS DESIGNED FOR ADULTS ONLY. ONLY HEALTHY PEOPLE AGES 13 AND UP SHOULD USE THE EQUIPMENT. INSTALLATION DETAILS Recommended crew (Adult): 2 Installation time: 2 hours (plus time for concrete to cure) User age: 13 and up Weight: 163 lbs MAINTENANCE: As the owner of the equipment you are responsible

More information

When I started tiling, we didn t do our own shower pans that BATHS

When I started tiling, we didn t do our own shower pans that BATHS BATHS Preventing Leaks in Tiled Showers Detail the pan properly before any tile is installed BY TOM MEEHAN Photos by Roe Osborn When I started tiling, we didn t do our own shower pans that job fell to

More information

Pre-Fabricated Roof Curbs

Pre-Fabricated Roof Curbs Knock Down Curb Assembly Instructions These roof curb assembly instructions are to be used as general guidelines only. Included with shipment are as-built drawings for proper location of sections and channels.

More information

Conergy SolarFamulus II

Conergy SolarFamulus II Conergy SolarFamulus II Installation manual www.conergy.com Table of Contents Table of Contents SolarFamulus II for universal use on flat roofs 1 Introduction 1 1.1 Short description 1 1.2 Intended use

More information

Site Preparation... 2

Site Preparation... 2 TRUFIREWALLS INSTALLATION MANUAL This Installation Manual is intended to assist in the preparation and installation of TruFireWalls products manufactured by Oldcastle Enclosure Solutions. The TruFireWalls

More information

CONSTRUCTION SPECIFICATION FOR FOOTINGS AND PADS FOR ELECTRICAL EQUIPMENT

CONSTRUCTION SPECIFICATION FOR FOOTINGS AND PADS FOR ELECTRICAL EQUIPMENT ONTARIO PROVINCIAL STANDARD SPECIFICATION OPSS.MUNI 616 APRIL 2018 CONSTRUCTION SPECIFICATION FOR FOOTINGS AND PADS FOR ELECTRICAL EQUIPMENT TABLE OF CONTENTS 616.01 SCOPE 616.02 REFERENCES 616.03 DEFINITIONS

More information

THE INSTALLING INSTRUCTION FOR CONCEALED TANK

THE INSTALLING INSTRUCTION FOR CONCEALED TANK THE INSTLLING INSTRUCTION FOR CONCELED TNK Important remind: 80mm300kgf FFL ccessories List:. Please read through this Instructions carefully prior to installation, and our company shall not be responsible

More information

SECTION SLUDGE HOLDING TANK DEWATERING

SECTION SLUDGE HOLDING TANK DEWATERING SECTION 13215 SLUDGE HOLDING TANK DEWATERING PART 1 GENERAL 1.01 SUMMARY A. Section Includes: Dewatering and cleaning of sludge holding tank and sludge disposal. Contractor shall pay for all sludge removal,

More information

United Window & Door - Series 5500 New Construction Double Hung Windows Specifications

United Window & Door - Series 5500 New Construction Double Hung Windows Specifications United Window & Door - Series 5500 New Construction Double Hung Windows Specifications Part 1 GENERAL 1.01 INCLUSIONS 1. All windows as called for in this specification will be furnished with all necessary

More information

C.R. LAURENCE CO., INC. Intelli-Track SPS. Phase One - Installation Instructions

C.R. LAURENCE CO., INC. Intelli-Track SPS. Phase One - Installation Instructions Tools and Supplies: C.R. LAURENCE CO., INC. Intelli-Track SPS Phase One - Installation Instructions Ratchet Wrench with 4" Extension 9/16" Open-End Wrench (two required for suspension mounting) 9/16" Hex

More information

lindab we simplify construction LindabSandwichPanels Installation instructions Mineral Wool Panels

lindab we simplify construction LindabSandwichPanels Installation instructions Mineral Wool Panels lindab we simplify construction LindabSandwichPanels Installation instructions Mineral Wool Panels Assembly instructions Handling Receiving of goods Check that the material has not been damaged in transit

More information

ROOF MOUNT KIT OWNERS MANUAL

ROOF MOUNT KIT OWNERS MANUAL ROOF MOUNT KIT OWNERS MANUAL Made in the USA by: Primus Wind Power, Inc. 938 Quail St. Lakewood, CO 80215 Phone: (303) 242-5820 www.primuswindpower.com AIR is a trademark of Primus Wind Power, Inc. ROOF

More information

Pre-Fabricated Roof Curbs

Pre-Fabricated Roof Curbs TC-1, TC-2, TC-3, TC-5 Table of Contents General Information 4-5 Specifications 6-9 Assembly Instructions 10-16 Pitch Information 17 Submittal 18-21 54 years of excellence... www.thybar.com 3 Insulated

More information

Operating Instructions

Operating Instructions Operating Instructions A-2600 SERIES AWWA SWING CHECK VALVE 500 West Eldorado Street Decatur, Illinois 62522 www.muellercompany.com! WARNING! 1. Read and follow all pertinent instructions carefully. Proper

More information

Raised Basement. Mechanical Installation Guide

Raised Basement. Mechanical Installation Guide R Raised Basement Mechanical Installation Guide Ensure masonry work is correct. If recessed, the depth must be 14 inches deep unless otherwise specified for a custom application. Width and length may vary

More information

Duct Wrap Flexible Wraps

Duct Wrap Flexible Wraps Design No. 3MU/ 60-01 December 23, 2010 VENTILATION DUCT PROTECTION 3M Company 3M Fire Barrier Duct Wraps: 615 and 615+ 3M Fire Barrier Sealants: Water-Tight 1000-NS Silicone, Water-Tight 1003-SL Silicone

More information

Protective Capony RTC-16

Protective Capony RTC-16 Protective Capony RTC-16 ASSEMBLY AND OPERATION MANUAL Protective Canopy RTC-16 Assembly and Operation Manual CONTENT: 1 APPLICATION...3 2 OPERATION CONDITIONS...3 3 TECHNICAL SPECIFICATIONS...3 4 DELIVERY

More information

Banyan Air Service November 18, 2011 AVE Aviation and Commerce Center Building 1 Miami, FL

Banyan Air Service November 18, 2011 AVE Aviation and Commerce Center Building 1 Miami, FL SECTION 09511 - ACOUSTICAL PANEL CEILINGS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification

More information

Wabo ElastoFlex - EFJ/EFJ-C Horizontal Expansion Joint System

Wabo ElastoFlex - EFJ/EFJ-C Horizontal Expansion Joint System Installation Procedure Last Updated: May 16 th, 2018 Wabo ElastoFlex - EFJ/EFJ-C Horizontal Expansion Joint System The following installation procedure is very important and must be fully understood prior

More information

MASTERSPEC - SHORT FORM. B. See Division 5 Section "Metal Stairs" for steel tube railings associated with metal stairs.

MASTERSPEC - SHORT FORM. B. See Division 5 Section Metal Stairs for steel tube railings associated with metal stairs. SECTION 05721 - ORNAMENTAL RAILINGS PART 1 - GENERAL 1.1 SUMMARY A. This Section includes the following: 1. Glass supported railings. B. See Division 5 Section "Metal Stairs" for steel tube railings associated

More information

Instruction Manual TWISTLOCK SAND VOLLEYBALL SOCKETS SVB23/SVB27

Instruction Manual TWISTLOCK SAND VOLLEYBALL SOCKETS SVB23/SVB27 Instruction Manual TWISTLOCK SAND VOLLEYBALL SOCKETS Customer Service (800) 247-7668 SVB23/SVB27 P A R T S L I S T Item Qty Description Item Qty Description A 1 Sand Volleyball Socket (3 or 4 ) B 1 Twistlock

More information

De Montfort Mark 7 Incinerator (Flatpack)

De Montfort Mark 7 Incinerator (Flatpack) De Montfort Mark 7 Incinerator (Flatpack) Introduction This design is specially for those occasions when a large number of incinerators are to be built at one location and transported to the places where

More information

ROOF MOUNT KIT OWNERS MANUAL

ROOF MOUNT KIT OWNERS MANUAL ROOF MOUNT KIT OWNERS MANUAL Made in the USA by: Southwest Windpower, Inc. 1801 W. Route 66 Flagstaff, Arizona 86001 Phone: (928) 779-9463 Fax: (928) 779-1485 E-mail: info@windenergy.com Web: www.windenergy.com

More information

SECTION FLAT WALK-ON TYPE ALGAE CONTROL/LAUNDER COVERS

SECTION FLAT WALK-ON TYPE ALGAE CONTROL/LAUNDER COVERS PART 1 GENERAL 1.01 THE REQUIREMENT SECTION 11301 FLAT WALK-ON TYPE ALGAE CONTROL/LAUNDER COVERS A. The contractor shall furnish and install complete Flat Walk-On Algae Control/Launder Covers as shown

More information

GROUND MOUNT INSTALLATION MANUAL

GROUND MOUNT INSTALLATION MANUAL GROUND MOUNT INSTALLATION MANUAL Contents DISCLAIMER 1 CHECKLIST 2 1. ERECT BASe 3 2. CONNECT PIPES 3 3. PLACE RAILS 4 4. SECURE LUGS 4 5. CLAMP MODULES 5 DIAGONAL BRACES (OPTIONAL) 6 UNDER CLAMPS (OPTIONAL)

More information

VAREC 3600B/3650B SERIES PRESSURE OR VACUUM RELIEF VALVES INSTRUCTION, OPERATION AND MAINTENANCE MANUAL

VAREC 3600B/3650B SERIES PRESSURE OR VACUUM RELIEF VALVES INSTRUCTION, OPERATION AND MAINTENANCE MANUAL Before installation these instructions must be fully read and understood 3600B 3650B DISCLAIMER OF WARRANTIES The contract between Varec Vapor Control Inc. and our customer states Varec Vapor Control Inc.

More information

ITEM 461 STRUCTURAL PLATE STRUCTURES. Galvanized steel plates shall conform to AASHTO M167 and aluminum plates shall conform to AASHTO M219.

ITEM 461 STRUCTURAL PLATE STRUCTURES. Galvanized steel plates shall conform to AASHTO M167 and aluminum plates shall conform to AASHTO M219. ITEM 461 STRUCTURAL PLATE STRUCTURES 461.1. Description. This Item shall govern for the furnishing and installing of structural plate pipes, pipe arches, arches, underpasses, box culverts and special shapes

More information

4 ft. and 6 ft. Downstream Defender Handling and Installation Instructions

4 ft. and 6 ft. Downstream Defender Handling and Installation Instructions 4 ft. and 6 ft. Downstream Defender Handling and Installation Instructions Page 2 Materials Supplied By Hydro International Ledger Angle (x4) Top Slab Top Riser Benching Skirt 4ft./6ft. Downstream Defender

More information

CONCRETE FORMWORK. .2 CSA , Supplement No.1 to CAN/CSA , Engineering Design in Wood. .4 CSA O151, Canadian Softwood Plywood.

CONCRETE FORMWORK. .2 CSA , Supplement No.1 to CAN/CSA , Engineering Design in Wood. .4 CSA O151, Canadian Softwood Plywood. CITY OF BRAMPTON LANDSCAPE SPECIFICATIONS SECTION 03100-1 PART 1 GENERAL 1.1 Related Work.1 All Division 1 Specification Sections.2 Section 02233 Granular Base.3 Section 02311 Site Grading.4 Section 03200

More information

AVK Couplings and Adaptors

AVK Couplings and Adaptors AVK SAUDI VALVES AVK Couplings and Adaptors Solutions for All Applications 2 A Comprehensive Range of Couplings and Adaptors Product quality The complete coupling range is manufactured by AVK in accordance

More information

Low-Profile Multi-Piece Shower with blue, high-density polyurethane bottom

Low-Profile Multi-Piece Shower with blue, high-density polyurethane bottom INSTALLATION INSTRUCTIONS Low-Profile Multi-Piece Shower with blue, high-density polyurethane bottom 1050 This packet includes installation instructions for the Bestbath products shown below. (These instructions

More information

IMPORTANT. Use of safety surfacing (wood mulch) in compliance with ASTM specification F1292 is required. WARNING

IMPORTANT. Use of safety surfacing (wood mulch) in compliance with ASTM specification F1292 is required. WARNING INSTALLATION DETAILS Recommended crew (Adult): 2-3 Installation time: 8-12 Hours not including concrete cure time User age: 5-12 Use zone: 22 Diameter Weight: 990 Actual Dimension: 120 Diameter MAINTENANCE:

More information

SECTION HANGERS AND SUPPORTS FOR ELECTRICAL SYSTEMS

SECTION HANGERS AND SUPPORTS FOR ELECTRICAL SYSTEMS SECTION 26 05 29 HANGERS AND SUPPORTS FOR ELECTRICAL SYSTEMS PART 1 GENERAL 1.1 DESCRIPTION A. Scope: 1. CONTRACTOR shall provide all labor, materials, equipment, and incidentals as shown, specified, and

More information

BioPrism Solid Surface

BioPrism Solid Surface Please read all instructions before installing products. STORAGE & HANDLING: Check for damage that may have occurred during transit. Keep receptor flat on pallet, as it was shipped, until ready to install.

More information

Model # 95-S8. Page 1 of 8

Model # 95-S8. Page 1 of 8 Model # 95-S8 Page 1 of 8 Page 2 of 8 WARRANTY & TERMS WARRANTY: 5 Year Limited Warranty on Thermoplastic coated elements. Ultra Play guarantees all items for one full year to be free of defects in workmanship

More information

FS-DUO. Wastewater Flow Distributor Technical Data. Submittal Special Precautions Specifications Installation. (62.2 cm) (62.2 cm)

FS-DUO. Wastewater Flow Distributor Technical Data. Submittal Special Precautions Specifications Installation. (62.2 cm) (62.2 cm) Wastewater Flow Distributor Technical Data Submittal Special Precautions Specifications Installation 24½" (62.2 cm) 12½" (31.8 cm) 24½" (62.2 cm) (30.5 cm) SUBMITTAL STANDARD: 4" plain end inlet/outlet

More information

TECHNICAL EVALUATION REPORT No. 27/2008/2060

TECHNICAL EVALUATION REPORT No. 27/2008/2060 TECHNICAL EVALUATION REPORT No. 27/2008/2060 Sheet 1 of 16 Sheets This report is a correct record of the measurements and observations made. The report is intended for the private information of those

More information

Installation Manual For Conical Tanks. INSTALLATION and MAINTENANCE INSTRUCTIONS FOR CONICAL TANKS

Installation Manual For Conical Tanks. INSTALLATION and MAINTENANCE INSTRUCTIONS FOR CONICAL TANKS INSTALLATION and MAINTENANCE INSTRUCTIONS FOR CONICAL TANKS Page 1 of 10 INDEX 1. Health & Safety 3 2. Introduction 3 3. Requirements 3 4. Working Area 3 5. Equipment 3 6. 2 and 3 metre tank above ground

More information

SECTION COLD-FORMED METAL FRAMING

SECTION COLD-FORMED METAL FRAMING SECTION 05400 PART I - GENERAL 1.01 DESCRIPTION A. Scope: Work of this Section shall include all materials and installation necessary to provide all cold formed metal framing. B. This Section includes:

More information

1.02 RELATED SECTIONS: Water supply piping, water use piping, electrical, irrigation, foundations, site plans.

1.02 RELATED SECTIONS: Water supply piping, water use piping, electrical, irrigation, foundations, site plans. INC. ENGINEERING/CONSTRUCTION/MANUFACTURING /WWW.CONTAINWATER.COM SPRINGS, TEXAS. 78620 MODEL SPECIFICATION FOR CONTAIN WATER INC. 30 DEGREE ROOF CORRUGATED STEEL WATER STORAGE Part 1 GENERAL 1.01 SECTION

More information

MIGUTAN. Installation instructions. MIGUTAN-Systems with short AAS sheets

MIGUTAN. Installation instructions. MIGUTAN-Systems with short AAS sheets Installation instructions MIGUTAN-Systems with short AAS sheets 1.1 General Information MIGUTAN systems will be fabricated according to a site measurement to ensure perfect fit. The metal parts will be

More information

ZS880 Linear Shower Drain Installation Instructions

ZS880 Linear Shower Drain Installation Instructions Introduction PATENT PENDING The Zurn ZS880 Stainless Steel Linear Shower Drain incorporates a simple approach to bathroom shower design, when compared to traditional point-drain applications. The linear

More information

1.02 RELATED SECTIONS: Water supply piping, water use piping, electrical, irrigation, foundations, site plans.

1.02 RELATED SECTIONS: Water supply piping, water use piping, electrical, irrigation, foundations, site plans. INC. ENGINEERING/CONSTRUCTION/MANUFACTURING /WWW.CONTAINWATER.COM SPRINGS, TEXAS. 78620 MODEL SPECIFICATION FOR CONTAIN WATER INC. DOME ROOF CORRUGATED STEEL WATER STORAGE TANKS. Part 1 GENERAL 1.01 SECTION

More information

Hot Pressed GRP Sectional Water Storage Tanks Manufacturer

Hot Pressed GRP Sectional Water Storage Tanks Manufacturer Emen Ista Electric Co. Hot Pressed GRP Sectional Water Storage Tanks Manufacturer EISECO. GRP Sectional Water Storage Tanks Introduction to EISECO. Hot Pressed GRP Sectional Water Storage Tanks EISECO.

More information

Operating & Maintenance Manual JEC JCP Series. Centrifugal Pumps

Operating & Maintenance Manual JEC JCP Series. Centrifugal Pumps Operating & Maintenance Manual JEC JCP Series Centrifugal Pumps JEC LTD. 408, Cheongyo-ri, Bibong-myun, Hwaseong-si, Gyeonggi-do, South Korea Tel: +82 31 355 0316 Fax: +82 31 355 0319 www.jecpump.com E-mail:

More information

E. Section Polymer Modified Cement Waterproofing. K. Section Sub drainage: Foundation perimeter drainage.

E. Section Polymer Modified Cement Waterproofing. K. Section Sub drainage: Foundation perimeter drainage. DELTA -MS CLEAR Section 07 10 00 Dampproofing and Waterproofing PART 1 GENERAL 1.1 SECTION INCLUDES A. Below grade waterproofing and dampproofing. 1.2 RELATED SECTIONS A. Section 07 11 13 - Bituminous

More information

All definitions are defined according to ANSI/AWWA C

All definitions are defined according to ANSI/AWWA C SAN ANTONIO WATER SYSTEM SPECIFICATIONS FOR REDUCED-WALL, RESILIENT-SEATED GATE AND TAPPING VALVES FOR WATER SUPPLY SERVICE 4 IN. THROUGH 48 IN. ANSI/AWWA C515-01 July 2017 1. SCOPE This product specification

More information

All definitions are defined according to ANSI/AWWA C b. Flanged Joint: The flanged and bolted joint as described in ANSI/AWWA C110/A21.10.

All definitions are defined according to ANSI/AWWA C b. Flanged Joint: The flanged and bolted joint as described in ANSI/AWWA C110/A21.10. 21-02 SAN ANTONIO WATER SYSTEM SPECIFICATIONS FOR RESILIENT-SEATED GATE AND TAPPING VALVES FOR WATER SUPPLY SERVICE ANSI/AWWA C509-01 3 IN., 4 IN., 6 IN., 8 IN., 10 IN., 12 IN., 16 IN., & 20 IN. Revised

More information

SECTION GROUND WATER STORAGE TANKS

SECTION GROUND WATER STORAGE TANKS SECTION 33 16 13 GROUND WATER STORAGE TANKS PART 1: GENERAL 1.01 SCOPE A. Section includes requirements for designing, fabricating, and erecting a welded steel ground storage tank. 1.02 SYSTEM DESCRIPTION

More information

ASSEMBLY INSTRUCTIONS for DATASAFE TM HX and HX FRONT TERMINAL UBC BATTERY RACKS

ASSEMBLY INSTRUCTIONS for DATASAFE TM HX and HX FRONT TERMINAL UBC BATTERY RACKS US-HXRACK-IM-002 ASSEMBLY INSTRUCTIONS for DATASAFE TM HX and HX FRONT TERMINAL UBC BATTERY RACKS Read all instructions carefully and observe all warnings before installation. See Installation, Operation

More information

Model # 358-R48. 7/7/2011 Page 1 of 11

Model # 358-R48. 7/7/2011 Page 1 of 11 Model # 358-R48 7/7/2011 Page 1 of 11 7/7/2011 Page 2 of 11 1675 Locust Street Red Bud, IL 62278 Phone: 618-282-8200 Fax: 618-282-8202 WARRANTY & TERMS WARRANTY: 5 Year Limited Warranty on Thermoplastic

More information

1. Temperature Change: 120 deg F (67 deg C), ambient; 180 deg F (100 deg C), material surfaces.

1. Temperature Change: 120 deg F (67 deg C), ambient; 180 deg F (100 deg C), material surfaces. SECTION 05500- METAL FABRICATIONS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification

More information

SECTION ARCHITECTURAL ORNAMENTAL HANDRAILS AND RAILINGS Summit tm Modular Railing System

SECTION ARCHITECTURAL ORNAMENTAL HANDRAILS AND RAILINGS Summit tm Modular Railing System SECTION 05720 ARCHITECTURAL ORNAMENTAL HANDRAILS AND RAILINGS Summit tm Modular Railing System PART 1 GENERAL 1.01 WORK INCLUDED A. Furnish and/or install supported glass stainless steel railings, glass

More information

IN2 Sleeves and Sleeve Seals for Communications Pathways and Cabling

IN2 Sleeves and Sleeve Seals for Communications Pathways and Cabling Illinois Math and Science Academy DigitalCommons@IMSA Project Manuals IN2 2015 IN2 Sleeves and Sleeve Seals for Communications Pathways and Cabling Illinois Mathematics and Science Academy Follow this

More information

Architectural Roof and Wall Products Guide Specifications

Architectural Roof and Wall Products Guide Specifications Architectural Roof and Wall Products Guide Specifications 901 W. Watkins St. Phoenix, AZ 85007 PH: 602-495-0048 FX: 602-261-7726 FORMED METAL ROOF AND WALL PANELS This Guide Specification is to be used

More information

CONSTRUCTION SPECIFICATION FOR FOOTINGS AND PADS FOR ELECTRICAL EQUIPMENT

CONSTRUCTION SPECIFICATION FOR FOOTINGS AND PADS FOR ELECTRICAL EQUIPMENT ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 616 NOVEMBER 2008 CONSTRUCTION SPECIFICATION FOR FOOTINGS AND PADS FOR ELECTRICAL EQUIPMENT TABLE OF CONTENTS 616.01 SCOPE 616.02 REFERENCES 616.03

More information

SECTION ARCHITECTURAL ORNAMENTAL HANDRAILS AND RAILINGS Monaco tm Modular Railing System

SECTION ARCHITECTURAL ORNAMENTAL HANDRAILS AND RAILINGS Monaco tm Modular Railing System SECTION 05720 ARCHITECTURAL ORNAMENTAL HANDRAILS AND RAILINGS Monaco tm Modular Railing System PART 1 GENERAL 1.01 WORK INCLUDED A. Furnish and/or install supported glass stainless steel railings, glass

More information

SECTION HANGERS AND SUPPORTS FOR HVAC PIPING AND EQUIPMENT

SECTION HANGERS AND SUPPORTS FOR HVAC PIPING AND EQUIPMENT SECTION 23 05 29 HANGERS AND SUPPORTS FOR HVAC PIPING AND EQUIPMENT PART 1 - GENERAL 1.1 SUMMARY A. Section includes pipe and equipment supports, hangers, anchors, bases sleeves and the sealing of work

More information

TRUSSCORE PVC INTERLOCKING LINER PANEL

TRUSSCORE PVC INTERLOCKING LINER PANEL Project Number Page 1 of 6 TRUSSCORE PVC INTERLOCKING LINER PANEL NOTE: THESE MASTER SPECIFICATIONS ARE TO BE UTILIZED AS A GUIDELINE AND IT IS ADVISED THAT THE EDITOR CONTACT A DOMTEK BUILDING PRODUCTS

More information

EXIRA EXPOSED PIPE SHOWER INSTALLATION

EXIRA EXPOSED PIPE SHOWER INSTALLATION SKU(s): 923583 EXIRA EXPOSED PIPE SHOWER INSTALLATION BEFORE YOU BEGIN We recommend consulting a professional if you are unfamiliar with installing plumbing fixtures. Signature Hardware accepts no liability

More information

A. Product Data: For each type of deck, accessory, and product indicated.

A. Product Data: For each type of deck, accessory, and product indicated. SECTION 053100 - PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Roof deck. 2. Composite floor deck. 3. Noncomposite form deck. 1.2 SUBMITTALS A. Product Data: For each type of deck, accessory, and

More information

INSTALLING A POUR-IN-PLACE DOCK LEVELER (EH & RR)

INSTALLING A POUR-IN-PLACE DOCK LEVELER (EH & RR) INSTALLING A POUR-IN-PLACE DOCK LEVELER (EH & RR) Part A: Prepare the Site & Make the Floor 1.) Prepare (concrete) dock wall and pit floor as shown in the diagrams. Pit floor should taper from back to

More information

BioPrism Solid Surface

BioPrism Solid Surface Please read all instructions before installing products. STORAGE & HANDLING: Check for damage that may have occurred during transit. Keep receptor flat on pallet, as it was shipped, until ready to install.

More information

P R E - I N S U L AT E D PIPE SYSTEMS COMPRESSION WALL SEAL INSTALLATION GUIDE. Compression Wall Seal Installation Guide

P R E - I N S U L AT E D PIPE SYSTEMS COMPRESSION WALL SEAL INSTALLATION GUIDE. Compression Wall Seal Installation Guide P R E - I N S U L AT E D PIPE SYSTEMS COMPRESSION WALL SEAL INSTALLATION GUIDE Compression Wall Seal Installation Guide Uponor Pre-insulated Pipe Systems Compression Wall Seal Installation Guide Published

More information

IN2 Sleeves and Sleeve Seals for Electrical Raceways and Cabling

IN2 Sleeves and Sleeve Seals for Electrical Raceways and Cabling Illinois Math and Science Academy DigitalCommons@IMSA Project Manuals IN2 2015 IN2 Sleeves and Sleeve Seals for Electrical Raceways and Cabling Illinois Mathematics and Science Academy Follow this and

More information

SECTION ARCHITECTURAL ORNAMENTAL HANDRAILS AND RAILINGS Casino Modular Railing System

SECTION ARCHITECTURAL ORNAMENTAL HANDRAILS AND RAILINGS Casino Modular Railing System SECTION 05 5200 ARCHITECTURAL ORNAMENTAL HANDRAILS AND RAILINGS Casino Modular Railing System PART 1 GENERAL 1.01 WORK INCLUDED A. Furnish and/or install stainless steel railings and components. 1.02 REFERENCE

More information

Building Your Visions

Building Your Visions Ferguson C EAP Curtain Wall Systems Ferguson-EAP 130HP Series High Performance Curtain Wall System Ferguson s 130HP curtain wall system was developed for high performance double, triple, unique acoustical

More information

CI/SfB (52.5) January 2004 Uniclass L L2123. ACO LightShaft Daylight and fresh air. Naturally.

CI/SfB (52.5) January 2004 Uniclass L L2123. ACO LightShaft Daylight and fresh air. Naturally. CI/SfB (52.5) January 2004 Uniclass L7315 + L2123 ACO LightShaft Daylight and fresh air. Naturally. OVERVIEW Why choose ACO LightShaft? Maximum daylight transmission thanks to bright white polypropylene

More information

Standard Sizes: 2.125m underside of gutters m total height m roof m roof m roof.

Standard Sizes: 2.125m underside of gutters m total height m roof m roof m roof. H Standard Sizes: H 2.125m underside of gutters. 2.280m total height. L L 5.450m roof. 6.050m roof. 7.250m roof. W W 3.000m roof/2.640m between posts. 3.600m roof/3.240m between posts. 5.400m roof/5.040m

More information

ROOF SUBSTRATE PREP MANUAL

ROOF SUBSTRATE PREP MANUAL ROOF SUBSTRATE PREP MANUAL ALDOCOAT Liquid Applied Roof Restoration Systems AFTER BEFORE JULY 2016 1604 N. Main St. Kannapolis, NC 28081 (800) 474-6019 www.aldoproducts.com ROOF SUBSTRATE PREPARATION Preparation

More information

INSTALLATION MANUAL. B-710/760 H20 SERIES MODULAR UST to AST TRANSITION SUMP

INSTALLATION MANUAL. B-710/760 H20 SERIES MODULAR UST to AST TRANSITION SUMP INSTALLATION MANUAL B-710/760 H20 SERIES MODULAR UST to AST TRANSITION SUMP H20-RATED B-710 WITH 2 RISERS, RACK SYSTEM AND BOLLARDS B-710 SPLIT LID TRANSITION SUMP SHOWN WITH H20-RATED DIAMOND PLATE LID

More information

SECTION CAST-IN-PLACE CONCRETE

SECTION CAST-IN-PLACE CONCRETE SECTION 03300 CAST-IN-PLACE CONCRETE PART 1 GENERAL 1.01 SECTION INCLUDES A. The Contractor shall furnish all work and materials, including cement, sand and coarse aggregate, water, admixtures, curing

More information

Model # 800SM-PS3. 8/3/2016 Page 1 of 8

Model # 800SM-PS3. 8/3/2016 Page 1 of 8 Model # 800SM-PS3 8/3/2016 Page 1 of 8 /3/2016 Page 2 of 8 1675 Locust Street Red Bud, IL 62278 Phone: 618-282-8200 Fax: 618-282-8202 WARRANTY & TERMS WARRANTY: 5 Year Limited Warranty on Thermoplastic

More information

Frameless Hinged Door - Alcove. These instructions must be left with the user. Installation Guide W2-B

Frameless Hinged Door - Alcove. These instructions must be left with the user. Installation Guide W2-B Frameless Hinged Door - Alcove These instructions must be left with the user Installation Guide 1 1290647-W2-B 1290647-W2-B 2 Introduction Thank you for purchasing a quality product. To enjoy the full

More information

Imperial. folds. Wall braces are attached to the multifunction. guard-railing post. Formworkprop. connectors and flange screws.

Imperial. folds. Wall braces are attached to the multifunction. guard-railing post. Formworkprop. connectors and flange screws. Wall all braces / Working scaffolds folds Wall braces are attached to the multifunction profiles by formwork-prop connectors and flange screws. guard-railing post brace frame 250 consists of push-pull

More information