THE INSTALLING INSTRUCTION FOR CONCEALED TANK
|
|
- Grant Sparks
- 6 years ago
- Views:
Transcription
1 THE INSTLLING INSTRUCTION FOR CONCELED TNK Important remind: 80mm300kgf FFL ccessories List:. Please read through this Instructions carefully prior to installation, and our company shall not be responsible for any loss caused by not installating accrding with this Instructions. There are lubricants in production for toilet bowl installation.. Please confirm the FFL according to the overall indoor fitment method. Line out the FFL on the wall and always regard FFL as datum line of 0 height. 3. Please confirm the wall is the main wall,the thickness exceed 80mm and it can bear more than 300kgf strength when the strength act on the front of toilet bowl. Note:.Please install the frame before paving the tiles. The dimensional unit is millimeter..please subject to the object as right if it is not in conformity with the components in picture. FFL of finish face, all dimension is millimeter main wall 300kgf FFL 0. Straight flush pipe of some products are offered with two kinds of seal gaskets. which can be selected according to toilet bowl type during installation. NO. NME QTY FUNCTION Expansion bolt components 4 To fix frame Protection frame For space reservation of push button plate when building the wall 3 Protection cover To prevent sundries falling into the tank when fitment Clamp Drainage pipe Flush pipe Drainage straight pipe components Flush straight pipe components Long bolt Transparent long bolt shield Long bolt components To fix drainage pipe To drain To supply water to flush To connect the bended pipes to toilet bowl To fix toilet bowl To shield long bolt To fix toilet bowl 9 Plug To reserve space for straight pipes when laying bricks 0 ngle valve On-off For Filling Water
2 . Dimensions and Supply Pipe-laying Main wall 0(0~95) Top inlet 安装墙 Main wall G/ 35(35~0) (40~40) FFL 0 0~ Please make sure W is between 70 to 30. ack inlet 安装墙 Main wall 360 Main wall 0(0~95) 35(35~0) 000 G/ ~00 FFL Please make sure W is between 70 to 30.
3 .Drainage Pipe Installation W 80/00 Remind: The function of drainage would be worse when the installation angle of drainage pipe exceed 45 PositionW=60/80 PositionW=80/00 Install drainage pipe clamp. 45(W=80/00) When excretory tube lean 45 it can only be fixed in Position (W=80/00). If necessary, adjust the clamp and drainage pipe location according to the bowl dimension. (Keep this clamp tightened to professionals!)
4 X50 3.Drill on the main wall and floor 4.Install Expansion olts FFL.. 0mm mm X s shown on picture:.drill 0*50. Insert expansion bolt 3. Tighten nut to strain bolt; 4. Unscrew nut; 5.Hold screw and washer for later use. a 340 a should be adjusted according to real location of drainage pipe. 5. Install Wall-fixing bracket and adjust floor-fixing bracket m Wall-fixing bracket Floor-fixing bracket
5 6. djust horizontally and vertically, and tighten bolt: 3 9 Supply pipe ngle valve Please pre-tighten bolt, and tighten after bracket adjustment. Flexible hose connecting inlet valve Install angle valve, connect it to inlet valve with hose. D E C F Click Click
6 7.Install Plug: Click For the fixing of the long screw, there are two groups of screw holes on the bracket which are of different distance. Please choose the right position according to the size of the toilet bowl. Sketch of installed frame Important remind: When the concealed tank fixed completely, it is important to test leaking with water upon hours before fixing wall. 0~60mm 8.The thickness of fixed wall is 0~60mm (measured from the front of frame to the finished tile surface) 0~60
7 9.Install toilet bowl.. 3. Set Straight Pipes into Flush end and Drain end properly, and marks lines dd lubricant onto the Rubber Gaskets of two Straight Pipes and set them into owl.flush Pipe seal Gasket assembly see 3., 3. and 3.3. L L L+6mm L+3mm Mark lines as shows. L is the distance of two marks on Flush Straight Pipe, and L is that of two marks on Drainpipe Straight Pipe Cut Straight Pipe just as shows. Chamfer and trim the cutting edges on the shortened Straight pipes (as shows). Take out the sponge with silicon oil and smear it on connecting edges of Straight Pipe and ends d djusting length for olt is d+5mm as shows. First install Drain Straight Pipe into Drain end, and second install Flush Straight Pipe into Hole on owl. Install owl. Station owl properly.
8 Installation of tank fittings: The tank fittings have been installed before leaving factory. The above sketches are only for reference. ll data contained is based upon the last product information available at the time of publication. We reserves the right to implement changes of product characteristics, packaging and availability at any time without further notice. TOTO (CHIN) CO., LTD. fter Service Free Tel: Mobile telephone:
FIXTURE CARRIERS TABLE OF CONTENTS S-WD-FC
TABLE OF CONTENTS Pictorial Index Product Recommendations Water Closet Carriers Matching Water Closet & Carrier Closet Carrier Selection & Battery Set-Up Stud & Nipple Adjustment to Finished Wall Anchoring
More informationB. Polyethylene samples shall be submitted for Owner approval of color and quality.
Glass Rail ENGINEERED DASHERBOARD SPECIFICATIONS PART 1 - GENERAL 1.01 PROJECT SCOPE A. Contractor shall furnish and install one complete set of steel framed dasherboards as indicated on the drawings and
More informationPre-Fabricated Roof Curbs
Knock Down Curb Assembly Instructions These roof curb assembly instructions are to be used as general guidelines only. Included with shipment are as-built drawings for proper location of sections and channels.
More informationFERTILIZER IRRIGATION EQUIPMENT LTD. SERIES 6000 APPLICATIONS
IRRIGATION EQUIPMENT LTD. FERTILIZER T A N K S SERIES 6000 APPLICATIONS Designed specifically for fertigation in agriculture Simple, efficient and trouble free operation. Standard models apply fertilizer
More informationUniversity of Delaware
University Contact: Energy & Engineering Group (302) 831-1744 SECTION 22 40 00_PLUMBING FIXTURES PART 1 GENERAL 1.1 SUMMARY A. Section Includes: 1. Water closets. 2. Urinals. 3. Lavatories. 4. Sinks. 5.
More informationInstallation Instructions
For Bar Mixers & Bath Shower Mixers Installation Instructions Installers please note these instructions are to be left with the user 2180388E June 2008 CONTENTS Page Introduction 1 Safety warnings 1 Main
More informationACO Building Drainage
ACO Building Drainage Backflow systems Installation, Operation and Maintenance Manual ACO TRIPLEX Anti-flood valve for GREYWATER drainage (wastewater without sewage) PLEASE READ THESE INSTRUCTIONS BEFORE
More informationPlanning and installation instructions
Planning and installation instructions Stofix Oy Ahlmaninkatu 2 E 40100 Jyväskylä Finland stofixgroup@stofix.com www.stofix.com 2 PLANNING AND INSTALLATION INSTRUCTIONS... 1 1 General... 3 2 Project Design...
More informationLAHAINA. Lahaina Showerspa Model #1030 Installation Instructions
LAHAINA Lahaina Showerspa Model #1030 Installation Instructions Lahaina ShowerSpa Model #1030 Please Read The Following Instructions COMPLETELY Before Beginning! Our goal is to ensure your installation
More information1. Start by removing the ash-pit door. Remove from frame by removing two rivet pins. Remove the frame by unscrewing the 4 bolts. (Fig 1.
Page 1 INTRODUCTION This instruction shows how to replace ceramic bricks in the Solo Plus and Excel solid fuel boiler. Please read carefully before replacement. Follow the instruction point by point. Fig
More informationBUILD A SHOWER CUBICLE
BUILD A SHOWER CUBICLE Building a shower cubicle requires some experience in carpentry and tiling. You also need a degree of expertise in wiring and plumbing in order to install a shower unit. By all means
More informationHELIOSTAR 252, 218 VERTICAL, FREE INSTALLATION
HELIOSTAR 252, 218 VERTICAL, FREE INSTALLATION INSTRUCTION MANUAL ENERGY AND SANITARY SYSTEMS Installation requirements General requirements The free-standing installation set is to be used or installing
More informationAssembly Instruction wedi Fundo Floor element
Assembly Instruction wedi Fundo Floor element Assembly Instructions wedi Fundo Legend A Caulking nut B Rubber caulking gasket C Drain body D wedi sealant E Rubber gasket F Fiber gasket G Locking nut A
More informationThe Otji-Toilet self builder manual The Clay House Project Otjiwarongo
- - The Otji-Toilet self builder manual The Clay House Project Otjiwarongo - 2 - The Otji-Toilet self builder set Your self builder set consists of following material 1 Lid box with following parts a)
More informationFreeStyle Linear Drain with Full Mortar Bed Adapter Kit
FreeStyle Linear Drain with Full Mortar Bed Adapter Kit U.S. Patent No. 8,474,068 Patents Pending: Canada & EP Publication No. 2354339 Discard Linear Drain installation instructions and refer to these
More informationOriginal Scandinavian rainwater system
Original Scandinavian rainwater system Siba Siba Square Contents Siba rainwater systems 3 Measuring 15-16 Siba 4-9 Gutter brackets 18-19 Siba Square 10-11 Gutters 20-23 Materials 12 Angles 24 Technical
More informationChannel Drain Shower Base. Aqua Line pro. Installation Instructions
Channel Drain Shower Base. Aqua Line pro Installation Instructions 02 JACKOBOARD Aqua Line pro System components a JACKOBOARD Aqua Line pro b JACKOBOARD Aqua Line pro - Horizontal Drain (Art. No. 4510370)
More informationMolokai ShowerSpa Model #1006
Molokai ShowerSpa Model #1006 Please Read The Following Instructions COMPLETELY Before Beginning! Our goal is to ensure your installation goes smoothly and safely. Please read these instructions carefully
More informationROOF MOUNT KIT OWNERS MANUAL
ROOF MOUNT KIT OWNERS MANUAL Made in the USA by: Primus Wind Power, Inc. 938 Quail St. Lakewood, CO 80215 Phone: (303) 242-5820 www.primuswindpower.com AIR is a trademark of Primus Wind Power, Inc. ROOF
More informationConergy SolarFamulus II
Conergy SolarFamulus II Installation manual www.conergy.com Table of Contents Table of Contents SolarFamulus II for universal use on flat roofs 1 Introduction 1 1.1 Short description 1 1.2 Intended use
More informationSKIRTED BATHTUB INSTALLATION MANUAL
SKIRTED BATHTUB INSTALLATION MANUAL 33778 North Railway Ave Mission, BC, V2V 1H6 Canada Toll free: 1-877 - 398-8827 Email: purchasing@valleyacrylic.com www.valleyacrylic.com INTRODUCTION products. Thank
More informationNORTH HARRIS COUNTY REGIONAL WATER AUTHORITY PIPE HANGERS, Section PIPE HANGERS, SUPPORTS, AND RESTRAINTS
PART 1 GENERAL 1.01 SUMMARY Section 15140 PIPE HANGERS, This Section includes the furnishing and subsequent installation of: A. Pipe and equipment hangers, supports, and associated anchors B. Equipment
More informationNU-WALL EXTRUDED ALUMINIUM CLADDING. Installation Specifications Vertical orientation (over cavity)
September 2014 NU-WALL EXTRUDED ALUMINIUM CLADDING Installation Specifications Vertical orientation (over cavity) 1. NW-V001C; Cavity batten layout 2. NW-V002C; Battening options 3. NW-V002C; Battening
More informationOur slimmest cistern. Sigma 75 concealed toilet cistern for back to wall pans
Our slimmest cistern Sigma 75 concealed toilet cistern for back to wall pans Geberit concealed cisterns. Easy to install, tough and low maintenance. 75 mm Geberit has the most extensive product range of
More informationAll panels can be supplied in a range of styles, to suit the applications pictured below.
Evolution Radiant panel system LPHW up to 90 C Suspended ceiling grid or soffit mounting Vertical wall surface mounting Standard widths 150mm to 900mm 1 Description Introduction Evolution by Dunham-Bush
More informationSTEP UP SHOWER BASE INSTALLATION GUIDE FOR TIMBER AND CONCRETE FLOORS
GUIDE FOR TIMBER AND CONCRETE FLOORS EDITION: APRIL 2016 IMPORTANT: This guide is for the installation of a Step Up shower base on a timber or concrete floor. If you require a walk in (flush with floor)
More informationeuropanel installation guide horizontally laid panel
europanel installation guide horizontally laid panel A 1. Check all support steelwork has been installed within standard dimensional tolerances. Check that the width of the steel bearing face is consistent
More informationLinear Drainage ZF806 ZF812
Linear Drainage ZF806 ZF812 Fiberglass Trench Installation Instructions ZF806 Accessories 6" [152mm] Wide Fiberglass Trench Drain System Below are some of the ZF806 trench drain components typical to an
More informationInstallation Instructions
Installation Instructions Flue Gas System Basic Kit GA-K - Chimney Flue Gas System for GB125 Oil Condensing Boiler For trained and certified installers Please read carefully prior to installation. 6 720
More information6032 SH 3P Residential Shower Installation Instructions Gelcoat & Solid Surface Bathware
Tools/materials you might need for proper installation 6D galvanized screws 100% silicone caulking caulking gun acrylic latex caulk shims tape measure 1/8 drill bit Phillips screw driver cardboard china
More informationLeap Walk In Enclosure
Leap Walk In Enclosure These instructions must be left with the user Installation Guide 1 1245546-W2-A Thank you for purchasing a quality Mira product. To enjoy the full potential of your new product,
More informationFS-DUO. Wastewater Flow Distributor Technical Data. Submittal Special Precautions Specifications Installation. (62.2 cm) (62.2 cm)
Wastewater Flow Distributor Technical Data Submittal Special Precautions Specifications Installation 24½" (62.2 cm) 12½" (31.8 cm) 24½" (62.2 cm) (30.5 cm) SUBMITTAL STANDARD: 4" plain end inlet/outlet
More informationDESIGN DOUBLE PANE BATH SCREEN
DESGN DOUBLE PNE BTH SCREEN DBDSC1060 NSTLLTON NSTRUCTONS MPORTNT - Please read before installation Please read these instructions carefully before starting installation and keep in a safe place for future
More informationIntroduction. Before You Begin
Installation Manual Introduction Thank you for choosing Valley Products. This installation mannual provides general information on the installation of our products. DO NOT lift or carry your unit by the
More informationA. Codes and Standards that are standard at the University. C. Coordinate cleanout locations with Architect.
PART 1: GENERAL 1.01 Purpose: A. This standard is intended to provide useful information to the Professional Service Provider (PSP) to establish a basis of design. The responsibility of the engineer is
More informationBioPrism Solid Surface
Please read all instructions before installing products. STORAGE & HANDLING: Check for damage that may have occurred during transit. Keep receptor flat on pallet, as it was shipped, until ready to install.
More informationZ5378 E6 Horizontal bracket Mounting instructions (1.0 EN)
Z5378 E6 Horizontal bracket Mounting instructions (1.0 EN) Contents 1. Product description and scope of supply...3 2. Intended use...4 3. Safety precautions...4 4. Assembly...4 5. Maintenance and care...5
More informationSECTION HANGERS AND SUPPORTS FOR ELECTRICAL SYSTEMS
SECTION 26 05 29 HANGERS AND SUPPORTS FOR ELECTRICAL SYSTEMS PART 1 GENERAL 1.1 DESCRIPTION A. Scope: 1. CONTRACTOR shall provide all labor, materials, equipment, and incidentals as shown, specified, and
More information1 PVC or ABS drain with strainer
Patents Pending ProBase II Single-Slope Shower Base and Kit CONTENTS 1. General Information...1 2. Materials...1 3. Planning...2 4. Preparation...3 5. Layout...3 6. Install Base and Shims...4 7. Install
More informationFiberstars Lighted Laminar Flow Fountains
Fiberstars Lighted Laminar Flow Fountains SAVE THESE DIRECTIONS! These directions are provided to ensure the proper installation and operation of Fiberstars Lighted Laminar Flow Fountain. The maximum lighted
More informationUnderground Exhaust System
Operation and Maintenance Manual Underground Exhaust MONOXIVENT - SOURCE CAPTURE SYSTEMS - info@ Oct. - 2015 Underground Duct Construction Standards 1. Dig trench depth to allow for minimum distance from
More informationON-ROOF ATTACHMENT FLAT COLLECTOR HELIOSTAR
ON-ROOF ATTACHMENT FLAT COLLECTOR HELIOSTAR INSTALLATION INSTRUCTIONS ENERGY AND SANITARY SYSTEMS Installation requirements Generel requirements The on-roof attachment set is capable for installation of
More informationInstallation Instructions
Installation Instructions Dynarail Safety Ladder System Corrosion Resistant Nonconductive Fire Retardant High Strength-To-Weight Ratio Long, Low Maintenance Life Meets OSHA, BOCA & Other Building Code
More informationPATENTS ARE PENDING. Building Dimensions. Exterior Dimensions Roof Edge to Roof Edge
Assembly Manual 8x9 PATENTS ARE PENDING Approximate Size 7640303 Storage Area Building Dimensions Exterior Dimensions Roof Edge to Roof Edge Interior Dimensions Wall to Wall Sq. Ft. Cu. Ft. Width Depth
More informationCANTILEVER RACK SPECIFICATIONS PART 1 GENERAL 1.1 SCOPE 1.2 APPROVED MANUFACTURER 1.3 REGULATORY ORGANIZATIONS AND GROUPS 1.4 QUALITY ASSURANCE
CANTILEVER RACK SPECIFICATIONS PART 1 GENERAL 1.1 SCOPE This specification is intended to describe the general requirements applicable to a proper structural cantilever rack design. In addition, it is
More informationSI T T FST
SI 440-600-700-700T-780-780T-900-1100 Freestanding TAPER TOP Open Fire - Wood Burner Installation Instructions Note: FLUE SYSTEMS Casing. Flue System may require to be Doubled Lined to Comply. Ref ASNZS:2918:2001
More informationSECTION HANGERS AND SUPPORTS FOR PLUMBING
SECTION 22 05 29 HANGERS AND SUPPORTS FOR PLUMBING PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division
More informationInstallation instructions LORO-DRAINJET. siphonic scupper drainage system with clamping flange, without roof penetration
LORO-DRAINJET Siphonic scupper drainage systems instructions LORO-DRAINJET siphonic scupper drainage system, without roof penetration and plastic, made of hot-dip galvanised steel, DN 50 and DN 70 LORO-DRAINJET
More informationA. Codes and Standards that are Standards at the University. A. Provide floor drains in all toilet rooms, janitor closets, and mechanical rooms.
PART 1: GENERAL 1.01 Purpose A. This standard is intended to provide useful information to the Professional Service Provider (PSP) to establish a basis of design. The responsibility of the engineer is
More informationConcealed Flushing and Installation Systems. PERFORMANCE AND INNOVATION
Concealed ing and Installation Systems. PERFORMANCE AND INNOVATION 2 Thinking about saving water? Think GROHE. 3 Water, our most vital resource. Few people realize how much water they flush down their
More informationSECTION PLUMBING FIXTURES
SECTION 15440 - PLUMBING FIXTURES PART 1 - GENERAL 1.01 RELATED DOCUMENTS A. Basic Requirements: Provisions of Section 15010, BASIC MECHANICAL REQUIREMENTS, are a part of this Section. 1.02 SUMMARY A.
More informationGGI-750. Gravity Grease Interceptor Technical Data. Submittal Special Precautions Specifications Installation
Gravity Grease Technical Data Submittal Special Precautions Specifications Installation 75" 81" (205.7 (94.0 cm) 19½" 20" (50.8 (49.5 cm) 21½" 20" (50.8 (54.6 cm) 76½" (194.3 cm) 56½" 57" (144.8 (143.5
More informationHELIOSTAR 252, 218 HORIZONTAL, FREE INSTALLATION
HELIOSTAR 252, 218 HORIZONTAL, FREE INSTALLATION INSTALLATION INSTRUCTIONS ENERGY AND SANITARY SYSTEMS Installation requirements General requirements The free-standing installation set is to be used for
More informationTechnology. Enabling Design. Geberit Duofix Carrier
Technology Enabling Design Geberit Duofix Carrier Geberit is Behind It All! With millions of installations throughout the world, the message is clear: the Geberit Duofix Carrier allows unique design without
More informationZS880 Linear Shower Drain Installation Instructions
Introduction PATENT PENDING The Zurn ZS880 Stainless Steel Linear Shower Drain incorporates a simple approach to bathroom shower design, when compared to traditional point-drain applications. The linear
More informationSlahaddin University College of Science Geology Department Field Geology. Theodolite Tripod (Leveling)
Slahaddin University College of Science Geology Department Field Geology Theodolite Tripod (Leveling) Leveling Leveling may be defined as an operation for the measurement of the difference in the elevations
More informationDe Montfort Mark 7 Incinerator (Flatpack)
De Montfort Mark 7 Incinerator (Flatpack) Introduction This design is specially for those occasions when a large number of incinerators are to be built at one location and transported to the places where
More informationFLUE KIT INSTALLATION MANUAL
FLUE KIT INSTALLATION MANUAL 7 76 9 55 ROOM SEALED TELESCOPIC FLUE 7 76 9 086 PLUME MANAGEMENT SYSTEM GREENSTAR 60/00 HORIZONTAL FLUE FOR USE WITH WORCESTER GREENSTAR GAS-FIRED APPLIANCES: Greenstar FS
More informationThese instructions must be left with the user
Leap Walk In These instructions must be left with the user Installation Guide 1 1245548-W2-A 1245548-W2-A 2 Thank you for purchasing a quality Mira product. To enjoy the full potential of your new product,
More informationLiner Replacement Instructions:
Liner Replacement Instructions: Before beginning the replacement procedure... Be sure to disconnect electrical service to all of your electrical components of the pool. Use extreme caution when working
More informationDIVISION: SPECIALTIES SECTION: DEMOUNTABLE PARTITIONS REPORT HOLDER: KRUEGER INTERNATIONAL, INC.
0 Most Widely Accepted and Trusted ICC ES Report ICC ES 000 (800) 423 6587 (562) 699 0543 www.icc es.org ESR 3505 Issued 04/2017 This report is subject to renewal 04/2018. DIVISION: 10 00 00 SPECIALTIES
More informationAir flue duct for use with ecotec boilers
For the installer Flue installation instructions Air flue duct for use with ecotec boilers Concentric System Ø 80/5 (Galvanized steel air duct/plastic flue duct) GB Contents Notes on the documentation
More informationPipe to Manhole Connectors, Sealants. Pipe to Manhole Connectors, Sealants
ITUPLAST Preformed Butyl Mastic Connector An excellent product of the NPC Company, USA. General Ituplast is a special gasket/sealant intended for sealing between sections of the sewage and drainage inspection
More informationSECTION OUTLET, PULL, AND JUNCTION BOXES
SECTION 16131 OUTLET, PULL, AND JUNCTION BOXES PART 1 GENERAL 1.01 SUMMARY A. Related Sections: 1. 09900 - Painting. 2. 16112 - Raceways and Conduits. 1.02 SYSTEM DESCRIPTION A. Performance Requirements:
More informationProtective Capony RTC-16
Protective Capony RTC-16 ASSEMBLY AND OPERATION MANUAL Protective Canopy RTC-16 Assembly and Operation Manual CONTENT: 1 APPLICATION...3 2 OPERATION CONDITIONS...3 3 TECHNICAL SPECIFICATIONS...3 4 DELIVERY
More informationPV Mounting System 2703 SERIES 200 UL GROUND MOUNT SYSTEM. SnapNrack Residential PV Mounting Systems Code Compliant Installation Manual
PV Mounting System 2703 SERIES 200 UL GROUND MOUNT SYSTEM SnapNrack Residential PV Mounting Systems Code Compliant Installation Manual Series 200 UL Introduction Series 200 UL Introduction SnapNrack Series
More informationD.I.Y DAMP COURSING APPLICATION INSTRUCTIONS
D.I.Y DAMP COURSING APPLICATION INSTRUCTIONS The Tech-Dry applicator kit makes it easy to install a damp course into single and double brick walls. Each kit contains enough re-useable applicators to treat
More informationSECTION I -- IRONWORK
SECTION I -- IRONWORK CONTENTS PAGE 1. GENERAL... I-2 1.1. Introduction... I-2 2. REQUIREMENTS... I-2 2.1. General... I-2 2.2. Auxiliary Framing... I-2 2.3. High Seismic Risk Zone Requirements... I-3 2.4.
More informationDiffused Aeration Piping Equipment
1.0 General 1.1. The specifications in this section include all components of the Diffused Aeration System with the exception of the individual diffuser units. Refer to additional specification sections
More informationNeo Threshold Shower System Installation Guide
TM Neo Threshold Shower System Installation Guide Manor House Collection Shown Sistine Stone showers are ideal for experienced Do-It-Yourselfers. Please read through this entire installation guide before
More informationMASTER. Water Conditioning Corp. OPERATION MANUAL. PURO PRO 1200 SCP Series Modular Reverse Osmosis System. January 2012 Version
MASTER Water Conditioning Corp. www.masterwater.com OPERATION MANUAL PURO PRO 1200 SCP Series Modular Reverse Osmosis System January 2012 Version Table of Contents Model Number... 1 Shipping Description
More informationDaytona Beach Pier Building Renovation Jun 2010
SECTION 15150 - SANITARY WASTE AND VENT PIPING PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification
More informationWhen I started tiling, we didn t do our own shower pans that BATHS
BATHS Preventing Leaks in Tiled Showers Detail the pan properly before any tile is installed BY TOM MEEHAN Photos by Roe Osborn When I started tiling, we didn t do our own shower pans that job fell to
More informationSpaVault TM Installation Guide for Bullfrog Spas (7-10 x 7-10 x 38 )
SpaVault TM Installation Guide for Bullfrog Spas (7-10 x 7-10 x 38 ) WARNING - When unpacking SpaVault, DO NOT discard styrofoam pieces, these are not packaging materials. Step 1 Excavation Important:
More informationMASTER. Water Conditioning Corp. OPERATION MANUAL. PURO PRO 1200 SC Series Modular Reverse Osmosis System. January 2012 Version
MASTER Water Conditioning Corp. www.masterwater.com OPERATION MANUAL PURO PRO 1200 SC Series Modular Reverse Osmosis System January 2012 Version Table of Contents Model Number... 1 Shipping Description
More informationRO400 USER'S MANUAL. Memo PURE-PRO REVERSE OSMOSIS SYSTEM RO400. Type of product. Date of purchase. Address
Type of product RO400 Memo Date of purchase Name Address Tel REVERSE OSMOSIS SYSTEM 19 RO400 USER'S MANUAL 01 Introduction of RO400 02 What is Reverse Osmosis 03 Components& Selections 04 Cartridge filters
More informationSe incluyen las instrucciones en español
Page 1 of 16 Pittsburgh Corning Corporation Pittsburgh, PA 15239 1-800-624-2120 www.pittsburghcorning.com All trademarks and registered trademarks in this brochure are owned and protected by Pittsburgh
More informationValance Installation. For Units with Beam Style Coils
Valance Installation For Units with Beam Style Coils 1. Before installation of valance units, determine if drapes are to be used, or if any wall construction will protrude into room. If either drapes or
More informationFreedom One-Piece Barrier Free Showers Installation Instructions
Tools & Materials you might need for proper installation Materials: 2-1 gallon buckets of solid wood flooring adhesive or 100% silicone adhesive (non-shrink) 20-1.25 wood screws 1-5 gallon bucket (to mix
More informationKeylar Shelving (QLD) Pty Ltd
Wall Strip Shelving Garage Option This product requires some assembly Wall Strip Shelving is an economical way of providing wall mounted shelving for any light duty application and is for indoor use only.
More informationYOUR SPLASH PAD RESOURCE
1 Index Permits & Inspections Material List Warnings Splash Pad Types Pre-Site Grading Plumbing Schematic Pressure Testing Concrete Preparation and Pour Housing/Nozzle Installation Above Ground Water Feature
More informationAssembly Instruction. wedi Fundo Primo Shower System
Assembly Instruction wedi Fundo Primo Shower System Assembly Instructions wedi Fundo wedi Fundo Shower System-Primo Overview & General Product Description of the wedi Fundo Shower Systems All wedi Waterproof
More informationZ5377 E6 Swivel bracket Mounting instructions (1.2 EN)
Z5377 E6 Swivel bracket Mounting instructions (1.2 EN) Contents 1. Product description and scope of supply...3 2. Intended use...3 3. Safety precautions...4 4. Assembly...4 5. Operation...4 6. Maintenance
More informationSECTION STORM UTILITY DRAINAGE PIPING PART 1 - GENERAL 1.1 SUMMARY 1.2 SUBMITTALS 1.3 PROJECT CONDITIONS
SECTION 334100 - STORM UTILITY DRAINAGE PIPING PART 1 - GENERAL 1.1 SUMMARY Section Includes: 1. Pipe and fittings. 2. Drain Basin. 3. De-chlorination tablet feeder. 4. Non-pressure transition couplings.
More informationBateau, Crucible and Timpani Vessels Installation and User Guide
005 Bateau, Crucible and Timpani Vessels Installation and User Guide MODEL NUMBERS 2273W 2271D 2277D Important :- Please quote the above model number(s) when ordering spares. IMPORTANT! Installer: This
More informationIn-Wall Tank and Bowl Carrier System With Dual Flush Technology Geberit Model No Flush Volume: 1.6 / 0.8 GPF / 3.
D400-00 07-00 965.94.00.0 (00) In-Wall Tank and owl Carrier System With Dual Flush Technology Geberit Model No..78.00. Flush Volume:.6 / 0.8 GPF - 6.0 /.0 LPF Product Data Product Specifications - For
More information1.2 ACTION AND INFORMATIONAL SUBMITTALS.1 Provide submittals in accordance with Section Submittal Procedures.
BID OPPORTUNITY NO. 253-2011 PAGE 1 OF 7 PART 1 GENERAL 1.1 REFERENCES.1 American Society of Mechanical Engineers (ASME).1 ASME B31.1, Power Piping, B31.3 Process Piping, B31.9 Building Services Piping..2
More informationA. This Section includes sanitary waste and vent piping inside the building and to locations indicated.
SECTION 221316 SANITARY WASTE AND VENT PIPING PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification
More informationSECTION DUCTILE IRON FITTINGS. A. This section includes materials, installation, and testing of ductile iron fittings 48 inches and smaller.
PART 1 - GENERAL 1.1 DESCRIPTION A. This section includes materials, installation, and testing of ductile iron fittings 48 inches and smaller. 1.2 RELATED WORK SPECIFIED ELSEWHERE A. Section 01300 Record
More informationThank you for purchasing our product. *Please read these instructions and follow them step by step.
PAGE 1 OF 5 PORTA-DOCK, INC. AD01- DS 4'x 16'SW-AA - AP01- DS 4'x 16'SW-APD AW01- DS 4'X 16'SW-CPD ALUMINUM PORTA-DOCK *For Beige Decking Add the Letter B to the Model* Thank you for purchasing our product.
More informationMASTERSPEC - SHORT FORM. B. See Division 5 Section "Metal Stairs" for steel tube railings associated with metal stairs.
SECTION 05721 - ORNAMENTAL RAILINGS PART 1 - GENERAL 1.1 SUMMARY A. This Section includes the following: 1. Glass supported railings. B. See Division 5 Section "Metal Stairs" for steel tube railings associated
More informationSHCM SHOWER COLUMN INSTALLATION INSTRUCTIONS
SHCM-27180 SHOWER COLUMN INSTALLATION INSTRUCTIONS IMPORTANT DreamLine TM reserves the right to alter, modify or redesign products at any time without prior notice. For the latest up-to-date technical
More informationBALCONY FLUE OUTLET KIT
BLCONY FLUE OUTLET KIT LOGIC Combi LOGIC + Combi LOGIC Heat LOGIC + Heat LOGIC System LOGIC + System LOGIC Code Combi i-mini When replacing any part on this appliance, use only spare parts that you can
More information801-MORD Mordred FIXING: Ground. ORDER No: CUSTOMER: Complied by Date AB 30/06/15 ISSUE ECN DATE SIGN /07/15 AB
CUSTOMER: 0-MORD Mordred ORDER No: FIXING: Ground Complied by Date 0/0/5 ISSUE ECN DATE SIGN 0 7 0/07/5 CUSTOMER: 0-MORD Mordred ORDER No: FIXING: Ground Low tower.m single slide Low scramble net High
More informationSECTION LAGUNA SERIES TOP HUNG SLIDING DOOR SYSTEM
Page 1 of 6 SECTION 08 32 20 LAGUNA SERIES TOP HUNG SLIDING DOOR SYSTEM USE THIS SECTION WHEN SPECIFYING OVERHEAD SUPPORTED GLASS SLIDING DOORS. SECTION INCLUDES OVERHEAD SLIDING TUBE ASSEMBLY, MOUNTING
More informationSECTION TAPPING SLEEVES AND VALVES
SECTION 33 12 16.17 TAPPING SLEEVES AND VALVES PART 1: GENERAL 1.01 SCOPE Furnish, install and test all tapping sleeves, tapping valves, and tapping saddles as shown on the Drawings. 1.02 RELATED WORK
More informationPITTSBURGH CORNING ASSEMBLY INSTRUCTIONS. KWiK N EZ Rigid Track Silicone System for Thinline Series Glass Block
Page 1 of 6 PITTSBURGH CORNING KWiK N EZ Rigid Track Silicone System for Thinline Series Glass Block ASSEMBLY INSTRUCTIONS Introduction The KWiK N EZ Rigid Track Silicone System is the easiest way to install
More information1.04 SUBMITTALS PLUMBING FIXTURES
SECTION 15440 - PLUMBING FIXTURES PART 1 GENERAL 1.01 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification Sections,
More informationThe Ashland Project. Total Area: 1,778 Sq.Ft. 3 Bedroom, 2 Bath, 2 Car Garage
The Ashland Project Total Area: 1,778 Sq.Ft. 3 Bedroom, 2 Bath, 2 Car Garage The garage and bedroom extend from the front of this three bedroom home, drawing you visually into the entryway. Brick and stucco
More informationNORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017
SECTION 22 1316 - SANITARY WASTE AND VENT PIPING PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01
More information