1 Pradhan Mantri Gram Sadak Yojana Draft Guidelines for Quality Monitoring by National Quality Monitors under Third Tier of Quality Mechanism National Rural Roads Development Agency Ministry of Rural Development, Government of India January,

2 Index of Contents Topics Page No. 1. Introduction 3 2. Arrangements of Inspection 5 3. Prioritization of Works for Inspection 7 4. Information and Details to be furnished to NQM by PIU 8 5. Inspection, Observation and Grading of Works Reporting, Entry in Website and Performance Evaluation of NQMs 18 List of Annexure 1. Annexure 1 Requirement of Man power, Equipments and Implements. 2. Annexure 2 Procedure to use PMGSY website. 3. Annexure 3 Item-wise observations, their method, frequency and awardable quality grading 4. Format 1 Part I Work Information 5. Format 1 Part II Observations of NQM for Ongoing/Completed Work 2

3 1. Introduction The State Governments are responsible for implementation of Pradhan Mantri Gram Sadak Yojana (PMGSY) in the State, as such; it is the responsibility of the State Government to ensure quality of road works under this programme. However, since the programme lays special emphasis on the quality and timely completion of road works, a three tier quality management mechanism has been operationalised. The standards for quality of works have been prescribed under the publication Ministry of Rural Development, Specifications for Rural Roads published by IRC in August, 2004 (hereinafter referred to as Specifications). The comprehensive details about rural roads are provided in Rural Roads Manual IRC SP: 20, In order to provide detailed guidance to the field engineers about the tests and testing procedures, the NRRDA has published Quality Control Hand Book (being revised by IRC) and for recording the test results, Quality Control Registers have been prescribed. The first tier of quality management mechanism is envisaged as in-house quality control system to ensure the implementation of quality standards by way of carrying out mandatory tests, however, the second tier is envisaged as independent quality check and monitoring mechanism to be operationalised by the States. Whereas, the State Governments are responsible for quality management through operationalization of the first two tiers, the National Rural Roads Development Agency (NRRDA) arranges for quality monitoring through independent monitors termed as National Quality Monitors (NQMs). The objective of this third tier of quality mechanism is to monitor the quality of road works executed by the States with a view to ensure that the road works under the programme confirm to standards and to see whether the quality management mechanism in the State is effective. The role of this tier is to provide guidance to State implementation machinery and the field engineers rather than fault finding, as such; the shortcomings are identified by the NQMs and a feedback is provided to the States for improvement. The National Quality Monitors are performing inspection of works since March, The guidelines for inspection and reporting formats were prescribed during the initial period of operationalization of this tier of QM; however, based on the feedback from various stakeholders, the guidelines and reporting formats were revised in July, Having gathered the experience of independent Quality Monitoring of rural roads in last four years and based on the valuable suggestions and feedback has been provided not only by the State officials and NQMs but also by the field officers and auditing agencies, it is felt that certain revisions in respect of the following items are necessary. 1. The attention of the third tier of QM should focus on the quality of work, guidance related to quality rather than other aspects. 2. The observations of the NQMs should be objectively based on defined methods. 3. The NQM should be more accountable for the observations he has made. Therefore, as an endeavor to continuously update to achieve the targets of best of the quality, the guidelines and reporting format for inspection of works under third tier are being revised and the process of continuous performance evaluation of National 3

4 Quality Monitors by way of periodic review of reports and field verification by reputed institutions is envisaged. Under the revised guidelines, the PIU and the NQM would also be required to use OMMAS website extensively. The NQM would be required to download the list of works in the district to be visited by him/her and make mandatory online entry of sub-item grading in the website which would generate the item grading as well as the overall grading and also enable the States, PIUs and the NRRDA to carry out the further analysis of NQM reports. To enable the NQM to make online entry, he/she would be given the log-in and the password for limited data entry. The PIU would be able to generate Part-I Work Information from the OMMAS using the PIU Log-in. 4

5 2. Arrangements of Inspection The NQMs shall be given the programme to inspect the works in designated State and designated districts during the designated months. The States shall continue to making necessary arrangements for visit of NQMs. The detailed guidelines for arrangement of inspection of NQMs are given below: 1. The National Quality Monitors will be sent the letter of request with programme of inspection of works. The copy of the letter will also be endorsed to the States for making necessary arrangements and for information to concerned PIU. 2. On receipt of the letter the SQC shall contact the NQM and get the tentative programme of inspection. In case, the SQC does not contact the NQM, the NQM may take initiative. As soon as the programme of inspection is finalized, the NQM shall invariably inform NRRDA about the programme of his visit in the prescribed Fax/ Mail Back Form only and in no other way. It has been observed that sometimes, some NQMs keep on trying to contact the SQC without any results, in such cases; the NQMs shall fax the programme to SQC. It shall be the duty and responsibility of the SQC to contact the NQM and concerned PIU and finalize the dates and programme of NQM as per mutual convenience of NQM and PIU. 3. It shall be responsibility of the SQC to ensure adequate arrangements for inspection of NQM. In these revised guidelines, it is mandatory for the NQM to make observations on the basis of quality control tests/ hand-feel tests/ measurements performed under his personal supervision for which necessary equipments, staff and implements would be required; therefore, it shall be the personal responsibility of the SQC to ensure that requisite staff and equipments are provided to NQM for performing/ getting performed required tests (List of equipments and staff required for inspection is enclosed as Annexure 1). 4. The details of schedule of visit will be available on website in the last week of the preceding month to enable the SQC and PIUs to make necessary arrangements. Detailed procedure to use website for viewing schedule, taking list of work and online data entry for sub-item grading is given in User Manual for NQMs at Annexure The NQM is required to inspect maximum of three districts in a single visit in one State in a month. In case of hill States where connectivity is poor and more time is taken in travel, the NQM may be allotted less number of districts also. 6. In the present format, the NQM is required to perform/ get performed the prescribed tests which would take time and it would not be possible to make desired observations in a day for one completed work of maximum 3km length or 2 ongoing works each of maximum 3km length in which about 50% work has been completed, as such; the NQM should finalize a suitable programme to spend not more than 3 days in each district inspecting not more than 1 completed work or 1 completed and one ongoing work in just initial stages or 2 on-going works both with less than 50% physical progress. The inspection of 1-2 road works is suggested with a view that normally, a road in PMGSY would not be of a length more than 3 Km, however; if the length of 5

6 road work is more, every 3 Km length or part thereof shall be treated as another work. It must be clearly understood that the observations required during the work should be made with due care and diligence. In no case, the superficial inspection/ observations would be accepted by NRRDA. 7. The NQM is expected to make his own arrangements to travel up to nearest rail/ air head of one of the District Headquarters of the State allotted to him. The PIU shall make necessary arrangements for transport required for inspection of works within the District and from one District to the next. The PIU may make arrangements of boarding of NQM in Government Guest Houses/ Inspection Bungalows but in case of nonavailability of such an accommodation, the NQM may stay in private Hotels/ Guest Houses and the reimbursement to NQM for boarding charges will be done by NRRDA as per Honorarium and Traveling Allowance Bye Laws 2006 for National Quality Monitors. 8. The programme of inspection is valid for the inspection of works for only the months mentioned in letter of request; therefore, in no case should the inspection spill over to the next month. This is necessary as the same district might have been allotted to another NQM for the next month. The inspection of works would therefore not be valid for purposes of reimbursement of expenses by NRRDA for a month other than the allotted one. 9. The NQM shall not be entitled for remunerations including travel expenses etc. for such inspections which are carried out in contravention to the guidelines or found to be superficial. 6

7 3. Prioritization of Works for Inspection It has been noticed that the NQMs are not able to inspect the works as per the priorities given in the guidelines. It is also noticed that either the PIUs have tendency to offer the works of their choice for inspection or some NQMs prefer to inspect the works which are situated at convenient locations. It has been therefore decided that the NQM before proceeding to the concerned district for inspection would log on to PMGSY website and obtain the list of works in the district and after obtaining the list, he will select the works as per the criteria for prioritization of works given in this guidelines. The NQM is required to not only take the list from website but also required to enter the grading of work online. Therefore, the arrangements to provide access for data entry regarding the inspections are being made. (the module for online entry of the reports and grading etc is being developed, therefore; the reporting for the month of January and February, 2007 shall be done in hard copy, however, as soon as the module is ready User Manual and process to enter the reports online shall be separately communicated). Guidelines for NQMs to use website for taking the list of works is given in Annexure 2. While inspecting the works, the NQM shall prioritize the selection of roads as follows: 1. Priority 1 shall be to inspect works which are at earthwork stage. This is with a view to examine the system and procedures which is being followed by the PIU and the Contractor. NQM intervention at this stage would help in ensuring that subsequent stages of the work are carried out after system deficiencies are removed. Under this category it would be sufficient that only one work of the contract package is examined. (As the PIU and Contractor would be common). In the next visit, the other NQM should inspect any other road in progress under the same package. 2. Priority 2 ongoing works (excluding Phase I and II works) which have not been inspected at all by NQM before. 3. Priority 3 shall be ongoing works that have not been inspected by NQM in the last 8 months. 4. Priority 4 shall be inspection of completed works and which have not been inspected by NQM in the 6 month period upon completion. 5. Works of Phase I and II shall not be inspected by NQM unless specifically requested by SQC or NRRDA. 6. The same ongoing road work shall not be inspected if the previous inspection by NQM is less than 8 months earlier and no ongoing or complete road work shall be inspected if it has been inspected twice before by any NQMs. 7. If the NQM is inspecting any road after the inspection by a SQM, he shall inspect the work with a view to analyze the quality of work in light of the observations made by SQM also. 8. Complaint cases and ATR cases shall be got inspected on case to case basis. 7

8 4. Information and Details to be furnished to NQM by PIU The SQC shall ensure that the information as detailed in the following paragraphs is provided to NQM by the head of PIU. 1. The PIU shall furnish the phase-wise list of road works to the NQM in the format given below in which the details about previous inspections shall compulsorily be mentioned. The PIU shall also make available a road map showing the location of roads to enable planning of the itinerary and selection of works to be inspected. Name of PIU Date Name of Road Phase and Date of Start % Progress Details of Inspt. (if any) by SQM/ NQM Name of NQM/SQM Date of Inspt. Action Taken/ Rectification Done and whether reinspected 2. The NQM shall compare the above list with the list obtained from web and inconsistencies shall be pointed out to PIU. The NQM shall select roads out of this list in accordance with the priority given in the guidelines, and shall enclose a copy of the list of roads given to him by the Programme Implementing Unit indicating the comparison and inconsistencies observed in the list along with his report to the SQC and NRRDA. 3. After the NQM selects the roads to be visited, the PIU shall provide the necessary works information in respect of the road in Part I of the Inspection Report Format (enclosed as Format 1). The PIUs are supposed to update data on OMMAS, as such; majority of information prescribed in Part I - Work Information shall be available in the OMMAS database. The arrangements for downloading the information from website are being made and in future, the format of Part I Work Information would be downloaded by the PIU from his own login and handed over to the NQM after filling information in the blank spaces. It is expected that the PIU would provide this information to the NQM without wasting any time. 4. The PIU shall produce to NQM the original DPR of the work being inspected along with working drawings. 5. The PIU shall produce the Quality Control Registers Part I and Part II to enable the NQM to understand the details of tests conducted. 6. The NQM shall get some hand feel tests and field test conducted under this personal supervision as such, the PIU shall necessarily provide the essential equipment and facilities and manpower to NQM for the purpose. 8

9 7. The road which has already been inspected by NQM earlier may also be selected by NQM for inspection (the road inspected by NQM shall not be inspected by other NQM till 6 months after the inspection of earlier NQM). The PIU shall provide the copy of report of SQM/NQM to NQM, so that while inspecting the work, the NQM could look into the issues raised by SQM/ NQM. If, there is marked difference in the observations of NQM/SQM made during the previous visits, the NQM is also required to analyze the reasons for difference in observations, therefore; it is mandatory for PIU to provide copy of NQM/SQM inspections conducted earlier. 9

10 5. Inspection, Observation and Grading of Works The objective of third tier of Quality Monitoring under PMGSY, i.e. inspection of road works by national level independent monitors is to identify shortcomings in respect of quality of road works and to guide the PIUs about the specifications, good practices and effective execution of works with desired quality. The role of these monitors is to critically examine the road works and give feedback about quality of road works and quality management related shortcomings to the State level quality management team and NRRDA to enable systemic improvements. After the selection of work for inspection as detailed in Chapter 3, the PIU would furnish the details of work in the prescribed format as detailed in Chapter 4. The NQM should visit the work and perform critical inspection of the entire work. 5.1 How to make observations: There could be many methods of inspecting, making observations and evaluating various items and sub-items involved in construction of a rural road. With a view to achieve uniformity, objectivity in observations and evaluation, the efforts have been made to standardize the methods of observations and evaluation. Various items and sub-items involved in construction of a rural road have been listed in Annexure 3. Each of the sub-items shown in the Appendix shall be examined by NQM as per the method of observation mentioned in column 4 and as per the frequency mentioned in column 5. The quality of the subitem/item would be quantified in one of the 2/3 grades prescribed in column 6. The NQM shall base his observations on the method of field tests, hand feel tests, measurements and visual observations as specified in column 4 of the Annexure 3 only and in no other way. The NQM shall record observations at the space provided in Format-1 Part-II. 5.2 How to organize inspection: The NQM is expected to traverse through the entire road length to ascertain the quantum of work such as length of road, number of CDs, protection works, side drains, catch water drains, rigid pavement and other aspects of the work. After the traverse, the NQM would decide about the locations for detailed observations. In case of on-going work/item of work it is easier to take samples of material; however, in case of completed work/item it may be difficult to take samples. As can be seen from Annexure 3, the tests are generally required to be made in one kilometer, as such, in case of completed work, it is suggested that after traversing the entire length of the road, the NQM should select one such spot in every kilometer, which is fairly representative of the overall quality of the road in that kilometer. The observations can be made on this spot by digging a pit either on pavement or at half pavement and half shoulder, as decided by the NQM. 5.3 Grading of Works: The quality of every item and sub-item of work would be evaluated by the NQM on the basis observations made as per prescribed standard method. The grading would be recorded in every item and abstracted at appropriate space provided in Part III of the format. The grading of work would be done with an intention to quantify the observations showing level of satisfaction in relation to the specification of the work/item under observation. The objective would be to indicate to the Executing Agency, as to whether the material or workmanship is acceptable, or unacceptable. If the item is unacceptable, the improvement could be done by either 10

11 replacement of the entire material/portion of work or by rectification in workmanship or material. The grading should be able to indicate to the PIU/ State, the level of intervention required for improvement. Therefore, based on the type of item and method of observation, each item/ sub-item of work would be graded in any of the categories i.e. Satisfactory (S), Requires Improvement (RI) or Unsatisfactory (U) out of the categories prescribed as per column 6 of the Annexure 3. Based on grading, the PIU shall take action for rectification of defect, therefore, it is very important to record the defect as well as the suggestive method by which the rectification could be done. The NQM shall record, in the space provided in Part II observation sheet, the grade as well as clear and express reasons for grading the item of work as RI or U along with his suggestions for improvement. The reasons and suggestions shall be recorded clearly in such a way that there are no ambiguities or contradictions with observations in other items. The detailed method of making observations and grading of item/ sub-item of works is given in paragraphs below. 5.4 How to fill up the reporting format and grade the items/ sub-items of the work: The detailed guidelines for making observations, filling up of the inspection format and grading are given below. It shall be ensured by the NQM that space provided for observations are not left blank without any observations. The space for observations in respect of items not executed should be filled up by writing Item not executed but if material is available at site, testing shall be done and observations be made for the quality of material. 5.5 Observations on Quality Arrangements: In case of ongoing works this item shall be examined. The observations about establishment of field laboratory would be made. It should be carefully seen that whether the field laboratory has adequate equipments and whether the equipments are being used to actually test the material and workmanship of the road work. If field laboratory has not been established, U grade would be awarded; if laboratory is established but does not have sufficient equipments or the equipments have not been used, RI grade would be awarded; if field laboratory with sufficient equipments has been established and equipments are being used S grade would be awarded. 5.6 Attention to Quality: Two types of observations are required to be made in this item. The first observation is regarding the maintenance of Quality Control Register Part I and II in case of ongoing works. It should be carefully seen that whether adequate number of tests as per prescribed mandatory frequency have been carried out or not (see abstract of tests in Quality Control Register). The other observation would be about the verification of test results recorded by the Contractor/PIU. In the subsequent paragraphs, the process for sampling and field testing is mentioned, the results of field tests carried out by NQMs shall be cross referenced with the test results recoded in Quality Control Register Part-I and the comment on correctness of the test results shall be recorded by the NQM. If, record of tests is properly maintained and monitored through Quality Control Register Part I and II, all the tests as per prescribed frequency have been carried out S grade would be awarded. If, the above items have been partly attended RI grade would be awarded and if, these items have not been attended by PIU U grade would be awarded. 11

12 On verification of the test results recorded by the PIU, the sub-item about verification of test results would be graded. The grading would be S if test results recorded by Contractor/PIU reasonably matches with the test results obtained by NQM after field testing at the same location otherwise the item would be graded U. 5.7 Observations on geometrics: In case of ongoing and completed works, the observations shall be made for this item. The measurements about the road way width, carriage way width and adequacy of camber shall be made at a selected RD and shall be tabulated in reporting format. The observations about execution of horizontal curve, superelevation and extra widening as per the provisions of DPR shall be made and entered at relevant space in the reporting format. If, it is felt that the provisions about camber, superelevation, extra widening etc. has not been made in DPR but are required as per field conditions, in such cases, clear observations should be made in the space provided under General Observations at the end of reporting format. If above items have been executed properly as provided in DPR S grade would be awarded otherwise U grade would be awarded. 5.8 Observations about the quality of work- General: The observation about the quality of work is required to be made for every item and sub-item of construction in the manner given in subsequent sub-paragraphs. In case of flexible pavements the observation about sub-grade, sub-base, base-course and surface course are required to be made for on-going as well as completed works. In case of on-going works/items under observations, it is easy to take samples; however, in case the item under observation is already complete or the entire work is complete it is required to take at least one observation pit of appropriate size and depth in every Km. The observations in case of completed works shall be based on tests performed on samples drawn form these observation pits. After reconnaissance, a location of fairly representative quality of road may be identified for digging a pit. The size of pit could be about 30cm x 30cm and upto a depth where the sub-grade starts. The pit should be dug with the help of appropriate tools but the observation should start right from application of the digging tool. Needless to add that the observation about sub-base course, base-course and subgrade can be taken from the same pit and it may not be generally required to dig more than one pit in one Km. From the surface course, the material of PMC/surface dressing may be removed and kept separately. The top layer of WBM can be removed, thickness of layer can be measured and course aggregate and fine aggregates can be separated easily. The gradation test can be performed on these samples of aggregate. The hand-feel tests for plasticity may be performed on fine aggregates. For ascertaining the adequacy of compaction, hand-feel test is mentioned in sub-para b of sub-para C below. The same process can be repeated in other layers of WBM. If it is difficult to distinguish between the different layers of WBM, still the gradation tests can be performed and fair assessment about the gradation of the aggregates, adequacy of compaction, plasticity of the screening/filler material may be done. After making observations about WBM, the observations about thickness, gradation and plasticity of material can be easily made for GSB but for adequacy of compaction, sand replacement/core cutter method may be adopted. After making observations about GSB, the observations about the sub-grade could be easily made. 12

13 5.9 Observation of Earth Work and Sub-grade: The Earth Work in rural roads could be either for embankment construction or for formation cutting. The observations shall be made for ongoing as well as completed works. The award of grades shall be done for earthwork in embankment and for cutting based on the type of works involved. There may be situations where either of the two sub-items would be involved but in exceptional cases where both the items have been executed, the grading of both the items may be suitably done. The NQM shall make the observations in the following manner. (a) (b) Earthwork and Sub-grade in Embankment: (i) Suitability of material for embankment construction: The NQM shall make detailed observations at-least at one location per kilometer and the RD at which observation is made shall be recorded in the table given in the reporting format. The NQM shall make observation about the suitability of the soil by visual classification of soil as prescribed in Annex 5.1 of Operations Manual and clear observations regarding the suitability should be made in reference to Specifications clause 301. In case of completed works or completed item of work the observations shall be based on test pit. If soil is suitable S grade would be awarded otherwise U grade would be awarded. (ii) For making observations about adequacy of compaction, the NQM shall carry actual field test for field density of the sub-grade/embankment. The field density shall be taken either by core cutter method or by sand replacement method, for ascertaining the OMC & MDD the NQM shall examine the QC Registers and record the value in reporting format. In case of on-going works at-lease one test per Km for field density shall be done. If the compaction work is on-going, one test for Field Moisture Content of the soil shall also be done to understand whether the compaction is being done at OMC or not. The findings shall be recorded in the report in the prescribed table. The observation sheet shall be enclosed with the report. If degree of compaction is found to be adequate S grade would be awarded otherwise U grade would be awarded. (iii) The visual observation about the side slopes and profile shall be made and recorded for completed work only. If proper side slopes with proper profile exist S grade would be awarded otherwise U grade would be awarded. Earthwork and Sub-grade in Cutting: The visual observations about stability and workmanship of cut slopes and adequacy of slope protection shall be made by the NQM.If cut slopes with adequate stability exist, S grade would be awarded, if the defects can be rectified by some improvement, RI grade would be awarded and otherwise, U grade would be awarded Observation of Granular Sub-base: The construction of Granular Sub-base is required to be done as per clause 401 of specifications, as such; the NQM is required to make observations about quality of material as well as workmanship for ongoing as well as completed works. (a) Quality of Material: At-least one test of gradation shall be carried out by the NQM for every kilometer of road. The observation sheet for the gradation test 13

14 result shall be enclosed with the report. For the assessment of plasticity of the material, it may not be possible to carry out the tests for liquid limit and plasticity index; however, the NQM can carry out hand feel tests of making ball by mixing small quantity of water in the material and try to make balls. If, well defined ball can be made by hands, the material would generally be plastic enough to be ranked as unsuitable and if ball cannot be made by hands the material is treated non-plastic to the desired extent. If the material is of suitable gradation and plasticity S grade would be awarded otherwise U grade would be awarded. (b) Workmanship and Compaction: Generally the field density test by sand replacement method shall be carried out but if it is not be possible to carry out detailed test about the compaction of GSB material, the adequacy of compaction may be judged by making visual observations about the density of compacted layer. In case of on-going works or in case of completed item, the observations about the denseness of GSB layer can be made at time of application of pick axe or crow bar while digging the test pit. If degree of compaction is found to be adequate S grade would be awarded otherwise U grade would be awarded Observations of Base Course: In rural roads, generally the base-course is being constructed with WBM. The construction of WBM base course is required to be done as per the provisions contained in clause 405 of Specifications for Rural Roads. The observations about WBM shall be made for completed as well as ongoing work by NQM in the following manner: (a) Quality of Material: At-least one test for gradation of aggregate of every layer of WBM shall be done for each kilometer in case of on-going works as well as completed works. The observation sheet for the gradation test result shall be enclosed with the report. For the assessment of plasticity of the crushable aggregate used as fillers or screenings, it may not be possible to carry out the tests for liquid limit and plasticity index, however, the NQM can carry out hand feel tests of making ball by mixing water into the material and make observations as to whether the material is non-plastic to the desired extent or is plastic enough to be ranked as unsuitable. If grading of course aggregate/ fine aggregate and plasticity of crushable aggregate/ filler is suitable S grade would be awarded otherwise U grade would be awarded. (b) Compaction: The exact assessment of compaction in a WBM is quite difficult, however; it is quite simple to make fair assessment about the fact that whether the compaction has been adequately done or not. For assessing the adequacy of compaction, the NQM is supposed to carry out the volumetric analysis. After digging the pit course and fine aggregates can be separated by sewing or by manual measures and comparative quantity of filers and course aggregate can fairly be judged, the course aggregate can be refilled in the same pit and it should be observed that how much bulging has taken place above the level of compacted surface. This process will give a fair idea as to whether the proper compaction has been done. The NQM shall make all the observations about the compaction only after carrying out the above hand feel test. It may however be noted by NQMs that by even the visual observations during the process of application of pick axe or crow bar also the compactness of WBM layer can be fairly assessed. 14

15 If compaction is found to be adequate S grade would be awarded otherwise U grade would be awarded Observations on Bituminous Construction: In Rural Roads, generally the BT surfacing is being done over prime coat, tack coat. BT work generally consists of 20mm premix carpet with seal coat. In few cases, surface dressing is constructed, whereas, in some other cases, modified penetration macadam is also constructed. It is rare to have BM or other types of BT surfacing under PMGSY. The observations about BT surface shall be made by NQM in the following manner: (a) Quality of BT surface in case of completed work: At the selected location the observation on a pit shall be tabulated in which thickness of layer shall be assessed. The observations in a pit shall reveal the fact that whether the BT surface has been constructed after proper cleaning of the granular surface or not, this observation should be assessed and recorded. Quality of workmanship shall be assessed in light of surface evenness, surface colour and texture, camber etc. In case of ongoing works/item of works, based on the stage of construction, the observations about cleaning of granular surface receiving BT, Prime coat, Tack coat etc. shall be made. The observations about gradation of aggregate by gradation test and verification of grade of bitumen by examination of original test report of the manufacturer shall be done. The observations will include the quality of aggregate, quality and quantity of binder, temperature at mixing point and laying temperature, rolling and other aspects. If material and workmanship is found satisfactory, S grade shall be awarded otherwise U grade shall be awarded Observations on Shoulders: The NQM should make observations about the classification of soil and if suitable soil is used for shoulders S grade would be awarded otherwise U grade would be awarded. The NQM should make visual observation about the shoulders and ascertain whether the shoulder has been constructed simultaneously with GSB and record observation carefully. If compaction is found to be adequate S grade would be awarded otherwise U grade would be awarded Observations on Cross Drainage Works: The NQM shall inspect at least 50% of CDs situated on roads. In Rural Roads generally flushed causeways and vented causeways with hume pipes are built. Box culverts and Slab culverts are also common. The NQM shall give details about the span and type of CDs with their numbers. Detailed observations about every inspected CD work with reference to Material and Workmanship shall be made by NQMs. In the reporting format the observations about Causeways of all the spans and Culverts upto 6 m. span shall be recorded, however, for Culverts/ bridges beyond 6 m. span separate observation sheet shall be enclosed in which detailed observations about quality of material and workmanship shall be made by NQM, at present detailed format is not being prescribed. The effect of quality grading of CD beyond 6 m. span shall be decided by NRRDA on case to case basis. General observation about quality of material used in CD works shall be made and recorded by the NQM. If proper CD work is found S grade would be awarded, if CD work requires improvement RI grade would be awarded, if work is not upto the standards U grade would be awarded. General observation about workmanship of CD works shall be made and recorded. If workmanship in CD work is found satisfactory S grade would be 15

16 awarded, if it requires improvement RI grade would be awarded, if work is not upto the standards U grade would be awarded Observations on Side Drains and Catch Water Drains: In Rural Roads situated in plain areas Kuchha Side Drains are required and these drains are required to be integrated with Cross Drains. In hilly and rolling terrain Catch Water Drains are constructed. Detailed observations should be made about these drains. If proper drainage work is found S grade would be awarded, if CD work requires improvement RI grade would be awarded, if work is not upto the standards U grade would be awarded Observations on Cement Concrete Pavements and Associated Drains: The observations about CC Pavements or other type of rigid or semi-rigid pavements and Associated Side Drains should be made in respect of Material and Workmanship. If quality and workmanship is found acceptable, S grade would be awarded otherwise U grade would be awarded Observations on Road Furniture and Markings: Main Informatory Board, Citizen Information Board and Logo Board is required to be fixed during the construction of work, however, other signage are fixed after the work is completed. It is prescribed that all the information in the boards should be displayed in local language and it is essential that information should be provided in such a way that it is well understood by the local people. The observations about signage fixing, language used and quality of signage should be made by NQM. If furniture are found properly fixed with information in understandable language and the quality and workmanship is acceptable in case of ongoing and completed works (as specified), S grade would be awarded otherwise U grade would be awarded General Observations of NQMs: The NQM is expected to interact with the PIU staff and Engineers of Contractors or Consultants. The work of NQM is guidance rather than fault finding, as such, the interaction with the personal should be oriented towards guidance. The NQM is expected to make observations about progress of work with reference to works programme and the action taken by PIU for liquidated damages etc. In case of ongoing works, the NQM should find out whether the work has been completed within sanctioned cost or not. The NQM should specifically focus his general observations about the action taken by PIU on observation made by senior officers/sqms and other NQMs and make clear remarks about the efficacy of action taken. In addition, the NQM is free to make other observations but it is clarified here that the NQMs should not make such observations which are in contravention to guidelines of PMGSY or provisions of specifications. It should be clearly understood by NQM that his observations should not amount to direct or indirect un-due advantage to either contractor, consultants or other personal involved in the work Sub-item/Item wise Grading and Overall Grading of Work: The sub-item wise grading of every item of work would be entered in the table at para 15 of reporting format and the item grading would be the lowest of the grading of sub-items within that item. The overall Item Grading would be entered in the table at Para 16 (table also given below) of the reporting format and the overall grading of work shall be calculated in the following manner (In case of online entry of the grading, the NQM would enter only 16

17 the sub-item grading and the system would be able to generate item grading and the Overall grading of work). # Item Awarded Grade 1 Quality Control Arrangements 2 Attention to Quality 3 Geometrics 4 Earthwork and Sub-grade in Embankment/Cutting 5 Granular Sub-base 6 Base Course Non-Bituminous and shoulders 7 Bituminous Surfacing 8 Shoulders 9 CD Works 10 Side Drains and Catch Water Drains 11 CC/Semi-Rigid Pavement and Associated Pukka Drains 12 Road Furniture and Markings Overall Grading If, any of the items in item no. 4, 5, 6 and 7 are graded as U, overall grading of the work shall be U i.e. Unsatisfactory. If, all the items given in above four items are S but grading in any of other items is U or RI, the overall grading of work shall be S-RI i.e. Satisfactory but Requiring Improvement. If grading of all items is S, the overall grading of work shall be S i.e. Satisfactory. 17

18 6. Reporting, Entry in Website and Performance Evaluation of NQMs The observations of the NQM shall be recorded by NQM in his own handwriting and in no case, the staff of PIU shall be engaged for the recording of observations. The reporting format shall be prepared in 4 copies, one copy shall be handed over by NQM to the PIU immediately after the inspection is over and in all cases before the NQM leaves the district where the works have been inspected. One set each of the observations should be sent to State Quality Coordinator of the concerned State and Chief Quality Coordinator of NRRDA soon after the inspection is over in that State. The reports should be sent to officers by name. The NQMs are aware that for online monitoring and management of the programme, a website is operational. The module for data entry is being developed and the access of the relevant module of this website would be provided to the NQM. In future, the NQM would be able to upload online the grading of work as specified in para 15 of reporting format, i.e. Part-II of Format 1. The performance of NQMs shall be evaluated in NRRDA on the basis of observations recorded in reporting formats. A Performance Evaluation Committee would evaluate the reporting formats selected on random basis for a sample of about 5%, as per the guidelines of NRRDA prescribed from time to time. Generally, the performance of NQM would be evaluated on the following points: a. Whether the NQM has carried out inspection as per the guidelines, b. Is there lack of application of mind by NQM in recording observations, c. Is there a tendency to avoid desirable technical observations, d. Whether the NQM has left inspection format incomplete without any reasons. The report of performance evaluation would be produced to the Independent Selection Committee constituted by NRRDA for empanelment and performance review of NQMs. The continuation of NQMs would depend on the performance not only related to the quality of field inspections and reporting but also on the observance of Code of Conduct. 18

19 Annexure 1 Requirement of Man power, Equipments and Implements for making the Observations by National Quality Monitor The following Man power, Equipments and Implements are required for making the Observations by National Quality Monitor during the inspection of a roadwork under PMGSY. 1. One or two unskilled laborers are required to dig the pit and take the samples of the material depending upon the work involved. 2. In addition, the following equipments and implements will also be required: # Observation Method of Observation Equipments/ Implements Required Item - Geometrics 1 Widths 2 Camber 3 Horizontal Curve, Super elevation and Extra widening 4 Longitudinal Gradient Actual Measurements Measuring tapes of 20m, thread, spirit level and straight edge. Item - Earth Work and Sub-grade in Embankment 1 Quality of Material 2 Compaction Item - Sub-Base 1 Quality of Material Visual Classification of Soils Field Density Test by sand replacement/ Core Cutter method. Visual Observation Rapid Moisture Meter, Sand Replacement Test/ Core Cutter Apparatus. a. Grain Size Gradation Test Standard Sieves. b. Plasticity Hand-feel test. 2 Compaction Field Density Test by sand replacement/ Core Cutter method. 3 Total Thickness of Layer Measurement Rapid Moisture Meter, Sand Replacement Test/ Core Cutter Apparatus. Measuring Tape and Steel Scale of 30cm. 19

20 Item - Base Course Water Bound Macadam 1 Quality of Material 2 a. Grain Size of Course Aggregate Gradation Test Standard Sieves. b. Suitability of Course Aggregate in respect degree of hardness. c. Plasticity of Crushable Aggregate used as fillers Adequacy of Compaction through volumetric analysis. Hand-feel test. Hand-feel test. Hand-feel test. Pick axe, crow bars and steel Scale of 30 cm. 3 Thickness of every layer of WBM. Measurement. Steel Scale of 30cm. Item - Bituminous Layer Premix Carpet (PMC)/ Surface Dressing (SD) 1 Gradation of Aggregate Gradation Test. Standard Sieves. 3 Mixing Temperature of Mix. Measurement. Thermometers. 4 Laying Temperature of Mix. Measurement. Thermometers. 5 Thickness of layer Measurement. Steel Scale of 30cm. Item - CC/ Semi Rigid Pavements and Associated Pukka Drains 3 Thickness of Layer Measurements Steel Scale of 30cm. 20

21 National Rural Roads Development Agency Fax/Mail Back Form 1 (Fax to 011/ or mail to pkkatare@nic.in) Response Sheet of National Quality Monitors With reference to your D.O. letter No. P-14013/2/2002-NRRDA Dated / / (Please tick the relevant box) 1. I am able to undertake the visit for the month of. Probable Dates 2. I am sorry; I am unable to under take visits proposed for the month. 3. In case of 2 above the reasons are as follows; (Please fill up the following if any change in address, telephone/ fax no. and Id) My correct addresses:.. My Telephone Number: 1. STD code Number 2. STD code Number My Fax Number: STD code Number My Id. (Signature) (Name of NQM) To, The Director (P-III), National Rural Roads Development Agency, 5 th Floor, 15-NBCC Tower, Bhikaji Cama Place, New Delhi

22 Annexure 2 Procedure to use PMGSY website for obtaining list of works 1. Open website 2. On left side go to Quality Monitoring 22

23 3. Click on NQM and SQM Inspection Report. The below screen will appears and then select Road wise report. 23

24 4. After selecting Road wise report option, following screen will appear and then select State and District, select year, status, and monitors and click GO button. You will get the list of Roads Inspected by SQM and NQM for the selected State and district. 24

25 25 Annexure 3 Statement showing item-wise observations, their method, frequency and awardable quality grading # Sub item for observation In case of work Method of Observation Frequency Grades Item 1 - Quality Arrangements Quality Arrangements Item 2 - Attention to Quality Maintenance of QC a Registers b Verification of test results Item 3 Geometrics On-going On-going On-going/ Complete Verification of field laboratory and availability of equipments. Verification of QC Register I and II Verification of test results on the basis of field tests. General observation Item Grade General observation Not Specified Item Grade S/RI/U S/RI/U S/RI/U S/RI/U a Road way width Actual Measurements 2 per Km b Carriageway width Ongoing or Actual Measurements 2 per Km c Camber complete Measurement 2 per Km d Superelevation & Extra 2 per Km Measurement Widening at Curves e Longitudinal Gradient in 2 critical Ongoing/ Visual Observation/ case of road in hilly/ stretches in a complete Measurements rolling terrain. Km Item Grade Item 4 - Earth Work and Sub-grade in Embankment/ Cutting a Quality of Material for Embankment/ Sub-grade b Compaction Ongoing or complete Visual Classification of Soils 1 per Km Field Density Test by sand replacement/core-cutter method. c Side Slopes and Profile Complete Measurement d e Stability and Workmanship of Cut Slopes (in case of hilly/ rolling terrain) Adequacy of Slope Protection (in case of high embankments/hilly/ rolling terrain) Ongoing or complete 1 per Km 4 Observations per Km Visual Observation 4 per Km Visual Observation 4 per Km Item Grade

26 Item 5 - Sub-Base Quality of Material a Grain Size Gradation Test 1 per Km Ongoing or b Plasticity complete Hand-feel test of ball making 1 per Km with moisture content Field Density Test by sand Ongoing or c Compaction replacement/ core cutter 1 per Km complete method. d Total Thickness of Layer Ongoing or complete Item 6 - Base Course Water Bound Macadam a b c d Quality of Material Grain Size of Course Aggregate Plasticity of Crushable Aggregate used as fillers Adequacy of Compaction through volumetric analysis. Thickness of every layer of WBM. Ongoing or complete Measurement by taking pit for full layer thickness 1 per Km Item Grade Gradation Test 1 per Km Hand-feel test of ball making with moisture content Hand-feel test by digging pit and volumetric analysis. Actual Measurement by taking pit Item 7 - Bituminous Layer Premix Carpet (PMC)/ Surface Dressing (SD) a Gradation of Aggregate Ongoing b c Mixing Temperature of Mix. Laying Temperature of Mix. d Thickness of layer e Surface Evenness Item 8 - Shoulders Quality of material for a shoulders b Degree of compaction Ongoing Ongoing Ongoing or complete Ongoing or complete Grain Size Analysis (Gradation Test). Measurement of temperature by thermometer. Measurement of temperature by thermometer. 1 per Km 1 per Km 1 per Km Item Grade 1 at hot-mix plant/ 1 per Km 1 at hot-mix plant 1 where laying is in progress. Measurement by taking pit 2 per Km By straight edge 2 per Km Item Grade Complete Visual classification of soil 1 test per Km S/RI/U Complete Field Density Test by sand replacement/core-cutter method. 1 test per Km S/RI/U c Camber. Complete Measurements 1 test per Km S/RI/U Item Grade S/RI/U 26

27 Item 9 - Cross Drainage Works Causeways of all spans and Culverts upto 6 m. span. a b Quality of Material Concrete, Stone/ brick masonry, Hume pipes including size etc. Quality of Workmanship such as positioning of pipes, wing walls, cushion over H Pipes etc. Ongoing or complete Item 10 - Side Drain and Catch Water Drain General quality of Side Drains/ Catch Water Ongoing or Drains and their integration complete with CDs. Visual observation ( for CC verify cube test results from records) Visual observation Visual observation Item 11 - CC/ Semi Rigid Pavements and Associated Pukka Drains a b c Quality of Material Concrete, Stone/ Concrete Block Pavement etc. Strength of CC in Concrete Pavement/ Concrete Block Pavement Quality of Workmanship Wearing surface texture, Adequacy of setting of concrete, Joints, Edges etc. d Thickness of Layer Ongoing or complete Item 12 - Road Furniture and Markings Citizen Information Board, a Main Informatory Board, Quality and whether fixed during construction. Ongoing Logo boards, 200 m stones b and Km stones, quality and whether fixed after Complete completion. C Whether the information in Complete/ boards is given in local Ongoing language. Visual Observation Strength using appropriate rebound hammers/ verification of cube test results from test records. Visual observation Measurements Visual observation Visual observation Visual observation General observation General observation Item Grade General observation Item Grade 1 per 100 m. Length of Pavement 1 per 100 m. Length of Pavement General observation 1 per 100 m. Length of Pavement Item Grade General observation General observation General observation Item Grade S/RI/U S/RI/U S/RI/U S/RI/U S/RI/U 27

D.O.# P 17012/1/2009 P III August 11, 2010

D.O.# P 17012/1/2009 P III August 11, 2010 Dr. Pramod Kumar Anand JS (RC) DG NRRDA : 23383553 : 23388207 : anandpk@nic.in D.O.# P 17012/1/2009 P III August 11, 2010 Subject: Comprehensive Guidelines for Quality Monitoring under Second Tier of Quality

More information

ANALYSIS OF QUALITY INSPECTION REPORTS OF NATIONAL QUALITY MONITORS FOR PMGSY ROADS IN INDIA

ANALYSIS OF QUALITY INSPECTION REPORTS OF NATIONAL QUALITY MONITORS FOR PMGSY ROADS IN INDIA Int. J. Struct. & Civil Engg. Res. 2013 Aruna Thube and Dattatraya Thube, 2013 Research Paper ISSN 2319 6009 www.ijscer.com Vol. 2, No. 2, May 2013 2013 IJSCER. All Rights Reserved ANALYSIS OF QUALITY

More information

FOR BUILDING WORKS PART-I WORK INFORMATION - (TO BE FILLED-UP BY PROJECT) Work is

FOR BUILDING WORKS PART-I WORK INFORMATION - (TO BE FILLED-UP BY PROJECT) Work is KARNATAKA RURAL INFRASTRUCTURE DEVELOPMENT LIMITED (FORMERLY KARNATAKA LAND ARMY CORPORATION LIMITED) "GRAMEENABHIVRUDDHI BHAVAN", 4TH & 5TH FLOOR, ANANDA RAO CIRCLE, BANGALORE 560 009 Annexure - 1 Format

More information

REQUEST FOR EXPRESSIONS OF INTEREST FOR CONSULTING SERVICES

REQUEST FOR EXPRESSIONS OF INTEREST FOR CONSULTING SERVICES REQUEST FOR EXPRESSIONS OF INTEREST FOR CONSULTING SERVICES INDIA Name of the Project: DESIGN REVIEW OF DETAILED PROJECT REPORT Loan No/Credit No/ Grant No.: 7995-IN/Cr 4848-IN/Cr 4849-IN Assignment Title:

More information

: TRANSPORTATION ENGINEERING COURSE CODE : 6014 COURSE CATEGORY : A PERIODS/WEEK : 6 PERIODS/SEMESTER : 90 CREDITS : 5

: TRANSPORTATION ENGINEERING COURSE CODE : 6014 COURSE CATEGORY : A PERIODS/WEEK : 6 PERIODS/SEMESTER : 90 CREDITS : 5 COURSE TITLE : TRANSPORTATION ENGINEERING COURSE CODE : 6014 COURSE CATEGORY : A PERIODS/WEEK : 6 PERIODS/SEMESTER : 90 CREDITS : 5 TIME SCHEDULE MODULE TOPICS PERIODS 1 Highway Engineering 22 2 Traffic

More information

Terms of Reference for Performance Audit Consultants

Terms of Reference for Performance Audit Consultants Terms of Reference for Performance Audit Consultants PMGSY Rural Roads Project 1. INTRODUCTION 1.1 Roads are arteries of the nation which provide infrastructural development for social and economic growth.

More information

DETAILED NOTICE INVITING TENDER FOR DPR CONSULTANCY. No./16538/22/D-12/DPR-Cons/MPRRDA/17 Bhopal, Date : 06/07/2017

DETAILED NOTICE INVITING TENDER FOR DPR CONSULTANCY. No./16538/22/D-12/DPR-Cons/MPRRDA/17 Bhopal, Date : 06/07/2017 GOVERNMENT OF MADHYA PRADESH MADHYA PRADESH RURAL ROAD DEVELOPMENT AUTHORITY (An agency of Panchayat & Rural Development Department, Govt. of M.P.) Block-II nd, 5 th Floor, Paryavas Bhavan, Arera Hills,

More information

GOVERNMENT OF INDIA MINISTRY OF ROAD TRANSPORT & HIGHWAYS DEPARTMENT OF ROAD TRANSPORT & HIGHWAYS TRANSPORT BHAWAN, NEW DELHI

GOVERNMENT OF INDIA MINISTRY OF ROAD TRANSPORT & HIGHWAYS DEPARTMENT OF ROAD TRANSPORT & HIGHWAYS TRANSPORT BHAWAN, NEW DELHI GOVERNMENT OF INDIA MINISTRY OF ROAD TRANSPORT & HIGHWAYS DEPARTMENT OF ROAD TRANSPORT & HIGHWAYS TRANSPORT BHAWAN, NEW DELHI 110001 No. NH-12031/32/2005/Ar.P/E&I/NH-10 Dated the 16 th September, 2005

More information

Quality Control Register- Part 2 For Building & Road Works

Quality Control Register- Part 2 For Building & Road Works KRIDL Quality Control Register Part-2 KARNATAKA RURAL INFRASTRUCTURE DEVELOPMENT LIMITED (FORMERLY KARNATAKA LAND ARMY CORPORATION LIMITED) GRAMEENABHIVRUDDHI BHAVANA, 4th & 5th FLOOR, ANAND RAO CIRCLE

More information

WMM, IRC: SP-20:2002, MORT&H, CBR, CVPD. I. INTRODUCTION

WMM, IRC: SP-20:2002, MORT&H, CBR, CVPD. I. INTRODUCTION Design and Construction of Rural Road from Boppudi-Kotavaripalem in Andhra Pradesh-A Case Study Aditya.G 1, Lakshmayya.M.T.S 2, Reddy Babu.G 3 1 M.Tech student, Dept. of Civil Engineering, 2 Assistant

More information

SURFACE DRAINAGE SYSTEM FOR ROADS. Components of Surface Drainage System

SURFACE DRAINAGE SYSTEM FOR ROADS. Components of Surface Drainage System Lecture Hour-49 UNIT 8 10CV755 HGD SURFACE DRAINAGE SYSTEM FOR ROADS Components of Surface Drainage System The surface water from the roadway and the adjoining land is to be collected and then disposed

More information

Analysis and Execution of WBM and Bituminous Premix Roads

Analysis and Execution of WBM and Bituminous Premix Roads Analysis and Execution of WBM and Bituminous Premix Roads Naveen.N 1, D.V.Manoj Kumar 2 Assistant Professor, Civil Engineering Department, Auroras Engineering College, Hyderabad, India 1 Site Engineer,

More information

Flagship Program. August Pradhan Mantri Gram Sadak Yojana (PMGSY)

Flagship Program. August Pradhan Mantri Gram Sadak Yojana (PMGSY) Flagship Program August 2015 Pradhan Mantri Gram Sadak Yojana (PMGSY) Pradhan Mantri Gram Sadak Yojana (PMGSY) was launched on 25 th December 2000. It is a 100% Centrally Sponsored Scheme (CSS), with the

More information

SECTION BITUMINOUS CONCRETE PAVING

SECTION BITUMINOUS CONCRETE PAVING PART 1 GENERAL 1.1 SECTION INCLUDES: SECTION 02400 BITUMINOUS CONCRETE PAVING A. The intent of this specification section is to provide requirements for materials, equipment, and methods for constructing

More information

Case Studies on Achieving Significant Development in Rural Road Project

Case Studies on Achieving Significant Development in Rural Road Project Case Studies on Achieving Significant Development in Rural Road Project Dated : 26-08-2014 Presented By: Mahesh Hiremath, Chief Operating Officer, K.R.R.D.A, Bangalore 1. PROFILE: Roads play major role

More information

Development & Application of Potentially Important Jute Geotextiles (CFC/IJSG/21) Prepared by Project Executing Agency (PEA)

Development & Application of Potentially Important Jute Geotextiles (CFC/IJSG/21) Prepared by Project Executing Agency (PEA) Development & Application of Potentially Important Jute Geotextiles (CFC/IJSG/21) GUIDELINES FOR INSTALLATION OF JUTE GEOTEXTILES Prepared by Project Executing Agency (PEA) AUGUST 2011 National Jute Board

More information

SCHEDULE A BILL OF QUANTITIES Part - I : Construction of Road

SCHEDULE A BILL OF QUANTITIES Part - I : Construction of Road Sl.Pg.No.193 Name of Work : Construction of 20.0 m. wide road in Sector 16 under 12.5% scheme around Shelghar Village at Ulwe Node, Navi Mumbai. SCHEDULE A BILL OF QUANTITIES Part - I : Construction of

More information

CITY OF LETHBRIDGE SECTION Construction Specifications SIDEWALK CONSTRUCTION PAGE 1 of 5

CITY OF LETHBRIDGE SECTION Construction Specifications SIDEWALK CONSTRUCTION PAGE 1 of 5 Construction Specifications SIDEWALK CONSTRUCTION PAGE 1 of 5 1.0 EXCAVATION AND FILL 1.1 GENERAL.1 The excavation or fill shall be made to provide proper grade, lines and crosssection for the laying of

More information

Highway construction C 5

Highway construction C 5 Highway construction C 5 Contents Equipments used in Highway Construction Construction of Earth Roads Gravel Roads Water Bound Macadam Roads Bituminous Pavements Cement Concrete Pavements Equipment used

More information

Allen & Sherriff Architects, Inc Yonge Street, S202, Richmond Hill, Ontario L4C 5K9 Tel: Fax: File Ref.

Allen & Sherriff Architects, Inc Yonge Street, S202, Richmond Hill, Ontario L4C 5K9 Tel: Fax: File Ref. Allen & Sherriff Architects, Inc. 10350 Yonge Street, S202, Richmond Hill, Ontario L4C 5K9 Tel: 905-884-1117 Fax: 905-884-4970 File Ref. 4166 Tender No.: T18-21 St. Theresa C.S. Child Care Expansion Durham

More information

Lecture Hour -41 CONSTRUCTION OF WATER BOUND MACADAM ROADS

Lecture Hour -41 CONSTRUCTION OF WATER BOUND MACADAM ROADS Lecture Hour -41 Unit-7 10CV56 TE-I CONSTRUCTION OF WATER BOUND MACADAM ROADS General The Water bound macadam (WBM) is the construction known after the name of John also article 2.16 and 2.17. The term

More information

UNIT 9 INSPECTION AND QUALITY CONTROL

UNIT 9 INSPECTION AND QUALITY CONTROL UNIT 9 INSPECTION AND QUALITY CONTROL Inspection and Quality Control Structure 9.1 Introduction Objectives 9.2 Need for Inspection and Quality Control 9.3 Principles of Inspection 9.4 Major Items in Construction

More information

Stanford University Facilities Design Guidelines SECTION ASPHALT UNIT PAVING. A. ASTM C-33 Standard Specification for Concrete Aggregates.

Stanford University Facilities Design Guidelines SECTION ASPHALT UNIT PAVING. A. ASTM C-33 Standard Specification for Concrete Aggregates. SECTION 32 14 23 ASPHALT UNIT PAVING PART 1 GENERAL 1.1 DESCRIPTION Work Included: All labor, materials, appliances, tools, equipment, facilities, transportation, and services for and incidental to performing

More information

The Role of the Resident Engineer. Liam Geoghegan MSc

The Role of the Resident Engineer. Liam Geoghegan MSc The Role of the Resident Engineer Liam Geoghegan MSc Inroduction Liam Geoghegan, RPS Consulting Engineers Experience in Road Construction Projects since 1991 I have worked for Local Authorities, Consulting

More information

Sl No. Rate. Hct By manual means In area of light jungle

Sl No. Rate. Hct By manual means In area of light jungle BILL OF QUANTITIES Name of Work : Extension of NH 37 from its dead end near Saikhowaghat in Assam ending near Roing in Arunachal Pradesh under Trans Arunachal Highway programme. SH: Strengthening of Shantipur

More information

CW 3170 EARTHWORK AND GRADING TABLE OF CONTENTS

CW 3170 EARTHWORK AND GRADING TABLE OF CONTENTS CW 3170 EARTHWORK AND GRADING TABLE OF CONTENTS 1. GENERAL CONDITIONS...1 3. DESCRIPTION...1 5. MATERIALS...1 5.1 General...1 5.2 Handling and Storage of Materials...1 5.3 Testing and Approval...1 5.4

More information

TOWN OF LAFAYETTE SPECIFICATIONS FOR HIGHWAY CONSTRUCTION. June 1984

TOWN OF LAFAYETTE SPECIFICATIONS FOR HIGHWAY CONSTRUCTION. June 1984 1 TOWN OF LAFAYETTE SPECIFICATIONS FOR HIGHWAY CONSTRUCTION June 1984 1. DEFINITIONS APPROVAL, APPROVED, ACCEPTED OR WORDS OR TERMS OF SIMILAR MEANING: Written approval of the Highway Superintendent. BASE

More information

SPECIFICATIONS FOR BONDED WEARING COURSE

SPECIFICATIONS FOR BONDED WEARING COURSE SPECIFICATIONS FOR BONDED WEARING COURSE 1.0 DEFINITIONS The term Director [Superintendent, etc.] shall mean the Director of Public Works of the awarding authority. The term Designee shall mean an employee

More information

SBI INFRA MANAGEMENT SOLUTIONS PVT. LTD., (SBIIMS) (WHOLLY OWNED SUBSIDIARY OF SBI) INVITES TENDERS ON BEHALF OF SBI, HYDERABAD.

SBI INFRA MANAGEMENT SOLUTIONS PVT. LTD., (SBIIMS) (WHOLLY OWNED SUBSIDIARY OF SBI) INVITES TENDERS ON BEHALF OF SBI, HYDERABAD. NIT NO SBIIMS/263/2018 DATE 20/11/2018 SBI INFRA MANAGEMENT SOLUTIONS PVT. LTD., (SBIIMS) (WHOLLY OWNED SUBSIDIARY OF SBI) INVITES TENDERS ON BEHALF OF SBI, HYDERABAD. IN A SINGLE BID PROCESS. FOR Repairing

More information

Schedule for construction of ROB Approaches no. 48, 54,55 of PKG-III (MGR) including temporary road diversion along ROB approach No 55.

Schedule for construction of ROB Approaches no. 48, 54,55 of PKG-III (MGR) including temporary road diversion along ROB approach No 55. Schedule for construction of ROB Approaches no. 48, 54,55 of PKG-III (MGR) including temporary road diversion along ROB approach No 55. QUOTED SL NO D E S C R I P T I O N OF ITEM UNIT Quantity IN Figures

More information

Make copies of all test results and control charts readily available to the Engineer at the project site.

Make copies of all test results and control charts readily available to the Engineer at the project site. 5.2.7.4 CONCRETE: CONTRACTOR S QUALITY CONTROL PLAN NOTE: This document is generally written in the imperative mood. The subject, "the Contractor" is implied. Also implied in this language are "shall",

More information

APPLICANT any person who makes application for a permit. BOROUGH Borough of Elizabethtown, Lancaster County, Pennsylvania.

APPLICANT any person who makes application for a permit. BOROUGH Borough of Elizabethtown, Lancaster County, Pennsylvania. CHAPTER 21 PART 2 TUNNELING AND EXCAVATIONS 201. Definitions. The following words and phrases, when used in this Part, shall have the meanings ascribed to them in this 201, except in those instances where

More information

A Surveying Design of Overlay Thickness of Rigid Pavements Using Road Software

A Surveying Design of Overlay Thickness of Rigid Pavements Using Road Software A Surveying Design of Overlay Thickness of Rigid Pavements Using Road Software Priya M S 1, Nithil 2 J S Vishwas 3 P.G. Student, Department of Civil Engineering, JNN College of Engineering, Shimoga, India

More information

CASE HISTORY REPAIR/IMPROVEMENT OF ROADS WITH GEOSYNTHETIC

CASE HISTORY REPAIR/IMPROVEMENT OF ROADS WITH GEOSYNTHETIC REPAIR/IMPROVEMENT OF ROADS WITH GEOSYNTHETIC Project Description Project: Improvement to Road from SH to Kandalgaon Road ODR- 90Km 0/000 to 4/300, Tal-Karveer, Dist-Kolhapur Client: Sanctioned & Approved:

More information

NATIONAL INSTITUTE OF TECHNOLOGY TIRUCHIRAPPALLI ESTATE MAINTENANCE DEPARTMENT

NATIONAL INSTITUTE OF TECHNOLOGY TIRUCHIRAPPALLI ESTATE MAINTENANCE DEPARTMENT NATIONAL INSTITUTE OF TECHNOLOGY TIRUCHIRAPPALLI 620 015 ESTATE MAINTENANCE DEPARTMENT NOTICE INVITING TENDERS NO: NITT/EMD//Civil works / 2015 TENDER NOTIFICATION Ref: NITT/EMD/ CoW/Civil Works /15-16

More information

CONSTRUCTION SPECIFICATION FOR COLD IN-PLACE RECYCLING

CONSTRUCTION SPECIFICATION FOR COLD IN-PLACE RECYCLING ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 333 NOVEMBER 2003 CONSTRUCTION SPECIFICATION FOR COLD IN-PLACE RECYCLING TABLE OF CONTENTS 333.01 SCOPE 333.02 REFERENCES 333.03 DEFINITIONS 333.04

More information

1.01 The work shall consist of spreading and compacting crushed and pugmilled aggregate on a prepared surface.

1.01 The work shall consist of spreading and compacting crushed and pugmilled aggregate on a prepared surface. 3505 - SPECIFICATION FOR GRANULAR BASE COURSE 3505 - l DESCRIPTION 1.01 The work shall consist of spreading and compacting crushed and pugmilled aggregate on a prepared surface. 1.02 The following definitions

More information

SECTION TRENCHING, BACKFILLING, COMPACTION AND GENERAL GRADING

SECTION TRENCHING, BACKFILLING, COMPACTION AND GENERAL GRADING PART 1 GENERAL SECTION 02221 TRENCHING, BACKFILLING, COMPACTION AND GENERAL GRADING 1.01 SECTION INCLUDES A. Excavation, dewatering and backfilling with compaction of trenches for pipes, conduits, channels

More information

SECTION ASPHALT PAVING

SECTION ASPHALT PAVING PART 1 - GENERAL 1.1 DESCRIPTION SECTION 32 12 16 ASPHALT PAVING SPEC WRITER NOTE: Delete or add information between // ---- // and any other items applicable to project. Any item added to the text shall

More information

CONSTRUCTION SPECIFICATION FOR COLD MIXED, COLD LAID, OPEN AND DENSE GRADED BITUMINOUS MIX TABLE OF CONTENTS

CONSTRUCTION SPECIFICATION FOR COLD MIXED, COLD LAID, OPEN AND DENSE GRADED BITUMINOUS MIX TABLE OF CONTENTS ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 309 NOVEMBER 2006 CONSTRUCTION SPECIFICATION FOR COLD MIXED, COLD LAID, OPEN AND DENSE GRADED BITUMINOUS MIX TABLE OF CONTENTS 309.01 SCOPE 309.02

More information

SECTION CURB, COMBINATION CURB AND GUTTER, AND MONOLITHIC MEDIAN. 1. Bituminous concrete pavement; Section

SECTION CURB, COMBINATION CURB AND GUTTER, AND MONOLITHIC MEDIAN. 1. Bituminous concrete pavement; Section 02670-1 of 6 SECTION 02670 CURB, COMBINATION CURB AND GUTTER, AND 02670.01 GENERAL A. Description This work shall include, but not necessarily be limited to, the construction of concrete curb, concrete

More information

EMPANELMENT OF CONTRACTORS FOR CIVIL WORKS Metropolitan Oil & Gas Pvt. Ltd.

EMPANELMENT OF CONTRACTORS FOR CIVIL WORKS Metropolitan Oil & Gas Pvt. Ltd. EMPANELMENT OF CONTRACTORS FOR CIVIL WORKS Metropolitan Oil & Gas Pvt. Ltd. Corporate Office: 326 Udyog Vihar, Phase IV, Gurgaon, Haryana - 122015 Tel: 0124-4309721, 4309724 Fax: 0124-4309725 Field Office:

More information

SECTION A1 EXCAVATION AND BACKFILL GENERAL

SECTION A1 EXCAVATION AND BACKFILL GENERAL SECTION A1 EXCAVATION AND BACKFILL GENERAL The work under this section shall include all excavation to such width and depth as shown on the drawings, specified herein, or ordered by the Engineer. Such

More information

SAND SEAL SPECIFICATIONS. The term Director [Superintendent, etc.] shall mean the Director of Public Works of the awarding authority.

SAND SEAL SPECIFICATIONS. The term Director [Superintendent, etc.] shall mean the Director of Public Works of the awarding authority. SAND SEAL SPECIFICATIONS 1. DEFINITIONS The term Director [Superintendent, etc.] shall mean the Director of Public Works of the awarding authority. The term Designee shall mean an employee of the awarding

More information

SECTION MECHANICALLY STABILIZED EARTH RETAINING WALLS

SECTION MECHANICALLY STABILIZED EARTH RETAINING WALLS SECTION 13100 MECHANICALLY STABILIZED EARTH RETAINING WALLS PART 1 -- GENERAL 1.01 THE REQUIREMENT A. Includes all labor, material, equipment, testing and submittals required to design and complete construction

More information

Scanned by CamScanner

Scanned by CamScanner JODHPUR MUNICIPAL CORPORATION G-SCHDULE NIT No. Date Sr No. Last Date of Sale :- Earnest Money : Rs... Date of Receipt :- CR No. Dated.. Copy issued to M/s STORM WATER DRAINAGE MASTER PLAN FOR THE CITY

More information

REINFORCED CONCRETE CULVERT STORM DRAIN AND SEWER PIPE FIELD SECTION 1026

REINFORCED CONCRETE CULVERT STORM DRAIN AND SEWER PIPE FIELD SECTION 1026 (Page 1 of 8) REINFORCED CONCRETE CULVERT STORM DRAIN AND SEWER PIPE FIELD SECTION 1026 1026.1 SCOPE. To establish procedures for the inspection of reinforced concrete pipe and the approval of modified

More information

ITEM D-701 PIPE FOR STORM DRAINS AND CULVERTS

ITEM D-701 PIPE FOR STORM DRAINS AND CULVERTS ITEM D-701 PIPE FOR STORM DRAINS AND CULVERTS 701-1 DESCRIPTION 701-1.1 This item shall consist of the construction of pipe culverts, and storm drains, removal of existing storm pipes, connections to existing

More information

SPECIFICATIONS FOR APPLYING PRIME COAT, BLOTTER, AND TACK COAT

SPECIFICATIONS FOR APPLYING PRIME COAT, BLOTTER, AND TACK COAT 805. 1 SCOPE SPECIFICATIONS FOR APPLYING PRIME COAT, BLOTTER, AND TACK COAT These Specifications govern all operations necessary for and pertaining to the spraying of asphalt products on the roadway surface,

More information

Cement Treated Sub-Base For Bituminous Pavement

Cement Treated Sub-Base For Bituminous Pavement 6th International Conference on Recent Trends in Engineering & Technology (ICRTET - 2018) Cement Treated Sub-Base For Bituminous Pavement 1 Aher D.D., 2 Sangale Y. B., 3 Pagar S. R., 4 Yadnesh Patil, 5

More information

Student Services & Classroom Addition

Student Services & Classroom Addition SECTION 321216 - ASPHALT PAVING PART 1 GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections,

More information

CONSTRUCTION SPECIFICATION FOR OPEN GRADED DRAINAGE LAYER

CONSTRUCTION SPECIFICATION FOR OPEN GRADED DRAINAGE LAYER ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 320 NOVEMBER 2010 CONSTRUCTION SPECIFICATION FOR OPEN GRADED DRAINAGE LAYER TABLE OF CONTENTS 320.01 SCOPE 320.02 REFERENCES 320.03 DEFINITIONS 320.04

More information

Special Provision No. 335S03 April 2015

Special Provision No. 335S03 April 2015 COLD IN-PLACE RECYCLED EXPANDED ASPHALT MIX Item No. Special Provision No. 335S03 April 2015 Amendment to OPSS 335, November 2009 OPSS 335, November 2009, Construction Specification for Cold In-Place Recycling

More information

Table of Contents. Chapter 1 : Introduction 1. Chapter 2 : Structure and design 15

Table of Contents. Chapter 1 : Introduction 1. Chapter 2 : Structure and design 15 Table of Contents Chapter 1 : Introduction 1 1-1 Overview of Japan 1 1-1-1 Topography 1 1-1-2 Climate 1 1-1-3 Population 3 1-1-4 Economy 3 1-2 History and current status of roads in Japan 5 1-2-1 Road

More information

SPECIFICATIONS FOR SAND SEAL

SPECIFICATIONS FOR SAND SEAL SPECIFICATIONS FOR SAND SEAL 1.0 DEFINITIONS The term Director [Superintendent, etc.] shall mean the Director of Public Works of the awarding authority. The term Designee shall mean an employee of the

More information

ROUTINE MAINTENANCE WORK

ROUTINE MAINTENANCE WORK ROUTINE MAINTENANCE WORK RURAL ROAD MAINTENANCE The basic objective of road maintenance is to ensure the road that has been constructed or improved, is to the extent possible kept in its original condition.

More information

INDIRA GANDHI NATIONAL OPNE UNIVERSITY CONSTRUCTION & M AINTENANCE DIVISION MAIDAN GARHI NEW DELHI

INDIRA GANDHI NATIONAL OPNE UNIVERSITY CONSTRUCTION & M AINTENANCE DIVISION MAIDAN GARHI NEW DELHI ` INDIRA GANDHI NATIONAL OPNE UNIVERSITY CONSTRUCTION & M AINTENANCE DIVISION MAIDAN GARHI NEW DELHI-110068 NOTICE INVITING QUOTATION IG/CMD/NIQ-civil/2014 Dated: - 26/06/2014 Name of work:- Construction

More information

PROPOSED ROAD No. 5(A) FROM GHANTAGHAR TO BADI OMTI JABALPUR (M.P.)

PROPOSED ROAD No. 5(A) FROM GHANTAGHAR TO BADI OMTI JABALPUR (M.P.) PROPOSED ROAD No. 5(A) FROM GHANTAGHAR TO BADI OMTI JABALPUR (M.P.) Based on. I to IV w.e.f. 10 May 2012 Length of the Road =250 m, ROW 18 m Abstract Estimate S.No. Description of Item SOR Item Cost 1

More information

ITEM 6 CONCRETE CURBS, GUTTERS, AND SIDEWALKS

ITEM 6 CONCRETE CURBS, GUTTERS, AND SIDEWALKS ITEM 6 CONCRETE CURBS, GUTTERS, AND SIDEWALKS 6.1 DESCRIPTION This work shall consist of constructing curbs, gutters, sidewalks, ramps, local depressions and driveways of the form and dimensions shown

More information

BRIEF NOTE ON FILLING OF POT HOLES & PATCH REPAIRS

BRIEF NOTE ON FILLING OF POT HOLES & PATCH REPAIRS BRIEF NOTE ON FILLING OF POT HOLES & PATCH REPAIRS 1 DEFINITION: POT HOLES ARE IRREGULAR SHAPED HOLES OF VARYING SIZES IN A SURFACE LAYER OR EXTENDING TO THE BASE COURSE CAUSED BY LOCALISED DISINTEGRATION

More information

CONSTRUCTION SPECIFICATION FOR CONCRETE SIDEWALK

CONSTRUCTION SPECIFICATION FOR CONCRETE SIDEWALK ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 351 NOVEMBER 2015 CONSTRUCTION SPECIFICATION FOR CONCRETE SIDEWALK TABLE OF CONTENTS 351.01 SCOPE 351.02 REFERENCES 351.03 DEFINITIONS 351.04 DESIGN

More information

SPECIFICATIONS FOR FOG SEAL WITH COVER AGGREGATE

SPECIFICATIONS FOR FOG SEAL WITH COVER AGGREGATE SPECIFICATIONS FOR FOG SEAL WITH COVER AGGREGATE 1.0 DEFINITIONS The term Director [Superintendent, etc.] shall mean the Director of Public Works of the awarding authority. The term Designee shall mean

More information

APPENDIX D VTM Virginia Test Method For Determining Percent of Moisture and Density of Soils and Asphalt (Nuclear Method)

APPENDIX D VTM Virginia Test Method For Determining Percent of Moisture and Density of Soils and Asphalt (Nuclear Method) APPENDIX D VTM - 10 Virginia Test Method For Determining Percent of Moisture and Density of Soils and Asphalt (Nuclear Method) I. Scope This method covers the procedure to be used in determining the percent

More information

Appendix 3. POLICY & PROCEDURE No

Appendix 3. POLICY & PROCEDURE No DEPARTMENT OF PUBLIC WORKS DIVISION: ENGINEERING SERVICES SECTION: ADMINISTRATIVE PAGE NO: 1 OF 10 REVISION NO: 3 DATE: 1995 05 01 ESTABLISHED: 1986 03 03 Appendix 3 POLICY & PROCEDURE No. 2.3.1-020 TITLE:

More information

MSCAA /04 ITEM P-219 RECYCLED CONCRETE CRUSHED AGGREGATE BASE COURSE DESCRIPTION MATERIALS

MSCAA /04 ITEM P-219 RECYCLED CONCRETE CRUSHED AGGREGATE BASE COURSE DESCRIPTION MATERIALS 219-1.1 ITEM P-219 RECYCLED CONCRETE CRUSHED AGGREGATE BASE COURSE DESCRIPTION This item consists of a base course composed of crushed recycled concrete aggregate, crushed to meet a particular gradation,

More information

Extraction and Sieve Analysis ( µm minus) Forming Marshall Specimens, Field Method

Extraction and Sieve Analysis ( µm minus) Forming Marshall Specimens, Field Method 3.56 COLD IN-PLACE RECYCLING 3.56.1 GENERAL This specification covers the requirements for Cold In-Place Recycling (CIR) which consists of reclaiming the existing asphalt pavement; sizing the reclaimed

More information

CHAPTER 1 INTRODUCTION

CHAPTER 1 INTRODUCTION 1 CHAPTER 1 INTRODUCTION 1.1 GENERAL Planning and Scheduling of construction projects has always been a significant factor determining the successful completion of a project due to competition, time, space

More information

EINRIP. Specification and Construction Issues

EINRIP. Specification and Construction Issues EINRIP Specification and Construction Issues There are a significant number of changes in the Specification Not all issues can be discussed here A more detailed list of changes will be provided with bid

More information

AN ISO 9001 & COMPANY TENDER DOCUMENT. TENDER No: EPI/WRO/CON/757/0119 FOR

AN ISO 9001 & COMPANY TENDER DOCUMENT. TENDER No: EPI/WRO/CON/757/0119 FOR AN ISO 9001 & 14001 COMPANY TENDER DOCUMENT TENDER No: EPI/WRO/CON/757/0119 FOR Construction of Boundary Wall and allied works for DHH & MCH Hospital at Kendrapara at Odisha state VOLUME III PRICE BID

More information

KU Design Guidelines APPENDIX II PERMEABLE BITUMINOUS PAVEMENT

KU Design Guidelines APPENDIX II PERMEABLE BITUMINOUS PAVEMENT PERMEABLE BITUMINOUS PAVEMENT PART 1: GENERAL 1.01. RELATED DOCUMENTS: A. Drawings and general provisions of Contract, including Special Requirements General Conditions and Division 1 Specifications Sections,

More information

SECTION FLEXIBLE PAVING

SECTION FLEXIBLE PAVING SECTION 321200 PART 1 GENERAL 1.01 GENERAL REQUIREMENTS A. Include GENERAL CONDITIONS and applicable parts of Division 1 as part of this Section. B. Examine all Drawings and other Sections of the Specifications

More information

SECTION 10.0 PIPE TRENCHES Excavation and Preparation of Trench

SECTION 10.0 PIPE TRENCHES Excavation and Preparation of Trench SECTION 10.0 PIPE TRENCHES 10.01 Excavation and Preparation of Trench The trench shall be excavated to the proper depth to permit installation of the pipe along the lines and grades shown on the Plans.

More information

RITES Limited. Uttar Pradesh Expressways Industrial Development Authority [Govt. of Uttar Pradesh]

RITES Limited. Uttar Pradesh Expressways Industrial Development Authority [Govt. of Uttar Pradesh] Uttar Pradesh Expressways Industrial Development Authority [Govt. of Uttar Pradesh] Agra - Lucknow Access Controlled Expressway Project INVESTIGATION REPORT FOR BREACH IN SERVICE ROAD AT KM 16+300 RITES

More information

ITEM 252 IN-PLACE FULL DEPTH COLD FLEXIBLE PAVEMENT RECYCLING

ITEM 252 IN-PLACE FULL DEPTH COLD FLEXIBLE PAVEMENT RECYCLING AFTER NOVEMBER 1, 2008 ITEM 252 IN-PLACE FULL DEPTH COLD FLEXIBLE PAVEMENT RECYCLING 252.1 Description. This work shall consist of a stabilized base course composed of a mixture of the existing bituminous

More information

MATERIALS DIVISION MEMORANDUM SIGNATURE:

MATERIALS DIVISION MEMORANDUM SIGNATURE: MATERIALS DIVISION MEMORANDUM GENERAL SUBJECT: Modified Acceptance Program for Fine, Coarse Open-Graded and Crusher Run Aggregates SPECIFIC SUBJECT: Materials Manual of Instructions: Section 204.02(b)

More information

Municipal Inspection and Construction Guidelines Section I Roadworks SECTION I ROADWORKS I-1 GENERAL

Municipal Inspection and Construction Guidelines Section I Roadworks SECTION I ROADWORKS I-1 GENERAL I-1 GENERAL SECTION I ROADWORKS The Consultant Engineer is to monitor all specified asphalt, granular materials and sub-grade preparation to ensure all road and curb construction is undertaken as outlined

More information

Method of Measurement for Road Works Series MM Pavements

Method of Measurement for Road Works Series MM Pavements Method of Measurement for Road Works Series MM 700 - CC-RMP-00700 March 015 CC Construction & Commissioning Standards TRANSPORT INFRASTRUCTURE IRELAND (TII) PUBLICATIONS About TII Transport Infrastructure

More information

SECTION ASPHALT PAVING AND SURFACING

SECTION ASPHALT PAVING AND SURFACING SECTION 02500 ASPHALT PAVING AND SURFACING PART 1 - GENERAL 1.01 WORK INCLUDED A. Traffic control as required to divert vehicular and pedestrian traffic around construction. B. Spreading and compacting

More information

Select Subgrade Material, Compacted

Select Subgrade Material, Compacted 314.1 GENERAL B314 SHOULDER, SELECTED SUBGRADE, AND STOCKPILING OPSS.PROV 314 Granular materials meeting the requirements of OPSS.PROV 1010 are obtained from pits and quarries, and recycled materials.

More information

To, The Intending Tenderers

To, The Intending Tenderers PUBLIC WORKS DEPARTMENT Executive Engineer, National Highway Division,Solapur Tel :- 0217-2315020 eenh1sol@mahapwd.com. NHD/AB/Tender/Camp-Mumbai/4 Date :- 14/05/2012 To, The Intending Tenderers SUB:-

More information

Safety Method Statement External Works

Safety Method Statement External Works Description of Work and Location EXTERNAL WORKS A.Generally Preambles for other Sections of work shall apply equally to this section where applicable. B.Weed Killer The weed killer to excavations to be

More information

A. Provide all labor, materials, and equipment as necessary to complete all work as indicated on the Drawings and specified herein.

A. Provide all labor, materials, and equipment as necessary to complete all work as indicated on the Drawings and specified herein. PAGE 321216-1 SECTION 321216 PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification sections,

More information

ROAD STRECH FROM Golbazar Circle(723m), Golbazar to Ranital chowk(195m) LENGTH METERS SUMMARY SHEET

ROAD STRECH FROM Golbazar Circle(723m), Golbazar to Ranital chowk(195m) LENGTH METERS SUMMARY SHEET ROAD STRECH FROM Golbazar Circle(723m), Golbazar to Ranital chowk(195m) LENGTH - 918 METERS SUMMARY SHEET Sr No. Item Description Amount (In Rs.) 1 ROAD 44445103.80 2 UTILITY DUCT 39514269.91 3 STORM WATER

More information

SECTION ASPHALT CONCRETE

SECTION ASPHALT CONCRETE SECTION 02740 ASPHALT CONCRETE PART 1. GENERAL 1.01 SECTION INCLUDES A. Work includes but is not limited to the following: 1.02 RELATED SECTIONS 1. Provide all material, labor, and equipment to prepare

More information

Empanelment of Internal Auditors

Empanelment of Internal Auditors No : Date : Empanelment of Internal Auditors The Maharashtra Nursing Council [ MNC ] invites application from Chartered Accountant Firms who fulfill the eligibility criteria for Empanelment as Internal

More information

LIFE CYCLE COST ANALYSIS OF ROAD PAVEMENTS IN RURAL AREAS

LIFE CYCLE COST ANALYSIS OF ROAD PAVEMENTS IN RURAL AREAS LIFE CYCLE COST ANALYSIS OF ROAD PAVEMENTS IN RURAL AREAS 1 Mr. Akhai Mudassar Mohammed Shafi, 2 Mr. Ahmed Afaque Shakeel, 3 Prof. Siddesh Kashinath Pai 1 Student of postgraduate programme in advance construction

More information

SECTION BITUMINOUS CONCRETE PAVEMENT

SECTION BITUMINOUS CONCRETE PAVEMENT SECTION 321216 BITUMINOUS CONCRETE PAVEMENT PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification

More information

BASE CONSTRUCTION MATERIALS A Aggregate

BASE CONSTRUCTION MATERIALS A Aggregate BASE CONSTRUCTION 2211 AGGREGATE BASE 2211.1 DESCRIPTION This work consists of placing aggregate base. 2211.2 MATERIALS A Aggregate... 3138 Provide the class of aggregate as required by the contract. 2211.3

More information

1. (a) Explain the necessity and objects of highway planning. (b) Briefly explain the engineering surveys needed for locating a new highway.

1. (a) Explain the necessity and objects of highway planning. (b) Briefly explain the engineering surveys needed for locating a new highway. Code No: R31016 R10 Set No: 1 1. (a) Explain the necessity and objects of highway planning. (b) Briefly explain the engineering surveys needed for locating a new highway. 2. (a) Derive an expression for

More information

GRIEVANCE REDRESSAL POLICY INDEX

GRIEVANCE REDRESSAL POLICY INDEX GRIEVANCE REDRESSAL POLICY - 2018 INDEX 1 Introduction 2 Dealing with Complaints 2.1 Complaints /Suggestion Box 2.2 Complaint Book /Register 2.3 Complaint 2.4 Analysis and Disclosure of Complaints Disclosure

More information

Reassessed Streetworks Excavation and Reinstatement ( )

Reassessed Streetworks Excavation and Reinstatement ( ) Reassessed Streetworks Excavation and Reinstatement (6156-24) Qualification unit handbook for centres www.cityandguilds.com October 2015 Version 4.0 Ov 0 Reassessed Streetworks Excavation and Reinstatement

More information

Special Provision No. 399F02 January 2017 CONSTRUCTION SPECIFICATION FOR TEMPORARY HOT MIX PAVEMENT

Special Provision No. 399F02 January 2017 CONSTRUCTION SPECIFICATION FOR TEMPORARY HOT MIX PAVEMENT TEMPORARY HOT MIX PAVEMENT - Item No. Special Provision No. 399F02 January 2017 CONSTRUCTION SPECIFICATION FOR TEMPORARY HOT MIX PAVEMENT 1.0 SCOPE This Special Provision covers the requirements for the

More information

SECTION EXCAVATION AND FILL

SECTION EXCAVATION AND FILL SECTION 02315 EXCAVATION AND FILL PART 1 GENERAL 1.01 SUMMARY A. Furnish labor, materials, equipment, and incidentals necessary to perform excavation, backfill, grading, and slope protection required to

More information

PREVENTION OF MUD PUMPING IN RIGID PAVEMENT BASE COURSE DUE TO CHANGE IN MOISTURE CONTENT ALONG THE JOINTS

PREVENTION OF MUD PUMPING IN RIGID PAVEMENT BASE COURSE DUE TO CHANGE IN MOISTURE CONTENT ALONG THE JOINTS PREVENTION OF MUD PUMPING IN RIGID PAVEMENT BASE COURSE DUE TO CHANGE IN MOISTURE CONTENT ALONG THE JOINTS Mr.Pradeep Kumar B K Assistant professor, School of Civil Engineering, REVA University, Bangalore,

More information

PARAMETRIC STUDIES OF BOX CULVERTS

PARAMETRIC STUDIES OF BOX CULVERTS International Journal of Research in Engineering and Science (IJRES) ISSN (Online): 2320-9364, ISSN (Print): 2320-9356 Volume 1 Issue 1 ǁ May. 2013 ǁ PP.58-65 PARAMETRIC STUDIES OF BOX CULVERTS Komal S.Kattimani

More information

ROAD PAVEMENTS GENERAL

ROAD PAVEMENTS GENERAL ROAD PAVEMENTS GENERAL Contents Clause Title Page 701 Pavement Construction... 2 702 Horizontal Alignments, Surface Levels and Surface Regularity of Pavement Courses... 2 703 Not Used... 4 704 Not Used...

More information

Office of the Executive Engineer,National Highway Division No. 7, KOLHAPUR

Office of the Executive Engineer,National Highway Division No. 7, KOLHAPUR Office of the Executive Engineer,National Highway Division No. 7, KOLHAPUR Phone No: - 0231-2652960 Email:-nh7kolhapur.ee@mahapwd.com No. AB/Tender/NHDn7/kop/ 1802/ 2012 Date. 11 / 07 / 2012 To, The e-tendering

More information

SECTION 28 AGGREGATE BASE COURSE (FAA P-208) [For base course under runway and taxiway surfaces, use Section 29, FAA Item P-209.]

SECTION 28 AGGREGATE BASE COURSE (FAA P-208) [For base course under runway and taxiway surfaces, use Section 29, FAA Item P-209.] 28-1 GENERAL SECTION 28 AGGREGATE BASE COURSE (FAA P-208) The Contractor shall perform all work required by the plans and specifications for construction of aggregate base course for, use under runway

More information

CONSTRUCTION SPECIFICATION FOR COLD MIXED, COLD LAID, OPEN AND DENSE GRADED BITUMINOUS MIX

CONSTRUCTION SPECIFICATION FOR COLD MIXED, COLD LAID, OPEN AND DENSE GRADED BITUMINOUS MIX ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 309 NOVEMBER 2013 CONSTRUCTION SPECIFICATION FOR COLD MIXED, COLD LAID, OPEN AND DENSE GRADED BITUMINOUS MIX TABLE OF CONTENTS 309.01 SCOPE 309.02

More information

TECHNICAL SPECIFICATIONS OF LAYING OF UNDER GROUND POWER CABLE FOR TRANSMISSION LINE

TECHNICAL SPECIFICATIONS OF LAYING OF UNDER GROUND POWER CABLE FOR TRANSMISSION LINE GUJARAT ENERGY TRANSMISSION CORPORATION LTD. Sardar Patel Vidyut Bhavan, Race Course, Vadodara: 390 007 TECHNICAL SPECIFICATIONS OF LAYING OF UNDER GROUND POWER CABLE FOR TRANSMISSION LINE GETCO/E/TS LUC058/R1

More information