DESIGN OF MONTESINHO DAM AND EMBANKMENT MONITORING DURING CONSTRUCTION

Size: px
Start display at page:

Download "DESIGN OF MONTESINHO DAM AND EMBANKMENT MONITORING DURING CONSTRUCTION"

Transcription

1 DESIGN OF MONTESINHO DAM AND EMBANKMENT MONITORING DURING CONSTRUCTION L. Ribeirinho *, G. Tavares *, M. Romeiro *, M. Samora *, J. Brito *, J. Marcelino, J. Boal Paixão and J. Cordeiro * CENOR Consultores, S.A. Rua das Vigias, 2. Piso Lisboa, Portugal cenor@cenor.pt, webpage: Keywords: Granitic Rockfill, CFRD, Grouting treatment, Waterstops, Instrumentation plan, Embankment monitoring, Ecological flow Abstract. This paper presents the main aspects of the design of Montesinho Dam. One of the main topics is the imperviousness of the dam and its foundation and the treatments and structures used to accomplish it. It also approaches the embankment zoning and the geomechanical characterization of the construction materials, as well as the designed instrumentation plan that allowed monitoring of the embankment deformations and the evaluation of water pressure in the foundation during construction. At last it is also presented the adopted ecological flow system, provided with rather unique characteristics. 1 INTRODUCTION The water supply to Bragança, a city in north-eastern Portugal (region of Trás-os-Montes), is provided by Serra Serrada dam. However, its storage capacity is insufficient for the actual demand for clean water urban supply. So, in the past ten years, many solutions to increase the water supply system were studied. The one that got the Authority's approval was the construction of a new reservoir, created by Montesinho Dam. This dam is located in the Sabor river, approximately 3 km east of Serra Serrada dam, in the Montesinho Natural Park. The design of Montesinho Dam included the embankment and its foundation treatment, the river diversion, to enable the dam construction, the bottom outlet, which uses the same cut-and-cover gallery of the diversion, the water intake and the system that ensures the ecological flow, which was very important for the approval of this project. 2 DAM GENERAL DESCRIPTION Montesinho Dam 1 is a concrete face rockfill dam (CFRD), with a height of 36.5 m and a crest of about 310 m in length and 7 m of width (Figure 1 and Figure 2). The embankment has a total volume of m³, consisting of granitic rockfill obtained from the quarry located upstream of the dam in the reservoir area. Laboratório Nacional de Engenharia Civil (LNEC) Águas de Trás-os-Montes e Alto Douro (ATMAD) 1

2 L. Ribeirinho, G. Tavares, M. Romeiro, M. Samora, J. Brito, J. Marcelino, J. Boal Paixão, J. Cordeiro. Figure 1: Montesinho Dam plan a) pouring of the face slab b) downstream view of the embankment Figure 2: Photographs during construction The reservoir has a total storage capacity of 3.69 hm³ (net volume of 3.53 hm³) with a flooded area of 35.8 ha for a full supply level of m and a catchment area of 10.1 km². The maximum flood level is at m. The freeboard is 1.37 m, thus the crest elevation is m. The upstream and downstream embankment slopes are 1:1.5 (V:H). In the area of the dam and reservoir the outcropping blocks and top layers of the bedrock consists essentially of two-mica granite with coarse grain (γ). The rock presents a generalized and mild to medium kaolinization of the feldspars, therefore sometimes its mechanical characteristics correspond to a weathered granite (W3 and W4), with low mechanical resistance and a low stiffness. However, a dozen meters below, the quality of the rock increases (W2 to W3). 2

3 Granit massif is exposed everywhere, except along the minor riverbed, where there is alluvium soil (a) that needed to be removed in the foundation area prior to the construction (Figure 3). A few residual blocks were also removed. 3 FOUNDATION PERMEABILITY AND GROUTING TREATMENT The seepage in the foundation occurs through the rock discontinuities by several systems of subhorizontal and subvertical fractures. It appends mainly through the wider and more persistent fractures witch occurs near the surface. From a dozen meters below it, the rock mass becomes almost impervious by the close-up of those fractures. In order to prevent that flow, it was conceived a grouting treatment in the dam and in the spillway. The grouting curtain has about 430 m long and spreads along the following stretches: the left abutment crest wall; the plinths of left and right banks; the diversion gallery, connecting both plinths; the dam axis at the right abutment; the spillway. The foundation treatment has two kinds of grouting: the retaining/consolidation grouting meant for sealing the contact concrete/rock in 5 m long holes, along two rows 2 m apart from each other, creating a rectangular distribution of 2.0 m x 3.0 m in the horizontal plane; the monolinear impervious curtain with holes of variable length, ensuring the penetration of at least 5.0 to 7.0 m in the low permeability massif ( 3 Lu), with a minimum of 10 m. The area of grouting curtain was m 2. The overall of main grouting works were: 352 holes; m of rotary and rotopercussion drilling; 115 ton of cement and 343 water pressure tests for investigations and controls. The sealing and retaining/consolidation grouting is only defined in the stretches with plinth. 4 ROCKFILL EMBANKMENT ZONING The embankment zoning (Figure 3) was established taking into account the construction materials available at the site and the current practice for zoning of impervious face rockfill dams, constructed by sound and free-draining rockfill on strong rock foundations 2. Embankment s cross section comprises 5 different types of rockfill (namely A, B, C, D and E). All rockfill materials were obtained from the excavations executed on the interior of the reservoir. C, D and E materials were obtained directly from the excavations and A and B materials were produced, on site, from the excavation materials, with a rock crushing equipment. A type material is a support rockfill (2 m wide), grading from silt to gravel size, to provide uniform support for the face slab, acting also as a semi-impervious layer to restrict flow through the embankment in the event of concrete face joints anomalies. It was placed in layers of 0.4 m maximum lift and compacted with 8 passes of vibrating cylinder. 3

4 Figure 3: Design cross-section of the rockfill embankment B type material is a filter transition between A and C materials (2 m wide), grading from silt to cobble size. This zone will assure adequate hydraulic behavior of the embankment in the event of concrete face joints anomalies. It was placed with the same specifications of the A material. C type material consists of a well compacted and free draining rockfill, with high deformability modulus to limit deformations under water load. It was placed in layers of 0.8 m lift and compacted with 10 passes of vibrating cylinder, with addition of water during placement (minimum of 15% of rockfill volume). D type material is a well graded rockfill. It was placed in layers of 1.0 m maximum lift and compacted with 10 passes of vibrating cylinder, with addition of water during placement (minimum of 15% of rockfill volume). E type material is a protection layer (Figure 2), 2 m wide, composed of large size blocks (50 to 800 mm). This material was produced from blasting of fresh sound granitic rock. According to the first stage of the geomechanical characterization of the rockfill, used in design and presented in the next chapter, the A, B and C materials were produced from moderate weathered granitic rock with minimum uniaxial compression resistance of 30 MPa. For the D material was allowed the use of more weathered granitic rocks with a uniaxial compression resistance between 20 and 30 MPa. However, the second stage of the characterization revealed that those values were too conservative, namely in regard to compression strength. It also revealed that those better materials were available to fulfil the required construction volume. 5 CONSTRUCTION MATERIALS. GEOMECHANICAL CHARACTERIZATION The construction materials of the embankment were obtained directly from the excavations made on the interior of the reservoir. The geomechanical characterization of the rockfill was performed in two phases: the first phase for the design; the second phase for confirmation of design assumptions, at the beginning of the construction works. 4

5 In both stages the physical and mechanical characteristics (index-properties) of rockfill fragments were determined (Table 1) and triaxial tests were performed on large cells, with 0.30 m diameter cylinder specimens. For the geomechanical parameterization of the rockfill two methodologies were used: (i) directly from triaxial test results; (ii) using the correlations proposed by Wilson and Marsal (1979) 3 based on index-properties of the rockfill fragments. In Figure 4, the variations of shearing resistance angle (φ) with the confining stress (σ 3 ) are presented for the triaxial tests done in both phases. The second triaxial test was executed using a sample of the embankment, retrieved when it has reached half of total volume. These results are based on the fact that, for rockfill materials of good quality, the Mohr- -Coulomb envelope presents a curvature, roughly represented by the following equation 4 : φ = φ 0 φ log (σ 3 /pa) (1) Figure 4: Strength parameters of rockfill from triaxial test The methodology presented by Wilson and Marsal is based on the fact that a correlation exists between the grain breakage (B g ) and the effective principal stress ratio at failure [(σ 1 /σ 3 ) f ]. This methodology takes into account the rockfill fragments characteristics, using a classification based on some index-properties (water absorption, slake durability and L.A. abrasion). From the Wilson and Marsal classification the rockfill is rated as soft well- -graded, with B g values between 3,4% and 6% for octahedral stresses of 120 kpa and 260 kpa (considering γ=21.5 kn/m 3 ), respectively. The shear resistance was obtained using the following equation: sinφ = [(σ 1 /σ 3 ) f 1]/[(σ 1 /σ 3 ) f + 1] (2) The values for the angle of shearing resistance were obtained: between 43º and 45.6º for low confining stresses; and between 39.5º and 41.8º for high confining stresses. 5

6 Characterization Parameter Scatter of results First stage Second stage Granulometry Uniformity coefficient (Cu) Texture Porosity (n) 2.4% 5.1% 0,3% 1,0% Bulk density (G) Compression Uniaxial compression (σ c ) 20.9 MPa MPa MPa strength MPa Crushing strength (Pa50) 361 kgf (air dried) 314 kgf (submerge) kgf (air dried) kgf (submerge) Durability Los Angeles (LA) 59% 73% 24% 47% Slake durability test (Id 2 % 0,95% 0,98% - retained) Water sensitivity Absorption - 0,3% 0,5% Table 1: Index-properties of granitic rockfill fragments Rockfill deformability was also determined using triaxial test results, considering the Young Modulus for an axial extension of 0.1%. Values of 175 MPa (σ 3 =100kPa), 184MPa (σ 3 =300kPa) and 239 MPa (σ 3 =400kPa) were obtained. 6 CONCRETE FACE 6.1 Face slab The face slab is the structure that ensures the imperviousness of the rockfill (Figure 2). It is fully supported by the underlying rockfill and is mostly in compression under the reservoir loadings, except near the dam abutments where tensile stresses can develop. This kind of slab has no structural function and therefore the focus of its design is towards watertightness, instead of strength. That s why the determination of face slab dimensions and reinforcement is usually based on previous experience and construction procedures. Slab thickness is established to facilitate waterstops placement and to ensure proper cover for the reinforcement. Current practice for low or medium height dams is between 0.25 and 0.30 m. In the present case, that value was set to 0.30 m. In order to achieve a good performance of the slab upon the expected deformations in its lifecycle, vertical joints were designed, establishing 10 m width panels. The quantity of reinforcement to be placed in the face slabs of CFRD s is typically specified by the reinforcement ratio, usually 0.3 to 0.4% of concrete cross-sectional area for both longitudinal and transversal reinforcement 5. In Montesinho Dam face slab the prescribed reinforcement was #ϕ10//0.125 applied in two layers ( 0.4%). Reducing the cover, by the use of two layers, and smaller rebar size and spacing were meant to control the crack development, which is the primary concern of face slab design. 6.2 Plinth The plinth is the structure that ensures a watertight connection between the foundation treatment and the face slab. Its width is determined as a function of the hydraulic gradient installed, or, if it is low as in Montesinho, by the space required to construct the three-row grout curtain and the dowels mesh. In the present case the plinth is 5 m wide and 0.5 m thick 6

7 (minimum). The 6.0 m long steel dowels (ϕ32) are sealed in the massif with grouting, in an alternating mesh of 2 or 3 dowels, 3 m apart. The purpose of reinforcement in the plinth is to reduce cracking due to temperature variations and to bending efforts induced by the grouting injections. The reinforcement area in this case is 0.3% of concrete cross-section each way. The plinth is continuous, without structural joints, and the longitudinal reinforcement is also continuous through construction joints. The plinth geometry was also defined to allow the face slab support. A minimum height of 1.0 m of embankment under the face slab was designed to ensure that in the perimeter joint the slab would move normal to its plane, without bending. 6.3 Perimeter and vertical joints and waterstops The perimeter joint connects the concrete face slab and the plinth of the dam to complete the water barrier of the dam. The main function of the perimeter joint is to maintain a watertight seal against full reservoir load while allowing for anticipated movements between the plinth and the face slabs. The watertight seal is achieved through a three-barrier system: bottom, middle and upper water barriers (Figure 5). Figure 5: Perimeter joint detail The bottom waterstop can be in copper, stainless steel or PVC. PVC s can offer advantages over the other water barrier materials for CFRDs lower than 100 m in height 5. Their greater thickness can simplify waterstop placement and reduce the risk of damage during construction. In the present case, the prescribed waterstop was in PVC with an external center rib and 300 mm wide. The height of the center rib should be tall enough to allow the waterstop to deform without rupture and the base width should be large enough to allow for proper placement and consolidation of concrete at the perimeter joint. The middle water barrier consists in a dumbbell shaped PVC waterstop, with a hollow center bulb at the middle. The hollow bulb is preferable to the alternatives due to its ability to undergo greater deformations before tearing or rupturing. The upper water barrier consists of a mastic fill at the top of the perimeter joint. A small diameter neoprene tube is placed in the groove of the joint before the mastic sealant is 7

8 applied. The tube serves to prevent the mastic from flowing into the joint until a sufficiently wide gap has formed. Mastic sealing is covered and protected with a hypalon membrane in order to provide a long lasting upper water barrier. To prevent damage to the perimeter joint during construction, a compressible wood board is placed in the plinth face in order to provide a cushion on which the face slab can rest, without spalling the concrete or damage the waterstops. The imperviousness of vertical joints between face slab panels is achieved through middle and upper water barriers like the ones described for the perimeter joint. The slab faces at the joints are painted with bitumen emulsion. 7 INSTRUMENTATION PLAN AND EMBANKMENT MONITORING To follow the behavior of the dam during construction and during its life cycle, a detailed monitoring system was considered. To monitor the deformation of the dam: vertical and horizontal displacements gauges were installed inside the dam body distributed in three important cross-sections, 1 1, 2 2 and 3 3 (Figure 1), with section 2-2 being the major monitoring cross section of the dam (Figure 3). The concrete slab deformations are monitored by three inclinometers installed in the cushion zone (material A), at the same sections: 1 1, 2 2 and 3 3. Surface settlements at the crest of the dam are measured by 12 monitoring gauges separated from each other about 25 m. To follow the water pressures in the foundation and to evaluate the efficiency of the grout curtain the monitoring system includes 3 sets of 2 piezometers. In each set, the first piezometer is located immediately after the grout curtain while the second is located near the dam axis. A total flow measuring system will be installed near the toe of the dam to evaluate any leakage that might occur. During the construction of the dam regular measurements of the vertical displacements and water pressures in the foundation where made. Figure 6 presents the recordings of the settlement gauges installed in the dam. The maximum settlement recorded so far, is about 20 mm, and occurs in the maximum cross section, near half the height. It is worth to note that to the end of the construction another 2 m of additional rockfill is needed (up to level m), therefore some additional settlement is expected. These settlements are very low and are in agreement to what was expected. Figure 6: Recordings from the settlement gauges (right bank, center, left bank) 8

9 8 ECOLOGICAL FLOW SYSTEM This dam has been provided with a peculiar and rather unique ecological flow system, which is shown in Figure 7. The location of the works, right inside a Natural Park, made environmental concerns especially critical. So, besides the demand for adequate ecological flows all year round, other concerns have been taken into account, one of these being the barrier effect caused by the dam to aquatic wildlife on the Sabor River. It was concluded that, obviously, the barrier effect cannot be fully eliminated, but that, nevertheless, it would be possible to limit it in time. As it can be seen in Figure 7, the spillway will be a structure separated from the dam body, which will discharge onto a tributary of the Sabor River. Computer simulation of the dam reservoir exploitation, balancing natural inflows, outflows and withdrawals for urban water supply, showed that it will remain at full supply level, or above, during 54% of the time on average. Low level periods will be limited, mostly to the dry season. So, the following decisions were made: To abandon the 600 m long reach of Sabor River bed located immediately downstream from the dam toe; To replace it by the bed of the tributary onto which the dam spillway will discharge (see Figure 7), that runs parallel to the Sabor bed and that has about the same length. Figure 7: Ecological flow system plan At the spillway connection point, the tributary has an almost negligible catchment area. So, it s bed hasn t yet the same physical characteristics as the Sabor River has. Nevertheless, since both beds are carved into good quality rock, it is expected that the adaptation of the replacement bed to the new strongly increased flows will happen gradually and naturally over time, without any catastrophic scouring. 9

10 To allow for the barrier effect to be eliminated, the spillway structure was designed as a double bed naturalized channel, with no sudden fall between the reservoir pond and the new river bed - Figure 8. During the periods when the reservoir will be full (54% of the time), there will be a fluvial continuum between the reservoir and the new river bed, allowing wildlife to circulate up and down freely. During the remaining periods, although continuity will be temporarily broken, adequate flow in the new river bed will still be guaranteed by injecting ecological discharges onto the spillway structure. To do so, ecological flow pumps will be installed inside the reservoir s intake tower, which will feed a pumping conduit headed to the spillway (see Figure 7), passing first through a regulation deposit installed over the tower s roof. Minimum ecological flows will vary along the year between 4.1 l/s and 45.5 l/s. Pumps will have redundancy and so will their power supply. But, if all this fails, there will still be an emergency gravity ecological flow outlet at the toe of the dam, feeding into the old abandoned river bed reach. Figure 8: Cross-section downstream the spillway 9 ACKNOWLEDGMENTS The authors are thankful to ATMAD for the permission given to publish this article and for the collaboration in its preparation. REFERENCES [1] CENOR Consulting Engineers, Dam of the Montesinho's Water Supply System. Final Design (in Portuguese), ATMAD, Lisbon, Portugal (2012). [2] R. Fell, P. MacGregor and D. Stapledon, Geotechnical engineering of embankment dams, A. A. Balkema, Rotterdam, Netherlands (1992). [3] S. Wilson and R. Marsal, Current trends in design and construction of embankment dams, ASCE, New York, USA (1979). [4] A.A. Veiga Pinto, Previsão do comportamento estrutural de barragens de enrocamento, LNEC, Lisboa (1983). [5] ICOLD, Concrete Face Rockfill Dams. Concepts for design and construction, International Commission on Large Dams, Bulletin 141 (2010). 10

Silvan Dam and Revisions to Adapt for Latest Developments in High CFRD Design and Construction

Silvan Dam and Revisions to Adapt for Latest Developments in High CFRD Design and Construction Silvan Dam and Revisions to Adapt for Latest Developments in High CFRD Design and Construction Ö. Özen, H. Küsmez, A. Akman Dam and Tunnel Projects Director, İLCİ Holding & TR COLD Member, Ankara, Turkey

More information

Discussions on the Technical Issues of the Construction of 300m High CFRD. Xu Zeping. (China Institute of Water resources and Hydropower Research)

Discussions on the Technical Issues of the Construction of 300m High CFRD. Xu Zeping. (China Institute of Water resources and Hydropower Research) COMMISSION INTERNATIONALE DES GRANDS BARRAGES ------- LA 78 EME CONGRES DES GRANDS BARRAGES Hanoi-Vietnam, may 2010 Discussions on the Technical Issues of the Construction of 300m High CFRD Xu Zeping (China

More information

Water Control Structures Selected Design Guidelines Alberta Environment Page 13-1

Water Control Structures Selected Design Guidelines Alberta Environment Page 13-1 Alberta Environment Page 13-1 13.0 DROP INLET SPILLWAYS 13.1 General The drop inlet spillway is commonly used for providing flood protection for earth dams which have smaller reservoirs and/or smaller

More information

Mitigation Measures Evaluation for Concrete Faced Rockfill Dams. Juan E. Quiroz Mehdi Modares REC Conference - IIT

Mitigation Measures Evaluation for Concrete Faced Rockfill Dams. Juan E. Quiroz Mehdi Modares REC Conference - IIT 1 Mitigation Measures Evaluation for Concrete Faced Rockfill Dams Juan E. Quiroz Mehdi Modares REC Conference - IIT INTRODUCTION 2 Dams for water impoundment can be: Gravity Arch Masonry Roller Compacted

More information

Mechanical and Hydraulic Behavior of Cut off-core Connecting Systems in Earth Dams

Mechanical and Hydraulic Behavior of Cut off-core Connecting Systems in Earth Dams Mechanical and Hydraulic Behavior of Cut off-core Connecting Systems in Earth Dams Zakaria Zoorasna Graduate Student Faculty of Engineering, Tarbiat Moallem University, Tehran, Iran z_zoorasna@yahoo.com

More information

Earth Brickwork Concrete Plain Radial Drum Roller Flap. fixed. Weirs Barrages. mobile. rockfills. Gravity butress Arch Arch-gravuty Cupola.

Earth Brickwork Concrete Plain Radial Drum Roller Flap. fixed. Weirs Barrages. mobile. rockfills. Gravity butress Arch Arch-gravuty Cupola. Dams type 1 Weirs Barrages fixed mobile Earth Brickwork Concrete Plain Radial Drum Roller Flap embankment Earthfills rockfills Dams Concrete gravity Arch Gravity butress Arch Arch-gravuty Cupola 2 Dams

More information

NUMERICAL MODELING OF CONCRETE FACE ROCKFILL DAM AT SEISMIC IMPACT

NUMERICAL MODELING OF CONCRETE FACE ROCKFILL DAM AT SEISMIC IMPACT NUMERICAL MODELING OF CONCRETE FACE ROCKFILL DAM AT SEISMIC IMPACT V.B. Glagovsky 1 and E.V. Kourneva 2 1 Deputy Director, The B.E.Vedeneev Research Institute of Hydraulic Engineering (VNIIG), Saint Petersburg,

More information

CHAPTER 8 SEEPAGE CONTROL IN EMBANKMENTS

CHAPTER 8 SEEPAGE CONTROL IN EMBANKMENTS CHAPTER 8 SEEPAGE CONTROL IN EMBANKMENTS 8-1. General. All earth and rock-fill dams are subject to seepage through the embankment, foundation, and abutments. Seepage control is necessary to prevent excessive

More information

6 TH INTERNATIONAL SYMPOSIUM ON ROLLER COMPACTED CONCRETE (RCC) DAMS Zaragoza, October 2012

6 TH INTERNATIONAL SYMPOSIUM ON ROLLER COMPACTED CONCRETE (RCC) DAMS Zaragoza, October 2012 6 TH INTERNATIONAL SYMPOSIUM ON ROLLER COMPACTED CONCRETE (RCC) DAMS Zaragoza, 23 25 October 2012 DESIGN AND CONSTRUCTION ADVANTAGES OF HARDFILL SYMMETRICAL DAMS - CASE STUDY: SAFSAF DAM IN EASTERN ALGERIA

More information

2012 Soil Mechanics I and Exercises Final Examination

2012 Soil Mechanics I and Exercises Final Examination 2012 Soil Mechanics I and Exercises Final Examination 2013/1/22 (Tue) 13:00-15:00 Kyotsu 155 Kyotsu 1 Kyotsu 3 W2 Lecture room Attention: There are four questions and four answer sheets. Write down your

More information

Bayardo Materon Bayardo Materon & Associates, Sao Paulo, Brazil

Bayardo Materon Bayardo Materon & Associates, Sao Paulo, Brazil Concrete Face Rockfill Dams Paulo T. Cruz Dam Consulting Engineer, Sao Paulo, Brazil Bayardo Materon Bayardo Materon & Associates, Sao Paulo, Brazil Manoel Freitas Hydrogeo Engharia SIC Ltda, Sao Paulo,

More information

Grouting Bilfinger Spezialtiefbau GmbH

Grouting Bilfinger Spezialtiefbau GmbH Grouting Bilfinger Spezialtiefbau GmbH Goldsteinstrasse 114 D-60528 Frankfurt Phone: +49 69 6688-345 Fax: +49 69 6688-277 Email: info.spezialtiefbau@bilfinger.com www.foundation-engineering.bilfinger.com

More information

CBC Aids WVDEP with Fresh Water Reservoir - Chief Logan State Park

CBC Aids WVDEP with Fresh Water Reservoir - Chief Logan State Park CBC Case Study-1212 1 of 5 CBC Aids WVDEP with Fresh Water Reservoir - Chief Logan State Park More Than Geotechnical Engineering DAYTON 125 Westpark Road Centerville, OH 45459 Phone: 937-428-6150 HAZARD

More information

MOUNT POLLEY MINING CORPORATION MOUNT POLLEY MINE TAILINGS STORAGE FACILITY

MOUNT POLLEY MINING CORPORATION MOUNT POLLEY MINE TAILINGS STORAGE FACILITY MOUNT POLLEY MINING CORPORATION MOUNT POLLEY MINE TAILINGS STORAGE FACILITY REPORT ON STAGE 3C CONSTRUCTION (REF.NO. VA-101-1/5-1) Rev. No. Revision Date Approved 0 Issued in Final September 23, 2005 AMEC010485_0001

More information

Filter Tube Barriers (Instream)

Filter Tube Barriers (Instream) Filter Tube Barriers (Instream) INSTREAM PRACTICES Flow Control No Channel Flow Dry Channels Erosion Control Low Channel Flows Shallow Water Sediment Control High Channel Flows Deep Water Symbol Photo

More information

Tailings dam raise with reinforced walls

Tailings dam raise with reinforced walls Tailings dam raise with reinforced walls Jorge Alvarez Tiburcio Anddes Asociados S.A.C.,Peru ABSTRACT This paper presents the design of a tailings dam raise with reinforced walls lined with geomembrane,

More information

Code No: RR Set No. 1

Code No: RR Set No. 1 Code No: RR320101 Set No. 1 III B.Tech Supplimentary Examinations, Aug/Sep 2008 GEOTECHNICAL ENGINEERING (Civil Engineering) Time: 3 hours Max Marks: 80 Answer any FIVE Questions All Questions carry equal

More information

Inclusion Effect on Heterogeneity of Excess Pore Water Pressure Distribution in Composite Clay

Inclusion Effect on Heterogeneity of Excess Pore Water Pressure Distribution in Composite Clay Inclusion Effect on Heterogeneity of Excess Pore Water Pressure Distribution in Composite Clay J. Jalili Payame Noor University, Iran M. K. Jafari & A. Shafiee International Institute of Earthquake Engineering

More information

CONSIDERATIONS ON THE SEISMIC DESIGN OF HIGH CONCRETE FACE ROCKFILL DAMS (CFRDs) Bayardo Materón - Gabriel Fernandez

CONSIDERATIONS ON THE SEISMIC DESIGN OF HIGH CONCRETE FACE ROCKFILL DAMS (CFRDs) Bayardo Materón - Gabriel Fernandez CONSIDERATIONS ON THE SEISMIC DESIGN OF HIGH CONCRETE FACE ROCKFILL DAMS (CFRDs) Bayardo Materón - Gabriel Fernandez CONCRETE FACE ROCKFILL DAMS CFRDs- HAVE INCREASED IN HEIGHT TO NEAR 300M. RECENT SEISMIC

More information

Dimensionamento Estrutural de uma Ponte Canal. Structural Design of a Canal Bridge. Francisco Barbosa Alves de Moura. Introduction

Dimensionamento Estrutural de uma Ponte Canal. Structural Design of a Canal Bridge. Francisco Barbosa Alves de Moura. Introduction Dimensionamento Estrutural de uma Ponte Canal Structural Design of a Canal Bridge Francisco Barbosa Alves de Moura IST, Technical University of Lisbon, Portugal Key Words: Structural Design, Canal Bridge,

More information

Water Resources. Associate Prof. Ahmed Moustafa Moussa Lecture -1 Lecture 4

Water Resources. Associate Prof. Ahmed Moustafa Moussa Lecture -1 Lecture 4 Water Resources By Associate Prof. Ahmed Moustafa Moussa Lecture -1 Lecture 4 High Aswan Dam Project 1. Location The High Aswan Dam (HAD) location was determined to fit the topographical features of the

More information

DESIGN AND CONSTRUCTION OF AN EMBANKMENT DAM IN NEW SOUTH WALES, AUSTRALIA

DESIGN AND CONSTRUCTION OF AN EMBANKMENT DAM IN NEW SOUTH WALES, AUSTRALIA DESIGN AND CONSTRUCTION OF AN EMBANKMENT DAM IN NEW SOUTH WALES, AUSTRALIA Nor Hamiza Zackaria and Robin Fell Civil Engineering Programme, Universiti Teknologi PETRONAS, Bandar Seri Iskandar, 31750 Tronoh,

More information

June i TABLE OF CONTENTS

June i TABLE OF CONTENTS June 2005 - i - 05-526 TABLE OF CONTENTS SECTION PAGE 1.0 INTRODUCTION... 1 1.1 Purpose of the Investigation... 1 1.2 Description of the Project and Scope of Work... 1 1.3 Site Geology... 1 1.4 Site Description

More information

Atterberg limits Clay A Clay B. Liquid limit 44 % 55% Plastic limit 29% 35% Natural water content 30% 50%

Atterberg limits Clay A Clay B. Liquid limit 44 % 55% Plastic limit 29% 35% Natural water content 30% 50% CE 6405 SOIL MECHANICS UNIT I INTRODUCTION Part A 1. Distinguish between Residual and Transported soil. 2. Give the relation between γ sat, G, γ w and e 3. A compacted sample of soil with a bulk unit weight

More information

A Brief History of Dams in Iraq. The Case of Mosul Dam Presented to Al-Diwan, April 10, 2016 by Mosaid Al-Hussaini, Ph.D, PE

A Brief History of Dams in Iraq. The Case of Mosul Dam Presented to Al-Diwan, April 10, 2016 by Mosaid Al-Hussaini, Ph.D, PE A Brief History of Dams in Iraq The Case of Mosul Dam Presented to Al-Diwan, April 10, 2016 by Mosaid Al-Hussaini, Ph.D, PE Dams in General Definition of a Dam: A dam is a barrier made of soil, concrete

More information

STUDY ON CEMENTED-ROCKFILL DAM

STUDY ON CEMENTED-ROCKFILL DAM STUDY ON CEMENTED-ROCKFILL DAM Peng Yunfeng, Hu Chao, Dong Jingyan College of Civil and Hydropower Engineering, China Three Gorges University, Yichang 443002 China, whpyf@163.com Abstract: In order to

More information

BEARING CAPACITY IMPROVEMENT USING MICROPILES A CASE STUDY

BEARING CAPACITY IMPROVEMENT USING MICROPILES A CASE STUDY BEARING CAPACITY IMPROVEMENT USING MICROPILES A CASE STUDY G.L. Sivakumar Babu 1, B. R.Srinivasa Murthy 2, D.S. N. Murthy 3, M.S. Nataraj 4 ABSTRACT Micropiles have been used effectively in many applications

More information

Created by Simpo PDF Creator Pro (unregistered version) Asst.Prof.Dr. Jaafar S. Maatooq

Created by Simpo PDF Creator Pro (unregistered version)  Asst.Prof.Dr. Jaafar S. Maatooq Lect.No.9 2 nd Semester Barrages, Regulators, Dams 1 of 15 In order to harness the water potential of a river optimally, it is necessary to construct two types of hydraulic structures, as shown in Figure

More information

Capability Statement

Capability Statement Capability Statement Trilab is Australasia's leading independent supplier of specialised soil and rock mechanics testing, to the Asia-Pacific mining, civil construction and infrastructure industries. Two

More information

DIVERSION CHANNEL OF BELO MONTE HPP

DIVERSION CHANNEL OF BELO MONTE HPP DIVERSION CHANNEL OF BELO MONTE HPP INTRODUCTION The diversion channel of Belo Monte HPP is an important engineering work which required the engagement of several specialties to be able to address all

More information

Successful Foundation Preparations in Karst Bedrock of the Masonry Section of Wolf Creek Dam

Successful Foundation Preparations in Karst Bedrock of the Masonry Section of Wolf Creek Dam Successful Foundation Preparations in Karst Bedrock of the Masonry Section of Wolf Creek Dam David M. Robison, P.G. Geotechnical and Dam Safety Section, Louisville District, U.S. Army Corps of Engineers

More information

In-plane testing of precast concrete wall panels with grouted sleeve

In-plane testing of precast concrete wall panels with grouted sleeve In-plane testing of precast concrete wall panels with grouted sleeve P. Seifi, R.S. Henry & J.M. Ingham Department of Civil Engineering, University of Auckland, Auckland. 2017 NZSEE Conference ABSTRACT:

More information

Applicability of Hilf s method to the compaction control of soil-rock mixtures

Applicability of Hilf s method to the compaction control of soil-rock mixtures Brito paper publish:. 27/4/11 16:16 Page 1 Applicability of Hilf s method to the compaction control of soil-rock mixtures Andrea Brito*, Laura Caldeira* and João Maranha* ABSTRACT The employment of non-traditional

More information

Remedial grouting works to two dams in Hong Kong

Remedial grouting works to two dams in Hong Kong Remedial grouting works to two dams in Hong Kong D. GALLACHER, AECOM, Edinburgh, UK SYNOPSIS. Tai Tam Upper and West Col Dams in Hong Kong had experienced substantial leakage over an extended period. Recommendations

More information

LABORATORY HYDRAULIC FRACTURING TESTS FOR CORE MATERIALS USING LARGE SIZE HOLLOW CYLINDRICAL SPECIMENS

LABORATORY HYDRAULIC FRACTURING TESTS FOR CORE MATERIALS USING LARGE SIZE HOLLOW CYLINDRICAL SPECIMENS LABORATORY HYDRAULIC FRACTURING TESTS FOR CORE MATERIALS USING LARGE SIZE HOLLOW CYLINDRICAL SPECIMENS Hiroyuki SATOH 1, Yoshikazu YAMAGUCHI 2 1,Senior Researche,Dam Structures Research Team (DSRT), Publics

More information

NUMERICAL ANALYSIS AND INVESTIGATION OF PIPING IN AN EARTH DAM FOUNDATION BY SOFTWARE SEEP / W (CASE STUDY OF KERMANSHAH EZGELEH EARTH DAM)

NUMERICAL ANALYSIS AND INVESTIGATION OF PIPING IN AN EARTH DAM FOUNDATION BY SOFTWARE SEEP / W (CASE STUDY OF KERMANSHAH EZGELEH EARTH DAM) NUMERICAL ANALYSIS AND INVESTIGATION OF PIPING IN AN EARTH DAM FOUNDATION BY SOFTWARE SEEP / W (CASE STUDY OF KERMANSHAH EZGELEH EARTH DAM) *Seyyed Hossein Naghmehkhan Dahandeh Civil Engineering, Hydraulic

More information

NPTEL Course GROUND IMPROVEMENT USING MICROPILES

NPTEL Course GROUND IMPROVEMENT USING MICROPILES Lecture 22 NPTEL Course GROUND IMPROVEMENT USING MICROPILES Prof. G L Sivakumar Babu Department of Civil Engineering Indian Institute of Science Bangalore 560012 Email: gls@civil.iisc.ernet.in Contents

More information

Type 1 System Sheet Flow Sandy Soils Type 2 System [1] Concentrated Flow Clayey Soils [2] Type 3 System [1] Supplementary Trap Dispersive Soils

Type 1 System Sheet Flow Sandy Soils Type 2 System [1] Concentrated Flow Clayey Soils [2] Type 3 System [1] Supplementary Trap Dispersive Soils Filter Tube Dams SEDIMENT CONTROL TECHNIQUE Type 1 System Sheet Flow Sandy Soils Type 2 System [1] Concentrated Flow Clayey Soils [2] Type 3 System [1] Supplementary Trap Dispersive Soils [1] Classification

More information

Fundamental Course in Mechanical Processing of Materials. Exercises

Fundamental Course in Mechanical Processing of Materials. Exercises Fundamental Course in Mechanical Processing of Materials Exercises 2017 3.2 Consider a material point subject to a plane stress state represented by the following stress tensor, Determine the principal

More information

VALLIAMMAI ENGINEERING COLLEGE DEPARTMENT OF MECHANICAL ENGINEERING QUESTION BANK CE 6306 - STRENGTH OF MATERIALS UNIT I STRESS STRAIN DEFORMATION OF SOLIDS PART- A (2 Marks) 1. What is Hooke s Law? 2.

More information

Dam Safety and Low Cost Spillway Designs

Dam Safety and Low Cost Spillway Designs Dam Safety and Low Cost Spillway Designs By F. Lempérière & J.P. Vigny (Hydrocoop France) THE CHALLENGE 5 th International Conference on Dam Engineering Lisbon 14-16 February 2007 Increasing dams safety

More information

Bewl Water spillway remedial works

Bewl Water spillway remedial works Bewl Water spillway remedial works I DAVISON, MWH K SHAVE, Babtie SYNOPSIS. Bewl Water is a major impounding reservoir in South East England, UK. In the mid-1990 s an external inspection confirmed that

More information

Building Construction

Building Construction Building Construction Shallow Foundations Module-III Introduction The foundation can be classified broadly into two types: Shallow foundations Deep foundations Shallow foundations Shallow Foundations When

More information

Downloaded from Downloaded from /1

Downloaded from  Downloaded from  /1 PURWANCHAL UNIVERSITY VI SEMESTER FINAL EXAMINATION-2003 LEVEL : B. E. (Civil) SUBJECT: BEG359CI, Foundation Engineering. Full Marks: 80 TIME: 03:00 hrs Pass marks: 32 Candidates are required to give their

More information

Coupled Stress-Seepage Numerical Design of Pressure Tunnels

Coupled Stress-Seepage Numerical Design of Pressure Tunnels IAHR-HK Student Research Forum, November 17, 2012 Coupled Stress-Seepage Numerical Design of Pressure Tunnels Afis Olumide BUSARI, Prof. C.W. LI Department of Civil and Environmental Engineering, the Hong

More information

Plastic concrete cutoff walls have been used for

Plastic concrete cutoff walls have been used for The world s largest cutoff wall at Karkheh dam A.A. Mirghasemi, Mahab Ghodss Co. and University of Tehran, Iran M. Pakzad, Mahab Ghodss Co., Iran B. Shadravan, University of Ottawa, Canada The Karkheh

More information

Seepage Analysis through an Earth Dam (KHASA-CHAI Dam) as a Case Study

Seepage Analysis through an Earth Dam (KHASA-CHAI Dam) as a Case Study Engineering and Technology Journal Vol. 35, Part A. No. 2, 27 A.J. Zedan Civil Eng. Dept., Tikrit University, Tikrit, Iraq. jayedadn@yahoo.com M.R. Faris Civil Eng. Dept., Tikrit University, Tikrit, Iraq.

More information

Design of Rigid Pavements

Design of Rigid Pavements Traffic and Highway Engineering (ІІ) CVL 4324 Chapter 20 Design of Rigid Pavements Dr. Sari Abusharar Assistant Professor Civil Engineering Department Faculty of Applied Engineering and Urban Planning

More information

Passage under Lövstavägen at Bypass Stockholm From Design to Realization

Passage under Lövstavägen at Bypass Stockholm From Design to Realization Passage under Lövstavägen at Bypass Stockholm From Design to Realization Roslin Mattias 1, Borio Luca 2 and Tomas Hellström 3 1 Swedish Transport Administration, Solna Strandväg 98, 171 54 Solna, mattias.roslin@trafikverket.se

More information

Lecture 7 BALLAST & SUBGRADE. Dr. Charisma Choudhury. April 2011

Lecture 7 BALLAST & SUBGRADE. Dr. Charisma Choudhury. April 2011 Transportation Engineering II: Highway Design & Railways Lecture 7 BALLAST & SUBGRADE Dr. Charisma Choudhury April 2011 Ballast Functions Provide a hard and level bed for sleepers Hold sleepers in place

More information

Three-dimensional computer simulation of soil nailing support in deep foundation pit

Three-dimensional computer simulation of soil nailing support in deep foundation pit Three-dimensional computer simulation of soil nailing support in deep foundation pit Abstract Chang Zhi Zhu 1,2*, Quan Chen Gao 1 1 School of Mechanics & Civil Engineering, China University of Mining &

More information

Table 1. Typical Soil Parameters Description Bulk Density, kn/m 3 Liquid Limit, % Plastic limit, % Natural Moisture Content, % Cohesion, kn/m 2 Compre

Table 1. Typical Soil Parameters Description Bulk Density, kn/m 3 Liquid Limit, % Plastic limit, % Natural Moisture Content, % Cohesion, kn/m 2 Compre CASE STUDY CONSTRUCTION OF HIGH ROAD EMBANKMENT OVER THICK SOFT SILTY CLAY- A CASE STUDY Radhakrishnan R, Geo-Enviro Engineers P Ltd, Chennai, Tamil Nadu, India, 044-24483522, geoenviro2012@gmail.com.

More information

Strength of Non-Traditional Granular Materials Assessed from Drained Multistage Triaxial Tests

Strength of Non-Traditional Granular Materials Assessed from Drained Multistage Triaxial Tests Procedia Engineering Volume 143, 216, Pages 67 74 Advances in Transportation Geotechnics 3. The 3rd International Conference on Transportation Geotechnics (ICTG 216) Strength of Non-Traditional Granular

More information

Modeling and monitoring of an excavation support using CSM

Modeling and monitoring of an excavation support using CSM Modeling and monitoring of an excavation support using CSM António Capelo 1 ; A. Gomes Correia 2, Luís F. Ramos 3, Alexandre Pinto 4 and Rui Tomásio 5 1 MSc, Casais Engenharia e Construção, S. A., Mire

More information

SEMBODAI RUKMANI VARATHARAJAN ENGINEERING COLLEGE SEMBODAI BACHELOR OF ENGINEERING DEPARTMENT OF CIVIL ENGINEERING QUESTION BANK

SEMBODAI RUKMANI VARATHARAJAN ENGINEERING COLLEGE SEMBODAI BACHELOR OF ENGINEERING DEPARTMENT OF CIVIL ENGINEERING QUESTION BANK SEMBODAI RUKMANI VARATHARAJAN ENGINEERING COLLEGE SEMBODAI - 614809 BACHELOR OF ENGINEERING Sub.Code: CE6405 DEPARTMENT OF CIVIL ENGINEERING QUESTION BANK Branch/Year/SEM: CIVIL/II/ IV Sub.Name: Soil Mechanics

More information

Rock Tunnel Engineering INTRODUCTION. Tunnel a hole in the ground to provide for desired movement or as mobility channel.

Rock Tunnel Engineering INTRODUCTION. Tunnel a hole in the ground to provide for desired movement or as mobility channel. Rock Tunnel Engineering INTRODUCTION Tunnel a hole in the ground to provide for desired movement or as mobility channel. Serves as highway, railroad, pedestrian passageway, water conveyance, waste water

More information

Important Role of Filters in Hydraulic Soil Structures Hamid Fallah Apr. 19, 2013

Important Role of Filters in Hydraulic Soil Structures Hamid Fallah Apr. 19, 2013 11 th PURDUE GEOTECHNICAL SOCIETY WORKSHOP Important Role of Filters in Hydraulic Soil Structures Hamid Fallah Apr. 19, 2013 Outline Introduction Brief history of evolution of filter design criteria Design

More information

Characteristic study on seepage field of dam under cutoff wall construction defects and freeze in winter

Characteristic study on seepage field of dam under cutoff wall construction defects and freeze in winter Available online www.jocpr.com Journal of Chemical and Pharmaceutical Research, 2014, 6(6):1094-1098 Research Article ISSN : 0975-7384 CODEN(USA) : JCPRC5 Characteristic study on seepage field of dam under

More information

HISTORY OF CONSTRUCTION 40 CFR (c)(1)(i)-(xii) PLANT WANSLEY ASH POND (AP-1) GEORGIA POWER COMPANY. Carrollton, Georgia 30116

HISTORY OF CONSTRUCTION 40 CFR (c)(1)(i)-(xii) PLANT WANSLEY ASH POND (AP-1) GEORGIA POWER COMPANY. Carrollton, Georgia 30116 (i) Site Name and Ownership Information: HISTORY OF CONSTRUCTION 40 CFR 257.73(c)(1)(i)-(xii) PLANT WANSLEY ASH POND (AP-1) GEORGIA POWER COMPANY Site Name: Site Location: Site Address: Owner: Owner Address:

More information

Typical set up for Plate Load test assembly

Typical set up for Plate Load test assembly Major disadvantages of field tests are Laborious Time consuming Heavy equipment to be carried to field Short duration behavior Plate Load Test Sand Bags Platform for loading Dial Gauge Testing Plate Foundation

More information

SPECIFICATION FOR REINFORCED SOIL WALL

SPECIFICATION FOR REINFORCED SOIL WALL SPECIFICATION FOR REINFORCED SOIL WALL 1.0 EXTENT OF WORK The work shall consist of Reinforced Soil walls built in accordance with this specification and in conformity with the lines, levels and details

More information

Introduction to Masonry Materials and Assemblages

Introduction to Masonry Materials and Assemblages 2:15 PM 4:15 PM Bennett Banting Introduction to Masonry Materials and Assemblages Lecture Outline 1. Overview (5) 2. Masonry Materials a) Concrete Block (20) b) Mortar (15) c) Grout (15) 3. Masonry Assemblages

More information

Shear Strength of Tire Derived Aggregate (TDA) California State University, Chico

Shear Strength of Tire Derived Aggregate (TDA) California State University, Chico Shear Strength of Tire Derived Aggregate (TDA) California State University, Chico Background Information At the end of 2005, the U.S. generated approximately 300 million scrap tires Historically, these

More information

Revision Nalcor Doc. No. MFA-SN-CD-0000-GT-DC C1 Date Page SLI Doc. No EC Dec-2013 ii DESIGN CRITERIA - GEOTECHNICAL

Revision Nalcor Doc. No. MFA-SN-CD-0000-GT-DC C1 Date Page SLI Doc. No EC Dec-2013 ii DESIGN CRITERIA - GEOTECHNICAL SLI Doc. No. 505573-3000-40EC-0003 01 5-Dec-2013 ii TABLE OF CONTENTS Page No. 1 INTRODUCTION... 1 2 CREST ELEVATIONS... 2 2.1 Cofferdams... 2 2.2 North Spur... 3 3 STABILITY ANALYSIS LOADING CASES AND

More information

Question Paper Code : 11410

Question Paper Code : 11410 Reg. No. : Question Paper Code : 11410 B.E./B.Tech. DEGREE EXAMINATION, APRIL/MAY 2011 Fourth Semester Mechanical Engineering ME 2254 STRENGTH OF MATERIALS (Common to Automobile Engineering and Production

More information

Behavior of Reinforced Embankment on Soft Ground with and without Jet Grouted Soil-Cement Piles

Behavior of Reinforced Embankment on Soft Ground with and without Jet Grouted Soil-Cement Piles Behavior of Reinforced Embankment on Soft Ground with and without Jet Grouted Soil-Cement Piles by 1 Dennes T. Bergado and 2 Glen A. Lorenzo 1 Professor and 2 Doctoral Candidate, respectively Geotechnical

More information

Geotech Services, X-18, MIDC, Hingna, Nagpur, Maharashtra. Discipline Mechanical Testing Issue Date

Geotech Services, X-18, MIDC, Hingna, Nagpur, Maharashtra. Discipline Mechanical Testing Issue Date Last Amended on 11.01.2014 Page 1 of 14 I. BUILDING MATERIALS 1. Soil / Rock Plate Load Test IS 1888 1982 (Reaffirmed-2007) Cyclic Plate Load Test IS 5249 1992 Clause 6 (Reaffirmed-2010) Load Test On In-Situ

More information

Analysis of skin friction in prebored and precast piles

Analysis of skin friction in prebored and precast piles Japanese Geotechnical Society Special Publication The 6th Japan-Korea Geotechnical Workshop Analysis of skin friction in prebored and precast piles Sangseom Jeong i), Gyoungja Jung ii), Dohyun Kim iii)

More information

CEX6230 GEOTECHNICS Dear Student:

CEX6230 GEOTECHNICS Dear Student: CEX6230 GEOTECHNICS 31.05.2010 Dear Student: Geotechnics (CEX6230) discusses design and construction aspects of Geotechnical Engineering. Even though this course requires a pass in CEX4230, I find that

More information

INNOVATIVE SLOPE STABILISATION BY USING ISCHEBECK TITAN SOIL NAILS

INNOVATIVE SLOPE STABILISATION BY USING ISCHEBECK TITAN SOIL NAILS Dipl.-Wirt.Ing. Oliver Freudenreich Friedr. Ischebeck GmbH phone: ++49 2333 8305-0 Loher Str. 31 79 fax: ++49 2333 8305-55 e-mail: freudenreich@ischebeck.de D-58256 Ennepetal www.ischebeck.com INNOVATIVE

More information

VERTICAL BARRIERS SLURRY TRENCH BARRIERS: excavation equipment. prof. E. Fratalocchi Environmental Geotechnics Waste and polluted sites containment

VERTICAL BARRIERS SLURRY TRENCH BARRIERS: excavation equipment. prof. E. Fratalocchi Environmental Geotechnics Waste and polluted sites containment VERTICAL BARRIERS SLURRY TRENCH BARRIERS: excavation equipment VERTICAL BARRIERS SLURRY TRENCH BARRIERS: excavation equipment rotary drill hydro-mill backhoe Clamshell + Kelly bar VERTICAL BARRIERS SLURRY

More information

2017 Annual Dam and Dike Inspection Report

2017 Annual Dam and Dike Inspection Report 2017 Annual Dam and Dike Inspection Report Bottom Ash Pond Complex Mitchell Plant Wheeling Power Company & Kentucky Power Company Marshall County, West Virginia October 20, 2017 Prepared by: American Electric

More information

Chapter 5.5 Inlets, Outlets, and Flow Control

Chapter 5.5 Inlets, Outlets, and Flow Control Chapter 5.5 Inlets, Outlets, and Flow Control There are common structural elements of SCMs that are designed to safely route water. Engineered flow control devices are used to effectively route water at

More information

Lyon Creek Cedar Way Stormwater Detention Dam Operation and Maintenance Manual

Lyon Creek Cedar Way Stormwater Detention Dam Operation and Maintenance Manual Lyon Creek Cedar Way Stormwater Detention Dam Operation and Maintenance Manual Prepared by: Mike Shaw Stormwater Program Manager City of Mountlake Terrace January 2010 Section I General Information This

More information

EXPERIMENTAL RESULTS

EXPERIMENTAL RESULTS Chapter 4 EXPERIMENTAL RESULTS 4.1 Introduction This chapter presents the results from the half scale interior Corcon rib beam-column subassemblage and the FRP repaired subassemblage. As described in chapter

More information

Case Studies on Soil Nailed Retaining Systems for Deep Excavations

Case Studies on Soil Nailed Retaining Systems for Deep Excavations Indian Geotechnical Conference 2010, GEOtrendz December 16 18, 2010 IGS Mumbai Chapter & IIT Bombay Case Studies on Soil Nailed Retaining Systems for Deep Excavations Murthy, B.R. Srinivasa Professor e-mail:

More information

SIDDHARTH GROUP OF INSTITUTIONS :: PUTTUR Siddharth Nagar, Narayanavanam Road QUESTION BANK (DESCRIPTIVE)

SIDDHARTH GROUP OF INSTITUTIONS :: PUTTUR Siddharth Nagar, Narayanavanam Road QUESTION BANK (DESCRIPTIVE) SIDDHARTH GROUP OF INSTITUTIONS :: PUTTUR Siddharth Nagar, Narayanavanam Road 517583 QUESTION BANK (DESCRIPTIVE) Subject with Code :Strength of Materials-II (16CE111) Course & Branch: B.Tech - CE Year

More information

Stone and Masonry Veneer

Stone and Masonry Veneer Stone and Masonry Veneer R703.7 Stone and masonry veneer, general. Stone and masonry veneer shall be installed in accordance with this chapter, Table R703.4 and Figure R703.7. These veneers installed over

More information

Asphalt on Concrete Base with Waterproofing Membrane

Asphalt on Concrete Base with Waterproofing Membrane CABLES CANNOT BE IN DIRECT CONTACT WITH THE WATERPROOFING MEMBRANE! CABLES WILL BURNOUT, AND THE MEMBRANE WILL MELT. 7 5 4 6 1 2 3 NOTES: 1) CLEAN CONCRETE SURFACE 2) HOT MEMBRANE WATERPROOFING 3) ASPHALTIC

More information

TEST PROCEDURE SUMMARY

TEST PROCEDURE SUMMARY TEST PROCEDURE SUMMARY 1. Compressive Strength - ASTM D695 The compressive strength of a product is determined by subjecting a solid cylinder of material whose length is equal to twice its diameter to

More information

WQ-06 SAND FILTER. 1.0 Sand Filter. Greenville County Technical Specification for: 1.1 Description

WQ-06 SAND FILTER. 1.0 Sand Filter. Greenville County Technical Specification for: 1.1 Description Greenville County Technical Specification for: WQ-06 SAND FILTER 1.0 Sand Filter 1.1 Description Sand Filters remove pollutants through sedimentation and filtration within the sand. The primary components

More information

Ohio Department of Transportation Division of Production Management Office of Geotechnical Engineering. Geotechnical Bulletin

Ohio Department of Transportation Division of Production Management Office of Geotechnical Engineering. Geotechnical Bulletin Ohio Department of Transportation Division of Production Management Office of Geotechnical Engineering Geotechnical Bulletin GB 2 SPECIAL BENCHING AND SIDEHILL EMBANKMENT FILLS Geotechnical Bulletin GB2

More information

Rehabilitation of the Ramalho Ortigão Viaduct

Rehabilitation of the Ramalho Ortigão Viaduct Rehabilitation of the Ramalho Ortigão Viaduct Edited by Kelly M. Page The Ramalho Ortigão Viaduct is an overpass carrying a high volume of traffic. The viaduct goes over one of the main Lisbon, Portugal,

More information

COURSE ON COMPUTATIONAL GEOTECHNICS A Geotechnical Design Tool. Faculty of Civil Engineering UiTM, Malaysia

COURSE ON COMPUTATIONAL GEOTECHNICS A Geotechnical Design Tool. Faculty of Civil Engineering UiTM, Malaysia COURSE ON COMPUTATIONAL GEOTECHNICS A Geotechnical Design Tool Faculty of Civil Engineering, Malaysia Name : COURSE CONTENTS Use of Plaxis Getting Started Exercise 1: Elastic analysis of drained footing

More information

EXPERIMENTAL INVESTIGATION ON THE INTERACTION OF REINFORCED CONCRETE FRAMES WITH PRECAST-PRESTRESSED CONCRETE FLOOR SYSTEMS

EXPERIMENTAL INVESTIGATION ON THE INTERACTION OF REINFORCED CONCRETE FRAMES WITH PRECAST-PRESTRESSED CONCRETE FLOOR SYSTEMS EXPERIMENTAL INVESTIGATION ON THE INTERACTION OF REINFORCED CONCRETE FRAMES WITH PRECAST-PRESTRESSED CONCRETE FLOOR SYSTEMS B.H.H. Peng 1, R.P. Dhakal 2, R.C. Fenwick 3, A.J. Carr 4 and D.K. Bull 5 1 PhD

More information

SEM-2017(02)-II CIVIL ENGINEERING. Papei> II. Please read each of the following instructions carefully before attempting questions.

SEM-2017(02)-II CIVIL ENGINEERING. Papei> II. Please read each of the following instructions carefully before attempting questions. Roll No. Candidate should write his/her Roll No. here. Total No. of Questions : 5 No. of Printed Pages : 7 SEM-2017(02)-II CIVIL ENGINEERING Papei> II Time : 3 Hours ] [ Total Marks : 300 Instructions

More information

Construction Inspection Checklists

Construction Inspection Checklists III. Construction Inspection Checklists 33 Bioretention - Construction Inspection Checklist Project: Location: Site Status: Date: Time: Inspector: Construction Sequence Satisfactory / Unsatisfactory Comments

More information

EARTHQUAKE SAFETY OF EXISTING DAMS

EARTHQUAKE SAFETY OF EXISTING DAMS EARTHQUAKE SAFETY OF EXISTING DAMS Dr. Martin Wieland Chairman, ICOLD Committee on Seismic Aspects of Dam Design Pöyry Energy Ltd., Zurich, Switzerland Formerly Electrowatt-Ekono Ltd. LARGE DAMS IN SWITZERLAND

More information

Low Gradient Velocity Control Short Term Steep Gradient Channel Lining Medium-Long Term Outlet Control [1] Soil Treatment Permanent

Low Gradient Velocity Control Short Term Steep Gradient Channel Lining Medium-Long Term Outlet Control [1] Soil Treatment Permanent Slope Drains DRAINAGE CONTROL TECHNIQUE Low Gradient Velocity Control Short Term Steep Gradient Channel Lining Medium-Long Term Outlet Control [1] Soil Treatment Permanent [1] Slope drains can act as outlet

More information

Low Gradient Velocity Control Short Term Steep Gradient Channel Lining Medium-Long Term Outlet Control [1] Soil Treatment Permanent

Low Gradient Velocity Control Short Term Steep Gradient Channel Lining Medium-Long Term Outlet Control [1] Soil Treatment Permanent Slope Drains DRAINAGE CONTROL TECHNIQUE Low Gradient Velocity Control Short Term Steep Gradient Channel Lining Medium-Long Term Outlet Control [1] Soil Treatment Permanent [1] Slope drains can act as outlet

More information

WATER RESOURCES ENGINEERING DAMS

WATER RESOURCES ENGINEERING DAMS WATER RESOURCES ENGINEERING DAMS Overview Classification of Dams Parts of Dams Planning of Dams Construction of Dams Concrete Gravity Dams Arch Dams Cross-sectional Layout Design of Dams Local Scour at

More information

SPECIAL SPECIFICATION 4900 Sacrificial Cathodic Protection Pile Jacket

SPECIAL SPECIFICATION 4900 Sacrificial Cathodic Protection Pile Jacket 1993 Specifications CSJ 0331-04-045 SPECIAL SPECIFICATION 4900 Sacrificial Cathodic Protection Pile Jacket 1. Description. This Item shall govern for the furnishing, installing and energizing a sacrificial

More information

10. STONE AND REINFORCED MASONRY

10. STONE AND REINFORCED MASONRY 10. STONE AND REINFORCED MASONRY Chapter 9 Chapter 9 Stone & Concrete Masonry 2 10.1 STONE AND REINFORCED MASONRY - OVERVIEW 10.2 TYPES OF ROCKS USED IN STONE MASONRY 10.3 QUARRYING AND PRODUCING OF BUILDING

More information

PRELIMINARY DESIGN OF THE HYDRAULIC STRUCTURES DAM IN THE PISÃO RIVER

PRELIMINARY DESIGN OF THE HYDRAULIC STRUCTURES DAM IN THE PISÃO RIVER PRELIMINARY DESIGN OF THE HYDRAULIC STRUCTURES DAM IN THE PISÃO RIVER Margarida Isabel Godinho Sobral Department of Civil Engineering and Architecture, Instituto Superior Técnico - Lisbon, Portugal SUMMARY

More information

Annex V Concrete Structures Removal Plan

Annex V Concrete Structures Removal Plan Appendix D Annex V Concrete Structures Removal Plan Figure V1 Lower Granite Sequences of Concrete Removal and Cofferdam Figure V2 Little Goose Sequence of Concrete Removal and Cofferdam Figure V3 Lower

More information

Suitability of Different Materials for Stone Column Construction

Suitability of Different Materials for Stone Column Construction Suitability of Different Materials for Stone Column Construction Dipty Sarin Isaac and Girish M. S. Department of Civil Engineering College of Engineering, Trivandrum, Kerala diptyisaac@yahoo.com, girishmadhavan@yahoo.com

More information

Regulation 18 August 2009 NO Operations and Maintenance LEVEE ENCROACHMENT STANDARDS AND PROCEDURES

Regulation 18 August 2009 NO Operations and Maintenance LEVEE ENCROACHMENT STANDARDS AND PROCEDURES CENWP-EC DEPARTMENT OF THE ARMY PDR 30-2-5 Portland District, Corps of Engineers (Draft) P.O. Box 2946 Portland, Oregon 97208 Regulation 8 August 2009 NO. 30-2-5 Operations and Maintenance LEVEE ENCROACHMENT

More information

Combination of undrained and drained analysis to design the temporary supports of a large diameter tunnel

Combination of undrained and drained analysis to design the temporary supports of a large diameter tunnel 16 TH Australasian Tunnelling Conference 2017 30 October 1 November 2017 Combination of undrained and drained analysis to design the temporary supports of a large diameter tunnel R. Mahinroosta CSU Engineering,

More information

mortarless masonry Design Manual Part 1 (IS 456:2000) Section 1 Page 1 IS 456:2000 PLAIN AND REINFORCED CONCRETE - CODE OF PRACTICE

mortarless masonry Design Manual Part 1 (IS 456:2000) Section 1 Page 1 IS 456:2000 PLAIN AND REINFORCED CONCRETE - CODE OF PRACTICE SECTION 1. mortarless masonry Design Manual Part 1 (IS 456:2000) Section 1 Page 1 1.1 Overview of IS 456:2000 IS 456:2000 PLAIN AND REINFORCED CONCRETE - CODE OF PRACTICE IS 456:2000 is the current Indian

More information

SPECIFICATIONS FOR STRUCTURAL EXCAVATION

SPECIFICATIONS FOR STRUCTURAL EXCAVATION SPECIFICATIONS FOR STRUCTURAL EXCAVATION 1.0 DESCRIPTION The Work shall consist of:.1 Excavation and removal of material for the placement of foundations, substructure units, approach slabs, transition

More information