STORMWATER BUBBLE UP PIT

Size: px
Start display at page:

Download "STORMWATER BUBBLE UP PIT"

Transcription

1 Cast iron swing grate in cast iron frame A Nominal 90 mm inlet SECTION A x ID concrete chamber. Available chamber depths 400mm or 600mm deep CHAMBER PLAN Stormwater pipe House Chamber location in vehicle cutdown Grass Berm K&C Roadway K&C SITE PLAN Gutter House Downpipe GL(Driveway) Flow Stormwater Pipe 700 Min. Boundary 450 M in. 500 Vehicle Crossing Roadway 800mm x ID Concrete Chamber for 100Ø outlet Single catchpit generally as Drawing D6.9 for Ø outlet. Double catchpit for 225Ø outlet as Drawing D6.8 upvc SN16 in berm LONGITUDINAL SECTION Min. Min deep STORMWATER BUBBLE UP PIT D4.1

2 Boundary Sweated spigot with 'kerb adaptor' 20 MPa Concrete 0.3m to 1.0m Trim adaptor to make flush with face of kerb Existing 35 min. Kerb and Channel 100 Ø SN16 upvc 25 min. Mountable Option SureCast Metals HCC Kerb Adaptor or approved similar KERB ENTRY Cutout - mortar infill 20MPa concrete To Fit 1000 min. Channel Invert Depressed Kerb at Vehicle Crossing Kerb Outlet VERTICAL KERB Private drainage system Road Reserve Boundary if present Kerb and channel Reinstate kerb with epoxy mortar Sealed end cap 100mm SN16 upvc pipe at Grade 1 in 100 Cast galvanised steel pipe kerb connection to channel invert LONGITUDINAL SECTION KERB CONNECTION D4.2 REGIONAL INFRASTRUCTURE TECHNICAL SPECIFICATION Version: AUGUST 2016 NOTE: DRAWINGS D3.4.2 AND D4.2 HAVE BEEN COMBINED

3 DN100 SN16 upvc Factory "T" Glued or screwed DN20 holes at 100mm spacings DN100 SN16 upvc Base of outlet clear of norm al flow Water Level Hardening of bank required anti-scour material (preferably rip rap, rock or concrete) DN 100 STORMWATER OUTLET D4.3

4 Boundary H5 200 X 50 Gap for flow under fence 50mm Min. 75mm Max. Note 1 100m m 50mm 100m m 600m m Min. 0mm 2.4m Spacing (Max.) NOTES: 1. For 10 year ARI flow velocities: < 1.0 m/s grass cover is sufficient m/s reinforcing is required >1.5 m/s Hardening is required REGIONAL INFRASTRUCTURE TECHNICAL SPECIFICATION STORMWATER SECONDARY FLOW PATH TREATMENT - PRIVATE PROPERTY D4.4 Version: AUGUST 2016

5 K&C Porous well liner Downpipe Stormwater connection Downpipe Porous well liner House Council Storm water Soakage Catchpit with overflow SITE PLAN Gutter House Downpipe Grate inlet for sealed surface Porous well liner Stormwater Pipe To connection or overland flow path LONGITUDINAL SECTION GROUNDWATER RECHARGING DEVICES PRIVATE PROPERTY D4.5

6 A 0 (Typical) dish channel in berm. Invert radius (approx.) PLAN Cast iron grate to fit socket of 225Ø RCRRJ pipe. See Note (Typical) 200 In-situ concrete apron 700 M in. 225Ø RCRRJ - class 4 pipe 500 M in. 225 Ø upvc pipe on Type HS2 bedding 1:100 grade (Min.) NOTES: 1. Top of 225Ø RCRRJ pipe and cast iron grate set 25mm below invert of dish channel. 2. All in-situ concrete shall have a minimum 28 day strength of 20MPa. In-situ concrete base SECTION A FOOTPATH BERM CATCHPIT DETAILS D4.6

7 C 600 Min. 100 Min Cariageway M in. ELEVATION SECTION C DETAIL B - PRECAST KERB COMPONENT Precast back-entry kerb component (see Detail B) Catchpit grate and frame angled to match channel profile Berm/ In-situ concrete inside face shaped to direct flow See Detail A In-situ concrete 675 x 450 precast concrete sump BACK ENTRY CATCHPIT Concrete haunching 10mm Plate across Catchpit barrel adjacent line of both lip and kerb of channel DETAIL A CATCHPIT BACK ENTRY DETAILS D4.7

8 Precast back entry kerb component to ID (i.e. back of grate central over pipe) KERB CHANNEL FALL 500 Steel plate PLAN Precast kerb component with no back-entry cavity (on upstream pit) Degreased aluminium fish (Giant Kokopu) See Drawing D4.10 Precast back-entry kerb component with no bar on upstream pit only pipe outlet 600 Min. Construction details See Drawing D WATER LEVEL 600 Ø Class 2 or 675 X 450 precast unit 700 M in. Floatables baffle See Drawing D Min. Ø RC pipe 400 Cast insitu concrete base SECTION NOTES: 1. Cast iron grate with parallel slots shown in drawing. 2. Epoxy product to be "ramset epcon C6" 2 pot epoxy or approved equivalent. 3. All in-situ concrete shall have a minimum 28 day strength of 20MPa 4. For details see Drawing D6.7 Alternative cast iron grate configuration (Perpendicular slots), for cycle routes DOUBLE SUMP CATCHPIT DESIGN D4.8

9 600 B Kerb Catchpit Sump Grate A A and Frame Channel Carriageway 500 B PLAN SCALE 1:25 Degreased Aluminium Fish (Giant Kokopu) Stiff brush clean prior to fixing fish icon. See Drawing D4.10 Top of Kerb 1.6mm Stainless Steel Sheet Grate set flush with normal grade 600Ø Class 2 or 675 x 450 precast unit 50 Holes to match rod alignment Floatables baffle fixed to chamber wall with 6mm galvanised rods, nut and spring washer, epoxied into sump wall Minimum outlet 225mm Ø FLOATABLES BAFFLE DETAIL Not to Scale SECTION A-A SCALE 1:25 Cariageway 600 M in. Floatables baffle top to be level with soffit of outlet Alternative cast iron grate configuration (perpendicular slots) for cycle routes 1800 NOTES: 1. Cast iron grate with parallel slots shown in drawing m in 2. Epoxy product to be "Ramset Epcon C6" 2 pot epoxy or approved equivalent. 3. All in-situ concrete shall have a minimum 28 day strength of 20MPa SECTION B-B SCALE 1:25 VERTICAL ENTRY CATCHPIT D4.9

10 70-80mm 220 mm GIANT KOKOPU 250mm 50mm 50mm BUBBLE UP SOAK AWAY 75mm 75mm BLUE NZ NATIVE KOKOPU NOTES: 1. Giant Kokopu Plate to be cast in aluminium - from catchpit suppliers Plates to be orientated for reading from road side. 5. FISH SYMBOLS FOR CATCHPITS D4.10

11 NOTES: 1. For single sloping carriageway, private discharge on opposite side of road shall be kerb discharge. 2. Private sites shall have on-site retention. 3. Private sites on same side of road as swale shall discharge via pipe to invert of swale. 4. Preferred water main location is at edge of footpath. Plant following Section Min. 900 Min. 600 Min If planted If mown Edge of seal Carriageway Optional 0.25mm polypropylene liner for detention only applications 50 min. 50 min. 50 min. Topsoil Edge restraint with haunching Refer Drawing D3.3.3 Slope dependent gravel underdrain with min. 100mm PVC with 8 x 10mmØ holes Filter cloth Subsoil drain per m where required in accordance with Section SECTION A 0.25mm polypropylene liner Min. 900 Min. 600 Min. 900 Edge of seal Berm M in. 0.5% Grade Carraigeway Edge restraint Refer Drawing D Optional gravel underdrain with min. 100mm PVC with 8 x 10mm Ø holes per meter A Connection to pipe network DN1050mm Manhole with scruffy dome PLAN SWALE PLAN AND SECTION D4.11

12 Wheel stop (timber or concrete) Topsoil Planted face Carriageway Optional 0.25mm polypropylene liner for detention only applications Driveway 225mmØ SN16 PVC culvert Min. 100mm clearance Slope dependent gravel underdrain with min. 100mm PVC with 8x 10mmØ holes per m where required in accordance with section Filter cloth Subsoil drain 0.25mm polypropylene liner Edge restraint Min. 900 Min. 600 Min. 900 Planted face 1 2 Refer to D3.3.5 for concrete specication. Carriageway Min ELEVATION A Wheel stop (timber or concrete) Driveway culvert ELEVATION A PLAN SWALE DRIVEWAY CROSSING DETAIL D4.12

13 Carriageway Parking Bays B Standard catchpit at invert of Channel Vertical kerb and channel surround Refer to Drawing D3.3.3 A 4.14 Vegetation Rip rap armour Perforated underdrain Raised kerb with sloped channel Refer Detail B Drawing 4.14 Capped flushing point In-situ soil with optional tree Temporary timber barrier for protection during construction Vertical kerb champhered to lip of channel with 45 champher at each end Champhered kerb and channel to raised kerb and sloped channel profile Parking Bays Vertical kerb & channel PLAN Standard catchpit at invert of channel Capped flushing point minimum 100mmØ Perforated underdrain UNDERDRAIN LONG SECTION B Not to Scale RAIN GARDEN PLAN AND UNDERDRAIN LONG SECTION D4.13 REGIONAL INFRASTRUCTURE TECHNICAL SPECIFICATION Version: AUGUST 2016

14 Non floating mulch on media surface Standard kerb & channel Carriageway Rip rap armour Sloped kerb Refer detail mm Subsoil drain and 0.25mm polypropylene liner Optional 0.25mm polypropylene liner for detention only applications 50 Min. 50 Min. Perforated 100mm PVC underdrain Min. 500mm deep media. For specification refer to HCC guideline Min. mm washed drain rock 16mm to 40mm drainage layer Cleaned well graded sand transition layer CROSS SECTION - SLOPED SIDES A Not to Scale Non floating mulch on media surface Standard kerb & channel Sloped kerb Refer detail Rip rap armour Carraigeway mm Precast concrete side Subsoil drain and 0.25mm polypropylene liner Min. 500mm deep media. For specification refer to HCC guideline Min. mm washed drain rock 16mm to 40mm drainage layer Optional 0.25mm polypropelene liner for detention only applications Perforated 100mm PVC underdrain with 8 x 10mm Ø holes per m Concrete sides (Precast) Min. 100mm cleaned well graded sand transition layer CROSS SECTION - VERTICAL SIDES A Not to Scale DETAIL B - KERB WITH SLOPED CHANNEL Not to Scale RAIN GARDEN CROSS SECTIONS AND KERB DETAIL D4.14

15 Service berm Front berm Traffic lanes Catchpits with approved catchpit filter Manhole Underground storage with filter cloth. Sized for soakage or detention using ITS Property boundary Kerb and channel High flow bypass Road centre line Kerb and channel A - Optional min. 100mØ outlet with orifice sized for detention. Not required for soakage only applications Manhole Property boundary PLAN Underground storage cell with filter cloth High flow bypass CROSS SECTION Not to Scale A REGIONAL INFRASTRUCTURE TECHNICAL SPECIFICATION UNDERGROUND STORAGE WITH APPROVED CATCHPIT FILTER PLAN AND SECTION D4.15 Version: AUGUST 2016

16 Catchpit with approved catchpit filter M anhole High flow bypass M anhole Bypass invert set at soffit of pipe to underground storage Underground storage cell with filter cloth. Sized for soakage or detention using ITS. Optional minimum 100mmØ outlet with orifice sized for detention. Not required for soakage only applications. Note: Underground storage can provide soakage and detention requirement if ground conditions are suitable. Consult a Geotechnical Engineer to determine if ground conditions are suitable for soakage. UNDERGROUND STORAGE WITH APPROVED CATCHPIT FILTER LONG SECTION D4.16

17 Catchpit M anhole Gross polutant trap High flow bypass M anhole Bypass invert set at soffit of pipe to underground storage Underground storage cell with filter cloth. Sized for soakage or detention using ITS. Optional minimum 100mmØ outlet with orifice sized for detention. Not required for soakage only applications. Note: Underground storage can provide soakage and detention requirement if ground conditions are suitable. Consult a Geotechnical Engineer to determine if ground conditions are suitable for soakage. UNDERGROUND STORAGE WITH GROSS POLLUTANT TRAP LONG SECTION D4.17

18 Property boundaries Property boundaries measure (WEM) Privately owned soakhole or soakage trench Service Pipe Point of discharge at boundary Stormwater Main SINGLE PROPERTY Soakage SINGLE PROPERTY Point of discharge at the Stormwater Main Stormwater Main Point of discharge stub. See D4.5 Service Pipe measure (WEM) Property boundaries Point of discharge at the serviced boundaries New service pipe WEM New House WEM Retain original for new Lot/ dwelling Old service pipe de-commisioned, as services cannot run underneath buildings House SINGLE PROPERTY SUBDIVISION Privately owned soakhole or soakage trench if possible Manhole required for of blockages Point of discharge at boundaries If greater than 120m, then another manhole is required WEM Stormwater catchpit Point of discharge at boundary Stormwater Main Stormwater Main 5+ CUSTOMERS 5+ CUSTOMERS Accessway Single Lot KEY: Council Ownership Private Ownership STORMWATER CONNECTIONS LAYOUT D4.18

19 NOTES: Ladder rung 1. Diameters of precast manhole pipes are nominal only. 2. Wastewater manholes to use ceramic for channelling. Stormwater manholes may use concrete. 3. See standard detail for cast iron lid with rim to fit recess and locking bolts and pre-cast slab detail. 4. Ground level tolerances: Pavemant +0mm, -5mm Berm +5mm, -5mm +10mm, -0mm (Min) 225 Radius minimum 2.5 x Pipe Ømm TYPICAL PLAN CURVE THROUGH MANHOLE Manhole top slab Cover to be HCC standard pattern (detail required) Maximum neck extension mm 1050Ø Chimney Manhole top slab 450 Cover slope to conform with ground slope. Manhole Chamber Slab Manhole top slab Manhole top slab Length m ax (Max) 600 (Max) BM100 jointing Concrete slab 450wide x 100deep with 4/12 bars min. length mm into undisturbed ground. First lift to be 2.4m pre-cast section Internal PVC drop Smooth steel trowel finish, do not sponge mm channel in benching (invert minimum 100mm above sewer) 90 PVC junction Precast flanged base Precast flanged base Precast flanged base DETAILS DN1050 & DN1200 MANHOLES DROP MANHOLES DETAILS DN1350 AND OVER MANHOLES DN DN1350 MANHOLES D4.21 REGIONAL INFRASTRUCTURE TECHNICAL SPECIFICATION Version: AUGUST 2016

20 NOTES: 1. Maximum depth for frame and cover adjustment rings onto top slab is mm. 2. Diameters of precast manhole pipes are nominal only. 3. See standard detail for cast iron lid with rim to fit recess and locking bolts and pre-cast slab detail. 4. Ground level tolerances: Pavemant +0mm, -5mm Berm +5mm, -5mm +10mm, -0mm 5. Approved steps as per Section 8 Acceptable Materials. 1050Ø Chimney Manhole top slab for 1050Ø Manhole cast iron cover slope to conform with general ground slope. Manhole top slab Manhole Chamber Slab Manhole top slab 1800 Pipe length M ax. 230 (Min.) 400 (Min.) Step Recess Refer NOTE (Max.) 1800 Pipe length M ax Pipe length M ax (Max.) 175 (Min.) REGIONAL INFRASTRUCTURE TECHNICAL SPECIFICATION TYPICAL DIMENSIONS FOR MANHOLES GREATER THAN DN1350 D4.22 Version: AUGUST 2016

21 2/12Ø Circular 320 lap reinforcing bars Ø (Min.) TOP SLAB FOR DN750 SHALLOW CHAMBER Standard HCC pattern cast iron cover with rim to fit recess Ground level tolerances (refer to Note 1) Top slab for DN750 shallow chamber 1000 (M ax.) DN No steps 250 (Min.) DN750 INTERNAL SHALLOW CHAMBER To be used only on pipes of DN100 to DN and where depth of invert is less than 1000mm NOTES: 1. Ground level tolerances: Pavemant +0mm, -5mm Berm +5mm, -5mm +10mm, -0mm SHALLOW MANHOLE/CHAMBER D4.23 REGIONAL INFRASTRUCTURE TECHNICAL SPECIFICATION Version: AUGUST 2016

22 CL Length varies Road Bdy mm Min. 1.0m Max. 50 x 50 wooden marker and marker tape to extend from connection to mm above ground level. Top 100mm of post painted red (Wastewater) or green (Stormwater) Ground level Trench *ACCESS POINT 2500 max 100mm Ø lateral Min. fall 1 in 60 (1.667%) * Rodding point shown. Refer New Zealand Building Code for the allowable types of access points. Main 'Y' junction upvc Pipes Seal end with painted screw on end cap Red = Wastewater Green = Stormwater STANDARD CONNECTION WITH A DEPTH TO INVERT LESS THAN 2500mm - SECTION CL Length varies Boundary mm Min. 1.0m Max. 50 x 50 wooden marker and marker tape to extend from connection to mm above ground level. Top 100mm of post painted red (Wastewater) or green (Stormwater) Ground level Trench *ACCESS POINT Greater than mm Ø lateral Min. fall 1 in 60 (1.667%) * Rodding point shown. Refer New Zealand Building Code for the allowable types of access points. upvc Pipes Seal end with painted screw on end cap Red = Wastewater Green = Stormwater Main Plain bend London junction RAMP RISER CONNECTION WITH A DEPTH TO INVERT GREATER THAN 2500mm - SECTION (1) Public pipe to end of junction Main fitting when main is located within the Lot the connection serves. (2) Public pipe to road boundary when main is located outside the Lot the connection serves. upvc Pipes Flow London junction Boundary Seal end with painted screw on end cap Red = Wastewater Green = Stormwater POINT OF DISCHARGE: PUBLIC AND PRIVATE INFRASTRUCTURE LATERAL CONNECTION D4.24 REGIONAL INFRASTRUCTURE TECHNICAL SPECIFICATION Version: AUGUST 2016

23 D/2 Drainage Pipe Bedding Weak Concrete Anti-scour blocks to be spaced at 5.0m intervals and poured against undisturbed soil, using 10mpa concrete LONG SECTION Trench side Dotted line indicates block dimensions for pipe gradients steeper than 1 in 3 Required for pipe gradients 1:5 or greater CROSS SECTION ANTI-SCOUR BLOCKS FOR STEEP DRAINAGE PIPES D4.25 REGIONAL INFRASTRUCTURE TECHNICAL SPECIFICATION Version: AUGUST 2016

24 Outside wall of the manhole structure Manhole 2000 M in. clearance Public Main All superstructures shall be supported by piles founded as shown Ground Level Retaining Post 1000 M in. below influence line Ground Level ZONE OF INFLUENCE 0 Min. pile clearance 0 Min. pile clearance 1000 M in. below influence line Founding Level Public Main 0 Min. Pile clearance Piles 0 Min. Pile clearance 0 Min. Pile clearance Piles 45 Influence Line Subsequent row Founding Level 1000 M in. below pipe invert Pipe Invert First row of piles 1000 M in. below pipe invert of piles Founding Level See Note 2. ELEVATION NOTES: 1. Building or other works over public sewer or stormwater pipelines is not a practice supported by Council so shall be avoided. Where this is not possible, the building and development shall be so designed that they act independently of the public sewer or stormwater network. 2. Where required by Council, the affected public pipelines or structures shall either be relocated or renewed in place with approved pipe materials at a cost to the development. See section ABC & XYZ for more information M in. clearance Building envelope Building envelope 3. Building is not permitted over manholes or connections under any circumstances. 4. Closed Circuit Television (CCTV) inspections shall be required of Council's assets before and after as a result of any work close to or over Council's assets. 5. No structural loads shall be placed on, or be transferred to the public pipelines, or other public wastewater/stormwater assets. All structural loads shall be absorbed (by means of piles where appropriate) outside of the 45 influence envelope and below the invert level of the sewer pipe for the first row of piles. 6.All piles located within the 45 influence envelope shall be drilled. Outside wall of the manhole structure PLAN: BUILDING ADJACENT TO A PUBLIC MAIN Manhole PLAN: BUILDING OVER A PUBLIC MAIN (Only permitted if an alternative alignment is not possible) REGIONAL INFRASTRUCTURE TECHNICAL SPECIFICATION BUILDING OVER AND ADJACENT TO PUBLIC WASTEWATER OR STORMWATER PIPELINES D4.26 Version: AUGUST 2016

electronic files to:- include in the subject heading:- HCC Subdivision Consent Number subdivision name and stage number

electronic files to:- include in the subject heading:- HCC Subdivision Consent Number subdivision name and stage number Authorised by : City Waters Unit Manager Section C Page 1 of 9 SECTION C : WORKS COMPLETION AND CLEARANCE 1.0 AS-BUILT PLANS Upon completion of construction work, copies of As-Built and data recording

More information

800 Streetlighting W801 Streetlighting Mowing Strip Detail. 900 Network Utilities W901 Network Utility Locations

800 Streetlighting W801 Streetlighting Mowing Strip Detail. 900 Network Utilities W901 Network Utility Locations Drawings QA Quality Assurance QA-01 Relativity of Datum Levels QA-02 Draughting Symbols QA-03 As Built Dimensioning QA-04 Benchmark In K & C QA-05 Benchmark in Block 200 Streetscape W201 Street Trees -

More information

CATCH BASIN ST-1 ENGINEERING DEPARTMENT PLATE NUMBER 3.33' 3.0' 2.0' 4.33' 3.0' 4.0' 1.00' TO BACK OF CURB LINE

CATCH BASIN ST-1 ENGINEERING DEPARTMENT PLATE NUMBER 3.33' 3.0' 2.0' 4.33' 3.0' 4.0' 1.00' TO BACK OF CURB LINE 3.33' 3.0' 2.0' 4.33' 4.0' 3.0' 1.00' TO BACK OF CURB LINE TOP OF GRATE ELEV. - SEE PLAN NEENAH CASTING R-3067-V OR AS NOTED ON PLANS. "INFA-SHIELD" SEAL OR EQUAL. RINGS (2 MIN., 1' MAX. OF RINGS AND MORTAR).

More information

Inflow pipe. Drain. Drain

Inflow pipe. Drain. Drain Inflow pipe Screened overflow Drain Foul flush diverter Screened intake Manhole cover Maximum water level Seal Inspection cover Possible local drainage through screen Drain Bottom sloped Screened outlet

More information

South Waikato District Council Code of Practice for Subdivision and Development PART 4. Drainage. Part 4: Drainage 56

South Waikato District Council Code of Practice for Subdivision and Development PART 4. Drainage. Part 4: Drainage 56 PART 4 Drainage Part 4: Drainage 56 PART 4: DRAINAGE 401 STORMWATER DRAINAGE 401.1 General The stormwater drainage system shall be available to any building site within urban development or subdivision.

More information

Standard products Tasmania 2010

Standard products Tasmania 2010 Standard products Tasmania 2010 Standard products A catalogue of standard products manufactured at Humes Invermay. All products are cast with means of lifting unless otherwise specified. Other products

More information

UPDATE 3A MINIMUM REQUIREMENTS

UPDATE 3A MINIMUM REQUIREMENTS 3. STORMWATER CONTENTS SECTION PAGE LATEST UPDATE 3A MINIMUM REQUIREMENTS 3.1 July 2004 3B MEANS OF COMPLIANCE 3.1 July 2004 3.B.1 DESIGN STANDARD 3.1 October 2005 3.B.2 DISCHARGE PERMITS 3.3 July 2004

More information

NELSON CITY COUNCIL INFRASTRUCTURAL ASSETS SD 601 APPROVED SENIOR EXECUTIVE INFRASTRUCTURE

NELSON CITY COUNCIL INFRASTRUCTURAL ASSETS SD 601 APPROVED SENIOR EXECUTIVE INFRASTRUCTURE SENIOR EXECUTIVE INFRASTRUCTURE DATE SD 601 SENIOR EXECUTIVE INFRASTRUCTURE DATE SD 602 SENIOR EXECUTIVE INFRASTRUCTURE DATE SD 603 SENIOR EXECUTIVE INFRASTRUCTURE DATE SD 604 NOTES 1. PRE-FORMED PLASTIC

More information

TYPE "A" CATCH BASIN

TYPE A CATCH BASIN 27" 1.67' TO BACK OF CURB LINE TOP OF GRATE ELEV. - SEE PLAN NEENAH CASTING R-3250-BV OR APPROVED EQUAL. "INFI SHIELD" SEAL OR APPROVED EQUAL RINGS (2 MIN., 1' MAX. OF RINGS AND MORTAR). PLASTER OUTSIDE,

More information

Suggested Stormwater Management Practices For Individual House Lots

Suggested Stormwater Management Practices For Individual House Lots Suggested Stormwater Management Practices For Individual House Lots These practices are necessary to satisfy the water quantity and water quality criteria of the Rappahannock Stormwater Ordinance. These

More information

DRAFT. Draft Bill of Quantities. Drainage

DRAFT. Draft Bill of Quantities. Drainage Draft Bill of Quantities September 2015 STORM DRAINAGE INFORMATION Measurement notes Drawings used : WYG (80) 140 Rev T1, D-(80) 001 Rev T1, D-(80) 002 Rev T1, D-(80) 003 Rev T1 and D-(80) 004 Rev T1 All

More information

SECTION 6 STORMWATER AND LAND DRAINAGE

SECTION 6 STORMWATER AND LAND DRAINAGE SECTION 6 STORMWATER AND LAND DRAINAGE Final Version, Approved September 2003 Section 6 and Land Drainage Contents 6.1 PERFORMANCE STANDARDS... 2 6.1.1 General... 2 6.2 MEANS OF COMPLIANCE... 3 6.2.1 General...

More information

Appendix 4. Bills of Quantities

Appendix 4. Bills of Quantities Appendix 4. Bills of Quantities 201 A4.1 Deep trench latrines Partitions of local materials 1m apart Timber foot rests and floor plates Lightweight timber frame Excavated soil (used for back-fill) Plastic

More information

CONSTRUCTION SPECIFICATION FOR THE INSTALLATION OF ELECTRICAL CHAMBER

CONSTRUCTION SPECIFICATION FOR THE INSTALLATION OF ELECTRICAL CHAMBER ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 602 MARCH 1993 CONSTRUCTION SPECIFICATION FOR THE INSTALLATION OF ELECTRICAL CHAMBER 602.01 SCOPE 602.02 REFERENCES 602.05 MATERIALS TABLE OF CONTENTS

More information

Whakatane District Council Chapter 4 Engineering Code of Practice CHAPTER 4 STORMWATER

Whakatane District Council Chapter 4 Engineering Code of Practice CHAPTER 4 STORMWATER CHAPTER 4 STORMWATER CHAPTER 4 STORMWATER PART 1 DESIGN 4.1.1 INTRODUCTION This part sets out the basic design principles for stormwater reticulation. While some construction information is included for

More information

Below ground System of pipework required to carry waste fluids from building to disposal site.

Below ground System of pipework required to carry waste fluids from building to disposal site. 1 Below ground System of pipework required to carry waste fluids from building to disposal site. Disposal site County Council sewage treatment facility. Septic tank system or alternative systems 2 1. Layout

More information

Section 5: Stormwater. Tauranga City Council

Section 5: Stormwater. Tauranga City Council Section 5: Tauranga City Council Contents Scope 5.A General 5.A.1 5.A.2 5.A.3 5.A.4 5.A.5 5.B. Design Standard 5.B.1. 5.B.2 Overall System Design 5..B.3 Secondary Flows 5.B.4. Freeboard 5.B.5 5.B.6 5.B.7

More information

CONSTRUCTION SPECIFICATION FOR INSTALLATION OF ELECTRICAL CHAMBERS

CONSTRUCTION SPECIFICATION FOR INSTALLATION OF ELECTRICAL CHAMBERS ONTARIO PROVINCIAL STANDARD SPECIFICATION OPSS.PROV 602 NOVEMBER 2017 CONSTRUCTION SPECIFICATION FOR INSTALLATION OF ELECTRICAL CHAMBERS TABLE OF CONTENTS 602.01 SCOPE 602.02 REFERENCES 602.03 DEFINITIONS

More information

DESIGN STANDARD TABLE OF CONTENTS

DESIGN STANDARD TABLE OF CONTENTS DESIGN STANDARD DS-5 STORMWATER TABLE OF CONTENTS DS-5.1 General...1 DS-5.2 Minimum Requirements...1 DS-5.3 Regional Council Requirements...1 DS-5.4 Design...2 DS-5.5 Conveyance - Primary and Secondary

More information

SPECIFICATION FOR PIPE CULVERT CONSTRUCTION

SPECIFICATION FOR PIPE CULVERT CONSTRUCTION SPECIFICATION FOR PIPE CULVERT CONSTRUCTION 1. SCOPE Pipe culverts shall be constructed in accordance with this specification and in conformity with the lines, levels and cross-sections shown on the drawings.

More information

2.1.2 Minimum wall thickness shall be 90 mm Frames and covers shall be bitumen coated by dipping.

2.1.2 Minimum wall thickness shall be 90 mm Frames and covers shall be bitumen coated by dipping. 1.0 GENERAL 1.1 Scope 2.0 PRODUCTS 1.1.1 The work shall consist of the construction, renovation or the adjustment of manholes and/or catchbasins as detailed on the plans or where designated by the Engineer

More information

Amendments to the January 2016 Design Criteria Manual & Supplementary Master Municipal Construction Documents

Amendments to the January 2016 Design Criteria Manual & Supplementary Master Municipal Construction Documents General Figure 2.3.1 16 Revise Revised Figure 2.3.1: New Development Areas where Secondary Suites Apply to include two new areas (#4 and 5). Water 3.3.2 Watermains 31 Add Added wording in Section 3.3.2.3

More information

Sewerage Code WSA Addendum PART 3 STANDARD DRAWINGS

Sewerage Code WSA Addendum PART 3 STANDARD DRAWINGS Addendum to the Water Industry Technical Standards and National Codes of Practice DOCUMENT W2 Sewerage Code WSA 02-1999 Addendum PART 3 STANDARD DRAWINGS Gippsland Water Business Management System Detailed

More information

Stormwater collection products for all NZ stormwater specifications

Stormwater collection products for all NZ stormwater specifications Stormwater collection products for all NZ stormwater specifications Designs to meet your local requirements Stormwater drainage is an essential task, with the need to convey water from the sides of roads

More information

Design Guidelines October 2016: Issue 3. Section 4 Civil.

Design Guidelines October 2016: Issue 3. Section 4 Civil. Design Guidelines October 2016: Issue 3 Section 4 Civil. www.canterbury.ac.nz/learningresources Standards in the Design Guidelines Suite Design Standard Guidelines Index: 01 General 02 Architecture 03

More information

CHECK THE LOWER RIGHT CORNER OF EACH DETAIL FOR THE LATEST REVISION.

CHECK THE LOWER RIGHT CORNER OF EACH DETAIL FOR THE LATEST REVISION. Standard Drawings Index NOTE: The specifications for materials and workmanship shall conform to the latest edition or the "Standard Specifications for Public Works Construction" published by the North

More information

CITY OF SCHERTZ TEXAS ENGINEERING AND PUBLIC WORKS

CITY OF SCHERTZ TEXAS ENGINEERING AND PUBLIC WORKS TEXAS STANDARD CONSTRUCTION NOTES DRWN. BY: DSGN. BY: KJW 1 of 2 *Place geotextile fabric as a permeable seperator to prevent mixing of coarse aggregate and underlying soil. (as needed). 1. GEOTEXTILE

More information

SUPPLEMENTARY SECTION: STANDARD SPECIFICATIONS PAGE 1 STORMWATER MAINS & CULVERTS MAY 2018

SUPPLEMENTARY SECTION: STANDARD SPECIFICATIONS PAGE 1 STORMWATER MAINS & CULVERTS MAY 2018 STANDARD SPECIFICATIONS PAGE 1 STORMWATER MAINS & CULVERTS MAY 2018 PART 1 - GENERAL... 2 1.1 Work Included... 2 1.2 Related Sections... 2 1.3 Reference Standards... 2 1.4 Shop Drawings... 3 1.5 Certificates...

More information

EFFECTIVE FEBRUARY note: drainage permit required to call for a dampproof inspection

EFFECTIVE FEBRUARY note: drainage permit required to call for a dampproof inspection EFFECTIVE FEBRUARY 2014 note: drainage permit required to call for a dampproof inspection PERMITS & INSPECTIONS 750 17th Street West Vancouver BC V7V 3T3 westvancouver.ca/permits t: 604-925-7040 f: 604-925-7234

More information

CONTENTS. Section 6 Stormwater and Land Drainage CODE OF PRACTICE FOR SUBDIVISION AND DEVELOPMENT 6.1 SCOPE... 2

CONTENTS. Section 6 Stormwater and Land Drainage CODE OF PRACTICE FOR SUBDIVISION AND DEVELOPMENT 6.1 SCOPE... 2 CONTENTS 6.1 SCOPE... 2 6.2 PERFORMANCE STANDARDS... 2 6.2.1 General... 2 6.3 MEANS OF COMPLIANCE... 4 6.3.1 General... 4 6.3.2 Resource Consents... 6 6.3.3 Gravity Mains Reticulation Layout... 6 6.3.4

More information

APPLICABILITY TABLE. Council BSC CHRC GRC IRC LSC MRC RRC Applicable Yes Yes Yes Yes Yes Yes Yes

APPLICABILITY TABLE. Council BSC CHRC GRC IRC LSC MRC RRC Applicable Yes Yes Yes Yes Yes Yes Yes Precast roof slabs refer Standard Drawing CMDG-D-03 Special cast iron cover and frame, refer Service Authority. Special cast iron cover and frame, refer Service Authority. Cast iron cover and frame Ø 200

More information

TAURANGA CITY COUNCIL

TAURANGA CITY COUNCIL Code of Practice for Development TAURANGA CITY COUNCIL SECTION 4 Stormwater Drainage 4. STORMWATER DRAINAGE MINIMUM REQUIREMENTS 4.A General 4.A.1 Most developments will modify the predevelopment drainage

More information

EROSION CONTROL GENERAL NOTES EC JAN 2017 C.B.

EROSION CONTROL GENERAL NOTES EC JAN 2017 C.B. EROSION CONTROL GENERAL NOTES EC - 000 EROSION CONTROL GENERAL NOTES EC - 001 INSTALL TEMPORARY DRIVEWAY CULVERT IF THERE IS A ROADSIDE DITCH PRESENT EXISTING PAVEMENT OR APPROVED ACCESS POINT OR AS PRACTICABLE

More information

SECTION STORM DRAINAGE DESIGN, GRADING, AND WATER QUALITY TECHNICAL CRITERIA TABLE OF CONTENTS PAGE 402 STORM DRAINAGE DESIGN CRITERIA 400-1

SECTION STORM DRAINAGE DESIGN, GRADING, AND WATER QUALITY TECHNICAL CRITERIA TABLE OF CONTENTS PAGE 402 STORM DRAINAGE DESIGN CRITERIA 400-1 CITY OF THORNTON Standards and Specifications Revised: October 2012 SECTION 400 - STORM DRAINAGE DESIGN, GRADING, AND WATER QUALITY TECHNICAL CRITERIA TABLE OF CONTENTS PAGE 401 GENERAL PROVISIONS 400-1

More information

T a b l e o f C o n t e n t s

T a b l e o f C o n t e n t s C i t y o f G l a d s t o n e P u b l i c W o r k s D e s i g n S t a n d a r d s T a b l e o f C o n t e n t s SECTION THREE SANITARY SEWER REQUIREMENTS... 1 3.0000 SANITARY SEWERS... 1 3.0010 General

More information

DIVISION 3: SEWER. Improvement Design Standards City of Dundee Oregon. Division 3 : Sewer Page 1

DIVISION 3: SEWER. Improvement Design Standards City of Dundee Oregon. Division 3 : Sewer Page 1 DIVISION 3: SEWER 3.1 DESIGN CRITERIA A. APPLICABILITY 1. These Design Standards shall govern all construction and upgrading of public sanitary sewer facilities in the City of Dundee and applicable work

More information

Description Unit Quantity Rate Kshs. Amount Kshs.

Description Unit Quantity Rate Kshs. Amount Kshs. BILL No.1 40m3 MASONRY STORAGE TANK No. Description Unit Quantity Rate Kshs. Amount Kshs. 1 SETTING OUT AND EARTH WORKS 1.1 General site clearance and setting out 1.2 Excavate over site 200mm to remove

More information

Division 33. Utilities

Division 33. Utilities See Section 32 for requirements on Utility Plan Preparation. 33 10 00. Water Utilities 33 11 00. Water Utility Distribution Piping 1. All underground pipe material, 4 inch diameter and larger shall be

More information

SECTION A-A NTS. Figure 4.1 Alternative Flow Dispersal Trench NOTES:

SECTION A-A NTS. Figure 4.1 Alternative Flow Dispersal Trench NOTES: Figure 4.1 Alternative Flow Dispersal Trench NOTES: galvanized bolts 2" x 12" pressure treated grade board 2" x 2" notches 18" O.C. *20% max 12" min. 36" max 1' - 6" min *20% max 4" x 4" support post clean

More information

CITY STANDARD DETAILS FOR CITY OF JACKSONVILLE FLORIDA DEPARTMENT OF PUBLIC WORKS

CITY STANDARD DETAILS FOR CITY OF JACKSONVILLE FLORIDA DEPARTMENT OF PUBLIC WORKS CITY STANDARD DETAILS FOR CITY OF JACKSONVILLE FLORIDA DEPARTMENT OF PUBLIC WORKS COMPLETE THROUGH REVISION #18 April 2009 CITY STANDARD DETAILS REVISIONS Revision No. Revision Date Effective Date 2 August

More information

1. Division 01 Section General Requirements - Temporary Facilities and Controls. 2. Division 31 Section Earthwork.

1. Division 01 Section General Requirements - Temporary Facilities and Controls. 2. Division 31 Section Earthwork. PAGE 334000-1 SECTION 334000 PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification sections,

More information

Chapter 10. Conduit Outlet Structures Introduction General Layout Information

Chapter 10. Conduit Outlet Structures Introduction General Layout Information 10.0 Introduction This section addresses the design of culvert outlets, which are typically oriented in-line with the flow in a drainageway, and storm sewer outlets, which are typically oriented perpendicular

More information

Temporary Watercourse Crossing: Fords

Temporary Watercourse Crossing: Fords Temporary Watercourse Crossing: Fords DRAINAGE CONTROL TECHNIQUE Low Gradient Velocity Control Short Term Steep Gradient Channel Lining Medium-Long Term Outlet Control Soil Treatment Permanent [1] [1]

More information

CHAPTER 17: STORM SEWER STANDARDS Introduction Administration Standards 17.1

CHAPTER 17: STORM SEWER STANDARDS Introduction Administration Standards 17.1 CHAPTER 17: STORM SEWER STANDARDS 17.00 Introduction 17.01 Administration 17.02 Standards 17.1 17.00 INTRODUCTION The purpose of this chapter is to provide guidance for the design and construction of storm

More information

GCG ASSOCIATES, INC. CIVIL ENGINEERING AND LAND SURVEYING 84 Main Street Wilmington, Massachusetts 01887

GCG ASSOCIATES, INC. CIVIL ENGINEERING AND LAND SURVEYING 84 Main Street Wilmington, Massachusetts 01887 GCG ASSOCIATES, INC. CIVIL ENGINEERING AND LAND SURVEYING 84 Main Street Wilmington, Massachusetts 01887 Phone: (978) 657-9714 Fax: (978) 657-7915 November 17, 2017 Ms. Sheila Page, Town Planner 101 Main

More information

Stormwater Disposal to Soakpits

Stormwater Disposal to Soakpits Engineering Appendix Two Stormwater Disposal to Soakpits 1. INTRODUCTION TO SOAKPITS... 2 2. WHAT SIZE IS MY SOAK PIT... 3 2.1 Carry out a Percolation test on site... 3 2.2 Determine the soakage rate...

More information

PERMANENT PAVEMENT REPAIR NO SCALE

PERMANENT PAVEMENT REPAIR NO SCALE SAWCUT EXISTING PAVEMENT 2" BITUMINOUS CONCRETE SURFACE COURSE, CLASS 2 (MIN) CLEAN EDGE PRIOR TO PAVING AND PAINT WITH LIQUID BITUMEN. INSTALL SEALANT OVER JOINT UPON COMPLETION 2" BITUMINOUS CONCRETE

More information

50.20 Drainage Structure Design

50.20 Drainage Structure Design 50.20 Drainage Structure Design All drainage structures, with the exception of bridges, culvert bridges and, in some cases, culverts, shall be designed for HS20-44 loading. Refer to Section 50.22 for design

More information

Volume 5. District Council Supplement

Volume 5. District Council Supplement HAMILTON CITY DEVELOPMENT MANUAL Volume 5 District Council Supplement Volume 5 District Council Supplement Table of Contents Part 1 : General Part 2 : Earthworks and Land Stability (no additions) Part

More information

City of St. Catharines Standard Drawings JULY Revised July 21, 2017 TES-ENG (SH)

City of St. Catharines Standard Drawings JULY Revised July 21, 2017 TES-ENG (SH) City of St. Catharines Standard Drawings JULY 2017 Revised July 21, 2017 TES-ENG (SH) Roads Dwg No. Revision Standard Sidewalk Detail 110-2001 1 Monolithic Curb-Faced Sidewalk for Concrete Road 110-2002

More information

ENGINEERING REVIEW CHECKLIST City of Mount Clemens

ENGINEERING REVIEW CHECKLIST City of Mount Clemens (To be completed by the Developer s & Submitted with ing Plans) DATE: PROJECT NAME: Site Plan Approved: Date DESIGN ENGINEERING COMPANY: ing Company Contact Information: Name: Phone: Email: Owner Contact

More information

A. BILL OF QUANTITIES FOR SANITARY SEWER

A. BILL OF QUANTITIES FOR SANITARY SEWER Note: Unit prices of BoQ items shall include the execution of all small and unforeseen works not covered by BoQ, but that are necessary to be carried out during construction for smooth process of works

More information

CPM Concrete Drainage Systems

CPM Concrete Drainage Systems CPM Group Ltd offer a complete range of precast concrete manhole units from DN 900 to DN 4000 in varying depths with tongue and groove joints. A djusting units Ductile iron cover & frame Cover slab DN1200

More information

STORM AND SURFACE WATER 4-1 GENERAL...4-1

STORM AND SURFACE WATER 4-1 GENERAL...4-1 SECTION 4 STORM AND SURFACE WATER SECTION DESCRIPTION PAGE 4-1 GENERAL...4-1 4-2 STORM DRAINAGE CONVEYANCE SYSTEM DESIGN CRITERIA...4-1 4-2.1 Overview...4-1 4-2.2 Design Flow and Route Requirements...4-2

More information

SECTION STORM DRAINAGE. A. This Section includes gravity-flow, nonpressure storm drainage (REMOVED), with the following components:

SECTION STORM DRAINAGE. A. This Section includes gravity-flow, nonpressure storm drainage (REMOVED), with the following components: SECTION 02630 STORM DRAINAGE PART - GENERAL. SUMMARY A. This Section includes gravity-flow, nonpressure storm drainage (REMOVED), with the following components:. Cleanouts. 2. Precast concrete manholes.

More information

Construction Inspection Checklists

Construction Inspection Checklists III. Construction Inspection Checklists 33 Bioretention - Construction Inspection Checklist Project: Location: Site Status: Date: Time: Inspector: Construction Sequence Satisfactory / Unsatisfactory Comments

More information

401 Sanitary Sewer System Design Criteria. The following additional design requirements shall also apply:

401 Sanitary Sewer System Design Criteria. The following additional design requirements shall also apply: SECTION 400 SANITARY SEWER SYSTEM The design of sanitary sewers shall be in conformance with the applicable sections of the State of Washington, Department of Ecology manual, Criteria for Sewage Works

More information

FORM 1 S Design Certification List - Wastewater Agreements

FORM 1 S Design Certification List - Wastewater Agreements FORM 1 S Design Certification List - Wastewater Agreements Job Description Location Developer / Owner Developer / Owner Contact Details Consultant Gippsland Water Drawing Numbers Notes: 1 Where the word

More information

INSPECTION TIMING CHECKLIST FOR RESIDENTIAL FRAME BUILDING PRIOR TO INSPECTION REQUEST

INSPECTION TIMING CHECKLIST FOR RESIDENTIAL FRAME BUILDING PRIOR TO INSPECTION REQUEST Village of Vernon Hills Community Development Department - Building Division 290 Evergreen Drive, Vernon Hills, IL 60061 Phone 847-367-3704 - Fax 847-367-2541 - http://www.vernonhills.org INSPECTION TIMING

More information

How To Construct a Ferro Cement Tank

How To Construct a Ferro Cement Tank How To Construct a Ferro Cement Tank Be Advised The following power point presentation assumes that individuals using it to construct ferro-cement tanks have a basic knowledge of geometry and calculating

More information

Sewer Audit - Design Checklist Gravity sewers, sewage pumping stations and pressure sewers

Sewer Audit - Design Checklist Gravity sewers, sewage pumping stations and pressure sewers Question Relevant Clauses Design checked? Do the drawings show an appropriate revision history, and is 1.1 the design complete, checked and effectively ready for construction? 1.2 Has the whole catchment

More information

Installation Procedure FP McCann DN1050 Easi-Pit

Installation Procedure FP McCann DN1050 Easi-Pit Installation Procedure FP McCann DN1050 Easi-Pit This document describes the recommended procedure for the installation of FP McCann Easi- Pit DN1050 Precast Concrete Catch-Pit, used in manhole construction

More information

STANDARD CONSTRUCTION DETAILS SANITARY SEWER REVISED MARCH 2018 DEPARTMENT OF ENGINEERING

STANDARD CONSTRUCTION DETAILS SANITARY SEWER REVISED MARCH 2018 DEPARTMENT OF ENGINEERING STANDARD CONSTRUCTION DETAILS REVISED MARCH 2018 GENERAL NOTES EMBEDMENT DETAILS EMBEDMENT DETAILS TWO-WAY CLEANOUT - EXISTING LATERAL TWO-WAY CLEANOUT - NEW CONSTRUCTION TYPICAL SEWER HOUSE SERVICE CONNECTION

More information

Low Gradient Velocity Control Short Term Steep Gradient Channel Lining Medium-Long Term Outlet Control [1] Soil Treatment Permanent

Low Gradient Velocity Control Short Term Steep Gradient Channel Lining Medium-Long Term Outlet Control [1] Soil Treatment Permanent Slope Drains DRAINAGE CONTROL TECHNIQUE Low Gradient Velocity Control Short Term Steep Gradient Channel Lining Medium-Long Term Outlet Control [1] Soil Treatment Permanent [1] Slope drains can act as outlet

More information

Low Gradient Velocity Control Short Term Steep Gradient Channel Lining Medium-Long Term Outlet Control [1] Soil Treatment Permanent

Low Gradient Velocity Control Short Term Steep Gradient Channel Lining Medium-Long Term Outlet Control [1] Soil Treatment Permanent Slope Drains DRAINAGE CONTROL TECHNIQUE Low Gradient Velocity Control Short Term Steep Gradient Channel Lining Medium-Long Term Outlet Control [1] Soil Treatment Permanent [1] Slope drains can act as outlet

More information

PUBLIC WORKS SKAGIT COUNTY SAMISH ISLAND ROAD SAMISH ISLAND ROAD SLIDE REPAIR

PUBLIC WORKS SKAGIT COUNTY SAMISH ISLAND ROAD SAMISH ISLAND ROAD SLIDE REPAIR EASEMENT NOTES:. EASEMENT LIMIT SHOWN AS PROVIDED BY. TESC NOTES:. CONTRACTOR SHALL DEVELOP TEMPORARY EROSION AND SEDIMENT CONTROL PLAN AND PROVIDE ONSITE CERTIFIED EROSION AND SEDIMENT CONTROL LEAD (CESCL)

More information

ONE PIPE LENGTH MAX (REFER TO 1/4"/FT SLOPE (MIN) 5'-0" (MIN) OR 4" LATERAL NOTE #1) INCREASER RIGHT-OF-WAY/ 4"x6" REFER TO TYPICAL EXCAVATION,

ONE PIPE LENGTH MAX (REFER TO 1/4/FT SLOPE (MIN) 5'-0 (MIN) OR 4 LATERAL NOTE #1) INCREASER RIGHT-OF-WAY/ 4x6 REFER TO TYPICAL EXCAVATION, VENT CAP (MUSHROOM TYPE) SOLID CAP EXIST GRADE MIN BUILDING REFER TO NOTE #4 MIN CONCRETE SIDEWALK CURB OR EDGE OF SIDEWALK STREET CLEANOUT (REFER TO NOTE #3) VENT PIPE 4" PVC 6" PVC CLEANOUT CONCRETE

More information

SECTION STORM DRAIN REHABILITATION. 1. Protection of environment; Section O Trench excavation, backfill, and compaction; Section

SECTION STORM DRAIN REHABILITATION. 1. Protection of environment; Section O Trench excavation, backfill, and compaction; Section 02540-1 of 10 SECTION 02540 STORM DRAIN REHABILITATION 02540.01 GENERAL A. Description Storm drain rehabilitation shall include, but not necessarily be limited to, pipe joint sealing, inlet and manhole

More information

SUPPLEMENTAL DRAWINGS

SUPPLEMENTAL DRAWINGS CITY OF GREATER SUDBURY SUPPLEMENTAL DRAWINGS TO THE ONTARIO PROVINCIAL STANDARD DRAWINGS Rev: February 2012 CITY OF GREATER SUDBURY STANDARD DRAWINGS TABLE OF CONTENTS Greater Sudbury Standard Drawings

More information

Contact the Jurisdictional Engineer for materials allowed by each jurisdiction.

Contact the Jurisdictional Engineer for materials allowed by each jurisdiction. Design Manual Chapter 3 - Sanitary Sewers 3C - Facility Design 3C-1 Facility Design A. Capacity of Pipe Pipe sizes 15 inches and smaller should carry the peak flow at a depth of no more than 0.67 of the

More information

General Legend Details...100

General Legend Details...100 SECTION 1 - ROADWAYS TABLE OF CONTENTS General Legend Details......100 Details Roadway Section......... 110 Residential Street Intersection.........115 Waterway and Waterway Transition Detail........116

More information

Temporary Watercourse Crossing: Culverts

Temporary Watercourse Crossing: Culverts Temporary Watercourse Crossing: Culverts DRAINAGE CONTROL TECHNIQUE Low Gradient Velocity Control Short Term Steep Gradient Channel Lining Medium-Long Term Outlet Control Soil Treatment Permanent Symbol

More information

Chapter 3: Permit Procedures and Requirements

Chapter 3: Permit Procedures and Requirements Chapter 1: General Provisions 1 1 Short Title 1 2 Jurisdiction 1 3 Amendments and Revisions 1 4 Enforcement Responsibility 1 5 Review Process 1 6 Prior Approval 1 7 Relationship to Other Standards 1 8

More information

CONSTRUCTION SPECIFICATION FOR INSTALLATION OF ELECTRICAL CHAMBERS

CONSTRUCTION SPECIFICATION FOR INSTALLATION OF ELECTRICAL CHAMBERS ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 602 NOVEMBER 2008 CONSTRUCTION SPECIFICATION FOR INSTALLATION OF ELECTRICAL CHAMBERS TABLE OF CONTENTS 602.01 SCOPE 602.02 REFERENCES 602.03 DEFINITIONS

More information

Cost Estimate Summary Site Prep Supervision Works Cost Risk OB Works + Risk + OB Total Union Street / Laburnum Row Junction 12,353 5,147 73,006

Cost Estimate Summary Site Prep Supervision Works Cost Risk OB Works + Risk + OB Total Union Street / Laburnum Row Junction 12,353 5,147 73,006 Cost Estimate Summary Site Prep Supervision Works Cost Risk OB Works + Risk + OB Total Union Street / Laburnum Row Junction 12,353 5,147 73,006 14,996 9,051 97,053 114,553 Union Street / Trematon Avenue

More information

APPENDIX: C. Stormwater and Wastewater Construction Specification. Tauranga City Council

APPENDIX: C. Stormwater and Wastewater Construction Specification. Tauranga City Council APPENDIX: C Stormwater and Wastewater Construction Specification Tauranga City Council General Where the word Contractor is used below, it shall mean either work undertaken by the Consent Holder s Representative

More information

Highway Drainage 1- Storm Frequency and Runoff 1.1- Runoff Determination

Highway Drainage 1- Storm Frequency and Runoff 1.1- Runoff Determination Highway Drainage Proper drainage is a very important consideration in design of a highway. Inadequate drainage facilities can lead to premature deterioration of the highway and the development of adverse

More information

IDAS form 6 Building or operational work assessable against a planning scheme

IDAS form 6 Building or operational work assessable against a planning scheme IDAS form 6 Building or operational work assessable against a planning scheme (Sustainable Planning Act 2009 version 2.0 effective 17 December 2012) This form must be used for development applications

More information

Installation Overview

Installation Overview Installation Overview Access Cover & Frame See page 6 for detail Cover Supports Hardwood, Concrete or Galvanised Angle 225mm PVC Push On Cap Code: 750191 Shroud Code: 750138 225mm PVC Extension Pipe Cut

More information

B. Fiberglass for construction in back lot easements placed on cast-in-place base.

B. Fiberglass for construction in back lot easements placed on cast-in-place base. Section 02083 PART 1 G E N E R A L 1.01 SECTION INCLUDES A. Fiberglass manholes for unpaved areas placed on top of a precast base to form a manhole. B. Fiberglass for construction in back lot easements

More information

Precast Concrete Trench Drain Systems INSTALLATION INSTRUCTIONS

Precast Concrete Trench Drain Systems INSTALLATION INSTRUCTIONS Precast Concrete Trench Drain Systems INSTALLATION INSTRUCTIONS GENERAL INSTALLATION INSTRUCTIONS 1 Ensure that the trench where the channels are going to be installed has enough room for the appropriate

More information

Gisborne District Council : Engineering Code of Practice ENGINEERING CODE OF PRACTICE

Gisborne District Council : Engineering Code of Practice ENGINEERING CODE OF PRACTICE ENGINEERING CODE OF PRACTICE Contents Section 1: An Introduction to this Code of Practice... 10 1.1 Introduction and Objectives... 10 1.2 Structure of this Code of Practice... 11 1.3 Relationship Between

More information

Employment Intensive Infrastructure Program (EIIP) in Lebanon ANNEX 2

Employment Intensive Infrastructure Program (EIIP) in Lebanon ANNEX 2 Employment Intensive Infrastructure Program (EIIP) in Lebanon ANNEX 2 PARTICULAR SPECIFICATIONS FOR THE CONSTRUCITON OF STORM WATER DRAINAGE NETWORK March 2018 BUREAU TECHNIQUE POUR LE DEVELOPPEMENT P.O.B

More information

3.7 Guidance for Large Bioretention/Biofiltration BMP Facilities

3.7 Guidance for Large Bioretention/Biofiltration BMP Facilities 3.7 Guidance for Large Bioretention/Biofiltration BMP Facilities Applicability LID BMPs Large sites, multi-parcel sites, BMPs treating greater than 5 acres This fact sheet is intended to be used in combination

More information

4 ft. and 6 ft. Downstream Defender Handling and Installation Instructions

4 ft. and 6 ft. Downstream Defender Handling and Installation Instructions 4 ft. and 6 ft. Downstream Defender Handling and Installation Instructions Page 2 Materials Supplied By Hydro International Ledger Angle (x4) Top Slab Top Riser Benching Skirt 4ft./6ft. Downstream Defender

More information

6 STORMWATER IMPROVEMENTS

6 STORMWATER IMPROVEMENTS 6 STORMWATER IMPROVEMENTS 6.01 General Requirements a. In addition to the standards contained in this, the design of stormwater systems is also governed by several ordinances and regulations. (1) Projects

More information

Stage One North Detail Refer to Geoscience Drawings

Stage One North Detail Refer to Geoscience Drawings Stormwater and Leachate Treatment Stage One North Detail Refer to Geoscience Drawings Morning glory bell mouth spillway Pe r i me ter d Spreader Bar rain Sediment Retention, Stormwater Detention Pond Area

More information

7.00 MANHOLES AND INSPECTION CHAMBERS. Hunter Underground Systems

7.00 MANHOLES AND INSPECTION CHAMBERS. Hunter Underground Systems 7.00 MANHOLES AND INSPECTION CHAMBERS Hunter Underground Systems 7.01 Access to drains 7.02 preformed plastic Inspection Chambers 7.03 Manholes 7.04 450mm diameter inspection chambers Equal 110mm inspection

More information

The Most Advanced Name in Water Management Solutions TM. The most cost-effective slotted and trench surface drain systems.

The Most Advanced Name in Water Management Solutions TM. The most cost-effective slotted and trench surface drain systems. The Most Advanced Name in Water Management Solutions TM The most cost-effective slotted and trench surface drain systems. A sensible alternative to metal and concrete Since 1987, Duraslot surface drains

More information

CHECKLIST FOR STREETS, INLETS, AND STORM SEWER DESIGN

CHECKLIST FOR STREETS, INLETS, AND STORM SEWER DESIGN CHECKLIST FOR STREETS, INLETS, I. STREET CLASSIFICATION AND DESIGN CRITERIA A. Determine drainage classification for the roadway section using Table 7-1 or Table 7-2. B. Determine the allowable flow depth

More information

SECTION UTILITY MANHOLES AND STRUCTURES

SECTION UTILITY MANHOLES AND STRUCTURES SECTION 33 05 14 UTILITY MANHOLES AND STRUCTURES PART 1 GENERAL 1.1 SUMMARY A. Section Includes: 1. Precast reinforced concrete manholes and structures with tongue-and-groove joints with masonry transition

More information

The Most Advanced Name in Water Management Solutions TM. The most cost-effective slotted and trench surface drain systems.

The Most Advanced Name in Water Management Solutions TM. The most cost-effective slotted and trench surface drain systems. The Most Advanced Name in Water Management Solutions TM The most cost-effective slotted and trench surface drain systems. A sensible alternative to metal and concrete Since 1987, Duraslot surface drains

More information

The Most Advanced Name in Water Management Solutions TM. The most cost-effective slotted and trench surface drain systems.

The Most Advanced Name in Water Management Solutions TM. The most cost-effective slotted and trench surface drain systems. The Most Advanced Name in Water Management Solutions TM The most cost-effective slotted and trench surface drain systems. A sensible alternative to metal and concrete Since 1987, Duraslot surface drains

More information

SECTION 39 - MANHOLES TABLE OF CONTENTS

SECTION 39 - MANHOLES TABLE OF CONTENTS Section SECTION 39 - MANHOLES TABLE OF CONTENTS Page 39-1 GENERAL... 39.1 39-2 CONCRETE MANHOLES... 39.1 39-2.01 NOT USED... 39.1 39-2.02 Concrete Storm Drain Manholes... 39.1 39-3 SADDLE SEWER MANHOLES...

More information

CITY OF ALBANY Public Works Department ADDENDUM #1 ST CROCKER LANE RECONSTRUCTION

CITY OF ALBANY Public Works Department ADDENDUM #1 ST CROCKER LANE RECONSTRUCTION CITY OF ALBANY Public Works Department ADDENDUM # ST-6-02 CROCKER LANE RECONSTRUCTION In order to clarify the intent of the Specifications and Drawings, the following provisions are provided and shall

More information

SECTION STORM DRAINAGE

SECTION STORM DRAINAGE SECTION 02720 STORM DRAINAGE PART 1 - GENERAL 1.01 WORK INCLUDED A. Trenching and other excavation. B. Ground water control. C. Pipe bedding. D. Installation of storm drains and appurtenances. E. Installation

More information

SECTION PRECAST CONCRETE MANHOLES

SECTION PRECAST CONCRETE MANHOLES SECTION 03 48 10 PRECAST CONCRETE MANHOLES PART 1: GENERAL 1.01 SECTION INCLUDES A. Precast concrete manholes for sanitary sewers and water lines or as indicated on the Drawings. B. Precast concrete sanitary

More information

SECTION STORM DRAIN

SECTION STORM DRAIN PART 1 - GENERAL 1-01 SECTION INCLUDED A. Furnishing and installing storm drainage facilities, including pipe, cleanout, manhole structures and inlet structures. 1-02 RELATED SECTIONS A. Division 00 Contract

More information

Miscellaneous and Cast Iron Listings

Miscellaneous and Cast Iron Listings aeconcrete.com May 2017 Miscellaneous and Cast Iron Listings Drawing Number Item Description Product Size (Length X Width X Depth in mm) SVVZ-20-SUMP-C Drainage Sump w/ Cover 660 x 510 x 765 i.d. SVVZ-NC-SUMP-C

More information

Tips with Creation of your Erosion and Sediment Control Plan

Tips with Creation of your Erosion and Sediment Control Plan Tips with Creation of your Erosion and Sediment Control Plan By Chris Droste, CESCO Senior Erosion Control Specialist Westmoreland Conservation District Forming Your Narrative Use the DEP checklist. Page

More information