1 Welcome Everyone My name is Christopher Paolini. I am a Licensed Professional Engineer. I am Member and a Principal Geotechnical Engineer of CME Engineering Group, PLLC. (CME). CME is a a Geotechnical and Civil Engineering firm, established in CME and its sister company, CME Associates, Inc. have five offices strategically located across New York State. Locations include Albany, Buffalo, Rochester, Syracuse and Elmira. Today, we are going to discuss Chapter 18 (with some references to Chapter 16) of the 2007 Version of the Building Code of New York State.
2 Building Code of New York State Chapter 18 - Soils and Foundations Chapter 18 provisions shall apply to building and foundation systems in those areas not subject to scour or water pressure by wind and wave action.
3 Section 1802 Foundation and Soils Investigation Foundation and soils investigations shall be conducted in conformance with said code and shall be made by a registered design professional. Basically, you want an experienced Licensed Geotechnical Engineer in responsible charge of this operation. *Note: The Code Enforcement Officer (CEO) may not require a foundation or soils investigation where soil data is available from adjacent areas that demonstrate that an investigation is not necessary.
4 What is required of the Foundation and Soils Investigation? Soil and Bedrock classification; i.e., What type of Soils and Bedrock are present at the site in question, and can they support the planned improvements? Determine if Expansive Soils are present at the site. Determine where the Groundwater Table is at the site. Question: How do we provide these requirements? Answer: Through an investigation program designed by your experienced Licensed Geotechnical Engineer.
5 Additional studies shall also be made as necessary, for items such as Slope Stability The effect on moisture variation on soil bearing capacity Compressibility Liquefaction And other items deemed applicable by the Licensed Geotechnical Engineer
6 How does one know what type of investigation is required? Answer: Rely on your Geotechnical Engineer to prepare the Investigation Program. Why? Engineering starts with the preparation of the subsurface investigation program. Let the investigation program be designed by your Geotechnical Consultant, who has the applicable expertise.
7 What type of investigation may be required? Answer: Test Borings Test Pits Laboratory testing In-situ testing Shear wave velocity testing Or a combination thereof Your Geotechnical Consultant shall prepare the exploration program such that there is a specific number of exploration locations outlined on a location plan, with estimated depths, along with the required laboratory testing.
8 The 2002, and subsequently 2007, version of the Building Code of New York State requires some specific items that were not required prior. During boring and sampling procedures, the Registered Design Professional shall have a fully qualified representative on the site to supervise the program. A determination of the seismic site class, pursuant of the Building Code of New York State, must be made (Chapter 16).
9 The product of the investigation program and analysis by your Geotechnical Engineering Consultant is a. Geotechnical Report
10 The written report of the investigation shall be submitted and shall include but not be limited to the following: A plot showing the location of test borings and/or excavations. A complete record of the soil samples. A record of the soil profile. Elevation of the water table, if encountered. Recommendations for foundation type and design criteria, including but not limited to: bearing capacity of natural or compacted soil; provisions to mitigate the effects of expansive soils; mitigation of the effects of liquefaction, differential settlement, and varying soil strength; and the effects of adjacent loads. Expected total and differential settlement. Pile and pier foundation information in accordance with section , if requested. Special design and construction provisions for footings or foundations founded on expansive soils, as necessary. Compacted fill material properties and testing in accordance with Section Additionally, site specific concerns shall be addressed by the Geotechnical Engineer.
11 Presumptive Load-Bearing Values of Soils In lieu of a geotechnical evaluation, the load bearing values in Table may be used. However, these values are conservative and do not take settlement into account. Therefore, it is always good to have a geotechnical investigation conducted at your site. You do not want to encounter surprises which could have been identified during an investigation program.
12 Chapter 18 then goes through the design requirements that the Structural Engineer/Architect will utilize (based on the geotechnical investigation results) and then in their design, i.e Design of actual foundations Uplift Design of reinforcing, etc. We are not going to go through these items in detail, but know that these elements do exist in Chapter 18.
13 Let s switch gears to the next topic Seismic Site Class (In Chapter 16) Pursuant to Section of The 2007 Version of the Building Code of New York State. The site shall be classified as one of the site classes defined in Table These include the best site class, A ; and the worst site class, F, and are determined based on the average soil shear wave velocity in the top 100 feet. When shear wave velocity, V s, of the soil is not known, the Geotechnical Engineer shall determine the site class through a computational analysis of the average standard penetration resistance or un-drained shear strength of the soil in the top 100 feet. This methodology is conservative. To determine actual soil shear wave velocity, direct shear wave velocity testing is required.
14 How is direct shear wave velocity testing accomplished? Answer: by installing a grouted borehole to 100 feet depth, or at least 10 feet into sound bedrock, whichever is less, and directly measuring shear wave velocity through each distinct soil strata.
15 This service may be beneficial on projects where a conservative Site Class results in a conservative Seismic Design Category, or when the computational analysis from the boring data results in a poor Site Class. CME has recently provided direct shear wave velocity testing, where the Site Class improved, resulting in a more liberal Seismic Design Category, thus saving the client money.
16 A site is automatically given a Seismic Site Class F if the soil profile has one or more of the following characteristics Soils vulnerable to failure or collapse under seismic loading, i.e. liquefiable soils. Peats or highly organic clays greater than 10 feet in thickness. Very high plasticity clays (H>25 feet). Soft/medium stiff clays (H>120 feet).
17 Liquefaction What is it? What type of analysis should be conducted? Do we have liquefiable sites in this area?
18 Any Questions?
19 Quiz 1. Who Shall conduct the classification and investigation of subsurface soil and bedrock at the site? A Registered Design Professional (RDP) 2. Does the RDP need to determine if expansive soils are present? Yes 3. Who must be present during the geotechnical field investigation? A Representative of the RDP 4. Does Chapter 18 provide presumptive soil load bearing values? Yes 5. What Types of Investigation may the RDP conduct? Soil Borings, Test Pits, In-Situ Testing, etc.
Partial Factors of Safety
APPENDIX A Partial Factors of Safety A.I Introduction The capacity of single piles in axial compression should provide an adequate safety factor against failure due to insufficient soil-pile interface
More informationChartered Professional Engineer (Geotechnical) Body of Knowledge and Skills
18 October 2016 Chartered Professional Engineer (Geotechnical) 1. Introduction This document defines the core knowledge and skills that a Chartered Professional Engineer (Geotechnical) ((Geotechnical))
More informationSOILS AND FOUNDATIONS
CHAPTER 1 SOILS AND FOUNDATIONS This chapter has been revised in its entirety; there will be no marginal markings. SECTION 101 GENERAL 101.1 Scope. The provisions of this chapter shall apply to building
More informationDetermination of Design Infiltration Rates for the Sizing of Infiltration based Green Infrastructure Facilities
Determination of Design Infiltration Rates for the Sizing of Infiltration based Green Infrastructure Facilities 1 Introduction This document, developed by the San Francisco Public Utilities Commission
More informationIn preparation for constructing buildings on a property, the builder. Site Preparation CHAPTER
CHAPTER 3 Site Preparation In preparation for constructing buildings on a property, the builder must consider a number of factors related to code requirements. The buildings must be located according to
More informationAPPENDIX A - Seismic Terms, Tables and Figures:
APPENDIX A - Seismic Terms, Tables and Figures: Seismic Design Force, (F p ) G-force that the unit must be able to withstand. This number is calculated using the factors described below. a S 0.4 P DS z
More information2016 Port of San Francisco Building Code
PORT CODE PROCEDURE NO. : DATE : December 5, 2012 SUBJECT : Permit Process; Inspection TITLE : Special Inspection and Structural Observation Procedures PURPOSE : The purpose of this Port Code Procedure
More informationMinimum Guidelines for the Design and Use of Underpins When Performing Foundation Stabilization and/or Supplementation UP-08
Minimum Guidelines for the Design and Use of Underpins When Performing Foundation Stabilization and/or Supplementation UP-08 Table of Contents 1. Title 2. Designation 3. List of Figures 4. Scope 5. Referenced
More informationRIGID INCLUSIONS. Rigid Inclusions offer an economical approach for building on sites underlain by soft soil.
H A Y W A R D B A K E R I N C. RIGID INCLUSIONS Rigid Inclusions offer an economical approach for building on sites underlain by soft soil. Above: HBI installed Rigid Inclusions on a congested downtown
More informationOweninny Wind Farm. Oweninny Environmental Impact Statement Appendix 5. Turbine Foundation Construction Method Statement
Oweninny Wind Farm Oweninny Environmental Impact Statement Appendix 5 Turbine Foundation Construction Method Statement Copyright ESB International Limited, all rights reserved. Farm Contents 1 Introduction
More informationFile No Supplemental November Geotechnical and Environmental Consulting Engineers
Supplemental Information & Geotechnical Recommendations Proposed New Solar Valley Location B (East of Building No. 7) Cañada Community College 4200 Farm Hill Boulevard Submitted to: Mr. Peter Hempel Construction
More informationThe following sections provide the approved standard infiltration testing specifications.
APPENDIX F.2 INFILTRATION TESTING To properly size and locate stormwater management facilities, it is necessary to characterize the soil infiltration conditions at the location of the proposed facility.
More informationFOR. by The Structural Committee of The Foundation Performance Association Houston, Texas. Document # FPA-SC-04-0
Issued for Website Publishing Foundation Performance Association Structural Committee Page 1 of 9 RECOMMENDED PRACTICE FOR GEOTECHNICAL EXPLORATIONS AND REPORTS by The Structural Committee of The Foundation
More informationENGINEERING DIRECTIVE
Number: E-95-001 Date: 2/2/95 ENGINEERING DIRECTIVE Ross B. Dindio (Signature on Original) CHIEF ENGINEER The purpose of this engineering directive is to formally notify ALL Department engineering personnel
More informationNPTEL Course GROUND IMPROVEMENT USING MICROPILES
Lecture 22 NPTEL Course GROUND IMPROVEMENT USING MICROPILES Prof. G L Sivakumar Babu Department of Civil Engineering Indian Institute of Science Bangalore 560012 Email: gls@civil.iisc.ernet.in Contents
More informationConsultant Specifications for Subsurface Investigation & Geotechnical Analysis and Design Recommendations
Consultant Specifications for Subsurface Investigation & Geotechnical Analysis and Design Recommendations Mn/DOT Geotechnical Section - Office of Materials & Road Research http://www.mrr.dot.state.mn.us/geotechnical/foundations/tcontract.asp
More informationSITE INVESTIGATION. Foundation Engineering
SITE INVESTIGATION Assist. Prof. Berrak TEYMUR Foundation Engineering Analysis Design Construction As a foundation engineer, you need to consider geotechnical/structural issues (involves geology, subsurface
More informationThe designer shall also submit additional information required by the University as described and underlined below.
I. Structural Engineering Submissions The designer shall submit all information required by the State Construction Office (SCO) as described in the State Construction Manual Chapter 300 - Project Design
More informationSCOPE OF WORK FOR PILING JOB
SCOPE OF WORK FOR PILING JOB 1.0 PURPOSE This document defines the scope of works and specific requirements for the tank pad construction including pile foundation system for the proposed tanks at Wadala
More informationOFFICE OF STATE AID ROAD CONSTRUCTION MISSISSIPPI DEPARTMENT OF TRANSPORTATION
Supplemental Specification 901-S-803-1 LFRD Driven Pile Specifications. DATE: May 24, 2010 OFFICE OF STATE AID ROAD CONSTRUCTION MISSISSIPPI DEPARTMENT OF TRANSPORTATION SUBJECT: LRFD Driven Pile Specifications
More informationGround Improvement. A Discussion on Dynamic Compaction. Chris Woods, P.E., D.GE., LEED AP BD+C Vice-President
Ground Improvement A Discussion on Dynamic Compaction Chris Woods, P.E., D.GE., LEED AP BD+C Vice-President Presentation Outline Provide a basic understanding of the principles involved in the design and
More informationDUCTILE IRON PILES ARE HIGHLY EFFECTIVE, FAST AND VERSATILE MODULAR DRIVEN MICROPILE SYSTEMS
DUCTILE IRON PILES DUCTILE IRON PILES ARE HIGHLY EFFECTIVE, FAST AND VERSATILE MODULAR DRIVEN MICROPILE SYSTEMS Designed to resist both compression and tension loads in either end-bearing or friction,
More informationFoundation/Site Work Code Requirements
Q: What is a Foundation Only permit and why did I receive one when I filed for a full Building Permit? All Building Permits for new construction and additions are reviewed for zoning compliance. This review
More informationEARTHQUAKE RESISTANT DESIGN OF FOUNDATIONS: DESIGN PRINCIPLES
EARTHQUAKE RESISTANT DESIGN OF FOUNDATIONS: DESIGN PRINCIPLES Dr. Ravi Sankar Jakka Asst. Professor (Soil Dynamics) Department of Earthquake Engineering Indian Institute of Technology, Roorkee 1. Introduction
More informationGEOTECHNICAL RESISTANCE FACTORS
Chapter 9 GEOTECHNICAL RESISTANCE FACTORS Final SCDOT GEOTECHNICAL DESIGN MANUAL 9-i Table of Contents Section Page 9.1 Introduction... 9-1 9.2 Soil Properties... 9-2 9.3 Resistance Factors for LRFD Geotechnical
More informationConstruction Planning, Equipment, and Methods PILES AND PILE-DRIVING EQUIPMENT
CHAPTER Construction Planning, Equipment, and Methods PILES AND PILE-DRIVING EQUIPMENT Sixth Edition A. J. Clark School of Engineering Department of Civil and Environmental Engineering 19 By Dr. Ibrahim
More informationaggregate piers / vscs
aggregate piers / vscs 1 2 HT1.0 1-1 1-2 1' - 1" 34' - 0" 16' - 11" 1' - 1" 13' - 10" BOF 817' - 6" (TYPICAL WITHIN HATCHED REGION) 1-17 1-32 1-47 1-62 1-3 1-18 1-33 1-48 1-63 1-4 1-19 1-34 1-49 1-64 1-5
More informationInspection and Quality Assurance Requirements for Metal Plate Connected Wood Trusses. Educational Overview
Inspection and Quality Assurance Requirements for Metal Plate Connected Wood Trusses Educational Overview Introduction What do the codes say about requirements for inspection and quality assurance of trusses?
More informationSECTION 5 GEOTECHNICAL ENGINEERING
SECTION 5 GEOTECHNICAL ENGINEERING Table of Contents Page No. 5.1 DEFINITIONS... 4 5.2 PURPOSE & CONTENT... 6 5.3 PREPARATION OF THE PHASE A GEOTECHNICAL REPORT... 8 5.3.1 DESK STUDY... 8 5.3.2 DEVELOPMENT
More informationSubsurface Investigation Report
AGI Project No. 17-154 Subsurface Investigation Report For the Proposed New One-Story Building Addition 7030 West 111 th Street Worth, Illinois Prepared for T63 Development LLC 11052 Mayflow er Lane Orland
More informationADVANCED GEOSOLUTIONS INC AGI FOUNDATION CONTRACTORS, ULC (Canada Subsidiary) The premier design-build ground improvement contractor TM
ADVANCED GEOSOLUTIONS INC AGI FOUNDATION CONTRACTORS, ULC (Canada Subsidiary) The premier design-build ground improvement contractor TM 1 AGI / WITH YOU FROM CONCEPT-TO-COMPLETION AGI is the premier design-build
More informationGEOTECHNICAL INVESTIGATION I-15 SIGN BRIDGES LAS VEGAS EA JANUARY
GEOTECHNICAL INVESTIGATION I-15 SIGN BRIDGES LAS VEGAS EA 73171 JANUARY 06 MATERIALS DIVISION STATE OF NEVADA DEPARTMENT OF TRANSPORTATION MATERIALS DIVISION GEOTECHNICAL SECTION GEOTECHNICAL REPORT I-15
More information3.5 Tier 1 Analysis Overview Seismic Shear Forces
Chapter 3.0 - Screening Phase (Tier ) 3.5 Tier Analysis 3.5. Overview Analyses performed as part of Tier of the Evaluation Process are limited to Quick Checks. Quick Checks shall be used to calculate the
More informationApplied GeoScience, Inc Hammond Dr., Suite 6 Schaumburg, Illinois
AGI Project No. 13-276 Subsurface Investigation Report For the Proposed New Retail Center 9601 South Pulaski Road Evergreen Park, Illinois Prepared for Mr. Feras Sweis FHS Design + Build LLC 2010 West
More informationODOT BRIDGE FOUNDATION DESIGN PRACTICES AND PROCEDURES
ODOT BRIDGE FOUNDATION DESIGN PRACTICES AND PROCEDURES OREGON DEPARTMENT OF TRANSPORTATION BRIDGE ENGINEERING SECTION OCTOBER 2005 FOREWORD This document was developed to assist Geotechnical Engineers
More information1. All underground utilities under railroad tracks shall be encased in a larger pipe or conduit called the casing pipe.
MTS Jack and Bore Design Criteria Note: For the purposes of this Design Criteria and subsequent Construction Notes, the term Jack and Bore is used generically to refer to a number of trenchless construction
More informationStormwater Standards. Clackamas County Service District No. 1. Infiltration Testing Guide
Stormwater Standards Clackamas County Service District No. 1 APPENDIX E Infiltration Testing Guide Table of Contents Appendix E - Infiltration Testing Guide... Page E.1 General... 1 E.2 Basic Method -
More informationDIVISION 31 EARTHWORK 2006 Edition, Published January 1, 2006; Division Revision Date: January 31, 2012
2006 Edition, Published January 1, 2006; Division Revision Date: January 31, 2012 PART FIVE DOCUMENTS FOR SITE AND INFRASTRUCTURE 31 00 00. EARTHWORK 31 10 00. SITE CLEARING.1 STRUCTURE REMOVAL: Include
More informationOverview of Structural Design and Detailing. (Caltrans Practice) Amir M. Malek, PE, PhD. Senior Bridge Engineer (Technical Specialist)
Overview of Structural Design and Detailing of Large Diameter Drilled Shafts (Caltrans Practice) Amir M. Malek, PE, PhD Senior Bridge Engineer (Technical Specialist) Office of Bridge Design Services California
More informationHow IBC-2009 seismic and wind loading standards apply to emergency standby power systems
TECHNICAL ARTICLE How IBC-2009 seismic and wind loading standards apply to emergency standby power systems Understanding provisions in the latest edition of the International Building Code is critical
More informationDIVISION: EARTHWORK SECTION: BORED PILES REPORT HOLDER: GOLIATHTECH INCORPORATED 175B RUE PELADEAU MAGOG, QUEBEC J1X 5G9 CANADA
0 Most Widely Accepted and Trusted ICC-ES Evaluation Report ICC-ES 000 (800) 423-6587 (562) 699-0543 www.icc-es.org ESR-3726 Issued 10/2017 This report is subject to renewal 10/2018. DIVISION: 31 00 00
More informationSPECIFICATION FOR ENGINEERED FILLS
SPECIFICATION FOR ENGINEERED FILLS This specification is intended to be used for the engineered fill. The specification is suitable for most purposes but there may be special conditions existing at some
More informationSECTION QUALITY CONTROL - CONSTRUCTION MANAGER EDITION
Montgomery County Public Schools Facilities DIVISION 1 - GENERAL REQUIREMENTS SECTION 01450 - QUALITY CONTROL - CONSTRUCTION MANAGER EDITION PART 1 - GENERAL 1.1 Summary: A Independent testing, inspection
More informationGround Improvement Specialists
is a design-build specialty geotechnical contractor offering expertise on ground improvement for sites with poor soil. We combine value engineering and innovative techniques to deliver practical, sustainable
More information2. Does not require, involve or include any additions to, or repair or modification of, the existing foundation.
SECTION 3109 STRUCTURES SEAWARD OF A COASTAL CONSTRUCTION CONTROL LINE 3109.1 General. The provisions of this section shall apply to the design and construction of habitable structures, and substantial
More informationProject Address: Name of Person Completing Form:
Statement of Inspections This form is provided as a way to list aspects of the project that require special inspection and testing in accordance with IBC Sections 107.1, 1704, and 1705 and define duties
More informationAPPENDIX 6 (not yet reviewed by UCCS) STRUCTURAL ANALYSIS/VIBRATION CRITERIA
APPENDIX 6 (not yet reviewed by UCCS) STRUCTURAL ANALYSIS/VIBRATION CRITERIA GENERAL The purpose of this standard is to identify structural submittal requirements, as well as identify vibration design
More informationGround Improvement for Mitigation of Failure Risks to Existing Embankment Dams
Ground Improvement for Mitigation of Failure Risks to Existing Embankment Dams by James K. Mitchell, Sc.D., P.E., Dist. M.ASCE University of Alberta, Edmonton, Alberta October 6, 2010 1 SCOPE OF THE LECTURE
More informationICC-ES Evaluation Report Issued July 1, 2011 This report is subject to renewal in one year.
ICC-ES Evaluation Report ESR-1959 Issued July 1, 2011 This report is subject to renewal in one year. www.icc-es.org (800) 423-6587 (562) 699-0543 A Subsidiary of the International Code Council DIVISION:
More informationGEOTECHNICAL REPORT B-1942
GEOTECHNICAL REPORT TUSCARORA BRIDGE REPLACEMENT B-1942 E.A. 73561 March 2011 MATERIALS DIVISION STATE OF NEVADA DEPARTMENT OF TRANSPORTATION MATERIALS DIVISION GEOTECHNICAL SECTION GEOTECHNICAL REPORT
More informationIn the event of any occurrence that does or could pose a hazard to rail traffic or the public, contact Canadian Pacific Railway at
Canadian Pacific Railway Technical Standards Services Guidelines for excavations on CPR property Last updated March 8, 2012 1. Introduction The purpose of this document is to assure the safety of rail
More informationGEOTECHNICAL ENGINEERING STUDY. For
GEOTECHNICAL ENGINEERING STUDY For PROPOSED RESIDENCE INN BY MARRIOTT ALONG THE SOUTH SIDE OF SPUR 54 JUST NORTH OF THE EXISTING BASS PRO SHOPS HARLINGEN, CAMERON COUNTY, TEXAS Prepared for KRISHNA HARLINGEN
More informationRevise Sections through of Part 1 of the 2009 Provisions as follows:
PROPOSAL - (00) SCOPE: Sec.. Concrete Sec... Additional Detailing Requirements for Concrete Piles PROPOSAL FOR CHANGE: Revise Sec... and Sec.... of Part of the 00 Provisions as follows:.. Additional Detailing
More informationSubsurface Investigations PDCA Professor s Driven Pile Institute. Loren R. Anderson Utah State University June 25, 2015
Subsurface Investigations PDCA Professor s Driven Pile Institute Loren R. Anderson Utah State University June 25, 2015 Ralph B. Peck (1962) Subsurface engineering is an art; soil mechanics is an engineering
More information2. Pavement Materials: Consist of flexible or rigid pavements, typically HMA or PCC, respectively, or a composite of the two.
Design Manual Chapter 6 - Geotechnical 6C - Pavement Systems 6C-1 Pavement Systems A. General Information This section addresses the importance of pavement foundations and the potential for pavement problems
More informationLIGHTWEIGHT FILL DESIGN GUIDANCE
Preferred Design Procedure LIGHTWEIGHT FILL The Federal Highway Administration (FHWA) and National Cooperative Highway Research Program (NCHRP) have two documents for this technology that contain design
More informationI-35W Retaining Wall Design Exhibit A - Draft Scope of Work
Background MnDOT, Metro Transit, Hennepin County, and the City of Minneapolis are in the process of developing a project for Interstate 35W between 43 rd Street in Minneapolis and 15 th Street in Minneapolis.
More informationDIVISION: EARTHWORK SECTION: BORED PILES REPORT HOLDER: GEOTECH ENTERPRISES, INC.
0 Most Widely Accepted and Trusted ICC ES Report ICC ES 000 (800) 423 6587 (562) 699 0543 www.icc es.org ESR 3623 Reissued 04/2017 This report is subject to renewal 04/2018. DIVISION: 31 00 00 EARTHWORK
More informationUNDERPINNING A CRANE FOUNDATION
UNDERPINNING A CRANE FOUNDATION Donald R. McMahon, P.E., McMahon & Mann Consulting Engineers, P.C., Buffalo, New York, USA Andrew J. Nichols, P.E., McMahon & Mann Consulting Engineers, P.C., Buffalo, New
More informationFOUNDATION DESIGN AND CONSTRUCTION ON KARSTIC ROCK FOR A 92-STOREY TOWER IN KUALALUMPUR, MALAYSIA
FOUNDATION DESIGN AND CONSTRUCTION ON KARSTIC ROCK FOR A 92-STOREY TOWER IN KUALALUMPUR, MALAYSIA by Sindhu Rudianto Telp. 021-5529233/Fax. 021-5528648, Email: geo_optima@yahoo.com ABSTRACT The 92-storey
More informationMonitoring a Drilled Shaft Retaining Wall in Expansive Clay: Long-Term Performance in Response to Moisture Fluctuations
1348 Brown, A.C., Dellinger, G., Helwa, A., El-Mohtar, C., Zornberg, J.G., and Gilbert, R.B. (2015). Monitoring a Drilled Shaft Retaining Wall in Expansive Clay: Long-Term Performance in Response to Moisture
More informationDIVISION: EARTHWORK SECTION: BORED PILES REPORT HOLDER: EMPIRE PIERS 2656 EAST HWY 47 WINFIELD, MO EVALUATION SUBJECT:
0 Most Widely Accepted and Trusted ICC-ES Evaluation Report ICC-ES 000 (800) 423-6587 (562) 699-0543 www.icc-es.org ESR-4050 Issued 12/2017 This report is subject to renewal 12/2018. DIVISION: 31 00 00
More informationPlease include this addendum in your Bid proposal for the above referenced project. Questions are in black ink, and the answers are in red ink.
JAHarchitects, LLC PROJECT NO. 393 RIVERCREST CDD 11560 RAMBLE CREEK DRIVE, RIVERVIEW FL ADDENDUM TO BID PROJECT: RIVERCREST CDD MULTI PURPOSE FIELD MAINTENANCE BUILDING & DOG PARK POOL & CABANNA JAH PROJECT
More informationLearning Outcomes. Background Definitions. Lesson 2 & 3. Definitions, Background, Classification, Applications and Costs
Lesson 2 & 3 Definitions, Background, Classification, Applications and Costs schnabel-eng.com Learning Outcomes Define a micropile Describe the characteristics, advantages and limitations of micropiles
More informationTRENCHLESS CONSTRUCTION (BORING, JACKING, AND TUNNELING)
PART 1 - GENERAL TRENCHLESS CONSTRUCTION (BORING, JACKING, AND TUNNELING) 1.01 SECTION INCLUDES A. Trenchless Installation of Carrier Pipe with Casing Pipe B. Trenchless Installation of Carrier Pipe without
More informationMeasurement and Documentation for Structural Integrity Assessment of an In-Service School. Building at Risk
Measurement and Documentation for Structural Integrity Assessment of an In-Service School Building at Risk J. O Ehiorobo a, O. C. Izinyon b and R. O. Ogirigbo c Department Of Civil Engineering, University
More informationASSESSMENT AND MITIGATION OF LIQUEFACTION RISK FOR EXISTING BUILDING FOUNDATION
ASSESSMENT AND MITIGATION OF LIQUEFACTION RISK FOR EXISTING BUILDING FOUNDATION Rolando P. Orense 1, Yukio Morita 2 and Masanori Ide 3 ABSTRACT This paper outlines the mitigation measures performed to
More informationB. Subsurface data is available from the Owner. Contractor is urged to carefully analyze the site conditions.
SECTION 31 23 33 - TRENCHING, BACKFILLING AND COMPACTION PART 1 - GENERAL 1.1 SCOPE A. This Section specifies the requirements for excavating and backfilling for storm sewer, sanitary sewer, water distribution
More informationOver the last decade, drilled and postgrouted micropile foundations have
Seismic Design of Micropile Foundation Systems Leo Panian, S.E., and Mike Korolyk, S.E. Over the last decade, drilled and postgrouted micropile foundations have come to be increasingly relied on for resisting
More informationApplication of Stress-Wave Theory to Piles
PROCEEDINGS OF THE SIXTH INTERNATIONAL CONFERENCE ON THE APPLICATION OF STRESS-WAVE THEORY TO PILES / SAO PAULO / BRAZIL/ 11 13 SEPTEMBER 2000 Application of Stress-Wave Theory to s Quality Assurance on
More informationFoundations in Coastal Areas
Foundations in Coastal Areas HOME BUILDER S GUIDE TO COASTAL CONSTRUCTION FEMA 499/August 2005 Technical Fact Sheet No. 11 Purpose: To describe foundation types suitable for coastal environments. Key Issues
More informationSPECIFICATIONS FOR PRECAST MODULAR BLOCK RETAINING WALL SYSTEM (revised 5/8/7)
Page 1 of 7 STONE STRONG SYSTEMS SPECIFICATIONS FOR PRECAST MODULAR BLOCK RETAINING WALL SYSTEM (revised 5/8/7) PART 1: GENERAL 1.01 Description A. Work includes furnishing and installing precast modular
More informationSee the IRC for additional information. See CPD-DS Information Bulletin 100 for Requirements for 1 & 2 Family Dwelling plan submittals.
As a customer service initiative, the Kansas City, Missouri, City Planning and Development Department/Development Services, in cooperation with the Greater Kansas City Home Builders Association, has developed
More informationLOAD FACTOR RESISTANCE DESIGN
LRFD LOAD FACTOR RESISTANCE DESIGN HOW CONSTRUCTION ACTIVITIES & SPECIFICATIONS ARE AFFECTED LOUISIANA TRANSPORTATION CONFERENCE 2009 Kim Martindale Garlington, P.E. LADOTD Pavement and Geotechnical Engineer
More informationAugust 15, 2006 (Revised) July 3, 2006 Project No A
August 15, 2006 (Revised) July 3, 2006 Project No. 01-05-0854-101A Mr. David Reed, P.E. Protean Design Group 100 East Pine Street, Suite 306 Orlando, Florida 32801 Preliminary Soil Survey Report Polk Parkway
More informationHILLSBOROUGH TOWNSHIP CODE ENFORCEMENT
HILLSBOROUGH TOWNSHIP CODE ENFORCEMENT SAMPLE GUIDE FOR RESIDENTIAL DECKS revised 7 16 Call before you dig! 1 800 272 1000 New Jersey One Call. Utility Mark Out. THIS GENERIC GUIDE IS NOT ALL INCLUSIVE
More informationSPECIFICATION : BORING AND JACKING
SPECIFICATION 330524: BORING AND JACKING PART 1.0 GENERAL 1.1 DESCRIPTION 1.1.1 The work of this specification includes all labor, machinery, construction equipment and appliances required to perform in
More informationAugust 17, DCN Number: ALB07WP001 Revision: 0. Prepared By: 8300 Jefferson NE Suite B Albuquerque, New Mexico 87113
WORK PLAN ENERGY FUELS RESOURCE CORPORATION URANIUM MILL LICENSING SUPPORT PHASE 1 GEOTECHNICAL INVESTIGATION KLEINFELDER PROJECT NO. 83088 August 17, 2007 DCN Number: 83088.1.4.2-ALB07WP001 Revision:
More informationKIEWIT FOUNDATIONS GROUP
KIEWIT FOUNDATIONS GROUP KIEWIT ADVANTAGE LOCAL CONTRACTOR, EXPANSIVE REACH With a strong local presence, access to a vast network of resources throughout North America and a focus on self-performing work,
More informationCONNECTICUT DEPARTMENT OF TRANSPORTATION GEOTECHNICAL ENGINEERING MANUAL Edition
CONNECTICUT DEPARTMENT OF TRANSPORTATION GEOTECHNICAL ENGINEERING MANUAL 2005 Edition Rev. Feb. 09 Connecticut Department of Transportation Geotechnical Engineering Manual Introduction This manual has
More informationSEPTIC TANK CONSTRUCTION GUIDELINES
SEPTIC TANK CONSTRUCTION GUIDELINES Septic tank for this airport will be designed/ built by the general contractor of the building facilities. At the time of the project design, availability of a septic
More informationBACKGROUND: SUBSURFACE CONDITIONS:
2 BACKGROUND: The planned project consists of a prefabricated modular apartment building with underground parking, located on the site bounded by Dexter Avenue N. to the east, multi-story residential/commercial
More informationRevision Nalcor Doc. No. MFA-SN-CD-0000-GT-DC C1 Date Page SLI Doc. No EC Dec-2013 ii DESIGN CRITERIA - GEOTECHNICAL
SLI Doc. No. 505573-3000-40EC-0003 01 5-Dec-2013 ii TABLE OF CONTENTS Page No. 1 INTRODUCTION... 1 2 CREST ELEVATIONS... 2 2.1 Cofferdams... 2 2.2 North Spur... 3 3 STABILITY ANALYSIS LOADING CASES AND
More informationADDENDUM No. 6. ITB No. 4424: W.R. Wheeler (Swift Run) Service Center PUD Non-motorized Improvements Phase 1
ADDENDUM No. 6 ITB No. 4424: W.R. Wheeler (Swift Run) Service Center PUD Non-motorized Improvements Phase 1 Due: June 9, 2016 at 2:00 p.m. (local time) The following changes, additions, and/or deletions
More informationSeismic risk assessment of the major Egnatia Motorway bridges and geotechnical works, based on the new seismological data (SHARE).
Seismic risk assessment of the major Egnatia Motorway bridges and geotechnical works, based on the new seismological data (SHARE). Seismic considerations in typical maintenance life cycle costs of Egnatia
More informationGENERAL SOILS EVALUATION REPORT. For
GENERAL SOILS EVALUATION REPORT For EL PASO WATER UTILITIES (EPWU) PROPOSED AUSTIN STORMWATER POND IMPROVEMENTS NE OF ALTURA AVE. & LACKLAND ST. EL PASO, EL PASO COUNTY, TEXAS Prepared For MORENO CARDENAS
More informationRETAINING WALL LEVEL BACKFILL
City of Poway Development Services Department Building Division (858) 668-4645 (858) 668-4646 (Inspection Line) building@poway.org RETAINING WALL LEVEL BACKFILL Construction of retaining walls, except
More informationgeotechnical and construction materials consultants
geotechnical and construction materials consultants City of Dallas Public Works and Transportation Department 320 E. Jefferson Blvd, Room 307 Dallas, Texas 75203 ATTN: Mr. Vincent Lewis, P.E. Email: Vincent.lewis@dallascityhall.com
More informationSubsurface Investigation Report. Proposed New 1-Story Building 6447 Grand Avenue Gurnee, Illinois
AGI Project No. -11 Subsurface Investigation Report For the Proposed New 1-Story Building 6447 Grand Avenue Gurnee, Illinois Prepared for Mr. Steve Panko Key Development Partners, LLC North State Street,
More informationRequirements for Foundations on Liquefiable Sites
Requirements for Foundations on Liquefiable Sites Robert Bachman, S.E. R. E. Bachman Consulting Structural Engineers Laguna Niguel, CA 1 Issue Team and ASCE 7 Contributing Members Evolved and Improved
More informationStructural Design Challenges for Plaza 66 Tower 2
Structural Design Challenges for Plaza 66 Tower 2 Authors: Dennis C.K. Poon P.E., Managing Principal, Thornton Tomasetti, Inc. dpoon@thorntontomasetti.com Ling-en Hsiao, PhD, Principal, Thornton Tomasetti,
More informationNovember 13, IP3406. Mr. Uriah Sowell Rooney Engineering 115 Inverness Drive East, Suite 300, Englewood, CO 80112
November 13, 2015 103IP3406 Mr. Uriah Sowell Rooney Engineering 115 Inverness Drive East, Suite 300, Englewood, CO 80112 Subject: Infiltration Testing Hopeland Road Valve Site Sunoco Pennsylvania Pipeline
More informationNovember 13, IP3406. Mr. Uriah Sowell Rooney Engineering 115 Inverness Drive East, Suite 300, Englewood, CO 80112
November 13, 2015 103IP3406 Mr. Uriah Sowell Rooney Engineering 115 Inverness Drive East, Suite 300, Englewood, CO 80112 Subject: Infiltration Testing Gates Road Valve Site Sunoco Pennsylvania Pipeline
More informationGeotechnical Engineering Report
Geotechnical Engineering Report Shaw AFB East Gate Entrance Control Facility Amendment Sumter, South Carolina September 13, 2010 Terracon Project No. 73105020A Prepared for: TranSystems North Charleston,
More informationEvaluation the Effectiveness of Rapid Impact Compaction (RIC) as a Ground Improvement Technique
Evaluation the Effectiveness of Rapid Impact Compaction (RIC) as a Ground Improvement Technique Bashar Tarawneh, Ph.D, P.E Assistant Professor Civil Engineering Department The University of Jordan Amman,
More informationLow Mobility Grouting (LMG) and Compaction Grouting, "Application Review"
Low Mobility Grouting (LMG) and Compaction Grouting, "Application Review" Sam Bandimere Abstract While the concept of using Low Mobility Grout (LMG) mix designs originated with the "Compaction Grouting"
More informationCIVIL BREADTH Exam Specifications
NCEES Principles and Practice of Engineering Examination CIVIL BREADTH and STRUCTURAL DEPTH Exam Specifications Effective Beginning with the April 2015 Examinations The civil exam is a breadth and depth
More informationGeotechnical Engineering Subsurface Investigation Report 15-SI-9-OI-1Page) 1637 Bank Street, Ottawa, ON. Yuri Mendez M. Eng, P. Eng.
Geotechnical Engineering Page) 1637 Bank Street, Ottawa, ON Abstract: This report present the findings of the geotechnical investigation completed at 1637 Bank Street, Ottawa, ON, and issue the recommendations
More informationSPECIAL CONDITIONS FOR PIPE JACKING (PJ) October, 2006
Michigan Department Of Transportation 3703C (11/06) 1 Materials 1.1 Pipe SPECIAL CONDITIONS FOR PIPE JACKING (PJ) October, 2006 Page 1 of 5 The type of pipe used for the pipe jacking method shall be capable
More information