1 RMP/PSM WEBINAR SERIES Webinar Starts at 08:00 PT Please call (877) if you are having technical issues. The background music may be used to adjust your audio volume. IIAR STANDARDS AND HOW THEY APPLY TO RAGAGEP PART 4 Stephanie Smith, PE Sara Willman Risk Management Professionals, Inc. (949) (877) Risk Management Professionals 1

2 RISK MANAGEMENT PROFESSIONALS Key Services Process Safety & Risk Management Process Hazard Analysis (PHA) What-If? Studies Hazard & Operability (HAZOP) Studies Layer of Protection Analysis (LOPA) Safeguard Protection Analysis (SPA) Safety Integrity Level (SIL) Assessment & Verification Process Safety Management (PSM) Risk Management Program (RMP) California Accidental Release Prevention (CalARP) Program Nevada Chemical Accident Prevention Program (CAPP) Security Vulnerability Assessment (SVA) Inherently Safer Technology (IST), Hierarchy of Hazard Control Analysis (HCA), Safer Technology & Alternatives Analysis (STAA) Safety & Environmental Management Systems (SEMS) Damage Mechanism Review (DMR) Safety Case Key Services (cont.) ERP Development & Emergency Preparedness Training (NIMS-Compatible) Risk-Graph and Bow-tie Analysis QRA Services FTA & ETA Background Services to Process Industries, Utilities, & Government Since 1995 International w/ US Focus Qualifications Extensive Experience Two Decades of Risk-Based Applications Engineering, Safety, Security, and Emergency Response Backgrounds Locations HQ: Irvine, CA Houston Norfolk Walnut Creek Contact U.S. (877) SUMMARY General IIAR 2 Information Overview of Parts 1 through 3 ANSI/IIAR Chapter 11 Evaporators Chapter 12 Pressure Vessels Chapter 13 Piping Chapter 14 Packaged Systems and Equipment Risk Management Professionals 2

3 ANSI/IIAR Standard for Safe Design of Closed-Circuit Ammonia Refrigeration Systems Partial purpose of the update was to compare to ASHRAE Standard 15, NFPA code, Uniform Mechanical Code, International Mechanical Code, and International Fire Code Part 4 discusses Chapters 11 to 14 DEFINITIONS Maximum Allowable Working Pressure (MAWP): The maximum pressure permissible at the top of the vessel in its normal operating position at a designated temperature. Minimum Design Metal Temperature (MDMT): The lowest temperature permitted according to the metallurgy of the vessel fabrication materials and the thickness of the vessel component. Packaged System: A prefabricated and preassembled closedcircuit refrigeration system, containing all essential equipment, piping, and devices. The package can either be enclosed within its case or framework or unenclosed. Risk Management Professionals 3

4 DEFINITIONS Piping: The interconnecting parts of a closed circuit mechanical refrigerating system which contain and convey the refrigerant. Piping includes pipe, flanges, bolting, gaskets, valves, fittings, the pressure-containing parts of other components such as heat transfer components, expansion joints, strainers, filters, and devices which serve such purposes as mixing, separating, snubbing, distributing, metering or controlling flow, pipe hangers, supporting fixtures and structural attachments. DEFINITIONS Pressure Vessel: Any refrigerant containing receptacle in a closed circuit mechanical refrigerating system designed and manufactured under the rules of ASME Section VIII, Division 1, Boiler and Pressure Vessel Code. Exceptions: compressors, pumps, controls, condenser coils, evaporator coils, headers, piping, other components and their headers not constructed as pressure vessels. Readily Accessible: Capable of being reached safely and quickly for operation, repair, and inspection without requiring those who ready access is required to climb over or remove obstacles or to resort to the use of portable access equipment. Risk Management Professionals 4

5 DEFINITIONS Shall (shall not): A term used where the provision is mandatory. Should (should not): A term used where the provisions are not mandatory but are (are not) recommended good practice under most but not all conditions. Tight Construction: Solid construction with holes or openings that are either sealed or provided with tight-fitting doors to control the transfer of liquid, moisture, air, and vapor. Ultimate Strength: The capacity of a material or structure to withstand loads tending to elongate. CHAPTER 11: EVAPORATORS 11.1 General clause 11.2 Forced-Air Evaporator Coils Design Minimum design pressure: Section 5.5 Ultimate strength: Section Hydrostatic overpressure protection: Section 15.6 Fan speeds: manufacturer recommendation Pressure vessels: Chapter Procedures/Testing: Coils shall be strength tested to a minimum 1.1x design pressure, subsequently leak tested, and proven tight at least at design pressure Risk Management Professionals 5

6 CHAPTER 11: EVAPORATORS Equipment ID manufacturer s name serial number model number year manufactured design pressure direction of fan rotation (if supplied) electric motor size (if supplied) electric defrost heater and drain pan heater ratings (as applicable) electric supply (volts, full load amps, frequency, phase) Installation Considerations Unobstructed airflow at inlet/outlet per manufacturer s recommended clearances Means for preventing freezing inside condensate drain lines where lines are exposed to freezing temperatures P-traps required on condensate drain for each evaporator CHAPTER 11: EVAPORATORS 11.3 Shell-and-Tube Evaporators with NH 3 Shell Design Minimum design pressure: Section 5.5 Pressure vessels: Chapter 12 Hydrostatic overpressure protection: Section Procedures/Testing: Shall be tested in accordance with ASME B&PVC, VIII, Div. 1, but at a minimum, strength tested to 1.1x design pressure, subsequently leak tested, and proved tight at least at design pressure Equipment ID: Manufacturer s name Shell-side max/min allowable working pressure at specific temperature Tube-side max/min design metal temperature at specific pressure Serial number Year manufactured Installation Considerations: Section Risk Management Professionals 6

7 CHAPTER 11: EVAPORATORS with NH3 Tubes Design Minimum design pressure: Section 5.5 Pressure vessels: Chapter 12 Hydrostatic overpressure protection: Section 15.6 Tube side: ASME B31.5 or ASME B&PVC, VIII, Div Procedures/Testing: Strength tested to a minimum 1.1x design pressure, subsequently leak tested, and proven tight at least at design pressure Equipment ID: Manufacturer s name Shell-side max/min allowable working pressure at specific temperature Tube-side max/min design metal temperature at specific pressure Serial number Year manufactured Test pressure, test type (hydraulic or pneumatic) Installation Considerations: Clearance shall be provided to accommodate maintenance and replacement of evaporator tubes CHAPTER 11: EVAPORATORS 11.4 Plate Heat Exchanger Evaporators Design Minimum design pressure: Section 5.5 Ultimate strength: Section Pressure vessels: Chapter 12 Ammonia side of the plate pack overpressure protection: Section 15.3 Non-refrigerant process overpressure protection: Section Procedures/Testing: Shall be strength tested to at least 1.1x design pressure, subsequently leak tested, and proven tight at least a design pressure Risk Management Professionals 7

8 CHAPTER 11: EVAPORATORS Equipment ID Manufacturer shall provide: manufacturer s name hot-side MAWP at specific temperature (where applicable) cold-side MAWP at specific temperature (where applicable) serial number year manufactured If incorporated pressure vessel is present, data shall be provided in accordance with UG section of ASME B&PVC, VIII, Div Installation Considerations: Clearance shall be provided for maintenance or replacement of evaporator plates. CHAPTER 11: EVAPORATORS 11.5 Scraped (Swept) Surface Heat Exchangers Design Minimum design pressure: Section 5.5 Pressure vessels: Chapter 12 Ammonia side overpressure protection: Section Procedures/Testing: Shall be tested in accordance with ASME B&PVC, VIII, Div. 1, but at a minimum, strength tested to 1.1x design pressure, subsequently leak tested, and proved tight at least at design pressure Equipment ID manufacturer s name Shell MAWP at specific temperature Shell MDMT at specific pressure serial number year manufactured Installation Considerations: Clearance shall be provided for the maintenance or replacement of equipment Risk Management Professionals 8

9 CHAPTER 11: EVAPORATORS 11.6 Jacketed Tanks Design Minimum design pressure: Section 5.5 Ultimate strength: Section Pressure vessels: Chapter 12 Ammonia side overpressure protection: Section Procedures/Testing: Shall be tested in accordance with ASME B&PVC, VIII, Div. 1, but at a minimum, strength tested to 1.1x design pressure, subsequently leak tested, and proved tight at least at design pressure Equipment ID Manufacturer shall provide: manufacturer s name MAWP at specific temperature serial number year manufactured If incorporated pressure vessel is present, data shall be provided in accordance with UG section of ASME B&PVC, VIII, Div. 1 CHAPTER 12: PRESSURE VESSELS 12.1 General clause 12.2 Design Minimum Pressure: Section 5.5 Design, fabrication, inspection, testing (inside diameter [I.D.] > 6 ): ASME B&PVC, VIII, Div. 1 Ultimate Strength (I.D. < 6 ): Section Pressure Relief Connections I.D. > 6 and < 10 ft 3 : > ¾ piping or ½ coupling Volume > 10 ft 3 : > 1 piping or ¾ coupling Heads of pressure vessels shall be hot formed or stress relieved after cold forming (except when primarily containing oil) Vessel shall be designed and stamped with MDMT < lowest expected operating temperature When subject to external corrosion, must have > 1/16 corrosion allowance in addition to thickness required by ASME B&PVC, VIII, Div. 1 Risk Management Professionals 9

10 CHAPTER 12: PRESSURE VESSELS 12.3 Procedures/Testing: Shall be tested in accordance with ASME B&PVC, VIII, Div Equipment ID Manufacturer s name MAWP at specific temperature MDMT at specific pressure Serial number Year of manufacture Model number (where applicable) Stamp with MDMT that the equipment is operated in accordance with ASME B&PVC, VIII, Div Nameplate Mounting Comply with Section If insulated, mounting on an approved standoff is required or the insulation at the nameplate location shall be removable CHAPTER 12: PRESSURE VESSELS 12.6 Pressure Vessel Installation Considerations Access: Section Physical Protection: Section Support: Section 5.11 Service Provisions Testing Security Isolation Loading Seismic Vibration/ Movement Risk Management Professionals 10

11 CHAPTER 13: PIPING 13.1 Design, fabrication, examination, and testing shall comply with ASME B31.5, unless otherwise specified in this section 13.2 Pipe, Tubing, Fittings, and Flanges Material: ASME B31.5, except: ASTM A53-Type F pipe and cast iron or wrought iron pipe shall not be used for pressure-containing side of closedcircuit ammonia refrigeration systems Zinc, copper, and copper alloys shall not be used in contact with or for containment of ammonia (includes copper-containing anti-seize and/or lubricated compounds) Minimum Pipe Wall Thickness: Shall be based on the properties of selected pipe material, design working pressure, and comply with ASME B Tubing: Wall thickness shall be based on properties of selected material and the greater of the design working pressure or the requirement specified by the manufacturer of the compression ferrule used for the fitting connection CHAPTER 13: PIPING Pipe Fittings Butt weld fittings shall match pipe schedules All forged and cast steel socket weld and screwed fittings shall be minimum Class 3000 per ASME B16.11 Threaded joints shall not be used for refrigerant piping larger than 2 diameter Pipe Flanges When in accordance with ASME B16.5, flanges shall comply with ASME B31.5. Flange class shall be based on the design working pressure and maximum working temperature at the design working pressure. Gaskets shall be correctly dimensioned for the flange set in accordance with ASME B16.20 or B16.21 Risk Management Professionals 11

12 CHAPTER 13: PIPING 13.3 Refrigerant Valves & Strainers Required Shut-Off Valve Locations Shall be installed at each location: Inlet/outlet of positive-displacement-type compressor, compressor unit, or condensing unit Main feed inlets/outlets of individual refrigeration equipment loads Refrigerant inlet/outlet of pressure vessel containing liquid ammonia and having an internal gross volume > 3 ft 3 Exceptions Valves in Equipment and Safety Design Where a required orientation of a valve is provided by the manufacturer (vertical, horizontal, or rotational), the system design shall indicate the required orientation Where a valve is deliberately specified for use with an indicator opposite the direction of flow, the system design shall specify the intended installation direction Valve gasket materials shall be in accordance with manufacturer s specifications and the thickness specified CHAPTER 13: PIPING Pressure relief shall be provided where a check valve is installed upstream of other automatic valves Provision for liquid removal downstream of check valve shall be required. Hydrostatic protection: Section Valve groups shall accommodate ammonia removal to facilitate strainer maintenance Shut-off valves used to isolate equipment or devices from other portions of the system shall be capable of being locked out (by design or alternate method) Shut-off valves connecting ammonia-containing equipment or piping to the atmosphere shall be capped, plugged, blanketed, or locked closed during shipping, testing, operating, servicing, or standby when not in use Valves required for emergency shutdown shall be accessible and identified in accordance with Sections and ; other valves must comply with Section if located in the machinery room Risk Management Professionals 12

13 CHAPTER 13: PIPING 13.4 Piping, Hangers, Supports, and Isolation Piping hangers and supports shall carry the weight of the piping and any additional expected loads Refrigerant piping shall be isolated and supported to prevent damage from vibration, stress, corrosion, and physical impact Threaded hot-rolled steel hanger rods shall be permitted Anchors, their attachment points, and attachment methods shall be designed to support applied loads Mechanically expanded concrete anchor bodies shall not be adjusted or axially spun after being set For insulated piping, supports shall be designed or the insulation shall be selected to avoid damage to the insulation from compression CHAPTER 13: PIPING 13.5 Location of Refrigerant Piping Refrigerant piping crossing walkway areas in a building shall be > 7.25 above the floor (exception: when piping is placed against the ceiling of such space) Shall not obstruct a means of egress Shall not be placed in a shaft containing a moving object (e.g., elevator shaft, dumbwaiter shaft, etc.) Shall not be installed in a stair, landing, or means of egress that is enclosed or is accessible to the public Shall be permitted to be installed underground provided that the piping is protected from corrosion If installed in concrete floors, piping shall be encased in pipe duct Risk Management Professionals 13

14 CHAPTER 14: PACKAGED SYSTEMS AND EQUIPMENT 14.1 General Packages shall be permitted to be enclosed or unenclosed; Must comply with Section Shall be designed, constructed, and installed in accordance with Chapters 4 through 7, as applicable Shall be ventilated based on the intended operation; Emergency mechanical ventilation shall be provided where required by the following: Any packaged system in machinery room shall follow requirements for emergency ventilation in machinery rooms (Section 7.3.1) Any packaged system located indoors and outside machinery room (per Section 4.2.3, item 5) shall follow requirements in Section Any packaged system located outside that are designed for human occupancy shall follow Section Equipment and devices incorporated into packages systems shall comply with Chapters 8 through 17, as applicable CHAPTER 14: PACKAGED SYSTEMS AND EQUIPMENT 14.2 Design Structure shall be designed to support the operating weight of the included equipment Structure of the package shall be designed to withstand the stresses cause by shipping and rigging Temporary supports and bracing are permitted Rigging instructions must be provided to accommodate the installation of the structure Structure of the package shall be designed to withstand loads or stresses imposed on the package after installation and start-up Shall have valved pump-out connections to remove ammonia Shall be designed for use in both the lowest and highest expected ambient temperatures in which they will operate Risk Management Professionals 14

15 CHAPTER 14: PACKAGED SYSTEMS AND EQUIPMENT Access shall be provided for manually operated valves Isolation valves used for emergency shutdown procedures shall comply with Section Valve tagging shall comply with Section Pipes shall be marked in accordance with Section Equipment shall be labeled in accordance with Section Shall be equipment with lighting, or the area with refrigeration equipment shall be equipped with light fixtures delivering a minimum of 30 foot-candles (320 lumens/m 2 ) at the working level (36 above ground surface) Enclosed packages that require entrance for service, maintenance, inspection, or operation shall have lighting control located at entrances CHAPTER 14: PACKAGED SYSTEMS AND EQUIPMENT 14.3 Fabrication Equipment shall be set on the package in accordance with manufacturer s recommendations Equipment/piping shall be supported to withstand transporting and rigging; Temporary supports and bracing are permitted Stationary or temporary rigging points shall be provided as required to position the package Piping shall be pressure tested after fabrication, and leaks shall be repaired Electrical equipment and wiring shall be installed in accordance with the Electrical Code Gas fuel devices and equipment used with refrigeration systems in the package shall be installed in accordance with Mechanical Code. Risk Management Professionals 15

16 CHAPTER 14: PACKAGED SYSTEMS AND EQUIPMENT 14.4 Alarms and Detection Detection and alarms for packaged systems shall comply with the following: If located in machinery rooms, they shall be included as machinery room equipment and comply with Section 6.13 If located indoors and outside of the machinery room, they shall be provided with Level 2 detection and alarms in accordance with Section If located outdoors, not intended for human occupancy, they shall not require ammonia detection or alarms WHAT S NEXT? Chapter 15 Overpressure Protection Devices Chapter 16 Instrumentation and Controls Chapter 17 Ammonia Detection and Alarms Appendix Overview * This agenda may be changed based on information presented and time allotted for the next webinar. Risk Management Professionals 16

17 UPCOMING WEBINARS / CONFERENCES June 1, 2017 Webinar DHS CFATS Regulations and How to Prepare for an Audit presented by Nicholas Cabrena and Carine Black June 27, 2017 Webinar Using HAZOP/LOPA to Create an Effective Mechanical Integrity Program presented by Steven Maher, PE and David Childs Sept 26-29, 2017 RETA National Conference (Hershey, Pennsylvania) Sponsor and Exhibitor Oct 5, 2017 Webinar Solid & Powder Dispersion Modeling in Accordance with CalARP/RMP/PSM Regulations presented by Nicolas Cabrena Stephanie Smith, PE Sara Willman Stephanie.Smith@RMPCorp.com Sara.Willman@RMPCorp.com Risk Management Professionals, Inc. (949) (877) Risk Management Professionals 17

C. ASSE 1013 Performance Requirements for Reduced Pressure Principle Backflow Preventers.

C. ASSE 1013 Performance Requirements for Reduced Pressure Principle Backflow Preventers. PART 1: GENERAL 1.01 Purpose: A. This standard is intended to provide useful information to the Professional Service Provider (PSP) to establish a basis of design. The responsibility of the engineer is

More information

SECTION ROTARY SCREW WATER CHILLERS

SECTION ROTARY SCREW WATER CHILLERS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Specification Sections, apply to this Section. B. Related Sections:

More information

How are Industry Standards, Engineering Codes, Best Management Practices and Other Measures of Compliance Being Met by Facilities?

How are Industry Standards, Engineering Codes, Best Management Practices and Other Measures of Compliance Being Met by Facilities? How are Industry Standards, Engineering Codes, Best Management Practices and Other Measures of Compliance Being Met by Facilities? More on what we re seeing at inspections 1 RMP Facility Chemicals Ammonia

More information

PSM RMP CalARP Regulatory Framework Update & Implementation Strategies with Focus on Oil and Gas Facilities

PSM RMP CalARP Regulatory Framework Update & Implementation Strategies with Focus on Oil and Gas Facilities PSM RMP CalARP Regulatory Framework Update & Implementation Strategies with Focus on Oil and Gas Facilities John M. Johnson Risk Management Professionals U.S. (877) 532-0806 www.rmpcorp.com Risk Management

More information

SPECIFICATION FOR SPHERICAL VESSELS (PROJECT STANDARDS AND SPECIFICATIONS)

SPECIFICATION FOR SPHERICAL VESSELS (PROJECT STANDARDS AND SPECIFICATIONS) Page : 1 of 1 April 01 #03-1 Block Aronia, TABLE OF CONTENTS 1. GENERAL 1.1 Scope. DESIGN.1 Shell Design. Support Column Design.3 Opening Reinforcement. Nozzles and Manholes.5 Internals and Externals.

More information

Read Only Copy Not For Distribution. Chapter 17. Private Potable Water Supply Systems 17.1 GENERAL REGULATIONS 17.2 QUANTITY OF WATER REQUIRED

Read Only Copy Not For Distribution. Chapter 17. Private Potable Water Supply Systems 17.1 GENERAL REGULATIONS 17.2 QUANTITY OF WATER REQUIRED Chapter 17 Private Potable Water Supply Systems 17.1 GENERAL REGULATIONS 17.1.1 Applicability The regulations in this chapter apply to any private potable water supply system where plumbing fixtures are

More information

Design & Construction Standards, Revised January

Design & Construction Standards, Revised January PART 1: GENERAL 1.01 Purpose: A. This standard is intended to provide useful information to the Professional Service Provider (PSP) to establish a basis of design. The responsibility of the engineer is

More information

ASME B31.3 Process Piping. 19. What s Different in B31.1

ASME B31.3 Process Piping. 19. What s Different in B31.1 ASME B31.3 Process Piping Charles Becht IV, PhD, PE Don Frikken, PE Instructors BECHT ENGINEERING COMPANY, INC. What s Different in B31.1-1 19. What s Different in B31.1 Scope Organization of the Code

More information

5. AMCA 301 Method of Publishing Sound Ratings for Air Moving Devices. 6. AMCA 500 Test Methods for Louver, Dampers, and Shutters

5. AMCA 301 Method of Publishing Sound Ratings for Air Moving Devices. 6. AMCA 500 Test Methods for Louver, Dampers, and Shutters PART 1: GENERAL 1.01 Purpose: A. This standard is intended to provide useful information to the Professional Service Provider (PSP) to establish a basis of design. The responsibility of the engineer is

More information

B. System Design and Performance Requirements

B. System Design and Performance Requirements 15625 Water Chillers This document provides design standards only, and is not intended for use, in whole or in part, as a specification. Do not copy this information verbatim in specifications or in notes

More information

The Canadian Electrical Code (Saskatchewan Amendments) Regulations, 1999

The Canadian Electrical Code (Saskatchewan Amendments) Regulations, 1999 CANADIAN ELECTRICAL CODE 1 The Canadian Electrical Code (Saskatchewan Amendments) Regulations, 1999 Repealed by Chapter E-6.3 Reg 8 (effective June 24, 2003). Formerly Chapter E-6.3 Reg 6 (effective March

More information

Training Certification Categories

Training Certification Categories Training Certification Categories Residential Residential Building Inspector structures are free from hazardous structural conditions and comply with the UCC. Duties include inspection of footings and

More information

SECTION SEISMIC RESTRAINT REQUIREMENTS FOR NON-STRUCTURAL COMPONENTS REVISED PART 1 GENERAL 1.1 DESCRIPTION:

SECTION SEISMIC RESTRAINT REQUIREMENTS FOR NON-STRUCTURAL COMPONENTS REVISED PART 1 GENERAL 1.1 DESCRIPTION: SECTION 13 05 41 SEISMIC RESTRAINT REQUIREMENTS FOR NON-STRUCTURAL COMPONENTS REVISED 1-25-13 PART 1 GENERAL 1.1 DESCRIPTION: A. Provide seismic restraint in accordance with the requirements of this section

More information

SECTION CHAIN-LINK FENCES AND GATES 02821/1

SECTION CHAIN-LINK FENCES AND GATES 02821/1 SECTION 02821 - CHAIN-LINK FENCES AND GATES 02821/1 PART 1 - GENERAL 1.1 SUMMARY A. This Section includes the following: 1. Chain-Link Fences: 2. Gates: horizontal slide or swing. 3. Fences installed where

More information

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017 SECTION 22 1316 - SANITARY WASTE AND VENT PIPING PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01

More information

A Comparison: ASME B31.1 Power Piping versus ASME B31.3 Process Piping

A Comparison: ASME B31.1 Power Piping versus ASME B31.3 Process Piping A Comparison: ASME B31.1 Power Piping versus ASME B31.3 Process Piping Don Frikken, PE BECHT ENGINEERING COMPANY, INC. 1 Topics Discussed B31 History Scopes Organization of the Codes Bases for Allowable

More information

DESIGN GUIDELINES WIRING AND CONDUITS PAGE 1 of 7

DESIGN GUIDELINES WIRING AND CONDUITS PAGE 1 of 7 DESIGN GUIDELINES WIRING AND CONDUITS PAGE 1 of 7 1.1. REFERENCE STANDARDS 1.1.1. Publications listed below (including amendments, addenda, revisions, supplements and errata) form a part of this specification

More information

A. Pipe Supports: ANSI B 31.1, Power Piping. B. Automatic Sprinkler Pipe Supports: Refer to Section

A. Pipe Supports: ANSI B 31.1, Power Piping. B. Automatic Sprinkler Pipe Supports: Refer to Section SECTION 15140 SUPPORTS, ANCHORS, AND SEALS PART 1 - GENERAL 1.01 RELATED DOCUMENTS A. Drawings and general provisions of Contract including General and Supplementary Conditions, Division 1 Specification

More information

SECTION COOLING TOWER

SECTION COOLING TOWER PART 1 GENERAL 1.1 SECTION INCLUDES A. Mechanical induced draft Cooling Tower B. Controls C. Ladder and handrails 1.2 REFERENCES SECTION 23 65 00 COOLING TOWER A. ANSI/AFBMA 9 - Load Rating and Fatigue

More information

MASTERSPEC TECHNICAL SPECIFICATIONS DIVISION 22 PLUMBING

MASTERSPEC TECHNICAL SPECIFICATIONS DIVISION 22 PLUMBING SECTION 221316 - SANITARY WASTE AND VENT PIPING PART 1 - GENERAL 1.1 SUMMARY A. This Section includes the following soil and waste, sanitary drainage and vent piping inside the building: 1. Pipe, tube,

More information

Telecommunication Spaces

Telecommunication Spaces Telecommunication Spaces October 19, 2016 Page 1 Revision History Telecommunication Spaces Standard Effective Date Email Version Contact Phone OIT-TS strevena@csustan.edu 1.0 Stan Trevena 209.667.3137

More information

SECTION HANGERS AND SUPPORTS FOR PLUMBING PIPING AND EQUIPMENT

SECTION HANGERS AND SUPPORTS FOR PLUMBING PIPING AND EQUIPMENT SECTION 220529 - PART 1 - GENERAL 1.1 SUMMARY A. This Section includes the following: 1. Steel pipe hangers and supports. 2. Metal framing systems. 3. Thermal-hanger shield inserts. 4. Fastener systems.

More information

DIVISION MEDIUM VOLTAGE VAULT DESIGN Contents MEDIUM VOLTAGE VAULT DESIGN... 2 DIVISION LIST OF FIGURES...

DIVISION MEDIUM VOLTAGE VAULT DESIGN Contents MEDIUM VOLTAGE VAULT DESIGN... 2 DIVISION LIST OF FIGURES... DIVISION 13 00 60 - MEDIUM VOLTAGE VAULT DESIGN Contents 13 00 60 - MEDIUM VOLTAGE VAULT DESIGN... 2 DIVISION 13 00 60 LIST OF FIGURES... 6 13 00 60 - MEDIUM VOLTAGE VAULT DESIGN 1. General Requirements

More information

SECTION [ ] COILING COUNTER DOORS. Display hidden notes to specifier. (Don't know how? Click Here)

SECTION [ ] COILING COUNTER DOORS. Display hidden notes to specifier. (Don't know how? Click Here) SECTION 08332 [08 33 13] COILING COUNTER DOORS Display hidden notes to specifier. (Don't know how? Click Here) PART 1 GENERAL 1.1 SECTION INCLUDES A. Coiling Metal Counter Doors. B. Coiling Metal Counter

More information

SECTION HVAC INSULATION

SECTION HVAC INSULATION PART 1 GENERAL 1.1 SUMMARY SECTION 23 07 00 HVAC INSULATION A. Section Includes: 1. Ductwork insulation. 2. Duct liner. 3. Insulation jackets. 4. Equipment insulation 5. Piping system insulation. 6. Insulation

More information

SECTION ACOUSTICAL PANEL CEILINGS

SECTION ACOUSTICAL PANEL CEILINGS SECTION 095113 ACOUSTICAL PANEL CEILINGS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and General Provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification

More information

PRESTON HEALTH SERVICES ARCHITECT'S NO. 2700

PRESTON HEALTH SERVICES ARCHITECT'S NO. 2700 SECTION 09 5113 - ACOUSTICAL PANEL CEILINGS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification

More information

GENERAL CONTENTS SECTION I - NUCLEAR ISLAND COMPONENTS

GENERAL CONTENTS SECTION I - NUCLEAR ISLAND COMPONENTS - June 2013 Addendum GENERAL CONTENTS SECTION I - NUCLEAR ISLAND COMPONENTS SUBSECTION "A" : GENERAL RULES SUBSECTION "B" : CLASS 1 COMPONENTS SUBSECTION "C" : CLASS 2 COMPONENTS SUBSECTION "D" : CLASS

More information

SUGGESTED SPECIFICATIONS Pump Frames through 64132

SUGGESTED SPECIFICATIONS Pump Frames through 64132 TYPE HBB - HORIZONTAL SOLIDS-HANDLING WASTEWATER PUMPS Pump Frames 44081 through 64132 GENERAL Furnish and install Horizontal Flexible Coupled Dry Pit Pumping Units complete with all accessories and appurtenances

More information

SECTION SWIMMING POOLS STAINLESS, FULL TILE, OR TILE TRIM

SECTION SWIMMING POOLS STAINLESS, FULL TILE, OR TILE TRIM SECTION 13 1100 SWIMMING POOLS STAINLESS, FULL TILE, OR TILE TRIM This section includes editing notes to assist the user in editing the section to suit project requirements. These notes are included as

More information

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017 SECTION 26 0526 - GROUNDING AND BONDING FOR ELECTRICAL SYSTEMS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions

More information

SECTION PACKAGE BOOSTER PUMP STATIONS

SECTION PACKAGE BOOSTER PUMP STATIONS SECTION 331223 PACKAGE BOOSTER PUMP STATIONS Scope: The Contractor shall install a pump station at two locations to be determined by the Owner. These pump stations shall be designed to deliver flow to

More information

REV. 9/08. Mounting Structure PRE-INSTALLATION GUIDE for Ergon Skybooms

REV. 9/08. Mounting Structure PRE-INSTALLATION GUIDE for Ergon Skybooms REV. 9/08 Mounting Structure PRE-INSTALLATION GUIDE for Ergon Skybooms SKYTRON MOUNTING STRUCTURES for Ceiling Mounted Equipment Foreword Skytron s objective is to provide a program and guideline to assist

More information

Meeting of April 25 th, 2016 Tampa, FL

Meeting of April 25 th, 2016 Tampa, FL Date Distributed: April 11th, 2016 NATIONAL BOARD SUBGROUP FRP MINUTES Meeting of April 25 th, 2016 Tampa, FL These minutes are subject to approval and are for committee use only. They are not to be duplicated

More information

Series Sump and Sewage Systems

Series Sump and Sewage Systems Series 000 Sump and Sewage Systems file no: 0. date: may 17, 13 supersedes: 0. date: march 29, 13 Series 000 Sump Series 0 & 2 Armstrong offers a complete range of high performance, easily maintained Column

More information

VIII. Rules for Construction of Pressure Vessels. Division 1. ASME Boiler and Pressure Vessel Code AN INTERNATIONAL CODE

VIII. Rules for Construction of Pressure Vessels. Division 1. ASME Boiler and Pressure Vessel Code AN INTERNATIONAL CODE 2013 ASME Boiler and Pressure Vessel Code AN INTERNATIONAL CODE VIII Rules for Construction of Pressure Vessels Division 1 24. 2013 ASME FINAL Covers_VIII Div 1 Rules PV ALT MECH 5.17.indd 1 5/17/13 11:11

More information

Class III Pipes Fittings (Dy 500 mm)

Class III Pipes Fittings (Dy 500 mm) p pproval roramms for U rcos orasato Mutual coto (M)No. 2.9 STANDARD FOR CERTIFICATION Approval Programmes Type Approval Programmes for EU recognised organisation Mutual Recognition (MR) No. MR-P003 Class

More information

The following definitions apply with regard to requirements specified in this document:

The following definitions apply with regard to requirements specified in this document: GUIDELINES FOR INSTALLATION OF TEMPORARY AND PERMANENT ABOVEGROUND DIESEL FUEL TANKS FOR EMERGENCY AND STANDBY POWER SYSTEMS LOCATED OUTSIDE OF BUILDINGS For Use by Unidocs Member Agencies or where approved

More information

Approval Standard. for. Flammable and Combustible Liquid Storage Buildings

Approval Standard. for. Flammable and Combustible Liquid Storage Buildings Approval Standard for Flammable and Combustible Liquid Storage Buildings Class Number 6049 August 1991 (Effective Date: August 1, 1992) 2002 FM Global Technologies LLC. All rights reserved. Foreword FM

More information

EVALUATION REPORT. PFC-5551 Reissued April 1, Filing Category: DESIGN Steel (038)

EVALUATION REPORT. PFC-5551 Reissued April 1, Filing Category: DESIGN Steel (038) ICBO Evaluation Service, Inc. 5360 WORKMAN MILL ROAD WHITTIER, CALIFORNIA 90601-2299 A subsidiary corporation of the International Conference of Building Officials EVALUATION REPORT Copyright 2001 ICBO

More information

Copper and Copper Alloy Tube, Pipe and Fittings COPPER and COPPER ALLOY TUBE and PIPE Seamless Copper Pipe: Copper pipe is almost pure copper manufactured to the requirements of ASTM B 42 - Standard Specification

More information

SECTION SEISMIC CONTROL OSHPD

SECTION SEISMIC CONTROL OSHPD SECTION 01451 PART 1 - GENERAL 1.01 DESCRIPTION A. Provide all required seismic restraints and calculations in order to insure that the installation of all architectural, mechanical, and electrical equipment/components

More information

Subpart C Specifications for Pressure Tank Car Tanks (Classes DOT-105, 109, 112, 114 and 120)

Subpart C Specifications for Pressure Tank Car Tanks (Classes DOT-105, 109, 112, 114 and 120) Subpart C Specifications for Pressure Tank Car Tanks (Classes DOT-105, 109, 112, 114 and 120) 179.100 General specifications applicable to pressure tank car tanks. 179.100-1 Tanks built under these specifications

More information

READ ONLY. Adopting Agency BSC SFM. Adopt Entire Chapter Adopt Entire Chapter as amended (amended sections listed below)

READ ONLY. Adopting Agency BSC SFM. Adopt Entire Chapter Adopt Entire Chapter as amended (amended sections listed below) CALIFORNIA PLUMBING CODE MATRIX ADOPTION TABLE APPENDIX C - ALTERNATE PLUMBING SYSTEMS (Matrix Adoption Tables are non-regulatory, intended only as an aid to the user. See Chapter 1 for state agency authority

More information

Diffused Aeration Piping Equipment

Diffused Aeration Piping Equipment 1.0 General 1.1. The specifications in this section include all components of the Diffused Aeration System with the exception of the individual diffuser units. Refer to additional specification sections

More information

TCC/SHORE TRANSIT BUS MAINTENANCE FACILITY - PHASE II

TCC/SHORE TRANSIT BUS MAINTENANCE FACILITY - PHASE II SECTION 221313 - FACILITY SANITARY SEWERS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification

More information

SECTION HYDRONIC PIPING

SECTION HYDRONIC PIPING SECTION 23 21 13 HYDRONIC PIPING PART 1 - GENERAL 1.1 SUMMARY A. This Section includes pipe and fitting materials, joining methods, special-duty valves, and specialties for the following: 1. Hot-water

More information

Electric Service Standards

Electric Service Standards V: 1 of 6 A. Padmounted Requirements Complete requirements are contained in FPL specifications given to Customers for individual projects. Typical pad mounted transformer requirements include, but are

More information

Stainless Steel Aeration Equipment Specification

Stainless Steel Aeration Equipment Specification Section 15 Stainless Steel Aeration Equipment Specification Part 1 - General 1.01 Description A. Scope of Work 1. Furnish, install and test aeration system including air mains, drop pipes, valves, expansion

More information

ENBRIDGE GAS DISTRIBUTION METER BOX. Builders Installation Guidelines September 2011

ENBRIDGE GAS DISTRIBUTION METER BOX. Builders Installation Guidelines September 2011 ENBRIDGE GAS DISTRIBUTION METER BOX Builders Installation Guidelines September 2011 Meter Box Builder s Guildline for Installations Introduction These guidelines are provided to communicate to Builders,

More information

Daytona Beach Pier Building Renovation Jun 2010

Daytona Beach Pier Building Renovation Jun 2010 SECTION 15150 - SANITARY WASTE AND VENT PIPING PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification

More information

YARWAY HANCOCK CONTINUOUS BLOWDOWN GLOBE VALVE SERIES 5505

YARWAY HANCOCK CONTINUOUS BLOWDOWN GLOBE VALVE SERIES 5505 Advanced construction features of this high pressure drop angle globe valve provide quality and long service life. FEATURES GENERAL APPLICATION In addition to continuous blowdown service, the Yarway high

More information

SECTION PIPE AND TUBE RAILINGS PART 1- GENERAL 1.1 RELATED DOCUMENTS 1.2 SUMMARY 1.3 PERFORMANCE REQUIREMENTS

SECTION PIPE AND TUBE RAILINGS PART 1- GENERAL 1.1 RELATED DOCUMENTS 1.2 SUMMARY 1.3 PERFORMANCE REQUIREMENTS SECTION 055213- PIPE AND TUBE RAILINGS PART 1- GENERAL 1.1 RELATED DOCUMENTS Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification

More information

SECTION MOTORS AND PUMPS FOR PLUMBING SYSTEMS

SECTION MOTORS AND PUMPS FOR PLUMBING SYSTEMS PART 1 GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including the General and Supplementary Conditions and Specification Sections, apply to this Section. B. Related

More information

Cryogenic Pipe Support Systems

Cryogenic Pipe Support Systems Cryogenic Pipe Support Systems Overview Rilco cryogenic pipe supports are developed to support cold piping in various applications ranging from chilled water to liquefied natural gas. The qualified service

More information

NAVSEA STANDARD ITEM. 2.1 S9086-RJ-STM-010/CH-504, Pressure, Temperature and Other Mechanical and Electromechanical Measuring Instruments

NAVSEA STANDARD ITEM. 2.1 S9086-RJ-STM-010/CH-504, Pressure, Temperature and Other Mechanical and Electromechanical Measuring Instruments NAVSEA STANDARD ITEM ITEM NO: 009-52 DATE: 29 JUL 2011 CATEGORY: II 1. SCOPE: 1.1 Title: Relief Valve; repair 2. REFERENCES: 2.1 S9086-RJ-STM-010/CH-504, Pressure, Temperature and Other Mechanical and

More information

UNIFIED FACILITIES GUIDE SPECIFICATIONS

UNIFIED FACILITIES GUIDE SPECIFICATIONS USACE / NAVFAC / AFCEC / NASA UFGS-13 48 00.00 10 (October 2007) ---------------------------------- Preparing Activity: USACE Superseding UFGS-13 48 00.00 10 (April 2006) UNIFIED FACILITIES GUIDE SPECIFICATIONS

More information

Northpointe Renovation EPN #1701 F/A Project #17027 September 8, 2017

Northpointe Renovation EPN #1701 F/A Project #17027 September 8, 2017 SECTION 055213 - PIPE AND TUBE RAILINGS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification

More information

SPECIFICATIONS FOR THE INSTALLATION OF REDUCED PRESSURE BACKFLOW PREVENTERS AND CONCRETE VAULTS FOR METERS 4 AND LARGER

SPECIFICATIONS FOR THE INSTALLATION OF REDUCED PRESSURE BACKFLOW PREVENTERS AND CONCRETE VAULTS FOR METERS 4 AND LARGER SPECIFICATIONS FOR THE INSTALLATION OF REDUCED PRESSURE BACKFLOW PREVENTERS AND CONCRETE VAULTS FOR METERS 4 AND LARGER Updated January 2018 RP-2 Installation Specifications 1. In W.H.U.D s service area

More information

SECTION FIELD ERECTED INDUCED DRAFT COOLING TOWER

SECTION FIELD ERECTED INDUCED DRAFT COOLING TOWER PART 1 GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the contract including general and supplementary conditions and specifications section apply to this section. B. Related Sections:

More information

SECTION PLUMBING PIPING SYSTEMS

SECTION PLUMBING PIPING SYSTEMS SECTION 15300 PLUMBING PIPING SYSTEMS PART 1 - GENERAL 1.01 SPECIAL NOTICE A. Each contractor shall read all relevant documents, become familiar with the job, the scope of work, type of general construction,

More information

SECTION MECHANICAL SPECIFICATION GRIT COLLECTION EQUIPMENT

SECTION MECHANICAL SPECIFICATION GRIT COLLECTION EQUIPMENT SECTION 11322 MECHANICAL SPECIFICATION GRIT COLLECTION EQUIPMENT PART 1 GENERAL 1.01 SCOPE There shall be furnished ( ) Grit Separator Mechanism(s) suitable for installation in (a) concrete tank(s) -ft.

More information

SECTION VIBRATION CONTROLS FOR HVAC PIPING AND EQUIPMENT

SECTION VIBRATION CONTROLS FOR HVAC PIPING AND EQUIPMENT SECTION 230548 - PART 1 - GENERAL 1.1 SUMMARY A. This Section includes the following: 1. Elastomeric Isolation pads. 2. Elastomeric Isolation mounts. 3. [Freestanding] [Restrained] [Freestanding and restrained]

More information

PTFE BELLOWS POLY FLUORO LTD. POLY FLUORO LTD.260A. Bommasandra Industrial Area, Hosur Road, Bangalore TECHNICAL SPECIFICATION

PTFE BELLOWS POLY FLUORO LTD. POLY FLUORO LTD.260A. Bommasandra Industrial Area, Hosur Road, Bangalore TECHNICAL SPECIFICATION PTFE BELLOWS TECHNICAL SPECIFICATION 1. MATERIALS 1.1 PTFE Only virgin (not reprocessed) PTFE conforming to ASTM D 1457, type III, IV or V shall be used for the production of bellows; the PTFE raw material

More information

A-Series Aluminum Gantry Crane

A-Series Aluminum Gantry Crane SPANCO PRODUCT SPECIFICATIONS 1 A-Series Aluminum Gantry Crane This guide can be used to prepare a bid specification for the incorporation of an A-Series Gantry Crane into a competitive bid project or

More information

GENERAL REGULATIONS CHAPTER 3

GENERAL REGULATIONS CHAPTER 3 CHAPTER 3 GENERAL REGULATIONS SECTION 301 GENERAL 301.1 Scope. The provisions of this chapter shall govern the general regulations regarding the installation of plumbing not specific to other chapters.

More information

A LOOK INTO THE 2015 IECC RESIDENTIAL PROVISIONS. Presented by: Shaunna Mozingo, Colorado Code Consulting

A LOOK INTO THE 2015 IECC RESIDENTIAL PROVISIONS. Presented by: Shaunna Mozingo, Colorado Code Consulting A LOOK INTO THE 2015 IECC RESIDENTIAL PROVISIONS Presented by: Shaunna Mozingo, Colorado Code Consulting WHAT CAN WE EXPECT TO SEE? Some consensus on enough is enough for now - No real roll backs, no real

More information

Table of Contents. Page Title

Table of Contents. Page Title Page Title Table of Contents 1 Floor plan/ Room utilization 2 Elevation (EAST) 3 Elevation (SOUTH) 4 Elevation (WEST) 5 Elevation (NORTH) 6 Foundation plan details 7 Foundation cross sections A Main grade

More information

SECTION DRAINAGE AND VENT SYSTEMS CONSTRUCTION STANDARD

SECTION DRAINAGE AND VENT SYSTEMS CONSTRUCTION STANDARD PART 1: GENERAL 1.01 The design guidelines contained herein include the requirements for drainage and vent systems utilized at The University of Texas at Austin. It is the intention of this document to

More information

SECTION VIBRATION ISOLATION FOR PLUMBING PIPING AND EQUIPMENT

SECTION VIBRATION ISOLATION FOR PLUMBING PIPING AND EQUIPMENT SECTION 220550 - VIBRATION ISOLATION FOR PLUMBING PIPING AND EQUIPMENT PART 1 - GENERAL REQUIREMENTS 1.1 SUMMARY A. It is the intent of this specification to provide vibration isolation supports for Plumbing

More information

This product specification is written according to the Construction Specifications Institute MasterFormat, 2014 Update.

This product specification is written according to the Construction Specifications Institute MasterFormat, 2014 Update. Kaf-Tech Product Specification This product specification is written according to the Construction Specifications Institute MasterFormat, 2014 Update. SECTION 260519 METAL CLAD CABLE - MC-PLUS Neutral

More information

SECTION CRL50 AND CRL51 HEAVY GLASS TOP HUNG SLIDING DOOR SYSTEMS

SECTION CRL50 AND CRL51 HEAVY GLASS TOP HUNG SLIDING DOOR SYSTEMS SECTION 08 32 20 CRL50 AND CRL51 HEAVY GLASS TOP HUNG SLIDING DOOR SYSTEMS Page 1 of 6 USE THIS SECTION WHEN SPECIFYING OVERHEAD SUPPORTED GLASS PANEL PARTITIONS. SECTION INCLUDES OVERHEAD TRACK ASSEMBLY,

More information

SERVICE LINES, METERS AND APPURTENANCES

SERVICE LINES, METERS AND APPURTENANCES AUGUST02 SECTION 02646 SERVICE LINES, METERS AND APPURTENANCES PART 1 - GENERAL 1.1 DESCRIPTION A. This section concerns materials and installation of corporation stops, curb stops, service lines, meters,

More information

SECTION ENTRANCE FLOOR GRILLES STAINLESS STEEL GRATING

SECTION ENTRANCE FLOOR GRILLES STAINLESS STEEL GRATING 7160 Krick Rd., Walton Hills, OH 44146 800-321-3827 - Tel 440-439-8650 - Fax 440-439-6889 SECTION 12 48 16 ENTRANCE FLOOR GRILLES STAINLESS STEEL GRATING PART 1. GENERAL 1.01 SUMMARY: This section includes

More information

ANNEXURE G, PRESERVATION OF IDLE EQUIPMENT / MATERIALS.

ANNEXURE G, PRESERVATION OF IDLE EQUIPMENT / MATERIALS. ANNEXURE G, PRESERVATION OF IDLE EQUIPMENT / MATERIALS. Preservation of idle equipment installed in the plant involves safeguarding unattended and inactive equipment from deterioration during their down

More information

ECONOMIZER ECM. Turnkey Price Installed: $115,295

ECONOMIZER ECM. Turnkey Price Installed: $115,295 ECONOMIZER ECM Turnkey Price Installed: $115,295 PRICE INSTALLED PER INVESTMENT GRADE AUDIT. CALCULATED ANNUAL SAVINGS OF $29,027.51 WITH A SIMPLE PAYBACK OF 3.97 YEARS. (SEE ATTACHED SAVINGS CALCULATIONS)

More information

2003 International Residential Code ELECTRICAL PROVISIONS ONLY October 2005 EDITORIAL CHANGES SEVENTH PRINTING

2003 International Residential Code ELECTRICAL PROVISIONS ONLY October 2005 EDITORIAL CHANGES SEVENTH PRINTING 2003 International Residential Code ELECTRICAL PROVISIONS ONLY October 2005 EDITORIAL CHANGES SEVENTH PRINTING E3305.3: now reads The space equal to the width and depth of the panelboard and extending

More information

Magnetically Coupled Submerged Cryogenic Pumps and Expanders for Ammonia Applications

Magnetically Coupled Submerged Cryogenic Pumps and Expanders for Ammonia Applications Paper 4d Magnetically Coupled Submerged Cryogenic Pumps and Expanders for Ammonia Applications Liquefied Ammonia, or Liquid NH3, is (like LNG or liquefied natural gas) a cryogenic fluid and production

More information

PIP PNSC0011 Installation of ASME B31.3 Metallic Piping

PIP PNSC0011 Installation of ASME B31.3 Metallic Piping February 2015 Piping PIP PNSC0011 Installation of ASME B31.3 Metallic Piping PURPOSE AND USE OF PROCESS INDUSTRY PRACTICES In an effort to minimize the cost of process industry facilities, this Practice

More information

Tate Access Floors, Inc. ConCore 1250 Access Floor Panel Bolted Stringer Understructure System

Tate Access Floors, Inc. ConCore 1250 Access Floor Panel Bolted Stringer Understructure System Notice: Tate Access Floors, Inc. ConCore 1250 Access Floor Panel Bolted Stringer Understructure System If you are using MasterFormat 2004 Edition, the proper section number to use is Section 09 69 00,

More information

Smarter. Safer. Leaner.

Smarter. Safer. Leaner. Smarter. Safer. Leaner. Fast Installation and Removal Decrease Leading Edge Exposure by 87% OSHA Compliant Versatile and Reusable Use Perimeter Protection Posts During Construction: At Building Perimeter

More information

THE WORLD LOOKS UP TO COMPOSITE ELEVATED TANK

THE WORLD LOOKS UP TO COMPOSITE ELEVATED TANK THE WORLD LOOKS UP TO COMPOSITE ELEVATED TANK or our breadth of capability. Of all the storage tank manufacturers doing business today, no other offers Caldwell s range of capability. We are the only manufacturer

More information

BUSWAY LOW VOLTAGE (POW-R-WAY III) SECTION SECTION 16466

BUSWAY LOW VOLTAGE (POW-R-WAY III) SECTION SECTION 16466 BUSWAY LOW VOLTAGE (POW-R-WAY III) PART 1 GENERAL 1.01 1.02 SCOPE The Contractor shall furnish and install the busway system including all necessary fittings, hangers and accessories as specified herein

More information

REQUIREMENTS FOR INDOOR INSTALLATION OF PADMOUNTED TRANSFORMERS

REQUIREMENTS FOR INDOOR INSTALLATION OF PADMOUNTED TRANSFORMERS REQUIREMENTS FOR INDOOR INSTALLATION OF PADMOUNTED TRANSFORMERS Introduction An applicant applying for permanent electric service who opts to have the padmounted transformers installed inside his building

More information

TYPICAL INSTALLATION INSTRUCTIONS

TYPICAL INSTALLATION INSTRUCTIONS TYPICAL INSTALLATION INSTRUCTIONS Environment One Grinder Pump Feature Identification 1. Grinder Pump Basin High density polyethylene (HDPE) 2. Accessway Cover Painted Steel 3. Electrical Quick Disconnect

More information

HVAC INSULATION. A. General Requirements for Flexible Elastomeric Insulation: 3. Use pre-molded roll on pipe sizes 3.5" and below.

HVAC INSULATION. A. General Requirements for Flexible Elastomeric Insulation: 3. Use pre-molded roll on pipe sizes 3.5 and below. 230700 HVAC INSULATION PART 1: GENERAL 1.01 RELATED SECTIONS A. Section 232300 Refrigeration B. Section 233100 Air Distribution 1.02 INSULATION A. General Requirements for Flexible Insulation: 1. Use is

More information

(Notices) NOTICES FROM EUROPEAN UNION INSTITUTIONS, BODIES, OFFICES AND AGENCIES EUROPEAN COMMISSION

(Notices) NOTICES FROM EUROPEAN UNION INSTITUTIONS, BODIES, OFFICES AND AGENCIES EUROPEAN COMMISSION 17.11.2017 EN Official Journal of the European Union C 389/1 IV (Notices) NOTICES FROM EUROPEAN UNION INSTITUTIONS, BODIES, OFFICES AND AGENCIES EUROPEAN COMMISSION Commission communication in the framework

More information

B. Provide liquid-filled secondary substation transformers as indicated on drawings.

B. Provide liquid-filled secondary substation transformers as indicated on drawings. SECTION 26 12 13 PART 1 - GENERAL 1.01 WORK INCLUDED A. Comply with the provisions of Sections 26 05 00. B. Provide liquid-filled secondary substation transformers as indicated on drawings. 1.02 RELATED

More information

Pipe Stress Analysis Where Do I Start?

Pipe Stress Analysis Where Do I Start? Pipe Stress Analysis Where Do I Start? This is a step-by-step logic guideline for the data collection effort that should occur prior to beginning to model a piping system for a stress analysis: TRIFLEX

More information

Materials Carbon Steel and Malleable Iron are used in the manufacture of concrete inserts. Stainless Steel and other materials are available.

Materials Carbon Steel and Malleable Iron are used in the manufacture of concrete inserts. Stainless Steel and other materials are available. Concrete inserts offered in this section are designed to provide a pre-set support point in concrete ceilings, walls, and floors. A range of inserts with varying design loads are available. Materials Carbon

More information

A. Access doors and frames are part of an access door and frame allowance.

A. Access doors and frames are part of an access door and frame allowance. SECTION 08 31 13 ACCESS DOORS AND FRAMES PART 1 GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification

More information

A. Product Data shall be provided for each type of product indicated.

A. Product Data shall be provided for each type of product indicated. 32 31 13 CHAIN LINK FENCES AND GATES SECTION 1 GENERAL 1.1 SUMMARY This Section includes the following: 1. Chain Link Fences 2. Gates for Chain Link Fences. See electrical specifications for electrical

More information

2004 NBIC Interpretations

2004 NBIC Interpretations 2004 NBIC Interpretations INTERPRETATION 04-23 Subject: Part RC 1110, RC-2050(c), RC-3030(c), RC-3031(e) Question 1: Does RC-1110 specifically require acceptance of the jurisdiction for alternative NDE

More information

PIP PCEPA003 Process Analyzer System Field Installation Guidelines

PIP PCEPA003 Process Analyzer System Field Installation Guidelines January 2016 Process Control PIP PCEPA003 Process Analyzer System Field Installation Guidelines PURPOSE AND USE OF PROCESS INDUSTRY PRACTICES In an effort to minimize the cost of process industry facilities,

More information

American Metal Specialties, Inc.

American Metal Specialties, Inc. American Metal Specialties, Inc. www.cablerailings.com (253) 272-9344 (253) 627-3843 Fax PART 1 GENERAL 1.1 SECTION INCLUDES SECTION 05 73 00 STAINLESS STEEL ORNAMENTAL HANDRAILS AND RAILINGS For best

More information

RB WEIR GATES MODEL GENERAL DESCRIPTION DESIGN CONSTRUCTION

RB WEIR GATES MODEL GENERAL DESCRIPTION DESIGN CONSTRUCTION GENERAL DESCRIPTION The Orbinox model RB Weir Gate is designed for downward opening applications where a more accurate flow control is required. The water flows over the top of the slide permitting a constant

More information

SECTION LAGUNA SERIES TOP HUNG SLIDING DOOR SYSTEM

SECTION LAGUNA SERIES TOP HUNG SLIDING DOOR SYSTEM Page 1 of 6 SECTION 08 32 20 LAGUNA SERIES TOP HUNG SLIDING DOOR SYSTEM USE THIS SECTION WHEN SPECIFYING OVERHEAD SUPPORTED GLASS SLIDING DOORS. SECTION INCLUDES OVERHEAD SLIDING TUBE ASSEMBLY, MOUNTING

More information

HIGH DENSITY CROSSLINKED POLYETHYLENE STORAGE TANKS WITH OXIDATION RESISTANT LINING SYSTEM (NSF/ANSI 61)

HIGH DENSITY CROSSLINKED POLYETHYLENE STORAGE TANKS WITH OXIDATION RESISTANT LINING SYSTEM (NSF/ANSI 61) PART 1-GENERAL INTEGRALLY MOLDED FLANGED OUTLET (IMFO ) - COMPLETE DRAIN HIGH DENSITY CROSSLINKED POLYETHYLENE STORAGE TANKS WITH OXIDATION RESISTANT LINING SYSTEM (NSF/ANSI 61) 1.01 Requirements 1. The

More information

This guide can be used to prepare a specification for incorporating free standing jib cranes into a competitively bid construction project.

This guide can be used to prepare a specification for incorporating free standing jib cranes into a competitively bid construction project. SECTION 14651 FREE STANDING JIB CRANE ***** Gorbel, Inc. manufacturers a broad range of material handling cranes including monorail, bridge, gantry, and jib cranes. Numerous work station and industrial

More information