1 Guidance on Ground gases, VOC s & Radon. Validation &Verification. By: Peter Atchison

2 Permanent Gas and VOC definitions Permanent Gas Element or compound that is a gas at all ambient temperatures likely to be encountered on the surface of the earth except Radon! Volatile Organic Compound a) organic compound that is volatile under normal environmental/atmospheric conditions, although it can be found in the ground in the solid, liquid and dissolved phase form as well as in gaseous phase. (from CIRIA Report 682) b) organic compound which is liquid at 20 C and which generally has a boiling point below 180 C (after ISO CD 11074:2011)

3 The Ground Gas Hierarchy Bulk gases: Methane, Carbon Dioxide NHBC - Guidance on evaluation of development proposals on sites where methane and carbon Dioxide are present Report No RO1 (04) January 2007 CIRIA - C665 Assessing Risks posed by hazardous ground gases to buildings 2007 BS8485 Code of Practice for the characterisation and remediation from ground gas in affected developments Dec 2007 BS 8576 Guidance on investigations for ground gas Permanent gases and Volatile Organic Compounds (VOCs) VOC/s CIRIA C716 RADON BRE s and overdue updating Missed out of the Building regulations revision last year - Is Radon treated as a second rate risk?

4 BS 8576: 2013 Guidance on investigations for ground gas Permanent gases and Volatile Organic Compounds (VOCs) In final draft now Links together key recent documents into a full British Standard Monitoring and sampling of ground gases Does not cover Radon

5 Preliminary Investigation Desk study and site reconnaissance (site walkover) in line with BS and establishes the site investigations to follow based on the objectives set For sites in which migration of permanent ground gases is to be investigated, a conceptual model cross section should be included.

6 CIRIA C716 Remediating VOC Risks Lead authors Arcadis Funders included: PAG & GGS Covers: Petroleum hydrocarbons Halogenated hydrocarbons N, S & O containing organic compounds CIRIA C

7 CIRIA C716 The guidance leads the reader through the three stages of remediation risk mitigation as outlined by DEFRA and the Environment Agency of England and Wales (2004) namely : 1 Development of the remediation strategy 2 Design and implementation of the remediation strategy 3 verification of the remediation strategy (including long term monitoring and maintenance)

8 Mechanism of Harm Ground gas seeps into enclosed spaces (e.g. Buildings), and collects. Basements are particularly susceptible to large accumulations (as greater area in contact with soil) High concentrations can build up, depending on local geology, atmospheric conditions & ventilation Methane explosive risk if concentrations between 5% and 16% (Acute risk!) Carbon Dioxide asphyxiates in excess concentrations; health affecting at lower concentrations (chronic acute) VOC s Mainly a odour nuisance but deleterious to health at high concentrations or long term exposure.(generally chronic risk) Radon - when inhaled, these irradiate the lungs and increase risk of developing lung cancer. Radon (Chronic Risk) and difficult to consider in isolation from other causes

9 Concentration of gases in the atmosphere (excluding water vapour) Gas Percentage by volume Nitrogen Oxygen Argon 0.93 Carbon dioxide Neon Helium Krypton Hydrogen Xenon Radon <

10 What is RADON? A naturally occurring element A radioactive gas Colourless & odourless Comes from radioactive decay of Radium Radium comes from radioactive decay of uranium

11 RADON Levels Average UK background radon concentration outside is 4 Bq m -3 Outside, radon gas dissipates harmlessly Average level inside UK homes is c20 Bq m - 3 For levels below 100 Bq m -3, individual risk remains relatively low However, risk increases as the radon level increases

12 Radon deaths compared to other causes of UK premature deaths per year

13 Radon Exposure Risks

14 Things to Remember! Type of Protection Membrane choice Detailing / Design Installation / Installation / Installation Validation Protection is only as good as its weakest part. Right First time saves cost!

15 Validation & Verification New document not yet published Approaching final draft stage Likely to be published in 6 months time!!!!! Aimed at clients and engineers / specifiers in order to assist them in setting appropriate levels of validation according to what system has been used and by whom installed. Uses all state of the art validation techniques from visual inspection to integrity testing

16 Validation and Verification Presumptions: ALL installations should be subject to some form of validation Validation should be proportionate to the risks from the site AND the experience of the installation operatives Validation should be conducted by suitably qualified INDEPENDENT practitioners. In the event of appropriate self validation this should be AUDITED by a suitably qualified independent auditor

17 Validation & Verification Table A (Low Rise Housing Only) Gas regime/ Risk Type of Slab Installer Experience Suggested Levels of Verification & Integrity Testing All Slabs General builder/groundworker/ landfill operative [No relevant qualification 1 ] Basic & Full Radon Protection Area, CS2* (with venting**) CS2* (no venting) or CS3* (with venting**) VOC & Hydrocarbons CS3* (no venting) or CS4* (with venting**) Qualified 1 and experienced installer (Minimum 1 operative to hold qualification) General builder/groundworker/ landfill operative [No relevant qualification 1 ] Qualified 1 and experienced installer (Minimum 1 operative to hold qualification) Qualified 1 and experienced installer (ALL operatives to hold qualification) Independent Consultant 4 to conduct a thorough visual inspection of the first plot, including vented void, subgrade, & membrane and after placement of floor reinforcement if no protection layer provided. On successful completion of the first plot independent validation inspections to be carried out at a frequency of around 1 in 10 plots. Contractor to supply plot sign off sheets including photographs to validation consultant for all other plots Consideration given to the need for and scope of integrity testing in the event of continuing concerns identified by visual inspections 3 Independent Consultant 4 to conduct a thorough visual inspection of the first plot, including vented void, subgrade, & membrane and after placement of floor reinforcement if no protection layer provided. On successful completion of the first plot independent validation inspections to be carried out at a frequency of around 1 in 20 plots. Contractor to supply plot sign off sheets including photographs to validation consultant for all other plots Consideration given to the need for and scope of integrity testing in the event of continuing concerns identified by visual inspections 3 Independent Consultant 4 to Inspect first 10 plots including vented void, subgrade, & membrane and after placement of floor reinforcement if no protection layer provided, furthermore all joints, pipe penetrations, corners etc. should be air lanced to ASTM D On successful completion of the first 10 plots independent validation inspections including air lancing to be carried out at a frequency of around 1 in 20 plots Contractor to supply plot sign off sheets including photographs to validation consultant for all other plots Consideration given to the need for and scope of integrity testing (e.g. initially on 30-50% of plots then falling to 0-10% of plots if first tranche gives acceptable results and no concerns raised by visual inspections). Independent Consultant 4 to Inspect first 5 plots including vented void, subgrade, & membrane and after placement of floor reinforcement if no protection layer provided, furthermore all joints, pipe penetrations, corners etc. should be air lanced to ASTM D On successful completion of the first 10 plots independent validation inspections including air lancing to be carried out at a frequency of around 1 in 20 plots. Contractor to supply plot sign off sheets including photographs to validation consultant for all other plots Consideration given to the need for and scope of integrity testing (e.g. initially on 10-25% of plots then falling to 0-5% of plots if first tranche gives acceptable results and no concerns raised by visual inspections) 3. Independent Consultant 4 to Inspect all plots, including vented void, subgrade, membrane and after placement of floor reinforcement if no protection layer provided, furthermore all joints, pipe penetrations, corners etc. should be air lanced to ASTM D % Leak Detection should also be considered. Consideration given to the need for and scope of integrity testing (e.g. initially on 30-50% of plots then falling to 0-10% of plots if first tranche gives acceptable results and no concerns raised by visual inspections) 3. Notes 1) Relevant qualification is NVG Level 2 Qualification in Gas Protection Installation [see report text] 2) Prior to Commencement of works the contractor should produce a detailed installation plan including: method statement, CQA procedures and qualifications, on receipt of these the validation protocol could be increased or reduced. 3) Consideration should be given to carrying out integrity testing/ leak detection (i.e. smoke, tracer gas or dielectric testing) on the above basis and/ or if an unacceptable amount of damage/ loss of integrity is found during visual inspections. In this instance the consultant should discuss with the relevant personnel, strategies to prevent this recurring. This could include changing material, improving subgrade preparation, putting up warning signs to reduce the amount of trafficking etc. 4) Independent Consultants should be appropriately trained and experienced. An example of relevant training could be a certificate of attendance for the C. Skills Installation of Gas Membrane Sector Apprenticeship and Up-Skilling Course (or equivalent), which includes inspection and integrity testing as part of its syllabus. Appropriately experienced could be say 3 years of building surveying, engineering or site supervision/ inspection experience. Less experienced staff should be accompanied by appropriately experienced staff at least for the initial visits. Inspections. A statement detailing the required qualifications and experience should be included in the Verification Plan. 5) Air Lancing is the only integrity test that has an independently recognized international standard that is suitable for testing taped and welded seams and should be used at the frequency suggested in the table. 6) This table should be used for guidance and is not intended to be used in lieu of sound professional judgment. * Gas regime defined by Characteristic Situation as set out in CIRIA C665 (and all other recent good practice guidance and British Standards) ** Assumes Venting designed to keep steady state concentration of CH4 below 1% in void, sites designed with higher levels of gas in the void should adjust the frequency of inspection and testing as deemed necessary.

18 Quality is never an accident; it is always the result of high intention, sincere effort, intelligent direction and skilful execution; it represents the wise choice of many alternatives. William A. Foster

19 The three most important elements of membrane efficiency INSTALLATION INSTALLATION INSTALLATION

20 How to do it well!

21 And How not to!

22 The good!

23 The bad!

24 And The Ugly!

25 Attention to detail

26 Ventilation & ancilliary products Void former Made from cuspated High Density Polyethylene (HDPE). High strength and crush resistance. Available as fully wrapped or single-sided geotextile. Cross linked butyl sealant Suitable for joining polyethylene membranes. Very low gas transmission.

27 Improving standards Construction Skills National Occupational Standards (NOS) Gap identified in the National Qualification Framework (NQF) Gas membrane installation for domestic and industrial/commercial buildings Existing standards for installing geomembranes NOSs should reflect current occupational practice Mandatory Core Standards

28 NVQ/SVQ Structure MANDATORY UNITS Unit No. VR 01 Conform to General Workplace Safety Unit No. VR 02 Conform to Efficient Work Practices Unit No. VR 03 Move and handle resources Unit No. GM 01 Prepare to install venting media and gas membranes Unit No. GM 02 Install venting media and gas membranes

29 Sealing Techniques

30 Validation / Verification Increasingly being specified as part of a well designed solution May consist of a variety of or combination of practices and should be specified appropriately according to risk There is no One off Validation! May consist of: Check for compliance with specification (Including materials, qualifications of installation operatives and position of components.) Visual inspection of work Close physical inspection of work including pick testing Seam and seal testing using test equipment Full installation integrity testing using gas, smoke or dielectric testing techniques. CIRIA Project currently under way to offer guidance due published 2013

31 Always confirm expectations pre-construction Combination of protection elements DPM or proprietary gas resistant membrane Detailing in line with current good practice Self installation or specialist sub contractor Third party validation or Detailed report with photographs Integrity testing Certificate of integrity

32 NHBC guidance: Amber 1 & Amber 2 Checklist Is there sufficient provision for ventilation? Is there a clear path to atmosphere? Is the membrane appropriate? Is the contractor competent to self install for Amber 1? Have repairs been carried out (correctly)? Is visual inspection adequate? Has the contractor employed a specialist for Amber 2 Is a certificated Integrity Test required?

33 Gas membrane installation: Concrete prep on Full Line Out

34 Gas membrane installation: 3-D detailing

35 External corner with level change

36 Internal corner

37 Wind posts & penetrations

38 Changes in level

39 Validation Report types Often based on LCC pro forma Must contain confirmed details of Project particulars & materials used. Should contain photographic records Should be completed by a competent person May involve validation via integrity testing Typically in report format 4-10 pages typical. Should be plot and visit specific (You can only validate what you have seen!)

40 Examples of Report format

41 Report extract 1

42 Report extract 2

43 Validation & Verification Validation and verification is the single most important aspect of barrier installation and has been implied for many years. Only with the development of this document will designers, clients, practitioners and the like be able to substantiate the presumptions of the past 20 years. NOS s VR 612 and 613 describe the process NVQ level 2 qualification in gas membrane installation has been developed and offered by NSAC Up-skilling course for installation operatives available via the British Geomembrane Association

44 How it shouldn t be done: Pipe entry missed

45 How it shouldn t be done: End lap not sealed

46 How it shouldn t be done: Both together

47 How it shouldn t be done: Lack of detailing awareness

48 How it shouldn t be done: Run out of gas membrane?

49 Integrity testing Is a TOOL of validation Whilst IT may be considered the ultimate verification. It should be used appropriately. There are a number of different methods currently available. Each are appropriate for certain sites Further information will be included in CIRIA guidance on validation and verification Due 2013

50 Integrity testing

51 Set up

52 Introduce tracer gas

53 Scan and repair

54 In conclusion Much has been accomplished over the last 10 years Much is still to be done Quality design relies on quality data. Good quality materials need good quality workmanship to perform Standards exist and can be applied Validation and verification form part of a quality design So could you be a validator..?

55 Spot The difference!

56 Thank You And remember.. Be a yardstick of quality. Some people aren't used to an environment where excellence is expected. Steve Jobs ( )

57 Thank you Peter Atchison

Understanding Gas Protection Measure Selection within Waterproofing Systems. John Naylor Technical Director

Understanding Gas Protection Measure Selection within Waterproofing Systems. John Naylor Technical Director Understanding Gas Protection Measure Selection within Waterproofing Systems John Naylor Technical Director The Main Hazardous Gases H 2 S CO CH 4 H 2 N 2 Rn CO 2 VOCs Sources of UK ground-gas Natural Bedrock

More information

Ground Gas Developments. Emerging Guidance. SILC Annual Forum, April 30, 2013

Ground Gas Developments. Emerging Guidance. SILC Annual Forum, April 30, 2013 Ground Gas Developments Emerging Guidance SILC Annual Forum, April 30, 2013 Contents Context of Existing Key Guidance Documents CIRIA Research Report Testing and Verification of Protection Systems for

More information

Visqueen Ultimate HC BLOK

Visqueen Ultimate HC BLOK Technical Product Datasheet Edition: 26/10/2017 Identification no. VBP010 Visqueen Ultimate HC BLOK The ultimate Methane & VOCs vapour barrier Conforms to CIRIA C748 and BS8485:2015 Excellent VOC (vapour)

More information

Glidevale offers a complete range

Glidevale offers a complete range CI/SfB (13.9) Uniclass Ss_32_20_30_48 November 2017 Glidevale offers a complete range of protection for ground floors against both damp and gases from the ground. This double function avoids the need for

More information

Regulations Detail Sheet 1

Regulations Detail Sheet 1 Electronic Copy Monarflex Geomembranes Ltd Lyon Way St Albans Herts AL4 0LB Tel: 01727 830116 Fax: 01727 858998 CI/SfB (21) Ln9 Agrément Certificate No 00/3668 Designated by Government to issue European

More information

Agrément Certificate 12/4912 website: Product Sheet 2 JUTA GAS-RESISTANT MEMBRANE JUTA GP2 GAS BARRIER

Agrément Certificate   12/4912 website:  Product Sheet 2 JUTA GAS-RESISTANT MEMBRANE JUTA GP2 GAS BARRIER Juta a.s. Dukelska 417 544 15 Dvur Kralove n.l Czech Republic Tel: 00 42 0499 314211 Fax: 00 42 0499 314210 Agrément Certificate e-mail: juta@juta.cz 12/4912 website: www.juta.cz Product Sheet 2 This Agrément

More information

Agrément Certificate 13/5069 website: Product Sheet 1

Agrément Certificate   13/5069 website:  Product Sheet 1 British Polythene Limited t/a Visqueen Building Products Heanor Gate Derbyshire DE75 7RG Tel: 0333 202 6800 Fax: 0333 202 6886 Page 1 of 9 Agrément Certificate e-mail: enquiries@visqueenbuilding.co.uk

More information

EPA S 2015 vapor intrusion guides What do they mean for your facility?

EPA S 2015 vapor intrusion guides What do they mean for your facility? Environmental law alert Nixon peabody LLP July 22, 2015 EPA S 2015 vapor intrusion guides What do they mean for your facility? By J. Timothy Ramsey and Jean McCreary The United States Environmental Protection

More information

GAS PROTECTION GAS BARRIER SYSTEM 17 CO2 PROTECTION SYSTEM 25

GAS PROTECTION GAS BARRIER SYSTEM 17 CO2 PROTECTION SYSTEM 25 GAS BARRIER SYSTEM 17 CO2 PROTECTION SYSTEM 25 Complete protection against methane and carbon dioxide Why the need for a protective Gas Barrier combined with Damp Proof Membrane? The Building Regulations

More information

26 Visqueen 100% Recycled Ecomembrane 28 Visqueen DPM To Pifa Standard PROOF. membranes

26 Visqueen 100% Recycled Ecomembrane 28 Visqueen DPM To Pifa Standard PROOF. membranes 26 Visqueen 100% Recycled Ecomembrane 28 Visqueen DPM To Pifa Standard DAMP PROOF membranes Visqueen Ecomembrane is a BRE certified DPM manufactured from 100% recycled polythene. This ensures valuable

More information

Chapter 2: Foundation

Chapter 2: Foundation Chapter 2: Foundation Crawlspace [V502.1.2] [V502.1.2] [V502.1.3] Vents. Vents in the crawlspace help keep floor insulation and floor framing dry. Crawlspace vents also reduce the potential for radon buildup

More information

E. Section Polymer Modified Cement Waterproofing. K. Section Sub drainage: Foundation perimeter drainage.

E. Section Polymer Modified Cement Waterproofing. K. Section Sub drainage: Foundation perimeter drainage. DELTA -DRAIN Section 07 10 00 Dampproofing and Waterproofing PART 1 GENERAL 1.1 SECTION INCLUDES A. Below grade drainage sheets. B. Plaza deck and planter drainage sheets. 1.2 RELATED SECTIONS A. Section

More information

Florida Energy Extension Service

Florida Energy Extension Service Florida Energy Extension Service Radon: The Gas, Threat, Detection, and Control 1 Gary D. Cook 2 THE GAS Radon is a potentially dangerous radioactive gas occurring naturally in the environment. It is one

More information

Ambient Air Quality Monitoring Baseline Report, Kirby Misperton A Wellsite, KM8 Production Well

Ambient Air Quality Monitoring Baseline Report, Kirby Misperton A Wellsite, KM8 Production Well Ambient Air Quality Monitoring Baseline Report, Kirby Misperton A Wellsite, KM8 Production Well. Prepared for: Third Energy UK Gas Ltd. Document Control Page Client Third Energy UK Gas Ltd. Document Title

More information

Distribution Restriction Statement

Distribution Restriction Statement DEPARTMENT OF THE ARMY U.S. Army Corps of Engineers CEMP-ET Washington, DC 20314-1000 ETL 1110-3-438 Technical Letter No. 1110-3-438 15 September 1993 Engineering and Design INDOOR RADON PREVENTION AND

More information

RIW SHEETSEAL GR BENEFITS APPLICATIONS APPLIED TO

RIW SHEETSEAL GR BENEFITS APPLICATIONS APPLIED TO CI/SfB TN6 LI4143 August 2017 RIW SHEETSEAL GR is a cold applied, high density polyethylene film bonded to aluminium foil and coated with a bitumen/rubber self adhesive layer with a removable reinforced

More information

Methane concentrations are measured using portable gas detection instruments, usually a methane meter or explosimeter which has a readout in either

Methane concentrations are measured using portable gas detection instruments, usually a methane meter or explosimeter which has a readout in either Methane gas produced by decomposing solid wastes can become an explosion hazard (see Section 6A - Solid Waste Decomposition). Methane monitoring is required at every Wyoming sanitary landfill to ensure

More information

VISQUEEN RADON MEMBRANE SYSTEM

VISQUEEN RADON MEMBRANE SYSTEM VISQUEEN RADON MEMBRANE SYSTEM TECHNICAL DATA & INSTALLATION GUIDELINES CONTENTS 1.0 Visqueen Radon Membrane System 1.1 Introduction 1.2 Product Description 2.0 Installation Procedures 3.0 Storage & Handling

More information

SECTION COLD APPLIED RUBBER MODIFIED ASPHALT WATERPROOFING

SECTION COLD APPLIED RUBBER MODIFIED ASPHALT WATERPROOFING P.O. Box 599 - Mars, PA 16046 800-321-3337 SECTION 07555 COLD APPLIED RUBBER MODIFIED ASPHALT WATERPROOFING PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including

More information

Development of Potentially Contaminated Land Guidance Note for Developers, Agents and Consultants

Development of Potentially Contaminated Land Guidance Note for Developers, Agents and Consultants Development of Potentially Contaminated Land Guidance Note for Developers, Agents and Consultants and Consultants Helping you get it right CONTENTS Page No 1.0 INTRODUCTION 2 2.0 WHAT IS CONTAMINATED LAND

More information

Radon in Ireland and the New National Radon Strategy

Radon in Ireland and the New National Radon Strategy Radon in Ireland and the New National Radon Strategy Radon Protection Conference Dresden, 2-12-2013 Eamonn Smyth Building Standards Section Dept. of Environment, Ireland Presentation Overview 1. Background

More information

VIRIDOR WASTE MANAGEMENT LIMITED. Lostock Waste Treatment Plant. Airborne Pollutant Management Plan. November 2009

VIRIDOR WASTE MANAGEMENT LIMITED. Lostock Waste Treatment Plant. Airborne Pollutant Management Plan. November 2009 VIRIDOR WASTE MANAGEMENT LIMITED Lostock Waste Treatment Plant CONTENTS 1 Introduction... 1 2 Sources, releases and impacts... 2 3 Airborne Pollutant Control Measures... 3 3.1 General... 3 3.2 Site Management

More information

EXPANDED POLYSTYRENE (EPS GEOFOAM) EMBANKMENT DIVISION 31 EARTHWORK

EXPANDED POLYSTYRENE (EPS GEOFOAM) EMBANKMENT DIVISION 31 EARTHWORK (Specifier Note: The purpose of this guide specification is to assist the specifier in correctly specifying AMVIC GEOFOAM products and execution. The specifier needs to edit the guide specifications to

More information

Copyright 2007 Essex Contaminated Land Consortium All rights reserved. December 2007 v2

Copyright 2007 Essex Contaminated Land Consortium All rights reserved. December 2007 v2 Copyright 2007 Essex Contaminated Land Consortium All rights reserved December 2007 v2 CONTENTS 1. Introduction 5 2. Site Characterisation & Risk Assessment 6 Phase 1 Desktop Study 6 Phase 2 Intrusive

More information

Material Safety Data Sheet

Material Safety Data Sheet EMERGENCY NUMBERS: Sealed Air Corporation (502) 380-4333 Material Safety Data Sheet Page: 1 of 5 For emergency and general information 8:30am - 5:00pm (Eastern Time), Monday - Friday CHEMTREC (800) 424-9300

More information

Soil Treatment Facility Design and Operation for Bioremediation of Hydrocarbon Contaminated Soil. Version 1.0

Soil Treatment Facility Design and Operation for Bioremediation of Hydrocarbon Contaminated Soil. Version 1.0 PROTOCOL 15 FOR CONTAMINATED SITES Soil Treatment Facility Design and Operation for Bioremediation of Hydrocarbon Contaminated Soil Version 1.0 Prepared pursuant to Section 64 of the Environmental Management

More information

Questar ThermWise Duct Technical Specifications

Questar ThermWise Duct Technical Specifications Questar ThermWise Duct Technical Specifications 1. Introduction and Scope: This document sets forth the specifications for duct sealing and duct insulation in accordance to Questar ThermWise Weatherization

More information

VISQUEEN WATERPROOFING MEMBRANES VISQUEEN GAS RESISTANT SELF ADHESIVE MEMBRANE

VISQUEEN WATERPROOFING MEMBRANES VISQUEEN GAS RESISTANT SELF ADHESIVE MEMBRANE Visqueen Building Products Heanor Gate Heanor Derbyshire DE75 7RG Tel: 0333 202 6800 Fax: 0333 202 6886 e-mail: enquiries@visqueenbuilding.co.uk website: www.visqueenbuilding.co.uk APPROVAL INSPECTION

More information

BULLETIN 34: BUILDING ENVELOPE SERVICES APPROPRIATE PROFESSIONAL PRACTICE

BULLETIN 34: BUILDING ENVELOPE SERVICES APPROPRIATE PROFESSIONAL PRACTICE 200-4010 Regent Street Burnaby BC V5C 6N2 Canada Telephone: (604) 430-8035 Toll Free Canada-wide: 1-888-430-8035 Facsimile: (604) 430-8085 BULLETIN 34: BUILDING ENVELOPE SERVICES APPROPRIATE PROFESSIONAL

More information

CORDEK VENTILATION VOID FORMERS VENTFORM PANELS

CORDEK VENTILATION VOID FORMERS VENTFORM PANELS APPROVAL INSPECTION TESTING CERTIFICATION Cordek Ltd Spring Copse Business Park Slinfold West Sussex RH13 0SZ Tel: 013 7990 Fax: 013 791718 TECHNICAL APPROVALS FOR CONSTRUCTION Agrément Certificate 12/4916

More information

Protech Regular 870 Radon Resisting Membrane

Protech Regular 870 Radon Resisting Membrane CI/SfB Ln9 CERTIFICATE NO. 05/0104 BSK, Commissioners Road, Strood, Rochester, Kent ME2 4ED, United Kingdom. Tel: 0044 1634 292700 Fax: 0044 1634 291029 Email: sales@bsk-laminating.com Website: www.bsk-laminating.com

More information

Building Regulations (Northern Ireland) Department of Finance and Personnel resistance to contaminants.

Building Regulations (Northern Ireland) Department of Finance and Personnel  resistance to contaminants. Department of Finance and Personnel www.dfpni.gov.uk Building Regulations (Northern Ireland) 2012 G u i d a n c e Technical Booklet C Site preparation and resistance to contaminants and moisture October

More information

1. IDENTIFICATION OF THE SUBSTANCE/PREPARATION AND OF THE COMPANY/UNDERTAKING. SIKA Schweiz AG Tüffenwies Zürich Switzerland

1. IDENTIFICATION OF THE SUBSTANCE/PREPARATION AND OF THE COMPANY/UNDERTAKING. SIKA Schweiz AG Tüffenwies Zürich Switzerland Safety Data Sheet Conforms to Regulation (EC) No. 1907/2006 (REACH), Annex II - Switzerland 1. IDENTIFICATION OF THE SUBSTANCE/PREPARATION AND OF THE COMPANY/UNDERTAKING Identification of the substance/preparation

More information

Corporate Safety Procedure Grid Mesh, Handrail and Flooring Removal. Table of Contents

Corporate Safety Procedure Grid Mesh, Handrail and Flooring Removal. Table of Contents Table of Contents 1. Purpose... 2 2. Scope... 2 3. Roles and Responsibilities... 2 3.1 Manager/Supervisor... 2 3.2 Workers... 2 3.3 Technical Specialist/Engineer... 2 4. Definitions... 2 5. Procedure...

More information

Level 6 NVQ Diploma in Construction Site Management (Construction)

Level 6 NVQ Diploma in Construction Site Management (Construction) Level 6 NVQ Diploma in Construction Site Management (Construction) Qualification Specification ProQual 2014 Contents Page Introduction 3 The Qualifications and Credit Framework (QCF) 3 Qualification profile

More information

Gas barrier and damp proofing accessories

Gas barrier and damp proofing accessories Gas barrier and damp proofing accessories Gas barriers and damp proofing 2-4 5 Gas barrier and damp proof membrane cavity tray systems and accessories Damp Proof coursing accessories 1 Call. 01405 765567

More information

ANSWERS: Combustion. 2C3H8(g) + 7O2(g) 6CO(g) + 8H2O(g)

ANSWERS: Combustion. 2C3H8(g) + 7O2(g) 6CO(g) + 8H2O(g) ANSWERS: Combustion organic molecule methane equation for complete combustion CH4(g) + 2O2(g) CO2(g) + 2H2O(g) equation for incomplete combustion 4CH4(g) + 5O2(g) 2CO(g) + 2C(s) + 8H2O(g) methanol 2CH3OH(l)

More information

Section Polished Concrete Finishing. Vexcon

Section Polished Concrete Finishing. Vexcon SS 105 5-16 Section 03 35 43 Polished Concrete Finishing Specifier Note: This product guide specification is written according to the Construction Specifications Institute (CSI) 3-part format. This section

More information

Colphene BSW Training and Application Guide. Colphene BSW Waterproofing Membrane. 1. Prepare substrate

Colphene BSW Training and Application Guide. Colphene BSW Waterproofing Membrane. 1. Prepare substrate Colphene BSW Training and Application Guide Colphene BSW Waterproofing Membrane. 1. Prepare substrate Substrate must be structurally sound. Surface must be free of voids, spalled areas, loose aggregate,

More information

Hazardous. Scheme. the power behind your business

Hazardous. Scheme. the power behind your business Hazardous Areas Scheme YOUR GUIDE TO REGISTRATION the power behind your business GUIDE TO REGISTRATION REQUIREMENTS Electrical work in potentially explosive atmospheres (hazardous areas) is not included

More information

GEOMEMBRANE INSTALLATION GUIDELINES RUFCO 20, 30 & 40 MIL UNREINFORCED DURA SKRIM 30, 36 & 45 MIL REINFORCED

GEOMEMBRANE INSTALLATION GUIDELINES RUFCO 20, 30 & 40 MIL UNREINFORCED DURA SKRIM 30, 36 & 45 MIL REINFORCED GEOMEMBRANE INSTALLATION GUIDELINES RUFCO 20, 30 & 40 MIL UNREINFORCED DURA SKRIM 30, 36 & 45 MIL REINFORCED Sept 2010 TABLE OF CONTENTS SECTION PAGE 1.0 SUBGRADE PREPARATION 3 2.0 PANEL LAYOUT 4 3.0 IDENTIFICATION

More information

Changes to the Atmosphere

Changes to the Atmosphere Changes to the Atmosphere 49 minutes 49 marks Page of 24 Q. The amount of carbon dioxide in the Earth s atmosphere has changed since the Earth was formed. The amount of carbon dioxide continues to change

More information

1. IDENTIFICATION OF THE SUBSTANCE / PREPARATION AND THE COMPANY DWS/LF/100, DWS/LF/250 & DWS/LF/500

1. IDENTIFICATION OF THE SUBSTANCE / PREPARATION AND THE COMPANY DWS/LF/100, DWS/LF/250 & DWS/LF/500 PAGE 1 of 8 1. IDENTIFICATION OF THE SUBSTANCE / PREPARATION AND THE COMPANY Product name: Product ref: Application: Suppliers trade names: Supplier: Diamond Abrasive Lapping Fluid DWS/LF/100, DWS/LF/250

More information

Effective June 17, 2013, the Energy Resources Conservation Board (ERCB) has been succeeded by the Alberta Energy Regulator (AER).

Effective June 17, 2013, the Energy Resources Conservation Board (ERCB) has been succeeded by the Alberta Energy Regulator (AER). Directive 055 Addendum Directive 055 Addendum: Interim Requirements for Aboveground Synthetically- Lined Wall Storage Systems, Updates to Liner Requirements, and Optional Diking Requirements for Single-Walled

More information

Environmental Impact of Construction

Environmental Impact of Construction Unit 13: Environmental Impact of Construction Unit code: A/601/1270 QCF level: 4 Credit value: 15 Aim This unit provides learners with the opportunity to develop an understanding of the impact of the construction

More information

Part E robustdetails. robustdetails. January 2017 Update Pack. Dear Colleague,

Part E robustdetails. robustdetails. January 2017 Update Pack. Dear Colleague, Part E Pack Dear Colleague, This is the first 2017 update to the Part E Robust Details Handbook. In this update pack, we have focussed on clarifying the situation on incorporating underfloor heating (UFH)

More information

NAVSEA STANDARD ITEM. 1.1 Title: Asbestos-Containing Material (ACM); control

NAVSEA STANDARD ITEM. 1.1 Title: Asbestos-Containing Material (ACM); control NAVSEA STANDARD ITEM ITEM NO: 009-10 DATE: 18 NOV 2016 CATEGORY: I 1. SCOPE: 1.1 Title: Asbestos-Containing Material (ACM); control 2. REFERENCES: 2.1 29 CFR 1915.1001, Occupational Safety and Health Standards

More information

Floor Insulation Underlayment Section Sound Control Matting

Floor Insulation Underlayment Section Sound Control Matting Floor Insulation Underlayment Section 09618 Sound Control Matting Part I General 1.1 Summary A. Section includes a sound control material for achieving an STC and IIC rating in excess of 50 to meet building

More information

THE COMBUSTION OF HYDROCARBONS. I love the smell of napalm in the morning smells like victory!

THE COMBUSTION OF HYDROCARBONS. I love the smell of napalm in the morning smells like victory! THE COMBUSTION OF HYDROCARBONS I love the smell of napalm in the morning smells like victory! Carbon monoxide is a toxic gas that can be produced during the combustion of a carbon-based fuel such as propane.

More information

Complete and simple system!

Complete and simple system! System Platon RadonStop 400 Complete and simple system! Platon RadonStop 400 is a non-reinforced polyethylene film with high strength and flexibility. The film is supplied in 4m widths and is installed

More information

SQAR-1. SUPPLIER QUALITY ASSURANCE REQUIREMENTS for DESIGN AND PROCUREMENT SERVICES Revision Date: 2/1/2018

SQAR-1. SUPPLIER QUALITY ASSURANCE REQUIREMENTS for DESIGN AND PROCUREMENT SERVICES Revision Date: 2/1/2018 SUPPLIER QUALITY ASSURANCE REQUIREMENTS for DESIGN AND PROCUREMENT SERVICES Revision Date: 2/1/2018 1.0 SCOPE This document establishes the quality program requirements for an organization providing engineering

More information

ENKASONIC FLOOR UNDERLAYMENT 9110

ENKASONIC FLOOR UNDERLAYMENT 9110 ENKASONIC FLOOR UNDERLAYMENT 9110 GS1197 Section 13080 SECTION 09618 SOUND CONTROL MATTING Part I General 1.1 Summary A. Section includes a sound control material for achieving an STC and IIC rating in

More information

MATERIALS MANAGEMENT PLAN (MMP)

MATERIALS MANAGEMENT PLAN (MMP) MATERIALS MANAGEMENT PLAN (MMP) CONTENTS 1. INTRODUCTION...5 1.1 Background...5 1.2 Scope...5 1.3 Conclusions from the Environmental Impact Assessments...6 2. THE USE OF SITE-DERIVED MATERIALS...7 2.2

More information

Jean Vaillancourt Fire Protection Specialist Hilti (Canada) Corp.

Jean Vaillancourt Fire Protection Specialist Hilti (Canada) Corp. Cable Management Firestop Jean Vaillancourt Fire Protection Specialist Hilti (Canada) Corp. FIRESTOPPING KNOWLEDGE FOR BETTER SPECIFICATION AND DESIGN OF FIRE-RATED CONSTRUCTION Presentation Topics and

More information

What Is A GAS VAPOR BARRIER?

What Is A GAS VAPOR BARRIER? The Use of a Gas Vapor Barrier to Mitigate Subsurface Vapor Intrusion What Is A GAS VAPOR BARRIER? An impermeable, chemically resistant membrane that prevents gas vapor intrusion into buildings 1 Who Uses

More information

SECTION RESILIENT SHEET FLOORING

SECTION RESILIENT SHEET FLOORING SECTION 09 65 16 RESILIENT SHEET FLOORING SPEC WRITER NOTE: Delete text between // // not applicable to project. Edit remaining text to suit project. PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1.

More information

SECTION ARCHITECTURAL SPECIFICATIONS FOR INDOOR WOOD ATHLETIC FLOORING

SECTION ARCHITECTURAL SPECIFICATIONS FOR INDOOR WOOD ATHLETIC FLOORING PART 1 GENERAL 1.1 SECTION INCLUDES A. Supply and installation of MFMA Maple Wood Flooring System B. Application of the game lines C. References for the correct construction and preparation of concrete

More information

Project Monitoring & Air Sampling

Project Monitoring & Air Sampling Project Monitoring & Air Sampling 1. Qualifications of Air Sampling Personnel. The project air sampling shall be conducted by an asbestos project air sampling technician who has been trained in the selected

More information

Notes. Lesson overview. This lesson discusses how radon enters a home, where people can be exposed to unhealthy levels.

Notes. Lesson overview. This lesson discusses how radon enters a home, where people can be exposed to unhealthy levels. Lesson 3: How does radon enter a home? Lesson overview This lesson discusses how radon enters a home, where people can be exposed to unhealthy levels. Lesson objectives By the end of this lesson, the learners

More information

Evergreen Project Implementation Plan Instructions Low Income Housing Tax Credit Program

Evergreen Project Implementation Plan Instructions Low Income Housing Tax Credit Program Evergreen Project Implementation Plan Instructions Low Income Housing Tax Credit Program The following table provides a brief description of the documentation that will be required of successful LIHTC

More information

Notes for Guidance on the Specification for Road Works Series NG CCTV Survey of Road Drainage Systems

Notes for Guidance on the Specification for Road Works Series NG CCTV Survey of Road Drainage Systems Notes for Guidance on the Specification for Road Works Series NG 2900 - Road Drainage Systems CC-GSW-02900 January 2009 CC Construction & Commissioning Standards TRANSPORT INFRASTRUCTURE IRELAND (TII)

More information

PROBUILD GUIDE SUBCONTRACTOR QUALITY MANAGEMENT. Section Two Project Specific Quality Management Plans. Version No 1.

PROBUILD GUIDE SUBCONTRACTOR QUALITY MANAGEMENT. Section Two Project Specific Quality Management Plans. Version No 1. PROBUILD SUBCONTRACTOR QUALITY MANAGEMENT GUIDE Section Two Project Specific Quality Management Plans Version No 1. PREFACE This document has been developed to assist subcontractors to meet Probuild s

More information

ROCKWOOL Board Insulation Section Master Guide Specification (ROCKBOARD 80) Page 1 January 2017

ROCKWOOL Board Insulation Section Master Guide Specification (ROCKBOARD 80) Page 1 January 2017 Master Guide Specification (ROCKBOARD 80) Page 1 Click on the pilcrow in the MS Word Toolbar to toggle ROCKWOOL GUIDE NOTES on and off. Delete this text before incorporating the section into a Project

More information

ROXUL Blanket (and Batt) Insulation Section Master Guide Specification (AFB) Page 1 April 2015

ROXUL Blanket (and Batt) Insulation Section Master Guide Specification (AFB) Page 1 April 2015 Master Guide Specification (AFB) Page 1 Click on the pilcrow in the MS Word Toolbar to toggle ROXUL GUIDE NOTES on and off. Delete this text before incorporating the section into a Project Manual. 1 GENERAL

More information

Vapor Intrusion Mitigation Methods & Strategies

Vapor Intrusion Mitigation Methods & Strategies Vapor Intrusion Mitigation Methods & Strategies NEWMOA Workshop on Vapor Intrusion Chelmsford, MA April 12, 2006 David J. Folkes P.E. Topics Overview of Mitigation Approaches Commercial Buildings Sub-Slab

More information

Concrete specifications and BRE Special Digest 1 We detail the main changes that you need to take account of

Concrete specifications and BRE Special Digest 1 We detail the main changes that you need to take account of NHBC s technical newsletter September 2005 Issue 33 This edition includes: 2 Concrete specifications and BRE Special Digest 1 We detail the main changes that you need to take account of 3 4 5 Robust Details

More information

RADBAR GAS MEMBRANE RANGE Radbar Radon Membrane Independently tested and certified throughout Europe by the following organizations: - IAB Ireland, NBI Norway, Sitac Sweden, and BBA UK. Radbar is tested

More information

PRODUCT SHEET 1 KINGSPAN KOOLTHERM K3 FLOORBOARD

PRODUCT SHEET 1 KINGSPAN KOOLTHERM K3 FLOORBOARD Kingspan Insulation Ltd Pembridge Leominster Herefordshire HR6 4LA Tel: 0870 8508555 Fax: 0870 8508666 e-mail: info.uk@insulation.kingspan.com website: www.insulation.kingspan.com Agrément Certificate

More information

ABOUT US. We operate on a nationwide basis and have built up an impressive portfolio of clients in the public and private sectors.

ABOUT US. We operate on a nationwide basis and have built up an impressive portfolio of clients in the public and private sectors. ASBESTOS MANAGEMENT ABOUT US Clifford Devlin has been providing specialist services to manage asbestos for over 25 years. The company is licensed by the Health & Safety Executive (HSE) to remove and dispose

More information

Conforms to Regulation (EC) No. 1907/2006 (REACH), Annex II - United Kingdom (UK)

Conforms to Regulation (EC) No. 1907/2006 (REACH), Annex II - United Kingdom (UK) 1. IDENTIFICATION OF THE SUBSTANCE/PREPARATION AND OF THE COMPANY/UNDERTAKING Identification of the substance/preparation Product name or Trade name Sikaflex -521 UV Safety Data Sheet Conforms to Regulation

More information

L 328/28 Official Journal of the European Union DIRECTIVES

L 328/28 Official Journal of the European Union DIRECTIVES L 328/28 Official Journal of the European Union 6.12.2008 DIRECTIVES DIRECTIVE 2008/99/EC OF THE EUROPEAN PARLIAMENT AND OF THE COUNCIL of 19 November 2008 on the protection of the environment through

More information

BENTOMAT CL GEOSYNTHETIC CLAY LINER SPECIFICATION GUIDELINES

BENTOMAT CL GEOSYNTHETIC CLAY LINER SPECIFICATION GUIDELINES BENTOMAT CL GEOSYNTHETIC CLAY LINER SPECIFICATION GUIDELINES This specification is intended for use as a GENERAL GUIDELINE for developing a specification for a specific project. It is NOT intended as a

More information

Minimum Standards for Building Occupancy. Safety Resources

Minimum Standards for Building Occupancy. Safety Resources Minimum Standards for Building Occupancy 2017 Safety Resources Contents 1 Purpose... 1 2 Applicable To... 1 3 Scope... 1 4 Definitions... 1 5 Training... 2 6 Safety... 2 7 Equipment and Materials... 2

More information

LAYING IBSTOCK CLAY PAVERS FOR PERMEABLE PAVEMENTS

LAYING IBSTOCK CLAY PAVERS FOR PERMEABLE PAVEMENTS PERMEABLE PAVEMENTS (SUDS) This leaflet highlights the basic requirements for laying Ibstock clay pavers to form a permeable pavement. Ibstock clay pavers are intended for domestic use only i.e. patios

More information

Asbestos Safety Toolkit

Asbestos Safety Toolkit HUMAN FOCUS Self-help Asbestos Safety Toolkit Contents Preparing to improve asbestos safety 2 An example asbestos safety policy statement 3 Main steps of the risk assessment process 5 Risk assessment form

More information

Safety data sheet according to 1907/2006/EC, Article 31

Safety data sheet according to 1907/2006/EC, Article 31 Page 1/6 SECTION 1: Identification of the substance/mixture and of the company/undertaking 1.1 Product identifier Article number: A1867 CAS Number: 14459-95-1 EC number: 237-722-2 1.2 Relevant identified

More information

RADBAR DAMP-PROOF COURSES RADBAR HIGH PERFORMANCE DAMP-PROOF COURSE

RADBAR DAMP-PROOF COURSES RADBAR HIGH PERFORMANCE DAMP-PROOF COURSE Capital Valley Plastics Ltd Cwmavon Works Cwmavon Nr Pontypool Gwent NP4 8UW Tel: 01495 772255 Fax: 01495 772251 e-mail: sales@capitalvalleyplastics.com website: www.capitalvalleyplastics.com APPROVAL

More information

Visqueen Building Products Maerdy Industrial Estate Rhymney Tredegar Gwent NP22 5PY Tel: Fax:

Visqueen Building Products Maerdy Industrial Estate Rhymney Tredegar Gwent NP22 5PY Tel: Fax: CI/SfB Visqueen Building Products Maerdy Industrial Estate Rhymney Tredegar Gwent NP22 5PY Tel: 01685 840672 Fax: 01685 842580 (13.9) n6 Agrément Certificate No 94/3009 Third issue* Designated by Government

More information

Level 2 Certificate in Warehousing and Storage Skills (QCF)

Level 2 Certificate in Warehousing and Storage Skills (QCF) Level 2 Certificate in Warehousing and Storage Skills (QCF) Qualification Handbook www.cityandguilds.com September 2010 Version 1.1 Level 2 Certificate 1016-02 QAN 501/1082/2 About City & Guilds City &

More information

Guide for AWS Visual Weld Inspection

Guide for AWS Visual Weld Inspection Guide for Visual Weld Overview & Contents Scope This guide is intended to assist Owner/Operators, Contractors, Authority Having Jurisdiction (AHJ) personnel, Inspectors, Manufacturers and Contractors/Fabricators

More information

1.1 Related Work Specified in Other Sections (Delete if Not Applicable):

1.1 Related Work Specified in Other Sections (Delete if Not Applicable): NOTE TO SPECIFIER: Concrete Resurfacing (Broom Finish) System provides an economical alternative to the removal and replacement of existing concrete. This system creates a flexible and durable finish that

More information

QUALIFICATION HANDBOOK

QUALIFICATION HANDBOOK QUALIFICATION HANDBOOK Level 6 NVQ Diploma in Construction Site Management (Construction) (6578) November 2013 Version 1.0 Qualification at a glance Subject area City & Guilds number 6578 Age group approved

More information

Are you in control of process safety? Basis of safety assurance can provide the answer

Are you in control of process safety? Basis of safety assurance can provide the answer Loss Prevention Bulletin 231 June 2013 23 Safety practice Are you in control of process safety? Basis of safety assurance can provide the answer Phil Eames Eur Ing BSc CEng FIChemE Eames Risk Consulting

More information

Radon in private water supplies. Jane Bradley PHE Centre for Radiation, Chemical and Environmental Hazards

Radon in private water supplies. Jane Bradley PHE Centre for Radiation, Chemical and Environmental Hazards Radon in private water supplies Jane Bradley PHE Centre for Radiation, Chemical and Environmental Hazards 6 billion years ago exploding supernovae create heavy elements including uranium 2 Radon practicalities:

More information

Update on ISO/DIS 45001:2016 Migration from OHSAS 18001:2007. May 31, 2016 Our webinar will begin at 1:00 PM

Update on ISO/DIS 45001:2016 Migration from OHSAS 18001:2007. May 31, 2016 Our webinar will begin at 1:00 PM Update on ISO/DIS 45001:2016 Migration from OHSAS 18001:2007 May 31, 2016 Our webinar will begin at 1:00 PM Update on ISO/DIS 45001:2016 Migration from OHSAS 18001:2007 Carmine Liuzzi Industry Leader SAI

More information

Landfill Gas Systems

Landfill Gas Systems Landfill Gas Systems A General Overview ASTSWMO STATE SOLID WASTE MANAGERS CONFERENCE Scottsdale, Arizona September 12-14, 14, 2005 Landfill Gas Management Issues/Objectives Topics to be Covered Reasons

More information

Level 2 NVQ Certificate in Erection of Precast Concrete (Construction)

Level 2 NVQ Certificate in Erection of Precast Concrete (Construction) Level 2 NVQ Certificate in Erection of Precast Concrete (Construction) Qualification Specification ProQual 2016 Contents Introduction 3 Qualification profile 3 Qualification Structure 4 Pathway 1 Flooring

More information

Level 2 NVQ Certificate in Wall and Floor Tiling (Construction) Qualification Specification

Level 2 NVQ Certificate in Wall and Floor Tiling (Construction) Qualification Specification Qualification Specification ProQual 2017 Contents Page Introduction 3 Qualification profile 3 Qualification structure 4 Centre requirements 5 Support for candidates 5 Assessment 6 Internal quality assurance

More information

AIR BARRIER DESIGN PRINCIPLES AN OVERVIEW.

AIR BARRIER DESIGN PRINCIPLES AN OVERVIEW. AIR BARRIER DESIGN PRINCIPLES AN OVERVIEW www.stromatech.com AIR BARRIER DESIGN PRINCIPLES Building Regulations Approved Document Parts L1A & L2A currently requires that new buildings have to achieve a

More information

2017 Archaeology Audit Program Procedure Manual. April 2017

2017 Archaeology Audit Program Procedure Manual. April 2017 2017 Archaeology Audit Program Procedure Manual April 2017 Table of Contents Contents Table of Contents... 2 1.0 Introduction and Scope... 3 2.0 Audit Objectives... 3 3.0 Audit Procedures... 4 3.1 Audit

More information

Industrial Services. Minimizing Downtime. Maximizing Performance. LDAR. Leak Detection and Repair (LDAR) Services

Industrial Services. Minimizing Downtime. Maximizing Performance. LDAR. Leak Detection and Repair (LDAR) Services Industrial Services Minimizing Downtime. Maximizing Performance. LDAR Leak Detection and Repair (LDAR) Services Leak Detection and Repair (LDAR) Services Advantages of Team s Emission Control + Single

More information

Vapor Barriers Under Concrete Slabs Guidance for Selection and Location

Vapor Barriers Under Concrete Slabs Guidance for Selection and Location PDHonline Course A125 (1 PDH) Vapor Barriers Under Concrete Slabs Guidance for Selection and Location Instructor: Brian M. McCaffrey, P.E. 2012 PDH Online PDH Center 5272 Meadow Estates Drive Fairfax,

More information

GUIDE SPECIFICATION: DUCT LINER

GUIDE SPECIFICATION: DUCT LINER GUIDE SPECIFICATION: DUCT LINER This specification guide includes thermal & acoustical insulation for ductwork and air handling systems. This section is based on the format recommended by MICA (Midwest

More information

How to develop and maintain an AS/NZS 4801 Health & Safety Management System faster, better, and smarter

How to develop and maintain an AS/NZS 4801 Health & Safety Management System faster, better, and smarter Qudos Management Pty. Ltd. Quality Health & Safety Environmental management 320 Adelaide Street, Brisbane, QLD 4000 Tel: +61 (07) 3010 9259 3 Spring Street, Sydney, NSW 2000 Tel: +61 (02) 8249 4670 Email:

More information

Occupational Health and Safety Management Manual v2.2

Occupational Health and Safety Management Manual v2.2 Occupational Health and Safety Management Manual v2.2 Written: February 2013 Author: David Seymour, Director of Operations Co Author: Mathew Sprake, Operations Manager Approved: Board of Directors 1. Introduction

More information

Overview ASTATT5. Prepare and issue the air tightness test report. Prepare and issue the air tightness test report

Overview ASTATT5. Prepare and issue the air tightness test report. Prepare and issue the air tightness test report Overview This standard is for those who produce and issue air tightness reports on the air permeability of buildings of any size or complexity. It covers those activities involved in preparing and issuing

More information

Register of Contaminated Land Consent Conditions

Register of Contaminated Land Consent Conditions Regional Contaminated Land Capacity Building Program Register of Contaminated Land Consent Conditions AUGUST 2017 Regional Contaminated Land Capacity Building Program This publication was produced by the

More information

AirSmart. The intelligent choice in airtight systems. Superior strength and quality. Energy saving and cost effective. Reduces condensation risk

AirSmart. The intelligent choice in airtight systems. Superior strength and quality. Energy saving and cost effective. Reduces condensation risk AirSmart Superior strength and quality Energy saving and cost effective Reduces condensation risk Enhances thermal performance Complete airtight solution The intelligent choice in airtight systems The

More information

CHAPTER 3: Modern Methods of Construction (MMC)

CHAPTER 3: Modern Methods of Construction (MMC) CONTENTS 3.1.1 INTRODUCTION 3.1.2 SUITABILITY OF SYSTEMS AND COMPONENTS 3.1.3 TYPES OF MODERN METHODS OF CONSTRUCTION (MMC) 3.1.4 SUITABILITY OF SYSTEMS TO MEET WARRANTY REQUIREMENTS 3.1.5 INSULATED CONCRETE

More information

An Integrated Model for Design of Soil Vapour Intrusion Mitigation Systems

An Integrated Model for Design of Soil Vapour Intrusion Mitigation Systems An Integrated Model for Design of Soil Vapour Intrusion Mitigation Systems RemTech 2009 October 14-16, 2009 Banff, Alberta Soil Contamination Chemical vapor Migration Water Table Dr. Ian Hers Golder Vancouver;

More information