1 AGENDA ITEM NO. 3.i REPORT TO MAYOR AND COUNCIL TO THE HONORABLE MAYOR AND COUNCIL: DATE: July 24, 2012 SUBJECT: AWARD A CONSTRUCTION CONTRACT IN THE AMOUNT OF $165, TO (FUNDED BY: SEWER ENTERPRISE FUNDS) Report in Brief Project No (Cowell Road BART Area Sewer Spot Repairs) will perform spot repairs on deteriorated sections of sewer lines to eliminate sags, broken, collapsed or displaced clay pipes in residential areas within the City. Bids were opened at 2 p.m. on Thursday, June 14, Roto-Rooter Plumbers (Roto- Rooter) of Concord submitted the lowest responsive and responsible bid of $165, though it did not acknowledge Addendum No. 1, which made revisions to the bid quantities. The original bid total was revised downward by $2,574 to reflect the adjusted quantities on the current bid form in accordance with the project specifications. The City Attorney has confirmed that the missing acknowledgement and minor bid revision can be waived as a minor bid defect. Roto-Rooter has an appropriate, valid contractor s license and satisfactory work references. The sewer repair project is funded by Sewer Enterprise funds. Staff recommends that the City Council award a Construction Contract in the amount of $165, to Roto-Rooter Plumbers of Concord and waive a minor bid defect for Project No (Cowell Road BART Area Sewer Spot Repairs). Background Project No (Cowell Road BART Area Sewer Repairs) is the product of the initial project site study under Project No (Sewer Condition Assessment) which revealed several deteriorated sections of sewer lines that had either broken, collapsed or become displaced, in the residential neighborhoods between Cowell Road and Clayton Road near BART. This project is a spin off of Project No (Sewer Capital Facility Replacement) which acts as an annual holding account for large scale sewer repair and replacement projects, and will utilize trenchless technologies wherever possible to reduce disruption to surrounding residents. Project No (Cowell Road BART Area Sewer Repairs) was approved by the City Council with the FY12-13 Capital Improvement Ten Year Plan and will repair or replace over 1,000 feet of sanitary sewer lines at approximately 20 separate locations, modify the channeling of 8 sanitary sewer manholes and inspect approximately 1,826 feet of 6-inch sanitary sewer line through closed circuit digital video recording (CCTV). In addition, Project No includes a bid alternate which will provide on-call sewer support services for a

2 AWARD A CONSTRUCTION CONTRACT IN THE AMOUNT OF $165, TO July 24, 2012 Page 2 period of one year, beginning from the date of award of contract. Public Contract Code Section requires that all projects defined as public work with an expenditure that exceeds five thousand dollars ($5,000), must be contracted. Public Works Sewer Division staff will manage the on-call contract which will allow staff to utilize these support services when necessary for emergencies, workload overflow, or for specific expertise, without having to go before Council for each incident. The bid opening was held at 2 p.m. on Thursday, June 14, Five (5) bids were received, ranging from $165, to $334,518 for the Total Base Bid (and Alternate) as shown on the Bid Results (Attachment 2). The Engineer s Estimate was $210,000 for the Total Bid. Roto-Rooter Plumbers of Concord submitted the apparent low bid of $165, which includes $23,360 for the Alternate (On-call services). Discussion Roto-Rooter Plumbers bid proposal was submitted in the amount of $168,437 and did not acknowledge Addendum No. 1, which made revisions to the quantities. The City Attorney has reviewed the matter and concluded that the omission of the Addendum acknowledgement can be considered as a minor bid defect and can be waived. The project specifications state that In the case of discrepancy between the unit bid price and the total bid price set forth for a unit basis item, the unit bid price shall prevail. Staff used Roto-Rooter s unit bid prices in the corrected bid form that adjusted the original submitted total of $168,437 to $165, when corrected. Staff informed the contractor of this minor error and the revised total on June 15th. The contractor acknowledged the mistake and confirmed its willingness to do the work at the corrected (lower) price on June 18, Roto-Rooter s low bid of $165, is approximately 21% lower than the Engineer s Estimate. The primary reason for the difference is Roto-Rooter s experience as a local contractor and their election to perform all of the work without subcontractors, thereby eliminating the need to mark-up costs associated with subcontractor work. Staff has completed its analysis of Roto-Rooter s bid and determined that it possesses an appropriate and valid contractor s license, has satisfactory references and experience in the construction of similar projects in Concord and other Contra Costa County agencies. Roto-Rooter remains committed to its bid and is ready to perform the work. Pursuant to the project schedule, construction will begin immediately after award in July, 2012 to take advantage of the decreased traffic in this residential area when most schools are in recess for the summer. Fiscal Impact The budget for this project is $300,000 which consists of Sewer Enterprise funds. The project budget is sufficient to fully fund the work. Public Contact The City Council Agenda was posted.

3 Recommendation for Action AWARD A CONSTRUCTION CONTRACT IN THE AMOUNT OF $165, TO July 24, 2012 Page 3 Staff recommends that the City Council award a Construction Contract in the amount of $165, to Roto-Rooter Plumbers of Concord and waive a minor bid defect for Project No (Cowell Road BART Area Sewer Spot Repairs). Valerie J. Barone Interim City Manager valerie.barone@ci.concord.ca.us Prepared by: Danea Gemmell, PE City Engineer danea.gemmell@ci.concord.ca.us Reviewed by: Victoria Walker Dir. of Comm. & Econ. Dev. victoria.walker@ci.concord.ca.us Attachment 1 Location Map Attachment 2 Bid Results

4 ATTACHMENT 1 X - Spot Repair Location LOCATION MAP PROJECT NO DOWNTOWN SEWER AND STREETSCAPE IMPROVEMENTS NO SCALE

5 PROJECT #2227 City of Concord Bid Sheet Cowell Road Bart Area Sewer Spot Repairs Attachment 2 Bid Opening: Thursday, June 14, :00 p.m. City Manager's Conference Room Engineer s Estimate: $210,000 To be awarded: July 24, 2012 COMPANY Roto-Rooter Plumbers 195 Mason Circle Concord, CA Darcy & Harty Construction, Inc Carroll Avenue San Francisco, CA (415) Pfister Excavating, Inc. PO Box 4312 Vallejo, CA J. Howard Engineering, Inc. 881 Moorpark Street Oakland, CA (510) MDF Pipeline 7172 Regional St. #307 Dublin, CA TOTAL BID $165, $191,130 $273,743 $283,470 $334,518 Contact: Rick Cole

AGENDA ITEM NO. June 6, 2017

AGENDA ITEM NO. June 6, 2017 DocuSign Envelope ID: 7CA39164-0C90-42A5-B40D-ED361AA88939 AGENDA ITEM NO. June 6, 2017 May 23, 2017 Honorable Board of Supervisors County of Alameda 1221 Oak Street, Suite 536 Oakland, CA 94612-4305 Dear

More information

CITY OF CHINO HILLS. Request for Proposals (RFP) for On-Call and Emergency Repair Services Including Water and Sewer Systems

CITY OF CHINO HILLS. Request for Proposals (RFP) for On-Call and Emergency Repair Services Including Water and Sewer Systems CITY OF CHINO HILLS Request for Proposals (RFP) for On-Call and Emergency Repair Services Including Water and Sewer Systems February 18, 2016 Department: Public Works Proposal Due Date: March 17, 2016

More information

BID # UTILITY SERVICE CONTRACT SECTION C SPECIFICATIONS OWNER

BID # UTILITY SERVICE CONTRACT SECTION C SPECIFICATIONS OWNER BID # 15-14 UTILITY SERVICE CONTRACT SECTION C SPECIFICATIONS OWNER Board of Trustees Middlesex County College 2600 Woodbridge Avenue P.O. Box 3050 Edison, New Jersey 08818-3050 SECTION C - DETAILED TECHNICAL

More information

Infiltration and Inflow. Michael Sassaman Phone

Infiltration and Inflow. Michael Sassaman Phone Infiltration and Inflow Michael Sassaman msassaman@entecheng.com Phone 610-373-3345 Inflow and Infiltration PA DEP Learning Objectives Do you have Excessive I/I? Sources of Inflow and Infiltration I/I

More information

SSO- WDR Compliance Workshop Electronic Reporting: Reporting Requirements & Tips. Sewer System Management Plan Chapter

SSO- WDR Compliance Workshop Electronic Reporting: Reporting Requirements & Tips. Sewer System Management Plan Chapter Chapter Contents Introduction SSMP Requirements and Suggested Content SSMP Preparation Deadlines Introduction This chapter provides a brief overview of the GWDR requirements for an SSMP and provides some

More information

AGENDA ITEM C8. COST/FUNDING SOURCE: $215,348.48/Uniform Rate (Total project costs $520, includes $304,952 previously committed to Phase II)

AGENDA ITEM C8. COST/FUNDING SOURCE: $215,348.48/Uniform Rate (Total project costs $520, includes $304,952 previously committed to Phase II) AGENDA ITEM C8 DATE: February 6, 2017 TO: Matt Jordan, General Manager FROM: Charles H. Carden, Chief Operating Officer SUBJECT: South Pasco Transmission Main Phase III Condition Assessment Services with

More information

Sample Bid Specification Revision 2 PVC Expanded-in-Place Pipeline Reconstruction

Sample Bid Specification Revision 2 PVC Expanded-in-Place Pipeline Reconstruction Sample Bid Specification Revision 2 PVC Expanded-in-Place Pipeline Reconstruction 1.00 DESCRIPTION 1.01 WORK INCLUDED: This work shall include the furnishing of all labor, equipment and materials necessary

More information

Village of Lincolnwood

Village of Lincolnwood Village of Lincolnwood REQUEST FOR QUALIFICATIONS (RFQ) MUNICIPAL ENGINEERING SERVICES Response Due Date: Friday, March 21, 2014, 4:00 p.m. Send Sealed Qualifications to: Timothy C. Wiberg Village Manager

More information

REPORT TO MAYOR AND COUNCIL

REPORT TO MAYOR AND COUNCIL AGENDA ITEM NO. 2.b REPORT TO MAYOR AND COUNCIL TO THE HONORABLE MAYOR AND COUNCIL: DATE: January 10, 2012 SUBJECT: ADOPT RESOLUTION NO. 12-1, AUTHORIZING THE CONTRA COSTA COUNTY FLOOD CONTROL & WATER

More information

AGENDA ITEM C2. COST/FUNDING SOURCE: $304,952.00/ Uniform Rate

AGENDA ITEM C2. COST/FUNDING SOURCE: $304,952.00/ Uniform Rate AGENDA ITEM C2 DATE: April 4, 2016 TO: Matt Jordan, General Manager FROM: Charles H. Carden, Chief Operating Officer SUBJECT: South Pasco Transmission Main Condition Assessment Services with Pure Technologies

More information

Tunnel Works. How we got here - Fort Wayne s Consent Decree. Tunnel Works Program Frequently Asked Questions

Tunnel Works. How we got here - Fort Wayne s Consent Decree. Tunnel Works Program Frequently Asked Questions City Utilities operates the largest municipally-owned wastewater collection and treatment system in Indiana. The system serves 161 square miles and includes 1,014 miles of sanitary sewer lines, 365 miles

More information

SAN JOSE / EVERGREEN COMMUNITY COLLEGE DISTRICT DOCUMENT BID PROPOSAL

SAN JOSE / EVERGREEN COMMUNITY COLLEGE DISTRICT DOCUMENT BID PROPOSAL DOCUMENT 00 41 13 BID PROPOSAL TO: SAN JOSE / EVERGREEN COMMUNITY COLLEGE DISTRICT, a California Community College District, acting by and through its Board of Trustees ("the District"). FROM: (Name of

More information

Private Side Sewer Inspections for Sources of Inflow & Infiltration Frequently Asked Questions

Private Side Sewer Inspections for Sources of Inflow & Infiltration Frequently Asked Questions Private Side Sewer Inspections for Sources of Inflow & Infiltration Frequently Asked Questions As of Oct. 1, 2010, Tacoma property owners are required to have a certified inspection of their private side

More information

SECTION 501 GRAVITY SEWERS. U. No pipe length used shall be less than 5 feet.

SECTION 501 GRAVITY SEWERS. U. No pipe length used shall be less than 5 feet. SECTION 501 GRAVITY S PART 2 MATERIALS 2.1 PIPE SIZE, TYPE, AND STRENGTH D. Only concrete or polyvinyl chloride sewer pipe shall be used for sewer line construction unless otherwise approved by the City

More information

REQUEST FOR PROPOSAL Engineering Design for Culinary Water Tank and Secondary Water Tank Conversion

REQUEST FOR PROPOSAL Engineering Design for Culinary Water Tank and Secondary Water Tank Conversion REQUEST FOR PROPOSAL Engineering Design for Culinary Water Tank and Secondary Water Tank Conversion Page 1 of 5 REQUEST FOR PROPOSALS Syracuse City is seeking the services of a qualified engineering consultant

More information

2016 CONCRETE REPLACEMENT PROJECT

2016 CONCRETE REPLACEMENT PROJECT CITY OF DELTA, COLORADO CONTRACT DOCUMENTS FOR 2016 CONCRETE REPLACEMENT PROJECT Prepared By: City of Delta 360 Main Street Delta, Colorado 81416 (970) 874-7566 ext 216 CITY OF DELTA PUBLIC WORKS DEPARTMENT

More information

REPORT TO MAYOR AND COUNCIL

REPORT TO MAYOR AND COUNCIL Concord REPORT TO MAYOR AND COUNCIL AGENDA ITEM NO. 3 n g TO THE HONORABLE MAYOR AND COUNCIL: DATE: January 26, 200 SUBJECT: AUTHORIZING THE CONTRA COSTA COUNTY FLOOD CONTROL & WATER CONSERVATION DISTRICT

More information

Residential Sewer Backup Prevention Program

Residential Sewer Backup Prevention Program City of Wheaton Residential Sewer Backup Prevention Program Please Note: The City reserves the right to modify the policies, procedures and rules of this program or discontinue the program in its entirety

More information

AGENDA STAFF REPORT. CLERK OF THE BOARD Pending Review COUNTY COUNSEL REVIEW. Approved Agreement to Form. Current Year Cost: NI A

AGENDA STAFF REPORT. CLERK OF THE BOARD Pending Review COUNTY COUNSEL REVIEW. Approved Agreement to Form. Current Year Cost: NI A Agenda Item AGENDA STAFF REPORT ASR Control 16-001333 MEETING DATE: 02/14/ 17 LEGAL ENTITY TAKING ACTION: Board of Supervisors BOARD OF SUPERVISORS DISTRICT(S): 2 SUBMITTING AGENCY/DEPARTMENT: John Wayne

More information

REQUEST FOR BIDS WELL DRILLING & TESTING SERVICES I-77 EXIT 1 WATER SYSTEM PROJECT DESCRIPTION

REQUEST FOR BIDS WELL DRILLING & TESTING SERVICES I-77 EXIT 1 WATER SYSTEM PROJECT DESCRIPTION REQUEST FOR BIDS WELL DRILLING & TESTING SERVICES I-77 EXIT 1 WATER SYSTEM The Carroll County Public Service Authority requests bids from properly licensed well drilling firms, hereafter referred to as

More information

Pipe Bursting Services. pipe bursting. services

Pipe Bursting Services. pipe bursting. services Pipe Bursting Services pipe bursting services We have decades of experience solving the really big problems. Concern over the condition of the nation s infrastructure has caused government, municipalities,

More information

SOS. City of Akron Combined Sewer Overflow (CSO) Long Term Control Plan. Separate Our Sewers Save Our Streams. Ohio OWEA Collection Systems Workshop

SOS. City of Akron Combined Sewer Overflow (CSO) Long Term Control Plan. Separate Our Sewers Save Our Streams. Ohio OWEA Collection Systems Workshop City of Akron Combined Sewer Overflow (CSO) Long Term Control Plan SOS Separate Our Sewers Save Our Streams Ohio OWEA Collection Systems Workshop Patrick Gsellman Genny Hanna Jim Hall Thursday, May 9,

More information

REQUEST FOR PROPOSAL FOR. CONSTRUCTION MANAGER and DESIGN TEAM FOR. Downtown Preservation Project URBAN RE DEVELOPMENT AUTHORITY OF PITTSBURGH

REQUEST FOR PROPOSAL FOR. CONSTRUCTION MANAGER and DESIGN TEAM FOR. Downtown Preservation Project URBAN RE DEVELOPMENT AUTHORITY OF PITTSBURGH REQUEST FOR PROPOSAL FOR CONSTRUCTION MANAGER and DESIGN TEAM FOR Downtown Preservation Project URBAN RE DEVELOPMENT AUTHORITY OF PITTSBURGH December 2010 I. GENERAL The Urban Redevelopment Authority of

More information

Bacon Creek Septic System Replacement Best Management Practices. Implementation Plan

Bacon Creek Septic System Replacement Best Management Practices. Implementation Plan 120 Webster Street, Suite 217 Louisville, KY 40206 502-589-8008 www.kwalliance.org Bacon Creek Septic System Replacement Best Management Practices Implementation Plan List of technologies to be installed

More information

BID FORM (LUMP SUM CONTRACT)

BID FORM (LUMP SUM CONTRACT) BID FORM (LUMP SUM CONTRACT) Place County of El Paso Purchasing Department Date Project No. 11-016 Proposal of (hereinafter called Bidder), a corporation organized under the laws of the State of /a partnership/an

More information

HAWTHORNE AND THAD WATER & WASTEWATER IMPROVEMENTS ITB #124D 16F CITY OF IRVING ADDENDUM # 1 MAY 10, 2016

HAWTHORNE AND THAD WATER & WASTEWATER IMPROVEMENTS ITB #124D 16F CITY OF IRVING ADDENDUM # 1 MAY 10, 2016 HAWTHORNE AND THAD WATER & WASTEWATER IMPROVEMENTS ITB #124D 16F CITY OF IRVING ADDENDUM # 1 MAY 10, 2016 1. THIS ADDENDUM IS HEREBY MADE AS PART OF THIS CONTRACT SPECIFICATION. THIS ADDENDUM IS ISSUED

More information

Public Hearing December 12, 2013

Public Hearing December 12, 2013 Public Hearing December 12, 2013 Commission s Water Transmission System Finished Water Transmission System South Transmission Main South Transmission Main Route South Main Replacement Route from Provin

More information

PIPE BURSTING GRAVITY SEWER MAINS WITH HDPE PIPE

PIPE BURSTING GRAVITY SEWER MAINS WITH HDPE PIPE PIPE BURSTING GRAVITY SEWER MAINS WITH HDPE PIPE SUGGESTED STANDARD SPECIFICATION January, 2012 Prepared by International Pipe Bursting Association Thanks to the following participants for the development

More information

ADDENDUM NO 1. TO: All Prospective Bidders DATE: 8/17/17 PROJECT: New Residence Hall (WP B)

ADDENDUM NO 1. TO: All Prospective Bidders DATE: 8/17/17 PROJECT: New Residence Hall (WP B) Office of the Capital Planning, Design & Construction Phone: 973-720-2352 Fax: 973-720-2829 WWW.WPUNJ.EDU ADDENDUM NO 1 TO: All Prospective Bidders DATE: 8/17/17 PROJECT: New Residence Hall (WP-16-01-99-B)

More information

Engineering Department

Engineering Department Engineering Department Stormwater Mission: To provide for the efficient and effective cleaning and repair of the stormwater collection system and implement the federally mandated Stormwater Pollution Prevention

More information

REQUEST FOR BIDS BUILDING DEMOLITION 102 W. Main St.

REQUEST FOR BIDS BUILDING DEMOLITION 102 W. Main St. 531 N. Nash Street Hortonville, WI 54944-0099 Phone: 920-779-6011 Fax: 920-779-6552 www.hortonvillewi.org REQUEST FOR BIDS BUILDING DEMOLITION 102 W. Main St. Date Issued: February 5, 2016 Date Due: March

More information

I. General Information. A. Project Team & Contacts: Role Company Name Phone City of Johnson City Jeff Owner Water & Sewer Harmon, PE Department

I. General Information. A. Project Team & Contacts: Role Company Name Phone  City of Johnson City Jeff Owner Water & Sewer Harmon, PE Department I. General Information Civil Engineering Surveying Environmental Consulting Tysinger, Hampton & Partners, Inc. OPTIONAL PRE-BID MEETING MINUTES Austin Springs Road Water Line Replacement Project ITB #6190

More information

REQUEST FOR PROPOSALS TO PROVIDE PLANNING, RECOMMENDATIONS, AND CONTRACT DOCUMENTS FOR PIPELINE INSPECTION AND CONDITION ASSESSMENT FOR THE

REQUEST FOR PROPOSALS TO PROVIDE PLANNING, RECOMMENDATIONS, AND CONTRACT DOCUMENTS FOR PIPELINE INSPECTION AND CONDITION ASSESSMENT FOR THE REQUEST FOR PROPOSALS TO PROVIDE PLANNING, RECOMMENDATIONS, AND CONTRACT DOCUMENTS FOR PIPELINE INSPECTION AND FOR THE 24-INCH UNIT B AND 27-INCH UNIT K RANCHO SUMMIT DRIVE PIPELINES 12-INCH ENCINITAS

More information

Peralta Community College District th Avenue Oakland, California Phone (510) Fax (510) Purchasing Department

Peralta Community College District th Avenue Oakland, California Phone (510) Fax (510) Purchasing Department Peralta Community College District 501 5 th Avenue Oakland, California 94606 Phone (510) 466-7225 Fax (510) 587-7873 Purchasing Department Date: March 30, 2011 ADDENDUM No. 3 BID NO.: 10-11/27 PCCD Smart

More information

City of New Haven. 101 FRONT STREET PO BOX 236 NEW HAVEN, MO Phone * * Fax

City of New Haven. 101 FRONT STREET PO BOX 236 NEW HAVEN, MO Phone *  * Fax City of New Haven 101 FRONT STREET PO BOX 236 NEW HAVEN, MO 63068 Phone 573-237-2349 * www.newhavenmo.org * Fax 573-237-4696 February 19, 2013 Request for Bids New Haven City Park Bock Field fencing The

More information

CONTRACTOR S PROPOSAL FISCAL YEAR STREET IMPROVEMENT PROJECT AND MAIN STREET BRIDGE REHABILITATION

CONTRACTOR S PROPOSAL FISCAL YEAR STREET IMPROVEMENT PROJECT AND MAIN STREET BRIDGE REHABILITATION CONTRACTOR S PROPOSAL COMPANY ADDRESS CITY, STATE, ZIP ( ) TELEPHONE NUMBER City of Hesperia 9700 Seventh Avenue Hesperia, CA 92345 Ladies and Gentlemen: STATE LICENSE NUMBER Pursuant to the Public Notice

More information

PROTECTIVE PLUMBING PROGRAM (3P)

PROTECTIVE PLUMBING PROGRAM (3P) PROTECTIVE PLUMBING PROGRAM (3P) Protect your home from sewer back-ups Call us to see if you are eligible for the program! Program Overview Backwater Valves... Provide protection against backflow of sewage

More information

EVALUATION SUBJECT: HAMMERHEAD CURED-IN- PLACE PIPE (CIPP) LINING SYSTEM DIVISION: PLUMBING SECTION: SANITARY WASTE AND VENT PIPING

EVALUATION SUBJECT: HAMMERHEAD CURED-IN- PLACE PIPE (CIPP) LINING SYSTEM DIVISION: PLUMBING SECTION: SANITARY WASTE AND VENT PIPING ICC-ES Report PMG-1273 Reissued 01/2018 This report is subject to renewal 01/2019 EVALUATION SUBJECT: HAMMERHEAD CURED-IN- PLACE PIPE (CIPP) LINING SYSTEM DIVISION: 22 00 00 PLUMBING SECTION: 22 13 16

More information

Pam Iorio, Mayor 306 E. Jackson St * Tampa, FL Wastewater Department. Overflow Report

Pam Iorio, Mayor 306 E. Jackson St * Tampa, FL Wastewater Department. Overflow Report Page 1 / 7 Reported By: Owner: Name: FRED OCASIO with KCI TECHNOLOGIES Name:, Wastewater Department Location of Overflow: 17301 BRUCE B DOWNS BLVD Address: 306 E. Jackson Street Phone Number: 813 495-2460

More information

Lessons [being] learnt 2016 Flood in Cedar Rapids. Sandy Pumphrey Project Engineer II Flood Mitigation

Lessons [being] learnt 2016 Flood in Cedar Rapids. Sandy Pumphrey Project Engineer II Flood Mitigation Lessons [being] learnt 2016 Flood in Cedar Rapids Sandy Pumphrey Project Engineer II Flood Mitigation 319 286 5363 s.pumphrey@cedar-rapids.org Agenda 2008 Flood Event 2016 Flood Event [Long Term] Flood

More information

The New Age for Sewer Planning at the City of Los Angeles

The New Age for Sewer Planning at the City of Los Angeles The New Age for Sewer Planning at the City of Los Angeles Mario Dimzon 1 * P.E., Fernando Gonzalez 1 P.E., Ali Poosti 1 PE, Adel Hagekhalil 1 PE, Erick Heath 2 P.E., Rajan Ray 2 P.E., Erin Breen 2 P.E.

More information

This policy will generally explain the following in regards to the City sewerage collection systems:

This policy will generally explain the following in regards to the City sewerage collection systems: CITY OF SACO POLICY ON SEWER AND STORMWATER BACK-UPS PURPOSE The purpose of this policy is to explain how and why sewer or stromwater backups occur, what to do in the event a homeowner has a backup, and

More information

BID INSTRUCTIONS. Montour County Courthouse Retaining Wall Repair Project

BID INSTRUCTIONS. Montour County Courthouse Retaining Wall Repair Project BID INSTRUCTIONS Montour County Courthouse Retaining Wall Repair Project The Montour County Commissioners are receiving bids for the Courthouse Retaining Wall Repair Project. The parking lot is located

More information

SAN FRANCISCO PUBLIC UTILITIES COMMISSION INFRASTRUCTURE CONSTRUCTION MANAGEMENT PROCEDURES

SAN FRANCISCO PUBLIC UTILITIES COMMISSION INFRASTRUCTURE CONSTRUCTION MANAGEMENT PROCEDURES SAN FRANCISCO PUBLIC UTILITIES COMMISSION INFRASTRUCTURE CONSTRUCTION MANAGEMENT PROCEDURES SECTION: SFPUC INFRASTRUCTURE CONSTRUCTION MANAGEMENT PROCEDURE NO: 032 TITLE: SQS PLAN AND SURVEILLANCE PROCESS

More information

Sidewalk Repair Program. Charter Township of Canton Engineering Services

Sidewalk Repair Program. Charter Township of Canton Engineering Services Sidewalk Repair Program Charter Township of Canton Engineering Services Sidewalk Repair Program History Canton lost a landmark case at the Michigan Supreme Court level in 1997. The Supreme Court has determined

More information

WINTERHAVEN PUBLIC SAFETY FACILITY PROJECT

WINTERHAVEN PUBLIC SAFETY FACILITY PROJECT WINTERHAVEN PUBLIC SAFETY FACILITY PROJECT Funded by: California Department of Housing and Community Development (HCD) through its Community Development Block Grant (CDBG) Program and the County of Imperial.

More information

Stacey Camillo, Contract Administration. As-Needed Construction Contracting

Stacey Camillo, Contract Administration. As-Needed Construction Contracting Stacey Camillo, Contract Administration As-Needed Construction Contracting November 3, 2016 Why we are here Agenda Introductions Methods of getting construction work in San Francisco New As-Needed Construction

More information

CITY OF ENCINITAS CITY COUNCIL AGENDA REPORT Meeting Date: December 12, 2012

CITY OF ENCINITAS CITY COUNCIL AGENDA REPORT Meeting Date: December 12, 2012 CITY OF ENCINITAS CITY COUNCIL AGENDA REPORT Meeting Date: December 12, 2012 TO: VIA: FROM: SUBJECT: City Council Gus Vina, City Manager Tim Nash, Finance Director Glenn Pruim, Director of Public Works/Engineering

More information

Request for Proposals

Request for Proposals Request for Proposals PLEASE TAKE NOTICE that the Lakewood Township Municipal Utilities Authority (Authority) hereby solicits proposals for performance of a Leak Detection Survey (LDS) of the Authority

More information

Finance & Technology Administrator (815) ext 223

Finance & Technology Administrator (815) ext 223 2017 PAVING IMPROVEMENTS BID PACKET Due: Location: April 26, 2017 by 10:00 am Oregon Park District Fairgrounds Park 607 Fair Park Drive Oregon, IL 61061 Bid Proposal: 2017 Paving Improvements Administrative

More information

MEMORANDUM DEBBIE MALICOAT, DIRECTOR OF ADMINISTRATIVE SERVICES

MEMORANDUM DEBBIE MALICOAT, DIRECTOR OF ADMINISTRATIVE SERVICES MEMORANDUM TO: FROM: CITY COUNCIL DEBBIE MALICOAT, DIRECTOR OF ADMINISTRATIVE SERVICES SUBJECT: CONSIDERATION OF A RESOLUTION AMENDING THE TITLE AND JOB DESCRIPTION OF THE CAPITAL PROJECTS ENGINEER POSITION

More information

17/03/2017 CONTENTS. Real Cases Studies in the Region for Pipelines Inspection & Rehabilitation. Introduction CONTENTS. Introduction / Cont.

17/03/2017 CONTENTS. Real Cases Studies in the Region for Pipelines Inspection & Rehabilitation. Introduction CONTENTS. Introduction / Cont. E M I R A T E S Real Cases Studies in the Region for Pipelines Inspection & Rehabilitation i) Introduction Dubia, UAE 14 March 2017 Trenchless Middle East Faiz Alelweet & Eng. Hamza Ali Maintenance Manager

More information

PROCESSING COMBINED LASER, SONAR AND HD IMAGING FOR BETTER EVALUATION DECISIONS

PROCESSING COMBINED LASER, SONAR AND HD IMAGING FOR BETTER EVALUATION DECISIONS North American Society for Trenchless Technology (NASTT) No-Dig Show 2011 Washington, D.C. March 27-31, 2011 Paper F-3-05 PROCESSING COMBINED LASER, SONAR AND HD IMAGING FOR BETTER EVALUATION DECISIONS

More information

Main Building Auditorium

Main Building Auditorium Main Building Auditorium Theatre and Lighting Upgrade Moberly Area Community College 101 College Avenue Moberly, Missouri This document contains all necessary instructions and specifications to perform

More information

EL PASO WATER - PUBLIC SERVICE BOARD REQUEST FOR SUBMITTALS RFS June 27, 2017

EL PASO WATER - PUBLIC SERVICE BOARD REQUEST FOR SUBMITTALS RFS June 27, 2017 EL PASO WATER - PUBLIC SERVICE BOARD REQUEST FOR SUBMITTALS RFS 21-17 June 27, 2017 TO: RE: Invited Firms Request for Submittals to El Paso Water - Public Service Board (EPWater) Statement of Work Professional

More information

THE MUNICIPALITY OF SIOUX LOOKOUT

THE MUNICIPALITY OF SIOUX LOOKOUT THE MUNICIPALITY OF SIOUX LOOKOUT CONSULTANT TERMS OF REFERENCE TO PREPARE DETAILED DESIGN FOR PARK STREET LANE INFRASTRUCTURE UPGRADES IN URBAN SIOUX LOOKOUT RFP R013-2017 July 21, 2017 Terms of Reference

More information

COUNTY OF SAN JOAQUIN

COUNTY OF SAN JOAQUIN August 1, 2012 COUNTY OF SAN JOAQUIN General Services Department 44 North San Joaquin Street, Suite 590 Stockton, California 95202-2778 (209) 468-3357, Fax (209) 468-2186 GABRIEL E. KARAM Director Capital

More information

INVITATION TO BID. Roof Repair Multiple Elastomeric Coating Roofs. Invitation to Bid No. 2013/14-09

INVITATION TO BID. Roof Repair Multiple Elastomeric Coating Roofs. Invitation to Bid No. 2013/14-09 INVITATION TO BID Invitation to Submittal Deadline: Wednesday, April 30, 2014 at 2:00 p.m. Mail bids to the following address: Curry County Administration 700 N. Main Street, Suite 10 Clovis, NM 88101

More information

City of Concord. Sewer System Management Plan

City of Concord. Sewer System Management Plan City of Concord Sewer System Management Plan June 2014 CIWQS WDID: 2SSO10109 City Council Original Adoption July 14, 2008 City Council 2 nd Adoption March 6, 2012 City Council 3 rd Adoption: September

More information

WEF Collection Systems Conference Managing the Useful Life of Your Segmented Block Combined Sewer

WEF Collection Systems Conference Managing the Useful Life of Your Segmented Block Combined Sewer Managing the Useful Life of Your Segmented Block Combined Sewer Dianne M Sumego, P.E. Black & Veatch ABSTRACT Following two road collapses, as a result of deterioration within the City s segmented block

More information

COUNTY OF SUFFOLK STEVEN BELLONE SUFFOLK COUNTY EXECUTIVE DEPARTMENT OF PUBLIC WORKS

COUNTY OF SUFFOLK STEVEN BELLONE SUFFOLK COUNTY EXECUTIVE DEPARTMENT OF PUBLIC WORKS CEE BS, Fulltime (3 positions) Posted 1/30/2017 COUNTY OF SUFFOLK STEVEN BELLONE SUFFOLK COUNTY EXECUTIVE DEPARTMENT OF PUBLIC WORKS SUFFOLK COUNTY IS AN EQUAL OPPORTUNITY / AFFIRMATIVE ACTION EMPLOYER

More information

Table of Contents. Page Title Sheet and Index Project History and Summary Work Summary Overview 3-7

Table of Contents. Page Title Sheet and Index Project History and Summary Work Summary Overview 3-7 Summary Final Report EPA Assistance ID Number: XP-00E59701-2 : Excess Flow Reduction Efforts Evergreen Farmington Sewage System Manhole Rehab and Sewer Lining Table of Contents Page Title Sheet and Index

More information

SUBJECT: ITB , Oxford Road Complete Street Improvements Project ADDENDUM #1

SUBJECT: ITB , Oxford Road Complete Street Improvements Project ADDENDUM #1 DATE: May 18, 2016 TO: FROM: All Bidders/Proposers Willie Velez, CPPB Procurement Administrator City of Casselberry Purchasing Division SUBJECT: ITB-2016-0023, Oxford Road Complete Street Improvements

More information

PROJECT MANUAL BID DOCUMENT 95% REVIEW CHECKLIST PROJECT BID NO EPWU PEM. CONSULTANT SUBMITTED ON / / as a 95% (A) original

PROJECT MANUAL BID DOCUMENT 95% REVIEW CHECKLIST PROJECT BID NO EPWU PEM. CONSULTANT SUBMITTED ON / / as a 95% (A) original PROJECT BID NO EPWU PEM CONSULTANT SUBMITTED ON / / as a 95% (A) original RESUBMITTED ON / / as a 95% (B) revision 1.0 FRONT COVER 1.1 1.2 1.3 1.4 Title begins with location key words, otherwise with program/project

More information

RFP # Request for Proposal Branding Services. Date: January 12, Proposals must be submitted by 3:00 PM: February 10, 2017

RFP # Request for Proposal Branding Services. Date: January 12, Proposals must be submitted by 3:00 PM: February 10, 2017 RFP #1116-1 Request for Proposal Branding Services Date: January 12, 2017 Proposals must be submitted by 3:00 PM: February 10, 2017 Purchasing Department Queens Borough Public Library 89-11 Merrick Boulevard

More information

10:00 AM, Wednesday, April 8, 2015

10:00 AM, Wednesday, April 8, 2015 NOTICE OF MANDATORY PRE-BID CONFERENCE WILL BE HELD AT 10:00 AM, Wednesday, April 8, 2015 IN ROOM 16, CITY HALL BUILDING, 101 NORTH MAIN STREET WINSTON-SALEM, NORTH CAROLINA The purpose of this conference

More information

AI-05-CCTV INSPECTION OF EXISTING PIPELINES PRIOR TO OTHER WORKS

AI-05-CCTV INSPECTION OF EXISTING PIPELINES PRIOR TO OTHER WORKS AI-05-CCTV INSPECTION OF EXISTING PIPELINES PRIOR TO OTHER WORKS Ver.1 Date: October 2014 1. SCOPE This section covers the inspection of existing sewer and stormwater pipelines before and after the construction

More information

REQUEST FOR PROPOSALS

REQUEST FOR PROPOSALS REQUEST FOR PROPOSALS CONSTRUCTION MANAGEMENT SERVICES OCTOBER 09, 2014 EAST BAY REGIONAL PARK DISTRICT Atlas Road Extension Improvements POINT PINOLE REGIONAL SHORELINE PROPOSALS DUE: 2:00PM, NOVEMBER

More information

PIPE BURSTING SUCCESS

PIPE BURSTING SUCCESS GRUNDOCRACK PNEUMATIC PIPE BURSTING SYSTEM PIPE BURSTING SUCCESS STARTS HERE TT Technologies is the world leader in pipe bursting equipment and experience. For over 20 years contractors have relied upon

More information

STORMWATER ASSET MANAGEMENT:

STORMWATER ASSET MANAGEMENT: STORMWATER ASSET MANAGEMENT: DEFINING THE ASSETS CONDITION John Martin, City of Sylvan Lake Nicole Selais, Hubbell, Roth & Clark, Inc. Janice Lerg, Hubbell, Roth & Clark, Inc. MWEA WATERSHED & STORMWATER

More information

GENERAL CONSTRUCTION

GENERAL CONSTRUCTION GENERAL CONSTRUCTION 1. All construction work shall be done in accordance with the current version of the Idaho Standards for Public Works Construction (ISPWC), the City of Meridian Supplemental Specifications

More information

CITY OF LYNWOOD. Specification for Correlator-Based Leak Detection Study

CITY OF LYNWOOD. Specification for Correlator-Based Leak Detection Study CITY OF LYNWOOD Request for Proposals (RFP) for Specification for Correlator-Based Leak Detection Study Date: November 16, 2011 Department: Project Name: Public Works Specification for Correlator-Based

More information

REQUEST FOR STATEMENT OF QUALIFICATIONS SOQ #

REQUEST FOR STATEMENT OF QUALIFICATIONS SOQ # REQUEST FOR STATEMENT OF QUALIFICATIONS SOQ #2018-010 for PROFESSIONAL SERVICES Architectural, Landscape Architectural, Appraisal, Title, Engineering and Survey FY 2018 Issue date: January 25, 2018 Lake

More information

Bloomington Township Public Water District User Information Packet. Water Service

Bloomington Township Public Water District User Information Packet. Water Service Bloomington Township Public Water District User Information Packet Water Service Page Description 1 I Water Service Connections 1 General Information 1 Water Meters Installed Inside Users Premises 1 New

More information

ADVERTISEMENT FOR DESIGN BUILDER PREQUALIFICATION

ADVERTISEMENT FOR DESIGN BUILDER PREQUALIFICATION ADVERTISEMENT FOR DESIGN BUILDER PREQUALIFICATION Subject to conditions prescribed by the University of California, San Diego, responses to the University's prequalification documents for a Design Build

More information

INLINER LAY_InLiner Brochure_FA_ indd 1

INLINER LAY_InLiner Brochure_FA_ indd 1 INLINER LAY_InLiner Brochure_FA_010913.indd 1 Layne Inliner, LLC is the second largest cured-in-place pipe (CIPP) lining company in the United States. We began as the first U.S. licensee of the Inliner

More information

ULTRAVIOLET LIGHT CIPP LINING OF EXISTING SEWERS

ULTRAVIOLET LIGHT CIPP LINING OF EXISTING SEWERS PART 1 GENERAL 1.01 DESCRIPTION A. SCOPE ULTRAVIOLET LIGHT CIPP LINING OF EXISTING SEWERS This contract covers the rehabilitation of severely deteriorated existing sanitary and combined sewers by lining

More information

Bolton & Menk, Inc Premier Drive Mankato, MN June 2, 2015

Bolton & Menk, Inc Premier Drive Mankato, MN June 2, 2015 ADDENDUM NO. 1 City of Saint James, MN Tower Coating Improvements Bid Date: June 5, 2015 Bid Time: 2:00 p.m. BMI Project No. M17.110096 Bolton & Menk, Inc. 1960 Premier Drive Mankato, MN 56001 June 2,

More information

Project Background for Trenchless Water Main Replacement Program Major Project Team Members : -City of Livonia and Department of Public Works - Prof.

Project Background for Trenchless Water Main Replacement Program Major Project Team Members : -City of Livonia and Department of Public Works - Prof. MI-AWWA / MWEA Joint Conference e August 13, 2010 Soaring Eagle Resort & Conference Center Livonia s Water System Winning Solution in Tough Times Concept to Construction HDPE Pipe Bursting / Prechlorinated

More information

BUYER MUST MAKE ARRANGEMENTS FOR LOADING AND TRANSPORTING THE CONTAINERS.

BUYER MUST MAKE ARRANGEMENTS FOR LOADING AND TRANSPORTING THE CONTAINERS. LOS ANGELES COUNTY METROPOLITAN REQUEST FOR BID TRANSPORTATION AUTHORITY PROCUREMENT DEPARTMENT BID NO. 021308-S ONE GATEWAY PLAZA LOS ANGELES, CALIFORNIA 90012-2932 TEL. (213) 922-1092 THIS IS NOT AN

More information

UNDERGROUND CONSTRUCTION ISSUE TRAUTWEIN TACKLES NEWHOPE PLACENTIA TRUNK SEWER REPLACEMENT PROJECT CONSTRUCTION, INC. PG. 6

UNDERGROUND CONSTRUCTION ISSUE TRAUTWEIN TACKLES NEWHOPE PLACENTIA TRUNK SEWER REPLACEMENT PROJECT CONSTRUCTION, INC. PG. 6 UNDERGROUND CONSTRUCTION ISSUE TRAUTWEIN CONSTRUCTION, INC. PG. 6 TACKLES NEWHOPE PLACENTIA TRUNK SEWER REPLACEMENT PROJECT TRAUTWEIN CONSTRUCTION, INC. TACKLES NEWHOPE PLACENTIA TRUNK SEWER REPLACEMENT

More information

Appendix A EXAMPLE COLLECTION SYSTEM PERFORMANCE INDICATOR DATA COLLECTION FORM

Appendix A EXAMPLE COLLECTION SYSTEM PERFORMANCE INDICATOR DATA COLLECTION FORM Appendix A EXAMPLE COLLECTION SYSTEM PERFORMANCE INDICATOR DATA COLLECTION FORM EXAMPLE COLLECTION SYSTEM PERFORMANCE INDICATOR DATA COLLECTION FORM I. General Information A. Agency Name B. Agency Address

More information

SAN FRANCISCO UNIFIED SCHOOL DISTRICT FACILITIES, DESIGN AND CONSTRUCTION ADDENDUM NO. 1

SAN FRANCISCO UNIFIED SCHOOL DISTRICT FACILITIES, DESIGN AND CONSTRUCTION ADDENDUM NO. 1 SAN FRANCISCO UNIFIED SCHOOL DISTRICT FACILITIES, DESIGN AND CONSTRUCTION ADDENDUM NO. 1 PROJECT: OWNER: Shell and Core Improvements-1235 Mission Scope 3: Roofs 1 & 3 DATE: December 29, 2017 1235 Mission

More information

SAN FRANCISCO UNIFIED SCHOOL DISTRICT FACILITIES DESIGN & CONSTRUCTION LOBBY AND CAFETERIA FLOORING INSTALLATION EVERETT MIDDLE SCHOOL ADDENDUM NO.

SAN FRANCISCO UNIFIED SCHOOL DISTRICT FACILITIES DESIGN & CONSTRUCTION LOBBY AND CAFETERIA FLOORING INSTALLATION EVERETT MIDDLE SCHOOL ADDENDUM NO. SAN FRANCISCO UNIFIED SCHOOL DISTRICT FACILITIES DESIGN & CONSTRUCTION LOBBY AND CAFETERIA FLOORING INSTALLATION ADDENDUM NO. 1 PROJECT: 450 CHURCH STREET DATE: 13 FEBRUARY 2015 San Francisco, 94114 OWNER:

More information

Proposition G: City of Chula Vista Fair and Open Competition Ordinance February 2010, ballot language revised March 2010

Proposition G: City of Chula Vista Fair and Open Competition Ordinance February 2010, ballot language revised March 2010 Proposition G: City of Chula Vista Fair and Open Competition Ordinance February 2010, ballot language revised March 2010 Board Recommendation: SUPPORT Rationale: SDCTA supports open competition on projects

More information

Storm Water and Sanitary Sewer

Storm Water and Sanitary Sewer Public Works Department Summary Report on Planned Capital Improvements Storm Water and Sanitary Sewer Introduction Public Works has assembled this summary report to highlight major capital improvements

More information

REQUEST FOR PROPOSALS FOR LAWN CARE SERVICES

REQUEST FOR PROPOSALS FOR LAWN CARE SERVICES REQUEST FOR PROPOSALS FOR LAWN CARE SERVICES Issued by the St. Louis County Port Authority Proposals Due By: 3:00 PM on Thursday, March 29, 2018 St. Louis County Port Authority c/o St. Louis Economic Development

More information

SPECIFICATIONS FOR STREET CONSTRUCTION WITHIN THE TOWN OF PLAINVILLE

SPECIFICATIONS FOR STREET CONSTRUCTION WITHIN THE TOWN OF PLAINVILLE SPECIFICATIONS FOR STREET CONSTRUCTION WITHIN THE TOWN OF PLAINVILLE BE IT ORDAINED by the Town Council of the Town of Plainville: SECTION 1. SUBDIVISIONS. All subdivisions hereinafter developed within

More information

Improved Inflow & Infiltration (I&I) Monitoring Program

Improved Inflow & Infiltration (I&I) Monitoring Program City of Abbotsford Improved Inflow & Infiltration (I&I) Monitoring Program Submission For 2009 UBCM Community Excellence Awards Best Practices City of Abbotsford Improved Inflow & Infiltration (I&I) Monitoring

More information

Wastewater Master Facility Report. (Project Name) (Project Basin Location)

Wastewater Master Facility Report. (Project Name) (Project Basin Location) Wastewater Master Facility Report For (Project Name) (Project Basin Location) The Wastewater Master Facility Report for (Project name) dated (Date); located in the (Basin Name) Basin has been completed

More information

FLORIDA DEPARTMENT OF TRANSPORTATION

FLORIDA DEPARTMENT OF TRANSPORTATION ADDENDUM NO. 1 RFP-DOT-15/16-4006PM FLORIDA DEPARTMENT OF TRANSPORTATION ADDENDUM NO. 1 DATE: December 2, 2015 RE: RFP Number: RFP-DOT-15/16-4006PM Description: Districtwide Storm Sewer Inspection QUESTION:

More information

There are many technologies available for

There are many technologies available for Engineering Technologies for Pipeline Asset Management Bryon L. Livingston, Ahmad Habibian, and Dan Kugler There are many technologies available for managing the condition of underground infrastructure,

More information

Date: Telephone: Company Name: Address: City: State: Zip Code: Contact Person: Title: Authorized Signature:

Date: Telephone: Company Name: Address: City: State: Zip Code: Contact Person: Title: Authorized Signature: SUBMISSION INFORMATION Kenton County Fiscal Court P.O. Box 792 303 Court Street, Room 207 Covington, Kentucky 41012-0792 QUALIFICATION: Radio Project Phase II RFQ OPENING DATE: December 7, 2015 TIME: 2:00

More information

K:\Personnel\Personnel Comm Memos\2007\Proposed Organizational Structure Memo.doc Page 2 of 5

K:\Personnel\Personnel Comm Memos\2007\Proposed Organizational Structure Memo.doc Page 2 of 5 DISCUSSION There are a number of important factors necessitating the proposed organizational restructuring at the Authority: 1) The agency s fund programming responsibilities have grown significantly and

More information

ADVERTISEMENT FOR BIDS

ADVERTISEMENT FOR BIDS ADVERTISEMENT FOR BIDS 1. INVITATION Sealed proposals for the following work will be received by the University of Kentucky, Construction Procurement Section, Peterson Service Building, 411 South Limestone,

More information

UTILITIES COMMISSION CITY OF NEW SMYRNA BEACH, FLORIDA 200 CANAL STREET P.O. BOX 100 NEW SMYRNA BEACH, FL

UTILITIES COMMISSION CITY OF NEW SMYRNA BEACH, FLORIDA 200 CANAL STREET P.O. BOX 100 NEW SMYRNA BEACH, FL DATE: January 5, 2018 UTILITIES COMMISSION CITY OF NEW SMYRNA BEACH, FLORIDA 200 CANAL STREET P.O. BOX 100 NEW SMYRNA BEACH, FL 32170-010 ITB# 04-18 REPLACE 12 WATER MAIN AT TURNBULL BAY (DAMAGED DURING

More information

REQUEST FOR QUALIFICATIONS (RFQ)

REQUEST FOR QUALIFICATIONS (RFQ) REQUEST FOR QUALIFICATIONS (RFQ) AGENCY STRATEGIC PLANNING CONSULTANT April 15, 2016 Fresno Economic Opportunities Commission (Fresno EOC) seeks a qualified, experienced, professional consultant or consultant

More information

REQUEST FOR PROPOSAL FOR DEVELOPMENT OF CITY-OWNED PROPERTY WITHIN THE BAYBORO HARBOR COMMUNITY REDEVELOPMENT AREA

REQUEST FOR PROPOSAL FOR DEVELOPMENT OF CITY-OWNED PROPERTY WITHIN THE BAYBORO HARBOR COMMUNITY REDEVELOPMENT AREA REQUEST FOR PROPOSAL FOR DEVELOPMENT OF CITY-OWNED PROPERTY WITHIN THE BAYBORO HARBOR COMMUNITY REDEVELOPMENT AREA Issue Date APRIL 20, 2014 Due Date 1:00 P.M. Local Time MAY 20, 2014 v3 RFP 4th at 11th

More information

DEPARTMENT OF CODE ENFORCEMENT CITY OF NIAGARA FALLS, NEW YORK FEE SCHEDULE

DEPARTMENT OF CODE ENFORCEMENT CITY OF NIAGARA FALLS, NEW YORK FEE SCHEDULE DEPARTMENT OF CODE ENFORCEMENT CITY OF NIAGARA FALLS, NEW YORK 1/1/15 FEE SCHEDULE No permit shall be issued by the Director of Code Enforcement until fees hereinafter prescribed have been paid to the

More information

EXCAVATION / RIGHT OF WAY PERMIT

EXCAVATION / RIGHT OF WAY PERMIT $25 Application Fee PERMIT# EXCAVATION / RIGHT OF WAY PERMIT NOTE: No permit shall be issued without current Montana Contractors License, Insurance and Bonding on file with the Public Works Department.

More information