1 Israel Electric Corporation RFI - Request for Information Invitation to submit Technical & Commercial Information Including Price Estimation For Design and Manufacturing of Floating Security Barrier At the Israel Electric Company Maritime Domaine Contact: zeev gross zeev.gross@iec.co.il Deadline for sending information: 11 August

2 The Israel Electric Corporation (hereinafter: the "IEC") is the owner of five power plants located along the coast Haifa power station, Hadera power station, Tel Aviv power station, Ashdod power station and Ashkelon power station. 1. Introduction 1.1. Project Goals: IEC is seeking Information to provide security and safety measures for the inlet / outlet IEC seawater cooling pumps. Therefore, IEC is seeks a solution that will meet the following challenges: Preventing an intrusion of vessels into a designated and marked forbidden area Preventing a drifting swimmer from reaching the inlet pumps either if the attempt is from a vessel or and either from the land and swimming into the designated and marked prohibited areas Preventing the endangering of human lives in the outlet areas of the water pumps Reference threat: Small boats (up to 8.5 meters) and jet skis, each with a Maximum engine power of 110 Kw Kayaks, surfboards and SUPs (Stand Up Paddleboards) Swimmers General perception: To meet the challenges described above, IEC adopted a concept of security barriers in the entrances to the sites and safety barriers in the water inlet/outlet areas The outer security barriers at the entrances to the sites will inhibit intruding vessels and swimmers with a barrier enhanced with a structure to increase the freeboard (inhibit vaulting over the barrier) A safety barrier is to be located in closer proximity to the inlet ports to provide assistance to an inadvertent drifting swimmer from the adverse force from the pull of the inlet water pumps (line of demarcation) A safety barrier is to locate at a distance away from the outlets to establish a minimum distance that keeps a swimmer from the forces of the outlet water flows. 2

3 1.4. Location: Israel (five different sites): Site No 1 Haifa power station Site No 2 Hadera power station Site No 3 Tel Aviv power station Site No 4 Ashdod power station Site No 5 Ashkelon power station 1.5. Site Visit and Data Collection: The Manufacturer will visit the site to ascertain the general and local conditions that can affect the designs or their costs can be coordinating with Mr. telephone 1.6. Information Provided by IEC: The IEC has reference drawings of the sites and surrounding areas in and will provide these to the successful Manufacturer ( Manufacturer ) To ensure that the existing conditions are accurately reflected on the reference drawings, the Manufacturer will field verify the existing conditions during the Site Tour Exiting Utilities: IEC shall field verify all utility locations before commencing work and send a copy of the findings to the Manufacturer. This shall include, but are not limited to, the use of visual, sonic, electronic or magnetic detection devices IEC shall be responsible for utilities damaged during construction at no additional cost to the Manufacturer Utility Availability: IEC will prepare all infrastructures necessary for the Manufacturer to assemble, transport to each site and install systems (including Manufacturer lay down area at each of the sites) and security at each site in accordance with the manufacturer's submitted Information to this document Safety: During the execution of this contract, the Manufacturer shall conform to the rules and regulations as set forth by IEC 1.10 Manufacturer Identification: Prior to the commencement of work, the Manufacturer shall submit legible, color photocopies of all Manufacture staff. Additionally, Manufacturer and submanufacturer personnel shall, at all times, wear 3

4 2. Scope Of Work: Manufacturer shall provide services to design, produce, transport and supervise the team of IEC installers to assemble and install the floating security and safety barriers at all five sites. For the construction phase, IEC shall provide all Sinkers, labor, and equipment necessary to install the floating barriers. The floating barrier shall meet the parameters stated below. These are the requirements on which the Manufacturer s bid will be evaluated. Work includes, but is not limited to the following: 2.1. Provide design (including As-builts) services to fully design the floating barriers from conceptual stage through construction and full acceptance. The IEC will secure the environmental permits required prior to construction. The IEC shall neither begin construction nor purchase boom or mooring materials until the 100% construction design is approved Design & supply two different types of linear floating barrier: A floating security barrier designed to impede lower level threats (see section 1.2.1, 1.2.2, 1.2.3) from entering designated restricted areas. This type of barrier will be designated as type "V" A floating safety barrier which will clearly delineate the boundaries of the designated restricted areas and will satisfy the requirement to assist any person who inadvertently is in the immediate areas of the inlet/out flows of water. (see section 1.2.2, 1.2.3). This type of barrier will be designated as type "N" or "U" (according to its location (inlet/outlet respectively) Environmental parameters: The floating barrier must be designed to withstand the following values and conditions: Vessel Barrier ("V") reiern eiitni ("N") Outlet Barrier )" U"( Remarks Other environmental conditions Wind Wave Tide Current ) stonk( ) stntek( ) stntek( ) stonk( The wind and current shall be assumed to act at normal incidence to the barrier. 2. The wave height is the significant wave height, H s. 1. Barriers systems will be required to meet the conditions of high intensity solar radiation. 2. Barriers systems will be required to meet Water temperature 15 to 32 C 3. Barriers systems will be required to meet Air temperature -10 to 50 C 4. Barriers systems will be required to meet the density of seawater

5 2.4 Life span All Types of floating barriers ("V", "N", and "U") must have a proven lifespan of at least 15 years maintenance free in similar environmental states All floating Modules must contain UV inhibitors to protect from sunlight and will have a proven lifespan of at least 20 years All mounting equipment and hardware must be stainless steel or other corrosionresistant material, wire rope cables must be encased in synthetic rubber tubing (EPDM) Design, fabricate and transport a linear (approximately 900 meters) barrier type "V" so that it creates a visible security barrier with enhanced energy absorbing freeboard The barrier shall be continuous from one shore connection to the other being joined with modular lengths of approximately 15m. IEC will designate the location in each barrier where the authorized access/egress and the width of the access will be specified The access/egress section must permit the passage of vessels that are 20 meters long with a 10 meter beam. All access sections must be able to be operated by 50 horsepower small vessels All sections must be able to be towed (for installation) by 50 horsepower small boats The system shall be capable of being opened on either end with a single-outboard rigid hull inflatable small boat The barrier must maintain an approximately rectangular shape; therefore it is required to be moored with mooring buoys and sinkers. The maximum allowable catenary in any barrier section is 50 meter, measured perpendicular to the barrier. (Sinkers will be supplied by IEC according Manufacturer design and specifications ( The barrier itself shall consist of closed cell foam-filled Modules The barrier will be a clear visible indicator with a specified pattern of White and International Orange colored Modules The barrier must be illuminated with solar-powered battery operated Warning lights at specified intervals. The lights shall be compatible with the standards of the Israel Shipping and Ports Authority aids-to-navigation lighting. Standards will be supplied upon award. 5

6 The barrier shall be capable of supporting an interior-mounted oil boom. The oil boom must be able to be separated from the primary barrier. The oil boom to be used shall be 23 to 27 oz. polyurethane The barrier will have a maximum draft of 15 cm to prevent the accumulation of jellyfish The barrier will have a Freeboard between 100 cm to 130 cm The barrier will provide a means for a swept exhausted swimmer to hold onto either side of the floating barrier The Manufacturer shall design a crossing infrastructure for electric cables inside the floating Modules for Video Motion Detection system & sensors and Public Address systems Folding the barrier will not be interrupted by the electric cables. However the opening section of the barrier will determine the source end of the power cables Each of the modules will allow at least two (2) different crossing 17mm power cables. One of them will cross under the water The fence posts configuration should avoid as much as possible making the floating barrier a fishing pier barrier Warning signs will be integrated in the floating barriers as specified by IEC The top of a warning sign will reach a height of 1.5 meters above the water level The sign will be an Aluminum 60 cm X 40 cm bolted to a frame The frame will be a welded Marine metal (profile dimensions will be advised by the Manufacturer of how the supporting structure will be connected to the barrier ( The support structure will also be the mounting for the solar powered battery operated Warning light The barrier will absorb direct impact Kinetic Energy of 40,000 Kg-Meter The barrier will not have a negative impact on the environment Design & supply a linear (approximately 900 meters) barrier type "N" so that it creates a visible safety line of demarcation The barrier shall be continuous from one shore connection to the other being joined with modular lengths of approximately 15m. IEC will designate the location in each 6

7 barrier where the authorized access/egress and the width of the access will be specified The access/egress section must permit the passage of vessels that are 20 meters long with a 10 meter beam. All access sections must be able to be operated by 50 horsepower small vessels All sections must be able to be towed (for installation) by 50 horsepower small boats The system shall be capable of being opened on either end with a single-outboard rigid hull inflatable small boat The barrier must maintain an approximately rectangular shape; therefore it is required to be moored with mooring buoys and sinkers. The maximum allowable catenary in any barrier section is 50 meter, measured perpendicular to the barrier. (Sinkers will be supplied by IEC according Manufacturer design and specifications) The barrier itself shall consist of closed cell foam-filled Modules The barrier will be a clearly visible indicator with a pattern of White and International Orange Modules The barrier must be illuminated with solar-powered battery operated Warning lights at specified intervals. The lights shall be compatible with standard of the Israel Shipping and Ports Authority The barrier shall be capable of supporting an interior-mounted oil boom. The oil boom must be able to be separated from the primary barrier. The oil boom to be used shall be 23 to 27 oz. polyurethane The barrier will have a maximum draft of 40 cm to prevent the accumulation of jellyfish The barrier will have a Freeboard between 50 cm to 70 cm The barrier will provide a means for a swept exhausted swimmer to hold onto it comfortably on both sides In case that in one of the sites, IEC will decide not to install type "V" barrier, then type "N" will include the following requirements: Warning signs will be integrated in the floating barriers as specified by IEC The top of a warning sign will reach a height of 1.5 meters above the water level The sign will be an Aluminum 60 cm X 40 cm bolted to a frame. 7

8 The frame will be a welded Marine metal (profile dimensions will be advised by the Manufacturer of how the supporting structure will be connected to the barrier ( The support structure will also be the mounting for the solar powered battery operated Warning light The Manufacturer shall design a crossing infrastructure for electric cables inside the floating Modules for Video Motion Detection system & sensors and Public Address systems Folding the barrier will not be interrupted by the electric cables. However the opening section of the barrier will determine the source end of the power cables Each of the modules will allow at least two (2) different crossing 17mm power cables. One of them will cross under the water The barrier will absorb direct impact Kinetic Energy of 25,000 Kg-Meter The barrier will not have a negative impact on the environment. 2.7 Design & supply a linear (approximately 1500 meters) barrier type "U" to create a visible safety line of demarcation The barrier shall be continuous from one shore connection to the other being joined with modular lengths of approximately 15m. IEC will designate the location in each barrier where the authorized access/egress and the width of the access will be specified In site #2, site #5 and possibly site #4 north the open water barrier side will be ended with a Marine Security Sign Buoy (include solar-powered battery operated light, radar reflector and a written warning sign) All sections must be able to be towed (for installation) by 50 horsepower small boats The system shall be capable of being opened on either end with a singleoutboard rigid hull inflatable small boat The barrier must maintain an approximately rectangular shape; therefore it is required to be moored with mooring buoys and sinkers. The maximum allowable catenary in any barrier section is 50 meter, measured perpendicular to the barrier. (Sinkers will be supplied by IEC according to Manufacturer design and specifications). 8

9 2.7.5 The barrier itself shall consist of closed cell foam-filled Modules The barrier will be a clearly visible indicator with a pattern of White and International Orange Modules The barrier must be illuminated with solar-powered battery operated Warning lights at specified intervals. The lights shall be compatible with standard of the Israel Shipping and Ports Authority The barrier will have a maximum draft of 40 cm The barrier will have a Freeboard between 50 cm to 70 cm the barrier will provide a means for a swept exhausted swimmer to hold onto it comfortably on both sides Warning signs will be integrated in the floating barriers as specified by IEC The top of a warning sign will reach a height of 1.5 meters above the water level The sign will be an Aluminum 60 cm X 40 cm bolted to a frame The frame will be a welded Marine metal (profile dimensions will be advised by the Manufacturer of how the supporting structure will be connected to the barrier) The support structure will also be the mounting for the solar powered battery operated Warning light the barrier must include radar reflectors at specified intervals. The reflectors shall be of a corrosion-resistant material to maximize their life span in the marine environment The Manufacturer shall design a crossing infrastructure for electric cables inside the floating Modules for Video Motion Detection system & sensors and Public Address systems Folding the barrier will not be interrupted by the electric cables. However the opening section of the barrier will determine the source end of the power cables Each of the modules will allow at least two (2) different crossing 17mm power cables. One of them will cross under the water the barrier will absorb direct impact Kinetic Energy of 25,000 Kg-Meter the barrier will not have a negative impact on the environment. 9

10 3. Additive items: 3.1. Electrically operated Gate: Site #4 is the home port of IEC vessels and barges. Hence, the opening and closing frequency of barrier #4V4 is high The Manufacturer shall Design & supply an electrical means for opening/closing of the 4V4 barrier sections (as wide a section as possible) The electrical means of opening/closing the GATE will be controlled from a remote unit (A small, portable unit) The order to open / close will be wireless (onshore/offshore), and from a distance of at least 1,000 meters in all weather conditions Gate opening time will be no more than 10 minutes giving an order to fully open Gate closing time will be no more than 15 minutes for the command to complete closure Gate failsafe will be in fully open position In the event of a malfunction, the GATE must be opened and closed in redounded mode (manually) by 50 horsepower small vessels After barrier closing it will be secured by a stainless steel lock The system will be supplied with two remote control units The M.T.B.F will allow proper functioning of at least 1000 opening / closing rate per year The Manufacturer will recommend the spare parts kit for the electrically operated gate The Manufacturer will define the electrically operated gate maintenance policy. 4. Jellyfish preventer: IEC experiences clogged debris screens in the cooling pumps inlet channels which can lead to power plant shutdown, therefore: 4.1. IEC invites Manufacturers to design and install a solution to keep the jellyfish out of the intake floating barrier IEC has chosen site #5 to deploy a technology demonstrator to prove that the system is meeting the challenge The system will be installed and operated and will be tested and examined for a full year IEC will supply all Infrastructure required to operate the system (electricity, compressed air, seawater) and will monitor the efficiency during the demonstration period. 10

11 5. Follow-on maintenance: the Manufacturer shall provide a schedule for annual maintenance of the system and associated cost estimates for each item. 6. Drawings: 6.1. It is recommended that all drawings necessary to fully describe the work to be performed be included Professional Engineer shall review, sign, and stamp all final design drawings under their responsible charge for each respective discipline. 7. Price estimation (Ex-factory price): 7.1. Manufacturers are asked to give price estimation in accordance with the following table (total price to each type of barrier and a breakdown to each site): Barrier type Price estimation Remarks Vessel Barrier ("V") Vessel Barrier ("V") without a fence Intake Barrier ("N") Outlet Barrier ("U") Electrical Gate 23 to 27 oz. polyurethane oil boom 7.2 It is hereby declared that the IEC is not obligated to purchase all types of barriers and is not obligated to the declared barrier lengths in this report. 8. Please provide a project (floating barriers longer than 100 meters and those with a means of access and egress for authorized vessels) reference list at least from year

12 9. Sites barrier types and the planned locations: 12

13 13

14 14

15 10. Barriers types and lengths Site Barrier Code Barrier Oil Boom V= vessel Length (m) Length (m) N= intake U= outlet OB= Oil Boom 1 1-V N1 232 =277 1-U V N2 2-N3 2-U =278 Total V = *(only one-for 3-V3a* 3-V3b* Total N = 865 price estimation 3-V3c) 3-V3c* 3-N Total U = U3 4-V Total OB= N5 200 =240 4-N N N U U V U LEGAL STATUS OF THIS INVITATION: Neither participation in this RFI nor the provision of any information to IEC hereunder or otherwise, shall grant participants any right, legal or otherwise, regarding participation in any current and/or future purchasing process conducted by IEC. IEC will not be obligated to engage with any person/entity that participates in this RFI for the purpose of Procurement of the services/equipment/system/goods or data that are the subject of the 15

16 RFI or for the purpose of development, implementation, manufacturing or construction Thereof. IEC will be entitled to use the information obtained through the RFI, as well as any datum, solution, process, technique or proposal included in any response and/or Documents/materials in connection with the responses, as submitted to IEC in this context. Without derogating from the aforesaid, IEC shall keep all information provided in this RFI confidential and shall use it or permit use thereof only for its own purposes, in connection with this RFI and/or any other purchasing process undertaken by IEC, subject to the right of perusal as specified below. IEC shall not be required, whether pursuant to this document or otherwise, to enter upon any purchase process of any type or kind. Response to the RFI will not provide an advantage in any procurement process, if and to the extent publicized, to any person/entity that responds to the RFI and will not obligate IEC to include such person/entity in any procurement process. Any reservation, amendment or supplement to the provisions above (whether included in the response to the RFI or otherwise) will have no legal effect and will not bind IEC. A participant in this RFI process shall have the right to peruse the procurement process documents as set forth in the Mandatory Tenders Regulations, , only if, following the RFI process, IEC initiates a tender/procurement process that is awarded to the provider of such information. 16

These guidelines are to ensure systematic and consistent pier construction throughout the Jonathan s Landing development.

These guidelines are to ensure systematic and consistent pier construction throughout the Jonathan s Landing development. PIER GUIDELINES 1 PIER CONSTRUCTION GUIDELINES These guidelines are to ensure systematic and consistent pier construction throughout the Jonathan s Landing development. 1. DEFINITIONS The following definitions

More information

SUPPLY PROCUREMENT NOTICE

SUPPLY PROCUREMENT NOTICE SUPPLY PROCUREMENT NOTICE Integrated Monitoring of the Romanian Black Sea Coast between Midia-Vama Veche RO 0103.02-02 Laboratory and Monitoring Component RO 0103.02-03 Ship Component Romania 1. Publication

More information

A-Series Aluminum Gantry Crane

A-Series Aluminum Gantry Crane SPANCO PRODUCT SPECIFICATIONS 1 A-Series Aluminum Gantry Crane This guide can be used to prepare a bid specification for the incorporation of an A-Series Gantry Crane into a competitive bid project or

More information

E-Series Steel Gantry Crane

E-Series Steel Gantry Crane SPANCO PRODUCT SPECIFICATIONS 1 E-Series Steel Gantry Crane This guide can be used to prepare a bid specification for the incorporation of an E-Series Gantry Crane into a competitive bid project or application.

More information

MSC Guidelines for Review of Ventilation System Plans

MSC Guidelines for Review of Ventilation System Plans K. B. FERRIE, CDR, Chief, Hull Division Purpose: This Plan Review Guideline (PRG) explains the requirements for seeking plan approval of ventilation systems from the Marine Safety Center (MSC) for most

More information

Combustion Laboratory Unit C492

Combustion Laboratory Unit C492 Combustion Laboratory Unit C492 Figure 1: C492 Unit with Optional C492A fitted Purpose built Combustion Chamber, with Instrumentation Designed for Supervised Student Operation Oil or Gas Burners Available

More information

Flotation Docking Systems INC

Flotation Docking Systems INC Flotation Docking Systems INC P.O. Box 178 Cedarville, MI 49719 P: 906-484-3422 F: 906-484-2335 E: info@flotationdocking.com W: www.flotationdocking.com Beauty strength is having, showing, or possessing

More information

Flotation Docking Systems, Inc.

Flotation Docking Systems, Inc. GENERAL SPECIFICATIONS The following data outlines the design calculations and specifications around which Flotation Docking Systems, Inc. products are constructed. The use of such information for contract

More information

Power Electronics, Inc. Packaged Equipment Center Standard Construction and Design Features

Power Electronics, Inc. Packaged Equipment Center Standard Construction and Design Features DESIGN CRITERIA FOR STANDARD CONSTRUCTION: These standard design elements of the P.E.I. Power Equipment Center are utilized to meet the following design criteria per ASCE 7-05 as adopted by the IBC (International

More information

PORT OF SAN FRANCISCO ELECTRICAL CODE. Based on the 2016 California Electrical Code

PORT OF SAN FRANCISCO ELECTRICAL CODE. Based on the 2016 California Electrical Code 2016 PORT OF SAN FRANCISCO ELECTRICAL CODE Based on the 2016 California Electrical Code The complete 2016 Port of San Francisco Electrical Code adopts and amends the 2013 edition of the California Electrical

More information

Questions and Answers for RFP No. 010 for the provision of prefabricated pharmacy storage units

Questions and Answers for RFP No. 010 for the provision of prefabricated pharmacy storage units December 6, 2017 Questions and Answers for RFP No. 010 for the provision of prefabricated pharmacy storage units 1. Question: In the site annex attachments mention is made of distance from the DHO What

More information

Lifting Appliances of Ships and Offshore Installations

Lifting Appliances of Ships and Offshore Installations CCS Rule Change Notice For: Lifting Appliances of Ships and Offshore Installations Version: May, 2016. RCN No.1 Effective date: 19 May, 2016 Beijing CONTENTS Chapter 3 CRANES, LIFTS, RAMPS AND SELF-LOADING

More information

OVERSHOT GATE TECHNICAL DATA SHEET

OVERSHOT GATE TECHNICAL DATA SHEET FRESNO OVERSHOT GATE TECHNICAL DATA SHEET Applications Fresno Overshot Gates effectively control upstream and downstream levels of canals. Improved flow control is achieved through the use of this fully

More information

Request for Proposal (RFP) Town of Carolina Beach. Refurbished Fire Boat 11/23/2016

Request for Proposal (RFP) Town of Carolina Beach. Refurbished Fire Boat 11/23/2016 Request for Proposal (RFP) Town of Carolina Beach Refurbished Fire Boat 11/23/2016 1.0 SUMMARY 1.1 Request for Proposals: Boat building firms with proven experience and expertise in fire/rescue boat up

More information

Underground and On ground Bicycle Parking Systems

Underground and On ground Bicycle Parking Systems Request for Information (RFI) Underground and On ground Bicycle Parking Systems July 2017 1 Israel Railways Ltd. Procurement & Contracting Division 1. Introduction Request for Information ( RFI ) Underground

More information

b) General instructions and documents to be submitted by an interested company:

b) General instructions and documents to be submitted by an interested company: REFERENCE: EOI/675/2015 Date: July 23, 2015 Dear Sir / Madam, United Nations Development Programme in Belarus (UNDP) invites companies to submit Expressions of Interest in participating in the subsequent

More information

Section Safety Section Cleanup. None Required

Section Safety Section Cleanup. None Required January 2000 Page 1 of 6 PART 1 GENERAL 1.01 OTHER CONTRACT DOCUMENTS 1.02 DESCRIPTION OF WORK 1.03 RELATED SECTIONS PART 2 PRODUCTS The General Conditions of the Contract, General Requirements, and Supplemental

More information

SST-II HYDRAULIC BI-FOLD SPECIFICATIONS

SST-II HYDRAULIC BI-FOLD SPECIFICATIONS PART 1 GENERAL 1.01 DESCRIPTION A. General 1. Furnish SST-II Hydraulic Bi-Fold System complete from one manufacturer. Provide all labor, materials, tools and equipment to furnish the SST-II Bi-Fold System

More information

ANNEX 1 DRAFT RESOLUTION MEPC.140(54) Adopted on 24 March 2006

ANNEX 1 DRAFT RESOLUTION MEPC.140(54) Adopted on 24 March 2006 DRAFT RESOLUTION MEPC.140(54) Adopted on 24 March 2006 GUIDELINES FOR APPROVAL AND OVERSIGHT OF PROTOTYPE BALLAST WATER TREATMENT TECHNOLOGY PROGRAMMES (G10) THE MARINE ENVIRONMENT PROTECTION COMMITTEE,

More information

Port and Harbour Monitoring Systems

Port and Harbour Monitoring Systems Data Management, Communications and Power Control In partnership with Port and Harbour Monitoring Systems Environmental Monitoring Tidal Gauges Dredge Monitoring Vessel Data Logging & Telemetry Asset Tracking

More information

RB WEIR GATES MODEL GENERAL DESCRIPTION DESIGN CONSTRUCTION

RB WEIR GATES MODEL GENERAL DESCRIPTION DESIGN CONSTRUCTION GENERAL DESCRIPTION The Orbinox model RB Weir Gate is designed for downward opening applications where a more accurate flow control is required. The water flows over the top of the slide permitting a constant

More information

Bottom Hinged Flood Barrier Operation & Maintenance Manual

Bottom Hinged Flood Barrier Operation & Maintenance Manual Rev. 091416 Bottom Hinged Flood Barrier Operation & Maintenance Manual Model BH-590 Table of Contents Product Information...2 Inspection & Maintenance...5 Inspection & Maintenance Log...8 Warranty Information...9

More information

INSTALLATION MANUAL Accordion Gangplank Model No. FBL-1000

INSTALLATION MANUAL Accordion Gangplank Model No. FBL-1000 INSTALLATION MANUAL Accordion Gangplank Model No. FBL-1000 PLEASE READ THE ENTIRE CONTENTS OF THIS MANUAL PRIOR TO INSTALLATION AND USE OF THE ACCORDION GANGPLANK. BY PROCEEDING, YOU AGREE THAT YOU FULLY

More information

Flood Mitigation Solutions

Flood Mitigation Solutions Brought to you by: (w) (p) 877-441-8368 (e) flexwall@smartvent.com Packed in Trench Mount Posts Vertically Deployed Flex-Wall Opera on The Ver cally Deployed Flex-Wall is deployed by opening the trench

More information

INVITATION TO BID B I D F O R M. Please submit bid on or before 2:15 pm 101 North Halagueno Street June 6, 2013, at the office of the

INVITATION TO BID B I D F O R M. Please submit bid on or before 2:15 pm 101 North Halagueno Street June 6, 2013, at the office of the BID NO.: 2013-30 INVITATION TO BID B I D F O R M Refuse Containers, Roll-Out Refuse Containers, Lids, Lid Assemblies, Front & Rear Replacement Lids, Piano and Loop Hinges City of Carlsbad Please submit

More information

Pioneer Forced Draft Cooling Tower Specifications

Pioneer Forced Draft Cooling Tower Specifications Delta Cooling Towers, Inc. 41 Pine Street P.O. Box 315 Rockaway, New Jersey 07866-0315 Telephone 973.586.2201 Fax 973.586.2243 www.deltacooling.com sales@deltacooling.com Pioneer Forced Draft Cooling Tower

More information

FLORIDA DEPARTMENT OF TRANSPORTATION

FLORIDA DEPARTMENT OF TRANSPORTATION ADDENDUM NO. 1 RFP-DOT-15/16-4006PM FLORIDA DEPARTMENT OF TRANSPORTATION ADDENDUM NO. 1 DATE: December 2, 2015 RE: RFP Number: RFP-DOT-15/16-4006PM Description: Districtwide Storm Sewer Inspection QUESTION:

More information

MDS TL5 Minimum Deflection Systems

MDS TL5 Minimum Deflection Systems MDS Minimum Deflection Systems Approvals FHWA NCHRP 350 MASH EN1317 H4 MDS BARRIERS Bridge & Road STEEL BARRIER SYSTEMS Page Page 1 1 V11 MDS BARRIERS Run-off-road crashes are one of the most common types

More information

MDS TL4 Minimum Deflection Systems

MDS TL4 Minimum Deflection Systems MDS Approvals FHWA NCHRP 350 MASH-08 EN1317 H2 Bridge & Road STEEL BARRIER SYSTEMS Page 1 V11 Run-off-road crashes are one of the most common types of crashes in urban and highway environments. Installing

More information

We are setting the standards! Modular. floating platforms

We are setting the standards! Modular. floating platforms We are setting the standards! Modular floating platforms RANGE OF SERVICE For the first time Zakład Wyrobów Metalowych created a floating platform in 2011. Over the last five years, we have built dozens

More information

White Rose Extension Project - Expression of Interest (EOI)/Prequalification Provision of Topsides Marine Transportation Reference No

White Rose Extension Project - Expression of Interest (EOI)/Prequalification Provision of Topsides Marine Transportation Reference No White Rose Extension Project - Expression of Interest (EOI)/Prequalification Provision of Topsides Marine Transportation Reference No. 8.34.1.092 Husky Energy Inc. (Husky), operator of the White Rose field

More information

SECTION FIELD ERECTED INDUCED DRAFT COOLING TOWER

SECTION FIELD ERECTED INDUCED DRAFT COOLING TOWER PART 1 GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the contract including general and supplementary conditions and specifications section apply to this section. B. Related Sections:

More information

HDPE Conduit Specification 2011

HDPE Conduit Specification 2011 General This specification covers the minimum requirements for HDPE conduit and is based on ASTM F 2160. HDPE Conduit is for use primarily in underground applications as conduit, innerduct, direct buried

More information

The Ton-Tel Weighbridge

The Ton-Tel Weighbridge The Ton-Tel Weighbridge Plug-and-Weigh Technology Built to last in a tough environment Proven reliability, lower total cost of ownership. Digital Load Cell weight sensors sealed to IP68. Plug-and-Weigh

More information

4. GENERAL REQUIREMENTS

4. GENERAL REQUIREMENTS 4. GENERAL REQUIREMENTS 4.1 APPLICATION FOR SERVICE Application for service must be made to, and accepted by, the Company before service will be furnished. At the time of application, the Customer shall

More information

T-Series Gantry Crane

T-Series Gantry Crane SPANCO PRODUCT SPECIFICATIONS 1 T-Series Gantry Crane This guide can be used to prepare a bid specification for the incorporation of a T-Series Gantry Crane into a competitive bid project or application.

More information

LNG Houston, February 6-7 th, The case for developing a Floating LNG Receiving Terminal on the US East Coast

LNG Houston, February 6-7 th, The case for developing a Floating LNG Receiving Terminal on the US East Coast LNG 2002 Houston, February 6-7 th, 2002 The case for developing a Floating LNG Receiving Terminal on the US East Coast By Sveinung J. Stohle, Executive Vice President, Golar LNG Ltd. Golar LNG s Strategy

More information

SECTION ELEVATED BLEACHERS (Angle Frame Semi-Closed Deck)

SECTION ELEVATED BLEACHERS (Angle Frame Semi-Closed Deck) SECTION 13125 ELEVATED BLEACHERS (Angle Frame Semi-Closed Deck) PART 1 GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and

More information

Woodfibre LNG Limited Response to SIGTTO LNG Ports and Risk Reduction Options

Woodfibre LNG Limited Response to SIGTTO LNG Ports and Risk Reduction Options Woodfibre LNG Limited Response to SIGTTO LNG Ports and Risk Reduction Options Introduction: The following is in response to the Environmental Assessment Office request for the Society of International

More information

About Cortland in Australia

About Cortland in Australia Marine Services Mooring and Marine Systems Solutions, Mooring Systems, Engineering and Support, Plasma Rope and Specialty Rope Products, Anchors, Chain and Fittings, Mooring and Navigation Buoys, Fenders,

More information

Contents. The Range The Finishes Application...09

Contents. The Range The Finishes Application...09 MARINE HARDWARE Contents The Range...03 The Finishes...08 Application...09 The Range HINGES The prime application of the hinge is for in cabin use; however, they can also be used for some alternative applications

More information

EXPRESSION OF INTEREST

EXPRESSION OF INTEREST EXPRESSION OF INTEREST White Rose Extension Project (WREP) EOI / Prequalification Wellhead Control Panel EOI-101414-702.0 Mustang Canada, Inc. is seeking prequalification responses from interested companies

More information

Diffused Aeration Piping Equipment

Diffused Aeration Piping Equipment 1.0 General 1.1. The specifications in this section include all components of the Diffused Aeration System with the exception of the individual diffuser units. Refer to additional specification sections

More information

Loading Dock Equipment. Three Generations of Quality Service Since Feature Product: Guardian Dor-Seal System. Quality Made, Built To Last

Loading Dock Equipment. Three Generations of Quality Service Since Feature Product: Guardian Dor-Seal System. Quality Made, Built To Last Quality Made, Built To Last Loading Dock Equipment Three Generations of Quality Service Since 1940 In this catalog: Feature Product: Guardian Dor-Seal System Dock Levelers Truck Restraints Dock Seals Dock

More information

Power Zone Center. Your solution for power distribution and control systems

Power Zone Center. Your solution for power distribution and control systems Power Zone Center Your solution for power distribution and control systems The Strength of One Powerful When you need to install a new power distribution center in your facility, you need it done in fastest

More information

INTERNATIONAL BUILDING CODE - ADOPTION AND AMENDMENTS Effective July 1, 2004

INTERNATIONAL BUILDING CODE - ADOPTION AND AMENDMENTS Effective July 1, 2004 CITY OF MERCER ISLAND 9611 SE 36 th Street, Mercer Island, Washington 98040-3732 PHONE (206) 236-5300 FAX (206) 236-3645 TDD (206) 232-9598 www.ci.mercer-island.wa.us INTERNATIONAL BUILDING CODE - ADOPTION

More information

AN HONOUR TO SERVICE SINCE 1985

AN HONOUR TO SERVICE SINCE 1985 AN HONOUR TO SERVICE SINCE 1985 Having property on a waterway and enjoying your free time boating, can sometimes be challenging and frustrating if you don t have the proper docking equipment. That s why

More information

DIRECTIVE 2006/42/EC OF THE EUROPEAN PARLIAMENT AND OF THE COUNCIL of 17 May 2006 on machinery, and amending Directive 95/16/EC (recast)

DIRECTIVE 2006/42/EC OF THE EUROPEAN PARLIAMENT AND OF THE COUNCIL of 17 May 2006 on machinery, and amending Directive 95/16/EC (recast) 2006L0042 EN 20.04.2016 004.001 1 This document is meant purely as a documentation tool and the institutions do not assume any liability for its contents B DIRECTIVE 2006/42/EC OF THE EUROPEAN PARLIAMENT

More information

SECTION WATERTIGHT FLOOD PLANKS. A. ASTM A 36 - Standard Specification for Carbon Structural Steel.

SECTION WATERTIGHT FLOOD PLANKS. A. ASTM A 36 - Standard Specification for Carbon Structural Steel. Page 1 of 5 Part 1. GENERAL SECTION 08390 WATERTIGHT FLOOD PLANKS 1.1 SECTION INCLUDES A. Flood Plank 1.2 RELATED SECTIONS 1.3 REFERENCES A. Section 03300 - Cast-In-Place Concrete. B. Section 04810 - Unit

More information

UNOPS Haiti Peguy-Ville, Haiti 13 January 2016 CLARIFICATIONS NOTES 1. Reference No. ITB-HTOC /re-tendering

UNOPS Haiti Peguy-Ville, Haiti 13 January 2016 CLARIFICATIONS NOTES 1. Reference No. ITB-HTOC /re-tendering UNOPS Peguy-Ville, 13 January 2016 CLARIFICATIONS NOTES 1 Reference No. ITB-HTOC-96347-001/re-tendering Provision and installation of a CCTV system Cap an Port Dear Bidders: Following the site visit held

More information

Quick-Start Operating Guide Document No Process Gas Cooler Copyright 2010 Terra Universal Inc. All rights reserved. Revised October 2010

Quick-Start Operating Guide Document No Process Gas Cooler Copyright 2010 Terra Universal Inc. All rights reserved. Revised October 2010 Document No. 1800-56 Copyright 2010 Terra Universal Inc. All rights reserved. Revised October 2010 Terra Universal, Inc. TerraUniversal.com 800 S. Raymond Ave. Fullerton, CA 92831 TEL: (714) 578-6000 FAX:

More information

B. System Design and Performance Requirements

B. System Design and Performance Requirements 15625 Water Chillers This document provides design standards only, and is not intended for use, in whole or in part, as a specification. Do not copy this information verbatim in specifications or in notes

More information

MICHIGAN DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR STOPPED TRAFFIC ADVISORY SYSTEM. OFS:CRB 1 of 8 APPR:JJG:LWB:

MICHIGAN DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR STOPPED TRAFFIC ADVISORY SYSTEM. OFS:CRB 1 of 8 APPR:JJG:LWB: MICHIGAN DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR STOPPED TRAFFIC ADVISORY SYSTEM OFS:CRB 1 of 8 APPR:JJG:LWB:10-30-13 a. Description. This work consists of providing, installing, operating,

More information

Stowage of Explosives on Vessels and issues noted with Small Ships

Stowage of Explosives on Vessels and issues noted with Small Ships Information Sheet (relevant until the 1st of January 2012 only) Stowage of Explosives on Vessels and issues noted with Small Ships INTRODUCTION The purpose of this Information Sheet is to advise all ship

More information

TARGAS-1. Portable Photosynthesis System. Photosynthesis Soil Respiration Canopy Assimilation Environmental Monitoring

TARGAS-1. Portable Photosynthesis System. Photosynthesis Soil Respiration Canopy Assimilation Environmental Monitoring TARGAS-1 Portable Photosynthesis System Photosynthesis Soil Respiration Canopy Assimilation Environmental Monitoring TARGAS-1 Main Console CO 2 & H 2 O Gas Analysis The TARGAS-1 console is compact, lightweight

More information

INVITATION TO BID ITB _UNDP PSU Clarifications 2 to Bidders 02/08/2016

INVITATION TO BID ITB _UNDP PSU Clarifications 2 to Bidders 02/08/2016 Question 1: LOT 2: Plug and play PV system with cabinet for ZIMBABWE: item 1.4: Minimum IP 55 class storage cabinet. and LOT 3: Plug and play PV system with cabinet for ZIMBABWE: item 1.5: Minimum IP 55

More information

level control gates Waterman Industries of Egypt WATERMAN

level control gates Waterman Industries of Egypt WATERMAN Automatic level control gates WATERMAN DOWNSTREAM LEVEL CONTROL Waterman Types "A" and "B" Automatic gates provide constant downstream water level control regardless of upstream level conditions or downstream

More information

SECTION PACKAGE BOOSTER PUMP STATIONS

SECTION PACKAGE BOOSTER PUMP STATIONS SECTION 331223 PACKAGE BOOSTER PUMP STATIONS Scope: The Contractor shall install a pump station at two locations to be determined by the Owner. These pump stations shall be designed to deliver flow to

More information

WALL MOUNTED ARTICULATING JIB CRANE

WALL MOUNTED ARTICULATING JIB CRANE SECTION 14656 WALL MOUNTED ARTICULATING JIB CRANE ***** Gorbel, Inc. manufacturers a broad range of material handling cranes including monorail, bridge, gantry, and jib cranes. Numerous work station and

More information

BP U.S. Pipelines and Logistics (USPL) Safety Manual Page 1 of 7

BP U.S. Pipelines and Logistics (USPL) Safety Manual Page 1 of 7 Safety Manual Page 1 of 7 Scaffolds 1. Purpose This policy establishes the basic safety requirements and safe work practices for the erection, use, inspection, movement, and dismantling of scaffolding.

More information

VPL-3200B Residential Vertical Platform Lift Technical Specifications

VPL-3200B Residential Vertical Platform Lift Technical Specifications Page 1 of 5 VPL-3200B Residential Vertical Platform Lift Technical Specifications MODEL NUMBER: VPL-3200B Series: Models VPL-3210B, VPL-3212B and VPL-3214B (DC-powered units) U.S. F.D.A. CLASSIFICATION:

More information

Safety Railing Solutions

Safety Railing Solutions providing safety solutions worldwide Safety Railing Solutions 2009 Solutions to your railing problems simple to design and specify unrivaled technical support world wide availability honoree CSI 05520

More information

A new generation of mooring bollards

A new generation of mooring bollards A new generation of mooring bollards TH NW NRATION MOORIN OLLARS.. ean & o was founded in 1949 by aptain.. ean a pilot with the Port of London Authority. Over the course of its history the company has

More information

Mounting System MCG 3.0 Membrane-Connected Glass. System description

Mounting System MCG 3.0 Membrane-Connected Glass. System description Mounting System MCG 3.0 Membrane-Connected Glass System description SUNOVA MCG 3.0 System Fields of application: Not suitable for: (please inquire for other SUNOVA systems) The SUNOVA MCG 3.0 system is

More information

FIBERGLASS ROUND CONTROL DAMPERS. Model K-RD INTRODUCTION M.K. PLASTICS PROVIDES FOUR DAMPER MODELS K-RD SUGGESTED SPECIFICATION

FIBERGLASS ROUND CONTROL DAMPERS. Model K-RD INTRODUCTION M.K. PLASTICS PROVIDES FOUR DAMPER MODELS K-RD SUGGESTED SPECIFICATION INTRODUCTION The M.K. Plastics series K-RD are manufactured to meet the needs of the odor control and corrosive HVAC industries by providing a corrosion-resistant FRP Damper that is used to regulate an

More information

MULTI STAIR ...THE FINEST WAY TO SET FOOT ON YOUR YACHT CARBON FIBRE 0% CORROSION 100% LIGHTWEIGHT PROTECTED SYSTEM BY MULTIPLEX GMBH

MULTI STAIR ...THE FINEST WAY TO SET FOOT ON YOUR YACHT CARBON FIBRE 0% CORROSION 100% LIGHTWEIGHT PROTECTED SYSTEM BY MULTIPLEX GMBH MULTI STAIR...THE FINEST WAY TO SET FOOT ON YOUR YACHT CARBON FIBRE 0% CORROSION 100% LIGHTWEIGHT PROTECTED SYSTEM BY MULTIPLEX GMBH 01 02...MULTISTAIR THE NOBLEST LIGHTWEIGHT IN ITS CLASS The multistair,

More information

Outreach Report Water Wall Turbine Inc.

Outreach Report Water Wall Turbine Inc. Outreach Report Water Wall Turbine Inc. Project: 443 MH - WWT Dent Island Tidal Power Generation Project March 2017 I. Executive Summary The Water Wall Turbine (WWT) project has produced the world s first

More information

References. EM , Sections 22 OSHA 29CFR (Subpart L ) UFGS [Latest] ANSI A

References. EM , Sections 22 OSHA 29CFR (Subpart L ) UFGS [Latest] ANSI A References EM385-1-1, Sections 22 OSHA 29CFR 1926.450 (Subpart L ) UFGS-01 35 29[Latest] ANSI A10.8-1988 What Is A Scaffold? An elevated, temporary work platform Three basic types: Supported scaffolds

More information

SPECIFICATIONS SECTION FLOOD CONTROL GATES. A. ASTM C 39 - Standard Test Method for Compressive Strength of Cylindrical Concrete Specimens.

SPECIFICATIONS SECTION FLOOD CONTROL GATES. A. ASTM C 39 - Standard Test Method for Compressive Strength of Cylindrical Concrete Specimens. SPECIFICATIONS SECTION FLOOD CONTROL GATES PART 1 GENERAL 1.1 SECTION INCLUDES A. Flood Gates. 1.2 RELATED SECTIONS A. N/A. 1.3 REFERENCES A. ASTM C 39 - Standard Test Method for Compressive Strength of

More information

MIL-L-26764B 4 March 1970 SUPERSEDING MIL-L-26764(ASG) 12 December 1963 MILITARY SPECIFICATION

MIL-L-26764B 4 March 1970 SUPERSEDING MIL-L-26764(ASG) 12 December 1963 MILITARY SPECIFICATION 4 March 1970 SUPERSEDING MIL-L-26764(ASG) 12 December 1963 MILITARY SPECIFICATION LIGHT, MARKER, AIRPORT APPROACH, HIGH INTENSITY, TYPE MB-2 This specification has been approved by the Department of the

More information

DESIGN GUIDELINES WIRING AND CONDUITS PAGE 1 of 7

DESIGN GUIDELINES WIRING AND CONDUITS PAGE 1 of 7 DESIGN GUIDELINES WIRING AND CONDUITS PAGE 1 of 7 1.1. REFERENCE STANDARDS 1.1.1. Publications listed below (including amendments, addenda, revisions, supplements and errata) form a part of this specification

More information

Portable Ventilator Product Catalog

Portable Ventilator Product Catalog Portable Ventilator Product Catalog WELCOME For more than 0 years, COPPUS portable ventilators and cooling products have been recognized as leaders in providing reliable, ventilation to meet the demands

More information

Fiberglass Cooling Towers

Fiberglass Cooling Towers Fiberglass Cooling Towers Available in sizes from 100 to 240 tons. FC Series 700 Fiberglass Cooling Tower Available in sizes from 170 to 240 tons. No other fiberglass cooling tower comes with as many high-quality

More information

JF (Bangladesh) Limited Topic: Project Cargo and/or Unique/Unusual Task

JF (Bangladesh) Limited Topic: Project Cargo and/or Unique/Unusual Task JF (Bangladesh) Limited Topic: Project Cargo and/or Unique/Unusual Task Presented by Sudatta Barua Lloyd s s Agency Department JF ( Bangladesh) Limited Finlay House Chittagong, Bangladesh at Lloyd s s

More information

TECHNICAL SPECIAL PROVISION FOR CONCRETE REPAIRS. Financial Project ID , &

TECHNICAL SPECIAL PROVISION FOR CONCRETE REPAIRS. Financial Project ID , & TECHNICAL SPECIAL PROVISION FOR CONCRETE REPAIRS Financial Project ID 429140-1-52-01, 429140-2-52-01 & 428267-1-52-01 The official record of this Technical Special Provision is the electronic file signed

More information

SECTION COOLING TOWER

SECTION COOLING TOWER PART 1 GENERAL 1.1 SECTION INCLUDES A. Mechanical induced draft Cooling Tower B. Controls C. Ladder and handrails 1.2 REFERENCES SECTION 23 65 00 COOLING TOWER A. ANSI/AFBMA 9 - Load Rating and Fatigue

More information

.2 The scales and automated system for each of the three (3) scales shall be supplied from a single manufacturer.

.2 The scales and automated system for each of the three (3) scales shall be supplied from a single manufacturer. New Entrance and Scale Facility Page 1 of 6 1. GENERAL 1.1 Work Included.1 The intent of the work under this section is to supply and install three (3) complete low profile platform (pitless) truck scales

More information

Buderus SB745WS/1550 Stainless Steel Condensing Boiler

Buderus SB745WS/1550 Stainless Steel Condensing Boiler Stainless Steel Condensing Boiler Engineering Submittal Sheet Boiler Components R Engineering Specifications The boiler(s) shall have a full three pass fire tube design to allow complete combustion of

More information

WE ARE EXPERTS ON ROOFINGS

WE ARE EXPERTS ON ROOFINGS WE ARE EXPERTS ON ROOFINGS READY TO SEE WHAT JUAL SOLAR CAN DO FOR YOUR NEXT PROJECT? CONTACT US TODAY! Industrivej 14, 7130 Juelsminde, Denmark E: jualsolar@jualsolar.dk T: +45 76 83 11 41 W: jualsolar.dk

More information

AREA SAFETY I

AREA SAFETY I AREA SAFETY Permanent Bollards 195 Removable Surface Mount Bollards 195 Pallet Racking Upright Protectors 196 Pallet Racking End Frame Protectors 196 3m and 6m Expandable Barriers 197 Multi Bay Expandable

More information

GXi SLIDING WINDOW AND BALCONY DOOR

GXi SLIDING WINDOW AND BALCONY DOOR Uniclass L41305 EPIC CI/SfB (31.4) Xh4 GXi SLIDING WINDOW AND BALCONY DOOR An elegant, robust and high specification sliding window and balcony door. Intelligent engineering and innovative design features

More information

OS-ALD ACOUSTIC LOUVERS

OS-ALD ACOUSTIC LOUVERS OPTIMA Acoustic Louvers Overview OPTIMA Acoustic Louvers are designed to provide optimal acoustic performance (noise reduction) with minimal airflow restrictions. OS-ALD acoustic Louvers are typically

More information

ARCADIA PULSE OPERATING LOUVRE SYSTEM 2015 NUROOF (W.A) PTY LTD

ARCADIA PULSE OPERATING LOUVRE SYSTEM 2015 NUROOF (W.A) PTY LTD ARCADIA PULSE OPERATING LOUVRE SYSTEM ARCADIA Arcadia is one of Australia s leading manufacturers and suppliers of natural ventilation, louvre and sun shading systems. Arcadia products control the natural

More information

PF-Series Gantry Crane

PF-Series Gantry Crane SPANCO PRODUCT SPECIFICATIONS 1 PF-Series Gantry Crane This guide can be used to prepare a bid specification for the incorporation of a PF-Series Gantry Crane into a competitive bid project or application.

More information

GENERAL PROVISIONS: Furnish and install one steel deck platform motor truck scale and associated electronic controls.

GENERAL PROVISIONS: Furnish and install one steel deck platform motor truck scale and associated electronic controls. GENERAL PROVISIONS: Furnish and install one steel deck platform motor truck scale and associated electronic controls. The scale shall have a clear and unobstructed weighing surface of not less than 70

More information

From the ADA and ABA Accessibility Guidelines for Buildings and Facilities

From the ADA and ABA Accessibility Guidelines for Buildings and Facilities From the ADA and ABA Accessibility Guidelines for Buildings and Facilities Published in the Federal Register on July 23, 2004 1003 Recreational Boating Facilities 1003.1 General. Recreational boating facilities

More information

SECTION CRL50 AND CRL51 HEAVY GLASS TOP HUNG SLIDING DOOR SYSTEMS

SECTION CRL50 AND CRL51 HEAVY GLASS TOP HUNG SLIDING DOOR SYSTEMS SECTION 08 32 20 CRL50 AND CRL51 HEAVY GLASS TOP HUNG SLIDING DOOR SYSTEMS Page 1 of 6 USE THIS SECTION WHEN SPECIFYING OVERHEAD SUPPORTED GLASS PANEL PARTITIONS. SECTION INCLUDES OVERHEAD TRACK ASSEMBLY,

More information

Product Portfolio 2016 v2. Trace the sun Capture the benefit

Product Portfolio 2016 v2. Trace the sun Capture the benefit Product Portfolio 2016 v2 Trace the sun Capture the benefit Renewable Energy Solutions High quality Tracking and Racking systems FTA-120 Utility Scale Racking System PST-1AX6 Single Axis Tracker PST-2AL

More information

3.1 Energy exists in different forms

3.1 Energy exists in different forms Ch 3 Energy 1 3.1 Energy exists in different forms Energy ability to cause a change; different forms of energy cause different changes 1. Mechanical energy involves the position & motion of objects (may

More information

Controls and Software CHORE-TRONICS 2 Controls

Controls and Software CHORE-TRONICS 2 Controls Controls and Software 2 Controls Chore-Time s Controls and Software Make House Management Easier and More Convenient Dependable hardware technology and software algorithms Chore-Time s Controls are industry

More information

DEPAUL UNIVERSITY. Scaffolding Program. Environmental Health & Safety. April 2017

DEPAUL UNIVERSITY. Scaffolding Program. Environmental Health & Safety. April 2017 DEPAUL UNIVERSITY Scaffolding Program Environmental Health & Safety April 2017 1 TABLE OF CONTENTS SECTION PAGE NO. 1.0 PURPOSE 2 2.0 SCOPE 2 3.0 SCAFFOLDING ERECTOR 2 4.0 GENERAL 2 5.0 WOOD SCAFFOLDING

More information

TENTS AND OTHER MEMBRANE STRUCTURES

TENTS AND OTHER MEMBRANE STRUCTURES CHAPTER 31 TENTS AND OTHER MEMBRANE STRUCTURES SECTION 3101 GENERAL 3101.1 Scope. Tents and membrane structures shall comply with this chapter. The provisions of Section 3103 are applicable only to temporary

More information

SECTION PRE-ENGINEERED MEMBRANE STRUCTURE

SECTION PRE-ENGINEERED MEMBRANE STRUCTURE SECTION 13125 PART 1 - GENERAL 1.1 SUMMARY A. Section includes the design, engineering, fabrication and erection of a frame-supported, tensilemembrane structure complete with entrance and exit doors and

More information

OUR OFFICES. PRODUCT RANGE & CAPABILITIES.

OUR OFFICES. PRODUCT RANGE & CAPABILITIES. COMPANY PROFILE PRODUCT RANGE & CAPABILITIES. Overview of our wide product range and fender sizes. For more information and special products, please visit our website at www.shibata-fender.team Many special

More information

Concept of Operations prepared for Minnesota Department of Transportation (MnDOT) for Rural Intersection Conflict Warning Systems II Deployment

Concept of Operations prepared for Minnesota Department of Transportation (MnDOT) for Rural Intersection Conflict Warning Systems II Deployment Concept of Operations prepared for Minnesota Department of (MnDOT) for Rural Intersection Conflict Warning Systems II Deployment December 22, 2014 Table of Contents 1. Introduction and Concept Overview...1

More information

Good Husband Brand Remote Lighting Lifter

Good Husband Brand Remote Lighting Lifter Good Husband Brand Remote Lighting Lifter National Patent Number:200520069085.5 200520075680.X 200520075677.8 200520075679.7 International Patent Number: PCT/CN2006/000409 Product Standard: Q/QABC002-2009

More information

EXHIBIT A SCOPE OF SERVICES Districtwide Storm Sewer Inspection

EXHIBIT A SCOPE OF SERVICES Districtwide Storm Sewer Inspection EXHIBIT A SCOPE OF SERVICES Districtwide Storm Sewer Inspection 1.0 Objective: The Department desires to obtain services from the Vendor to inspect existing storm sewer systems. This includes the remote

More information

CONTRACT MANAGEMENT POLICY CITY OF BEACONSFIELD

CONTRACT MANAGEMENT POLICY CITY OF BEACONSFIELD CONTRACT MANAGEMENT POLICY CITY OF BEACONSFIELD Revised 03-03-2014 CONTRACT MANAGEMENT POLICY Division I: General provisions 1. Purpose The City of Beaconsfield hereby establishes various rules pertaining

More information