1 TECHNICAL CHECKLIST Technical checklist is one of the advance feature of AKASTI DESIGNS. This is the document where we provide the details of different construction work individually. This document contains the details of structural work, brickwork procedure and their technical specifications, plaster work detail, etc. it is suggested to use the same technical specification in different work as shown in technical checklist to maintain higher structural quality. This is the document which contains all the technical specification details of finishing work. This way the maximum structural life can be achieved by following the details included in this section. R.C.C. Work P.C.C. 1. Study the plan carefully. (Design plan, structural plan, layout plan, formwork details). 2. Select cement aggregate as per the specifications. 3. Whenever the batch of P.C.C. is prepared, it will always maintain the constant ratio of 1:4:8. 4. The assigned authority must make sure that the drawing is properly checked and the places are carefully marked where the P.C.C is to be placed. 5. If the specifications are not mentioned then the thickness of P.C.C. should always be kept 100 mm (4 inches). Reinforcements 1. Study the structural drawing carefully. 2. The reinforcement work should be done according to the requirement of the plans. 3. The advanced structural terms and codes must be followed during the binding of reinforcements for structural work. (For exa.:- corners of the footing reinforcements should be bent at 75 mm in right angles, column reinforcement development length at column footing junction should be at least around 400mm, the already bent corners of the reinforcement footing must be bent up again by 45 0 etc ) 4. The binding wire should be provided at each and every junction where two or more bars meet/cut each other in a precise manner. 5. The minimum spacing between two parallel bars should be at least the minimum size of an aggregate. (So, that it may pass through it.) 6. In case if there is a problem regarding the minimum spacing not being achieved then the final decision rests with the higher authority appointed on the site. 7. When a span of bar being used is less than 2.5 m then the bar should be continuous and must not overlap. (Overlapping must be avoided at all costs.) 1

2 8. The smaller bits/pieces of bars must be used to make transverse reinforcements and it must be designed as per the specifications and if the length of the piece of a bar being used is less by 1 or 1.5 even then the bar must be discarded as unfit to be used as a transverse reinforcement. 9. The smaller bits/pieces that remained After the binding work should be used in sill, lintels, chajjas, coping etc. 10. Once the reinforcement binding work is completed, the site in charge or supervisor must schedule a visit to check and give approval. Only after his/her approval should the work proceeds for concreting. 11. If a modification/alteration is suggested by the supervisor, it should be duly noted by the subordinates and executed instantly before seeking further approval from the authority. 12. The cover should be provided as per the guidelines mentioned in the drawing (at every 3 ft. of the span) and the reinforcements should be tied up with a binding wire at each of those points wherever the cover blocks/stones are kept. 13. The criteria for minimum spacing must be strictly adhered to, and the instructions of the higher authority must be followed regarding the same. Formwork 1. A metal plate or plywood sheet should be used as a form work and the wooden planks should be avoided being used for the same at all costs and even then if the necessity arises to do so then a polyethylene/plastic sheet must be used to cover it completely and then put it to use. 2. Final level of centering/formwork should be checked properly as per the specifications mentioned in the plan or according to the instructions provided. 3. The metal sheets/plywood must be oiled prior 24 hours before installing it. 4. The prop used in the formwork must be checked for any and all kinds of flaws and must be erected upright, a special precaution must be taken to ensure that the connections of the props must not be loose. All the metal sheets/plywood must not be loose, if that is the case then the faulty props and sheets must be replaced by the new ones or the better ones. 5. The bracings should be installed horizontally and in such a way that each floor must have two iterations of bracings one on the above and other below it. Also it should be installed in such a way that the two bracings must intersect a column in right angle and they should intersect each other in right angle as well. 6. Recheck the entire centering/formwork installation before laying concrete over it for the last time to ensure that there are no flaws in it. 7. During the removal of centering/formwork, the procedures should be followed in the light of IS codes mentioned for that particular part. (Viz. the duration, the removal procedure etc.) 2

3 R.C.C. 1. Before commencing the laying of concrete, mark the level using a red paint on the edges of the corners of the formwork and reinforcements for reference.(to get an idea about how much concrete level is desired to be placed). 2. Select cement, sand and aggregate as per the recommended specifications. 3. Use the mix proportion of 1:2:4 for M15 grade concrete and 1:1.5:3 for M20 grade concrete. 4. Mixing should be done with the help of a mechanical concrete mixer. 5. Special precautions must be taken whilst the concrete mix is being placed like the unwanted stones (round shaped sandstones) must be removed & the mix must be placed in such a way that it should not be cast down from a height but gently from below the shoulder level of a man/woman so that the future complications must be avoided. 6. A vibrator must be used wherever the R.C.C is placed. 7. The curing of the structural work might take at least a month to get set in completely. Hence, it is advisable to continuously for a month. Brick and Block Wall Construction 1. Cleaning of entire floor before starting the line-out of masonry. 2. The level of RCC band marked on the column with due consideration to the thickness of the layer. 3. Dimensions and diagonals of all the rooms should be checked after putting in the first layer on the entire floor. 4. Check the first layer using beam bottom edge, offset & plumb with respect to the face of beam. 5. An opening is to be provided for doors, at first layer, for windows and A.C. units at sill level or as per the specifications provided in the drawing. 6. Check the quality of doors and frames as per the specifications, it should be free from cracks, bends, knots & termite attack, also check for the grooves, section, size, height, corner support, bottom support etc., of the doors and frames. 7. Ensure the proper screening of sand and proper mixing of mortar i.e., 1.6 sand sieved and its silt content must be less than 8%. 8. All the blocks/bricks to be used are thoroughly soaked in water for 2 hours, so that they do not absorb the water from the mortar. Use saw for block cutting don t allow taccha for same. 9. Erection of door frames with 2-3 holdfasts/columns provided using a patti after laying the first layer, fix the holdfast to frames on wall face and Patti to RCC column side. Thickness of holdfast should be minimum of 3 mm. Use screw for frame and cement nails for column nailing. Ensure that all the frames are in level. 10. Holdfasts should be fixed on the second layer of block from bottom/top and one at center of Patti level. Also check whether Black Japan is applied on the side of frames. 3

4 11. The concrete of holdfast should be done in the size of length- 230 mm x width- wall thickness x height- one block. 12. On a 4 inch internal wall a reinforced coping (4 x4 size with two 6 mm dia. bars) should be provided at every 1m height of the wall. 13. The work should progress in such a way that a wall & a coping must be completed in a single day so that the coping must get time to settle for at least 6 hours. 14. There should be a provision for plaster margin, projecting 12mm out of the wall. 15. Raking of joint and surface cleaning (ensure that it should be done vertically) should be done after the completion of work at the end of the day. 16. Thickness of joints should be 10mm thick uniformly. 17. Metal chips filling in the mortar in RCC/masonry junction must be 10mm to 20mm in size. 18. Adjust the size of patti level to ensure that the last level touches the beam bottom, do not leave a gap as far as possible. 19. The room should be cleaned regularly. 20. Check for any extra amenities. 21. Curing should be done for 14 days from the day of completion. Window and Door Fixing DOOR FIXING 1. While fixing a door frame there should be at least three hole-passes that should be going in the wall, two at 30 cm from the top and bottom corner of the frame each and one at the middle. 2. One end of each of the hole-pass is fixed in the frame with the help of a screw and the other end of the hole-pass in the wall is covered with the concrete which is filled up to the size of thickness of wall x height of one block or 1 feet x cm length with the help of formwork. 3. When the door is fixed in the frame, three hinges are provided for the door frame. The two are fixed at a distance of 25 cm each from the top and bottom of each shutter and one at the middle. The crack in between the door panel is filled with wooden putty and primer (used for painting). 4. Above the window, concrete with reinforcement, i.e., lintel (of size at least 4 x 4 with three 10 mm dia. Bars and M20 grade concrete) is constructed which helps in distributing the load of the wall structure above on either side of the window. WINDOW FIXING 1. On the window before fixing the door frame, a Kadappa stone/granite is fixed at the level below the bottom of the window. The Kadappa stone is fixed on the wall with the help of a cement slurry having ratio 1:1, i.e., the cement slurry of honey like viscosity. It is gently placed on the back side of stone and then fixed in the wall. The dry cement is then thrown on the cement slurry to fixate the position of the stone. 4

5 2. Above the window, concrete with reinforcement, i.e., sill (of size at least 4 x 4 with three 10 mm dia. Bars and M20 grade concrete) is constructed which helps in distributing the above wall structure load on either side of the window. Plastering External Plaster 1. Ensure that the Block or Brick masonry and concrete surfaces are found clean, free from dust, loose materials, oil, grease, mortar droppings, nails, metal strips, wooden pieces, binding wire etc. 2. Erect a double scaffolding without making a hole in the wall (Or erect a single standing scaffolding by taking support of wall as directed by the higher authority). 3. Fill the external gaps on the side in masonry & beam or column joints with rich mortar and complete the socketing work. 4. Fix 6 wide chicken mesh on the joint of RCC & Masonry wall (Nailing of chicken mesh should be at a distance of 230mm interval). 5. Take the plumb or line from top to bottom at all the edges to ensure the accuracy and keep the thickness of the single coat plaster at minimum 10-12mm uniformly. 6. If a beam or column is bulged out, then chiseling is to be done with a small concrete breaker or a sharp chisel and hammer, only after the RCC designer permits it. 7. Check all the elevational features and window openings as per the architectural drawings. 8. Ensure that masonry work is complete in all respect and the surface to be plastered should be dampened a day before plastering. 9. The above process should begin at least two days prior to the plastering so that it may gain strength. 10. Sand sieved properly and silt content within permissible limits i.e., less than 8%. If silt content is more than 8% then wash the sand before use. 11. Take sand proportion 1:5 with machine mix and the mixed mortar should be placed within half an hour. Add waterproofing chemicals per bag into the mix as per the recommendations. 12. After the preparatory measures, start plastering, ensure that no uneven surface is observed. 13. Roughen the surface with wires for better bonding with the second coat. 14. Ensure that for all chajjah, projection should be finished with a protective drip mould (pani patti) at the bottom of the chajjah. 15. Curing of single coat should be carried out then wait for 5 days and apply the second coat plaster with punch finish, thickness should not be less than 6mm & not more than 10mm. 16. Curing of double coat plaster shall be minimum of 7 days. 5

6 Internal Plaster 1. Ensure that the block or brick masonry & concrete surfaces are found clean and free form dust, loose materials, oil, grease, mortar droppings, nails, metal strips, wooden pieces, binding wire etc. 2. Joints in the block masonry should be raked off. 3. Ensure that the surface to be plastered is sufficiently dampened a day before plastering. 4. Ensure that the unavoidable projection in masonry and concrete is chipped properly. 5. If a leakage is observed on the ceiling before plastering in toilet and W.C. then rectify it by pressure grouting. 6. Chicken mesh must be fixed on all the vertical & horizontal RCC, masonry joints & on electrical conduits and repair the area of 150mm width. 7. Thiyya/level dots are made before the plaster interval which is no more than 1.5m in length according to betel patti. 8. Sand should be sieved properly and silt content must be within permissible limits i.e., less than 8%. 9. Ensure the thickness of plaster should be no less than 12mm & not more than 15mm. 10. All the doors and window openings should be as specified in the drawings. 11. Ensure that all the Door frames are free from cracks, knots etc., and are in plumb level lines & right angle. 12. Ensure that holdfasts or column strips (three on each side) are fixed properly with the help of nailing and concrete. 13. Ensure that the height and location of electrical points, wall conduit, and switch board, DB, TV and telephone points are fixed into the positions as per the drawings. 14. Ensure that all the electrical boxes are covered by putha or tape. 15. Make sure that the soffit of slab is in line & properly levelled and check for any other extra entities that requires attention. 16. Ensure that the dimensions of the room are as per the drawing. 17. All the above points must be checked and permitted for plaster. 18. Make sure that the plaster is in line and properly levelled, the difference in plumb line should not be more than 2mm. 19. Ensure that the putty Neeru finish is mm thick and is applied over the hardened plaster. 20. It should be cured by slightly sprinkling water as per the specifications for 7 days. 21. Ensure that at least a 100 mm cutting of plaster should be carried out in order to get it levelled for the fixing of skirting & no exposed chicken mesh wire should be seen. 22. After Putty Neeru finish verify the room dimensions. 23. Ensure that the toweling of the plaster is done (Glutei) right after the above procedure, preferably on the next day of plaster. 24. Cleaning should be carried out for window sill, door frame, electrical boxes, floor and exposed slab to check unwanted plaster/brick mortar. 25. Loft tops are finished in level (should be flat and not slanted). 6

7 26. For toilet and bath leave the space of 45cm for plaster at the bottom for the purpose of waterproofing. Flooring 1. Flooring materials are checked in the lab as per the quality plan manual states and must be approved. Test the certification number and ensure that the tiles are of the same lot/batch. 2. Floors should be cleaned and leveled. There should not be any cement mortar lumps on the slab and at the corners of the rooms. 3. Check the skirting margin required from the surface level & ensure that it should be at least 10cm high from floor surface. 4. Cement mortar required to be laid under the flooring should be prepared well in advance before flooring work. 5. The cement lime mortar proportion should be 1:3:3. 6. This mortar is spread evenly in all the rooms with reference to the level dots. 7. Level dots are marked first on the main door frame (For exa..:- at 60cm from finished door level) transfer the markings to all the other door frames of the flat on that particular floor and consider this as a reference level for the walls as well. 8. Prepare the level dots below every marking in corners. The level spacing should not be more than 2 m. with the help of line dori. 9. Prepare the uniform layer of minimum thickness of 12mm but not more than 40mm with cement lime mortar bed and let it set for minimum of 12 hrs. and tiles should be fixed on the same day at least after 3 hours. 10. Fix the right angle to the longest span of the room, it will reduce the wastage and keep it to the minimum. 11. Then fix string line format. Angle corner with one corner reference tile, if the reference right angle string is not matching with wall, then try to adjust the difference in skirting. 12. Prepare cement slurry bag 1.5 bag to 100 liter of water and spread it as much as possible on the area so that it could be covered with tiles within half an hour and start fixing the tiles from the reference line and match all the four corners of the tiles properly with the help of a wooden mallet. 13. In case of two types of tilling, break the joins at a shutter groove line or on the inside edge of the other room s masonry that is if a door is not provided. 14. After completing the tilling work of the floor check the overall level, any unevenness found may be rectified with wooden mallet. 15. Clean the floor and do not allow anybody to enter the premises for next 24 hrs. 16. On the next day fill the joint with white cement or grout chemical. 17. Fix the skirting tiles at the two ends of the wall, skirting tiles should be flushed with the plaster surface and a 5mm groove should be marked over the skirting tiles. 7

8 18. All the skirting tiles should be at the same line & level. So, put the plaster on the surface and make a 5mm groove over the skirting tiles. Waterproofing Specification for Water Proofing Work W.C. & Bath Pre-procedural work: 1. After the Completion of internal plaster of walls, commence with the work by leaving a margin of 450 mm from the final floor level of W.C. and bath. 2. Ensure the Completion of grooving / chasing for concealed G.I. Piping, electrical conduct of W.C. is executed according to the specifications provided. 3. Make sure that all the concealed G.I. and electrical work is executed properly. 4. Remove all the debris from W.C. and chiseling the extra mortar wherever required. 5. Make holes in the external walls for connecting nahani trap, p-trap, floor trap etc. to connect it to the external drainage line. 6. Ensure the thorough cleaning of W.C. with sufficient quantity and force of water. 7. Make the level markings in red colour on wall with respect to floor level to set up trap level. Procedural work: 1. Remove all the debris form W.C. and extra mortar left from making holes in the external wall for connecting nahani trap, ptrap, and floor trap drainage line. Fill up W.C. slab up to 10 cm with water (after plugging rap holes) and keep it that way for the day to check for any leakage in base slab or underneath. 2. If a major leakage is observed, provide socket at a leakage spot with addition of four sockets at each corner of the slab. 3. Grout socket with cement slurry directly with the help of 1 bag of cement mixed with 75 liters of water. 4. In case of minor leakage put a cement slurry with an added recommended chemicals directly over the slab and spread it with the help of a trowel and a brush. 5. After completion of cement grouting, Run a test for leakage by filling in the water till the slab is found watertight otherwise retrace the whole step again. 6. Once the leakage of the base slab is rectified, provide 25 to 40 mm (or up to the depth of sunken slab) thick cement mortar 1:4 base coat with a slope of 1:100 from entrance door towards escape pipe. 7. Carry out a base coat on walls up to 45 cm above toilet s finished floor. 8. Keep this base coat flooded with water on a slab top for minimum four days in order to cure it & then test it, get it checked and certified by the site engineer and proceed further only after his/her approval. 9. Select well burnt brick bats and soak them thoroughly in water for at least half an hour before laying. 8

9 10. Fix the brick bat in cement mortar layer as per the proportion 1:6 and having slope of 1:100 adding a water proofing compound in it as per the specification for brick bat coba. 11. All the holes made in wall for PVC/GI pipe connection should be finished with water proofing Coba. 12. Cure this coba by ponding water for minimum four days and check for leakage and certify the same and get it approved by project in charge. 13. Carry out a top coat with 1:4 cement mortar mixed with water proofing compound, finish this coat properly with neat cement slurry using metal/wood float. 14. Roughen the surface by wire brush to keep the bonding for horizontal filler coat and continue the coat on the side wall up to 45 cm above W.C. finish level. 15. The final coat should be tested by ponding water for the minimum of 7 days. 16. Chajja waterproofing should be completed before external plaster, joint socketing work should be completed before 1 st coat of external plaster, joint grouting work should be completed before second coat of external plaster.(or as suggested by the higher authority according to the circumstances) 17. Provide an outlet spout in toilet sunk for the prevention of over flow. Socketing for W.C. & BATH waterproofing: 1. In case if there is a leakage in Base slab in that area, socketing is done. 2. Fill up W.C. slab with 7 cm of water (after plugging trap hole) preferably before a day. 3. It is advisable to keep it filled with water for 12 hours. 4. Check if a major leakage is observed, provide 4 sockets in four corners of slab and grouting the same with cement slurry by mixing a bag of cement in 75 liter of water by stirring the mixer well and get a desired viscosity. 5. Grouting of cement slurry is done by grouting machine. 6. If a minor leakage is found in the base slab, put a cement slurry over base slab with the help of trowel and brush, spread the slurry over base area of slab of W.C. and Bath room. 7. Process of socketing and grouting is to be continued until the leakage in the base slab is totally rectified, after the completion of cement grouting and testing of leakage, remove the sockets for once. Base coat for water proofing: 1. Provide 20 to 30 mm thick cement mortar base coat in proportion of 1:4 with waterproofing chemical as per the requirement. 2. Carry out this base coat on walls above up to the height of 450 mm above the finished floor level of W.C. and Bathroom. It should cover all beam tops, junction etc. 3. Base coat is kept flooded with water up to the slab drop or minimum 4 days for wiring and testing purpose. 4. After 4 days, get the same checked & certified. 9

10 Brick bat coba for W.C. & bath waterproofing: 1. Select well burnt brick bats. Over burnt brick bats should be strictly avoided. 2. Before laying, soak it thoroughly in water for at least half an hour. 3. Lay well- brick bats on the edge and not on the flat surface. 4. See to it that the minimum width is achieved between brick bats for filling such gaps with mortar. Complete brick bat coba with joints filled in with cement mortar (1:4) using a recommended water proofing chemical. 5. Give this coat 4 days to set in and check for leakage after 4 days. Top coat for W.C. and bath waterproofing: 1. After the curing of brickbat coba coat carry out a top coat with a ratio of 1:4 CM mixed with waterproofing compound. Finish this coat with neat cement slurry by metal/wooden float. 2. Roughen the surface by wire brush to keep the bonding for horizontal filler coat. Continue this coat on the side walls up to 45 cm above the finished floor level of W.C. and bathroom. This coat should not project out more than the plastering coat of W.C. walls to avoid un-necessary thickness of glazed tile dado. Fixing and finishing of W.C. pan:- 1. Fix W.C. pan at a required level considering 5 to 10mm above from floor level or at the floor level. 2. Block p/s -trap outlet hole of the W.C. by gunny bags of sand to avoid chances of damages by waterproofing workmen. 3. Check whether the W.C. pan is in the center as per the drawing. 4. Over the top coat, fill the extra gaps around W.C. pan with a brick bat and mortar layer such that it should be 7.5 cm below the top surface level of I.W.C. (Indian water closet). 5. Allow it to Cure for 3 days. 6. Final top coat should be done up to 50 mm below the top surface level of W.C. with a required slope towards W.C. pan. 7. Roughen up the top coat surface by wire brush to receive the tile mortar with an intension of bonding. 8. Curing is advisable for at least 7 days. 9. All joints of P/S -trap, flush pipe, anti-syphon pipe, connection to vertical line etc. should be properly joined. 10

11 Stair Case Water Proofing 1. Staircase side wall socketing & grouting work should be completed once the internal plastering is done and the socketing & grouting waterproofing work of staircase should be completed right after the internal plastering & just before staircase tile work. 2. Main door frame socketing & grouting work should be completed after internal plaster work & just before staircase lobby plaster work. Balcony & Terrace Waterproofing 1. Chisel whatever the extra mortar is found accumulated on terrace. 2. Rinse it completely with water. 3. Base coat procedure- Mix one bag of cement with 100 liters of water. Stir up the mixer to get consistent cement slurry, spread this slurry on terrace and allow it to penetrate uniformly over the cleaned surface. 4. Check grading of sand, its silt content before using it for waterproofing. 5. Check the terrace door level. See to it that there is enough margin (approximately 15 cm) provided for waterproofing at its bottom. 6. Check the level mark it with red color on parapet wall from all the sides. 7. Check that the provision of rain water pipe outlet is bent at the correct position. 8. Select well burnt bricks and soak them well in water for at least half an hour. 9. Stack well burnt brick bats on terrace. 10. Check MS tray required for mixing mortar. 11. Check whether there is a provision for plastic paper/tarpolin for the protection of waterproofing from occasional rains. Brick bat coba for terrace waterproofing: 1. Fix line dori with a slope 1:150 starting from the corner points from rainwater down take and by keeping 65 mm minimum thickness below rainwater outlet. 2. Fix bricks bats in CM of ratio 1:6 with a slope 1:150 mixed with a waterproofing compound. 3. Fill CM 1:4 with waterproofing compound in brick bat joints. 4. In case, if joints of the coba work concludes at the end of the day then it is necessary to provide brick bats in staggered manner and avoid continuous horizontal joint of mortar. 5. Chisel out the bottom of the parapet wall up to 20 mm and fill in small pieces of brick bats with mortar. 6. Special care should be taken for achieving the round shape near rain water pipe. 11

12 7. Block rainwater outlet with gunny bags to avoid entry of cement slurry into it. Cure it for 7 days. Final coat for terrace waterproofing: 1. Spread CM 1:4 along with waterproofing compound over brick bat coba. 2. Press cement mortar by 2 m long rules. 3. Level the surface using a wooden float by keeping 25 mm thickness. 4. Apply a thick cement slurry over leveled surface along with a waterproofing compound for smooth finish. 5. Make vertical, horizontal lines at interval of 30 cm x 30 cm with line dhori of 3mm thickness to avoid cracking of top layer. 6. Make projected edge between parapet plaster and rounding after a day. 7. Clean and cure final coat 21 days with at least 6 water standing on waterproofing work. 8. If recommended, provide tiles & fix them on terrace tops with pani patti to the inner side of the parapet wall. UG Tank Waterproofing For UG tank external waterproofing use Box type waterproofing. While doing the waterproofing of any of the structure following points are checked to ensure the correctness of waterproofing method: 1. Check whether all the materials i.e. cement, sand, brick and chemical used are of a good quality as per quality standars manual. 2. All the plumbing holes made in wall/sunk before basecoat by using core cutting method only. 3. Socketing / grouting is done before the base coat work (wherever required). 4. Grouting of cement slurry is done by grouting machine only. 5. Check if there is any kind of leakage from the W.C, bath and toilet slab once the socketing is done. 6. Base coat is completed up to a height of 450mm from the floor level, and carry it out up to the outer wall face. 7. Base coat should be kept flooded with water up to the slab drop top for 4 days and no seepage / leakage is seen. 8. All the traps, outlets, chairs, water escape, and concealed pipes are fixed properly as per the drawing. 9. The mouth of release pipe is well tied with M.S. net and approximately 2kg of metal net is spread over and arranged in a way to make it porous. 10. Check water pressure and look out for leakage. 11. All the joints of traps, W.C. pan are sealed properly with cement mortar and sealant as required. 12

13 12. All brick bats are well soaked in water and slope must be maintained properly. 13. Water-proofing compound is mixed with the mortar with C.M. ratio 1: Brick bat coba kept flooded with water up to the slab drop top for 4 days and ensure if a seepage / leakage is observed. 15. Brick bat coba is completed in slope 1:100 from entrance door to the water escape. 16. The top coat is carried out in one stroke, without any joints. 17. Cure the coat for minimum of 7 days and check for the seepage / leakage. Dado / Tile Fixing 1. Dado materials are checked in the lab as per quality plan manual states and are approved if found ok. Test certificate number. 2. Ensure that the Loft (for toilet and bath) are in level and there will be no gap between top tiles & loft ceiling. 3. Vertical surface should be roughened, fairly plumbed and must be in right angles. 4. All concealed GI, PVC, plumbing & electric conduit installing should be carried out before dado and flooring and check for leakage and blocking in electrical conduits. 5. Tile markings are marked on wall as per the plan and thiyya right angles are checked before commencing the work. Take level dots at the corner with minimum thickness on top and bottom and at right angles to the wall. 6. Set the base line with setting aluminum pattern patti in line and level by keeping full tiles margin from bottom. 7. Tiles must be well soaked in water for minimum 2 hours. 8. Tiles must be well passed with wooden mallet, so that the cement paste at the back of the tile should be covered to avoid hollow sound on the tiles (Hollow sound in tiling is an example of bad workmanship). 9. All accessories opening holes in the tile like geyser, mixer, electrical, PVC etc. should be made by grinder machine only and it should be of the same size of the outlet. 10. Start tiling in toilet / W.C. / Bath on the opening side of the door for dado and floor. Carry out the work of dado tiling by working up step by step covering the height of 1.2m every day and on every second day grout the joint/ gap for better bonding. 11. Always try to match the line of tile vertically and horizontally and see if any of the corners are coming out of the line dori, if so get it placed with a wooden mallet. 12. In case of window portion, if sill and jam is not provided, then tiling is done on sill and jam overlapping it on the vertical tile. 13. The joint between two tiles should be kept nil. 14. Curing should be carried out continuously for 7 days. 13

CONCRETE BLOCK MASONRY

CONCRETE BLOCK MASONRY CONCRETE BLOCK MASONRY CONTENT Introduction Types Manufacturing process Properties Advantages Introduction These are the concrete blocks either hollow or solid. A hollow unit is that unit which has core

More information

PART A: JOB PROCDRE FOR PLASTERING

PART A: JOB PROCDRE FOR PLASTERING PART A: JOB PROCDRE FOR PLASTERING 1. SCOPE: The scope of this procedure shall apply to all cement plaster finishes to column, ceilings, walls and similar surfaces on backgrounds met with such as brick,

More information

Technical Notes 11B - Guide Specifications for Brick Masonry, Part 3 Rev [Feb. 1972] (Reissued Sept. 1988) INTRODUCTION

Technical Notes 11B - Guide Specifications for Brick Masonry, Part 3 Rev [Feb. 1972] (Reissued Sept. 1988) INTRODUCTION Technical Notes 11B - Guide Specifications for Brick Masonry, Part 3 Rev [Feb. 1972] (Reissued Sept. 1988) INTRODUCTION This Technical Notes contains the guide specifications in CSI format for Part III

More information

CONCRETE FORMWORK CHECKLIST AT SITE

CONCRETE FORMWORK CHECKLIST AT SITE CONCRETE FORMWORK CHECKLIST AT SITE Concrete formwork is a temporary supporting structure for concrete when it is placed at the construction site to keep the concrete in position and shape till it gets

More information

Estimate FOR THE SEPTIC TANK

Estimate FOR THE SEPTIC TANK Estimate FOR THE SEPTIC TANK S.NO ITEM DESCRIPTION. 1 Excavation in soil,soft & hard murum... Qty UNIT Rate Excavation for footing, machine foundation, plinth beams, wall footing, gutters,brick wall, tanks

More information

0331 Brick and block construction

0331 Brick and block construction 0331 BRICK AND BLOCK CONSTRUCTION 1 GENERAL 1.1 STANDARDS Materials and construction: To AS 4773.1 and AS 4773.2. 2 PRODUCTS 2.1 DURABILITY Exposure environment: [complete/delete] Exposure locations: To

More information

BOQ for Lintel, Chajja, Brick work & Plastering work at Pkg. - III - Phase - I

BOQ for Lintel, Chajja, Brick work & Plastering work at Pkg. - III - Phase - I BOQ for Lintel, Chajja, Brick work & Plastering work at Pkg. - III - Phase - I S.No. Description Unit Qty RATE Amount PART-I CIVIL WORKS B-PLAIN AND REINFORCED CEMENT CONCRETE : Notes : ( the following

More information

Appendix 4. Bills of Quantities

Appendix 4. Bills of Quantities Appendix 4. Bills of Quantities 201 A4.1 Deep trench latrines Partitions of local materials 1m apart Timber foot rests and floor plates Lightweight timber frame Excavated soil (used for back-fill) Plastic

More information

Caparol System PRO Data sheet

Caparol System PRO Data sheet System features Expanded polystyrene insulation Cost effective solution Excellent detailing options Proven technology Wide variety of colours Reliable protection and crack resistance Proven track record

More information

Foirgniochta. Marking Scheme Leaving Certificate Examination, Ordinary Level. Construction Studies

Foirgniochta. Marking Scheme Leaving Certificate Examination, Ordinary Level. Construction Studies 2000 Foirgniochta Marking Scheme Leaving Certificate Examination, 2000 Construction Studies Ordinary Level of site.. Adjoining. Distinct Landmarks.. site in Red.. 1: (ii) Site Boundary site. Site. Drainage

More information

SUB HEAD : 22.0 WATER PROOFING TREATMENT

SUB HEAD : 22.0 WATER PROOFING TREATMENT SUB HEAD : 22.0 WATER PROOFING TREATMENT CONTENTS Clause No. Brief Description Page No. List of Bureau of Indian Standards (BIS) Codes 987 22.0 Terminology 988 22.1 Integral Cement based Treatment for

More information

F10. BRICK/BLOCK WALLING To be read with Preliminaries/General conditions. TYPES(S) OF WALLING 110 CLAY FACING BRICKWORK SHALL BE:

F10. BRICK/BLOCK WALLING To be read with Preliminaries/General conditions. TYPES(S) OF WALLING 110 CLAY FACING BRICKWORK SHALL BE: F10 BRICK/BLOCK WALLING To be read with Preliminaries/General conditions. TYPES(S) OF WALLING 110 CLAY FACING BRICKWORK SHALL BE: Product Name: Pre War Common Size: 215x102x65mm Manufacturer and reference:

More information

RCC PRECAST TOILET UNITS

RCC PRECAST TOILET UNITS RCC PRECAST TOILET UNITS TOILET UNIT PHOTO TOILET UNIT PLANS PDG Vinay Kulkarni Wins Coordinator West Zone Quotation for Toilet Units with Bio Digester Sr. Description Price (Rs.) Unit No. 1 TTSS1: 1 Super

More information

(D) BRICK MASONRY / STONE MASONRY WORK

(D) BRICK MASONRY / STONE MASONRY WORK (D) BRICK MASONRY / STONE MASONRY WORK 1.0 INDIAN STANDARDS TO BE FOLLOWED ARE All relevant standards as specified elsewhere in this volume are also applicable. Indian standards to be followed are : IS

More information

RFP/GRC/LSV/ : RENOVATION (CIVIL WORKS) OF THR 8th PRIMARY SCHOOL TOILETS IN MYTILENE. Annex A - BILL OF QUANTITIES 1/9

RFP/GRC/LSV/ : RENOVATION (CIVIL WORKS) OF THR 8th PRIMARY SCHOOL TOILETS IN MYTILENE. Annex A - BILL OF QUANTITIES 1/9 RFP/GRC/LSV/2017-005: RENOVATION (CIVIL WORKS) OF THR 8th PRIMARY SCHOOL TOILETS IN MYTILENE Annex A - BILL OF QUANTITIES 1/9 The Contractor shall consider in his price all costs or expenses of all requirements

More information

SECTION INSTALLATION AND/OR REPLACEMENT OF MASONRY UNITS AND REPOINTING

SECTION INSTALLATION AND/OR REPLACEMENT OF MASONRY UNITS AND REPOINTING SECTION 04210 INSTALLATION AND/OR REPLACEMENT OF MASONRY UNITS AND REPOINTING PART I GENERAL 1.1 SUMMARY A. Provide installation of new or replacement of masonry units and/or repointing of masonry units

More information

TILING SPECIFICATIONS

TILING SPECIFICATIONS TILING SPECIFICATIONS SPECIFICATION NUMBER: NR204-16 PREPARED BY: Mike Cubley PREPARED FOR: Porcelain Plus ATTENTION: Kirk Pollock INSTALLATION: 712 Turner Floor and Wall Tiling Specification. M40 STONE/

More information

Clay and clay products

Clay and clay products Clay and clay products Introduction Clays are natural materials made up of very small crystalline mineral fragments. The shape, size and type of these fragments give clays their plastic quality which allows

More information

DIVISION 04 MASONRY. Section Title Number MASONRY Maintenance of Masonry Masonry Mortaring Masonry Accessories

DIVISION 04 MASONRY. Section Title Number MASONRY Maintenance of Masonry Masonry Mortaring Masonry Accessories 04 00 00 MASONRY 04 01 00 Maintenance of Masonry 04 01 20 Maintenance of Masonry 04 05 13 Masonry Mortaring 04 05 23 Masonry Accessories 04 20 00 UNIT MASONRY 04 21 00 Clay Unit and Brick Veneer 04 22

More information

1.02 STANDARD REFERENCES: The following standard specifications shall apply to the Work of this Section as indicated:

1.02 STANDARD REFERENCES: The following standard specifications shall apply to the Work of this Section as indicated: SECTION 04220 CONCRETE UNIT MASONRY PART 1 - GENERAL 1.01 SCOPE: A. The CONTRACTOR shall furnish all labor, materials and equipment necessary for the masonry construction as shown on the drawings or as

More information

SECTION BRICK MASONRY ASSEMBLIES

SECTION BRICK MASONRY ASSEMBLIES PART 1 - GENERAL 1.1 SUMMARY A. Section includes the following: 1. Face brick. 2. Mortar and grout. 3. Ties and anchors. 4. Miscellaneous masonry accessories. 1.2 SUBMITTALS A. Product Data: For each type

More information

Installation Guide Wall Panels

Installation Guide Wall Panels Installation Guide Wall Panels Jointless or Dry-Stacked Installation (Read Prior to installation) The MStone system is a jointless / dry-stacked installation where panels and corners fit tightly together

More information

Name of work: Renovation of toilets in main building near molecular biology lab. Sl Rate Amount Description Quantity Unit No Rs Ps Rs Ps Schedule A

Name of work: Renovation of toilets in main building near molecular biology lab. Sl Rate Amount Description Quantity Unit No Rs Ps Rs Ps Schedule A SPECIFICATIONS AND SCHEDULE OF QUANTITIES Name of work: Renovation of toilets in main building near molecular biology lab Sl Rate Amount Schedule A 1 Demolishing concrete in cement mortar including disposal

More information

SIKALASTIC-152 EXTERIOR WATERPROOFING MEMBRANE. Product. Scope. Appraisal No. 811 [2013] Appraisal No. 811 (2013) Amended 28 August 2017

SIKALASTIC-152 EXTERIOR WATERPROOFING MEMBRANE. Product. Scope. Appraisal No. 811 [2013] Appraisal No. 811 (2013) Amended 28 August 2017 SIKALASTIC-152 EXTERIOR WATERPROOFING MEMBRANE Amended 28 August 2017 BRANZ Appraisals Technical Assessments of products for building and construction. Sika (NZ) Ltd PO Box 19 192 Avondale Auckland 1746

More information

PPC Cement TUTORIAL. how to screed a floor

PPC Cement TUTORIAL. how to screed a floor PPC Cement TUTORIAL how to screed a floor Pre-build: TOOLs & Materials ITEM Quantity Check. Builders bucket. Wheelbarrow 3. Shovel 4. Builder s line 5. 50mm steel pegs 6. Rigid timber forms 7. Flexible

More information

Tidy tiles Walls, floors, stairs and tiles on tiles Building materials of brand-name quality for your home Nur im

Tidy tiles Walls, floors, stairs and tiles on tiles Building materials of brand-name quality for your home Nur im www.probau.eu Building materials of brand-name quality for your home PROBAU offers a wide range of products in many areas of application for home improvement, renovation and construction. In professional

More information

Colphene BSW Training and Application Guide. Colphene BSW Waterproofing Membrane. 1. Prepare substrate

Colphene BSW Training and Application Guide. Colphene BSW Waterproofing Membrane. 1. Prepare substrate Colphene BSW Training and Application Guide Colphene BSW Waterproofing Membrane. 1. Prepare substrate Substrate must be structurally sound. Surface must be free of voids, spalled areas, loose aggregate,

More information

2 1. In cracked external corners place wooden planks across the crack and then support the planks with wooden members.

2 1. In cracked external corners place wooden planks across the crack and then support the planks with wooden members. MANUAL AND GUIDELINES FOR EMERGENCY SAFETY MEASURES IN EARTHQUAKE DAMAGED MASONRY AND HERITAGE BUILDINGS 1 In the earthquake there are two reasons for the development of defects in any building. a Due

More information

A. Coordinate concrete unit masonry (also termed CMU and block ) work with work before and after, especially:

A. Coordinate concrete unit masonry (also termed CMU and block ) work with work before and after, especially: 04222 CONCRETE UNIT MASONRY (UNREINFORCED ONLY) SPECIFIER: Use this section only for UNREINFORCED concrete masonry. Its only reinforcement is in the horizontal joints. It covers ONLY plain blockwork (no

More information

DIVISION 03 CONCRETE SPECIFICATION : FORMS AND FORMWORK

DIVISION 03 CONCRETE SPECIFICATION : FORMS AND FORMWORK DIVISION 03 CONCRETE SPECIFICATION 031000: FORMS AND FORMWORK PART 1.0 GENERAL 1.1 DESCRIPTION The work of this specification includes furnishing of all labor, materials, equipment and incidentals to install,

More information

KIM Best Practices Guide for Shotcrete Nov 2013

KIM Best Practices Guide for Shotcrete Nov 2013 Contents 1. What This Document Is For 2. Materials You Will Need 3. Receiving Surfaces For Shotcrete 4. Pre-Shoot Inspection and Preparation 5. Control Joint Spacing 6. How to Install Control Joints o

More information

SECTION UNIT MASONRY SYSTEM

SECTION UNIT MASONRY SYSTEM SECTION 04320 UNIT MASONRY SYSTEM PART 1 GENERAL 1.01 SECTION INCLUDES A. Concrete masonry and face brick units. B. Reinforcement, anchorage, and accessories. 1.03 SUBMITTALS A. Submit product data under

More information

SECTION RADIATION SHIELDING ENCLOSURE Low Intensity Radiation Protection

SECTION RADIATION SHIELDING ENCLOSURE Low Intensity Radiation Protection SECTION 13090 RADIATION SHIELDING ENCLOSURE Low Intensity Radiation Protection Prepared by: 90 Dayton Avenue, Unit 4B, Suite 13 Passaic, NJ 07055 (973) 574-9077 13090-1 LOW INTENSITY RADIATION PROTECTION

More information

UFGS (April 2006) UNIFIED FACILITIES GUIDE SPECIFICATIONS

UFGS (April 2006) UNIFIED FACILITIES GUIDE SPECIFICATIONS USACE / NAVFAC / AFCEC / NASA UFGS-07 16 19 (January 2007) ---------------------------- Preparing Activity: NAVFAC Replacing without change UFGS-07 16 19 (April 2006) UNIFIED FACILITIES GUIDE SPECIFICATIONS

More information

BUILD A SHOWER CUBICLE

BUILD A SHOWER CUBICLE BUILD A SHOWER CUBICLE Building a shower cubicle requires some experience in carpentry and tiling. You also need a degree of expertise in wiring and plumbing in order to install a shower unit. By all means

More information

SECTION CAST-IN-PLACE CONCRETE

SECTION CAST-IN-PLACE CONCRETE SECTION 03300 CAST-IN-PLACE CONCRETE PART 1 GENERAL 1.01 SECTION INCLUDES A. The Contractor shall furnish all work and materials, including cement, sand and coarse aggregate, water, admixtures, curing

More information

Construction. Hydrophilic, swellable hose for sealing construction joints in watertight structures. (formerly Sika Injectoflex HPM)

Construction. Hydrophilic, swellable hose for sealing construction joints in watertight structures. (formerly Sika Injectoflex HPM) System Product Data Sheet Edition 06/12/2010 Identification no: 02 07 03 07 010 2 000099 (formerly Sika Injectoflex HPM) SikaFuko Swell 1 (formerly Sika Injectoflex HPM) Hydrophilic, swellable hose for

More information

Semstone Construction Details

Semstone Construction Details Semstone Construction Details SP01-94 Treatment for Expansion Joints, Control Joints, and Structural Cracks, Vertical and Horizontal, for Non-Vehicular Traffic 1. Maintain joint/crack through coating.

More information

Construction. One component cementitious mortar fibre reinforced for flexible waterproofing. Product Description. Product Data. Form.

Construction. One component cementitious mortar fibre reinforced for flexible waterproofing. Product Description. Product Data. Form. Product Data Sheet Edition 12/12/2014 Identification no: 02 07 01 01 001 0 000180 Sikalastic -1K Sikalastic -1K One component cementitious mortar fibre reinforced for flexible waterproofing Construction

More information

DURRELL DESIGN GROUP, PLLC ROOF REPLACEMENT BARR ELEMENTARY SCHOOL JACKSON PUBLIC SCHOOL DISTRICT JACKSON, MISSISSIPPI.

DURRELL DESIGN GROUP, PLLC ROOF REPLACEMENT BARR ELEMENTARY SCHOOL JACKSON PUBLIC SCHOOL DISTRICT JACKSON, MISSISSIPPI. DURRELL DESIGN GROUP, PLLC 500-G E. WOODROW WILSON AVENUE JACKSON, MISSISSIPPI 39216 PHONE: 601.708.4788 FAX: 601.488.4717 ROOF REPLACEMENT BARR ELEMENTARY SCHOOL JACKSON PUBLIC SCHOOL DISTRICT JACKSON,

More information

FLUID APPLIED WATERPROOFING

FLUID APPLIED WATERPROOFING SECTION 07120 FLUID APPLIED WATERPROOFING PART 1 GENERAL 1.01 SUMMARY A. Related Sections: 1. 03300 - Cast-In-Place Concrete. 2. 09200 - Metal Studs, Metal Lath, Suspension Ceilings, Plaster, and Stucco.

More information

Product Data Sheet SikaFuko Swell-1 Positioning Description Uses Advantages Approval / Standards Construction Product Data Packaging

Product Data Sheet SikaFuko Swell-1 Positioning Description Uses Advantages Approval / Standards Construction Product Data Packaging Product Data Sheet Version Nos.: 0414 SikaFuko Swell-1 Hydrophilic, swellable hose for sealing construction joints in watertight structures Construction Positioning Description Uses Swellable and injectable

More information

SITE VISIT REPORT DATE: JOB: NO. OF VISIT: PAGE OF : PURPOSE OF VISIT: CONTRACTOR: Items to be checked Observations Actions SETTING OUT

SITE VISIT REPORT DATE: JOB: NO. OF VISIT: PAGE OF : PURPOSE OF VISIT: CONTRACTOR: Items to be checked Observations Actions SETTING OUT SETTING OUT Correct to boundaries Correct to building lines? Diagonals accurate? Levels correct? EXCAVATIONS Adjoining structures OK? Centres of foundations line with walls? Bottoms of trenches uniform,

More information

LAMINATE GENERAL INSTALLATION INSTRUCTIONS FOR DROP LOCK FLOORING

LAMINATE GENERAL INSTALLATION INSTRUCTIONS FOR DROP LOCK FLOORING LAMINATE GENERAL INSTALLATION INSTRUCTIONS FOR DROP LOCK FLOORING WARNING Prior to installation, please ensure that the product received is the correct style and color as well as to the customer s satisfaction.

More information

1.3 Work shall include all reinforcement and accessories necessary to complete installation.

1.3 Work shall include all reinforcement and accessories necessary to complete installation. CERAMIC TILING GENERAL INFORMATION 1.1 Ceramic mosaic tile floors and bases, glazed wall tile wainscots and walls, and marble thresholds. 1.2 Installation will typically be with latex-portland cement mortar

More information

TILE TILE

TILE TILE 09300 - TILE 09300-1 PART ONE: GENERAL 1.1 Description TILE 1.1.1 Work of this Section, as shown or specified, shall be provided by the Interior Contractor and shall be in accordance with the requirements

More information

Confined masonry. Definition

Confined masonry. Definition Lesson prepared by the Swiss Agency for Development and Cooperation for the trainings at the Housing Reconstruction Centres Ballakot and Battagram 13 August 2006 1 Definition Confined Masonry is a construction

More information

B. Samples: Submit, for verification purposes, samples of the following:

B. Samples: Submit, for verification purposes, samples of the following: SECTION 04500 - MASONRY RESTORATION AND CLEANING PART 1 GENERAL 1.1 RELATED DOCUMENTS A. Drawings, photos and general provisions of Contract, including General and Supplementary Conditions and Division-1

More information

Real Stone Cladding mm sandstone ashlar. Thin Sandstone Ashlar Catalogue

Real Stone Cladding mm sandstone ashlar. Thin Sandstone Ashlar Catalogue 12 15 20 mm sandstone ashlar Thin Sandstone Ashlar Catalogue 12 15 20 mm ashlar 1 SANDSTONE ASHLAR 12 15 20 MM Ashlar sandstone is the most desired and expensive stone finish for any facade. It is now

More information

Construction Specification for Utility Adjustments

Construction Specification for Utility Adjustments Engineering & Construction Services Division Standard Specifications for Road Works TS 4.50 September 2017 for Utility Adjustments Table of Contents TS 4.50.01 SCOPE... 2 TS 4.50.02 REFERENCES... 2 TS

More information

Concrete Block Machines Typical Fixed Block Machine

Concrete Block Machines Typical Fixed Block Machine SEAOG 2016 Masonry Workshop Concrete Masonry Units and Terminology Concrete Masonry in Georgia Georgia World Congress Center Reference: Inspector s Handbook Masonry Institute of America Roy Keck, FACI

More information

Nepal Biogas Plant -- Construction Manual. Construction Manual for GGC 2047 Model Biogas Plant

Nepal Biogas Plant -- Construction Manual. Construction Manual for GGC 2047 Model Biogas Plant Nepal Biogas Plant -- Construction Manual Construction Manual for GGC 2047 Model Biogas Plant Introduction The success or failure of any biogas plant mainly depends upon the quality of construction works.

More information

8245 Remmet Ave Canoga Park, CA (888) Installation Instructions - AVM System 700 Under Tile Waterproofing and Anti-Fracture Membrane

8245 Remmet Ave Canoga Park, CA (888) Installation Instructions - AVM System 700 Under Tile Waterproofing and Anti-Fracture Membrane 8245 Remmet Ave Canoga Park, CA. 91304 (888) 414-1041 Division 7-Moisture Protection Page 1 Table of Contents General... 2 Approvals... 2 Applicator... 2 Product Delivery, Storage and Handling... 2 Limitations...

More information

OLD BRICK ORIGINALS KILN-FIRED THIN BRICK VENEER Installation Guide. RobinsonBrick.com

OLD BRICK ORIGINALS KILN-FIRED THIN BRICK VENEER Installation Guide. RobinsonBrick.com OLD BRICK ORIGINALS KILN-FIRED THIN BRICK VENEER Installation Guide RobinsonBrick.com OLD BRICK ORIGINALS THIN BRICK VENEER Page 2 INTRODUCTION Check local building codes for proper installation guidelines

More information

***************************************************************************************************************

*************************************************************************************************************** 09330 QUARRY TILE *************************************************************************************************************** SPECIFIER: CSI MasterFormat 2004 number 09 30 16 ***************************************************************************************************************

More information

1.2 Reference Standard: NOFMA - National Oak Flooring Manufacturers Association Grading Standards.

1.2 Reference Standard: NOFMA - National Oak Flooring Manufacturers Association Grading Standards. WOOD FLOORING GENERAL INFORMATION 1.1 This section applies to factory finished wood strip flooring. 1.2 Reference Standard: NOFMA - National Oak Flooring Manufacturers Association Grading Standards. 1.3

More information

Concrete Slab-on-Ground

Concrete Slab-on-Ground Concrete Slab-on-Ground This training package provides information on concrete slab-on-ground construction, including reinforcement, formwork, mix, placement and curing, for village infrastructure and

More information

SECTION UTILITY MANHOLES AND STRUCTURES

SECTION UTILITY MANHOLES AND STRUCTURES SECTION 33 05 14 UTILITY MANHOLES AND STRUCTURES PART 1 GENERAL 1.1 SUMMARY A. Section Includes: 1. Precast reinforced concrete manholes and structures with tongue-and-groove joints with masonry transition

More information

Important: Before You Start

Important: Before You Start Advantage ICF System Advantage ICF System TM Field Guide Important: Before You Start Does Your Building Inspector Know You Are Building with the Advantage ICF System? You are required to check with your

More information

Standard specification for the application of Danosa Two-Layer waterproof roofing membrane to plywood & concrete surfaces.

Standard specification for the application of Danosa Two-Layer waterproof roofing membrane to plywood & concrete surfaces. Standard specification for the application of Danosa Two-Layer waterproof roofing membrane to plywood & concrete surfaces. BRANZ Appraised No. 678 Ref: P3200 Rev 1 February 2016 Page 1 of 5 1.0 PREAMBLE:

More information

SILASEC DESCRIPTION FEATURES AND BENEFITS SURFACE PREPARATION

SILASEC DESCRIPTION FEATURES AND BENEFITS SURFACE PREPARATION SILASEC WP0001 REVISED: JANUARY 2002 DESCRIPTION Bondall Silasec is a concentrated liquid waterproofing compound designed to be used with Portland type A or type GP cements to form a permanent waterproof

More information

GENERAL SHALE NATURAL THIN ROCK VENEER Installation Guide. GeneralShale.com

GENERAL SHALE NATURAL THIN ROCK VENEER Installation Guide. GeneralShale.com GENERAL SHALE NATURAL THIN ROCK VENEER Installation Guide GeneralShale.com GENERAL SHALE NATURAL THIN ROCK VENEER Page 2 INTRODUCTION - TABLE OF CONTENTS Check local building codes for proper installation

More information

CONSTRUCTION SUMMARY REPORT

CONSTRUCTION SUMMARY REPORT Edison Engineers Inc. 89 King Street W. Suite 3 Dundas (Hamilton) Ontario Canada L9H 1V1 Info@edisonengineers.ca CONSTRUCTION SUMMARY REPORT To: Halton Condominium Corporation No. 70 c/o Wilson Blanchard

More information

STEP UP SHOWER BASE INSTALLATION GUIDE FOR TIMBER AND CONCRETE FLOORS

STEP UP SHOWER BASE INSTALLATION GUIDE FOR TIMBER AND CONCRETE FLOORS GUIDE FOR TIMBER AND CONCRETE FLOORS EDITION: APRIL 2016 IMPORTANT: This guide is for the installation of a Step Up shower base on a timber or concrete floor. If you require a walk in (flush with floor)

More information

TIVOLI CARPARK SITE DEVELOPMENT, LITTLE COLLINS STREET, MELBOURNE BRICK AND BLOCK CONSTRUCTION

TIVOLI CARPARK SITE DEVELOPMENT, LITTLE COLLINS STREET, MELBOURNE BRICK AND BLOCK CONSTRUCTION NATSPEC 1 18 November, 2003 1 GENERAL 1.1 CROSS REFERENCES General Conform to the Preliminaries. Conform to the Environmental Management section of the Invitation to Tender document. Related worksections

More information

1. Repairing brick masonry, including replacing damaged units as indicated on drawings. 2. Repointing mortar joints.

1. Repairing brick masonry, including replacing damaged units as indicated on drawings. 2. Repointing mortar joints. SECTION 040120 BRICK MASONRY REPAIR AND REPOINTING PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division

More information

INSULATED CONCRETE MASONRY UNITS Section 04220

INSULATED CONCRETE MASONRY UNITS Section 04220 INSULATED CONCRETE MASONRY UNITS Section 04220 PART 1 GENERAL 1.01 Summary A. Section Includes 1. Insulated masonry wall units (CMU's) 2. Decorative insulated masonry wall units 1.02 SUBMITTALS A. Samples:

More information

When I started tiling, we didn t do our own shower pans that BATHS

When I started tiling, we didn t do our own shower pans that BATHS BATHS Preventing Leaks in Tiled Showers Detail the pan properly before any tile is installed BY TOM MEEHAN Photos by Roe Osborn When I started tiling, we didn t do our own shower pans that job fell to

More information

REF : WEBSITE08. Monday, 12 December 2011

REF : WEBSITE08. Monday, 12 December 2011 REF : WEBSITE08 Monday, 12 December 2011 GENERAL SPECIFICATION FOR INSTALLING UNDER TILE HEATING ELEMENTS AND FIXING GLAZED CERAMIC FLOOR TILES OR PORCELAIN TILES ON INTERIOR SURFACE BEDS OR SUSPENDED

More information

Development of the Urban Water and Sanitation Sector in South Sudan (DUWSS) Bill of Quantities. for LOCATED AT PRIMARY & SECONDARY SCHOOL.

Development of the Urban Water and Sanitation Sector in South Sudan (DUWSS) Bill of Quantities. for LOCATED AT PRIMARY & SECONDARY SCHOOL. Development of the Urban Water and Sanitation Sector in South Sudan (DUWSS) Bill of Quantities for SIX CHAMBER VIP LATRINE FACILITY LOCATED AT PRIMARY & SECONDARY SCHOOL YEI RIVER COUNTY South Sudan JUN,

More information

Planning and installation instructions

Planning and installation instructions Planning and installation instructions Stofix Oy Ahlmaninkatu 2 E 40100 Jyväskylä Finland stofixgroup@stofix.com www.stofix.com 2 PLANNING AND INSTALLATION INSTRUCTIONS... 1 1 General... 3 2 Project Design...

More information

WALNUT CREEK - DETAILS OF TECHNICAL SPECIFICATIONS SPECS FOR VASWANI PORTION. 200 mm solid concrete blocks. Reinforced Cement Concrete - Flat Roof

WALNUT CREEK - DETAILS OF TECHNICAL SPECIFICATIONS SPECS FOR VASWANI PORTION. 200 mm solid concrete blocks. Reinforced Cement Concrete - Flat Roof WALNUT CREEK - DETAILS OF TECHNICAL SPECIFICATIONS DESCRIPTION BASIC STRUCTURE Foundation Super Structure Internal Walls External Walls Roof RCC footing Framed Structure 200 & 100 mm Solid Concrete Blocks

More information

Freedom One-Piece Barrier Free Showers Installation Instructions

Freedom One-Piece Barrier Free Showers Installation Instructions Tools & Materials you might need for proper installation Materials: 2-1 gallon buckets of solid wood flooring adhesive or 100% silicone adhesive (non-shrink) 20-1.25 wood screws 1-5 gallon bucket (to mix

More information

A. ASTM C190 - Test Method for Tensile Strength of Hydraulic Cement Mortars

A. ASTM C190 - Test Method for Tensile Strength of Hydraulic Cement Mortars SECTION 04850 (04 40 00) MSI PRECAST STONE VENEER SYSTEM PART 1 GENERAL 1.1 SECTION INCLUDES A. MSI Precast Stone Veneer for exterior and interior vertical surfaces. 1.2 RELATED SECTIONS Specifier Notes:

More information

COLLEGE CLASSROOM & DORMITORY SPECIFICATION SECTION 08100

COLLEGE CLASSROOM & DORMITORY SPECIFICATION SECTION 08100 COLLEGE CLASSROOM & DORMITORY SPECIFICATION SECTION 08100 Part 1 General 1.01 Work Included A. The work under this section shall include the furnishing of all items shown on the drawings and as specified,

More information

Surface dryness Do not wet background surfaces of tiles when fixing with adhesives of any sort.

Surface dryness Do not wet background surfaces of tiles when fixing with adhesives of any sort. Tiling Guides & Techniques 3.2 Fixing Tiles 3.2.1 Bedding tiles in adhesive for walls and floors 3.2.1.1 Thickness of adhesive Apply adhesive only to the thickness given in the adhesive manufacturer s

More information

SSS003: Substrate Specification Sheet 3 - Brick, Block and Concrete

SSS003: Substrate Specification Sheet 3 - Brick, Block and Concrete SSS003: Substrate Specification Sheet 3 - Brick, Block and Concrete Page 1 of 6 Document: 70.5 Collection: 116: Substrate Specification Sheets (SSS) Modified: 3/01/017 14:56 Created: 7/05/016 17:0 Armourcoat

More information

NCMA TEK TEK 19-5A FLASHING DETAILS FOR CONCRETE MASONRY WALLS

NCMA TEK TEK 19-5A FLASHING DETAILS FOR CONCRETE MASONRY WALLS NCMA TEK National Concrete Masonry Association an information series from the national authority on concrete masonry technology FLASHING DETAILS FOR CONCRETE MASONRY WALLS TEK 19-5A Water Penetration Resistance

More information

SECTION CONCRETE PAVING SLABS SET IN MORTAR

SECTION CONCRETE PAVING SLABS SET IN MORTAR SECTION 32 14 13.16 CONCRETE PAVING SLABS SET IN MORTAR (1995 MasterFormat Section 02784) Note: This guide specification for the U.S. is for paving slabs mortared to a concrete base and grouted joints

More information

ARCHITECTURAL DRAWINGS

ARCHITECTURAL DRAWINGS PROJECT DETAILS Implementation Partner: Project title: Grant No.: KIS062 Content : ARCHITECTURAL DRAWINGS SHEET NO. REHABILITATION OF GRANT NO.: - KIS062 COVER SHEET INDEX SHEET CONTENTS 01 02 03 04 05

More information

SCHEDULE OF QUANTITIES INTERIOR WORKS FOR RACC,GADAG Description Qty. Unit Rate Amount

SCHEDULE OF QUANTITIES INTERIOR WORKS FOR RACC,GADAG Description Qty. Unit Rate Amount Item No. 1 PARTITION 1.1 DOUBLE SKIN WOODEN PARTITION SCHEDULE OF QUANTITIES INTERIOR WORKS FOR RACC,GADAG Description Qty. Unit Rate Amount Providing and fixing 71 mm thick solid fully or partly glazed

More information

The better way to build TM. Installation Manual FOUNDATION SIPs & FROST WALLS SIPs

The better way to build TM. Installation Manual FOUNDATION SIPs & FROST WALLS SIPs The better way to build TM Installation Manual FOUNDATION SIPs & FROST WALLS SIPs November 2016 PWF FOUNDATION & FROST WALL SIPs Installation Manual Table of Contents Topics General Requirements....................................

More information

DIVISION 04 MASONRY CAST STONE. A. Design Considerations. 1. Cast stone shall comply with ASTM C1364, Standard Specification for Cast Stone.

DIVISION 04 MASONRY CAST STONE. A. Design Considerations. 1. Cast stone shall comply with ASTM C1364, Standard Specification for Cast Stone. DIVISION 04 MASONRY 04720 CAST STONE A. Design Considerations 1. Cast stone shall comply with ASTM C1364, Standard Specification for Cast Stone. 2. Care must be taken in the design of individual units

More information

Application Instructions for Keystone Kool Deck on Existing Concrete

Application Instructions for Keystone Kool Deck on Existing Concrete Application Instructions for Keystone Kool Deck on Existing Concrete REQUIRED MATERIALS Keystone Kool Deck PTA Bonding Agent Water 20 Mesh Marble Sand White Portland Cement OPTIONAL TOOLS Mortex Pattern

More information

FERROCEMENT WATER TANKS

FERROCEMENT WATER TANKS FERROCEMENT WATER TANKS Action Sheet 21 What is this Action Sheet about? This Action Sheet describes how to build ferrocement water tanks. Take advice from an engineer or other experienced person if necessary,

More information

Tile on Existing. Viewpoint

Tile on Existing. Viewpoint Viewpoint Tile on Existing Exterior Reinforced Concrete BalconieS By Steven C. Turner Exterior reinforced concrete balconies are often covered by tile set in mortar beds with grouted joints. These installations

More information

Residential Installation

Residential Installation Residential Installation 51 Masonry Cement Shouldice Designer Stone recommends the use of Type N masonry mixed at a ratio of 3 to 1 with clean sharp masonry sand. Type S masonry should not be used in conjunction

More information

Anchor bolts ASTM F1554, Gr. 36 Wide flange beams ASTM A992, Fy = 50 ksi Misc. structural steel ASTM A36, Fy = 36 ksi

Anchor bolts ASTM F1554, Gr. 36 Wide flange beams ASTM A992, Fy = 50 ksi Misc. structural steel ASTM A36, Fy = 36 ksi STRUCTURAL NOTES MATERIAL STRENGTHS Structural Steel Reinforcing Steel Concrete Masonry Structural Lumber Anchor bolts ASTM F1554, Gr. 36 Wide flange beams ASTM A992, Fy = 50 ksi Misc. structural steel

More information

Plaster systems. Plaster systems.

Plaster systems. Plaster systems. Plaster systems Plaster systems Gyproc plasters have been formulated to suit a wide variety of background types including concrete, brick, blockwork, sand / cement, Gyproc Plasterboards and expanded metal

More information

84 Lapping & Jointing 86 Service Pipe Penetrations 87 Sealing to Cavity Wall Constructions 88 Protecting Membranes System Components.

84 Lapping & Jointing 86 Service Pipe Penetrations 87 Sealing to Cavity Wall Constructions 88 Protecting Membranes System Components. 84 Lapping & Jointing 86 Service Pipe Penetrations 87 Sealing to Cavity Wall Constructions 88 Protecting Membranes 90 System Components installation/ SYSTEM COMPONENTS INSTALLATION ADVICE LAPPING and JOINTING

More information

Assembly Instruction. wedi Fundo Primo Shower System

Assembly Instruction. wedi Fundo Primo Shower System Assembly Instruction wedi Fundo Primo Shower System Assembly Instructions wedi Fundo wedi Fundo Shower System-Primo Overview & General Product Description of the wedi Fundo Shower Systems All wedi Waterproof

More information

Specialists in Acoustic Flooring and House to Flat Conversions

Specialists in Acoustic Flooring and House to Flat Conversions Sound Solution Consultants Ltd Po Box 755 Capel St Mary Ipswich Suffolk IP9 2WF Tel No: 0845 5212096 Fax No: 0845 5212097 Email: mpconsultservice@aol.com Specialists in Acoustic Flooring and House to Flat

More information

BISON PRECAST FLOORING SPECIFICATION

BISON PRECAST FLOORING SPECIFICATION BISON PRECAST FLOORING SPECIFICATION 1.0 SCOPE OF THE SPECIFICATION 1.01 Relates to: This specification covers the design, manufacture and associated site work of the following types of floors:- Hollowcore

More information

For RSA Coating Systems over For RSA Coating Systems over Austech Foamula Extruded Polystyrene (XPS) (Skin Off)

For RSA Coating Systems over For RSA Coating Systems over Austech Foamula Extruded Polystyrene (XPS) (Skin Off) Austech Foamula Extruded Polystyrene (XPS) (Skin Off) RSA strongly recommend the use of our full render and texture systems with the appropriate water tight membrane over polystyrene products. SEVEN STEPS

More information

Installation Instructions for SuperFast Hurricane

Installation Instructions for SuperFast Hurricane SuperFast Hurricane Installation Instructions for SuperFast Hurricane I. Before You Start / Preparations Please read all the instructions before you begin the installation. Improper installation will void

More information

PERM-FLEX ASSEMBLY DIRECT APPLICATION TO CEMENTITIOUS SUBSTRATES MANUFACTURERS SPECIFICATION / SECTION 09960

PERM-FLEX ASSEMBLY DIRECT APPLICATION TO CEMENTITIOUS SUBSTRATES MANUFACTURERS SPECIFICATION / SECTION 09960 STUC-O-FLEX PERM-FLEX ASSEMBLY DIRECT APPLICATION TO CEMENTITIOUS SUBSTRATES MANUFACTURERS SPECIFICATION / SECTION 09960 PART 1 - GENERAL 1.01 DESCRIPTION Provide all labor, materials and equipment necessary

More information

SECTION LATEX-MODIFIED MEDIUM BED MORTAR

SECTION LATEX-MODIFIED MEDIUM BED MORTAR SECTION 09305.24 LATEX-MODIFIED MEDIUM BED MORTAR This product guide specification can be used to specify Hydroment Big Tile & Stone Mortar, a latex-modified, medium bed mortar designed for setting large

More information

***********************************************************************************

*********************************************************************************** AQUAFIN-2K/M Two-Component Cement-based Acrylic-based Waterproofing GUIDE AQUAFIN, Inc. SPECIFICATION PART 1 - GENERAL 1.1 SECTION INCLUDES SECTION 07 16 14 ACRYLIC MODIFIED (FLEXIBLE) CEMENTITIOUS WATERPROOFING

More information

ECO OUTDOOR INSTALLATION TIPS FLOORING TORINO MELBOURNE SYDNEY BRISBANE ADELAIDE PERTH T ECOOUTDOOR.COM.AU

ECO OUTDOOR INSTALLATION TIPS FLOORING TORINO MELBOURNE SYDNEY BRISBANE ADELAIDE PERTH T ECOOUTDOOR.COM.AU ECO OUTDOOR INSTALLATION TIPS FLOORING TORINO MELBOURNE SYDNEY BRISBANE ADELAIDE PERTH T. 1300 13 14 13 ECOOUTDOOR.COM.AU Installations Tips Please note these tips are guides only and should be used in

More information

Residential Building Inspections

Residential Building Inspections Residential Building Inspections Foundations, Grade Beams, Pile Caps, Foundation Pads 1. All trenches or excavations and formwork shall be in accordance with the size(s) and configuration(s) as per approved

More information