SAFE WORK PROCEDURE 037 STORMWATER DRAINAGE CONSTRUCTION MARCH 2014 DOC. NO. D14/184659
|
|
- Blaze Montgomery
- 6 years ago
- Views:
Transcription
1 MORELAND CITY COUNCIL Operations Centre 7-9 Walter Street Hadfield Vic 3046 Tel: Approved by the Walter Street OHS committee Date: September 2014 Operation Brief Description of Activity Construction of Stormwater Drainage Construction of stormwater drainage including excavation, base preparation, bedding, pipe/box culvert installation and backfill Limitations This Safe Work Procedure is applicable to the construction of stormwater drains up to 1.2 metres diameter Operator Skill Requirement Unit Induction, Traffic Control Certificate, Licence or Other Mandatory Qualification Required Victorian Driver s Licence for Class of Vehicle Safe Work Procedures and Risk Assessments to Be Read in Conjunction With This Safe Work Procedure Refer to: SWP 001 Driving Trucks; SWP 002 Towing trailers; SWP 004 Working Outdoors; SWP 007 Excavation: SWP 008 Trenching; SWP 020 Backhoe; Other SWP s dependent on location and conditions discuss with supervisor Workplace Conditions Affecting Safety Weather rain, fog, icy conditions Sun glare Traffic density and movements Incidents and Safety Alerts Nil Personal Protective Equipment Safety Sunglasses, High Visibility Vest, Safety Footwear, Protective Headwear, Protective Eyewear, Gloves SWP 114 Key!OHS " Public Health and Safety # Environmental Quality Page 1 of 5
2 Critical Steps in this Activity Potential Hazards Risk Controls Mobile Plant and Vehicles Use of Mobile Plant and Vehicles SWP 001 Driving Trucks SWP 002 Towing trailers SWP 020 Backhoe General Precautions for Manual Work Activities All Manual Outdoor Tasks. SWP 004 Working Outdoors SWP 011 Manual Handling Traffic Control Working in Trafficked Areas.! " SWP 012 Traffic Control at Worksites Identification of Services Identify and Locate Services. SWP 005 Working near Overhead Services SWP 006 Buried Services Material Conformance Pipes, Fittings, Bedding and Backfill Materials. Trenching Trenching. Moreland City Council Technotes SWP 007 Excavation SWP 114 Key!OHS " Public Health and Safety # Environmental Quality Page 2 of 5
3 Critical Steps in this Activity Potential Hazards Risk Controls Inspection Inspection of base of trench for suitability. Excavation to line and level Installation Install bedding.! Base of trench unsuitable for proposed installation causing pipe movement and possible failure and flooding. Trench at incorrect location or depth Trench encroaches upon other structures or services Trench not sufficiently wide for planned installation Insufficient thickness of bedding causing deformation of pipe, damage to pipe and pipe movement and possible failure and flooding. Insufficient compaction of bedding Workers in trench struck or buried by bedding material being placed in trench. Once the trench is excavated to the required depth the base of the trench is inspected. If the base is soft or unstable discuss the proposed method of rectification with your supervisor. Rectification of unstable base areas is completed in accordance with instruction from the Works Officer. Bedding as per the Moreland Technotes is placed over the full width of the trench. The bedding is shaped to ensure uniform support over the length of the pipe, including at the socket (where appropriate). The bedding shall be compacted by plate compactor or equivalent. Once the pipe or culvert sections are in place, bedding is forced around the pipe barrel with shovels to provide pipe support. An additional layer of bedding material is placed around and over the pipe and compacted. No workers to be in trench section where bedding is being placed by backhoe, excavator or front end loader. Operator to follow instructions and signals of spotter SWP 114 Key!OHS " Public Health and Safety # Environmental Quality Page 3 of 5
4 Placing of Pipe and Box Culverts in Trench. Laying of Pipes Laying of Box Culverts! Workers struck or crushed by pipes or culvert sections being lowered into trench. Pipe sections installed incorrectly. Box culvert sections installed incorrectly. All pipe/culverts to be lifted and transported using approved lifting devices only. All lifting devices must have WLL marked and be inspected before use. Pipes and culvert sections are lifted at designated lifting points only. Loads not to be lifted or suspended above other workers. Workers must not be between the suspended load and installed culvert sections, trench supports or trench wall. Pipe sections are placed on the bedding with the rebate and socket ends facing upstream. The ends of the rebated and socketed pipes are fully entered. Where applicable the top of the pipe as marked is set within 5 o of the vertical axis of the culvert. Interlocking (flush) joint reinforced concrete pipes are sealed using the wide rubber rings supplied. Rubber rings are fitted to rubber ring jointed pipes. Box Culverts laid as per Moreland Technotes The box culverts are laid on the bases. All sections are firmly butted together. All joints are mortared. Drainage Pits and structures Construction of Drainage Pits. Construction of inlet and outlet structures. Headwalls constructed when specified. Backfill Stormwater drainage trenches backfilled. Inlet and Outlet Structures SWP 038 Pit Construction Moreland Technotes Moreland Technotes SWP 114 Key!OHS " Public Health and Safety # Environmental Quality Page 4 of 5
5 Headwalls. SWP SWP SWP 114 Key!OHS " Public Health and Safety # Environmental Quality Page 5 of 5
SPECIFICATION FOR PIPE CULVERT CONSTRUCTION
SPECIFICATION FOR PIPE CULVERT CONSTRUCTION 1. SCOPE Pipe culverts shall be constructed in accordance with this specification and in conformity with the lines, levels and cross-sections shown on the drawings.
More informationSpecial Provision No. 405F03 March 2005
PIPE SUBDRAINS - Item No. VIDEO CAMERA INSPECTION Item No. Special Provision No. 405F03 March 2005 OPSS 405, February 1990, Construction Specification for Pipe Subdrains is deleted in its entirety and
More informationSECTION STORM DRAIN
PART 1 - GENERAL 1-01 SECTION INCLUDED A. Furnishing and installing storm drainage facilities, including pipe, cleanout, manhole structures and inlet structures. 1-02 RELATED SECTIONS A. Division 00 Contract
More informationINDEX FOR SPECIFICATIONS FOR REMOVING CULVERTS AND PLACING CULVERTS SCOPE... 1
March 2002 No. 400 INDEX FOR SPECIFICATIONS FOR REMOVING CULVERTS AND PLACING CULVERTS 400. 1 SCOPE... 1 400. 2 REMOVING CULVERTS AND TIMBER STRUCTURES 2.1 Concrete and Metal Pipe Culverts... 1 2.2 Structural
More informationCITY OF LETHBRIDGE SECTION Construction Specifications SIDEWALK CONSTRUCTION PAGE 1 of 5
Construction Specifications SIDEWALK CONSTRUCTION PAGE 1 of 5 1.0 EXCAVATION AND FILL 1.1 GENERAL.1 The excavation or fill shall be made to provide proper grade, lines and crosssection for the laying of
More informationITEM D-701 PIPE FOR STORM DRAINS AND CULVERTS
ITEM D-701 PIPE FOR STORM DRAINS AND CULVERTS 701-1 DESCRIPTION 701-1.1 This item shall consist of the construction of pipe culverts, and storm drains, removal of existing storm pipes, connections to existing
More informationFabrication and Installation Table of Contents
Fabrication and Installation Table of Contents HDPE AQUASHIELD PRODUCTS 2 Fabrication and Installation 2 System Fabrication 3 Aqua-Swirl Installation 4 Step 1 Excavation and Bedding 4 Step 2 Pipe Connection
More informationC. Foundation stabilization for pipe and utility structures.
PART 1 - GENERAL 1.1 SECTION INCLUDES A. Excavating, backfilling, and compacting for utilities, including pipe, structures, and appurtenances. B. Control of water in trenches. C. Foundation stabilization
More informationPERMEABLE INTERLOCKING PAVERS
PERMEABLE INTERLOCKING PAVERS PART 1 - GENERAL 1.01 SECTION INCLUDES A. Subgrade Preparation B. Placement of Storage Aggregate C. Placement of Filter Aggregate D. Placement of Bedding Course E. Placement
More informationSEPTIC TANK CONSTRUCTION GUIDELINES
SEPTIC TANK CONSTRUCTION GUIDELINES Septic tank for this airport will be designed/ built by the general contractor of the building facilities. At the time of the project design, availability of a septic
More informationGWINNETT COUNTY STORM SEWER PIPE STANDARDS
1.0 Standard Specifications GWINNETT COUNTY STORM SEWER PIPE STANDARDS 1.1 Unless otherwise specifically set forth herein or in the Gwinnett County Standard Drawings, all of the materials, methods of the
More informationNOVEMBER 2016 GRANDWALL. retaining walls installation guide
NOVEMBER 2016 GRANDWALL retaining walls installation guide RETAINING WALL INSTALLATION GUIDE RETAINING WALL information Austral Masonry Grandwall retaining wall blocks are an ideal choice for retaining
More informationSECTION STORM DRAINAGE AND STORMWATER MANAGEMENT
SECTION 322 - STORM DRAINAGE AND STORMWATER MANAGEMENT 322.01 DESCRIPTION Work includes all labor, material and equipment to construct storm drain systems and stormwater management facilities, including
More informationSECTION UTILITY MANHOLES AND STRUCTURES
SECTION 33 05 14 UTILITY MANHOLES AND STRUCTURES PART 1 GENERAL 1.1 SUMMARY A. Section Includes: 1. Precast reinforced concrete manholes and structures with tongue-and-groove joints with masonry transition
More informationBox Culverts. Easy to install, suitable for very shallow or deep fill, ideal for use in a wide variety of civil engineering applications.
Box Culverts Box Culverts Easy to install, suitable for very shallow or deep fill, ideal for use in a wide variety of civil engineering applications. 2 3 System Overview Forterra is one of the largest
More informationUnderground Exhaust System
Operation and Maintenance Manual Underground Exhaust MONOXIVENT - SOURCE CAPTURE SYSTEMS - info@ Oct. - 2015 Underground Duct Construction Standards 1. Dig trench depth to allow for minimum distance from
More informationSAFETY FACT SHEETS. Working with and around High Risk Plant Safety Non Negotiable. G-HS-ST Working with and around High Risk Plant
SAFETY FACT SHEETS Working with and around High Risk Plant Safety Non Negotiable G-HS-ST-00741 Working with and around High Risk Plant Safety Non-Negotiables (SNN) Zinfra Group is committed to providing
More informationDrainage structure refers to manholes, catch basins, leaching basins, inlets and drop inlets. Drainage structures are designated as follows.
403.01 Section 403. DRAINAGE STRUCTURES 403.01 Description. Adjust, construct, or temporarily lower drainage structures. Clean existing drainage structures and leads as directed by the Engineer. Drainage
More informationSummary of the 2011 Changes
The following is a list of amendments to the Residential Site Improvement s, N.J.A.C. 5:21, adopted in 2011. The Notice of Adoption of these changes appeared in the New Jersey Register on May 16, 2011.
More informationUwall UNIVERSAL CONSTRUCTION MANUAL
Uwall UNIVERSAL Retaining Wall System CONSTRUCTION MANUAL TM President s Letter CSI is a leader in its industry supplying precast infrastructure products throughout New England and beyond since 1972, developing
More informationSection 401. PIPE CULVERTS
401.02 Section 401. PIPE CULVERTS 401.01. Description. This work consists of constructing pipe culverts of the size and class required, including excavation and backfill. 401.02. Materials. Provide materials
More informationAUGUST 2017 HASTINGS. retaining walls installation guide
AUGUST 2017 HASTINGS retaining walls installation guide RETAINING WALL INSTALLATION GUIDE RETAINING WALL information Austral Masonry retaining wall blocks are an ideal choice for retaining walls in gardens,
More informationK_`j `e]fidxk`fe `j Yifl^_k kf pfl Yp Fncj?Xcc <em`ifed\ekxc nfib`e^ `e gxike\ij_`g n`k_ BcXi^\jk\i gif[lzkj% '/+, *., (/'(
Excellent Treatment PD0064, Issue 1 INSTALLATION INSTRUCTIONS FOR N3 to N5 NITRIFICATION BIODISCS Introduction PD0064, Issue 1 Klargester BioDiscs are manufactured in Glass Fibre Reinforced Polyester (GRP).
More informationInstallation Manual. ArchCast Bridge. 3-Sided Precast Concrete Bridge Structure
ArchCast Bridge 3-Sided Precast Concrete Bridge Structure Installation Manual Salem Location: 749 West Commercial Ave. Salem, IL 62881 (618) 548-1190 countymaterials.com Email: info@countymaterials.com
More informationPolysewer Gravity Sewer System SPECIFICATION
Polysewer Gravity Sewer System SPECIFICATION July 2014 SCOPE OF WORKS To meet the specific performance criteria detailed within this specification and accompanying drawings. The completed drainage systems
More informationSECTION 39 - MANHOLES TABLE OF CONTENTS 39-1 GENERAL PRECAST CONCRETE MANHOLES
Section SECTION 39 - MANHOLES TABLE OF CONTENTS 39-1 GENERAL... 39-1 39-2 PRECAST CONCRETE MANHOLES... 39-1 39-2.01 Precast Concrete Storm Drain Manholes... 39-1 39-3 SADDLE MANHOLES... 39-2 39-3.01 Saddle
More informationCONSTRUCTION STANDARDS SECTION CS 3 TRENCH FOUNDATION, BEDDING AND BACKFILL
CONSTRUCTION STANDARDS SECTION CS 3 TRENCH FOUNDATION, BEDDING AND BACKFILL CS 3-01 GENERAL: A. The foundation, bedding and backfill for all trenches shall conform with the requirements of the City Standard
More informationCHAPTER 200 STORM SEWER CONSTRUCTION STANDARDS
CHAPTER 200 STORM SEWER CONSTRUCTION STANDARDS Storm Sewer System: 1. Detention/retention of stormwater runoff shall be provided in accordance with the requirements of the DuPage County Countywide Stormwater
More informationSECTION DUCTILE IRON FITTINGS. A. This section includes materials, installation, and testing of ductile iron fittings 48 inches and smaller.
PART 1 - GENERAL 1.1 DESCRIPTION A. This section includes materials, installation, and testing of ductile iron fittings 48 inches and smaller. 1.2 RELATED WORK SPECIFIED ELSEWHERE A. Section 01300 Record
More informationWATER DISTRIBUTION WORKER I WATER DISTRIBUTION WORKER II
CITY OF ROSEVILLE WATER DISTRIBUTION WORKER I WATER DISTRIBUTION WORKER II DEFINITION To perform a variety of semi-skilled and skilled tasks in the construction, maintenance, and repair of water distribution
More informationDUKE UNIVERSITY CONSTRUCTION STANDARDS
1 33 40 00 Storm Drainage 1. Introduction A. Duke University is divided into the main areas of the Medical Center, West Campus, Central Campus, and East Campus. The University also includes the Washington
More informationCPCCLSF3001A Licence to erect, alter and dismantle scaffolding intermediate level
CPCCLSF3001A Licence to erect, alter and dismantle scaffolding intermediate level Release: 1 CPCCLSF3001A Licence to erect, alter and dismantle scaffolding intermediate level Modification History Not Applicable
More informationITEM 460 REINFORCED CONCRETE PIPE Description. This Item shall govern for the furnishing of reinforced concrete pipe.
AFTER MARCH 1, 2012 ITEM 460 REINFORCED CONCRETE PIPE 460.1 Description. This Item shall govern for the furnishing of reinforced concrete pipe. 460.2 Materials. A. Except as modified herein, materials,
More informationUnit 9 Reinstatement of modular surfaces and concrete footways
This unit covers the requirements that you must meet when reinstating modular surfaces and concrete. You must ensure that you act in accordance with all current specifications and procedures and that you
More informationROAD PAVEMENTS GENERAL
ROAD PAVEMENTS GENERAL Contents Clause Title Page 701 Pavement Construction... 2 702 Horizontal Alignments, Surface Levels and Surface Regularity of Pavement Courses... 2 703 Not Used... 4 704 Not Used...
More informationR-TANK SPECIFICATIONS
TECHNICAL STORMWATER MANAGEMENT R-TANK SPECIFICATIONS PART 1 GENERAL 1.01 Related Documents A. Drawings, technical specification and general provisions of the Contract as modified herein apply to this
More informationExcavation Safety Program
Excavation Safety Program Excavation, Trenching & Shoring Safety I. Purpose The purpose of this policy is to establish safe operating procedures for any earthwork or underground work that is done on a
More informationSteps And Stairs Installation Steps In Wall - Option 1 Steps In Front of Walls - Option 2 Steps In Wall; 10 (25cm) Tread - Option 3 Step Parallel to
Steps And Stairs Installation Steps In Wall - Option 1 Steps In Front of Walls - Option 2 Steps In Wall; 10 (25cm) Tread - Option 3 Step Parallel to Wall - Option 4 Steps and Stairs Q & A E CONSTRUCTION
More informationLANDSCAPE RETAINING WALLS
SUDAS Standard Specifications Division 9 - Site Work and Landscaping Section 9070 - Landscape Retaining Walls LANDSCAPE RETAINING WALLS PART - GENERAL.0 SECTION INCLUDES A. Modular Block Retaining Walls
More informationLyon Creek Cedar Way Stormwater Detention Dam Operation and Maintenance Manual
Lyon Creek Cedar Way Stormwater Detention Dam Operation and Maintenance Manual Prepared by: Mike Shaw Stormwater Program Manager City of Mountlake Terrace January 2010 Section I General Information This
More informationChapter 4 Bridge Program Drawings
Chapter 4 Bridge Program Drawings Section 4.18-Miscellaneous Hydraulic Structures Introduction Miscellaneous hydraulic structures include siphons and flumes. Either single or multiple barrel siphons or
More informationConstruction Inspection Checklists
III. Construction Inspection Checklists 33 Bioretention - Construction Inspection Checklist Project: Location: Site Status: Date: Time: Inspector: Construction Sequence Satisfactory / Unsatisfactory Comments
More informationInstallation Information 2016
Installation Information 2016 DENDRO-SCOTT Root Barrier... why use anything else? DENDRO-SCOTT Root Barrier, recognised by the Environment Agency, is known for its quality and reliability. It is flexible
More informationSECTION EXCAVATION AND BACKFILL FOR UTILITIES AND STRUCTURES
SECTION 02215 EXCAVATION AND BACKFILL FOR UTILITIES AND STRUCTURES PART 1 - GENERAL 1.1 DESCRIPTION: This section includes materials, testing, and installation of earthwork for excavations, fills, and
More informationCOMMERCIAL AND INDUSTRIAL CONCRETE SPECIALISTS CAPABILITY STATEMENT
COMMERCIAL AND INDUSTRIAL CONCRETE SPECIALISTS CAPABILITY STATEMENT INDEX ABOUT US OUR WORK ETHIC MANAGEMENT SYSTEMS ACCREDITATIONS & ASSOCIATIONS CAPABILITIES & COMPETENCIES PLANT AND EQUIPMENT PREVIOUS
More informationConstruction Specification for Concrete Unit Pavers
Engineering & Construction Services Division Standard Specifications for Road Works TS 3.80 September 2017 for Concrete Unit Pavers Table of Contents TS 3.80.01 SCOPE... 2 TS 3.80.02 REFERENCES... 2 TS
More informationh Installation Manual
h Installation Manual 1 General Information The installation of HOBAS GRP Pipes is subject to applicable standards and guidelines such as EN 1610 and ISO/ TS 10465-1. Correct installation always requires
More informationNOTES ON CORRUGATED PLASTIC PIPE SUBSOIL DRAIN CONSTRUCTION SPECIFICATION
TNZ F/5 Notes: 2000 NOTES ON CORRUGATED PLASTIC PIPE SUBSOIL DRAIN CONSTRUCTION SPECIFICATION These notes are for guidance and must not be included in the Contract Documents In general subdivision numbers
More informationProposed Structure and Construction Method for Improved Interlocking Concrete Block Pavement Used in Residential Parking Spaces
Proposed Structure and Construction Method for Improved Interlocking Concrete Block Pavement Used in Residential Parking Spaces Akihiko Karasawa, 1 Masahiko Nakamura, 1 Yoshio Yanagisawa 1 1 S-BIC Company
More informationBIO-AQUIFER STORM SYSTEM
BIO-AQUIFER STORM SYSTEM Specifications for Construction PART 1 GENERAL 1.01 SECTION INCLUDES A. Providing labor, materials, tools and equipment to furnish and install a permeable concrete paving stone
More informationPROJECT: INCREASE DEMAND FOR UNIVERSITY OF FIJI- KULA STREET SAMABULA SCHEME: G115-15
TENDER NO MR 151/2016 PROJECT: INCREASE DEMAND FOR UNIVERSITY OF FIJI- KULA STREET SAMABULA SCHEME: G115-15 Notes : 1. Bidders to provide 2 hardcopies of tender bid. 2. Safety Plan to be incuded in tender
More informationITEM 464 REINFORCED CONCRETE PIPE
ITEM 464 REINFORCED CONCRETE PIPE 464.1. Description. This Item shall govern for furnishing and installing all concrete pipe and materials and for constructing precast concrete pipe culverts or precast
More informationMATERIAL SPECIFICATION FOR CIRCULAR AND ELLIPTICAL CONCRETE PIPE
ONTARIO PROVINCIAL STANDARD SPECIFICATION OPSS.MUNI 1820 NOVEMBER 2017 MATERIAL SPECIFICATION FOR CIRCULAR AND ELLIPTICAL CONCRETE PIPE TABLE OF CONTENTS 1820.01 SCOPE 1820.02 REFERENCES 1820.03 DEFINITIONS
More informationSteps And Stairs Installation Option 1 - Steps In Wall Option 2 - Steps With Plant Space Option 3 - Steps In Front of Walls Option 4 - Steps Along
Steps And Stairs Installation Option 1 - Steps In Wall Option 2 - Steps With Plant Space Option 3 - Steps In Front of Walls Option 4 - Steps Along Wall Face Option 5 - Steps In Wall; 10 (25cm) Tread Option
More informationGROUNDtrax GROUNDGRIDZ
INSTALLATION GUIDE The product is asymmetric and must be lifted by placing the hands on the diagonally opposed corners of the central paver (as shown). 1. Place grids onto the prepared well consolidated
More informationTasman Retaining Wall System
Tasman Retaining Wall System The Tasman Retaining Wall System incorporates purpose made corners and capping units to provide classical reconstructed stone retaining walls for any landscape situation. From
More informationPerfect Manhole Installation Manual May 2012 Rev 8 Perfect Manhole System Precast concrete manholes with load bearing elastomeric joints
Perfect Manhole System Precast concrete manholes with load bearing elastomeric joints Installation Manual 1 1 Introduction This manual gives guidance on how to install the CPM Group Perfect manhole system
More informationATTACHMENT A Sanitary Sewage Line Replacement Columbia County, Roadside Rest Site# 38, I-80 WB Project# Roadside Rest Grounds# 031R380
I. Base Bidding Requirements This is not a base bid project. II. Work Included The following items are site specific requirements of the project. Contractor to repair, replace and install the necessary
More informationSECTION 19 - TRENCH EXCAVATION, BEDDING AND BACKFILL TABLE OF CONTENTS
SECTION 19 - TRENCH EXCAVATION, BEDDING AND BACKFILL TABLE OF CONTENTS Section Page 19-1 TRENCH EXCAVATION... 19.1 19-1.01 Exploratory Excavation... 19.1 19-1.02 Trench Width... 19.1 19-1.02.A Storm Drain
More informationSTATE OF OHIO DEPARTMENT OF TRANSPORTATION SUPPLEMENTAL SPECIFICATION 811 CONDUIT AND DRAINAGE STRUCTURES
STATE OF OHIO DEPARTMENT OF TRANSPORTATION SUPPLEMENTAL SPECIFICATION 811 CONDUIT AND DRAINAGE STRUCTURES January 18, 2013 811.01 Conduit Description 811.02 Conduit Materials 811.03 Conduit Definitions
More informationD. Removal of existing storm sewerage pipe and drainage structures.
SECTION 33 40 00 - PART 1 - GENERAL 1.01 RELATED DOCUMENTS A. Drawings and General Provisions of the Contract, including General and Supplemental Conditions, Division B and other Division 1 Specifications
More informationSECTION 19 - TRENCH EXCAVATION, BEDDING AND BACKFILL TABLE OF CONTENTS
SECTION 19 - TRENCH EXCAVATION, BEDDING AND BACKFILL TABLE OF CONTENTS Section Page 19-1 TRENCH EXCAVATION...19.1 19-1.01 Exploratory Excavation...19.1 19-1.02 Trench Width...19.1 19-1.02.A Storm Drain
More informationSECTION A1 EXCAVATION AND BACKFILL GENERAL
SECTION A1 EXCAVATION AND BACKFILL GENERAL The work under this section shall include all excavation to such width and depth as shown on the drawings, specified herein, or ordered by the Engineer. Such
More informationFS-DUO. Wastewater Flow Distributor Technical Data. Submittal Special Precautions Specifications Installation. (62.2 cm) (62.2 cm)
Wastewater Flow Distributor Technical Data Submittal Special Precautions Specifications Installation 24½" (62.2 cm) 12½" (31.8 cm) 24½" (62.2 cm) (30.5 cm) SUBMITTAL STANDARD: 4" plain end inlet/outlet
More informationOperate a dozer (wheeled and tracked)
Operate a dozer (wheeled and tracked) Code OHSCER209A Workplace Health and Safety Queensland is moving to a new learning and assessment system for certificates to work in prescribed occupations. Learning
More information***************************************************************************************************************
02735 WASTE WATER DRAINAGE SYSTEM *************************************************************************************************************** SPECIFIER: CSI MasterFormat 2004 number 22 14 00 ***************************************************************************************************************
More informationTasman and Norfolk Retaining Wall
Tasman and Norfolk Retaining Wall Evaluation and Installation Guide BAINES We deliver Sydney s Best! Order online: bcsands.com.au Call: (02) 8543 3400 Taren Point & Mascot Tasman and Norfolk are registered
More informationREGISTRATION EXAMINATION, NOVEMBER 2012 LICENSED DRAINLAYER QUESTION AND ANSWER BOOKLET. Time allowed THREE hours
Affix label with Candidate Code Number here. If no label, enter candidate Number if known No. 9197 REGISTRATION EXAMINATION, NOVEMBER 2012 LICENSED DRAINLAYER INSTRUCTIONS QUESTION AND ANSWER BOOKLET Time
More informationSECTION TRENCHING & BACKFILLING
SECTION 02225 - TRENCHING & BACKFILLING 1.0 GENERAL 1.1 Work included in this Section includes trenching and backfilling for underground pipelines and related structures only. 1.2 Reference Specifications
More informationMATERIAL SPECIFICATION FOR CIRCULAR AND ELLIPTICAL CONCRETE PIPE
ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 1820 NOVEMBER 2012 MATERIAL SPECIFICATION FOR CIRCULAR AND ELLIPTICAL CONCRETE PIPE TABLE OF CONTENTS 1820.01 SCOPE 1820.02 REFERENCES 1820.03 DEFINITIONS
More informationSECTION EXCAVATING, BACKFILLING, AND COMPACTION FOR UTILITIES
SECTION 02221 EXCAVATING, BACKFILLING, AND COMPACTION FOR UTILITIES PART 1 GENERAL 1.01 SUMMARY A. Related Sections: 1. 02200 - Earthwork. 2. 02660 - Water Systems. 3. 02720 - Storm Drainage System. 4.
More informationModular Sediment Barriers (Instream)
Modular Sediment Barriers (Instream) INSTREAM PRACTICES Flow Control No Channel Flow Dry Channels Erosion Control Low Channel Flows Shallow Water Sediment Control High Channel Flows Deep Water Symbol Photo
More informationCONNECTION TO INSPECTION CHAMBERS PRAKTO
CONNECTION TO INSPECTION CHAMBERS PRAKTO The inspection chambers PRAKTO made by Pipelife are designed and manufactured to be conveniently and securely connected to pipes and fittings of the Pragma series
More informationSection Storm Sewers STORM SEWERS PART 1 - GENERAL 1.01 SECTION INCLUDES. A. Storm Sewers. B. Abandonment of Storm Sewers
STORM SEWERS PART 1 - GENERAL 1.01 SECTION INCLUDES A. Storm Sewers B. Abandonment of Storm Sewers 1.02 DESCRIPTION OF WORK A. Construct storm sewers. B. Abandon storm sewers. 1.03 SUBMITTALS Comply with
More informationTasman Retaining Wall
Tasman Retaining Wall EVALUATION AND INSTALLATION GUIDE Landscaping Tasman Retaining Wall Evaluation and Installation Guide This installation guide demonstrates the basics on how to construct: A. Tasman
More informationSECTION MANHOLES AND STRUCTURES. A. Section Includes: 1. Manholes for water, storm drain and sanitary sewer systems.
SECTION 33 05 13 MANHOLES AND STRUCTURES PART 1 GENERAL 1.1 SUMMARY A. Section Includes: 1. Manholes for water, storm drain and sanitary sewer systems. B. Related Sections: 1. Section 03 20 00 - Concrete
More informationTCC/SHORE TRANSIT BUS MAINTENANCE FACILITY - PHASE II
SECTION 221313 - FACILITY SANITARY SEWERS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification
More informationINDUSTRIAL PIPE FITTINGS, LLC
Page 1 of 9 SPIROLITE MUNICIPAL AND INDUSTRIAL ODOR CONTROL PIPING Municipal wastewater treatment plants, industrial processes and composting facilities can be assured of trouble free transport of foul
More informationBest Practices for Building High-Performance Resource Roads. Road Drainage. Developed by: The Roads and Infrastructure Group
Best Practices for Building High-Performance Resource Roads Road Drainage Developed by: The Roads and Infrastructure Group THIS GUIDE IS INTENDED FOR EQUIPMENT OPERATORS CONSTRUCTION CONTRACTORS FIELD
More informationENGINEERED SOLUTIONS SAFETY INSTRUCTIONS FOR STRUCTURAL PLATE PRODUCTS
ENGINEERED SOLUTIONS SAFETY INSTRUCTIONS FOR STRUCTURAL PLATE PRODUCTS UNLOADING HANDLING ASSEMBLING Preface This instruction book is for your crews. Distribute it to help them safely unload and handle
More informationRISK RATING SAFE WORK METHOD STATEMENT 1 HIGH 2 MEDIUM 3LOW. I approve the use of this Safe Work Method Statement: NAME: POSITION: Department Manager
RISK RATING 1 HIGH 2 MEDIUM 3LOW SAFE WORK METHOD STATEMENT Title: : Bridge Inspection Ref No: 1 I approve the use of this Safe Work Method Statement: NAME: POSITION: Department Manager SIGNATURE: DATE:
More informationSECTION EXCAVATION AND EMBANKMENT. B. Subbase Grading A samples for gradation analysis.
PART 1 GENERAL 1.1 DESCRIPTION A. The WORK under this Section includes providing all labor, materials, tools and equipment necessary for excavation and embankment construction to the lines, grades and
More informationStandards for Soil Erosion and Sediment Control in New Jersey May 2012 STANDARD FOR SLOPE PROTECTION STRUCTURES. Definition
STANDARD FOR SLOPE PROTECTION STRUCTURES Definition Structures to safely conduct surface runoff from the top of a slope to the bottom of the slope. Purpose The purpose of this practice is to convey storm
More informationSECTION 1100 GRADING 1102 MATERIALS AND DEFINITIONS.
SECTION 1100 GRADING 1101 SCOPE. This section covers the performance of all work required for grading the project in coordination with all previous work performed at the locations shown on the contract
More informationINTERLOCKING CONCRETE PAVERS SECTION 02780
INTERLOCKING CONCRETE PAVERS SECTION 02780 NOTE: This is a guide specification for the construction of Tremron Interlocking Concrete Pavers and bedding sand over a dense-graded, compacted aggregate base.
More informationLIPUMAX GREASE SEPARATOR
ACO Passavant Installation guide LIPUMAX GREASE SEPARATOR AUTHOR Kate Jennings DATE COMPLETED 8 August 2016 v14 ACO Polycrete, 134-140 Old Bathurst Road, Emu Plains, NSW 2750 Tel: +61 2 4747 4000 Fax:
More informationAppendix J: Storm Conveyance Design Parameters
Appendix J: Storm Conveyance Design Parameters Drain Commissioner 39 February 2005 STORM DRAINAGE DESIGN CRITERIA A. STORM SEWERS 1. The required discharge capacity shall be determined by the Rational
More informationGUIDELINES FOR INSTALLATION OF ON-SITE SEWAGE SYSTEMS
UTAH COUNTY HEALTH DEPARTMENT Div. of Environmental Health 151 South University Avenue, Provo 84601 (801) 851-7525 FAX 851-7521 GUIDELINES FOR INSTALLATION OF ON-SITE SEWAGE SYSTEMS This is intended to
More informationMunicipal Inspection and Construction Guidelines Section I Roadworks SECTION I ROADWORKS I-1 GENERAL
I-1 GENERAL SECTION I ROADWORKS The Consultant Engineer is to monitor all specified asphalt, granular materials and sub-grade preparation to ensure all road and curb construction is undertaken as outlined
More informationSelection of Proprietary Shoring Equipment
CPA Safety Guidance Selection of Proprietary Shoring Equipment Introduction Every contractor involved with groundwork must ensure the safe support of trenches and excavations as part of their risk assessment.
More informationUNIT 4: INCIDENT RESOURCE MANAGEMENT
INCIDENT RESOURCE MANAGEMENT PURPOSE AND SCOPE The purpose of this unit is to acquaint you with the resource categories that you may encounter at an incident. This unit will introduce the concept of incident
More informationSPECIFICATION FOR REINFORCED SOIL WALL
SPECIFICATION FOR REINFORCED SOIL WALL 1.0 EXTENT OF WORK The work shall consist of Reinforced Soil walls built in accordance with this specification and in conformity with the lines, levels and details
More informationSTANDARD SPECIFICATION FOR CRIBLOCK CONCRETE CRIBWALL
STANDARD SPECIFICATION FOR CRIBLOCK CONCRETE CRIBWALL 1. SCOPE 2. DESIGN 3. MATERIALS 4. CONSTRUCTION 5. METHOD OF MEASUREMENT AND PAYMENT SCOPE This Specification sets out requirements for the design,
More informationTree Protection Policy
Appendix F Tree Protection Policy The following is according to the City of Hamilton s special provision SP-97. General Tree Protection shall be in accordance with OPSS 801 as amended by this special provision.
More informationSITE SERVICES GUELPH TRANSIT OPERATIONS & MAINTENANCE SECTION WATSON ROAD FACILITY PAGE 1 OF 6 WATER RECLAMATION PROJECT JUNE 2013
WATSON ROAD FACILITY PAGE 1 OF 6 PART 1 GENERAL 1.1 Description The work covered by this Section includes all labour, materials, equipment, and supervision necessary to complete the site services as shown
More informationLevel 2 NVQ Diploma in Construction Operations and Civil Engineering Services Construction Operations (Construction)
Civil Engineering Services Construction Operations (Construction) Qualification Specification ProQual 2017 Contents Page Introduction 3 Qualification profile 4 Qualification structure 5 Centre requirements
More informationAqua-Swirl Stormwater Treatment System
Aqua-Swirl Stormwater Treatment System Inspection and Maintenance Manual AquaShield, Inc. 2705 Kanasita Drive, Chattanooga, TN 37343 Phone: (423) 870-8888 Fax: (423) 826-2112 Email: info@aquashieldinc.com
More information***************************************************************************************************************
02720 STORM DRAINAGE SYSTEM *************************************************************************************************************** SPECIFIER: CSI MasterFormat 2004 number 33 40 00. ***************************************************************************************************************
More informationCHAPTER 6. Sanitary Sewer
CHAPTER 6 Sanitary Sewer A. Introduction All proposed developments, subdivisions, and buildings must have a properly designed and constructed sanitary sewer collection system. The system shall provide
More informationProviding proper drainage system
Environment Friendly and Cost Effective Alternative to Conventional Graded Filters Providing proper drainage system for structures such as earth retaining structures, pavements, water front structures,
More information