1 ACO Passavant Installation guide LIPUMAX GREASE SEPARATOR AUTHOR Kate Jennings DATE COMPLETED 8 August 2016 v14 ACO Polycrete, Old Bathurst Road, Emu Plains, NSW 2750 Tel: Fax: sales@acoaus.com.au
2 Contents 1 GENERAL SAFETY CONSIDERATIONS INSTALLATION MAINTENANCE WATER AUTHORITY APPROVALS CONTACT INFORMATION
3 1 GENERAL The ACO Passavant Lipumax grease separator is designed for below ground installation only. Lipumax grease separators are designed to remove waste Fats, Oils and Grease (FOG) from commercial tradewaste from applications such as commercial kitchens and food processing factories. They are not anticipated for use in residential applications. When discharging tradewaste into the public sewer system, local water authority requirements must be adhered to. 2 SAFETY CONSIDERATIONS All work in installing and maintaining this grease separator shall comply with requirements of the relevant authorities. 2.1 Site handling Inspect the Lipumax upon delivery and prior to installation, check for damage that may have occurred during transportation or at the job site prior to installation. Grease separators can be extremely large. To avoid damage to the grease separator, ensure that correct equipment (e.g. forklift, crane or sling ropes) is available for proper unloading and manoeuvring on site. Use lifting provisions (shown below). Note: NS10 separators may require a 3 tonne excavator to dig the required depth. 2.2 Foreseeable misuse No substances that pollute the water or limit the functionality of the grease separator should be introduced into the grease separator. This is particularly important in regard to: Wastewater containing faeces Wastewater containing light liquid oil (e.g. petrol) Wastewater in which a considerable amount of stable emulsions is present (e.g. dairy) 3
4 Lipumax is not designed for waste oil to be tipped into it and macerators must not be discharged into it. Note that only wastewater from specific fixtures from commercial kitchen and food processing facilities should be connected to the grease separator. Good work practices are vital to ensure the correct functioning of the grease separator. Before plates and dishes are washed, they should be scraped of food scraps into a bin. Waste oil must never be poured down the sink and it should be set aside and removed by an appropriate disposal company. 2.3 Owners responsibilities All work performed on the grease separator equipment is to be carried out by trained and approved personnel, in accordance with local water authority regulations. The owner is responsible for complying with the following points and must ensure that: The grease separator is in proper condition. Personnel are qualified and authorised to operate and maintain the grease separator. Adequate personal safety equipment is used. The grease separator is operated according to relevant regulations. There is adherence to a scheduled maintenance program (as per individual tradewaste agreement with the local water authority) and faults are repaired immediately. Contact ACO for information on replacement parts. Complete and legible operating instructions are displayed at the grease separator s site of installation and training is provided for relevant personnel. 2.4 Workplace Health and Safety (WHS) Safety instructions are intended to prevent damage to equipment or injury to personnel and must be read before any maintenance is performed. All safety instruction labels must be replaced if they become detached or illegible Installed devices (e.g. baffles, inlet and outlet parts, etc.) are not load bearing. They must not be used as steps, footholds or resting places for cleaning equipment etc. Grease separators should be not be installed where a danger to health is possible from the grease separator leaking, blocking or surcharging 3 INSTALLATION The Lipumax grease separator must be installed in compliance with local water authority regulations, Safe Work Australia and all other codes of practice. Prior to installation, ensure that the local water authority approves each installation. Sydney Water requirement Sydney Water requires a certificate of compliance from a licensed plumber when a grease separator is being installed. Gold Coast Water requirement Gold Coast Water require a Gold Coast Water raising tube to be included with all below ground separators. For Class B applications, ensure part number is ordered. For Class D applications, ensure the GCW cover is ordered instead of regular cover. Use part number
5 South Australia Water requirement South East Water, City West Water, Yarra Valley Water, Melbourne Water ACTEW requirement A cap is required on top of each baffle (inlet and outlet) to prevent surcharge. Ensure each grease separator is installed with a baffle cap on the inlet and outlet baffle. Water Corporation A cap is required on top of the outlet baffle only. To suit Lipumax NS 2-4: To suit Lipumax NS 7-10: Sizing The correct sizing and regular emptying of a grease separator is vital to its correct and on-going functioning. Class B Class D 5
6 ACO Passavant can be used in conjunction with a number of different pipe materials. The most commonly used pipe materials are HDPE (High Density Polyethylene) and PVC (Poly Vinyl Chloride). These pipe materials have various connection methods. The most commonly used methods are detailed below. a) HDPE pipe HDPE pipe is commonly used in applications where the temperature of discharging water is high. There are three options available for connecting the ACO Passavant inlet and outlet with HDPE pipe: HDPE connector (left) Flexible coupling (middle) Flex seal shielded coupling (right) The HDPE connector (pictured left) allows the ACO Passavant inlet or outlet to be buttwelded to the connector, and the other end of the connector is a push-fit connection to the connecting HDPE pipe. Flexible couplings are designed to fit two pipes of a similar outside diameter together. The flexible connector (pictured middle) is placed over the inlet or outlet and over the connecting HDPE pipe. The stainless steel hose clamps are tightened to achieve the seal. Note: some authorities do not permit the use of flexible couplings in ground slabs. Alternatively, a flex seal shielded coupling (pictured right) can be used. This coupling is also a flexible coupling, but has a layer of stainless steel and is designed for below ground applications. Check manufacturers approvals for use in ground slab applications prior to use. 6
7 b) PVC pipe PVC pipe is used in projects where cost requirements exceed the importance of hygiene, heat and corrosion resistance. To connect the ACO Passavant inlet or outlet to PVC pipe, a flexible coupling can be used (pictured left). The flexible connector is placed over the inlet/outlet and over the connecting PVC pipe. The stainless steel hose clamps are tightened to achieve the seal. Note: some authorities do not permit the use of flexible couplings in ground slabs. Another option is a flex seal shielded coupling (pictured middle). This is also a flexible coupling, but has a layer of stainless steel and is designed for below ground applications. Ensure to check manufacturers approvals for use in ground slab applications prior to use. A slip coupling (pictured right) is another option for connecting PVC pipe below ground. The inlet/outlet push-fits into one end of the slip coupling and the connecting PVC pipe the other. This method can also be used in ground slabs. Please note, couplings are not supplied by ACO. The grease separator model and size can be identified on the inside lip of the separator and an external label. 7
8 3.2 Location Ensure the location of the grease separator is positioned where a maintenance contractor can easily access for pump out. If in doubt, contact a grease removal contractor and obtain a written agreement that the grease separator is able to be serviced. To minimise sedimentation in long runs, grease separators should be installed as close to the source of the grease as possible. Due to hygiene, grease separators should not be installed directly in the kitchen. A hose tap fitted with a backflow prevention device must be located within 5 metres of the grease separator for cleaning purposes (as per AS/NZS 3500). 3.3 Connecting pipes Connecting pipes and pipe materials should be installed in accordance with AS/NZS 3500 and local plumbing codes. The grease separator has moulded outlet and inlet points, marked respectively. A calming region of 10 metres of straight pipe upstream is recommended of the inlet to reduce turbulent wastewater from entering the grease separator and disrupting separation. Any angled pipes to the inlet should not exceed 45. Adequate backflow prevention must be in place. Water Corp requirement Refer to Information Sheet 23B. 3.4 Sampling 8
9 To test the quality of the influent and effluent, some water authorities have a requirement for an Inspection Opening/Industrial Waste Sampling Point (IWSP) to be installed at both the inlet and outlet of the grease separator to test the quality of the influent and effluent. Pipework must be a minimum DN100. Water Corp requirement Refer to drawing HX for precise construction requirements of Industrial Waste Sampling Point (IWSP). 3.5 Disconnector Gully Disconnector gullies shall be installed where required in accordance to the local water authority. Refer to AS/NZS 3500 part 2 for typical detail. Water Corp requirement Refer to drawing HX for precise construction requirements of disconnector gully. 3.6 Ventilation Grease separators should be adequately ventilated at both the inlet and outlet using the marked vent connection. To fit the vent, use a hole saw to drill open the cap marked vent. Fasten the vent pipe (minimum DN100) using a flexible coupling. Ventilation connection Outlet The high level vent on the inlet line must terminate above the roofline and the vent from the outlet shall be installed to AS/NZS Site works Excavation should comply with Work Health and Safety (WHS) regulations and Safe Work Australia. Excavate to the required depth, allowing for the separator depth and an additional 300mm. Concrete is to be used to bed the separator. The separator bed must be applied on to a well compacted foundation. The width of excavation should be sufficient for the compactor to access. Ensure the angle of excavation is suitable for the soil type. Backfill with compacted sand and gravel or non-binding soil in 300mm layers. 3.8 Load class, cover and collar/load distribution plate installation Each Lipumax separator requires a gas and water tight access cover (complaint to AS 3996) to close the system and offer access for maintenance purposes. A range of Class B and Class D covers are available. 9
10 Class B covers are supplied with a reinforced concrete collar. For Class D applications, there is a fully engineered solution including: Class D cover and reinforced collar, load distribution plate and raising tube. An alternative, for use in a structural slab where the load is distributed through the slab, is to purchase a Class D cover and reinforced collar only. Refer to engineers detail for design preference. When installed, the tops of the cover and collar assembly should be flush with the finished surface level. A load distribution plate is available separately and with Class D assembled solutions, where a structural slab is not present, to distribute load. A load distribution plate can also be used for Class B applications where buoyancy is a concern in high water tables. If in doubt, seek specific engineering advice. 10
11 An optional riser tube can be ordered (part no ) to achieve a greater depth in installation and comes with Class D assembled solutions. The minimum height the riser tube adds is 372mm and maximum height 692mm. When the raising tube is used in conjunction with a load distribuion plate, the rebate must be cut to off the top of the raising tube (prior to installation) using the groove provided and a saw, as per the diagrams below. L1 L2 Ø 836 Ø 836 To achieve a variable height, the riser tube can be cut.the riser tube uses two o-rings: a retaining ring to prevent the raising tube sliding into the separator and a sealing ring to seal between the separator and riser to stop odours escaping. Retaining ring Sealing ring Prepare shaft by cutting it to the required height and fitting the sealing ring (supplied) and position the retaining ring one notch above to bring the riser to the desired height. To ensure water tightness, apply acid free grease to the seal and collar seating. Before installing the concrete collar and cover, ensure the riser tube has been backfilled. For downloadable installation details, visit Flow distribution installation A flow distributor is available for ACO separators to evenly split flow into two correctly sized separators (see technical handbook for more information). To ensure the correct functioning of the flow distributors, the fitting must be installed completely level within the pipework system. 11
12 An access point for rodding must be installed directly upstream of the Y branch for maintenance purposes. This must be regularly maintained according to the maintenance plan to ensure the pipes run without blockage Start-up Before using the grease separator for the first time, fill with clean water. 4 MAINTENANCE 4.1 Disposal and cleaning The cleaning interval must be agreed with the local water authority and in compliance with AS A proper disposal and cleaning procedure is critical to the ongoing efficient function of the grease separator. Before disposal and cleaning, kitchen operation must stop. The entire contents of the grease separator should be removed by a disposal truck with a suction hose through the maintenance openings. Once emptied, the tank must be cleaned manually using a hose/high pressure hose to completely remove residual FOG from the walls of the grease separator. Scraping may also be required to achieve this. The cleaning water must be completely removed from the grease separator. Finally, the grease separator must be refilled at least two thirds of the entire volume with hosepipe from an on-site water supply. Water Corp requirement Only camlock fittings are to be used for pump out line and no fixed suction is to be installed. 4.2 General inspection 4.2 General inspection A general inspection should be carried out regularly by qualified personnel, including a visual check of the grease separator and its connections. If any defects are found, they must be remedied without delay (refer to 2.3). 5 WATER AUTHORITY APPROVALS Please refer to for a list of the approved ACO grease separator water authority approvals. 12
13 6 CONTACT INFORMATION For queries, servicing assistance and spare parts, contact ACO. ACO Polycrete Old Bathurst Road Emu Plains NSW 2750 Australia e: p: Original manufacturer document ACO Haustechnik HT 869 subject number
LIPUMAX-G GREASE SEPARATOR
ACO Passavant Installation guide LIPUMAX-G GREASE SEPARATOR VERSION NO. IMPLEMENTED BY REVISION DATE REASON 1 Kate Jennings 29 September 2017 Amendments Water Corp 2 Kate Jennings 31 October 2017 Amendments
More informationAssembly and Installation Instructions Grease Separator KLsepa.pop
Assembly and Installation Instructions Grease Separator KLsepa.pop It is imperative to observe the items described in these instructions. In case of noncompliance, all warranty claims shall lapse. For
More informationFS-DUO. Wastewater Flow Distributor Technical Data. Submittal Special Precautions Specifications Installation. (62.2 cm) (62.2 cm)
Wastewater Flow Distributor Technical Data Submittal Special Precautions Specifications Installation 24½" (62.2 cm) 12½" (31.8 cm) 24½" (62.2 cm) (30.5 cm) SUBMITTAL STANDARD: 4" plain end inlet/outlet
More informationGB-20. Submittal Specifications Installation Application Specific Details
GREASE INTERCEPTOR TECHNICAL DATA Submittal Specifications Installation Application Specific Details 27" (68.6 cm) 4¼" (10.8 cm) 15" (38.1 cm) 10¾" (27.3 cm) SUBMITTAL (53.3 cm) STANDARD: 2" plain end
More informationFS-TRIO. Wastewater Flow Distributor Technical Data. Submittal Special Precautions Specifications Installation. (62.2 cm) (62.
Wastewater Flow Distributor Technical Data Submittal Special Precautions Specifications Installation 24½" (62.2 cm) 12½" (31.8 cm) 24½" (62.2 cm) (30.5 cm) SUBMITTAL STANDARD: 4" plain end inlet/outlet
More informationGGI-750. Gravity Grease Interceptor Technical Data. Submittal Special Precautions Specifications Installation
Gravity Grease Technical Data Submittal Special Precautions Specifications Installation 75" 81" (205.7 (94.0 cm) 19½" 20" (50.8 (49.5 cm) 21½" 20" (50.8 (54.6 cm) 76½" (194.3 cm) 56½" 57" (144.8 (143.5
More informationSV24. Submittal Special Precautions Specifications Installation. 12½" (31.8 cm) 12½" (31.8 cm) 12" (30.5 cm) 12" (30.5 cm) 12" (30.
Wastewater Sampling Port Technical Data Submittal Special Precautions Specifications Installation 16½" (31.8 (41.9 cm) 8" (20.3 cm) -L -O SUBMITTAL STANDARD: 4" plain end inlet/outlet Highway traffic load
More informationGGI-750. Gravity Grease Interceptor Technical Data. Submittal Special Precautions Specifications Installation
Gravity Grease Technical Data Submittal Special Precautions Specifications Installation 75" 81" (205.7 (94.0 cm) 19½" 20" (50.8 (49.5 cm) 21½" 20" (50.8 (54.6 cm) 76½" (194.3 cm) 56½" 57" (144.8 (143.5
More informationACO Building Drainage Products
ACO Building Drainage Products ACO Building Drainage Product overview brochure Roof and floor drains Stainless steel linear drains Bathroom drainage Threshold drainage Grease separators Stainless steel
More informationGB-25. Submittal Special Precautions Specifications Installation Application Specific Details
Submittal Special Precautions Specifications Installation Application Specific Details 27" (68.6 cm) 4¼" (10.8 cm) 15" (38.1 cm) 10¾" (27.3 cm) SUBMITTAL 21" (53.3 cm) STANDARD: 3" plain end inlet/outlet
More informationACO Building Drainage Products
ACO Building Drainage Products Grease Separators ACO PASSAVANT Technical Handbook and Product Catalogue Below ground gravity grease separators Above ground gravity grease separators The ACO Group Founded
More informationIntroduction. Installation
ADVANCE CONCRETE & PRE-CAST HOLDING PTY LTD A.C.N.083 235 536 50 Victoria street Riverstone N.S.W. P.O Box130 Riverstone n.s.w. 2765 Phone 02 96276476 fax 02 96276478 Introduction To supply Grease Traps
More informationModular Grease Trap (MGT)
Modular Grease Trap (MGT) Installation Requirements Unit 2 187 South Creek Road Cromer NSW 2099 Postal: PO Box 255 Collaroy NSW 2097 Freecall 1800 626 753 Phone: 02 9972 1355 Fax: 02 9972 1455 Email: sales@halgan.com.au
More informationGB-75. Submittal Specifications Installation Application Specific Details
GREASE INTERCEPTOR TECHNICAL DATA Submittal Specifications Installation Application Specific Details 38½" 51½" (1,308 (978 mm) 13½" 12½" (343 (318 mm) 38" 26" (660 (965 mm) 68" 46" (1,168 (1,727 mm) 33½"
More informationCERTIFYING DRAINLAYER
Affix label with Candidate Code Number here. If no label, enter candidate Number if known No. 9198 REGISTRATION EXAMINATION, JUNE 2013 CERTIFYING DRAINLAYER INSTRUCTIONS QUESTION AND ANSWER BOOKLET Time
More informationTechnical Data Sheet NEC/GRAN/95:01
Technical Data Sheet NEC/GRAN/95:01 Installation Guidance Notes Granular Surround Note : These guidance notes refer only to the installation of Granular surround underground tanks. These guidance notes
More informationSaudi Vitrified Clay Pipe Co.
Saudi Vitrified Clay Pipe Co. Practical tips for laying V.C.Pipes professionally Table of contents: 1. Unloading of the truck 2. Storage on site 3. Transportation to the pipe trench 4. Installation 5.
More informationINSTALLATION GUIDE. Model #PP2 Pumpout Port Kit For Use with Grease Interceptors Models GB-50, GB-75 and GB-250. Contents
INSTALLATION GUIDE Model #PP2 Pumpout Port Kit For Use with Grease s Models GB-50, GB-75 and GB-250 Contents Special Precautions............................................ 2 Getting to Know the PP2........................................
More informationGB-75. High Efficiency Grease Interceptor Technical Data. Submittal Specifications Installation Application Specific Details
High Efficiency Grease Interceptor Technical Data Submittal Specifications Installation Application Specific Details 38½" 38.5" (97.8 cm) 12½" (31.7 cm) 26" (66.0 cm) 46" (116.8 cm) 33½" 32" (851 (81.3
More informationREGISTRATION EXAMINATION, JUNE 2017 CERTIFYING PLUMBER QUESTION AND ANSWER BOOKLET. Time allowed THREE hours
Affix label with Candidate Code Number here. If no label, enter candidate Number if known No. 9195 REGISTRATION EXAMINATION, JUNE 2017 CERTIFYING PLUMBER INSTRUCTIONS QUESTION AND ANSWER BOOKLET Time allowed
More information4 ft. and 6 ft. Downstream Defender Handling and Installation Instructions
4 ft. and 6 ft. Downstream Defender Handling and Installation Instructions Page 2 Materials Supplied By Hydro International Ledger Angle (x4) Top Slab Top Riser Benching Skirt 4ft./6ft. Downstream Defender
More informationTHIS IS A COURTESY COPY OF THIS RULE. ALL OF THE DEPARTMENT S RULES ARE COMPILED IN TITLE 7 OF THE NEW JERSEY ADMINISTRATIVE CODE.
(f) The minimum requirements for construction, materials and foundations of grease traps shall be the same as those required for septic tanks, as prescribed in N.J.A.C. 7:9A-8.2. (g) The inlet and outlet
More informationGBHF Submittal Special Precautions Specifications Installation Application Specific Details
Submittal Special Precautions Specifications Installation Application Specific Details 68" (1,27 (172 cm) mm 13½" (343 cm) mm) 51½" (1,308 (131 cm) mm) 38" (965 (97 cm) SUBMITTAL 33½" (851 cm) mm) STANDARD:
More informationPerfect Manhole Installation Manual May 2012 Rev 8 Perfect Manhole System Precast concrete manholes with load bearing elastomeric joints
Perfect Manhole System Precast concrete manholes with load bearing elastomeric joints Installation Manual 1 1 Introduction This manual gives guidance on how to install the CPM Group Perfect manhole system
More informationStainless Metal Craft (Aust) Pty Ltd
Stainless Metal Craft (Aust) Pty Ltd Product Appraisal Report TWA 1001 Stainless Steel Boat Shaped Passive Grease Arrestor GT-1 1000L GT-1.5 1500L GT-2 2000L GT-3 3000L GT-4 4000L GT-5 5000L Published
More information> Pre-installation reference guide
> Pre-installation reference guide Toroid underground tanks > The patent and copyright are the property of Viscount Rotational Mouldings Pty. Ltd, and may not be reproduced without the written permission
More informationInstallation Guide Trade Waste Products
Installation Guide Trade Waste Products Given the large range of trade waste products, there are various standard installation instructions for our products. All trade waste products are delivered to site
More information> Pre-installation reference guide Toroid underground tanks >
> Pre-installation reference guide Toroid underground tanks > The patent and copyright are the property of Viscount Rotational Mouldings Pty. Ltd, and may not be reproduced without the written permission
More informationREGISTRATION EXAMINATION, november 2015 LICENSED PLUMBER. Time allowed THREE hours
Affix label with Candidate Code Number here. If no label, enter candidate Number if known No. 99 REGISTRATION EXAMINATION, november 05 LICENSED PLUMBER INSTRUCTIONS QUESTION AND ANSWER BOOKLET Time allowed
More informationPerfect Manhole System Precast concrete manholes with load bearing elastomeric joints Installation Manual
Perfect Manhole System Precast concrete manholes with load bearing elastomeric joints Installation Manual 1 1 Introduction This manual gives guidance on how to install the Marshalls CPM Perfect manhole
More informationGB-50. Submittal Special Precautions Specifications Installation Application Specific Details
Submittal Special Precautions Specifications Installation Application Specific Details 37" (94.0 cm) 10½" (26.7 (27 cm) 28½" (72.4 cm) (46.7 (45.7 cm) 28" (71.1 cm) SUBMITTAL STANDARD: 4" plain end inlet/outlet
More informationEnviroModule TM 2 installation guide
EnviroModule TM 2 installation guide assembly excavation installation backfilling design examples contents Product specifications 2 Assembly 3 Excavation 5 Installation 6 Rainwater harvesting - residential
More informationSECTION WASTEWATER FORCE MAINS
SECTION 02732 WASTEWATER FORCE MAINS PART - GENERAL 1.01 GENERAL: A. This section includes the general requirements for design and installation of force main systems serving wastewater lift stations. B.
More informationGB-75. Submittal Special Precautions Specifications Installation Application Specific Details
Submittal Special Precautions Specifications Installation Application Specific Details 38½" 38.5" (97.8 cm) 12½" (31.7 cm) 26" (66.0 cm) 46" 33½" 32" (851 (81.3 mm) cm) SUBMITTAL STANDARD: 4" plain end
More informationGL0025P Washdown & Silt Separator Installation & Operation Guidelines
GL0025P Washdown & Silt Separator Installation & Operation Guidelines Contact Numbers: UK: Service Tel: +44 (0) 845 355 0555 Service Fax: +44 (0) 1264 325245 Ireland: Service Tel: +44 (0) 28 302 54077
More informationACO Building Drainage Products
ACO Building Drainage Products Channels and Gullies HygieneFirst System Overview Brochure Stainless steel channels Stainless steel gullies The ACO Group Founded in 1946, the ACO Group manufactures products
More informationSECTION HIGH DENSITY POLYETHYLENE PIPE AND FITTINGS
SECTION 02620 PART 1 GENERAL 1.1 SCOPE OF WORK A. Furnish all labor, materials, equipment, and incidentals required to install High Density Polyethylene (HDPE) pressure pipe, fittings, and appurtenances
More informationRAINWATER HARVESTING SYSTEMS
BALMORAL TANKS RAINWATER HARVESTING SYSTEMS www.balmoralrainwatersystems.co.uk UK Designed and manufactured The Balmoral HydroStore TM With the recognition of water as a valued commodity, Balmoral Tanks
More informationRAINWATER HARVESTING SYSTEMS
BALMORAL TANKS RAINWATER HARVESTING SYSTEMS www.balmoralrainwatersystems.co.uk UK Designed and manufactured The Balmoral HydroStore TM With the recognition of water as a valued commodity, Balmoral Tanks
More informationESTABLISHED IN Infiltration Tank. Assembly and Installation Guide.
ESTLISHED IN 1986 Infiltration Tank ssembly and Installation Guide www.atlantiscorp.com.au Tank Module ssembly Guide 2 2 ssemble Matrix Tank Units If Matrix Tanks arrive on your project in flat panels
More informationRoth MultiTank (RMT) Certified Installer Training
Roth MultiTank (RMT) Certified Installer Training Roth MultiTank Multi-usage for water cistern, pump, holding, rainwater or septic tank Inner layer of FDA approved virgin HDPE, two inside layers of PE
More informationDate: 13/04/2015 1:14:38 PM
Date: 13/04/2015 1:14:38 PM Cad File No: J:\500-Cad-data\Standard_Drawings\Flow Systems\FSI-1000-FS_On-Lot Infrastructure Installation Set Out Details.dwg Date: 25/02/2015 11:18:14 AM Cad File No: J:\500-Cad-data\Standard_Drawings\Flow
More informationWastewater treatment for single houses. D. O Dowd
Wastewater treatment for single houses 1 * In rural settings, connection to the local authority main sewer is not always possible, so each house has its own separate wastewater treatment system for the
More informationSection 4 Service Lines
Section 4 Service Lines A. General 1. A service line is that portion of a sanitary sewer line that extends from the outer building wall or foundation wall to its connection with the sewer lateral at the
More informationATS WMK AGA. Installation and Operating Instructions ASI25 ISSUE D 15/02/2016
ATS 5200.477 WMK 60075 AGA www.acquasaver.com.au 1 Introduction The AcquaSaver valve is a fully automatic mechanical rainwater/mains water changeover device designed for pressure pump supply systems for
More informationSPECIAL SPECIFICATION 3504 Septic Tank System
1993 Specifications CSJ s 3136-01-126, etc. & 0683-01-070, etc. SPECIAL SPECIFICATION 3504 Septic Tank System 1. Description. This Item shall govern for all materials, equipment and labor necessary for
More informationGrease Management. EnduraGreaseManagement.com. Rethinking Grease Interception
Grease Management EnduraGreaseManagement.com Rethinking Grease Interception Endura has the right stuff The Right Reason Guided by a philosophy of minimizing downstream toxic waste, Endura engineers have
More informationA. This Section includes sanitary waste and vent piping inside the building and to locations indicated.
SECTION 221316 SANITARY WASTE AND VENT PIPING PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification
More informationBALMORAL TANKS FULL RETENTION AND BYPASS SEPARATORS. Introduction. Applications/uses. Principles of operation. What is an oil separator?
BALMORAL TANKS FULL RETENTION AND BYPASS SEPARATORS CI/SfB (52.4) Xn6 Introduction Balmoral Group has been the leading designer and manufacturer of thermoplastic tanks in the United Kingdom for many years.
More informationDate. Invoice No. Job No. SPEL Ecoceptor / 4000 / 6000 / 8000 Series. Operation & Maintenace Manual.
Date Invoice No. Job No. SPEL Ecoceptor 2000 / 4000 / 6000 / 8000 Series Operation & Maintenace Manual www.spel.com.au www.spel.com.au CONTENTS Introduction... 3 Important... 3 Safety Precautions... 3
More informationENVIROMODULE 2 DESIGN AND INSTALLATION GUIDE. Assembly Excavation Installation Backfilling Pipe Connections Design Examples Structural Design
ENVIROMODULE 2 DESIGN AND INSTALLATION GUIDE Assembly Excavation Installation Backfilling Pipe Connections Design Examples Structural Design STORMWATER SOLUTIONS CONTENTS Product specifications 3 Assembly
More informationSECTION WASTEWATER FORCE MAINS
SECTION 02732 WASTEWATER FORCE MAINS PART 1 GENERAL 1.01 GENERAL: A. This section includes the general requirements for design and installation of force main systems serving wastewater lift stations. B.
More informationCity of Muskogee Pollution Control Department POLICY STATEMENT FOR GREASE AND OIL CONTROL
POLICY STATEMENT FOR GREASE AND OIL CONTROL Section 1: Introduction - In an effort to curb sanitary overflows (SSOs) from grease accumulation in its sanitary sewer main all nonresidential facilities connected
More information***************************************************************************************************************
02732 SANITARY FORCE MAIN *************************************************************************************************************** SPECIFIER: CSI MasterFormat 2004 number 33 34 00. ***************************************************************************************************************
More informationSECTION PUBLIC WATER SERVICE CONNECTIONS
SECTION 33 14 14 PUBLIC WATER SERVICE CONNECTIONS PART 1 GENERAL 1.1 SUMMARY A. Section Includes: 1. Pipe and fittings for water service connections to small commercial, light industrial, and residential
More informationParts Supplied with Kit
Parts Supplied with Kit 1 x Series 300 x 450mm Polymer Pit 1x Series 300 Pit Cover with fitted Vent 1x Claytech Prosub-6 Submersible Pump (with Manufacturers Instructions) 1x Greywater Pit Basket 1x Stainless
More informationSANITARY WASTE AND VENT PIPING
SECTION 15420 - SANITARY WASTE AND VENT PIPING PART 1 GENERAL 1.01 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification
More informationUnderground Exhaust System
Operation and Maintenance Manual Underground Exhaust MONOXIVENT - SOURCE CAPTURE SYSTEMS - info@ Oct. - 2015 Underground Duct Construction Standards 1. Dig trench depth to allow for minimum distance from
More informationDRAINAGE SYSTEMS FOR BELOW GROUND
DRAINAGE SYSTEMS FOR BELOW GROUND STAINLESS STEEL DRAINAGE SYSTEMS BELOW GROUND BLÜCHER EuroPipe is the ideal drainage system for belowground use. The stainless steel systems offers the specifier and
More informationInstallation Instructions
Installation Instructions Flue Gas System Basic Kit GA-K - Chimney Flue Gas System for GB125 Oil Condensing Boiler For trained and certified installers Please read carefully prior to installation. 6 720
More informationWith CE certificate EN USER MANUAL BORA-CLEAN FILTER 5
With CE certificate EN12566-3 USER MANUAL BORA-CLEAN FILTER 5 PART 1 : Description Description of the installation The BORA-CLEAN installation exists of a pre-treatment tank of 6.000 litre, a pumping station,
More informationLabko FRW Basic flow regulation well
www.wavin-labko.fi WAVIN-LABKO OY Labkotie 1 FIN-36240 KANGASALA Tel: +358 (0)20 1285 210 Fax: +358 (0)20 1285 280 E-mail: tanks@wavin-labko.fi 06/09 Labko FRW Basic flow regulation well Installation,
More informationTYPICAL INSTALLATION INSTRUCTIONS
TYPICAL INSTALLATION INSTRUCTIONS Environment One Grinder Pump Feature Identification 1. Grinder Pump Basin High density polyethylene (HDPE) 2. Accessway Cover Painted Steel 3. Electrical Quick Disconnect
More informationHOLDING TANK PLANNING & INSTALLATION GUIDELINES
HOLDING TANK PLANNING & INSTALLATION GUIDELINES Under no circumstances is sewage from a holding tank to be discharged onto the surface of the ground or into groundwater or surface waters. TABLE OF CONTENTS
More informationAluminium Floor Outlets - Materials Care, Maintenance, Installation & Specifying/Ordering
Aluminium Floor Outlets - Materials Care, Maintenance, Installation & Specifying/Ordering Maintenance The bodies of Harmer Floor Drains have a smooth polyester coating which prevents adherence of foreign
More informationcomponent developments Stainless Steel Industrial Floor Drainage
component developments Stainless Steel Industrial Floor Drainage Component Developments What we do We design, manufacture and supply standard, adapted and bespoke stainless steel building products. We
More informationINSTALLATION MANUAL. B-710/760 H20 SERIES MODULAR UST to AST TRANSITION SUMP
INSTALLATION MANUAL B-710/760 H20 SERIES MODULAR UST to AST TRANSITION SUMP H20-RATED B-710 WITH 2 RISERS, RACK SYSTEM AND BOLLARDS B-710 SPLIT LID TRANSITION SUMP SHOWN WITH H20-RATED DIAMOND PLATE LID
More informationSection 10 Design Criteria: Components
1. Tanks and Vaults Section 10 Design Criteria: Components a. Watertightness i. Septic tanks, vaults, dosing tanks, other treatment components, risers and lids must not allow infiltration of ground water
More informationFLOOR DRAINS GENERAL INFORMATION
FLOOR DRAINS 11 FLOOR DRAINS GENERAL INFORMATION All floor drains and rodding eyes are made from stainless steel V2A (AISI 304) or V4A (AISI 316). The floor drain type depends on the load, amount of drained
More informationWastewater & Rainwater Solutions
Wastewater & Rainwater Solutions Efficient and reliable wastewater treatment solutions for Domestic & Commercial applications FREE delivery Mainland GB Only ON-SITE ADVICE available Clearwater offers affordable
More informationLifetime Guaranteed Construction with unique built-in installation and maintenance features
Lifetime Guaranteed Construction with unique built-in installation and maintenance features Great Basin grease interceptors provide the best in quality materials and engineered craftsmanship. Units are
More informationSection 12 Hydraulics.
Design Guidelines Section 12 Hydraulics. www.canterbury.ac.nz/learningresources Standards in the Design Guidelines Suite Design Standard Guidelines Index: 01 General 02 Architecture 03 Audio Visual 04
More informationSTANDARD SPECIFICATIONS
TOWN OF COLONIE DEPARTMENT OF PUBLIC WORKS DIVISION OF PURE WATERS STANDARD SPECIFICATIONS for RESIDENTIAL SANITARY SEWER CONNECTIONS Latest Revision Date: November 2017 TABLE OF CONTENTS Section Page
More informationTABLE OF CONTENTS
DIVISION 33: SEWER AND SEPTIC SYSTEMS 33 3633 UTILITY SEPTIC TANK DRAINAGE FIELD TABLE OF CONTENTS 33 0000-1 SECTION 33 3633-- UTILITY SEPTIC TANK DRAINAGE FIELD PART 1 - GENERAL 1.1 SUMMARY A. Includes
More informationStandard terms and conditions
Standard terms and conditions Development Services For the provision of a water service (Water Supply, Wastewater and Drainage) Introduction Under Section 73(2)(a) of the Water Services Act 2012, landowners
More informationBeacon Hill Water & Sewer District Standard Specifications
Beacon Hill Water & Sewer District Standard Specifications STEP Sewer Systems Including: Design Criteria Standard Construction Drawings REVISED JANUARY 2012 Alternative sewer systems must meet the requirements
More informationAWASHAFT DN400. Product and Installation Guide
AWASHAFT DN400 Product and Installation Guide AWASHAFT DN400 Safety for generations The AWASHAFT DN400 is a cleaning, inspection and transfer chamber for installation in private or municipal sewerage or
More informationACO Building Drainage
ACO Building Drainage Backflow systems Installation, Operation and Maintenance Manual ACO TRIPLEX Anti-flood valve for GREYWATER drainage (wastewater without sewage) PLEASE READ THESE INSTRUCTIONS BEFORE
More informationCRAFTSMAN EXAMINATION, NOVEMBER 2008 PLUMBING ANSWER SCHEDULE
No. 9195 CRAFTSMAN EXAMINATION, NOVEMBER 2008 PLUMBING ANSWER SCHEDULE Plumbers, Gasfitters and Drainlayers Board, 2008. All rights reserved. No part of this publication may be reproduced by any means
More informationFOX METRO WATER RECLAMATION DISTRICT MANHOLE / SEWER PIPE MATERIALS AND INSTALLATION SPECIFICATIONS MATERIALS 1. PIPE & FITTINGS
FOX METRO WATER RECLAMATION DISTRICT MANHOLE / SEWER PIPE MATERIALS AND INSTALLATION SPECIFICATIONS MATERIALS 1. PIPE & FITTINGS Rev: 3/26/18 Pipe and fittings used in sanitary sewer construction shall
More informationSECTION FIRE HYDRANTS
SECTION 21 11 10 PART 1. GENERAL 1.1 SUMMARY: A. Work consists of furnishing and installing new fire hydrants, (boot with ductile iron retainer gland, standpipe and hydrant complete) plus constructing
More informationInstallation and maintenance instructions for PLATIN and PLATIN XL Rainwater Underground Tank
Installation and maintenance instructions for PLATIN and PLATIN XL Rainwater Underground Tank PLATIN 1500 L 3000 L 5000 L 7500 L Order No. 390000 Order No. 390001 Order No. 390002 Order No. 390005 PLATIN
More informationPART 5 WATER SYSTEMS
PART 5 WATER SYSTEMS Abbreviations and Symbols Plan 501 Abbreviations and symbols for water... 205 Concrete Boxes and Hardware 502 27" Frame and cover... 207 503 38" Frame and cover... 209 505 Concrete
More informationSan Antonio Water System Standard Specifications for Construction ITEM NO. 812 WATER MAIN INSTALLATION
ITEM NO. 812 WATER MAIN INSTALLATION 812.1 DESCRIPTION: This item shall consist of water main installation in accordance with these specifications and as directed by the Engineer. 812.2 MATERIALS: The
More informationSANDERS COUNTY ENVIRONMENTAL HEALTH PROPERTY OWNER SEPTIC INSTALLATION BOOKLET
SANDERS COUNTY ENVIRONMENTAL HEALTH PO BOX 519 406-827-6961 1111 MAIN STREET, THOMPSON FALLS, MT 59873 sanitarian@sanderscounty.mt.gov PROPERTY OWNER SEPTIC INSTALLATION BOOKLET This booklet discusses
More informationDRINKING WATER LINE INSTALLATION STANDARDS
30" MIN. 72" MAX. ORIGINAL GROUND SURFACE BACKFILL WITH A-1-a OR NATIVE MATERIAL PER APWA STANDARDS. MATERIAL MUST MEET APWA STANDARD FOR GRANULAR BORROW. COMPACT BACKFILL ABOVE PIPE ZONE TO 96% DENSITY
More informationInstallation Manual For Conical Tanks. INSTALLATION and MAINTENANCE INSTRUCTIONS FOR CONICAL TANKS
INSTALLATION and MAINTENANCE INSTRUCTIONS FOR CONICAL TANKS Page 1 of 10 INDEX 1. Health & Safety 3 2. Introduction 3 3. Requirements 3 4. Working Area 3 5. Equipment 3 6. 2 and 3 metre tank above ground
More informationCI/SfB (52.5) September 2005 Uniclass L7315. ACO EuroCover Stainless steel composite double sealed access covers
CI/SfB (2.) September 200 Uniclass L731 ACO EuroCover Stainless steel composite double sealed access covers ACO Building Drainage ACO Building Drainage Our built environment is becoming ever more complex.
More informationREGISTRATION EXAMINATION, JUNE 2013 LICENSED PLUMBER QUESTION AND ANSWER BOOKLET. Time allowed THREE hours
Affix label with Candidate Code Number here. If no label, enter candidate Number if known No. 9192 REGISTRATION EXAMINATION, JUNE 2013 LICENSED PLUMBER INSTRUCTIONS QUESTION AND ANSWER BOOKLET Time allowed
More informationSection [ ] Storm Water Treatment Device
PART 1 GENERAL Section [ ] Storm Water Treatment Device 01.01.00 Purpose The purpose of this specification is to establish generally acceptable criteria for Storm Water Treatment Devices for treating storm
More informationFeatures Include: Near Vertical Walls Do it Yourself No Concrete Footings Required
Features Include: Near Vertical Walls Do it Yourself No Concrete Footings Required Tel: Office: +27 (0)11 964 2995 Fax number: +27 (0)86 601 6692 info@dsmmasonry.co.za www.dsmmasonry.co.za Range three
More informationThis unofficial translation of. Ministerial Decision No 421/1998. was downloaded from METS is not the copyright owner.
Disclaimer This unofficial translation of Ministerial Decision No 421/1998 was downloaded from www.mets-oman.com. METS is not the copyright owner. METS is not responsible for the content of this document.
More informationCommon Septic System Installation Mistakes
Common Septic System Installation Mistakes Inspection Tips for Health Agents Chris Sparages, P.E. Principal at Williams & Sparages LLC Learning Objectives Review Title 5 Regulations Governing the Design,
More informationFabrication and Installation Table of Contents
Fabrication and Installation Table of Contents HDPE AQUASHIELD PRODUCTS 2 Fabrication and Installation 2 System Fabrication 3 Aqua-Swirl Installation 4 Step 1 Excavation and Bedding 4 Step 2 Pipe Connection
More informationSECTION SANITARY WASTE INTERCEPTORS
SECTION 22 13 23 SPEC WRITER NOTES: 1. Use this section only for NCA projects. 2. Delete between //----// if not applicable to project. Also delete any other item or paragraph not applicable in the section
More informationReview the section Preparing for work, then complete the following.
CHAPTER 4: PLANNING THE LAYOUT FOR A RESIDENTIAL EXTERNAL SANITARY DRAINAGE SYSTEM 105 WORKSHEET 1 Student name: Enrolment year: Class code: Competency name/number: To be completed by teachers Satisfactory
More information