1

2 F:\Projects\ \40-Design\Microstation\OTA Turner TP Bridge 31.20\DGN\S\017_GENNOTES.dgn 1/8/201 SPECIFICATIONS: ALL CONSTRUCTION AND MATERIALS SHALL BE IN ACCORDANCE WITH THE OKLAHOMA AUTHORITY, 2010 STANDARD SPECIFICATIONS FOR CONSTRUCTION, EXCEPT AS MODIFIED PLAN NOTES AND SPECIAL PROVISIONS. DESCRIPTION OF WORK: THE WORK TO BE PERFORMED UNDER THIS CONTRACT CONSISTS OF REPAIRING THE DAMAGE TO AT THE CHANDLER INTERCHANGE IN LINCOLN COUNTY. THE BRIDGE SHALL REMAIN OPEN TO NORMAL TRAFFIC DURING REPAIR OPERATIONS. FLAME STRAIGHTEN A PORTION OF THE DAMAGED EASTERN OUTSIDE BEAM OVER THE INSIDE AND OUTSIDE EASTBOUND LANES AS INDICATED IN THE PLANS. HEAT STRAIGHTEN THE PORTIONS OF THE WEB AND FLANGES AS DIRECTED THE ENGINEER TO THEIR ORIGINAL SHAPES IN ACCORDANCE WITH SECTION 50.04E(7) OF THE STANDARD SPECIFICATIONS. VERIFICATION OF CONDITIONS: THE DIMENSIONS OF THE BRIDGE COMPONENTS SHOWN ON THESE PLANS AND THE ORIGINAL PLANS ARE APPROXIMATE. THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS NECESSARY AND SHALL BE SOLELY RESPONSIBLE FOR THE ACCURACY THEREOF. PRIOR TO SUBMITTING HIS BID, THE CONTRACTOR SHALL FULLY INFORM HIMSELF OF THE NATURE OF THE WORK AND CONDITIONS UNDER WHICH IT WILL BE PERFORMED. THE CONTRACTOR SHALL ADOPT METHODS CONSISTENT WITH GOOD CONSTRUCTION PRACTICE AND SHALL TAKE ALL NECESSARY PRECAUTIONS TO PREVENT DAMAGE TO THE BRIDGE OR ATTACHMENTS. ANY DAMAGE TO THE BRIDGE OR ROADWAY DUE TO THE CONTRACTOR'S NEGLIGENCE SHALL BE REPAIRED AT THE CONTRACTOR'S EXPENSE AND TO THE SATISFACTION OF THE ENGINEER. PLANS: TH1S BRIDGE WAS CONSTRUCTED THE. PLANS FOR THE ORIGINAL CONSTRUCTION AND REHABILITATION ARE AVAILABLE ON OTA WEB SITE; FTP://FTP.PIKEPASS.COM/ORIGINAL/CONSTRUCTION/CONTRACTS//CONT035: OR FROM: 2401 NW 23rd STREET, SUITE 2B OKLAHOMA CITY, OKLAHOMA ASK FOR: 035. PAINTING - CATEGORY 'R': THE CONTRACTOR SHALL PAINT INTERIOR AND EXTERIOR FACES OF THE DAMAGED BEAM INCLUDING TOP AND BOTTOM FLANGES A MINIMUM OF 1'-0" BEYOND THE EXTENTS OF BEAM REPAIR AREAS AND ALL AREAS WHERE PAINT HAS BEEN DAMAGED, EITHER THE CONTRACTOR OR AS A RESULT OF DAMAGES TO THE BEAM. BEFORE APPLYING NEW PAINT, ALL LOOSE PAINT SHALL BE REMOVED HAND SCRAPING AND WITH BRUSHING LEAVING A FEATHERED EDGE ON THE REMAINING SOUND PAINT. PAINTING SHALL CONSIST OF TWO COATS OF INORGANIC ZINC PRIMER AND ONE FINISHED COAT OF PAINT USING HIS COATINGS MASTERTHANE OTA GREEN IN ACCORDANCE WITH THE MANUFACTURERS RECOMMENDATIONS. HIS COATINGS MASTERTHANE OTA GREEN PRODUCT S ARE: #T81-5 M.E.K. THINNER #98G05KIT-1.25 EPOXY GRAY PRIMER KIT INCLUDES: 1. #98G05-1 LIFE-COAT SP EPOXY PRIMER GRAY 2. #98Z05-QT EPOXY ACTIVATOR #71D0KIT-1 MASTERTHANE OTA GREEN KIT INCLUDES: 1. #71D0-3/4 MASTERTHANE OTA GREEN 2. #H8002-PT ACRYLIC URETHANE CATALYST PAINT SHEEN TO BE REDUCED TO 50-0 SEMI GLOSS. CAUTION: THE BRIDGE MAY CONTAIN A LEAD BASED PAINT SYSTEM. ALL REMOVAL AND DISPOSAL OF ANY LEAD BASED PAINT WITHIN THE LIMITS OF THE REPAIR SHALL BE IN ACCORDANCE WITH SECTION 512 OF THE SPECIFICATIONS. COST TO BE INCLUDED IN THE LUMP SUM PRICE BID FOR "REPAIR BRIDGE S". MAINTENANCE OF TRAFFIC: (CHANDLER INTERCHANGE) SHALL REMAIN OPEN TO NORMAL TRAFFIC DURING REPAIR OPERATIONS, TRAFFIC SHALL BE PHASED TO HAVE ONE LANE EASTBOUND OPENED AT ALL TIMES DURING REPAIR OPERATIONS. THE WESTBOUND LANES SHALL REMAIN OPEN TO TRAFFIC. THE CONTRACTOR SHALL HAVE THE OPTION OF WORKING DURING NON-DAYLIGHT HOURS. IF THE CONTRACTOR ELECTS TO WORK DURING NON-DAYLIGHT HOURS, THE CONTRACTOR SHALL SUBMIT TO THE ENGINEER FOR REVIEW AND APPROVAL PRIOR TO BEGINNING CONSTRUCTION A METHOD TO PROTECT TRAFFIC FROM THE LIGHT EMITTED THE FLAME. THE CONTRACTOR SHALL MAINTAIN THE AND CHANDLER INTERCHANGE TRAFFIC CONTROL AT ALL TIMES (24 HOURS/DAY) DURING THE CONTRACT. PROTECTION OF TRAFFIC UNDER BRIDGE: THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROTECTING THE TRAFFIC UNDER THE BRIDGE DURING BRIDGE REPAIR WORK. A PROPOSED METHOD OF PREVENTING DEBRIS FROM FALLING ON TRAFFIC BELOW THE BRIDGE SHALL BE SUBMITTED TO THE ENGINEER FOR APPROVAL. ALL MATERIALS REMOVED FROM THE BRIDGE SHALL BE REMOVED FROM THE WORK AREA PROMPTLY. THE AREA SHALL BE CLEARED TRAFFIC SURVEILLANCE, POLICE TRAFFIC SURVEILLANCE, POLICE WILL NOT BE A PART OF THIS CONTRACT. THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING HIS ANTICIPATED WEEKLY SCHEDULE TO THE OTA ON-SITE REPRESENTATIVE ONE (1) WEEK IN ADVANCE OF THE WORK. THE WORK SCHEDULE WILL INCLUDE THE DAYS IN WHICH TRAFFIC SURVEILLANCE, POLICE IS REQUESTED AND WILL BE SUBJECT TO THE APPROVAL OF THE ENGINEER. OTA WILL COORDINATE WITH THE OKLAHOMA HIGHWAY PATROL TO DETERMINE THE OF OFFICERS AND SCHEDULE REQUIRED FOR THE PROJECT. HEAT STRAIGHTENING SPECIFICATIONS: HEAT STRAIGHTENING OF THE DAMAGED STEEL BRIDGE MEMBERS SHALL BE PERFORMED THE CAREFULLY PLANNED AND SUPERVISED APPLICATION OF A LIMITED AMOUNT OF LOCALIZED HEAT TO THE DAMAGED MEMBERS. MECHANICAL MEANS MAY BE USED TO STRAIGHTEN THE MATERIAL ONLY IN CONJUNCTION WITH THE APPLICATION OF HEAT. ONLY CONTRACTORS THAT CAN DOCUMENT EXPERIENCE IN HEAT STRAIGHTENING OF DAMAGED STEEL HIGHWAY OR RAILROAD BRIDGE MEMBERS WILL BE ALLOWED TO BID ON THIS HEAT STRAIGHTENING PROJECT. ALL GAS FUELED HEATING EQUIPMENT, AS WELL AS MECHANICAL STRAIGHTENING EQUIPMENT, SHALL BE SUPPLIED THE CONTRACTOR AS NECESSARY TO PERFORM ALL HEAT STRAIGHTENING. IN GENERAL, THE METHODS OF CONSTRUCTION WILL RELY ON THE EXPERIENCE OF THE CONTRACTOR. "NATIONAL COOPERATIVE HIGHWAY RESEARCH PROGRAM" (NCHRP) REPORT NO. 271 CONTAINS BROAD GUIDES TO THIS TYPE OF REPAIR. THE STRAIGHTENING HEAT SHOULD BE APPLIED AS RAPIDLY AS POSSIBLE TO OBTAIN THE BEST STRAIGHTENING EFFECT. HEAT SHOULD BE APPLIED TO SMALL AREAS, USUALLY TRIANGULAR IN SHAPE; THE SMALL AREAS TO WHICH HEAT IS APPLIED AND THE SEQUENCE OF HEATING DIFFERENT SMALL AREAS SHALL BE DETERMINED THE CONTRACTOR TO PRODUCE THE MOST EFFICIENT STRAIGHTENING. IT IS NOT RECOMMENDED TO HEAT THE SAME SMALL AREA MORE THAN ONCE. THE MAXIMUM TEMPERATURE TO WHICH THE STEEL SHALL BE HEATED IS 1200 DEGREES FAHRENHEIT (~50 DEG. C.). THE CONTRACTOR MAY VISUALLY DETERMINE THAT THIS TEMPERATURE HAS BEEN REACHED WHEN THE COLOR OF THE STEEL BECOMES A DULL RED. THE ENGINEER MAY PERIODICALLY MONITOR THE TEMPERATURE OF THE STEEL TO VERIFY THE VISUAL TEMPERATURE DETERMINATION. THE EQUIPMENT FOR CHECKING THE TEMPERATURE SHALL BE PROVIDED THE CONTRACTOR AND MEET THE APPROVAL OF THE ENGINEER. A HIGH TEMPERATURE PYROMETER IS PREFERRED FOR THE MEASUREMENT OF THE TEMPERATURE, BUT TEMPERATURE INDICATING CRAYONS OR OTHER MEANS APPROVED THE ENGINEER MAY BE USED. NO ACCELERATED OR ARTIFICIAL COOLING WILL BE PERMITTED. THE FINAL ACCEPTABLE LOCAL TOLERANCES FOR STRAIGHTNESS IN THE AREA OF THE DAMAGE SHALL BE: 1. HORIZONTAL SWEEP-- 1/4 INCH PER 10 FEET (3 M.) OF DAMAGED LENGTH OF BEAM. 2. VERTICAL DEFLECTION (WAVES)-- 1/4 INCH IN FLANGES 3. DEFLECTION OF WEB (OUT OF PLANE OF WEB)-- 1/4 INCH * * MEASURED A STRAIGHTEDGE HELD VERTICALLY AND HORIZONTALLY IN THE DAMAGED AREAS. APPLYING HEAT TO STEEL: BEFORE APPLYING HEAT TO STEEL COATED WITH A LEAD-BASED PAINT, REMOVE ALL PAINT ON ALL SIDES WITHIN 3 INCHES OF THE HEATED AREA. CLEAN THE SURFACES TO SSPC-SP2, HAND TOOL CLEANING, OR TO SSPC-SP3, CONVENTIONAL POWER TOOL CLEANING, IN ACCORDANCE WITH CFR ALL COSTS FOR THIS CLEANING WILL BE INCLUDED IN OTHER S OF WORK. ANY REMOVED MATERIALS SHALL BE DISPOSED AS DIRECTED THE ENGINEER. SUGGESTED SEQUENCE OF CONSTRUCTION A SUGGESTED SEQUENCE OF CONSTRUCTION IS SHOWN ON THIS. THE CONTRACTOR IS RESPONSIBLE FOR DETERMINING FINAL CONSTRUCTION SEQUENCE, AND SHALL SUBMIT FOR APPROVAL A PROPOSED CONSTRUCTION SEQUENCE SIGNED AND SEALED A PROFESSIONAL ENGINEER WHO IS CURRENTLY REGISTERED WITH THE STATE OF OKLAHOMA STATE BOARD OF LICENSURE FOR PROFESSIONAL ENGINEERS AND LAND SURVEYORS. 1. INSTALL TRAFFIC CONTROL ON CHANDLER INTERCHANGE () AT. 2. INSTALL TRAFFIC CONTROL ON THE OUTSIDE LANE OF EASTBOUND TO SHIFT TRAFFIC TO INSIDE LANE FOR BRIDGE REPAIRS. 3. HEAT STRAIGHTEN DAMAGED PORTIONS OF THE BEAM TO REASONABLY CLOSE CONFORMITY TO THE ORIGINAL SHAPE. 4. INSTALL TRAFFIC CONTROL ON THE INSIDE LANE OF EASTBOUND TO SHIFT TRAFFIC TO OUTSIDE LANE FOR BRIDGE REPAIRS. 5. HEAT STRAIGHTEN THE REMAINING DAMAGED PORTIONS OF THE BEAM.. INSTALL TRAFFIC CONTROL ON THE INSIDE AND OUTSIDE LANES OF EASTBOUND AS NECESSARY TO PAINT THE BEAM. 7. REMOVE TRAFFIC CONTROL ON. 8. REMOVE TRAFFIC CONTROL ON CHANDLER INTERCHANGE BRIDGE. (G-48) (G-51) (G-52) (G-53) (G-55) (G-5) (G-58a) (G-0) (G-1) (G-2) (G-71) (G-72) (G-73) (G-75) GENERAL CONSTRUCTION NOTES: THE CONTRACTOR SHALL PROVIDE A PERSON TO BE ON 24 HOUR CALL AS NEEDED AS DETERMINED THE ENGINEER. THIS PERSON SHALL HOLD A CURRENT CERTIFICATION FROM THE AMERICAN TRAFFIC SAFETY SERVICE ASSOCIATION (ATSSA) OR THE OKLAHOMA TRAFFIC ENGINEERING ASSOCIATION (OTEA) AS A TRAFFIC CONTROL TECHNICIAN OR TRAFFIC CONTROL SUPERVISOR. COST TO BE INCLUDED IN OTHER S OF WORK. ALL LANES OF SHALL BE OPEN ON FRIDAY OR A LANE RENTAL PENALTY OF $10,000 PER HOUR PER LANE PER MILE WILL BE APPLIED UNTIL SUCH TIME AS THE CAPACITY IS RESTORED. CONTRACTORS SHALL NOT UTILIZE EMERGENCY VEHICLE TURNAROUNDS ON THE. THE CONTRACTOR SHALL SUBMIT A FINAL TRAFFIC CONTROL AND CONSTRUCTION PHASING PLAN TO THE ENGINEER FOR REVIEW AND APPROVAL PRIOR TO BEGINNING CONSTRUCTION DESCRIBING ALL WORK PHASES FOR CONSTRUCTION OF THE BRIDGES AND ROADWAYS AFFECTED. LANE LINES,AT MINIMUM,SHALL BE ESTABLISHED AT ALL TIMES DURING CONSTRUCTION. CONTRACTOR SHALL DOCUMENT PRE-CONSTRUCTION SITE CONDITIONS MEANS OF PHOTOGRAPHS AND VIDEO WITH A DESIGNATED O.T.A. REPRESENTATIVE, BEFORE THE START OF CONSTRUCTION. COST SHALL BE CONSIDERED AS INCIDENTAL AND NO SEPARATE PAYMENT SHALL BE MADE. THE CONTRACTOR SHALL PROVIDE THE ENGINEER A DIGITAL COPY OF THE PHOTOGRAPHS AND VIDEO AT THE PRE-WORK MEETING. CONTRACTOR SHALL PAY ALL FEES. TOLL COST SHALL BE INCLUDED IN OTHER S OF WORK. ALL WORK AND/OR MATERIALS NOT CLASSIFIED AS A "CONTRACT PAY " SHALL BE CONSIDERED INCIDENTAL AND THE COST THEREOF SHALL BE INCLUDED IN THE UNIT PRICE BID FOR S WHICH ARE CLASSIFIED FOR PAYMENT. CONSTRUCTION ACTIVITIES ARE NOT PERMITTED ON FRIDAYS. THE PRIME CONTRACTOR SHALL BE REPRESENTED ON SITE AT ALL TIMES. HE MUST BE PRESENT WHEN WORK IS BEING PERFORMED HIS SUBCONTRACTORS. ALL FIELD MEASUREMENTS SHALL PREVAIL ON INSTALLATION AND REMOVAL. CONTRACTOR SHALL BE ALLOWED TO USE OTA RIGHT-OF-WAY AT APPROVED LOCATIONS FOR STORAGE ONE WEEK PRIOR TO BEGINNING OF WORK UNTIL THE ISSUANCE OF THE FINAL ACCEPTANCE OF ALL PUNCH LIST S. THE SITE MUST BE RESTORED TO ITS ORIGINAL CONDITION INCLUDING ALL DISASSEMBLY, REMOVAL AND SITE CLEAN UP, OF OFFICES, BUILDINGS AND OTHER FACILITIES ASSEMBLED IN THE SITE SPECIFICALLY FOR THIS CONTRACT. FAILURE TO COMPLY SHALL RESULT IN TIME CHARGES BEING RESTARTED AND ASSESSED. ALL DIMENSIONS OF THE BRIDGE AND ROADWAYS SHOWN ON THE PLANS ARE APPROXIMATE ONLY. THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS, BOTH SURVEYED AND AS-BUILT, NECESSARY TO CONNECT THE NEW MATERIAL AND SHALL BE SOLELY RESPONSIBLE FOR THE ACCURACY THEREOF. REFER TO THE AS-BUILT PLANS FOR DIMENSIONS AND DETAILS NOT SHOWN IN THE PLANS. THE ENGINEER SHALL BE NOTIFIED THE CONTRACTOR TWO (2) WEEKS PRIOR TO ALL CONSTRUCTION ACTIVITIES THAT REQUIRES A LANE/RAMP/TOLL FACILITY CLOSURE. FAILURE TO ADEQUATELY NOTIFY THE ENGINEER WILL RESULT IN A SHUTDOWN NOTICE BEING ISSUED FOR THE WORK REQUIRING THE LANE/RAMP/TOLL FACILITY CLOSURE. IF THE CONTRACTOR FAILS TO GIVE THE PROPER NOTIFICATION, A LANE RENTAL PENALTY OF $10,000 PER HOUR PER LANE PER MILE WILL BE APPLIED UNTIL SUCH TIME AS THE CAPACITY IS RESTORED. ANY DEVIATION FROM THE PLANS WITHOUT PRIOR WRITTEN NOTICE WILL RESULT IN A SHUTDOWN NOTICE. ALL TRASH, DEBRIS, SPOILS, ETC. SHALL BE REMOVED DAILY. CONSTRUCTION SITE SHALL SHALL BE KEPT IN A CLEAN, WORKMANLIKE MANNER DAILY AS DIRECTED THE ENGINEER. GENERAL CONSTRUCTION NOTES 2 AT THE CLOSE OF ANY WORK PERIOD. ALL COST FOR TRAFFIC PROTECTION AS STATED SHALL BE INCLUDED IN THE PRICE BID FOR OTHER S OF WORK. NO. 2 1/8/1

3 F:\Projects\ \40-Design\Microstation\OTA Turner TP Bridge 31.20\DGN\S\017_PQNOTES.dgn 1/8/201 DESCRIPTION UNIT QUANTITY SPEC (PL) REPAIR BRIDGE S LSUM PAY QUANTITIES - BRIDGE MOBILIZATION LSUM TRAFFIC PAY QUANTITIES - BRIDGE DESCRIPTION UNIT QUANTITY 87(A) TRUCK MOUNTED ATTENUATOR (1) (TC-7,77,84) SD (A) (SP) ARROW DISPLAY (TYPE C) (TC-84) SD (J) LSUM (A) (SP) CHANGEABLE MESSAGE SIGNS (TC-84,85) (1)(2) SD PART B - PROJECT SITE RENTAL DESCRIPTION UNIT QUANTITY 45(A) PROJECT SITE RENTAL $/PSRD TRAFFIC PAY NOTES: (TC-25) CONSTRUCTION TRAFFIC CONTROL WILL BE INSTALLED IN A MANNER APPROVED THE ENGINEER, IN ACCORDANCE WITH CHAPTER VI OF THE MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES, CURRENT EDITION, AND APPLICABLE O.D.O.T. STANDARD DRAWINGS. PRICE BID FOR THIS SHALL BE PAYMENT IN FULL FOR THE INSTALLATION, MAINTENANCE AND SUBSEQUENT REMOVAL OF ALL NECESSARY CONSTRUCTION TRAFFIC CONTROL DEVICES AND PAVEMENT MARKINGS REQUIRED FOR COMPLETION OF THE PROJECT. ALL SIGNS AND BARRICADES,WHICH ARE SHOWN WITH TYPE 'A' LIGHTS IN THE STANDARD DRAWINGS SHALL HAVE THE CORRESPONDING LIGHT ATTACHED DURING NON-DAYLIGHT HOURS. ALL CONSTRUCTION WORK ZONE SIGNS SHALL HAVE FLUORESCENT ING. THE FLUORESCENT ING SHALL MEET THE REQUIREMENTS OF ASTM D495 (LATEST REVISION). THE MANUFACTURER SHALL FURNISH A TYPE 'D' CERTIFICATION IN ACCORDANCE WITH O.T.A. STANDARD SPECIFICATIONS (CURRENT EDITION) SUBSECTION THE CERTIFICATION SHALL INCLUDE TEST RESULTS ON MATERIALS SUBMITTED FOR APPROVAL. (TC-7) ANY TRUCK MOUNTED ATTENUATOR USED ON THIS PROJECT SHALL HAVE PASSED ALL MANDATORY AND OPTIONAL TESTS LISTED IN NCHRP 350, TL-3 CRITERIA, THIS IS TO BE USED WHERE SHOWN IN THE STANDARD DRAWINGS OR AT THE DISCRETION OF THE ENGINEER ON SHADOW VEHICLES PROTECTING THE WORK AREAS AND TEMPORARY ROADSIDE HAZARDS. (TC-77) TRUCK MOUNTED ATTENUATORS ARE TO BE INSTALLED ON NON STATE OWNED TRUCKS HAVING A MINIMUM GROSS WEIGHT RATING OF 15,000 POUNDS. EACH OF THESE TRUCKS SHALL ALSO BE EQUIPPED WITH AN ARROW DISPLAY (TYPE B). (TC-84) 10 CONSTRUCTION CALENDAR DAYS WERE USED TO COMPUTE THE SIGN DAY PAY S. THE AMOUNT OF CALENDAR DAYS USED TO COMPUTE THE SIGN DAY PAY S IS AN ESTIMATED QUANTITY ONLY, BASED ON THE CURRENT O.D.O.T. STANDARDS AND SUGGESTED CONSTRUCTION SEQUENCE FOR THIS PROJECT. THESE ESTIMATED SIGN DAY QUANTITIES MAY CHANGE AS THE PROJECT'S CONSTRUCTION TRAFFIC CONTROL IS MODIFIED DURING CONSTRUCTION. (TC-85) THESE SIGNS MUST BE ON THE OKLAHOMA DEPARTMENT OF TRANSPORTATION LIST OF APPROVED CHANGEABLE MESSAGE SIGNS. FOR A LIST OF THE APPROVED SIGNS GO TO THE OKLAHOMA DEPARTMENT OF TRANSPORTATION WEBSITE AT: (1) ANY USED TRUCK MOUNTED ATTENUATOR, CHANGEABLE MESSAGE SIGN, PORTABLE TRAFFIC SIGNAL, OR SAND FILLED IMPACT ATTENUATION MODULE TO BE PLACED ON THIS PROJECT SHALL BE SUBJECT TO INSPECTION AND APPROVAL, THE, TO ASSURE THAT THEY ARE IN GOOD WORKING CONDITION, PRIOR TO PLACEMENT ON THE PROJECT. THESE DEVICES SHALL MEET ALL NCHRP-350, TL-3 CRITERIA. (2) THIS SHALL BE FURNISHED, INSTALLED AND MAINTAINED THE CONTRACTOR AND PLACED SEVEN (7) DAYS PRIOR TO BEGINNING WORK. (3) THE S LISTED IN THE TABLE BELOW ARE INCLUDED IN THE THE PAY "CONSTRUCTION TRAFFIC CONTROL". LUMP SUM TRAFFIC PAY S - BRIDGE DESCRIPTION 880(B) CONSTRUCTION SIGNS 0 TO.25 SF 880(B) CONSTRUCTION SIGNS.2 TO SF 880(B) CONSTRUCTION SIGNS 1.00 TO SF 880(C) CONSTRUCTION BARRICADES (TYPE III) 880(C) WING BARRICADES (TC-84) 880(E) WARNING LIGHTS (TYPE A) 880(F) DRUMS BRIDGE PAY NOTES REPAIR BRIDGE S: HEAT STRAIGHTEN A PORTION OF THE EAST EXTERIOR BEAM OVER EASTBOUND AS INDICATED ON THE PLANS. HEAT STRAIGHTEN THE PORTIONS OF THE WEBS AND FLANGES TO REASONABLY CLOSE CONFORMITY TO THE BEAMS ORIGINAL SHAPE IN ACCORDANCE WITH SECTION 50.04E(7) OF THE STANDARD SPECIFICATIONS. PAY "(PL) REPAIR BRIDGE S" CONSISTS OF THE FOLLOWING: A) HEAT STRAIGHTENING THE PORTIONS OF THE BEAM CONFORMITY TO THE ORIGINAL BEAM SHAPE. ALL MATERIAL REMOVED SHALL BECOME THE PROPERTY OF THE CONTRACTOR AND DISPOSED OF IN ACCORDANCE WITH THE SPECIFICATIONS AND AS DIRECTED THE ENGINEER. B) PAINT ALL NEW STRUCTURAL STEEL AND THE AREAS WHERE THE PAINT HAS BEEN DAMAGED EITHER THE CONTRACTOR OR AS A RESULT OF DAMAGES TO THE BEAM. PAY QUANTITIES AND PAY NOTES 3 NO. 3 1/8/1

4 F:\Projects\ \40-Design\Microstation\OTA Turner TP Bridge 31.20\DGN\S\017_GPE_01.dgn 1/8/201 2'-0" MEDIAN BARRIER '-9" 24'-0" 44'-9" 5'-9" 24'-0" 2'-9" The preliminary WINGWALL plans should not be 18'-0" APPROACH SLAB BACKFACE OF BACKWALL WINGWALL 2'-9" SPAN NO. 1 ABUT. NO. 1 39'-8"! PIER NO. 1 OVERALL WIDTH OF BRIDGE PIER NO. 1 LANE REPAIR SECTION 44'-9" SPAN NO. 2 LANES EASTBOUND LANE EASTBOUND 155'-0" LENGTH OF BRIDGE! PIER NO. 2 PLAN 155'-0" LENGTH OF BRIDGE PIER NO. 2 SPAN NO ELEVATION '-9" 1'-" 17'-4" 17'-4" 1'-"! PIER NO. 3 WINGWALL 2'-9" SPAN NO. 4 PIER NO. 3 WINGWALL EXP. FIX. FIX. FIX. FIX. FIX. FIX. EXP. REPAIR SECTION LANE LANE RAMP LANE LANE LANE LANE LANE RAMP LANE WESTBOUND WESTBOUND LANES 2'-0" MEDIAN BARRIER 18'-0" APPROACH SLAB BACKFACE OF BACKWALL ABUT. NO. 2 2'-0" 2'-0" 1+75 LANE LANE 48'-0" NOTE:STATIONS, ELEVATIONS AND DIMENSIONS SHOWN ARE TAKEN FROM ORIGINAL CONSTRUCTION PLANS: OTA 35 GENERAL PLAN AND ELEVATION 4 NO. 4 1/8/1

5 F:\Projects\ \40-Design\Microstation\OTA Turner TP Bridge 31.20\DGN\S\017-FRAMING.dgn 1/8/201 DIAPHRAGM 15'-0" 14'-9" 15'-0" 14'-4" SPACING! PIER NO. 1! PIER NO. 2 1 DIMENSION FOR BEAM HEAT STRAIGHTENING IS APPROXIMATE. FINAL DIMENSION TO BE DETERMINED IN THE FIELD. 34'-0 " 3WF150 3WF150 1 APPROX. EXTENTS OF HEAT STRAIGHTENING 44'-9" SPAN NO. 2 EASTBOUND PARTIAL FRAMING PLAN NOTE: ALL DIMENSIONS SHOWN ARE TAKEN FROM AS-BUILT PLANS MEASURED ALONG BEAM LINES. 14'-0 " WESTBOUND 5'-9" SPAN NO. 3 14'-0 " 14'-4" 3WF10 3WF150 3WF150 3WF150 3WF150 3WF10! PIER NO. 3 '-9 " '-9 " '-9 " '-9 " '-9 " BRIDGE REPAIR DETAIL 5 NO. 5 1/8/1

6 panelsizes:min.:12x18,std.:18x24,spcl.:24x30,exp.:30x3,fwy.:3x48 constructpanels: panelstyle:warning.ssi panelname:w1-8 panelsizes:min.:12x18,std.:18x24,spcl.:24x30,exp.:30x3,fwy.:3x48 constructpanels: panelstyle:warning.ssi panelname:w1-8 panelsizes:min.:30x30,std.:3x3,spcl.:48x48 constructpanels: panelstyle:warning.ssi panelname:w5-1 panelwidthlock:0 panelheightlock:0 constructpanels: panelstyle:g20-1.ssi panelname:name panelsizes: F:\Projects\ \40-Design\Microstation\OTA Turner TP Bridge 31.20\DGN\C\TRAFFIC CONTROL 01.dgn 1/8/201 10' 10' MATCHLINE 'A' (2) CS-1E (1) CONSTRUCTION (2) CS-17E SIGN NO. 3 (2) CS-18E 1,000' (1) WING BARRICADE 1,000' (2) W20-1(1 MILE) ROAD WORK 1 MILE WORK AREA 100' TAPER 100' TAPER 900' MERGING TAPER (20) 50' C/C DETAIL OF SUGGESTED TRAFFIC CONTROL ON WESTBOUND ON RAMP OVER (10) W1-8 (EVERY OTHER DRUM) (1) CONSTRUCTION SIGN NO. 3 A A (3) TYPE III BARRICADES () TYPE 'A' LIGHTS (3) W1-E (THRU TAPER) WESTBOUND I ' 1,300' EASTBOUND I-44 (2) W3-5(5) SPEED LIMIT 5 50' ADVANCE SIGNING (EASTBOUND) (2) R2-1E(5) 5 ARROW DISPLAY (TYPE 'C') 50' 1,000' TANGENT (12) 50' C/C (2) W20-5(R) OR (L)(1/2 MILE) RIGHT LANE CLOSED 1 2MILE OR LEFT LANE CLOSED 1 2MILE (1) 25' C/C (8) R4-7A(L) (EVERY OTHER DRUM WESTBOUND I-44 EASTBOUND I-44 OR (1) CONSTRUCTION SIGN 10 (1) CONSTRUCTION SIGN 11 levels:gscolorfill GSBWFILL GSOUTLINE panelstyle:regulatory.ssi constructpanels: legendmaterial:2 panelmounting:1 panelstandard:1 panelname:name panelsizes: levels:gscolorfill GSBWFILL GSOUTLINE panelstyle:regulatory.ssi constructpanels: legendmaterial:2 panelmounting:1 panelstandard:1 panelname:name panelsizes: LANE CLOSED (3) 50 C'C (1) CONSTRUCTION SIGN NO. 900' MERGING TAPER (20) 50' C/C (10) W1-8 (EVERY OTHER DRUM) MATCH POINTS BEGIN 900' MERGING TAPER 1000' (2) W4-2(R) OR (L) OR KEEP LEFT (4) TYPE III BARRICADES (50' C/C) (8) TYPE 'A' LIGHTS (4) R11-2(LANE) MATCHLINE 'A' KEEP LEFT (27) 25 C'C (10) R4-7A(R)(EVERY OTHER DRUM) TRUCK MOUNTED ATTENUATOR (2) R4-1E PASS NOT DO CONSTRUCTION SIGN NO. 3 (G-72) (G-73) (2) CS-13E SPEED LIMIT 5 (2) CS-14E THE ENGINEER SHALL BE NOTIFIED THE CONTRACTOR TWO (2) WEEKS PRIOR TO ALL CONSTRUCTION ACTIVITIES THAT REQUIRES A LANE/RAMP/TOLL FACILITY CLOSURE. FAILURE TO ADEQUATELY NOTIFY THE ENGINEER WILL RESULT IN A SHUTDOWN NOTICE BEING ISSUED FOR THE WORK REQUIRING THE LANE/RAMP/TOLL FACILITY CLOSURE. IF THE CONTRACTOR FAILS TO GIVE THE PROPER NOTIFICATION, A LANE RENTAL PENALTY OF $10,000 PER HOUR PER LANE PER MILE WILL BE APPLIED UNTIL SUCH TIME AS THE CAPACITY IS RESTORED. ANY DEVIATION FROM THE PLANS WITHOUT PRIOR WRITTEN NOTICE WILL RESULT IN A SHUTDOWN NOTICE. * (2) R2-1F(5) 00' TANGENT (12) 25' C/C ARROW DISPLAY (TYPE 'C') LANE CLOSURE/RAMP CLOSURE NOTES: WORK AREA 17'-4" WESTBOUND EXIT RAMP EXIST. MEDIAN SEE DETAIL THIS BARRIER (1) W5-1 (1) TYPE 'A' LIGHT * PRESENT BEHIND CHANNELIZER CONES. SPEED LIMIT OF 55 TO BE DISPLAYED WHEN WORKERS ARE SECTION A-A 17'-4" WESTBOUND ON RAMP 10'-0" LANE 25' C/C (1) G20-2A ENGINEER. ROAD WORK AHEAD SPEED LIMIT 75 (1) W20-1(AHEAD) (1) TYPE 'A' LIGHT (1) R2-1F(75) STAGE ONE OF CONSTRUCTION SHOULD BE SET UP AS SHOWN, CLOSING THE EASTBOUND AND CONSTRUCTION SIGNING SHOWN ON I-44 OF THE CONTRACTOR WITH APPROVAL OF THE OUTSIDE TRAVEL LANE. CHANNELIZING DEVICES SHOULD BE IN THE SAME ORDER ONLY REVERSED TO CLOSE THE EASTBOUND INSIDE LANE. THIS PROCESS MAY BE REVERSED AT THE DISCRETION S.H. 18 NO. SUGGESTED TRAFFIC CONTROL 1/8/1

NOT FOR CONSTRUCTION AND BIDDING Preliminary plan sheets are for information purposes only. The preliminary plans shall not be used as a basis for

NOT FOR CONSTRUCTION AND BIDDING Preliminary plan sheets are for information purposes only. The preliminary plans shall not be used as a basis for 7/ 1/2017 SPECIFICATIONS: PROTECTION OF TRAFFIC UNDER BRIDGE: ALL CONSTRUCTION AND MATERIALS SHALL BE IN ACCORDANCE WITH THE OKLAHOMA THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROTECTING THE TRAFFIC UNDER

More information

NOT FOR CONSTRUCTION Preliminary plan sheets are for information purposes only. The preliminary plans should not be used as a basis for bid.

NOT FOR CONSTRUCTION Preliminary plan sheets are for information purposes only. The preliminary plans should not be used as a basis for bid. SPECIFICATIONS: ALL CONSTRUCTION AND MATERIALS SHALL BE IN ACCORDANCE WITH THE SPECIAL PROVISIONS. Preliminary VERIFICATION plan OF sheets EXISTING CONDITIONS:, 2010 STANDARD SPECIFICATIONS FOR TURNPIKE

More information

NOT FOR CONSTRUCTION AND BIDDING Preliminary plan sheets are for information purposes only. The preliminary plans shall not be used as a basis for

NOT FOR CONSTRUCTION AND BIDDING Preliminary plan sheets are for information purposes only. The preliminary plans shall not be used as a basis for NOT FOR CONSTRUCTION AND BIDDING SHEET NO. OKLAHOMA TURNPIKE AUTHORITY 4/17/2017 NOT FOR CONSTRUCTION AND BIDDING OLSSON ASSOCIATES PROJECT ENGINEERS SHEET ENGINEER CONTRACT NO. NUMBER OLSSON T-ER-021

More information

MAINE TURNPIKE AUTHORITY ADDENDUM NO. 1 CONTRACT EXIT 103 SOUTHBOUND UNDERPASS BRIDGE REHABILITATION MILE 103.0

MAINE TURNPIKE AUTHORITY ADDENDUM NO. 1 CONTRACT EXIT 103 SOUTHBOUND UNDERPASS BRIDGE REHABILITATION MILE 103.0 MAINE TURNPIKE AUTHORITY ADDENDUM NO. 1 CONTRACT 2018.05 EXIT 103 SOUTHBOUND UNDERPASS BRIDGE REHABILITATION MILE 103.0 The bid opening date is Thursday March 15, 2018 at 11:00 a.m. The following changes

More information

MAINE TURNPIKE AUTHORITY ADDENDUM NO. 2 CONTRACT EXIT 44 SOUTHBOUND ON RAMP IMPROVEMENTS MILE 44.3

MAINE TURNPIKE AUTHORITY ADDENDUM NO. 2 CONTRACT EXIT 44 SOUTHBOUND ON RAMP IMPROVEMENTS MILE 44.3 MAINE TURNPIKE AUTHORITY ADDENDUM NO. 2 CONTRACT 2018.03 EXIT 44 SOUTHBOUND ON RAMP IMPROVEMENTS MILE 44.3 The following changes are made to the Proposal, Specifications, and Plans. PROPOSAL Proposal Sheets

More information

KANSAS DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION TO THE STANDARD SPECIFICATIONS, 1990 EDITION

KANSAS DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION TO THE STANDARD SPECIFICATIONS, 1990 EDITION Sheet 1 of 7 KANSAS DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION TO THE STANDARD SPECIFICATIONS, 1990 EDITION SECTION TRAFFIC CONTROL Page 628, subsection.01. Delete the following bid items: Advance

More information

SECTION 616 TEMPORARY TRAFFIC CONTROL

SECTION 616 TEMPORARY TRAFFIC CONTROL SECTION 616 TEMPORARY TRAFFIC CONTROL 616.1 Description. This work shall consist of furnishing, installing, operating, maintaining, cleaning, relocating and removing temporary traffic control devices and

More information

53.20 PAINTED ROADWAY LINES

53.20 PAINTED ROADWAY LINES 53.20 PAINTED ROADWAY LINES 53.20.1 GENERAL The Work consists of supplying paint and painting roadway lines on pavement surfaces. The various configurations of roadway lines are shown in the Department

More information

SECTION 905 TRAFFIC SIGNS, STRIPING AND RAISED MARKERS

SECTION 905 TRAFFIC SIGNS, STRIPING AND RAISED MARKERS SECTION 905 TRAFFIC SIGNS, STRIPING AND RAISED MARKERS Delete this Section in its entirety and replace with the following: SECTION 905 TRAFFIC SIGNS, STRIPING AND RAISED MARKERS 905-1 DESCRIPTION: This

More information

May 2004 Traffic Control 600-i. Table of Contents 601 WORK ZONE TRAFFIC CONTROL DESCRIPTION OF WORK

May 2004 Traffic Control 600-i. Table of Contents 601 WORK ZONE TRAFFIC CONTROL DESCRIPTION OF WORK DIVISION 600 Traffic Control SOUTH CAROLINA DEPARTMENT OF TRANSPORTATION May 2004 May 2004 Traffic Control 600-i Section Table of Contents Page 601 WORK ZONE TRAFFIC CONTROL...601-1 601.1 DESCRIPTION

More information

ESTIMATE OF QUANTITIES

ESTIMATE OF QUANTITIES ESTIMATE QUANTITIES STATE S.D. SHEET NO. TOTAL SHEETS 2 12 SPECIFICATIONS TEMPORARY PAVEMENT MARKING, Continued STATE S.D. SHEET NO. TOTAL SHEETS 3 12 South Dakota Standard Specifications for Roads and

More information

GENERAL NOTES FOR WORK ZONE SAFETY SET UP GUIDE

GENERAL NOTES FOR WORK ZONE SAFETY SET UP GUIDE FORWARD It shall be the responsibility of the person in charge to institute the placing of all appropriate cautionary devices and controls as may be required for the particular job. Traffic protection

More information

805 - WORK ZONE TRAFFIC CONTROL & SAFETY SECTION 805 WORK ZONE TRAFFIC CONTROL AND SAFETY

805 - WORK ZONE TRAFFIC CONTROL & SAFETY SECTION 805 WORK ZONE TRAFFIC CONTROL AND SAFETY SECTION 805 WORK ZONE TRAFFIC CONTROL AND SAFETY 805.1 DESCRIPTION Provide, erect, maintain and remove traffic control devices as shown in the Contract Documents. On roadways that carry traffic through

More information

!"#$ % 1( =4+0(1*0)4 A)*.(.)44)4 8(: 4 0, 2(3*05. Page 1A of 10 11

!#$ % 1( =4+0(1*0)4 A)*.(.)44)4 8(: 4 0, 2(3*05. Page 1A of 10 11 !"#$ % 9 8 8 8784 867 *-+(+ +,- 40. -8/5 '()* +,-. *()/ 0,, 0, (*0 )4 *, /)(*0)4 06&5 &60 455678 ()() 90( (:8; +,- (7)4 4 0 4(+0()*0/ 0()*5 ', 0@A' +,- -* =B9C+ ()( 0 0, +0(0 8(:5 ', =40(*0( +,- (?)/ 4

More information

SECTION 26 - COLD PLANE ASPHALT CONCRETE PAVEMENT TABLE OF CONTENTS

SECTION 26 - COLD PLANE ASPHALT CONCRETE PAVEMENT TABLE OF CONTENTS SECTION 26 - COLD PLANE ASPHALT CONCRETE PAVEMENT TABLE OF CONTENTS Section Page 26-1 GENERAL... 26.1 26-2 PAVEMENT KEYCUTTING... 26.1 26-3 PAVEMENT PLANING... 26.2 26-4 PLANED PAVEMENT CONFORMS... 26.3

More information

LOCATION AND DESIGN DIVISION

LOCATION AND DESIGN DIVISION VIRGINIA DEPARTMENT OF TRANSPORTATION LOCATION AND DESIGN DIVISION INSTRUCTIONAL AND INFORMATIONAL MEMORANDUM GENERAL SUBJECT: ROADWAY SAFETY FEATURES SPECIFIC SUBJECT: NCHRP 350 TEST REQUIREMENTS LOCATION

More information

Table of Contents. List of Appendices

Table of Contents. List of Appendices Table of Contents Page Executive Summary 3 Description of Project 3 TMP Roles and Responsibilities 3 Area Engineer 3 Communications Office 4 TMP Monitoring 4 Existing and Future Conditions 4 Traffic Counts

More information

OHIO TURNPIKE AND INFRASTRUCTURE COMMISSION

OHIO TURNPIKE AND INFRASTRUCTURE COMMISSION MAINTENANCE OF TRAFFIC NOTES 431606 - MOT Notes - Addendum 1.dwg; 10/22/15-3:25pm MAINTENANCE OF TRAFFIC MAINTENANCE OF TRAFFIC SEQUENCE: THESE PLANS ARE BASED ON THE FOLLOWING SUGGESTED SEQUENCE OF CONSTRUCTION.

More information

LOCATION AND DESIGN DIVISION

LOCATION AND DESIGN DIVISION VIRGINIA DEPARTMENT OF TRANSPORTATION LOCATION AND DESIGN DIVISION INSTRUCTIONAL AND INFORMATIONAL MEMORANDUM GENERAL SUBJECT: ROADWAY SAFETY FEATURES SPECIFIC SUBJECT: NCHRP 350 TEST REQUIREMENTS LOCATION

More information

Guardrail Repair and/or Replacement Due To Damage on Interstate 90 In The Winner Area Project No. 000I-391 PCN i21n

Guardrail Repair and/or Replacement Due To Damage on Interstate 90 In The Winner Area Project No. 000I-391 PCN i21n Sheet 1 of 46 ESTIMATE OF QUANTITIES Bid Item Number Item Quantity Unit 009E0197 Mobilization 1- East of Murdo 4 EACH 009E0198 Mobilization 2 - West of Murdo 4 EACH 110E0700 Remove 3 Cable Guardrail 175

More information

ODOT District Bridge General Notes B405: OBJECT MARKERS AND STRUCTURE/CULVERT IDENTIFICATION SIGNS

ODOT District Bridge General Notes B405: OBJECT MARKERS AND STRUCTURE/CULVERT IDENTIFICATION SIGNS B401: DELETED B402: DELETED B403: DELETED B404: STRUCTURE/CULVERT IDENTIFICATION SIGNS B405: OBJECT MARKERS AND STRUCTURE/CULVERT IDENTIFICATION SIGNS B406: ITEM 514 - FIELD PAINTING, MISC.; REPAIR PAINTING

More information

Ohio Department of Transportation

Ohio Department of Transportation Ohio Department of Transportation Central Office 1980 West Broad Street Columbus, OH 43223 Ted Strickland, Governor Jolene M. Molitoris, Director THE DEPARTMENT UTILIZES BID EXPRESS (http://www.bidx.com)

More information

APPENDIX A. Traffic Accommodation and Temporary Signing

APPENDIX A. Traffic Accommodation and Temporary Signing APPENDIX A Section 7 Specification 7.1 TABLE OF CONTENTS 7.1 TRAFFIC ACCOMMODATION AND TEMPORARY SIGNING...1 7.1.1 GENERAL...1 7.1.2 TRAFFIC ACCOMMODATION STRATEGY...1 7.1.2.1 Requirements for...2 7.1.3

More information

SECTION CONSTRUCTION FACILITIES AND TEMPORARY CONTROLS

SECTION CONSTRUCTION FACILITIES AND TEMPORARY CONTROLS PART 1 GENERAL 1.1 DESCRIPTION A. Temporary Utilities: Electricity, lighting, heating, cooling, ventilation, water, and sanitary facilities. B. Temporary Controls: Barriers, fencing, erosion control, exterior

More information

Cuyahoga County Department of Public Works Cuyahoga County Engineer's Sample Maintenance of Traffic Notes TABLE OF CONTENTS

Cuyahoga County Department of Public Works Cuyahoga County Engineer's Sample Maintenance of Traffic Notes TABLE OF CONTENTS Cuyahoga County Department of Public Works Cuyahoga County Engineer's Sample Maintenance of Traffic Notes TABLE OF CONTENTS NAME PAGE PLAN ENDORSEMENT NOTES (11/04/2013; CUY-M01) 3 ITEM 614 - MAINTAINING

More information

I-91 Viaduct Public Information Briefing

I-91 Viaduct Public Information Briefing I-91 Viaduct Public Information Briefing Project File No. 607731 MassDOT Contract No. 85020 Briefing no. 10 December 18, 2017 Agenda Welcome Update on Construction Activities (Full Beneficial Use) Next:

More information

TRAFFIC INCIDENT MANAGEMENT SYSTEM (TIMS)

TRAFFIC INCIDENT MANAGEMENT SYSTEM (TIMS) TRAFFIC INCIDENT MANAGEMENT SYSTEM (TIMS) GUIDELINES 1. Purpose A. Ensure that an Ohio Turnpike and Infrastructure Commission (OTIC) Guideline exists to manage traffic backups and travel delays. B. Ensure

More information

REQUEST FOR PROPOSAL Asphalt & Concrete Repair

REQUEST FOR PROPOSAL Asphalt & Concrete Repair REQUEST FOR PROPOSAL 2017 Asphalt & Concrete Repair English Landing Elementary School Union Chapel Elementary School Lakeview Middle School Park Hill High School Prairie Point Elementary School Congress

More information

ODOT District MOT General Notes M401: ITEM PAVEMENT FOR MAINTAINING TRAFFIC, CLASS A, AS PER PLAN

ODOT District MOT General Notes M401: ITEM PAVEMENT FOR MAINTAINING TRAFFIC, CLASS A, AS PER PLAN M401: ITEM 615 - PAVEMENT FOR MAINTAINING TRAFFIC, CLASS A, AS PER PLAN M402: DELETED M403: DETOUR NOTIFICATION [ODOT] M404: DETOUR NOTIFICATION [CITY/COUNTY] M405: DELETED M406: DELETED M407: DELETED

More information

SECTION UNCLASSIFIED EXCAVATION AND GRADING

SECTION UNCLASSIFIED EXCAVATION AND GRADING SECTION 02210 UNCLASSIFIED EXCAVATION AND GRADING PART 1 GENERAL 1.1 DESCRIPTION Work in this section includes the excavation, undercut excavating, grading, earthwork and compaction required as shown on

More information

SECTION 820 PUMP STATION DEMOLITION AND SITE RESTORATION

SECTION 820 PUMP STATION DEMOLITION AND SITE RESTORATION 820-1 SCOPE OF WORK: SECTION 820 PUMP STATION DEMOLITION AND SITE RESTORATION a. Furnish all labor, materials, equipment, and incidentals required for demolition and/or removal and disposal of existing

More information

SPECIAL PROVISIONS - SP2014 BOOK Page 1 October 8, 2013

SPECIAL PROVISIONS - SP2014 BOOK Page 1 October 8, 2013 SPECIAL PROVISIONS - SP2014 BOOK Page 1 S-1 (2104) REMOVE AND REPLACE BITUMINOUS PAVEMENT (ADA) Always include SP2014-119 (PLANT MIXED ASPHALT PAVEMENT) or SP2014-121 (PLANT MIXED ASPHALT PAVEMENT FOR

More information

CHAPTER 16: TRAFFIC. In either situation, the plan must contain the detail for the interim pavement markings.

CHAPTER 16: TRAFFIC. In either situation, the plan must contain the detail for the interim pavement markings. CHAPTER 16: TRAFFIC ADVANCE WARNING SIGN SPACING The Advance Warning Sign Spacing for 0-30 mph has been reduced from 300 feet to 100 feet. This is more in line with the Federal MUTCD and accounts for more

More information

603 - ASPHALT PAVEMENT SMOOTHNESS SECTION 603 ASPHALT PAVEMENT SMOOTHNESS

603 - ASPHALT PAVEMENT SMOOTHNESS SECTION 603 ASPHALT PAVEMENT SMOOTHNESS SECTION 603 ASPHALT PAVEMENT SMOOTHNESS 603.1 DESCRIPTION Determine the smoothness of the pavement surface and correct the deficiencies as specified in the Contract Documents. For the purposes of this

More information

CITY OF HOMESTEAD Utility Rights-of-Way Use Permit Application

CITY OF HOMESTEAD Utility Rights-of-Way Use Permit Application CITY OF HOMESTEAD Utility Rights-of-Way Use Permit Application Good for 90 days from the Date Issued This permit is only required if the work location is owned or controlled by the City of Homestead and

More information

KANSAS DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION TO THE STANDARD SPECIFICATIONS, 1990 EDITION

KANSAS DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION TO THE STANDARD SPECIFICATIONS, 1990 EDITION Sheet 1 of 9 KANSAS DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION TO THE STANDARD SPECIFICATIONS, 1990 EDITION SECTION STRUCTURAL STEEL CONSTRUCTION Page 392, subsection.01. Add the following bid items:

More information

Night Work Specification

Night Work Specification 1.0 HOURS OF WORK Night Work Specification Night time hours are defined as per the Tender documents. 2.0 TRAFFIC CONTROL PLAN Prior to the start of work the Contractor shall submit 4 bound copies of a

More information

Cherokee Nation Entertainment Casino Ramona, Oklahoma. WORK PACKAGE: Existing Casino Demolition and Dismantling 8/7/12

Cherokee Nation Entertainment Casino Ramona, Oklahoma. WORK PACKAGE: Existing Casino Demolition and Dismantling 8/7/12 SCOPE SUMMARY: DIVISION: 0 - LEGAL DOCUMENTS Complete; DIVISION: 1 - GENERAL REQUIREMENTS As Applicable; SECTION: - ATTACHED SKETCH Complete; Geotechnical Engineering Report as prepared by Building and

More information

SECTION 14 - RESTORATION OF SURFACES TABLE OF CONTENTS

SECTION 14 - RESTORATION OF SURFACES TABLE OF CONTENTS SECTION 14 - RESTORATION OF SURFACES TABLE OF CONTENTS Section Page SECTION 14 RESTORATION OF SURFACES... 14.1 14-1 GENERAL... 14.1 14-2 PRIVATE ROADS... 14.1 14-3 STREETS AND PARKING LOTS... 14.1 14-3.01

More information

KANSAS DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION TO THE STANDARD SPECIFICATIONS, 1990 EDITION

KANSAS DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION TO THE STANDARD SPECIFICATIONS, 1990 EDITION Sheet 1 of 6 KANSAS DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION TO THE STANDARD SPECIFICATIONS, 1990 EDITION SECTION TRAFFIC CONTROL Page 628, subsection.01. Delete the following bid items: Advance

More information

MAINE TURNPIKE AUTHORITY ADDENDUM NO. 2 CONTRACT

MAINE TURNPIKE AUTHORITY ADDENDUM NO. 2 CONTRACT MAINE TURNPIKE AUTHORITY ADDENDUM NO. CONTRACT 08.09 BRIDGE REPAIRS RUNNING HILL ROAD UNDERPASS (MILE 5.) BLACKSTRAP ROAD UNDERPASS (MILE 58.3) WEYMOUTH ROAD UNDERPASS (MILE 66.) SUPERSTRUCTURE REPLACEMENT

More information

ESTIMATE OF QUANTITIES

ESTIMATE OF QUANTITIES ESTIMATE OF QUANTITIES STATE OF PROJECT SOUTH DAKOTA 083S-351 SHEET TOTAL NO. SHEETS 2 9 ESTIMATED QUANTITIES The below quantities are based on the rates shown in the Rates of Materials. This is only an

More information

805 - WORK ZONE TRAFFIC CONTROL & SAFETY SECTION 805 WORK ZONE TRAFFIC CONTROL AND SAFETY

805 - WORK ZONE TRAFFIC CONTROL & SAFETY SECTION 805 WORK ZONE TRAFFIC CONTROL AND SAFETY SECTION 805 WORK ZONE TRAFFIC CONTROL AND SAFETY 805.1 DESCRIPTION Provide, erect, maintain and remove traffic control devices as shown in the Contract Documents. BID ITEMS UNITS Work Zone Signs (0 to

More information

JANUARY 4, 2017 AT 2:00 P.M. (EASTERN. (Estimated Cost: $4,600,000) Bids J D WILLIAMSON CONSTRUCTION CO INC $3,799,476.25

JANUARY 4, 2017 AT 2:00 P.M. (EASTERN. (Estimated Cost: $4,600,000) Bids J D WILLIAMSON CONSTRUCTION CO INC $3,799,476.25 General Info Number: PROJECT NO. 43-17-03 Description: BRIDGE DECK REPAIR AND REHABILITATION, ARLINGTON ROAD OVER OHIO TURNPIKE M.P. 122.3, JOPPA ROAD OVER OHIO TURNPIKE M.P. 128.5, DEAN ROAD OVER OHIO

More information

SECTION 14 - RESTORATION OF SURFACES TABLE OF CONTENTS

SECTION 14 - RESTORATION OF SURFACES TABLE OF CONTENTS SECTION 14 - RESTORATION OF SURFACES TABLE OF CONTENTS Section Page 14-1 GENERAL... 14.1 14-2 PRIVATE ROADS... 14.1 14-3 STREETS AND PARKING LOTS... 14.1 14-3.01 Aggregate Base... 14.1 14-3.02 Asphalt

More information

Town of Wascott Advertisement for Bids ROAD MAINTENANCE PROJECTS

Town of Wascott Advertisement for Bids ROAD MAINTENANCE PROJECTS Advertisement for Bids ROAD MAINTENANCE PROJECTS Notice is hereby given by the Town of Wascott, Douglas County, WI, that it will receive sealed bids for crack routing and sealing, chip seal coating, and

More information

Welcome!! Traffic Control Supervisor. Training Course

Welcome!! Traffic Control Supervisor. Training Course Welcome!! Traffic Control Supervisor Training Course Traffic Control Supervisor Training Course Two-day course Begins promptly at 8:00 AM Ends no later than 5:00 PM Flexible schedule!! 0-2 Course Objectives

More information

S-1 (2356) BITUMINOUS SEAL COAT REVISED 9/26/07 SP Mn/DOT 2356 is deleted and replaced by the following:

S-1 (2356) BITUMINOUS SEAL COAT REVISED 9/26/07 SP Mn/DOT 2356 is deleted and replaced by the following: S-1 (2356) BITUMINOUS SEAL COAT REVISED 9/26/07 SP2005-136 Mn/DOT 2356 is deleted and replaced by the following: S-1.1 DESCRIPTION Construct a seal coat on a prepared surface. A seal coat is the application

More information

CONSTRUCTION SURVEY. Construction survey includes personnel, equipment, and supplies required for, but not limited to, the following:

CONSTRUCTION SURVEY. Construction survey includes personnel, equipment, and supplies required for, but not limited to, the following: CONSTRUCTION SURVEY PART 1 - GENERAL 1.01 SECTION INCLUDES Construction survey includes personnel, equipment, and supplies required for, but not limited to, the following: A. Construction Survey: 1. Project

More information

Implementation of this Special Provision requires a complete understanding of the following documents:

Implementation of this Special Provision requires a complete understanding of the following documents: VIRGINIA DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR Quality Assurance/Quality Control (QA/QC) for the Construction of Deep Foundation Systems for Design-Build and PPTA Contracts November 10, 2009

More information

STATE OF NEW YORK DEPARTMENT OF TRANSPORTATION OFFICE OF ENGINEERING AMENDMENT NO. 1 TO: IN THE LETTING OF MARCH 17, 2011

STATE OF NEW YORK DEPARTMENT OF TRANSPORTATION OFFICE OF ENGINEERING AMENDMENT NO. 1 TO: IN THE LETTING OF MARCH 17, 2011 STATE OF NEW YORK DEPARTMENT OF TRANSPORTATION OFFICE OF ENGINEERING AMENDMENT NO. 1 TO: ALBANY, NEW YORK FEBRUARY 15, 2011 CONTRACT NO. D261661 F. A. PROJECT ONONDAGA COUNTY PIN 3501.68 IN THE LETTING

More information

May 8, 2017 ADDENDUM #1. IFB Resin Floor System For Highway Department Central District Building

May 8, 2017 ADDENDUM #1. IFB Resin Floor System For Highway Department Central District Building May 8, 2017 ADDENDUM #1 IFB 17-082 Resin Floor System For Highway Department Central District Building Addendum #1 is being issued to offer an alternate resin flooring system. 096700 FLUID-APPLIED FLOORING

More information

Project Team. D6 South Miami-Dade Resident Engineer Erik Padron, P.E. D6 Construction Project Manager Dari Vorce

Project Team. D6 South Miami-Dade Resident Engineer Erik Padron, P.E. D6 Construction Project Manager Dari Vorce Project Team D6 South Miami-Dade Resident Engineer Erik Padron, P.E. D6 Construction Project Manager Dari Vorce D6 Design Project Manager Ali Toghiani, P.E. CEI: AIM Engineering and Surveying Francis Chin,

More information

SPECIFICATIONS FOR AluSystems Aluminum Composite Panels Series 20 Dry Joint 1.00 GENERAL 1.01 RANGE OF WORK Section includes: Laminated panels and attachment systems for use as exterior cladding. A. Provide

More information

Design and Construction of the SH58 Ramp A Flyover Bridge over IH70. Gregg A. Reese, PE, CE, Summit Engineering Group, Inc.

Design and Construction of the SH58 Ramp A Flyover Bridge over IH70. Gregg A. Reese, PE, CE, Summit Engineering Group, Inc. Design and Construction of the SH58 Ramp A Flyover Bridge over IH70 Gregg A. Reese, PE, CE, Summit Engineering Group, Inc., Littleton, CO ABSTRACT: The SH58 Ramp A bridge in Golden, CO is the latest on

More information

Superior Aluminum Guide Specification 10/4/2016 Non-Welded Aluminum Pipe Railing

Superior Aluminum Guide Specification 10/4/2016 Non-Welded Aluminum Pipe Railing The following specification has been developed by: Superior Aluminum Products 555 East Main Street Russia, Ohio 45363-0430 to assist Architects and Designers in the specification of Non Welded Concealed

More information

MAINTENANCE OF TRAFFIC NOTES

MAINTENANCE OF TRAFFIC NOTES MAINTENANCE OF TRAFFIC NOTES GENERAL: 1. THE REGULATORY SPEED USED FOR MOT CALCULATIONS FOR EACH FACILITY ARE NOTED BELOW. MODIFICATIONS TO THE REGULATORY SPEED MAY REQUIRE RESUBMITTAL OF THE MOT PLAN.

More information

Section 13. Guidelines for the Design of Ground Mounted Sign Supports

Section 13. Guidelines for the Design of Ground Mounted Sign Supports Section 13 BDC11MR-04 13.1 Introduction Highway signs fall into two main categories, which are subdivided as follows: 1. Overhead Signs a. Sign Bridge Structures (GO) b. Sign Cantilever Structures (GO)

More information

Section 2 Supplemental Specification 2.11 High Tension Cable Barrier

Section 2 Supplemental Specification 2.11 High Tension Cable Barrier 2.11 HIGH TENSION CABLE BARRIER 2.11.1 GENERAL This Work consists of the supply, installation, removal, disposal and reinstallation of High Tension Cable Barrier (HTCB) system. 2.11.2 DEFINITIONS AND INTERPRETATION

More information

INCLUDE IN ALL PAVING PROJECTS UNLESS OTHERWISE DIRECTED BY TSB

INCLUDE IN ALL PAVING PROJECTS UNLESS OTHERWISE DIRECTED BY TSB 1.1 TESTING AND EVALUATION OF FINISHED PAVEMENT SURFACE SMOOTHNESS USING INTERNATIONAL ROUGHNESS INDEX (IRI) CRITERIA 1.1.1 General Contrary to the requirements of Specification 3.50, Asphalt Concrete

More information

MAINE TURNPIKE AUTHORITY ADDENDUM NO. 1 CONTRACT Pavement Rehabilitation Clear Zone Improvements MM 64.4 to MM 68.5

MAINE TURNPIKE AUTHORITY ADDENDUM NO. 1 CONTRACT Pavement Rehabilitation Clear Zone Improvements MM 64.4 to MM 68.5 MAINE TURNPIKE AUTHORITY ADDENDUM NO. 1 CONTRACT 2017.02 Pavement Rehabilitation Clear Zone Improvements MM 64.4 to MM 68.5 The following changes are made to the Proposal, Specifications and Plans: SPECIFICATIONS:

More information

BRIDGE CONSTRUCTION USING SELF-PROPELLED MODULAR TRANSPORTERS (SPMT)

BRIDGE CONSTRUCTION USING SELF-PROPELLED MODULAR TRANSPORTERS (SPMT) SPECIAL PROVISION August 31, 2009 PROJECT # S-R399(42) PROJECT # S-R399(59) PIN # 6697/7236 SECTION 03253S BRIDGE CONSTRUCTION USING SELF-PROPELLED MODULAR TRANSPORTERS (SPMT) Add Section 03253S: PART

More information

Asphalt Rubber Chip Sealing DRAFT MAINTENANCE SPECIFICATION. March 22, 2007

Asphalt Rubber Chip Sealing DRAFT MAINTENANCE SPECIFICATION. March 22, 2007 Asphalt Rubber Chip Sealing DRAFT MAINTENANCE SPECIFICATION March 22, 2007 Description: This work consists of furnishing and applying asphalt rubber binder followed by an application of treated cover aggregate

More information

SECTION 39 - MANHOLES TABLE OF CONTENTS 39-1 GENERAL PRECAST CONCRETE MANHOLES

SECTION 39 - MANHOLES TABLE OF CONTENTS 39-1 GENERAL PRECAST CONCRETE MANHOLES Section SECTION 39 - MANHOLES TABLE OF CONTENTS 39-1 GENERAL... 39-1 39-2 PRECAST CONCRETE MANHOLES... 39-1 39-2.01 Precast Concrete Storm Drain Manholes... 39-1 39-3 SADDLE MANHOLES... 39-2 39-3.01 Saddle

More information

Field Guide on. Safe Maintenance and. Work Zone Operations

Field Guide on. Safe Maintenance and. Work Zone Operations Field Guide on Installation and Removal of Temporary Traffic Control for Safe Maintenance and Work Zone Operations August 2008 Introduction This field guide provides field personnel with introductory guidance

More information

December 19, 2012 ADDENDUM NO. 11. To Prospective Bidders and Others on:

December 19, 2012 ADDENDUM NO. 11. To Prospective Bidders and Others on: 601096-12 December 19, 2012 ADDENDUM NO. 11 To Prospective Bidders and Others on: Technical/Price Proposals Postponed To: Thursday, January 17, 2013 @ 2:00 PM Transmitting the following Documents and Clarifications:

More information

Chapter 8 WORK ZONE TRAFFIC CONTROLS

Chapter 8 WORK ZONE TRAFFIC CONTROLS October 31, 2009 Chapter 8 WORK ZONE TRAFFIC CONTROLS TABLE OF CONTENTS Page 8-1.00 INTRODUCTION..........................................................8-3 1.01 Purpose 1.02 Scope 1.03 Relation to Other

More information

SPECIFICATION : BORING AND JACKING

SPECIFICATION : BORING AND JACKING SPECIFICATION 330524: BORING AND JACKING PART 1.0 GENERAL 1.1 DESCRIPTION 1.1.1 The work of this specification includes all labor, machinery, construction equipment and appliances required to perform in

More information

CHAPTER 4 GRADE SEPARATIONS AND INTERCHANGES

CHAPTER 4 GRADE SEPARATIONS AND INTERCHANGES CHAPTER 4 GRADE SEPARATIONS AND INTERCHANGES 4.0 INTRODUCTION The ability to accommodate high volumes of intersecting traffic safely and efficiently through the arrangement of one or more interconnecting

More information

CONSTRUCTION SPECIFICATION FOR KEYHOLE EXCAVATION AND PERMANENT REINSTATEMENT OF KEYHOLE CORES TABLE OF CONTENTS

CONSTRUCTION SPECIFICATION FOR KEYHOLE EXCAVATION AND PERMANENT REINSTATEMENT OF KEYHOLE CORES TABLE OF CONTENTS CITY OF TORONTO TRANSPORTATION SERVICES STANDARD CONSTRUCTION SPECIFICATIONS TS 4.70 November 2007 CONSTRUCTION SPECIFICATION FOR KEYHOLE EXCAVATION AND PERMANENT REINSTATEMENT OF KEYHOLE CORES TABLE OF

More information

Section 505. CHIP SEALS

Section 505. CHIP SEALS Section 505. CHIP SEALS 505.01. Description. This work consists of preparing the pavement surface and providing and placing a single chip seal, double chip seal, or shoulder chip seal. 505.02. Materials.

More information

CITY OF SANTA ANA PROPOSAL PROJECT NO.: CHESTNUT AVE & BUSH/CYPRESS BIKE LANES FAID#: U58DP005861

CITY OF SANTA ANA PROPOSAL PROJECT NO.: CHESTNUT AVE & BUSH/CYPRESS BIKE LANES FAID#: U58DP005861 PROPOSAL BID PROPOSAL TO: CITY COUNCIL OF THE CITY OF SANTA ANA FROM: REQUIREMENT: The undersigned bidder declares that they have carefully examined the location of the proposed work, that they have examined

More information

MANDATORY SUPPLEMENTAL SPECIFICATIONS FOR CONTRACTOR QUALITY CONTROL Contractor Quality Control - is replaced with the following:

MANDATORY SUPPLEMENTAL SPECIFICATIONS FOR CONTRACTOR QUALITY CONTROL Contractor Quality Control - is replaced with the following: MANDATORY SUPPLEMENTAL SPECIFICATIONS FOR CONTRACTOR QUALITY CONTROL EFFECTIVE DATE: OCTOBER 14, 2011 200.07 Contractor Quality Control - is replaced with the following: (a) (b) (c) Scope: These requirements

More information

STANDARD SPECIFICATIONS SECTION PAVEMENT REQUIREMENTS

STANDARD SPECIFICATIONS SECTION PAVEMENT REQUIREMENTS STANDARD SPECIFICATIONS SECTION 02950 PAVEMENT REQUIREMENTS PART 1 GENERAL 1.1 DESCRIPTION A. Section includes requirements for removing, replacing and providing new paving for roads, driveways, parking

More information

.2 The scales and automated system for each of the three (3) scales shall be supplied from a single manufacturer.

.2 The scales and automated system for each of the three (3) scales shall be supplied from a single manufacturer. New Entrance and Scale Facility Page 1 of 6 1. GENERAL 1.1 Work Included.1 The intent of the work under this section is to supply and install three (3) complete low profile platform (pitless) truck scales

More information

NOTIFICATION OF ADDENDUM ADDENDUM NO. 1 DATED 12/20/2017

NOTIFICATION OF ADDENDUM ADDENDUM NO. 1 DATED 12/20/2017 NOTIFICATION OF ADDENDUM ADDENDUM NO. 1 DATED 12/20/2017 Control 6316-00-001 Project RMC - 631600001 Highway US0059 County HARRISON Ladies/Gentlemen: Attached please find an addendum on the above captioned

More information

AGENDA AGENDA. Route 15/29 SBL Bridge Superstructure Replacement & Widening. NOVA District. Bridge Views SCOPE. Existing Structure.

AGENDA AGENDA. Route 15/29 SBL Bridge Superstructure Replacement & Widening. NOVA District. Bridge Views SCOPE. Existing Structure. Route 15/29 SBL Bridge Superstructure Replacement & Widening Existing Structure Scope Accelerated Procedure Staging (Superstructure) Preparatory Work (Substructure) NOVA District Questions EXISTING STRUCTURE

More information

NOTIFICATION OF ADDENDUM ADDENDUM NO. 1 DATED 3/23/2018

NOTIFICATION OF ADDENDUM ADDENDUM NO. 1 DATED 3/23/2018 NOTIFICATION OF ADDENDUM ADDENDUM NO. 1 DATED 3/23/2018 Control 6315-63-001 Project RMC - 631563001 Highway IH0035W County TARRANT Ladies/Gentlemen: Attached please find an addendum on the above captioned

More information

REQUEST FOR CONSTRUCTION BIDS May 23, 2017

REQUEST FOR CONSTRUCTION BIDS May 23, 2017 REQUEST FOR CONSTRUCTION BIDS May 23, 2017 Cambridge Greenway Trail / Railroad Bridge Replacement Flood Mitigation Project 1.0 Project Background A former railroad bridge that currently carries the Cambridge

More information

The Town will coordinate with the adjacent property Owner for access allowing work to the East side of the building.

The Town will coordinate with the adjacent property Owner for access allowing work to the East side of the building. ADDENDUM #1 EXTERIOR REPAIRS YOUTH SERVICES BUREAU 63 LINDEN STREET MANCHESTER, CT 06040 BID #15/16-68 S/P+A PROJECT NO. 15.207 DATE: March 15, 2016 The following changes to the Drawings and Project Specifications

More information

A. Texas Department of Transportation 2004 Standard Specifications for Construction and Maintenance of Highways, Streets and Bridges (TxDOT).

A. Texas Department of Transportation 2004 Standard Specifications for Construction and Maintenance of Highways, Streets and Bridges (TxDOT). SECTION 32 01 16 ASPHALT OVERLAY PART 1 - GENERAL 1.1 SCOPE OF WORK A. This Section specifies the requirements for scarifying, grinding, sweeping and repair of existing asphalt concrete pavement to establish

More information

JOB BB0113 SHELL LAKE STR. & APPRS. (S) MARCH 10, 2015 LETTING QUESTIONS PREVIOUSLY ASKED UNDER JOB BB0106.

JOB BB0113 SHELL LAKE STR. & APPRS. (S) MARCH 10, 2015 LETTING QUESTIONS PREVIOUSLY ASKED UNDER JOB BB0106. JOB BB0113 SHELL LAKE STR. & APPRS. (S) MARCH 10, 2015 LETTING QUESTIONS PREVIOUSLY ASKED UNDER JOB BB0106. There are notes in the plans regarding driving the test pile without the use of a follower. The

More information

In Service Replacement of Box Girder Bottom Slab

In Service Replacement of Box Girder Bottom Slab In Service Replacement of Box Girder Bottom Slab WSDOT Bridge No. 5/537S - Span 11 Craig R. Boone, P.E., S.E. Lynn Peterson Secretary of Transportation 2015 Western Bridge Engineers Seminar Reno, Nevada

More information

SINGLE SWING DOOR PAIRED SWING DOOR

SINGLE SWING DOOR PAIRED SWING DOOR Rev. 091416 SINGLE SWING DOOR PAIRED SWING DOOR Drawing No.: Revision: Date: If you need to contact Customer Service Please complete the following information and retain for future reference: Serial Number:

More information

REVISED SECTION REINFORCING STEEL FOR CONCRETE STRUCTURES. Approved:

REVISED SECTION REINFORCING STEEL FOR CONCRETE STRUCTURES. Approved: To: SUPERSEDED BY EB 06-057 EFFECTIVE 05/03/07 New York State Department of Transportation ENGINEERING INSTRUCTION EI 03-030 Title: REVISED SECTION 556 - REINFORCING STEEL FOR CONCRETE STRUCTURES Approved:

More information

Ohio Department of Transportation Central Office 1980 West Broad Street Columbus, OH John R. Kasich, Governor Jerry Wray, Director

Ohio Department of Transportation Central Office 1980 West Broad Street Columbus, OH John R. Kasich, Governor Jerry Wray, Director Ohio Department of Transportation Central Office 1980 West Broad Street Columbus, OH 43223 John R. Kasich, Governor Jerry Wray, Director 11/21/2014 Project 140560 Addendum No. 2 PID No. 82972 HAM IR 275

More information

Special Provision No. 199S53 February 2012

Special Provision No. 199S53 February 2012 PERFORMANCE REQUIREMENT QUALITY PROCESSES Special Provision No. 199S53 February 2012 1.0 SCOPE This Special Provision describes the performance requirements for quality processes, assessment of conformance

More information

Yuba County Water Agency. Our House Diversion Dam Page 1 of 5 Sediment Removal Project 2017

Yuba County Water Agency. Our House Diversion Dam Page 1 of 5 Sediment Removal Project 2017 Our House Diversion Dam Page 1 of 5 Addendum #1 Our House Sediment Removal This addendum contains two items: 1. Clarification regarding times. Please note that all times are Pacific Daylight time (PDT)

More information

ITEM 6 CONCRETE CURBS, GUTTERS, AND SIDEWALKS

ITEM 6 CONCRETE CURBS, GUTTERS, AND SIDEWALKS ITEM 6 CONCRETE CURBS, GUTTERS, AND SIDEWALKS 6.1 DESCRIPTION This work shall consist of constructing curbs, gutters, sidewalks, ramps, local depressions and driveways of the form and dimensions shown

More information

BID # REPAIR AREA OF PARKING LOT DAMAGED BY WATER LINE LEAK SECTION C TECHNICAL SPECIFICATIONS OWNER

BID # REPAIR AREA OF PARKING LOT DAMAGED BY WATER LINE LEAK SECTION C TECHNICAL SPECIFICATIONS OWNER BID # 14-47 REPAIR AREA OF PARKING LOT DAMAGED BY WATER LINE LEAK SECTION C TECHNICAL SPECIFICATIONS OWNER Board of Trustees Middlesex County College 2600 Woodbridge Avenue P.O. Box 3050 Edison, New Jersey

More information

MICHIGAN DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR STOPPED TRAFFIC ADVISORY SYSTEM. OFS:CRB 1 of 8 APPR:JJG:LWB:

MICHIGAN DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR STOPPED TRAFFIC ADVISORY SYSTEM. OFS:CRB 1 of 8 APPR:JJG:LWB: MICHIGAN DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR STOPPED TRAFFIC ADVISORY SYSTEM OFS:CRB 1 of 8 APPR:JJG:LWB:10-30-13 a. Description. This work consists of providing, installing, operating,

More information

I-91 Viaduct Public Information Briefing

I-91 Viaduct Public Information Briefing I-91 Viaduct Public Information Briefing Project File No. 607731 MassDOT Contract No. 85020 Briefing no. 9 September 13, 2017 Agenda Welcome and Presenter Introductions Update on Construction and Demolition

More information

GENERAL PROVISIONS: Furnish and install one steel deck platform motor truck scale and associated electronic controls.

GENERAL PROVISIONS: Furnish and install one steel deck platform motor truck scale and associated electronic controls. GENERAL PROVISIONS: Furnish and install one steel deck platform motor truck scale and associated electronic controls. The scale shall have a clear and unobstructed weighing surface of not less than 70

More information

Construction operations shall be conducted in a manner to provide DOT forces access to the Maintenance Yard on a continuous basis.

Construction operations shall be conducted in a manner to provide DOT forces access to the Maintenance Yard on a continuous basis. ESTIMATE OF QUANTITIES Bid Item Number Item Quantity Unit 009E0010 Mobilization Lump Sum LS 120E0100 Unclassified Excavation, Digouts 100 CuYd 260E1030 Base Course Salvaged 2,351.0 Ton 270E0040 Salvage

More information

The Contractor is responsible for quality control, including workmanship and materials furnished by his subcontractors and suppliers.

The Contractor is responsible for quality control, including workmanship and materials furnished by his subcontractors and suppliers. SECTION 05 31 13 STEEL FLOOR DECKING PART 1 - GENERAL 1.1 RELATED DOCUMENTS Drawings and general provisions of the contract, including General and Supplementary Conditions and Division 01 - Specification

More information

Maine Turnpike Authority

Maine Turnpike Authority Company Name Total Bid Amount Wyman & Simpson Inc. - Richmond, ME $984,032.05 Gordon Contracting - Sangerville, ME $985,607.00 CPM Constructors - Freeport, ME $1,177,689.54 Page 1 of 7 Wyman & Simpson

More information

ENGINEERED SOLUTIONS. Contech Bridge Plank

ENGINEERED SOLUTIONS. Contech Bridge Plank ENGINEERED SOLUTIONS Contech Bridge Plank Contech Bridge Plank for Rehabilitation Make unsound bridges safe with Contech Bridge Plank Every state is faced with the problem of replacing old bridges. In

More information

SECTION STORM DRAINAGE AND STORMWATER MANAGEMENT

SECTION STORM DRAINAGE AND STORMWATER MANAGEMENT SECTION 322 - STORM DRAINAGE AND STORMWATER MANAGEMENT 322.01 DESCRIPTION Work includes all labor, material and equipment to construct storm drain systems and stormwater management facilities, including

More information

Subject: ACTION: National Cooperative Highway Research Program (NCHRP) Report 350 Hardware Compliance Dates

Subject: ACTION: National Cooperative Highway Research Program (NCHRP) Report 350 Hardware Compliance Dates Memorandum - FHWA Safety Program Page 1 of 2 Memorandum US Department of Transportation Federal Highway Administration Subject: ACTION: National Cooperative Highway Research Program (NCHRP) Report 350

More information

Interior Painting Artesi II & III Day Care Facilities at 777 & 333 W. Matthews Road

Interior Painting Artesi II & III Day Care Facilities at 777 & 333 W. Matthews Road Interior Painting Artesi II & III Day Care Facilities at 777 & 333 W. Matthews Road Introduction: The HACSJ is seeking quotes from licensed and bonded C-33 Interior/Exterior Painting Contractors to provide

More information