1 SECTION UNDERFLOOR AIR DISTRIBUTION SYSTEM PART 1 GENERAL 1.1 SUMMARY A. The Contractor shall furnish and install a complete access floor air distribution system as shown on the drawings, including all wiring, controls and other accessories required for a complete system. Contractor shall provide submittals, samples, and operation and maintenance documentation. Specific equipment includes: 1. Variable-air-volume diffuser terminal unit. 2. Constant-volume, directionally adjustable diffuser terminal unit with sliding manual damper. 3. Constant-volume, omni-directional diffuser terminal unit with sliding manual damper. 4. Directionally adjustable diffuser terminal unit with sliding manual damper and motorized variable-air-volume control 5. Omni-directional diffuser terminal unit with sliding manual damper and motorized variable-airvolume control. 6. Continuous Linear Water Heat Modular Trough. 7. Continuous Linear Electric Heat Modular Trough. 8. Underfloor fan-powered terminal unit with electric heat. 9. Underfloor fan-powered terminal unit with heating hot water heat. 10. Space thermostats. 11. Underfloor supply power module. 12. Plug and Play modular control wiring B. The Access Floor Contractor shall furnish and install all floor panels, structural supports, underfloor Airway barriers, floor cutout openings and any other floor-related components and accessories necessary for a complete raised access floor system. C. The General Contractor shall be responsible for sealing the access floor system and all penetrations through the building wall and floors that occur below the raised floor elevation. D. All openings in access floor panels required for installation of diffusers and terminals shall be coordinated with the Access Floor Contractor who shall also be responsible for providing the factory cut holes for diffusers (or cutting the panel openings only if such factory cutting is not available) and installing panels as indicated on the drawings. UNDERFLOOR AIR DISTRIBUTION SYSTEM

2 E. The Electrical Contractor shall furnish and install all electric power-related materials above 24vac and components necessary for system operation. F. The Controls Contractor shall furnish and install all control system interfaces, Building Automation System (BAS) integration, and other control system-related materials and accessories. The Controls Contractor shall install the factory furnished PAP wiring to the tstats and underfloor temperature controllers. 1.2 QUALITY ASSURANCE A. All equipment and components shall be suitable for use in an environmental Airway space. B. All components within the air stream including underfloor terminals shall conform to the NFPA 90A Standard for Flame/Smoke/Fire contribution of 25/50/0. Dampers, electrical enclosures, dust pans, and duct connecting plenums shall be metal. Plastic is not permitted for these components. C. All units shall be the product of a single manufacturer who is regularly engaged in the production of underfloor air distribution system. D. Units shall be specifically designed for installation in an underfloor air distribution system and shall be furnished complete with all necessary controls and wiring to provide operation according to manufacturer s recommendations. E. Terminal operation shall be coordinated with the air-handling system and control system to assure complete compatibility and proper operation. F. Equipment shall be listed under and conform to appropriate sections of U.L., CSA, E.T.L. and other testing laboratory requirements as required by local building codes. 1.3 SUBMITTALS A. Submit dimensioned drawings, performance and product data for approval. Include listing of discharge and radiated sound power level for the second, third, fourth, fifth and sixth octave bands for fan-powered terminal units. Data shall include all wiring diagrams, control sequences and power requirements as applicable to the product and coordination with other systems. B. Submit certified independent 3 rd party sound testing data on all diffusers and terminal units. 1.4 OPERATION AND MAINTENANCE DATA A. Quantity: [4] B. Maintenance and Service Contracts: Provide a list for each product and include the name, address and telephone number of: 1. Subcontractor or installer. 2. Local Maintenance Contractors, as appropriate. Identify responsibility of each. UNDERFLOOR AIR DISTRIBUTION SYSTEM

3 3. Local source of supply for parts and replacement. C. Table of Contents: List all products in the order in which they appear in the specifications and label accordingly. D. Sections: All sections shall be separated with an appropriate tabbed section divider with the appropriate specification section number. Provide the manufacturer s written installation and maintenance instructions for all items supplied. E. Routine Maintenance: Provide a list indicating all routine maintenance procedures and recommended intervals. F. Contents: Include copies of approved submittal data, installation instructions, operation and maintenance instructions and parts lists. 1.5 WARRANTY A. The underfloor Airway distribution system components, materials and workmanship shall be guaranteed to be free from defects for a period of one year after start-up or 18 months from date of shipment from the factory, whichever occurs first. B. Contractor and/or vendor shall maintain availability of replacement parts compatible with the terminals for no less than ten years after acceptance. PART 2 PRODUCTS 2.1 GENERAL DESCRIPTION A. The Contractor shall furnish a pre-engineered, prefabricated, access floor air terminal system that includes all necessary components from a single manufacturer. All components, including controls and wiring, shall be furnished as a plug-and-play system of modular and interchangeable components that are factory prepared to operate as a complete system. B. Supply Terminals 1. Construction of unit shall permit easy cleaning and prevent dirt and debris from entering system; and no plastic dampers, grilles or other parts shall be exposed to the Airway space or air stream whether or not in accordance with NFPA 90A. 2. Constant volume diffuser terminal unit shall include a dirt catch pan. The pan shall be minimum 18- gauge galvanized steel pre painted flat black. The grille, damper assembly, and dirt catch pan are shipped fully assembled and can be securely installed in floor tile by turning the center screw and allow retention bar to clip to bottom side of floor tile. 3. Variable air volume diffuser terminal Unit shall include a chassis. The chassis shall be minimum 20- gauge galvanized steel pre painted flat black and shall enclose and support all components. Chassis construction shall admit underfloor air from only one direction to control sound transmission. Airflow volume control shall be pressure independent with airflow sensor and controller or time modulation control. UNDERFLOOR AIR DISTRIBUTION SYSTEM

4 4. Supply air terminals shall have grilles made of die cast aluminum material that matches the trim ring in color. Grilles shall include a means for adjusting air throw direction and pattern, and shall fit securely within the trim ring and chassis without mechanical fasteners. Grilles shall be rated for 1,250 pounds. No grille openings shall be larger than 0.30 inches (7.6 mm) for shoe heel penetration protection. 5. Grille trim rings shall be die-cast aluminum designed to engage the chassis and floor to provide complete support for the air grilles. Trim ring color shall match the grille color. Plastic or any Non- Metallic diffusers are not acceptable. 6. Panel Size: Unless noted otherwise, the nominal dimensions of all floor-mounted system components shall be suitable for installation in a standard 24-inch by 24-inch (610-mm by 610-mm) raised access floor suspension grid. 7. Airflow Performance: The manufacturer shall provide published airflow data for the all supply and return terminals in accordance with ANSI/ASHRAE Standard Variable-Air-Volume Controls: Terminals specified for variable-air-volume service shall incorporate the following requirements: a. Terminal construction shall include an integral time-modulation damper and motor (air valve) that is specifically designed for low static pressure air distribution to maintain a constant throw height and distance at all load conditions. The damper motor shall be a 90-degree stepper type motor having no stops, springs, gears, belts or linkages, and shall rotate continuously in one direction (not reversing) to minimize wear. The motor shall directly drive the damper blade. The damper assembly shall be rated and tested for a life of 100 million cycles (factory tests of at least 20 million cycles at normal operating speeds are required). A warranty of up to 10 years shall be available at a cost of 1% of the cost of the VAV box cost, per year of extended warranty. Modulation shall involve the timed duty cycle of fully open and closed periods to produce an average open time corresponding to the average terminal air volume required. If this time modulation strategy is not used, (2) VAV diffusers of ½ size (of the scheduled cfm per diffuser) shall be provided and installed, for each diffuser shown on the plans. The first diffuser will modulate 100% to 0 while the second will remain at 100%. When the load falls below 50%, the first diffuser shall shut off completely and the second shall modulate from 100% to a field adjustable minimum cfm via pressure independent control with airflow sensor and controller. This strategy will prevent pooling of cold air at floor levels and insure delivery of conditioned air to the breathing zone (up to 6 ft) at all load conditions. If the 2 for 1 diffuser strategy of control is employed, the mechanical contractor will be responsible to coordinate with all other trades including but not limited to carpenters, electricians, raised floor installer, carpet installer and controls contractor. b. Terminal shall include a microprocessor control that controls the damper movement in response to a remote digital signal. The digital signals and power shall be delivered to the device through a 4-conductor, plenum-rated modular cable furnished with the terminal. A daisy-chain output port shall be furnished that repeats the digital signals with a nominal 6 second delay, and provides parallel connection of the 24 volts ac control power supply to other connected terminals. This 6 second delay prevents all the air terminals in a zone from actuating at the same time. c. The damper and motor shall be designed for continuous use with a nominal design life of 100,000,000 cycles. The installed damper and motor operation shall be inaudible with a UNDERFLOOR AIR DISTRIBUTION SYSTEM

5 background sound level of 30 dba and shall be tested to be quieter than NC-17 with full airflow. The unit shall feature all solid-state electronics, self-contained within a housing using printed circuit board mounted components with no relays, mechanical switches, or other analog devices required for operation of the device. d. The terminal shall not require periodic lubrication or other maintenance. The device shall be delivered to the job site fully assembled and operational, needing no programming, setup or adjustment. 2.2 ACCEPTABLE MANUFACTURERS AND PRODUCTS A. Basis of Design Products: The products specified herein are the Basis of Design. Subject to compliance with requirements provide the Basis of Design products or comparable products 1. MIT-CS Type-C, Type-CN; VAV Diffusers a. Type-C Grille: nominal 10 inch by 10 inch (254 mm by 254 mm) b. Type-CN Grille: nominal 5 inch by 10 inch (127 mm by 254 mm) c. Type-C Supply Rating: variable-air-volume, 150 cfm (71 L/sec) at 0.05 inches w.g. (12.4 Pa) static pressure. d. Type-CN Supply Rating: variable-air-volume, 100 cfm (47 L/sec) at 0.05 inches w.g. (12.4 Pa) static pressure. Each grille shall be provided with PAP-1 25 ft plug and play cable. e. Grille Color: Special colors as shown on the finish schedule and submittal data. Color shall be factory applied, powder coated, and baked. 2. Élan Diffusers Type Élan-08R-180, Élan-08R-360, Élan-08R-180VAV-C, Élan-08R-360VAV-C a. Nominal 8 inch round (203 mm). b. Supply Rating: variable-air-volume, 82 cfm (39 L/sec) at 0.05 inches w.g. (12.4 Pa) static pressure. c. Includes a manual adjustable slide plate at the face of grille to limit airflow. d. Élan diffusers allows for directional adjustability of the airflow. e. VAV diffusers shall include a PAP-1-25 ft plug and play cable. f. Grille shall be solid cast aluminum and rated for 1,250 pounds. g. Installation of grille shall occur from top of floor access floor only. Provisions shall be made to secure the grille in the floor so it cannot be lifted or removed by users. h. Grille Color: Special colors as shown on the finish schedule and submittal data. Color shall be factory applied, powder coated, and baked. 3. CLWMIT - Continuous Linear Water Heat Modular Trough. UNDERFLOOR AIR DISTRIBUTION SYSTEM

6 a. ETL listed variable air volume heating and cooling linear trough system, factory assembled to include; trough housing, fintube, fin tube support brackets, integral baffle separator, air valve(s), wall angle, pedestal brackets, associated modular power cables, and grille sections. The unit shall be factory rated and performance tested as an assembly. Field assembled components are not acceptable. b. Trough shall be load bearing, self-supporting without installing access floor panels in place and shall provide means of positioning support pedestals without the use of tools or hardware. Trough and linear grille shall be rated to 1250 lbs load strength. c. Trough housing shall be 10 wide by 10 deep with 7/8 flange on long side for self-supporting. It features 20 gauge pre-painted galvanized steel construction. Trough length shall be as specified on drawings. d. Trough to include factory installed integral time-modulation damper and motor (air valve) each rated for w.c. Number of air valves to match specified design cooling airflow scheduled on drawings. e. Fin-tube shall be factory assembled inside trough and includes support brackets. Fin-tube trough assembly shall provide heating output rating as scheduled on drawings with the specified low entering water temperature and water flows. Heating capacity shall be rated in accordance with ARI Standard 410. Fin-tube shall be made of seamless copper tubing conforming to ASTM B75 & ASTM B251 standards, (minimum inch thick wall), with aluminum fins (minimum inch thick), mechanically bonded to the tubes, suitable for 250+ psig working pressure. Tested hydrostatically at 320 psig. Elements shall be positively positioned front to back with provisions for silent horizontal expansion and contraction. Provide coil connections with no less than 7/16 inch outside diameter soldered connections. Extend piping connections outside the trough s housing front side for ease of installation to field routed piping below the raised access floor. f. Piping specialties including shut-off valves, terminal connections, control valve, manual air vent shall be provided by others. Trough s thermostat shall control operation of control water valve (2-position or modulating). Control water valve to open in heating mode and close in cooling mode. g. Grille shall be mill finish extruded aluminum with fixed deflection bars parallel to the long side. Grille shall be heavy duty suitable for floors applications. Core style, frame, subframe, and grille lengths shall be as specified by Architect and Engineer. Bar spacing shall be pencil proof. h. Grille Color: Special colors as shown on the finish schedule and submittal data. Color shall be factory applied powder coated, and baked. 4. CLEMIT - Continuous Linear Electric Heat Modular Trough. a. UL & ETL listed variable air volume heating and cooling linear diffuser system, factory assembled to include; trough housing, heating element, integral electrical disconnect, safety cutoff switches, control panel, control transformer, air valve(s), wall angle, pedestal brackets, associated modular power cables, and grille sections. Trough shall have a single point electrical power connection. Power voltage and phase shall be as specified on drawings. UNDERFLOOR AIR DISTRIBUTION SYSTEM

7 b. Trough shall be load bearing, self-supporting without installing access floor panels in place and shall provide means of positioning support pedestals without the use of tools or hardware. Trough and linear grille shall be rated to 1250 lbs load strength. c. Trough housing shall be 6 wide by 10 deep with 7/8 flange on long side for self-supporting. It features 20 gauge pre-painted galvanized steel construction. Trough length shall be as specified on drawings. d. Trough to include factory installed integral time-modulation damper and motor (air valve) each rated for w.c. Number of air valves shall match specified design cooling airflow scheduled on drawings. Airvalve(s) shall modulate cooling air based on 0-10 vdc signal from the thermostat or controller. Airflow throw shall be consistent regardless of airvalve position. e. Heater shall be UL listed sheathed type low temperature finned heating element capable to provide heating output as schedule on drawings. Heater assembly to include factory installed high limit temperature sensor to limit grille surface temperature and a high-high limit temperature sensor to deenergize if heater element gets too hot. Electric heater shall utilize silent solid state contactors to pulse heat based on 0-10 vdc signal from the thermostat or controller to maintain space setpoint. f. Grille shall be mill finish extruded aluminum with fixed deflection bars parallel to the long side. Grille shall be heavy duty suitable for floors applications. Core style, frame, subframe, and grille lengths shall be as specified by Architect and Engineer. Bar spacing shall be pencil proof. g. Grille Color: Special colors as shown on the finish schedule and submittal data. Color shall be factory applied powder coated, and baked. 5. Underfloor Fan Terminal Units with electric heat - UFE a. Construction of unit shall permit easy installation between access floor pedestals. Unit casing shall be minimum 22-gauge galvanized steel pre painted flat black and shall enclose and support all components. Chassis construction shall admit underfloor air from only one direction to permit adjusting delivery volume independent of underfloor air velocity pressure and to control sound transmission. The centrifugal supply fan shall have a vertical axis of rotation to minimize vibration transmission to the slab. Each fan terminal shall have a field programmable microprocessor based control board to permit change of control sequence in the field by connecting an electronic programming tool. Non-adjustable relay logic is not acceptable. Connection to the thermostat shall by via externally mounted 4 pin Molex connectors and factory supplied and tested plug and play cables. b. Casing shall be lined with 1 dual density insulation. Insulation shall meet the following Standards and Classifications: c. Fungi Resistance Test Standards ASTM C-1071 & ASTM G21. d. NFPA 90A, and UL181. e. Fire classification of 25/50 Per ASTM E-84 & UL723. f. Bacteriological Test Standards ASTM C-665 & ASTN G22 UNDERFLOOR AIR DISTRIBUTION SYSTEM

8 g. UFE-AE shall be a fan powered terminal unit with an ECM motor designed to deliver variable airflow as indicated on the drawings. Shaded-pole, split capacitor or other standard fixed speed AC motor with speed control is not acceptable. UFE-A shall be constant speed fan powered terminal unit designed to deliver airflow as indicated on the drawings. h. UFE unit shall include modulating Dark Heat UL listed sheathed type finned heater sized up to 9 KW. The finned heating elements shall utilize silent solid state contactors to modulate with 0-10 VDC signal from associated space thermostat when unit is in heating mode. The fan speed shall modulate with 0-10 VDC signal from associated space thermostat when unit is in cooling mode on AE units. i. Each UFE shall include a 90VA transformer for 24 VAC to power time modulation air valves and thermostats. 6. Underfloor Fan Terminal Units with Heating hot water - UFW a. Construction of unit shall permit easy installation between access floor pedestals. Unit casing shall be minimum 22-gauge galvanized steel pre-painted flat black and shall enclose and support all components. Chassis construction shall admit underfloor air from only one direction to permit adjusting delivery volume independent of underfloor air velocity pressure and to control sound transmission. The centrifugal supply fan shall have a vertical axis of rotation to minimize vibration transmission to the slab. Each fan terminal shall have a field programmable microprocessor based control board to permit change of control sequence in the field by connecting an electronic programming tool. Non-adjustable relay logic is not acceptable. Connection to the thermostat shall by via externally mounted 4 pin Molex connectors and factory supplied and tested plug and play cables. b. c. Casing shall be lined with 1 dual density insulation. Insulation shall meet the following Standards and Classifications: d. Fungi Resistance Test Standards ASTM C-1071 & ASTM G21. e. NFPA 90A, and UL181. f. Fire classification of 25/50 Per ASTM E-84 & UL723. g. Bacteriological Test Standards ASTM C-665 & ASTN G22 h. UFW-AE shall be a fan powered terminal unit with an ECM motor designed to deliver variable airflow as indicated on the drawings. Shaded-pole, split capacitor or other standard fixed speed AC motor with speed control is not acceptable. UFW-A shall be constant speed fan powered terminal unit designed to deliver airflow as indicated on the drawings. i. Heating coil shall be integral with the fan powered terminal unit in a blow thru configuration, with the piping connections extended beyond the unit casing, the supply and return connections shall be on the same side. Heating capacity shall be as scheduled on drawings. coil shall be made of seamless copper tubing conforming to ASTM B75 & ASTM B251 standards, (minimum inch thick wall), with brazed return bends. Aluminum fins shall mechanically bonded to the tubes, suitable for 225 psig working pressure at 325F. UNDERFLOOR AIR DISTRIBUTION SYSTEM

9 j. Each UFW shall include a 90VA transformer for 24 VAC to power time modulation air valves. 7. Space Thermostat Provide wall mounted thermostat device for seamlessly controlling FlexSys underfloor vav terminal diffuser units and underfloor fan terminal units. Thermostat shall include the following features: a. Building Automation System (BAS) BACnet MS/TP communication capability that enables remote monitoring and programmability for efficient space temperature control. Thermostat shall be compatible with other BACnet device, or BACnet network or BACnet BAS. RS-485 twisted pair shall be field provided by control Contractor for networking to BACnet. b. Thermostat shall include user interface with backlit temperature display in Degree F or C temperature. c. Factory pre-wired plug and play pigtail. Include (1) 10 foot PAP-7 for connection to FlexSys terminal units. d. Set points shall be permanently held in memory with no batteries used. Retain setpoint during power outages. e. Thermostat shall be rated for 24 VAC operation with plug and play cabling. f. Thermostat shall employ a unique, Proportional-Integral (PI) time-proportioning algorithm that eliminates temperature offset associated with traditional, differential-based thermostats. g. Thermostat model 2688, DDC space thermostat shall be used for cooling only time-modulation control. h. Thermostat model 2647, DDC space thermostat shall be used for underfloor fan terminal unit signal control in cooling and in heating, or to control modulating heating hot water valve. 8. PM, Power Module a. Input power: [120], [240] or [277] volts ac, single-phase, 60 [50] Hertz. b. Transformer Output Rating: 90 volt-ampere class 1 transformer, 24 volts ac, with load side circuit breaker. c. Output connection: Molex modular plug-and-play connector with 25-0 PAP-5 power cable. d. Housing: steel junction box with knockouts for conduit. 9. Modular Control System Cables Modular control cables shall be rated for plenum service and shall be equipped (unless indicated otherwise) with Molex modular plug-and-play electrical connectors with strain relief at connectors. RJ- 11 cables are not acceptable. Each Cable shall be factory-tested for continuity, shorts, opens and proper UNDERFLOOR AIR DISTRIBUTION SYSTEM

10 impedance. Each cable shall bear evidence tag of QC testing. Plug and play cables shall be color coded as follows to distinguish them from other communication cabled used under floor. The specific colors below must be used. a. PAP-1, General purpose cable: 4-conductor, 18-gauge, and 25 feet (7.6 m) long, with Molex modular receptacle at both ends. Identification color: blue. b. PAP-2, External device (whip) cable: 4 conductor, 18 gauge, 50 feet (15.2 m) long, with Molex modular receptacle on one end and pig tail on the other. Identification color: yellow. c. PAP-3, Extension cable: 4-conductor, 18-gauge, 25 feet (7.6 m) long, with Molex modular receptacle on one end and plug on the other end. Identification color: blue. d. PAP-5, Power only cable: 2-conductor, 18-gauge, and 25 feet (7.6 m) long, with receptacles at both ends. One end shall have an additional short 4 conductor jumper with a plug to permit daisy-chaining one power distribution cable to another. For 24 volts ac, single-phase, 60 hertz power only. Identification color: green. e. PAP-6, Heating cable: 2 conductor, 22-gauge, 50 feet (15.2 m) long, with receptacle at one end and both receptacle and plug on the other end. Identification color: orange. f. PAP-7, Thermostat cable: 8 conductor, 18-gauge shielded, 10 feet (9.1 m) long, with 2 plugs on one end, and 2 receptacles on the other end. Identification color: white. PART 3 EXECUTION 3.1 INSTALLATION A. Prior to installing underfloor Airway distribution components, verify that all penetrations and openings in the area under the raised access floor have been sealed. B. Verify that the building area under the raised access floor has been cleaned and is free of dust, dirt, debris, standing water and other contaminants. C. Install all underfloor air distribution system components, including supply air terminals, fan-powered terminals and controls in accordance with the manufacturer s instructions. D. Prior to installation, all components shall be stored in a clean, dry location that is protected from weather and damage from other construction activities. E. Coordinate installation of underfloor Airway distribution components with the Access Floor Contractor, who is responsible for erection of the raised access floor. F. Coordinate location and size of all cut openings in raised access floor panels with the Access Floor Contractor. G. Install supply air terminals, fan-powered terminals and other components in the locations indicated on the drawings. UNDERFLOOR AIR DISTRIBUTION SYSTEM

11 H. All power and control wiring shall be installed in accordance with the requirements of specification Section [???]. I. All power and control wiring for the underfloor Airway distribution system components shall be installed in a neat and workmanlike manner. J. Line voltage and sensor wiring shall not be installed in the same harness. K. Low voltage and communication wiring (less than 30 volts) may be installed in the same wiring harness. 3.2 MANUFACTURER S FIELD PROJECT MANAGEMENT SERVICES A. The manufacturer shall provide the services of a Registered Professional Engineer with at least 5 years experience with VAV underfloor air systems, plenum construction and the control systems. This engineer shall make at least 3 trips of 1 day each to the project in to meet with construction and design personnel. 3.3 TESTING 1. The first meeting shall be occur after the general and subcontracts are decided to instruct the construction team on proper installation of the underfloor air devices and proper plenum construction methods. A detailed conversation with all trades present shall establish the construction sequence related to the raised floor and its systems. Site observation report shall be made and ed to the HVAC engineer for approval. If approved he shall forward the report to the construction team as appropriate. 2. The second trip to the job shall occur shortly before the raised floor installation begins. The engineer will inspect all plenum penetrations and construction to see that proper methods are being used. Any deficiencies found shall be brought to the general contractor s attention on site that day. Site observation report shall be made and ed to the HVAC engineer for approval. If approved he shall forward the report to the construction team as appropriate. 3. The third trip to the job shall occur during the building commissioning process. Communication shall occur with all associated trades to solve any problems that prevent contract completion. The engineer shall assist with system testing and verify proper functioning of the UFAD system. Any deficiencies found shall be brought to the general contractor s attention on site that day. Site observation report shall be made and ed to the HVAC engineer for approval. If approved he shall forward the report to the construction team as appropriate A. Upon completion of all installation activities, perform the manufacturer s pre-start checkout instructions. B. Start-up and operate underfloor Airway distribution system components to demonstrate functional operation and compliance with specifications. END OF SECTION UNDERFLOOR AIR DISTRIBUTION SYSTEM

1.02 Related Sections A. Section Heating, Ventilation and Air Conditioning (HVAC). C. Section Pneumatic and Electric Control HVAC.

1.02 Related Sections A. Section Heating, Ventilation and Air Conditioning (HVAC). C. Section Pneumatic and Electric Control HVAC. PART 1: GENERAL 1.01 Section Includes A. Dual duct terminal units. B. Variable volume regulators. C. Integral damper motor operators. D. Integral controls. 1.02 Related Sections A. Section 23 00 00 Heating,

More information

A. This Section includes ceiling- and wall-mounted diffusers, registers, grilles and louvers.

A. This Section includes ceiling- and wall-mounted diffusers, registers, grilles and louvers. SECTION 23 37 13 - PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply

More information

YORK BULKHEAD MOUNTED CHILLED BEAMS ENGINEERING GUIDE

YORK BULKHEAD MOUNTED CHILLED BEAMS ENGINEERING GUIDE YORK BULKHEAD MOUNTED CHILLED BEAMS ENGINEERING GUIDE Contents YORK Bulkhead Active Chilled Beams 3 CB-ABB-YK / CB-ABC-YK Performance Data 5 CB-ABB-YK Dimensions 10 CB-ABC-YK Dimensions 11 Specifications

More information

This product specification is written according to the Construction Specifications Institute MasterFormat, 2014 Update.

This product specification is written according to the Construction Specifications Institute MasterFormat, 2014 Update. AFC Cable Systems, Inc. Product Specification This product specification is written according to the Construction Specifications Institute MasterFormat, 2014 Update. SECTION 260519.13 METAL CLAD CABLE-MC

More information

10200/ARR Buyline 4822 ARROW LOUVERS. The Preferred Line PUBLICATION

10200/ARR Buyline 4822 ARROW LOUVERS. The Preferred Line PUBLICATION 10200/ARR ARROW LOUVERS The Preferred Line PUBLICATION 697 03 ARROW LOUVERS Arrow Louvers are custom-built, quality assemblies manufactured to meet your design specifications. Our louvers are constructed

More information

LTH3700, HOLLOW METAL SLIDING FIRE DOOR

LTH3700, HOLLOW METAL SLIDING FIRE DOOR LTH3700, HOLLOW METAL SLIDING FIRE DOOR Consult Manufacturer for additional options or modifications PART 1-GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General

More information

BUSWAY LOW VOLTAGE (POW-R-WAY III) SECTION SECTION 16466

BUSWAY LOW VOLTAGE (POW-R-WAY III) SECTION SECTION 16466 BUSWAY LOW VOLTAGE (POW-R-WAY III) PART 1 GENERAL 1.01 1.02 SCOPE The Contractor shall furnish and install the busway system including all necessary fittings, hangers and accessories as specified herein

More information

This product specification is written according to the Construction Specifications Institute MasterFormat, 2014 Update.

This product specification is written according to the Construction Specifications Institute MasterFormat, 2014 Update. Kaf-Tech Product Specification This product specification is written according to the Construction Specifications Institute MasterFormat, 2014 Update. SECTION 260519 METAL CLAD CABLE - MC-PLUS Neutral

More information

ACBC Floor Mounted Active Beam

ACBC Floor Mounted Active Beam Floor Mounted Active Beam The Price Floor Mounted Active Beam,, is designed for occupant comfort. It provides high cooling and heating capacities while simultaneously supplying ventilation air from a DOAS

More information

SECTION AUTOMATIC TRANSFER SWITCH

SECTION AUTOMATIC TRANSFER SWITCH SECTION 26 36 23 AUTOMATIC TRANSFER SWITCH PART 1: GENERAL 1.01 SCOPE A. Furnish all labor, materials, equipment and appurtenances, install and test electrically operated, automatic transfer switch (ATS)

More information

1. Telecommunications mounting elements. 2. Backboards. 3. Telecommunications equipment racks and cabinets. 4. Grounding.

1. Telecommunications mounting elements. 2. Backboards. 3. Telecommunications equipment racks and cabinets. 4. Grounding. ALLIANT ENERGY CENTER PAVILIONS Project No. 2013 027 SECTION 27 11 00 - PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions

More information

N-SERIES: NTH3500 SPECIFICATIONS Hollow Metal Sliding Door System

N-SERIES: NTH3500 SPECIFICATIONS Hollow Metal Sliding Door System Version 5.22.13 N-SERIES: NTH3500 SPECIFICATIONS Hollow Metal Sliding Door System OPTIONS ARE LISTED IN BOLD, PLEASE MODIFY THESE AREAS AS NEEDED BASED ON YOUR PROJECT CONSULT MANUFACTURER FOR ADDITONAL

More information

5. AMCA 301 Method of Publishing Sound Ratings for Air Moving Devices. 6. AMCA 500 Test Methods for Louver, Dampers, and Shutters

5. AMCA 301 Method of Publishing Sound Ratings for Air Moving Devices. 6. AMCA 500 Test Methods for Louver, Dampers, and Shutters PART 1: GENERAL 1.01 Purpose: A. This standard is intended to provide useful information to the Professional Service Provider (PSP) to establish a basis of design. The responsibility of the engineer is

More information

CFFWA-20-1-U Chilled/Hot Water Universal Mount Fan Coil 2-Pipe Heat / Cool Fan Coil 60,000 BTUH

CFFWA-20-1-U Chilled/Hot Water Universal Mount Fan Coil 2-Pipe Heat / Cool Fan Coil 60,000 BTUH CFFWA-20-1-U Chilled/Hot Water Universal Mount Fan Coil 2-Pipe Heat / Cool Fan Coil 60,000 BTUH Rev. 1.3 HVAC Guide Specifications Chilled and Hot Water Universal Mount Fan Coil 2-Pipe Nominal Size: 60,000

More information

F-SERIES: F SPECIFICATIONS Four-Fold Door Systems

F-SERIES: F SPECIFICATIONS Four-Fold Door Systems Version 5.22.13 F-SERIES: F100-600 SPECIFICATIONS Four-Fold Door Systems OPTIONS ARE IN BOLD, PLEASE MODIFY THESE AREAS AS NEEDED BASED ON YOUR PROJECT. CONSULT MANUFACTURER FOR ADDITIONAL OPTIONS OR MODIFICATIONS.

More information

SECTION HVAC INSTRUMENTATION AND CONTROLS INSTALLATION. (Applicable to IUPUI Only)

SECTION HVAC INSTRUMENTATION AND CONTROLS INSTALLATION. (Applicable to IUPUI Only) SECTION 15957 (Applicable to IUPUI Only) I. GENERAL A. NOTES 1. The University has a pre-purchase agreement (PPA) with Johnson Controls (JCI) and Siemens Building Technologies (SBT). The University will

More information

Special Specification 6292 Radar Vehicle Detection System for Signalized Intersection Control

Special Specification 6292 Radar Vehicle Detection System for Signalized Intersection Control Special Specification 6292 Radar Vehicle Detection System for Signalized Intersection Control 1. DESCRIPTION 2. MATERIALS Furnish, install, relocate, or remove radar vehicle detection systems (RVDS) of

More information

MV Product Specifications

MV Product Specifications MODULAR VARIABLE SPEED BLOWER CABINET 2, 3, 4, and 5 TONS FEATURES Variable Speed modular blower Supports two-stage outdoor units Dehumidification Speed: 80% Airflow Efficient low continuous fan selection:

More information

A. Product Data shall be provided for each type of product indicated.

A. Product Data shall be provided for each type of product indicated. 32 31 13 CHAIN LINK FENCES AND GATES SECTION 1 GENERAL 1.1 SUMMARY This Section includes the following: 1. Chain Link Fences 2. Gates for Chain Link Fences. See electrical specifications for electrical

More information

Request for Bids. At The Greenville-Spartanburg International Airport

Request for Bids. At The Greenville-Spartanburg International Airport Request for Bids At The Greenville-Spartanburg International Airport Addendum No. 2 June 27, 2011 All Bidders shall include with their bid submittal a signed statement indicating they have reviewed and

More information

Tate Access Floors, Inc. All Steel 1000 Access Floor Panel 600 mm Bolted Stringer Understructure System

Tate Access Floors, Inc. All Steel 1000 Access Floor Panel 600 mm Bolted Stringer Understructure System Tate Access Floors, Inc. All Steel 1000 Access Floor Panel 600 mm Bolted Stringer Understructure System SECTION 10270 PART 1 - GENERAL 1.1 Section Includes A. Work of this section includes, but is not

More information

Tate Access Floors, Inc. ConCore 1250 Access Floor Panel Bolted Stringer Understructure System

Tate Access Floors, Inc. ConCore 1250 Access Floor Panel Bolted Stringer Understructure System Notice: Tate Access Floors, Inc. ConCore 1250 Access Floor Panel Bolted Stringer Understructure System If you are using MasterFormat 2004 Edition, the proper section number to use is Section 09 69 00,

More information

Robert E. McMains Date Robert E. McMains Date

Robert E. McMains Date Robert E. McMains Date DESIGN AND CONSTRUCTION STANDARDS Title: Section 230923 Direct-Digital Control System for HVAC & Mechanical Author: Author: Date Active Version Distribution: Date Approved By: Approved By: Robert E. McMains

More information

SECTION HEAT TRACING FOR PLUMBING PIPING

SECTION HEAT TRACING FOR PLUMBING PIPING SECTION 22 05 33 HEAT TRACING FOR PLUMBING PIPING PART 1 - GENERAL 1.1 DESCRIPTION SPEC WRITER NOTES: 1. Delete between //----// if not applicable to project. Also delete any other item or paragraph not

More information

SECTION GROUNDING AND BONDING FOR ELECTRONIC SAFETY AND SECURITY

SECTION GROUNDING AND BONDING FOR ELECTRONIC SAFETY AND SECURITY PART 1 - GENERAL 1.1 DESCRIPTION SECTION 28 05 26 GROUNDING AND BONDING FOR ELECTRONIC SAFETY AND SECURITY SPEC WRITER NOTE: Delete // // if not applicable to project. Also delete any other item or paragraph

More information

HIGH MAST CAMERA POLE ASSEMBLY GENERAL

HIGH MAST CAMERA POLE ASSEMBLY GENERAL 10-3.24 HIGH MAST CAMERA POLE ASSEMBLY GENERAL The Contractor must furnish and install the following equipment for high mast camera pole assembly as described herein and as shown on the plans: 1. Camera

More information

SECTION ROTARY SCREW WATER CHILLERS

SECTION ROTARY SCREW WATER CHILLERS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Specification Sections, apply to this Section. B. Related Sections:

More information

A. Submit the following in addition to the standard requirements.

A. Submit the following in addition to the standard requirements. SECTION [13120] OMNIFLEX 300 MODULAR WALL SYSTEM SECTION 1 GENERAL 1.01 SECTION INCLUDES A. This Section specifies all requirements necessary to furnish and install a complete modular wall system including,

More information

Price Single Duct Terminal Units

Price Single Duct Terminal Units Price Single Duct Terminal Units Division 23 Heating, Ventilating, and Air Conditioning Section 23 36 00 Air Terminal Units The following specification is for a defined application. Price would be pleased

More information

SECTION [ ] COILING COUNTER DOORS. Display hidden notes to specifier. (Don't know how? Click Here)

SECTION [ ] COILING COUNTER DOORS. Display hidden notes to specifier. (Don't know how? Click Here) SECTION 08332 [08 33 13] COILING COUNTER DOORS Display hidden notes to specifier. (Don't know how? Click Here) PART 1 GENERAL 1.1 SECTION INCLUDES A. Coiling Metal Counter Doors. B. Coiling Metal Counter

More information

SECTION OUTLET, PULL, AND JUNCTION BOXES

SECTION OUTLET, PULL, AND JUNCTION BOXES SECTION 16131 OUTLET, PULL, AND JUNCTION BOXES PART 1 GENERAL 1.01 SUMMARY A. Related Sections: 1. 09900 - Painting. 2. 16112 - Raceways and Conduits. 1.02 SYSTEM DESCRIPTION A. Performance Requirements:

More information

SECTION (Master Template Final-05) ELECTRICAL BOXES. A. Provide boxes for electrical equipment and wiring devices as follows:

SECTION (Master Template Final-05) ELECTRICAL BOXES. A. Provide boxes for electrical equipment and wiring devices as follows: SECTION 16130 (Master Template Final-05) ELECTRICAL BOXES PART 1 GENERAL 1.01 SECTION INCLUDES A. Provide boxes for electrical equipment and wiring devices as follows: 1. Wall and ceiling outlet boxes.

More information

SECTION RADIO FREQUENCY SHIELDING ENCLOSURE RF Welded System

SECTION RADIO FREQUENCY SHIELDING ENCLOSURE RF Welded System SECTION 13096 RADIO FREQUENCY SHIELDING ENCLOSURE RF Welded System Prepared by: 90 Dayton Avenue, Unit 4B, Suite 13 Passaic, NJ 07055 (973) 574-9077 13096-1 RF WELDED SYSTEM PART 1 GENERAL 1.1 SECTION

More information

FABRICOIL BASIC January 10, 2006

FABRICOIL BASIC January 10, 2006 FABRICOIL BASIC January 10, 2006 General Notes: This guide specification document is provided by Raynor Door for use by design professionals in preparing project specification documents for FABRICOIL BASIC

More information

SECTION HVAC INSTRUMENTATION AND CONTROLS INSTALLATION

SECTION HVAC INSTRUMENTATION AND CONTROLS INSTALLATION I. GENERAL A. NOTES SECTION 15957 (Applicable to IUPUI Only) 1. The University has a pre-purchase agreement (PPA) with Johnson Controls (JCI) and Siemens Building Technologies (SBT). The University will

More information

SECTION VIBRATION ISOLATION

SECTION VIBRATION ISOLATION SECTION 15240 VIBRATION ISOLATION PART 1 GENERAL 1.01 SUMMARY A. Related Sections: 1. 15450 - Plumbing Equipment. 2. 15510 - Piping (HVAC). 3. 15515 Valves, Hangers, and Specialties. 4. 15540 - Pumping

More information

CONSTRUCTION REQUIREMENTS

CONSTRUCTION REQUIREMENTS CONSTRUCTION REQUIREMENTS Note: The buildings on the UCCS campus are divided into two categories: General Fund and Auxiliaries. General Fund Buildings include academic and administrative functions. Auxiliary

More information

ACBC Floor Mounted Active Beam

ACBC Floor Mounted Active Beam Floor Mounted Active Beam The Price Floor Mounted Active Beam,, is designed for occupant comfort. It provides high cooling and heating capacities while simultaneously supplying ventilation air from a DOAS

More information

SECTION LUMINAIRES AND ACCESSORIES

SECTION LUMINAIRES AND ACCESSORIES SECTION 16500 LUMINAIRES AND ACCESSORIES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. The general provisions of the contract including General and Special Conditions and General Requirements shall apply to

More information

SECTION LOW-VOLTAGE ELECTRICAL POWER CONDUCTORS AND CABLES (24 Volt AC/DC or Less)

SECTION LOW-VOLTAGE ELECTRICAL POWER CONDUCTORS AND CABLES (24 Volt AC/DC or Less) SECTION 260523 LOW-VOLTAGE ELECTRICAL POWER CONDUCTORS AND CABLES (24 Volt AC/DC or Less) PART 1 - GENERAL 1.1 SUMMARY A. Related Documents: 1. Drawings and general provisions of the Subcontract apply

More information

SUGGESTED SPECIFICATIONS Pump Frames through 64132

SUGGESTED SPECIFICATIONS Pump Frames through 64132 TYPE HBB - HORIZONTAL SOLIDS-HANDLING WASTEWATER PUMPS Pump Frames 44081 through 64132 GENERAL Furnish and install Horizontal Flexible Coupled Dry Pit Pumping Units complete with all accessories and appurtenances

More information

B. Polyethylene samples shall be submitted for Owner approval of color and quality.

B. Polyethylene samples shall be submitted for Owner approval of color and quality. Glass Rail ENGINEERED DASHERBOARD SPECIFICATIONS PART 1 - GENERAL 1.01 PROJECT SCOPE A. Contractor shall furnish and install one complete set of steel framed dasherboards as indicated on the drawings and

More information

SECTION MECHANICAL SPECIFICATION GRIT COLLECTION EQUIPMENT

SECTION MECHANICAL SPECIFICATION GRIT COLLECTION EQUIPMENT SECTION 11322 MECHANICAL SPECIFICATION GRIT COLLECTION EQUIPMENT PART 1 GENERAL 1.01 SCOPE There shall be furnished ( ) Grit Separator Mechanism(s) suitable for installation in (a) concrete tank(s) -ft.

More information

Pioneer Forced Draft Cooling Tower Specifications

Pioneer Forced Draft Cooling Tower Specifications Delta Cooling Towers, Inc. 41 Pine Street P.O. Box 315 Rockaway, New Jersey 07866-0315 Telephone 973.586.2201 Fax 973.586.2243 www.deltacooling.com sales@deltacooling.com Pioneer Forced Draft Cooling Tower

More information

Specification for MRL Passenger Elevators

Specification for MRL Passenger Elevators Specification for MRL Passenger Elevators Part 1 General 1.1 Description A. This specification is intended to cover the complete furnishing and installing of one MRL passenger elevator as manufactured

More information

OSU PROJECT NO PAGE 1 02 NOV 2006 SECTION SUPPORTS AND ANCHORS

OSU PROJECT NO PAGE 1 02 NOV 2006 SECTION SUPPORTS AND ANCHORS OSU PROJECT NO. 30-04-15 PAGE 1 PART 1 GENERAL 1.1 WORK INCLUDED A. Supports and anchors for piping systems and equipment. 1.2 RELATED WORK SPECIFIED ELSEWHERE A. The provisions of Section 15050, Basic

More information

B. Shop Drawings: For air terminal units. Include plans, elevations, sections, details, and attachments to other work.

B. Shop Drawings: For air terminal units. Include plans, elevations, sections, details, and attachments to other work. SECTION 233600 - PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Fan-powered air terminal units. 2. Shutoff, single-duct air terminal units. 1.2 PERFORMANCE REQUIREMENTS A. Structural Performance:

More information

SECTION CRL50 AND CRL51 HEAVY GLASS TOP HUNG SLIDING DOOR SYSTEMS

SECTION CRL50 AND CRL51 HEAVY GLASS TOP HUNG SLIDING DOOR SYSTEMS SECTION 08 32 20 CRL50 AND CRL51 HEAVY GLASS TOP HUNG SLIDING DOOR SYSTEMS Page 1 of 6 USE THIS SECTION WHEN SPECIFYING OVERHEAD SUPPORTED GLASS PANEL PARTITIONS. SECTION INCLUDES OVERHEAD TRACK ASSEMBLY,

More information

Air Cooled Condensing Units - Technical Catalog. Featuring Bitzer TM Compressors 404A and 507 Refrigerants

Air Cooled Condensing Units - Technical Catalog. Featuring Bitzer TM Compressors 404A and 507 Refrigerants N SERIES Air Cooled Condensing Units - Technical Catalog Featuring Bitzer TM s 404A and 507 Refrigerants 4492 Hunt St - Pryor, OK 74361-918.825.7222 - Fax 800.264.5329 - www.century-refrigeration.com Standard

More information

1. Vertical reciprocating conveyor, Hydraulic straddle VRC.

1. Vertical reciprocating conveyor, Hydraulic straddle VRC. PART 1: GENERAL 1.01 Section Includes: 1. Vertical reciprocating conveyor, Hydraulic straddle VRC. a. Machine, controller, platform, structural steel hoist frame. b. Wire mesh enclosure and gates. Related

More information

SECTION BASIC ELECTRICAL REQUIREMENTS

SECTION BASIC ELECTRICAL REQUIREMENTS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of Contract, including General and Supplementary Conditions, apply to work of this section. 1.2 SUMMARY A. This section specifies

More information

C. Concrete Inertia Bases: Drawings showing required concrete steel reinforcing, construction details, and dimensions.

C. Concrete Inertia Bases: Drawings showing required concrete steel reinforcing, construction details, and dimensions. 15240 VIBRATION ISOLATION ************************************************************************************************************* SPECIFIER: CSI MasterFormat 2004 number: 230548 An optional keynote

More information

Wilo MC Self Priming, Horizontal Multi-Stage, High Pressure Pumps. Engineering Specification

Wilo MC Self Priming, Horizontal Multi-Stage, High Pressure Pumps. Engineering Specification Wilo MC Self Priming, Horizontal Multi-Stage, High Pressure Pumps Engineering Specification PART 1 - GENERAL 1.1 SUMMARY A. Furnish and install horizontal multi-stage, high pressure, self priming pressure

More information

SECTION Manufactured Metal Casework FLEXIBLE LABORATORY FURNITURE SYSTEM (OPTIMA) USA VERSION

SECTION Manufactured Metal Casework FLEXIBLE LABORATORY FURNITURE SYSTEM (OPTIMA) USA VERSION SECTION 12 31 00.4 Manufactured Metal Casework FLEXIBLE LABORATORY FURNITURE SYSTEM (OPTIMA) USA VERSION PART 1 GENERAL Summary: This Specification identifies the minimum material and construction standards

More information

EFFICIENT 13 SEER 3 PHASE AIR CONDITIONER ENVIRONMENTALLY SOUND R 410A REFRIGERANT. Nominal Btu/hr. Min. Circuit Ampacity 18.

EFFICIENT 13 SEER 3 PHASE AIR CONDITIONER ENVIRONMENTALLY SOUND R 410A REFRIGERANT. Nominal Btu/hr. Min. Circuit Ampacity 18. ENVIRONMENTALLY SOUND REFRIGERANT H4A3 Product Specifications EFFICIENT 13 SEER 3 PHASE AIR CONDITIONER ENVIRONMENTALLY SOUND R 410A REFRIGERANT 3 THRU 5 TONS SPLIT SYSTEM 208 / 230 Volt, 3 phase, 60 Hz

More information

PRESTON HEALTH SERVICES ARCHITECT'S NO. 2700

PRESTON HEALTH SERVICES ARCHITECT'S NO. 2700 SECTION 09 5113 - ACOUSTICAL PANEL CEILINGS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification

More information

SECTION CHAIN-LINK FENCES AND GATES 02821/1

SECTION CHAIN-LINK FENCES AND GATES 02821/1 SECTION 02821 - CHAIN-LINK FENCES AND GATES 02821/1 PART 1 - GENERAL 1.1 SUMMARY A. This Section includes the following: 1. Chain-Link Fences: 2. Gates: horizontal slide or swing. 3. Fences installed where

More information

This guide can be used to prepare a specification for incorporating free standing jib cranes into a competitively bid construction project.

This guide can be used to prepare a specification for incorporating free standing jib cranes into a competitively bid construction project. SECTION 14651 FREE STANDING JIB CRANE ***** Gorbel, Inc. manufacturers a broad range of material handling cranes including monorail, bridge, gantry, and jib cranes. Numerous work station and industrial

More information

SECTION HANGERS AND SUPPORTS FOR PLUMBING

SECTION HANGERS AND SUPPORTS FOR PLUMBING SECTION 22 05 29 HANGERS AND SUPPORTS FOR PLUMBING PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division

More information

SECTION PACKAGE BOOSTER PUMP STATIONS

SECTION PACKAGE BOOSTER PUMP STATIONS SECTION 331223 PACKAGE BOOSTER PUMP STATIONS Scope: The Contractor shall install a pump station at two locations to be determined by the Owner. These pump stations shall be designed to deliver flow to

More information

MHWW-09-H-1 Chilled/Hot Water Hi-Wall Fan Coil. Heat / Cool Fan Coil 9,000 BTUH. Rev. 1.3

MHWW-09-H-1 Chilled/Hot Water Hi-Wall Fan Coil. Heat / Cool Fan Coil 9,000 BTUH. Rev. 1.3 MHWW-09-H-1 Chilled/Hot Water Hi-Wall Fan Coil Heat / Cool Fan Coil 9,000 BTUH Rev. 1.3 HVAC Guide Specifications Chilled and Hot Water Hi-Wall Fan Coil 2-Pipe Nominal Size: 9,000 BTUH Multiaqua Model

More information

VPL-3200B Residential Vertical Platform Lift Technical Specifications

VPL-3200B Residential Vertical Platform Lift Technical Specifications Page 1 of 5 VPL-3200B Residential Vertical Platform Lift Technical Specifications MODEL NUMBER: VPL-3200B Series: Models VPL-3210B, VPL-3212B and VPL-3214B (DC-powered units) U.S. F.D.A. CLASSIFICATION:

More information

SECTION NON-PENETRATING PORTABLE ROOFTOP SUPPORTS AND WALKWAYS. For best results, display hidden notes to specifier.

SECTION NON-PENETRATING PORTABLE ROOFTOP SUPPORTS AND WALKWAYS. For best results, display hidden notes to specifier. SECTION 15062 NON-PENETRATING PORTABLE ROOFTOP SUPPORTS AND WALKWAYS PART 1 GENERAL 1.1 SECTION INCLUDES For best results, display hidden notes to specifier. A. Portable, non-penetrating, rooftop support

More information

Trench Duct Class Catalog 5230CT9601R10/08

Trench Duct Class Catalog 5230CT9601R10/08 5230CT9601R10/08 2009 Class 5230 CONTENTS Application.................................................5 Unassembled Trench Duct Components.........................6 Factory Assembled Trench Duct..............................11

More information

Specification Lightning Protection Systems

Specification Lightning Protection Systems Specification Lightning Protection Systems General: Summary A) This Section specifies the lightning protection system for the building(s) or structure(s). This system provides safety for the building and

More information

University of Houston Master Construction Specifications Insert Project Name SECTION AIR DISTRIBUTION DEVICES PART 1 - GENERAL

University of Houston Master Construction Specifications Insert Project Name SECTION AIR DISTRIBUTION DEVICES PART 1 - GENERAL SECTION 23 37 13 - AIR DISTRIBUTION DEVICES PART 1 - GENERAL 1.1 RELATED DOCUMENTS: A. The Conditions of the Contract and applicable requirements of Division 1, "General Requirements", and Section 23 01

More information

NORTH HARRIS COUNTY REGIONAL WATER AUTHORITY PIPE HANGERS, Section PIPE HANGERS, SUPPORTS, AND RESTRAINTS

NORTH HARRIS COUNTY REGIONAL WATER AUTHORITY PIPE HANGERS, Section PIPE HANGERS, SUPPORTS, AND RESTRAINTS PART 1 GENERAL 1.01 SUMMARY Section 15140 PIPE HANGERS, This Section includes the furnishing and subsequent installation of: A. Pipe and equipment hangers, supports, and associated anchors B. Equipment

More information

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017 SECTION 12 2113 - LOUVER BLINDS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections,

More information

B. System Design and Performance Requirements

B. System Design and Performance Requirements 15625 Water Chillers This document provides design standards only, and is not intended for use, in whole or in part, as a specification. Do not copy this information verbatim in specifications or in notes

More information

FOUR FOLD DOORS-WITH SINGLE OVERHEAD MTD OPERATOR

FOUR FOLD DOORS-WITH SINGLE OVERHEAD MTD OPERATOR FOUR FOLD DOORS-WITH SINGLE OVERHEAD MTD OPERATOR Section 083713- Four Fold Doors- With Single Overhead Mounted Operator Part 1-General 1.1 Related Document: A. Drawing and general provisions of contract,

More information

Item 442 Metal for Structures

Item 442 Metal for Structures Item 442 Metal for Structures 1. DESCRIPTION 2. MATERIALS Provide structural steel, high-strength bolts, forgings, steel castings, iron castings, wrought iron, steel pipe and tubing, aluminum castings

More information

Revision 1 RAM ELEVATORS. Elevator Electrical Planning Guide. RAM Manufacturing Ltd

Revision 1 RAM ELEVATORS. Elevator Electrical Planning Guide. RAM Manufacturing Ltd RAM ELEVATORS Elevator Electrical Planning Guide This guide is intended for people with an understanding of electricity. If you are not, please consult a licensed electrician as errors in application of

More information

METERING INSTALLATION

METERING INSTALLATION 4.01 METERING SPECIFICATIONS METERING INSTALLATION Metering specifications will be issued to the customer by OPPD. Metering specifications are required before any work is started on all new wiring or additions

More information

SECTION INFLUENT EQUALIZATION TANK PUMPS

SECTION INFLUENT EQUALIZATION TANK PUMPS PART 1 GENERAL 1.01 SCOPE OF WORK A. The Contractor shall furnish and install all materials, labor and equipment to put into service the Influent Equalization Pumps in accordance with the Contract Drawings

More information

Power Electronics, Inc. Packaged Equipment Center Standard Construction and Design Features

Power Electronics, Inc. Packaged Equipment Center Standard Construction and Design Features DESIGN CRITERIA FOR STANDARD CONSTRUCTION: These standard design elements of the P.E.I. Power Equipment Center are utilized to meet the following design criteria per ASCE 7-05 as adopted by the IBC (International

More information

Price Egg Crate Grille

Price Egg Crate Grille Price Egg Crate Grille Division 23 Heating, Ventilating, and Air Conditioning Section 23 37 13 Diffusers, Registers, and Grilles The following specification is for a defined application. Price would be

More information

SECTION 16496A MTS MANUAL TRANSFER SWITCH (MANUAL CONTROL ONLY) Note to Spec Writer: { } Denotes EATON Feature reference number

SECTION 16496A MTS MANUAL TRANSFER SWITCH (MANUAL CONTROL ONLY) Note to Spec Writer: { } Denotes EATON Feature reference number MTS MANUAL TRANSFER SWITCH (MANUAL CONTROL ONLY) Note to Spec Writer: { } Denotes EATON Feature reference number PART 1 GENERAL 01 02 03 04 SCOPE Furnish and install Manual Transfer Switches (MTS) and

More information

GLASSWALL SPECIFICATIONS

GLASSWALL SPECIFICATIONS GLASSWALL SPECIFICATIONS Series GL Paired, Glass Panels PRODUCT OVERVIEW: Top Supported Center Stack Paired Panels Manually Operated Maximum Opening Height: 0' 5 [3.m] Maximum Opening Width: Unlimited

More information

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017 SECTION 26 0526 - GROUNDING AND BONDING FOR ELECTRICAL SYSTEMS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions

More information

ASPT Series. Multi-Position, Multi-Speed, ECM-Based Air Handler with Internal TXV 1½ to 5 Tons. Contents. Product Features

ASPT Series. Multi-Position, Multi-Speed, ECM-Based Air Handler with Internal TXV 1½ to 5 Tons. Contents. Product Features Series Multi-Position, Multi-Speed, ECM-Based Air Handler with Internal TXV ½ to Tons Contents Air Handler Nomenclature... Heater Kit Nomenclature... Product Specifications... Dimensions... Airflow Data...

More information

UNDERFLOOR DISTRIBUTION PRODUCTS UFAD

UNDERFLOOR DISTRIBUTION PRODUCTS UFAD PRODUCTS Round Diffusers Rectangular Diffusers Segmented Linear Diffuser Continuous Linear Plenum Power Supply Module Extruded Aluminum Grille Perimeter Heat/Cool Convector System Airflow Panel UNDERFLOOR

More information

MODELS: SM & SMSS

MODELS: SM & SMSS Most Dependable Fountains, Inc. OPERATIONS MANUAL MODELS: 410-18 SM & 410-18 SMSS Most Dependable Fountains, Inc 5705 Commander Drive Arlington, TN 38002 800-552-6331 FOUNTAINS, MOST DEPENDABLE FOUNTAINS,

More information

ITEM L-119 AIRPORT OBSTRUCTION LIGHTS DESCRIPTION

ITEM L-119 AIRPORT OBSTRUCTION LIGHTS DESCRIPTION SECTION 74 AIRPORT OBSTRUCTION LIGHTS (FAA L-119) 74-1 GENERAL The Contractor shall perform all work required by the plans and specifications for construction of obstruction lights in accordance with the

More information

A. This Section includes acoustical panel ceilings installed with exposed suspension systems.

A. This Section includes acoustical panel ceilings installed with exposed suspension systems. SECTION 09511 ACOUSTICAL PANEL CEILINGS PART 1 - GENERAL 1.01 RELATED DOCUMENTS A. Drawings and general provisions of Contract, including General and Supplementary Conditions and Division 1 Specification

More information

GUIDE SPECIFICATION EXETER VERSA SHIELD SECURITY SCREEN SYSTEM

GUIDE SPECIFICATION EXETER VERSA SHIELD SECURITY SCREEN SYSTEM 1 GUIDE SPECIFICATION EXETER VERSA SHIELD SECURITY SCREEN SYSTEM 1.01 WORK INCLUDED PART 1: GENERAL A. Provide for all labor, equipment, materials, and services to furnish and install VERSA SHIELD Window

More information

GENERAL PROVISIONS: Furnish and install one steel platform motor truck scale and associated electronic controls.

GENERAL PROVISIONS: Furnish and install one steel platform motor truck scale and associated electronic controls. GENERAL PROVISIONS: Furnish and install one steel platform motor truck scale and associated electronic controls. The scale shall have a clear and unobstructed weighing surface of not less than 70 feet

More information

SST-II HYDRAULIC BI-FOLD SPECIFICATIONS

SST-II HYDRAULIC BI-FOLD SPECIFICATIONS PART 1 GENERAL 1.01 DESCRIPTION A. General 1. Furnish SST-II Hydraulic Bi-Fold System complete from one manufacturer. Provide all labor, materials, tools and equipment to furnish the SST-II Bi-Fold System

More information

SECTION 1101 TRAFFIC SIGNALS AND APPURTENANCES END OF SECTION

SECTION 1101 TRAFFIC SIGNALS AND APPURTENANCES END OF SECTION SECTION 1101 SIGNALS AND APPURTENANCES PART 1 GENERAL 1.4 SUBMITTALS E. Submit warranty for all supplied material and workmanship for a period of two years from final acceptance. The warranty must state

More information

SECTION ALUMINUM GATES

SECTION ALUMINUM GATES P.O. Box 1058 370 South Athol Rd. Athol, Massachusetts 01331 Phone: (978) 249-7924 Fax: (978) 249-3072 SECTION ALUMINUM GATES PART 1 GENERAL 1.01 SCOPE OF WORK A. The CONTRACTOR shall furnish all labor,

More information

FORM HEADWALL. FORM HEADWALL (floor mount) (floor mount) Installation Manual

FORM HEADWALL. FORM HEADWALL (floor mount) (floor mount) Installation Manual FORM HEADWALL (floor mount) Installation Manual FORM HEADWALL (floor mount) OVERVIEW The Form is a UL-listed configurable headwall system. This system includes multiple horizontal equipment channels integrated

More information

SECTION AIR DUCT CLEANING

SECTION AIR DUCT CLEANING PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Specification Sections, apply to this Section. B. Related Sections:

More information

SECTION ELEVATED BLEACHERS (Angle Frame Semi-Closed Deck)

SECTION ELEVATED BLEACHERS (Angle Frame Semi-Closed Deck) SECTION 13125 ELEVATED BLEACHERS (Angle Frame Semi-Closed Deck) PART 1 GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and

More information

Design Standard Conduit for Electrical Systems

Design Standard Conduit for Electrical Systems Design Standard Purpose: This design standard has the purpose of creating a consistent application for the installation of conduits throughout the East Side Union High School District, therefore achieving

More information

FORM HEADWALL. FORM HEADWALL (floating) (floating) Installation Manual

FORM HEADWALL. FORM HEADWALL (floating) (floating) Installation Manual FORM HEADWALL (floating) Installation Manual FORM HEADWALL (floating) OVERVIEW The Form is a UL-listed configurable headwall system. This system includes multiple horizontal equipment channels integrated

More information

1.2 DEFINITIONS, REFERENCES, AND OVERALL STANDARDS Follow 07500

1.2 DEFINITIONS, REFERENCES, AND OVERALL STANDARDS Follow 07500 07721 ROOF ASSEMBLY SUPPORTS FOR ROOFTOP EQUIPMENT ****************************************** SPECIFIER: All roof-related items above or outside the structural roof deck, including such work as blocking,

More information

Introduction. Disclaimer. Table of contents

Introduction. Disclaimer. Table of contents Updated July 18, 2012 Introduction The Cambridge Elevating Limited-Use / Limited-Application Elevator is designed to service schools, libraries, low rise, low occupancy commercial buildings, churches and

More information

Mechatronics Courses by School Period

Mechatronics Courses by School Period Mechatronics Courses by School Period Year One P1 P1 P2 P3 P3 P3 P4 P4 P4 Integrated Systems Industrial Math (Geometry, Trig, Algebra,) Blueprint Reading Machine Tool I (Hand tools-measuring-saws & Drill

More information

Attachment 1: RAE Corporation Technical Specification

Attachment 1: RAE Corporation Technical Specification Attachment 1: RAE Corporation Technical Specification RAE Corporation Phone: 918-825-7222, ext. 105 Steve Corbin Quote# XXXX Qty Customer Tag Technical Systems Model Number 1 ACC-4 10A0-162-S General Scope

More information

DESIGN GUIDELINES WIRING AND CONDUITS PAGE 1 of 7

DESIGN GUIDELINES WIRING AND CONDUITS PAGE 1 of 7 DESIGN GUIDELINES WIRING AND CONDUITS PAGE 1 of 7 1.1. REFERENCE STANDARDS 1.1.1. Publications listed below (including amendments, addenda, revisions, supplements and errata) form a part of this specification

More information

2003 International Residential Code ELECTRICAL PROVISIONS ONLY October 2005 EDITORIAL CHANGES SEVENTH PRINTING

2003 International Residential Code ELECTRICAL PROVISIONS ONLY October 2005 EDITORIAL CHANGES SEVENTH PRINTING 2003 International Residential Code ELECTRICAL PROVISIONS ONLY October 2005 EDITORIAL CHANGES SEVENTH PRINTING E3305.3: now reads The space equal to the width and depth of the panelboard and extending

More information