1 University Campus Perspective; C/D Materials Reuse and Recycling Prepared by Sarah Myers and BJ Tipton
2 The campus perspective Residence halls Houses Restaurants & dining halls Medical clinics and hospital Office buildings Classrooms Science research labs Retail stores Facilities maintenance shops Service station Theatres Indoor and outdoor stadiums Performance halls Power plant & cooling towers Museum Planetarium
3 UNC Chapel Hill One of 16 schools in the North Carolina state system 26,800 students; 8,000 on-campus residents 3,100 faculty and 5,000 staff members $500 million bond ($1.5 billion total) Master plan process Square feet 6.5 million in construction or design 4.5 million remaining
4 Before After! Renovation of existing buildings Demolition of existing buildings Construction of new buildings
5 All Active Capital Projects by Title
6 Active Construction Projects by Title
7 Pieces of the capital project puzzle Design Stages (review at each phase!) Schematic Design Development Construction Documents (Bid Documents) Construction Abatement Demolition New Construction/Renovation At UNC, a design manager works with the architect/design firm until the project goes into construction. Once in construction, a UNC construction manager becomes the university point of contact for the project.
8 Stakeholders and participants UNC Occupants, Board of Trustees, and Town Design Manager (until construction starts) Construction Manager Environment, Health and Safety Office of Waste Reduction and Recycling Facilities Maintenance Shops (salvage) Architect/Design Firm Construction Manager at Risk Abatement Contractors Contactors and their subs County solid waste officials (local regulations) Surplus, non-profits and salvage firms
9
10 Hierarchy - Salvage Reuse in project Reuse on campus Reuse elsewhere Recycle Reuse in project Reuse on campus Source separation MRF Movables Building components Fixtures Landfill Construction and demolition Land clearing and inert debris Hole in someone s field or gravel quarry!
11 Determine what can be reused, salvaged, or recycled during design: Walkthroughs Inventory Project Documents (drawings and specs)
12 Project specific list shown in documents (specifications and drawings): Required by law (RRMO, NC) Required for the project (ceiling tile, concrete) Suggested (markets are there, but iffy) Selective demolition Material or item-specific specifications Slate, ceiling tile, brick
13 Meetings: Pre-bid Pre-construction Solid waste planning meeting Progress and follow up Site inspections Planning and implementation: Draft plan Final plan
14 Documentation Monthly solid waste management plan reporting Selective demolition reporting Project close-out reporting LEED documentation
15 Case studies Movable Fixtures Building structure components
16 Movable Asset Salvage 120 student desks to an Emerson Waldorf school 250 student desks to the Nash County Boys/Girls club Stacking chairs to the Zen Center.
17 Movable Asset Salvage - This ain t your granny s attic it s worse. Biology building with a packrat facilities manager Animal skeletons, trunk of mounted birds Chairs, table, autoclaves, equipment, A/V carts Surplus sold all they could get but there s a lot they didn t get at all.
18 This is what happens when there s no plan hundreds of beds end up in a pile, and then the dumpster. And our office pays the bill.
19 Fixed Asset Salvage 211 units of library shelving to schools and libraries 300 seats from Memorial Hall to a community theater An Emerson Waldorf school filled a 24 ft. truck with wall cabinets, bookshelves, chalkboards, and projector screens.
20 Fixed Asset Salvage Chase Dining facility demolition Consultants were supposed to handle the situation. Ended up having a last-minute scramble.
21 Fixed Asset Salvage Chase Surplus moved 20 truckloads and received an additional 2 semis full of equipment, fixtures, and dishes. Surplus retail store estimates sales to date of approximately $8,000. Abatement contractor not having to deal with equipment = priceless.
22 Building Components SALVAGE Slate roofing tiles Flooring RECYCLING Metal Ceiling tiles Concrete, brick, masonry
23 Building Component Salvage Woolen Gym 30K sq ft went to a salvage company. They sold some, and are turning the rest into tables, plaques, and bar stools. They are selling them as official memorabilia. Habitat for Humanity got 5K sq ft and made $10,000 on it. Small portion reused on campus.
24 Building Component Salvage Phillips Hall Roof Purchased 26 squares out of nearly 90% of the existing slate was reused. New slate - $200 per square* Reused slate - $65 per square* (includes labor to salvage) Reuse saved $63,500 in material purchases $300 - $2,000 saved in averted tip fees. *According to estimates in the design phase
25 Source Separation Peabody 380 tons total debris 150 tons diverted 40% recycling rate* Materials recycled include: metals (ductwork) ceiling tile drywall brick/block/porcelain Project Supt. attests that he increased his profit margin by recycling.
26 Source Separation Chase Dining Hall 84% landfilled ouch! Triple the normal amount of rebar. Contractor tried to crush on site by picking up concrete and dropping it. Demo started 2 months behind schedule and critical path items were waiting on demo completion.
27 Material Recovery Facility Manning Steam Tunnel ph. 2B, 9/05 (estimated) 2.8 tons wood 3.45 tons metal 1.0 tons concrete 0.9 tons cardboard 0.5 tons plastic 5.6 tons landfill 61% diverted from landfill
28 Problems encountered: Getting buy-in and understanding of the big picture Reporting Getting information. When we need it In a consistent format across projects Reliable information (matching weight tickets to the job) Accuracy (volume to weight conversion) Compiling and analyzing data Timing Can t delay the project Small window of opportunity Schedules shift Labor for salvage
29 Where do we go from here? Solid waste management team Architects UNC design and construction managers Office of Waste Reduction and Recycling Solid waste consultant (assessments, coordination, markets) Contractors Joint goal setting (buy-in) Standard pre-qualifications for demo contractors Better communication when problems arise Accountability for reporting Compiling the numbers! Analyze Publicize Come up with a plan
30 Sarah Myers (919) BJ Tipton (919)
31 Office of Waste Reduction and Recycling: 8 full time staff, 1 temp, 1 student employee, 1 volunteer Operations staff = 4 Office Manager Recycling and Education Coordinator Construction Waste Specialist Program Manager Recycled % Trash %
Venable Hall Demolition recycling and waste management
UNC Chapel Hill Venable Hall Demolition recycling and waste management Planning: June 2004 July 2007 Decommission/demolition: August 2007 January 2008 Prepared by Sarah Myers January 9, 2009 Venable Hall
More informationGet the Green Edge. Construction/Demolition Recycling for a Competitive Advantage
Get the Green Edge Construction/Demolition Recycling for a Competitive Advantage Presented by the UNC Office for Historically Underutilized Businesses (HUB) and the UNC Office of Waste Reduction and Recycling
More informationCONSTRUCTION WASTE MANAGEMENT PLAN
CONSTRUCTION WASTE MANAGEMENT PLAN Project: Construction Manager: Location: Prepared by: PREMIER FACILITY MANAGEMENT (PFM) Date: I. OBJECTIVES The objectives of this plan are to: 1. Recycle, reuse or salvage
More informationDUKE UNIVERSITY CONSTRUCTION & DESIGN STANDARDS
1 01 74 00 Cleaning and Waste Management 1. Introduction The University, Durham County, and North Carolina are committed to reducing waste and the use of landfills. Waste reduction and recycling practices
More informationConstruction Waste Management Plan (CWMP)
Construction Waste Management Plan (CWMP) Section 4.408.1 and Section 5.408.1 of the 2010 California Green Building Standards requires at least 50% of non-hazardous construction debris is recycled and/or
More informationSolid Waste Trend Report Annual Summary (includes June info)
2008-2009 Solid Waste Trend Report Annual Summary (includes June info) Good news! We set a record low for tons landfilled. The amount landfilled this year is the lowest it has been since we started measuring
More informationCITY OF RIO VISTA Construction and Demolition Waste Management Plan and Disposal Report
WMP / RECYCLING Applicant CITY OF RIO VISTA Construction and Demolition Waste Management Plan and Disposal Report Address, City, Zip Phone Number Contractor License Number Construction Type Job Address
More informationAlameda County Waste Management Authority Model Specification Update March 2004 SECTION CONSTRUCTION AND DEMOLITION WASTE MANAGEMENT
SECTION 01505 CONSTRUCTION AND DEMOLITION WASTE MANAGEMENT 1.01 SUMMARY A. Section specifies diversion of construction and demolition (non-hazardous) debris from landfill. B. Related requirements specified
More informationManagement of Construction and Demolition Debris
CAPCOG C&D Summit Management of Construction and Demolition Debris Presented By: Seth Cunningham May 6, 2009 Presentation Overview Provide overview of C&D management Provide examples of C&D management
More information1. Have you attached a copy of the site plan including the location and design of the recycling and trash enclosure(s)? X Yes No (4.1 4.
City of Redlands Municipal Utilities Department SITE AND BUILDING RECYCLING PLAN Please answer the following questions: Bldg./Demo Permit No. Approved Not Approved Project Address: Name of Project Manager:
More informationFredonia Space & Furniture, Fixtures & Equipment (FF&E) Definition
Fredonia Space & Furniture, Fixtures & (FF&E) s General Space s Classroom: Classroom Service: Classroom Lab: Classroom Lab Service: Computer Labs: A room or space that is used primarily for scheduled instructions
More informationConstruction & Demolition (C&D) Waste Diversion in California
Construction & Demolition (C&D) Waste Diversion in California Dan Burgoyne Sustainability Manager State of California Department of General Services (DGS) 1 New Motivation to Recycle in California 2 C
More informationConstruction and Demolition Waste Management at UVM
Construction and Demolition Waste Management at UVM Definition of C&D Waste Waste material that is produced in the process of construction, renovation, or demolition of structures. Structures include buildings
More informationUniversity of Illinois Business Instructional Facility LEED Gold Design. University of Illinois. University of Illinois
Keys to success: Sustainable design strategies included early. Clear and early benchmarking choice. Integrated design process. Consensus building. Keys to success: Sustainable design strategies considered
More informationConstruction and Demolition (C&D) Debris Re-use and Recycling Program
City of Agoura Hills, 30001 Ladyface Ct., Agoura Hills California Construction and Demolition (C&D) Debris Re-use and Recycling Program What is the Construction and Demolition Debris Re-use and Recycling
More informationManaging and Administering an Indoor Recycling Contract: Implementing Performance Measures for Better Results. Amy Preble
Managing and Administering an Indoor Recycling Contract: Implementing Performance Measures for Better Results Amy Preble UNC Office of Waste Reduction and Recycling Services and History Then: Student and
More informationDemolition Waste Management Plan Guidelines
Demolition Waste Management Plan Guidelines A resource for Western Australian Local Government, Developers, Property Owners and Demolition Contractors Contents 1 Introduction... 2 2 Project Planning...
More informationSt. Monica Food Pantry Construction Waste Management and Disposal SBA-13105
St. Monica Food Pantry 01 7419-1 SECTION 01 7419 - CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL PART 1 - GENERAL 1.1 SUMMARY: A. Work of this section includes administrative and procedural requirements for
More informationConstruction & Demolition Materials Research Project
Construction & Demolition Materials Research Project Sara Graham, ReSource St. Louis Allison Carmen, Material Mix This project is supported by the St. Louis-Jefferson Solid Waste Management District and
More informationCONSTRUCTION AND DEMOLITION (C&D) DIVERSION REQUIREMENTS
CONSTRUCTION AND DEMOLITION (C&D) DIVERSION REQUIREMENTS Salinas Municipal Code 9-4.1 requires all Construction and Demolition (C&D) projects within the City to divert at least 50% of the C&D debris and
More informationSECTION CONSTRUCTION WASTE MANAGEMENT. 1. Section Sustainable Project Requirements. 2. Section Temporary Facilities and Controls.
Buchtel/Perldns Community Learning Center GPD 2007271.15 OSFC Project # 55-7110-9029425 Phase 3 CLC Package Bidding Documents July 1, 2010 PART 1- GENERAL 1.1 SUMMARY SECTION 01524 CONSTRUCTION WASTE MANAGEMENT
More informationCalifornia State University, Chico Campus Conservation Committee
CSU, Chico established the Campus Conservation Committee (CCC) in August 2000 to review the university s waste management procedures and to make recommendations to campus administration on ways to further
More informationConstruction Waste Management
Best Practices for an Environmentally Optimized Job Site Photo: courtesty turner Construction Waste Management Learning Objectives After completing this course, you will be able to: Describe waste recycling
More informationAPPA AWARD SUBMISSION UNC Charlotte
APPA AWARD SUBMISSION UNC Charlotte Construction and Demolition Waste Management Program STATEMENT OF PROGRAM/PRACTICE: The University of North Carolina at Charlotte is the 4 th largest university in the
More informationConstruction & Demolition Recycling Program Building Contractor s Resource Guide & FAQ s (Revised December 2016)
Construction & Demolition Recycling Program Building Contractor s Resource Guide & FAQ s (Revised December 2016) Table of Contents Frequently Asked Questions 3 List of Organizations & Agencies....7 List
More informationWho we are: Multidisciplinary team of 20 FTE, including urban planners, civil engineers, economists, scientists, architects, LEED APs, GIS.
Founded in 1998 to work at the nexus of environmental sustainability and economic development. Who we are: Multidisciplinary team of 20 FTE, including urban planners, civil engineers, economists, scientists,
More informationCity of South San Francisco Construction and Demolition Waste Management Plan Information for the Applicants
City of South San Francisco Construction and Demolition Waste Management Plan Information for the Applicants General The City of South San Francisco is mandated by the State of California to divert 65
More informationSAVE YOURSELF TIME AND MONEY! PLEASE READ THE FOLLOWING INFORMATION:
TOWN OF SURFSIDE BEACH, SC SUBSTANTIAL IMPROVEMENT NOTICE TO PROPERTY OWNERS Rebuilding your Home or Non-residential structure after the storm? Adding on, renovating, or remodeling your home or business?
More informationCity of Tustin Construction and Demolition Debris Recycling Requirements
City of Tustin Construction and Demolition Debris Recycling Requirements The California Green Building Standards Code requires project applicants to recycle or divert from landfills at least 65% of the
More informationRECYCLERS OF THE YEAR: MECKLENBURG COUNTY RECOGNIZES ORGANIZATIONS FOR WASTE-CUTTING PROGRAMS
May 15, 2009 FOR IMMEDIATE RELEASE RECYCLERS OF THE YEAR: MECKLENBURG COUNTY RECOGNIZES ORGANIZATIONS FOR WASTE-CUTTING PROGRAMS Charlotte, N.C. A wide variety of businesses and organizations, and three
More informationWASTE MANAGEMENT & DIVERSION GUIDE
WASTE MANAGEMENT & DIVERSION GUIDE General Services/City Clerk s Department 34272 Yucaipa Blvd. Yucaipa, CA 92399 909/797-2489 0 Waste Management & Diversion Plan Chart Phase 1 Applicant submits initial
More informationGRC 20 th Annual Conference
Salvaging Recycling, New Developments in Construction and Demolition Materials Andy Lake CSI NDA CMRA Recycling Infrastructure Process Specialist ABP Technology Armstrong World Industries GRC 20 th Annual
More informationORDINANCE NO. IT IS ORDAINED by the City Council of the City of San Carlos as follows:
ORDINANCE NO. ORDINANCE OF THE CITY OF SAN CARLOS AMENDING THE SAN CARLOS MUNICIPAL CODE, ADDING CHAPTER 8.05 RELATING TO RECYCLING AND DIVERSION OF CONSTRUCTION AND DEMOLITION DEBRIS IT IS ORDAINED by
More informationBusiness Models for Deconstruction and Building Materials Salvage
Business Models for Deconstruction and Building Materials Salvage Sponsored by Yale University February 2, 2010 1 Why Salvage Building Materials? 2 Improves the Environment 3 Saves Embodied Energy 4 Provides
More information- SUPPLEMENT HISTORY TABLE Title 15 - BUILDINGS AND CONSTRUCTION. Chapter RECYCLING AND DIVERSION OF CONSTRUCTION AND DEMOLITION DEBRIS
Chapter 15.56 RECYCLING AND DIVERSION OF CONSTRUCTION AND DEMOLITION DEBRIS Sections: 15.56.010 Findings and purpose. 15.56.020 Definitions. 15.56.030 Deconstruction Salvage Recovery. 15.56.040 Diversion
More informationAPPENDIX B FF&E RESPONSIBILITY MATRIX
APPENDIX B FF&E RESPONSIBILITY MATRIX The -Build Contractor () shall work with the Government and be responsible for the development of the Furniture, Fixtures and Equipment (FF&E) Plan and Schedule for
More informationDECONSTRUCTION OPPORTUNITIES FOR SALVAGE, REUSE & RECYCLING. Northeast Recycling Council Inc. Spring Conference EPA Region III, March 2006.
DECONSTRUCTION OPPORTUNITIES FOR SALVAGE, REUSE & RECYCLING Northeast Recycling Council Inc. Spring Conference EPA Region III, March 2006 Tom Napier Construction Engineering Research Laboratory Champaign,
More informationSalt Lake City Corporation CONSTRUCTION AND DEMOLITION WASTE MANAGEMENT PLAN
Salt Lake City Corporation CONSTRUCTION AND DEMOLITION WASTE MANAGEMENT PLAN Date submitted: Date received: Date Approved: REQUIREMENT A Construction Waste Management Plan documenting how 55% or more of
More informationRecover Your Resources. Reduce, Reuse, and Recycle Construction and Demolition Materials at Land Revitalization Projects
Recover Your Resources Reduce, Reuse, and Recycle Construction and Demolition Materials at Land Revitalization Projects What s in Your Dumpster? Don t waste your resources Sustainable reuse of brownfield
More informationSECTION DEMOLITION WASTE MANAGEMENT AND DISPOSAL
SECTION 017418 PART 1 - GENERAL 1.01 GENERAL REQUIREMENTS A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION. B. Examine all conditions as they exist at the project prior to submitting
More informationAPPENDIX B CONSTRUCTION WASTE MANAGEMENT SAMPLE SPECIFICATION
APPENDIX B CONSTRUCTION WASTE MANAGEMENT SAMPLE SPECIFICATION The following appendix includes information and standard drawings that are diagrammatic and are used only to convey intent. Construction Waste
More informationConstruction / Demolition (C&D) Recycling Program
Construction / Demolition (C&D) Recycling Program The State of California requires that all cities in the State divert at least 65% of its waste materials from landfills (AB 939). The City of Stockton
More informationMichael J. Talbert Hazen and Sawyer, P.C WestChase Blvd. Raleigh, NC (919)
~ Preparation of Solid Waste Management Plans at Military Installations Michael J. Talbert Hazen and Sawyer, P.C. 411 WestChase Blvd. Raleigh, NC 2767 (919) 833-7152 Completion of solid waste management
More informationEstablishing a Green Deconstruction Project. Presenter: Barry J. Franz, PE, BCEE, PG, CP (119) Environmental Director
Establishing a Green Deconstruction Project Presenter: Barry J. Franz, PE, BCEE, PG, CP (119) Environmental Director Objectives of Presentation Define green deconstruction. Provide background for green
More informationClemson, South Carolina Public, land-grant university Established 1889 Current FTE: 26,000 10,000 Acres 3M Cleanable FT2 of building space
Clemson, South Carolina Public, land-grant university Established 1889 Current FTE: 26,000 10,000 Acres 3M Cleanable FT2 of building space Waste & Recycling Services Primarily managed in-house Exceptions:
More informationCITY OF ALISO VIEJO CONSTRUCTION AND DEMOLITION DOCUMENTATION
CITY OF ALISO VIEJO CONSTRUCTION AND DEMOLITION DOCUMENTATION This document includes the following: Section I: Construction and Demolition Recycling Requirements... Page 1 Section II: Compliance Form..Page
More informationRebuilding your Home after the storm? Adding on, renovating, or remodeling your home? Here's information YOU need to know about the 50% Rule.
FEMA 50% RULE - SUBSTANTIAL IMPROVEMENT SUBSTANTIAL IMPROVEMENT/DAMAGE Z101-0410 NOTICE TO PROPERTY OWNERS Rebuilding your Home after the storm? Adding on, renovating, or remodeling your home? Here's information
More informationCONSTRUCTION AND DEMOLITION (C & D) Waste Management Plan Form:
CONSTRUCTION AND DEMOLITION (C & D) Waste Management Plan Form: Please complete and submit this form with your building permit application. 80% of all demolition and construction material must be recycled.
More informationAmerican Association of Port Authorities 2010 Environmental Enhancement Award Demolition Program Port of Tacoma
American Association of Port Authorities 2010 Environmental Enhancement Award Demolition Program Port of Tacoma Sue Mauermann Port of Tacoma Acting Chief Sustainable Development Officer April 30, 2010
More informationSECTION CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL. A. This Section includes administrative and procedural requirements for the following:
SECTION 017419 - CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and
More informationConstruction and Demolition Diversion Capacity Study for Hennepin County
Construction and Demolition Diversion Capacity Study for Hennepin County Sustainable Practices for Minimizing Demolition Waste Solid Waste Management Coordinating Board Workshop March 31, 2017 Purpose
More informationTITLE I SWA CODE DEFINITION OF TERMS
TITLE I Chapter 1.01 SWA CODE DEFINITION OF TERMS 1.01.010 Definitions. Unless the context otherwise requires, the definitions set forth in this chapter shall govern the interpretation of this code. Administrative
More informationConstruction Waste Minimization and Reuse Management
Construction Waste Minimization and Reuse Management Mr.M.KalilurRahman 1, Mr.S.S.Janagan 2 1 Student M.E., (CE&M), Gnanamani College of Engineering, Namakkal-637018, Tamilnadu, India 2 Assistant Prof,
More informationConstruction and Demolition Material Recovery Facility Feasibility Study
FINAL REPORT North Central Texas Council of Governments Construction and Demolition Material Recovery Facility Feasibility Study AUGUST 2007 This study was funded through a solid waste management grant
More informationSANTA ANA COLLEGE FACILITIES COMMITTEE MEETING OCTOBER 18, 2016
FACILITIES COMMITTEE MEETING OCTOBER 18, 2016 1 ACTIVE PROJECTS Santa Ana College Central Plant, Infrastructure and Mechanical Upgrades 2 COMPLETED PROJECTS Santa Ana College Perimeter Site Improvements
More informationA study on construction and demolition wastes from buildings in Seberang Perai
A study on construction and demolition wastes from buildings in Seberang Perai Faridah A.H.Asaari 1, Hasmanie Bt Abdul Halim 2, M Hasnain Isa 1 1 School Of Civil Engineering, Engineering Campus, Universiti
More informationNorth Carolina State University Harrelson Hall Demolition. American Council of Engineering Companies of North Carolina. Engineering Excellence Awards
American Council of Engineering Companies of North Carolina 2019 Submitted by: October 2018 Project Summary Harrelson Hall was a four-story reinforced concrete structure located in the central part of
More informationOconee County Solid Waste
C&D DEBRIS GUIDEBOOK Oconee County Solid Waste Roughly 80% of a home builder s waste stream is recyclable, and contractors are partially liable for waste generated at jobsites. Date: 07/01/04 Waste Generation
More informationLEED Analysis of the Knight Management Center. Energy & Atmosphere. Materials & Resources
LEED of the Knight Management Center Energy & Atmosphere Materials & Resources Energy & Atmosphere: 17 possible points LEED-NC Scorecard LEED for New Construction v2.2 Registered Project Checklist Project
More informationAppendix M-2 Example Specification Language for Construction Waste Management
The State of Minnesota Sustainable Building Guidelines Version 2.1 Appendix M-2 Example Specification Language for Construction Waste Management The following pages show example language that may be of
More information/ Policy Number: Policy Name: Capital Planning and Development Processes Definitions
Page 1 7-101 Definition A. Alternative Construction Delivery Methods: Building Delivery Processes that vary from the more standard Design-Bid-Build model. These may include Construction Manager-At-Risk
More informationJoin. movement. the. by James R. Kirby, AIA
Join movement the by James R. Kirby, AIA 10 The sustainability movement is a driving force for change not only in society but in the construction industry, as well. And one important aspect of sustainability
More informationConstruction and Demolition Material Recycling Program
Construction and Demolition Material Recycling Program WMAC Meeting June 26, 2012 Purpose As part of the Waste Management Advisory Committee s (WMAC) defined role and associated task/project document:
More informationConstruction and Demolition (C&D) Waste Management Plan Program Requirements
Construction and Demolition (C&D) Waste Management Plan Program Requirements The State of California requires that all cities in the State divert at least 65% of its waste materials from landfills (AB
More informationMcCollum Hall Classroom Renovation Project Profile LEED-CI Gold, August 2007
Project Highlights McCollum Hall Classroom Renovation Project Profile LEED-CI Gold, August 2007 > 42.7% reduction in potable water usage achieved with high-efficiency low-flow fixtures > 94.6% of the construction
More informationHIDDEN VALLEY ELEMENTARY SCHOOL
SCHOOL DATA Address: 3435 Bonita Vista Santa Rosa, CA 95404 Established: 975 Permanent Classrooms: 29 Portable Classrooms: 8 Building Area: Site Area: Satellite Building Area: Satellite Site Area: 48,802
More informationA. IEMA ten day notification for demolition provisions as necessary. C. IEPA Uncontaminated Soil Certification LPC 663
August 2013, Rev 00 01 7419 Construction Waste Management PART 1. GENERAL 1.01 Requirements Include: A. Each Contractor provide: 1. Participation in Construction Waste Management plan, including separation
More informationConstruction and Demolition WASTE REDUCTION AND RECYCLING PACKET
City of Laguna Niguel 30111 Crown Valley Pkwy Laguna Niguel, CA 92677 (949) 362 4360 www.cityoflagunaniguel.org Construction and Demolition WASTE REDUCTION AND RECYCLING PACKET 146 The California Green
More informationConstruction Waste Management Plan Guidelines. A resource for Western Australian Local Government, Developers, Property Owners and Builders
Construction Waste Management Plan Guidelines A resource for Western Australian Local Government, Developers, Property Owners and Builders Contents 1 Introduction... 2 2 Project Planning... 3 3 Construction
More informationINFORMATION SHEET. To demolish the entire building to the foundation will require a demolition permit (Form 6).
City and County of San Francisco Department of Building Inspection Edwin M. Lee, Mayor Tom C. Hui, S.E., C.B.O., Director INFORMATION SHEET NO. 5-04 DATE CATEGORY SUBJECT : June 22, 2015 Structural Demolition
More information1. Division 01 Section General Requirements Temporary Facilities and Controls.
PAGE 024210-1 SECTION 024210 PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification sections,
More informationSOUTH DAKOTA BOARD OF REGENTS. Budget and Finance ******************************************************************************
SOUTH DAKOTA BOARD OF REGENTS Budget and Finance AGENDA ITEM: 7 X DATE: March 27-29, 2018 ****************************************************************************** SUBJECT USD North Commons Renovation
More informationDem-Con Recovery & Recycling
Landfill Established 1985 120 Acre Site Lined and Unlined Dem-Con Companies Recovery & Recycling Established 1999 Expanded 2008 Shingle Processing Established 2008 1 st facility to be granted MPCA approval
More informationSECTION 2 DIVISION 01C DESIGN SERVICES PROJECT GUIDELINES (INFORMAL)
SECTION 2 DIVISION 01C DESIGN SERVICES PROJECT GUIDELINES (INFORMAL) PART 1 - PROJECT TITLE PAGE February 8, 2018 Project No. PROJECT NAME PART 2 - PROJECT GUIDELINES 2.1 BIDDERS/CONTRACTORS SHOULD CHECK
More informationConstruction Waste Management and Disposal
University of New Hampshire University of New Hampshire Scholars' Repository Division 01 General Requirements Chapter 5 Technical Construction and Renovation Standards 1-25-2013 017419 - Construction Waste
More informationC&D Recycling Market Overview and Identification
Building Materials Reuse Association- DECON 2007 C&D Recycling Market Overview and Identification Finding and Getting Materials to Market What to do with the materials you don t want? Types of Waste Market
More informationMASTERSPEC TECHNICAL SPECIFICATIONS DIVISION 01 GENERAL REQUIREMENTS SECTION CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL
SECTION 017419 - CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL PART 1 - GENERAL 1.1 SUMMARY A. This Section includes administrative and procedural requirements for the following: 1. Salvaging non-hazardous
More informationOffice of Planning, Design and Construction. Capital Program Update May 10, 2017
Office of Planning, Design and Construction Capital Program Update May 10, 2017 Projects Under Construction Translational Research Center Translational Research Center Phase I Site work Status: Completed
More informationSECTION (SECTION 01351) CONSTRUCTION WASTE MANAGEMENT
This is a guidance document with sample specification language intended to be inserted into project specifications on this subject as appropriate to the agency's environmental goals. Certain provisions,
More information2016 Fall Workshop C&D Recovery and Management: Deconstruction Options
2016 Fall Workshop C&D Recovery and Management: Deconstruction Options This work is licensed under the Creative Commons Attribution-ShareAlike 4.0 International License. To view a copy of this license,
More informationSTATEMENT OF QUALIFICATIONS
STATEMENT OF QUALIFICATIONS Turn-Key Environmental & Demolition Services Phone: 631-873-4357 Info@MetroIndustrialWrecking.com M E T R O I N D U S T R I A L W R E C K I N G & E N V I R O N M E N T A L C
More informationIntegrating Deconstruction and Recycling Into the Demolition Process in Buffalo, NY
Cornell University ILR School DigitalCommons@ILR Buffalo Commons Centers, Institutes, Programs 2007 Integrating Deconstruction and Recycling Into the Demolition Process in Buffalo, NY Tara Stahl Follow
More informationProject Summary. Sustainability Facts. LEED for New Construction Rating (out of 69 possible points) Total Score 40 Sustainable Sites 7
Lindner Hall Martha S. and Carl H. Lindner III Hall was designed and constructed to be a high performance, sustainable building. It is the first building on campus to receive LEED Gold certification. LEED
More informationSECTION CONSTRUCTION WASTE MANAGEMENT. A. Section includes administrative and procedural requirements for Construction Waste Management.
SECTION 01 35 63 CONSTRUCTION WASTE MANAGEMENT PART 1 - GENERAL 1.1 SUMMARY A. Section includes administrative and procedural requirements for Construction Waste Management. 1.2 DEFINITIONS A. Construction
More informationTech Assignment 1 University Medical Center of Princeton. Plainsboro Road, Township of Plainsboro, New Jersey
Tech Assignment 1 University Medical Center of Princeton Plainsboro Road, Township of Plainsboro, New Jersey David Bodnar CM Chris Maget 10/5/2009 Table of Contents Executive Summary...3 Project Schedule
More informationConstruction & Demolition Waste Management Plan Resource Guide for Contractors
Construction & Demolition Waste Management Plan Resource Guide for Contractors Environmental Utilities Solid Waste Division 2005 Hilltop Circle Roseville, California 95747 916-774-5780 916-774-5798 fax
More informationConstruction & Demolition Waste Management Plan Resource Guide for Contractors
Construction & Demolition Waste Management Plan Resource Guide for Contractors Environmental Utilities Solid Waste Division 2005 Hilltop Circle Roseville, California 95747 916-774-5780 916-774-5798 fax
More informationSAMUEL CLEMENS ADDITIONS & RENOVATIONS ( )
SAMUEL CLEMENS ADDITIONS & RENOVATIONS (06-05-2018) BUDGET - $ 72,000,000 2020 PROJECTED COMPLETION DATE ARCHITECT MARMON MOK GENERAL CONTRACTOR Bartlett Cocke CONSTRUCTION MGMT. AG CM 63% COMPLETE As
More informationUpdate on FCPS Construction/Renovation Projects. June 2016
Update on FCPS Construction/Renovation Projects Squires Elementary -- Renovation Architect: General Contractor: JRA Architects D.W. Wilburn, Inc. GC Contract Sum: $12,166,000 Total Project Cost: $15,207,000
More informationSustainability: Solar and Green Building Projects
Sustainability: Solar and Green Building Projects Donna Jones-Dulin, Associate Vice President Finance & Educational Resources February 23, 2011 Founded 1967 112 acres; 66 buildings; 116 classrooms/lecture
More informationRecycled Waste in Concrete
Recycled Waste in Concrete Ing. Vladimíra Vytlačilová, PhD. This presentation was created thanks to the support of FRVŠ project 915/2013 B1d Tools for teaching design of concrete and masonry structures
More informationCITY OF FONTANA COMMUNITY DEVELOPMENT DEPARTMENT Building and Safety Division Construction Waste Management Plan (CWMP) (Provide During Plan Review)
CITY OF FONTANA COMMUNITY DEVELOPMENT DEPARTMENT Building and Safety Division Construction Waste Management Plan (CWMP) (Provide During Plan Review) Building permit applicants must prepare a Construction
More informationMONTHLY PROGRESS REPORT
MONTHLY PROGRESS REPORT Through May 2018 Strong Schools Bond Capital Improvement Projects Prepared by fs3 Hodges 1 TABLE OF CONTENTS Executive Summary page 3 Attachment 1 Consolidated Expenditure Report
More informationCONTENTS. 71 Section 01352, #7 (Life Cycle Cost and Life Cycle Assessment) 2/1/12 Modified entire section 72 Section 01352, #8 (Sustainability
01352 Sustainable Design Requirements This document provides design standards only, and is not intended for use, in whole or in part, as a specification. Do not copy this information verbatim in specifications
More informationNO WASTE BY 2010 Graham Mannall A.C.T. NOWaste
Introduction NO WASTE BY 2010 Graham Mannall A.C.T. NOWaste In December 1996 the ACT (Australian Capital Territory) Government released the No Waste By 2010 - Waste Management Strategy for Canberra. As
More informationBOYERTOWN AREA SENIOR HIGH SCHOOL
BOYERTOWN AREA SCHOOL DISTRICT ADDITIONS & RENOVATIONS To BOYERTOWN AREA SENIOR HIGH SCHOOL MONTHLY PROGRESS REPORT No. 10 November / December 2015 Construction Manager D Huy Engineering, Inc. Architect
More informationSustainability, cost-effectiveness, and energy-efficiency in Army Rehabilitations of Historic Buildings
The adaptive use of historic buildings conserves the invested-cost of energy and materials as well as encouraging the preservation of these resources and cultural landscapes. The design, materials, type
More informationSUSTAINABLE ARCHITECTURAL DESIGN JOSH DYGERT, AIA EDWARD TUCKER ARCHITECTS, INC.
SUSTAINABLE ARCHITECTURAL DESIGN JOSH DYGERT, AIA WHAT DOES IT MEAN TO BE GREEN? Sustainable of, or relating to, or being a method of harvesting or using a resource so that the resource is not depleted
More information«Improving management of construction and demolition waste»
«Improving management of construction and demolition waste» What is DEMOCLES? DEMOCLES (The keys of demolition) is a 2 years collaborative project involving more than 40 French stakeholders of construction
More informationBelmont Mill Renovation Project. February 23, :30 P.M. Informational Session
Belmont Mill Renovation Project February 23, 2015 6:30 P.M. Informational Session Belmont Mill Renovation Project In December 2012, the Board of Selectmen were asked to consider replacement of the carpet
More information