1 SOUTH DAKOTA BOARD OF REGENTS Budget and Finance AGENDA ITEM: 7 X DATE: March 27-29, 2018 ****************************************************************************** SUBJECT USD North Commons Renovation Facility Design Plan CONTROLLING STATUTE, RULE, OR POLICY SDCL Classification of Capital Improvements SDCL Supervision by Bureau of Administration of Capital Improvement Projects Payment of Appropriated Funds SDCL Preparation of Plans and Specifications for Capital Improvements State Building Committees Approval by Board or Commission in Charge of Institution BOR Policy 6:4 Capital Improvements BACKGROUND / DISCUSSION The Preliminary Facility Statement for the North Commons renovations was approved by the Board of Regents at their March 2017 meeting; the Facility Program Plan was approved at the June 2017 meeting. In August 2017, the Board of Regents approved removing the USD Commons from the auxiliary system due to the building s change in purpose. The Commons, formally the dining facility for the residence hall complex comprised of Beede/Mickelson and Richardson/Olson halls, no longer operates as a revenue generating, food service space due to the Muenster University Center expansion in The building committee, headed by Regent Adam, selected Perspective Inc. as the design architect for the project. The final design was approved by the building committee at the March 14, 2018, meeting. The planned 19,000 square foot renovation will serve multiple purposes for support services such as campus stores, postal services, UCopy and the information technologies desktop support team. All of these services are currently located in several different locations across the campus. Additionally, space will be renovated to provide office meeting spaces for such groups as residence life, TRIO, veteran s affairs, and student programs. Additional details can be found in USD s attached Facility Design Plan. (Continued) ****************************************************************************** DRAFT MOTION _7-X: I move to approve USD s Facility Design Plan to renovate the North Commons at an estimated cost of $2,923,081 funded by HEFF M&R proceeds.
2 USD North Commons Renovation FDP March 27-29, 2018 Page 2 of 2 IMPACT AND RECOMMENDATION There have been no major changes to the design or costs from what was included in the Facility Program Plan (approved June 2017). The North Commons renovation project is part of an overall campus master space plan. The project will allow USD to properly utilize this space and to provide better efficiency within the space for mechanical and electrical systems. This will have a positive impact on the existing building and on USD s energy consumption. Total project cost is estimated at $2,923,081 and will be funded from HEFF M&R allocations. The utilities for this facility will be separately metered and removed from the auxiliary system. ATTACHMENTS Attachment I USD North Commons Renovation FDP and Schematics
3 ATTACHMENT I 3 FACILITY DESIGN PLAN North Commons Renovation THE UNIVERSITY OF SOUTH DAKOTA Introduction: The Facility Program Plan for the North Commons Renovation was approved by the board in June The Building Committee selected Perspective Inc. as the design architect for the project. The North Commons Renovation will serve multiple purposes; it will provide a more central location for USD support services such as Campus Stores, Postal Services, UCopy and the Information Technologies Desktop Support Team, all of which are currently located in several different buildings around campus. In addition, this renovation will also provide office and meeting spaces for such groups as Residence Life, TRIO, Veteran s Affairs, and student programs. Locating these services/programs all under one roof will create the opportunity for other departments to move into the Continuing Education building per our long term Space Management Plan. a. Architectural, mechanical, and electrical schematic design: The project is a renovation of the existing North Commons space. The Schematic Design Drawings by Perspective Inc. showing overall aerial, floor plan, and exterior elevations are attached. The new North Commons, will house Campus Stores, Postal Services, UCopy, Information Technologies Desktop Support team, as well as Resident Life, TRIO, Veteran s Affairs, and student groups. The facility will provide a central location for support services to all campus student, faculty, and staff. The North Commons is a 19,000 square feet facility. It is a single story building with existing masonry block and brick exterior, steel bar joists with metal deck, and a fullyadhered roof membrane. The new exterior finishes at the loading dock and west vestibule will complement the existing building and will be made up of metal wall panels with a fullyadhered roof membrane. On the exterior of the building we will be adding a new loading dock entrance, new exterior Low-E insulated aluminum windows and doors, and a new entrance vestibule on the west side of the building. On the interior of the building we will be completely removing all existing walls, ceilings, and will be removing some concrete slab-on-grade for new sanitary sewer piping. The facility will receive all new steel stud wall systems with 5/8 sheetrock and finished to level.
4 ATTACHMENT I 4 4. All walls will be painted, and we will install all new interior doors and hardware. The space will receive all new acoustical ceiling systems and new flooring throughout. Mechanical Systems: 1. The building currently has four (4) existing Air Handling Units (AHU s). The project will remove one (1) AHU and retrofit the other three (3) existing AHU s existing supply fan motor with a new premium efficiency 7.5 HP motor. They will also supply a new Variable Frequency Drive (VFD) for more efficient control of the AHU s through the building automation system. All new ductwork with new registers and grilles will be installed to supply heating and cooling to the various spaces. A new humidifier will be installed in UCopy space to provide humidification control within this space due to the large amounts of paper being stored within the space. 2. The heating water system will be controlled by installation of two (2) new high efficiency boilers and two (2) new high efficiency hot water pumps. 3. At all existing and new vestibules there will be a new Cabinet Unit Heater (CUH) installed to supplement the building heating system during winter months. 4. The facility will house all new plumbing fixtures including, but not limited to, water closets, urinals, sinks, and faucets. 5. The old fire sprinkler system will be removed and a new fire sprinkler system meeting NFPA 13 requirements will be installed, providing complete fire protection coverage throughout the facility. 6. The control system will be integrated into the campus building automation system and designed for energy use optimization. Electrical Systems: 1. The facility will utilize existing electrical panels and install two (2) new electrical panels to house the circuits for the facility. 2. All existing light fixtures will be removed and installation of all new high efficiency LED light fixtures will be used throughout. Occupancy sensors will be provided in all spaces to help with energy consumption. At the exterior, we will remove the outdated china hat light fixtures and install new LED light fixtures which match the standard light pole design installed across campus. 3. The facility will house all new electrical and data outlets and will be set up with exterior card access systems, security cameras, and wireless access points. 4. Power will be distributed throughout the facility at 208Y/120V. 5. An addressable fire alarm system including a new control panel and devices will be provided throughout the renovated space. This system will coordinate with existing campus Building Automation System. The project is being designed to achieve Leadership in Energy and Environmental Design (LEED) Silver certification. b. Changes from facility program plan: There have been no changes from the Facility Program Plan.
5 ATTACHMENT I 5 c. Impact to existing building or campus-wide heating/cooling/electrical systems: The North Commons Renovation project is part of an overall campus master space plan. This project will allow us to properly utilize this space and to provide better efficiency within the space for our mechanical and electrical systems. This will have a positive impact on the existing building and on our campus energy consumption. d. Total project cost estimates: The estimated project cost is $2,923,081. The following is the breakdown of the project estimate: North Commons Renovation Facility Design Plan March 2018 Total Estimate Of Probable Construction Costs $2,174,900 A/V & IT Allowance/BIT $220,215 FF & E Allowance $22,438 A & E Fees $213,900 LEED $26,700 Testing $5,000 OSE/USD Fees $151,183 Owner's Contingency: $108,745 PROJECT TOTAL $2,923,081 FUNDING FOR THE PROJECT Facility Design Plan March 2018 HEFF M&R Proceeds $2,923,081 Total $2,923,081 e. Changes from cost estimate for operational or M&R expenses: Per the Facility Program Plan, this renovation will be eligible for funding from USD s maintenance and repair annual HEFF allocation. Ongoing operational budgets are estimated to be $63,855 for one full-time custodian ($39,611) and maintenance ($24,244). The utility budget is estimated at $20,000 per year. There are no changes from the Facility Program Plan.
6 Aerial View ATTACHMENT I 6
7 Floor Plan ATTACHMENT I 7
8 Exterior Elevations ATTACHMENT I 8
SOUTH DAKOTA BOARD OF REGENTS. Budget and Finance ******************************************************************************
SOUTH DAKOTA BOARD OF REGENTS Budget and Finance AGENDA ITEM: 6 O DATE: December 5-7, 2017 ****************************************************************************** SUBJECT USD Dakota Dome Renovation
More informationSOUTH DAKOTA BOARD OF REGENTS. Budget and Finance ******************************************************************************
SOUTH DAKOTA BOARD OF REGENTS Budget and Finance AGENDA ITEM: 7 Y DATE: December 6-8, 2016 ****************************************************************************** SUBJECT: SDSU Student Wellness
More informationFACILITY DESIGN PLAN FOR HARDING HALL RENOVATION AND ADDITION SOUTH DAKOTA STATE UNIVERSITY DATE: March 29, 2017
FACILITY DESIGN PLAN FOR HARDING HALL RENOVATION AND ADDITION SOUTH DAKOTA STATE UNIVERSITY DATE: March 29, 2017 SDSU requests approval of this Facility Design Plan for renovation and addition to Harding
More informationSOUTH DAKOTA BOARD OF REGENTS. Budget and Finance ******************************************************************************
SOUTH DAKOTA BOARD OF REGENTS Budget and Finance AGENDA ITEM: 7 I DATE: May 9-11, 2017 ****************************************************************************** SUBJECT: SDSU Harding Hall Renovation
More informationFACILITY DESIGN PLAN
FACILITY DESIGN PLAN Sports Performance Enhancement Facility Arena and Outdoor Track and Soccer Complex Introduction: THE UNIVERSITY OF SOUTH DAKOTA The Facility Program Plan for the Sports Performance
More informationFACILITY DESIGN PLAN FOR INDOOR PRACTICE AND HUMAN PERFORMANCE FACILITY SOUTH DAKOTA STATE UNIVERSITY
FACILITY DESIGN PLAN FOR INDOOR PRACTICE AND HUMAN PERFORMANCE FACILITY SOUTH DAKOTA STATE UNIVERSITY DATE: November 20, 2012 SDSU requests approval of this Facility Design Plan to continue planning the
More information1.0 Total Points % 2.1 Building Exterior Elements % 2.2 Accessibility % 2.3 Structural %
8/11/ Building Rating System Percent Site: 1.0 Total 0 163 82% Building: 2.1 Building Exterior Elements 0 82 82% 2.2 Accessibility 0 92 92% 2.3 Structural 0 91 91% 2.4 Building Envelope 0 84 84% 2. Interior
More informationAppendix J - Custom Uniformat for EDU Migration
Appendix J - Custom Uniformat for EDU Migration Nr. MTC Uniformat for VFA.facility Life (Years) Weight (1-100) Out of Scope Cost Y/N 1 A Substructure 150 N 2 A10 Foundations 150 N 3 A1010 Standard Foundations
More informationB. RESIDENTIAL MASTER PLUMBER $ $ $
FEE SCHEDULE FOR LICENSE Res. Non-Res. Out of State BUILDING CATEGORIES A. GENERAL CONTRACTOR (Unlimited Scope) B. BUILDING CONTRACTOR $ 100.00 $ 150.00 $ 300.00 Limited to construction and remodeling
More information6 Holub Middle School Overall Site Plan Gymnasium Floor Plan Exterior Perspective Before Exterior Perspective - After
Contents 1 Program Outline Gymnasium Restrooms Storage rooms IDF 2 Finish Outline Walls Flooring Ceiling Roof 3 MEP Outline Plumbing Mechanical Electrical 4 Communication and Security Guideline Communication
More informationG703 Continuation Sheet Minimum Schedule of Values Please use the breakdown listed below when submitting your billing for the project
Billing Requirements G703 Continuation Sheet Minimum Schedule of Values Please use the breakdown listed below when submitting your billing for the project Sitework / Paving Excavation and Grading Labor
More information1.0 Total Points % 2.1 Building Exterior Elements % 2.2 Accessibility % 2.3 Structural %
8/11/ Building Rating System Percent Site: 1.0 Total 0 9 8 Building: 2.1 Building Exterior Elements 0 82 82% 2.2 Accessibility 0 82 82% 2.3 Structural 0 7 7% 2.4 Building Envelope 0 47 47% 2. Interior
More informationMINUTES OF THE MEETING SDSU CENTRAL HEATING PLANT BOILER REPLACEMENT AND PLANT UPGRADES June 17, 2011
MINUTES OF THE MEETING SDSU CENTRAL HEATING PLANT BOILER REPLACEMENT AND PLANT UPGRADES June 17, 2011 The Building Committee for the SDSU Central Heating Plant Boiler Replacement and Plant Upgrades met
More informationExhibit A Library Shell Construction
Exhibit A Library Shell Construction Library Component Building Requirements Approximately 15,000-17,000 square feet plus 900 square feet for mechanical room and additional space on roof for installation
More informationSOUTH DAKOTA BOARD OF REGENTS. Budget and Finance ******************************************************************************
SOUTH DAKOTA BOARD OF REGENTS Budget and Finance AGENDA ITEM: 9 F DATE: June 26-28, 2018 ****************************************************************************** SUBJECT SDSU American Indian Student
More informationPROCUREMENT AND CONTRACTING DOCUMENTS GROUP
PROCUREMENT AND CONTRACTING DOCUMENTS GROUP DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS 00 11 00 Notice To Bidders 00 21 00 Instructions To Bidders 00 22 00 Supplementary Instructions To Bidders
More informationDESIGN DEVELOPMENT REVIEW PACKAGE CHECKLIST
DESIGN DEVELOPMENT REVIEW PACKAGE CHECKLIST Check off each item that is included within the submitted Design Development Review Package. Provide a written explanation for any omissions. The following items,
More informationBVSC BVSC. Midwest Technical Inspections Survey Worksheet. Account / Account Code: Insured: Policy #: Building Data - Section 1
Midwest Technical Inspections Survey Worksheet BVSC BVSC Account / Account Code: Agency: Insured: Policy #: Telephone: Alt. Phone: Building Data - Section 1 Building Name (Entire Valuation) Section Name
More informationADDENDUM 2 - JULY 14, 2015
7/9/2015 The Professional(s) of Record above has signed for the following specification sections: DIVISION 1 GENERAL REQUIREMENTS Section 01 10 00 Summary of Work Section 01 25 00 Substitution Procedures
More informationVOLUME 4 DIVISION SPECIFICATIONS
Page 1 Section Title Consultant Pages VOLUME 4 DIVISION 00-01 SPECIFICATIONS Division 00 - Procurement and Contracting Requirements 00 01 07 SEALS PAGE All 5 00 01 11r6 TABLE OF CONTENTS All 7 00 21 13r1
More informationIntroduction & Project Background
Introduction & Project Background Project Background is located in Pasadena, Maryland and is owned and maintained by Anne Arundel County School District. A new elementary school to replace the existing
More informationWelcome Center, New Student Services, and Career and Employment Services
Architectural Program Welcome Center, New Student Services, and Career and Employment Services East Memorial Stadium Renovation May 2014 Prepared By Table of Contents Introduction.... 1 Competitive Market....
More informationHOUSE REPAIRS & RENOVATIONS BUILDING PERMIT REQUIREMENTS
St. Louis County Department of Public Works Division of Code Enforcement HOUSE REPAIRS & RENOVATIONS BUILDING PERMIT REQUIREMENTS This guide is intended to provide the homeowner or contractor with the
More informationSOUTH DAKOTA BOARD OF REGENTS. Committee on Budget and Finance ******************************************************************************
SOUTH DAKOTA BOARD OF REGENTS Committee on Budget and Finance AGENDA ITEM: III C DATE: June 19-20, 2013 ****************************************************************************** SUBJECT: SDSU Physical
More informationSECTION PAYMENT PROCEDURES
SECTION 012900 PART 1 GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract including General and Supplementary Conditions and other Division 01 Specifications Sections apply
More informationExisting Site Aerial Frederick High School Feasibility Study September 5, 2012
Existing Site Aerial Building Developmental History 1981 1966 1939 1977 1978 1955 1966 Exterior Roof: Most of existing roof has multi ply built up roofing. Some areas have gravel ballast, others have cap
More information1.0 Total Points % 2.1 Building Exterior Elements % 2.2 Accessibility % 2.3 Structural %
BartelsRode Gymnasium 8/11/ Building Rating System Percent Site: 1.0 Total 0 13 77% Building: 2.1 Building Exterior Elements 0 8 8% 2.2 Accessibility 0 74 74% 2.3 Structural 0 76 76% 2.4 Building Envelope
More informationProgrammatic Need Building improvements will support the Fine Arts Music Department Programs.
Reference 15 Music Room due to the extensive wall removal and repair. Insulation and vapor barrier issues at the west wall of Davis Concert Hall will also be addressed as part of this project. RATIONALE
More informationOverbrook Theater / Fruenthal Foundation Art Center. 1.0 Total Points % 2.1 Building Exterior Elements %
8/13/ Building Rating System Percent Site: 1.0 Total 0 9 8 Building: 2.1 Building Exterior Elements 0 64 64% 2.2 Accessibility 0 66 66% 2.3 Structural 0 77 77% 2.4 Building Envelope 0 4 4% 2. Interior
More informationManufacturing Facilities Proposal
Manufacturing Facilities Proposal Construction proposal To assist business owners with expansion projects, Wisconsin Public Service has compiled information and renderings of common building types in business
More informationBOARD OF TRUSTEES OCTOBER 13, 2014
Measure E BOARD OF TRUSTEES OCTOBER 13, 2014 FACILITIES UPDATE Measure Q 1 RECENTLY COMPLETED PROJECTS Santa Ana College Perimeter Site Improvements Building G Renovation Artesia Street Improvements Property
More informationAdministration Building Needs Assessment
Town Hall Meeting with the Habersham County Board of Commissioners Administration Building Needs Assessment JUNE 13, 2016 Detailed Evaluation Performed in 2015 Engineering Evaluation Site/Civil Architectural
More informationThesis Proposal for Berks Classroom and Lab Building
Thesis Proposal for Berks Classroom and Lab Building Berks Classroom and Lab Building Berks Campus Reading, PA Authored by Julia Broskey Mechanical Option Prepared for Dr. William P. Bahnfleth PE 11 January
More informationSTATE UNIVERSITY CONSTRUCTION FUND
STATE UNIVERSITY CONSTRUCTION FUND The following checklist show the general items required by the Agreement and the Program Directives. Unless included in the lump sum fee or the Schedule B of the Consultant
More informationSOUTH DAKOTA BOARD OF REGENTS. Budget and Finance ******************************************************************************
SOUTH DAKOTA BOARD OF REGENTS Budget and Finance AGENDA ITEM: 6 I DATE: December 4-6, 2018 ****************************************************************************** SUBJECT SDSU American Indian Student
More informationAPPLICATION AND CERTIFICATE FOR PAYMENT
AND CERTIFICATE FOR PAYMENT TO OWNER: MASTER TEMPLATE - SAVE PROJECT FILE 1 DATE: 10/5/2012 PERIOD TO: ARCHITECT: PROJECT NO: CONTRACTOR'S FOR PAYMENT Application is made for payment, as shown below, in
More informationCONSTRUCTION REQUIREMENTS
CONSTRUCTION REQUIREMENTS Note: The buildings on the UCCS campus are divided into two categories: General Fund and Auxiliaries. General Fund Buildings include academic and administrative functions. Auxiliary
More informationDayton Chapter February 9, Bob Thomson, P.E., LEED-AP, CDT
Dayton Chapter February 9, 2009 Bob Thomson, P.E., LEED-AP, CDT World Population is estimated to be 6,000,000,000 people U.S. Population is estimated to be 3,000,000 people U.S. makes up 5% of the world
More informationCity of Treasure Island FEMA Cost Breakdown Worksheet For Substantial Improvement / Damage
City of Treasure Island FEMA Cost Breakdown Worksheet For Substantial Improvement / Damage Property Address: Company Name: Contractor Name: Contractor Address: City: State: Zip: License Number: Phone Number
More informationDeficiency ID Qty UoM Priority. K Play Area Requires Impact Resistant Material Ea. 2
School and Site Level Deficiencies Site K Play Area Requires Impact Resistant Material 1320 1 Ea. 2 Exterior Basketball Goals Are Damaged And Require Replacement 1322 1 Ea. 4 Bus drop-off area does not
More informationTown of Falmouth FEMA Cost Breakdown Worksheet For Substantial Improvement / Damage COSTS FOR SUBSTANTIAL IMPROVEMENTS / REPAIR OF SUBSTANTIAL DAMAGE:
S FOR SUBSTANTIAL IMPROVEMENTS / REPAIR OF SUBSTANTIAL DAMAGE: Included Costs: Items that must be included in the costs of improvement or costs to repair are those that are directly associated with the
More information0B MAGNOLIA HALL. Scale: 1:110. Date: Feb Time: 7:40 pm. User: brady. 10 ft
0B 2 m 1:110 7:40 pm. 01 5 m 1:230 7:38 pm. 02 5 m 1:230 7:38 pm. 03 5 m 1:230 7:45 pm. Facility Profile ( FP-1 ) City: State: Country: Address: Stories: Attic: Basement: Glassboro New Jersey United States
More informationEnergy Reduction Strategy Through 2020
Through 2020 Revised: August 2017 Executive Summary Auburn University is a land, sea and space grant university established in 1856. The university consists of 11,629,000 square feet on 1,840 acres and
More informationSOUTH DAKOTA BOARD OF REGENTS. Budget and Finance Consent ******************************************************************************
SOUTH DAKOTA BOARD OF REGENTS Budget and Finance Consent AGENDA ITEM: 7 L DATE: June 27-29, 2017 ****************************************************************************** SUBJECT: FY18 HEFF M&R Projects
More informationCity of Treasure Island FEMA Cost Breakdown Worksheet For Substantial Improvement / Damage
City of Treasure Island FEMA Cost Breakdown Worksheet For Substantial Improvement / Damage Property Address: Company Name: Contractor Name: Contractor Address: City: State: Zip: License Number: Phone Number
More informationSOUTH DAKOTA BOARD OF REGENTS. Committee on Budget and Finance ******************************************************************************
SOUTH DAKOTA BOARD OF REGENTS Committee on Budget and Finance AGENDA ITEM: III E DATE: December 4-5, 2013 ****************************************************************************** SUBJECT: FY15 HEFF
More informationSERIES 0 BIDDING REQUIREMENTS AND CONTRACT FORMS
SERIES 0 BIDDING REQUIREMENTS AND CONTRACT FORMS INDIANA UNIVERSITY BIDDING REQUIREMENTS NOTICE TO BIDDERS BID FORM INSTRUCTIONS TO BIDDERS CONTRACTOR S BID FOR PUBLIC WORK - FORM 96 (REVISED 2005) MINORITY,
More informationPHASE I ACADEMIC BUILDING CORE RENOVATIONS RCNJ Project No C
PHASE I ACADEMIC BUILDING CORE RENOVATIONS RCNJ Project No. 20140101C CONSTRUCTION ESTIMATE AND PROJECT BUDGET Dated June 7. 2014 Estimated Cost HARD COSTS $ 1,560,284 Core Renovations (Toilet Rooms, Ceilings
More informationCITY AND COUNTY OF DENVER DEPARTMENT OF PUBLIC WORKS STATEMENT OF QUANTITIES. Item No. Description Quantity Estimated Mobilization 1 LS
010100-01 Mobilization 1 LS 010500-01 Construction Surveying 1 LS 015000-01 Temporary Construction Fence 1 LS 029100-01 Tree Retention and Protection 1 LS 015150-01 Erosion and Sediment Control 1 LS Division
More informationThe Creative and Performing Arts High School (CAPA) Pittsburgh, PA 9/30/2002 Andrew Tech Mechanical Option Prof. S. A. Mumma
LEED Green Building Certification The purpose of the LEED Green Building Rating is to provide a national standard that aims to improve environmental, health and economic performance of buildings using
More informationSimcoe County District School Board. 5yr Condition Assessment 2006/07 to 2010/11. Warnica PS, 9283
5yr Condition Assessment 2006/07 to 2010/11 Construction Year Area 1964 3,035 Page 1 of 27 1. Architectural / Structural & Site Exec Summary Warnica Public School is a one storey structure of masonry construction
More informationTABLE OF CONTENTS. (Δ = Rev 06/08)
TABLE OF CONTENTS (Δ = Rev 06/08) INTRODUCTION REQUEST FOR REVISION FORMS TAB A TABLE OF CONTENTS TAB B PROCEDURES B-9 Record Drawings B-10 Variance Procedure B-11 Surface Water Procedures (New Section)
More informationST. CLOUD, MN. 316,000 Square Feet Situated on Acres. For additional information contact:
ST. CLOUD, MN 316,000 Square Feet Situated on 49.56 Acres For additional information contact: Gerald P. Norton Tel: 952.831.1993 E-mail: gnorton@binswanger.com B. Andrew Lubinski Tel: 952.831.1931 E-mail:
More informationArchitect and Engineer: Friar Associates inc.
Architect and Engineer: Friar Associates inc. BACKGROUND In June, after soliciting and interviewing several professional firms, Friar Associates was hired to perform an Existing Conditions Survey and Facilities
More informationSchedule of Values Cruise Terminal 2 Expansion
Schedule of Values The Schedule of Values outlined below is intended to reflect the standard format that would be used in a Contractors Application for Payment. Values reflect materials and labor. General
More informationTimberglen Recreation Center Summary
Timberglen Recreation Center Summary Address Building Purpose 3810 Timberglen Road Dallas, TX 75287 Recreation Center Original Year of Construction 2003 Building Area 15,000 SF Inspection Date August 2,
More informationMarch 2018 Progress. Work Completed, Week Ending 3/23/18:
March 2018 Progress Work Completed, Week Ending 3/23/18: Continued draft curtains and liner panels. Continued running power to hangar doors. Continued installation of bath accessories in the gang bathrooms.
More informationCoos Bay Best Bond Cost Breakdowns
Coos Bay Best Bond Cost Breakdowns Overview [For itemized breakdown by school, see following pages.] Harding: New 7 th /8 th grade school on Harding site, including second gym: $18,440,000 Demotion of
More informationSOUTH DAKOTA BOARD OF REGENTS. Budget and Finance Consent ******************************************************************************
SOUTH DAKOTA BOARD OF REGENTS Budget and Finance Consent AGENDA ITEM: 4 P DATE: December 5-7, 2017 ****************************************************************************** SUBJECT FY19 HEFF M&R Projects
More informationSafety Update Crossing study is in final review stages. Facilities Update Construction Progress
Major Projects Update September 2017 Prepared by Business and Operations September 11, 2017 Transportation Update As of 9/6/17 we have 4,803 students registered for busing, up 643 from last month s update.
More informationMorehouse School of Medicine
/0/00 Print /0/00 00 Campus General Building ID Built 7098 98 Renovated Gross Square Feet Building Type Current Replace Value 00 - ACADEMIC FALITIES $ FC/QI (%) > 00.00 Electrical Lighting upgrades/retrofits
More informationDelco Activity Center Site Summary
1 Site Summary Address 4601 Pecan Brook Austin, TX 78724 Number of Permanent Campus Facilities 1 Original Year of Construction 2003 Total Campus Building Area (combined) 60,294 SF Introduction The is located
More informationUpdate on FCPS Construction/Renovation Projects. June 2016
Update on FCPS Construction/Renovation Projects Squires Elementary -- Renovation Architect: General Contractor: JRA Architects D.W. Wilburn, Inc. GC Contract Sum: $12,166,000 Total Project Cost: $15,207,000
More informationST. CLOUD, MN 316,000 Square Feet Situated on Acres
ST. CLOUD, MN 316,000 Square Feet Situated on 49.56 Acres For additional information contact: Gerald P. Norton Tel: 952.831.1993 E mail: gnorton@binswanger.com B. Andrew Lubinski Tel: 952.831.1931 E mail:
More informationBuilding Systems and Design Elements included in SliDeRulE
Building Systems and Design Elements included in SliDeRulE No. System Subsystem Design Element 1.1.1 Foundation Deep Foundation Steel H-pile 1.1.2 Foundation Deep Foundation Steel pipe pile 1.1.3 Foundation
More informationBorough of Doylestown Building and Zoning Department
Borough of Doylestown Building and Zoning Department 57 West Court Street, Doylestown, PA 18901 215.345.4140 RESIDENTIAL BUILDING AND ZONING PERMIT APPLICATION PACKAGE BACKGROUND A building permit is required
More informationTable of Contents. Division 2 Site Work Site Preparation Site Demolition Tree Protection Excavation, Trenching, and Backfilling for Utilities
Division 1 Requirements Design and Construction Quality Campus Master Plans Texas Tech University System Operating and Building Maintenance Project Administration Historically Underutilized Business (HUB)
More informationAuburn University Construction Project Update March 2010
New Basketball Arena: Construction Cost: $68.5 million. The Arena is currently 91% complete. Contract completion is July 25, 2010, but the project is on schedule to complete by May 2010. Interior finish
More informationTexas State University System Telephonic Called Board of Regents Meeting
Texas State University System Telephonic Called Board of Regents Meeting Monday, April 6, 2015 2:00 PM 1. Call Meeting to Order 2. Agenda Items 1. SHSU: Design Development Documents for South Dining...
More informationA Homeowner s Guide to Renovation and Addition Permits
A Homeowner s Guide to Renovation and Addition Permits What is a Building? The Building Code Act of Ontario defines a building as: 1. A structure occupying an area greater than 10 m2 (108 sq. ft.) consisting
More informationFranklin Hall Renovation TABLE OF Document Indiana University Bloomington
VPS Project No. 2013022.00 Page 1 SPECIFICATIONS VOLUME I INTRODUCTORY INFORMATION Document 000010 - Table of Contents... 6 Document 000011 - Certification and Seals... 2 Document 000012 - Project Directory...
More informationTEXAS A&M ENGINEERING
TEXAS A&M ENGINEERING 312 Jack K. Williams Administration Building I 3126 TAMU I College Station, Texas 77843-3126 M. Katherine Banks, Ph.D., P.E. Vice Chancellor and Dean of Engineering Director, Texas
More informationPROPERTY OVERVIEW PROPERTY HIGHLIGHTS. 2,340 SF Convenience Store. 3,508 SF Three Unit Strip Center. U-Haul Business. Sunoco Branded Gas Station
RETAIL FOR SALE 5990 Asheville Highway, Hendersonville, NC 28791 OFFERING SUMMARY SALE PRICE: $1,350,000 LOT SIZE: 0.75 Acres YEAR BUILT: 1980 BUILDING SIZE: 5,848 SF RENOVATED: 2018 C-2 Commercial ZONING:
More informationMinneapolis Community and Technical College T-Building Floor 2 Student Affairs Cost Estimating Form Templates - Exhibit C
2 3 4 5 6 7 8 9 0 2 3 4 5 6 7 8 9 20 2 22 23 24 25 26 27 28 29 30 3 32 33 34 35 36 37 38 39 40 4 42 43 44 45 46 DIVISION 02 EXISTING CONDITIONS Demolition; Removal & Disposal: CMU Partitions AD Quan UM
More informationCheldelin Middle School
Facility Information Address: 987 NE Conifer Blvd Corvallis Site Size: Building Area: Construction Date: Improved Parking: Grade Levels Served: Regular Classrooms: Portable Classrooms: Sept. 2007 Enrollment:
More informationTABLE OF CONTENTS Public Safety Building
DOCUMENT 00 01 10 - TABLE OF CONTENTS VOLUME I DIVISION 00 PROCUREMENT AND CONTRACTING REQUIREMENTS 00 01 10 Table of Contents 00 31 32 Geotechnical Data DIVISION 01 GENERAL REQUIREMENTS 01 10 00 Summary
More informationTABLE OF CONTENTS. (Δ = Rev 11/15) Update #7
TABLE OF CONTENTS ( = Rev 11/15) Update #7 INTRODUCTION REQUEST FOR REVISION FORMS TAB A TABLE OF CONTENTS TAB B PROCEDURES B-4 International Suite of Codes (New) B-9 Record Drawings B-10 Variance Procedure
More informationTABLE OF CONTENTS. (Δ = Rev 04/17) Update #8
TABLE OF CONTENTS ( = Rev 04/17) Update #8 INTRODUCTION REQUEST FOR REVISION FORMS TAB A TABLE OF CONTENTS TAB B PROCEDURES B-4 International Suite of Codes B-9 As-Builts and Record Drawings B-10 Variance
More informationBasement Build-Out Guidelines
Community Development Department Five Plaza Drive Woodridge, IL 60517-5014 (630) 719-4750 FAX (630) 719-2900 Basement Build-Out Guidelines The Village of Woodridge requires that a building permit be submitted
More informationREQUIRED RESIDENTIAL PERMITS
100 Parklane Drive Eagleville, PA 19403 www.lowerprovidence.org Administration: 610 539-8020 Fax: 610 539-6347 Police: 610-539-5901 Fax: 610-630-2219 REQUIRED RESIDENTIAL PERMITS The majority of construction
More informationJV PROPERTIES, LLC (AQUA GLASS/MASCO) 320 INDUSTRIAL ROAD ADAMSVILLE, MCNAIRY COUNTY, TN Approximately 511,807 square feet
(AQUA GLASS/MASCO) 320 INDUSTRIAL ROAD ADAMSVILLE, MCNAIRY COUNTY, TN 38310 SIZE: GROUND: NUMBER OF BUILDINGS: NUMBER OF FLOORS: Approximately 511,807 square feet Approximately 59 acres, mostly level with
More informationSANDTOWN CROSSING PROFESSIONAL OFFICE PARK Atlanta, GA
Atlanta, GA LOCATED AT CAMP CREEK PARKWAY AND CAMPBELLTON ROAD For Sale or Lease Single units start at 1,176sf and can be combined to exact specification Custom Designed Medical and Professional finishes
More informationDESIGN & CONSTRUCTION GUIDELINES
DESIGN & CONSTRUCTION GUIDELINES EDITION: USF FACILITIES MANAGEMENT - DC 5 DCG FACILITIES MANAGEMENT DESIGN & CONSTRUCTION PHONE: (813) 974-2845 4202 E. FOWLER AVENUE, OPM 1000 TAMPA, FLORIDA 33620-7550
More informationInterior Architects, P.C REV 2 CONCEPTUAL ESTIMATE. Brooklyn Heights Library, Brooklyn Public Library, Brooklyn, NY GARDINER AND THEOBALD INC FOR: AT:
REV 2 CONCEPTUAL ESTIMATE FOR: Interior Architects, P.C Brooklyn Heights Library, Brooklyn Public Library, Brooklyn, NY AT: BY: GARDINER AND THEOBALD INC Issued: 6/20/2013 BROOKLYN HEIGHTS LIBRARY, BROOKLYN
More information1200 Oakman Blvd INDUSTRIAL INVESTMENT/ USER OPPORTUNITY. Building A 85,999 SF. Building D. Building C 11,495 SF 15,046 SF.
1200 Oakman Blvd A 85,999 SF Detroit, MI 48238 C D 15,046 SF A C Below (4) Grade Level Replacement Cost Doors Shop Floor Height: Zoning M4-Intensive 18 3 Industrial District Immediate HVAC - 6 Ton Unit
More informationProperty Condition Assessment
Property Condition Assessment Pewaukee, WI 53072 Inspection Date: 1/6/15 Prepared For: Report Number: Prepared By: Shamrock Building Inspection Consultants LLC N29 W29951 Shel-Mar Dr. Pewaukee, WI 53072
More informationNew Beautifully Designed Office Condominium Complex. Heading
FOR SALE DOYLESTOWN EXECUTIVE QUARTERS COMMERCIAL INDUSTRIAL INVESTMENT 2003 Lower State Road Doylestown, Bucks County, PA New Beautifully Designed Office Condominium Complex Heading PRESENTED BY: Kurt
More informationHealth Life Safety Survey and Master Facilities Plan
Health Life Safety Survey and Master Facilities Plan Community Presentation Board Meeting June 22, 2015 June 22, 2014 Board Presentation Overview and Summary of the Health Life Safety Survey and Master
More informationSimcoe County District School Board. 5yr Condition Assessment 2006/07 to 2010/11. Hillcrest PS (Barrie), 9205
5yr Condition Assessment 2006/07 to 2010/11 Construction Year Area 1951 3,813 Page 1 of 25 1. Architectural / Structural & Site Exec Summary Hillcrest Public School is a two storey structure of masonry
More informationKEY ELEMENTARY SCHOOL
INITIAL YEAR BUILT 1925 BUILDING AREA 52,000 SF CURRENT PROGRAM CAPACITY 320 ENROLLMENT 2008 328 WARD 3 PROPOSED PROGRAM CAPACITY 325 Site Plan KEY - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION PK-5
More informationCapital Projects Update
Issaquah School District Issaquah High School Reconstruction March 2010 Installation of exterior masonry and siding panels continues on the classroom wings. Library windows are complete. Window and storefront
More informationTenant Fit-Out for PLCB / Waynesboro Mall
Tenant Fit-Out for PLCB / CODE REVIEW: PROJECT DESCRIPTION TENANT BUILD OUT PROPOSED USE SALE OF BEVERAGE ALCOHOL / PLCB SPRINKLERED: YES ALLOWABLE BUILDING HEIGHT & AREA: GROUP M / TYPE VB ALLOWED 1 STORY
More informationFlorida Army National Guard Construction Facilities Management Office. Scope of Work:
Florida Army National Guard Construction Facilities Management Office Florida Armory Revitalization Program (FARP) Design Guidelines September 2011 Scope of Work: To provide complete design for the renovation/alterations
More informationBetter By Design Energy Efficiency in Needham s Public Construction Projects
Better By Design Energy Efficiency in Needham s Public Construction Projects Green Needham Monday, November 26 th, 2012 7:00PM Needham Public Library Energy Efficiency in Town Projects Presenters tonight
More informationColumbia County Health Care Center Added Amenities
Columbia County Health Care Center Added Amenities Columbia County Board Meeting on January 16th, 2013 Building Exterior Added Amenities 1. Upgraded nail-base roofing insulation to 3 thickness on Center
More informationRenovation Progress. May 12 18, Week 32
Renovation Progress May 12 18, 2012 Week 32 May 12 Furring strips along back wall of Sisters new Dining Area completed; projection room holes to be covered up when sheetrock is installed May 12 Another
More informationEASTERN HIGH SCHOOL. Site Plan East Capitol Street, N.E., Washington, DC INITIAL YEAR BUILT 1923
INITIAL YEAR BUILT 1923 BUILDING AREA 288,800 SF CURRENT PROGRAM CAPACITY 1,425 ENROLLMENT 2008 565 WARD 6 PROPOSED PROGRAM CAPACITY 1,100 Site Plan EASTERN - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION
More informationROD Grant Round 4 Presentation June 9, 2014
ROD rant Round 4 Presentation June 9, 2014 713 Creek Road Bellmawr, NJ 08031 Telephone (856) 396-6200 Facsimile (856) 396-6205 Please visit us on the web at www.garrisonarch.com 2 Agenda NJDOE Application
More informationDIVISION 0 - BIDDING REQUIREMENTS, CONTRACTOR FORMS AND CONDITIONS OF THE CONTRACT
TABLE OF CONTENTS INTRODUCTORY INFORMATION Section 00 00 10 Title Page 00 00 20 Table of Contents DIVISION 0 - BIDDING REQUIREMENTS, CONTRACTOR FORMS AND CONDITIONS OF THE CONTRACT Section 00 02 00 Invitation
More informationPRODUCER'S PRODUCE CONCEPT MASTER PLAN 501 North Main, Springfield, Missouri. Prepared for: Joe Costello and Charlie Hoke October 12, 2009
PRODUCER'S PRODUCE CONCEPT MASTER PLAN 501 North Main, Springfield, Missouri Prepared for: Joe Costello and Charlie Hoke Southeast Corner looking Northwest Aerial View looking Northeast 0' 8 16 32 64'