Civil Engineering Construction I (CBE5031)

Size: px
Start display at page:

Download "Civil Engineering Construction I (CBE5031)"

Transcription

1 Civil Engineering Construction I (CBE5031) Pile Test 1

2 Ch. 2B Quality Control of Piles As the design and construction of buildings become more complex, it is necessary to exercise closer supervision during construction to ensure quality of the building works. The foundation of a building is a fundamental structural element which supports the whole building. 2

3 Ch. 2B Quality Control of Piles As the foundation, when constructed, is buried in the ground, its built quality is not readily visible There is a need to enhance the supervision of foundation works during construction and testing of the completed works in order to ensure that the quality of the foundation works is up to standard. 3

4 2b.1. Pre drilling for piles founded on rock For piles founded on rock, sufficient pre drilling should be carried out before the installation works, such that the quality of the founding rock can be identified and the appropriate founding levels can be determined. The pre drilling should be sunk to at least 5m below the tentative founding rock levels of the piles. 4

5 2b.1. Pre drilling for piles founded on rock Pre drilling should be carried out for each of the large diameter bored piles, barrettes and the like. For minipiles, socketted steel H piles and similar small diameter bored piles, founding on rock, the number of pre drill boreholes required should be such that the pile tip of every such pile should be within 5 metres from a pre drill hole, or at a larger distance from it as decided by the Engineer. 5

6 2b.2 Determination of the Settlement of the Piles by Load Test Pile Loading Test Setup 6

7 2b.2 Determination of the Settlement of the Piles by Load Test Hydraulic Jack Kentledge 7

8 2b.2.1 Procedure of Load Test (Extraction from General Specification for Civil Engineering Works 2006) a. Working piles shall be tested to not less than 1.8 times working load. b. Test loads shall be applied and removed in three stages as stated in Table 1. c. The test loads shall be applied in increments, and removed in decrements, of 25% of the working load. Increments of load shall not be applied until the rate of settlement of the pile is less than 0.1 mm in 20 minutes. 8

9 2b.2.1 Procedure of Load Test d) The full test loads for Stage I shall be applied in increments and shall then be maintained for at least 24 hours after the rate of settlement has reduced to less than 0.1 mm per hour. The test loads shall be removed in decrements and the recovery of the pile determined before loading is resumed. e) The procedure stated in (d) shall be repeated for Stage II loading. f) The procedure stated in (d) shall be repeated for Stage III loading. 9

10 2b.2.1 Procedure of Load Test g) The settlement of the pile shall be measured at hourly intervals. The settlement of the pile under each increment and decrement of loading shall be measured. The exact times at which increments are applied and decrements are removed shall be recorded. h) The level of the reference beam shall be checked at regular intervals agreed by the Engineer during the test. Table 1 Test loading stages Stage Test load I 25%ofmax.testload II 50% of max. test load III 100% of max. test load 10

11 2b.2.2 Compliance criteria of load tests on piles (Remark: Buildings Department and Architectural Services Department have a different pile loading test procedure and compliance criteria. Please refer to the relevant technical documents which are available form the websites of the government departments.) 1. The settlement at any load shall be less than twice the settlement at 90% of that load (Brinch Hansen's criteria). 2. Under working load the gross pile head settlement shall not exceed 20 mm for buildings and 10 mm for other structures. 11

12 2b.3. Proof drilling 2b.3.1 For Large diameter bored piles Proof drilling shall be carried out on every largediameter bored pile to check the condition at the concrete/rock interface. A base coring tube of at least 150 mm diameter shall be left at about 1 m above the founding level of the pile. The core drilling shall be carried out to 1 m below the concrete/rock interface. 12

13 2b.3For minipiles and socketted steel H piles Proof drilling shall be carried out to verify the adequacy of the socketted length of minipiles and socketted steel H piles The depths of the proof drill holes shall be at least 5 metres below the founding levels of the adjoining piles. 13

14 2b.4Testing of concrete core from piles Concrete cores shall be 100 mm diameter. Each concrete core from a pile shall be inspected for evidence of segregation of the constituents and for the presence of voids. Specimens selected from each core shall be tested to determine the compressive strength. The concrete core shall be considered as non compliant if it exhibits honeycombing which means interconnected voids arising from, for example, inadequate compaction or lack of mortar. 14

15 2b.4Testing of concrete core from piles For any set of cores representing a test location, the average estimated equivalent cube strength shall be at least 85% of the specified grade strength. Each individual estimated equivalent cube strength shall be at least 75% of the specified grade strength. 15

16 2b.5. Sonic Test on bored pile Prior to concreting, three to four mild steel tubes of not less than 50 mm internal diameter are fixed to reinforcement cage of the cast insitu pile. The tubes shall be watertight, parallel to the axis of the pile and extend the full depth of the pile. Testing is carried out by lowering a pair of sensor probes (a transmitter and a receiver) to the bottom of the tubes. The tubes are filled with water/jelly prior to testing to provide acoustic coupling The probes are maintained at the same elevation and simultaneously raised slowly (20cm/s). The propagation of sonic signals between the tubes is recorded. 16

17 2b.5. Sonic Test on bored pile The test is repeated for each pair of tubes, i.e. three runs for a pile with three tubes and six runs for a pile with four tubes. 17

18 2b.6. Reference R.Chudley, 1985, Construction Technology Vol, 3 &4, Longman S.A.R. Jufri & R.J. Wellman, 1991, Civil Engineering Construction IV, Vol 2 & 3, Hong Kong Polytechnic R. Holmes, 1983, Introduction to Civil Engineering Construction, College of Estate Management M.J. Turner, 1997, Integrity testing in Piling Practice, Construction Industry Research and Information Association 18

Construction Technology B (CON4313)

Construction Technology B (CON4313) 2 - Foundation The British Standard Code of Practice BS8004 defines a foundation as 'that part of the structure designed and constructed to be in direct contact with and transmitting loads to the ground'

More information

Civil Engineering Construction I (CBE5031)

Civil Engineering Construction I (CBE5031) Civil Engineering Construction I (CBE5031) Basement 1 1 Quick Revision 1.1 Problems arising from basement construction a) Excavation method. b) Surface and ground water control c) Lateral stability of

More information

Construction Technology B (CON4313)

Construction Technology B (CON4313) 3 - Basement 1 Quick Revision 1.1 Problems arising from basement construction a. Excavation method. b. Surface and ground water control c. Lateral stability of basement excavation. d. Stability of adjoining

More information

Capstone C O N S U L T A N T S

Capstone C O N S U L T A N T S Ultrasonic Pulse Velocity Tests These tests are primarily done to establish: the homogeneity of concrete presence of cracks, voids and other imperfections changes in quality of concrete over time this

More information

SAMPLE SPECIFICATION for CROSSHOLE SONIC LOGGING (CSL) September 2015

SAMPLE SPECIFICATION for CROSSHOLE SONIC LOGGING (CSL) September 2015 SAMPLE SPECIFICATION for CROSSHOLE SONIC LOGGING (CSL) September 2015 Note: This sample specification contains recommended or typical quantities in parenthesis, in the format (quantity); the specifying

More information

The Technical and Contractual Matters of Bored Piling Works. By Wallace Yeung Vibro (H.K.) Ltd.

The Technical and Contractual Matters of Bored Piling Works. By Wallace Yeung Vibro (H.K.) Ltd. The Technical and Contractual Matters of Bored Piling Works By Wallace Yeung Vibro (H.K.) Ltd. What is large diameter bored pile? How to construct a large diameter bored pile? Its advantages and limitation

More information

FURTHER TECHNICAL INFORMATION IN RELATION TO THE OPERATIONS OF OUR GROUP

FURTHER TECHNICAL INFORMATION IN RELATION TO THE OPERATIONS OF OUR GROUP A. TECHNICAL INFORMATION OF OUR FOUNDATION WORKS The major types of our foundation works (with illustrative diagram, where applicable) are set out below: 1. Bored piles 0.80m 3.5m pile shaft By Grabbing

More information

Bi-Directional Static Load Testing of Drilled Shafts

Bi-Directional Static Load Testing of Drilled Shafts Supplemental Technical Specification for Bi-Directional Static Load Testing of Drilled Shafts SCDOT Designation: SC-M-712 (9/15) September 2, 2015 1.0 GENERAL This work shall consist of furnishing all

More information

Bi-Directional Static Load Testing of Drilled Shafts

Bi-Directional Static Load Testing of Drilled Shafts Supplemental Technical Specification for Bi-Directional Static Load Testing of Drilled Shafts SCDOT Designation: SC-M-712 (01/18) 1.0 GENERAL This work shall consist of furnishing all materials, equipment,

More information

Civil Engineering Construction I (CBE5031)

Civil Engineering Construction I (CBE5031) Civil Engineering Construction I (CBE5031) Precast Concrete 1 Definition of Precast Concrete Precasting means casting a concrete member at a place other than where it will be used and then moving it to

More information

S.No Description Unit Quantity Rate (Rs) Amount (Rs)

S.No Description Unit Quantity Rate (Rs) Amount (Rs) , S.No Description Unit Quantity Rate (Rs) Amount (Rs) 1 2 Vertical load testing of piles in accordance with IS 2911 (Part IV) including installation of loading platform by Kentledge method and preparation

More information

sonitec The most effective solution for integrity checking of concrete piles and deep foundations

sonitec The most effective solution for integrity checking of concrete piles and deep foundations sonitec The most effective solution for integrity checking of concrete piles and deep foundations www.dextragroup.com Dextra sonitec WHAT IS CROSS SONIC LOGGING? Definition Crosshole Sonic Logging (CSL)

More information

CONTINUOUS FLIGHT AUGER (CFA) PILES QC/QA PROCEDURES. Preferred QC/QA Procedures

CONTINUOUS FLIGHT AUGER (CFA) PILES QC/QA PROCEDURES. Preferred QC/QA Procedures Preferred QC/QA Procedures The Federal Highway Administration (FHWA) has provided QC/QA guidance for this technology as noted below. The reference document also contains information about construction

More information

SECTION XXXXX STONE COLUMNS PART 1 - GENERAL

SECTION XXXXX STONE COLUMNS PART 1 - GENERAL SECTION XXXXX STONE COLUMNS PART 1 - GENERAL 1.1 RELATED DOCUMENTS: Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 00 and Division 01

More information

SPECIFICATION 1035 M

SPECIFICATION 1035 M MAY 1984 SPECIFICATION 1035 M SPECIFICATIONS FOR UNDERWATER CONCRETE 1035. 1. DESCRIPTION The work will consist of the mixing of concrete in accordance with the "Specifications for Reinforced Concrete",

More information

SECTION XXXXX AGGREGATE PIERS PART 1 - GENERAL

SECTION XXXXX AGGREGATE PIERS PART 1 - GENERAL SECTION XXXXX AGGREGATE PIERS PART 1 - GENERAL 1.1 RELATED DOCUMENTS: Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 00 and Division

More information

Lesson 7 REINFORCING CAGE. Version 1-1/

Lesson 7 REINFORCING CAGE. Version 1-1/ Lesson 7 REINFORCING CAGE 7-1 Version 1-1/15 7-1 Learning Outcomes Describe cage construction Determine the circumference of a shaft and rebar cage and calculate the required number of side spacers. Explain

More information

703 - DRILLED SHAFTS SECTION 703 DRILLED SHAFTS

703 - DRILLED SHAFTS SECTION 703 DRILLED SHAFTS SECTION 703 DRILLED SHAFTS 703.1 DESCRIPTION Construct drilled shafts by the cased or uncased method depending upon site conditions and Contract Document requirements. BID ITEMS Drilled Shaft (*) (**)

More information

Integrity evaluation of concrete by cross-hole sonic logging in Bangladesh

Integrity evaluation of concrete by cross-hole sonic logging in Bangladesh IABSE-JSCE Joint Conference on Advances in Bridge Engineering-III, August 2-22, 25, Dhaka, Bangladesh. ISBN: 978-984-33-933-5 Amin, Okui, Bhuiyan, Ueda (eds.) www.iabse-bd.org Integrity evaluation of concrete

More information

Detection of Concrete Damage Using Ultrasonic Pulse Velocity Method

Detection of Concrete Damage Using Ultrasonic Pulse Velocity Method Indian Society for Non-Destructive Testing Hyderabad Chapter Proc. National Seminar on Non-Destructive Evaluation Dec. 7-9, 2006, Hyderabad Detection of Concrete Damage Using Ultrasonic Pulse Velocity

More information

Non-destructive Testing of Installed Soil Nails Using Sonic Echo Test Method

Non-destructive Testing of Installed Soil Nails Using Sonic Echo Test Method Non-destructive Testing of Installed Soil Nails Using Sonic Echo Test Method Specifications for Grouting Mixtures and Procedures for Soil Nail Installations Research Project Number 0-4484 Research Product

More information

The Updated Drilled Shaft Manual: Potential Impacts on AASHTO Specifications. J. Turner & D. Brown May 24, 2010 AASHTO T-15 Sacramento, CA

The Updated Drilled Shaft Manual: Potential Impacts on AASHTO Specifications. J. Turner & D. Brown May 24, 2010 AASHTO T-15 Sacramento, CA The Updated Drilled Shaft Manual: Potential Impacts on AASHTO Specifications J. Turner & D. Brown May 24, 2010 AASHTO T-15 Sacramento, CA Drilled Shafts: Construction Procedures and LRFD Design Methods

More information

SECTION WATERTIGHTNESS TEST FOR PLANT TANKAGE STRUCTURES

SECTION WATERTIGHTNESS TEST FOR PLANT TANKAGE STRUCTURES SECTION 01 48 00 - WATERTIGHTNESS TEST FOR PLANT TANKAGE STRUCTURES PART 1 - GENERAL 1.1 SCOPE OF WORK A. Furnish all labor, materials and incidentals required and perform tightness testing of water-containing

More information

1. Structural Steel Sections Structural steel sections can be classified into various groups according to their shapes.

1. Structural Steel Sections Structural steel sections can be classified into various groups according to their shapes. 1 Structural Steelwork 1. Structural Steel Sections Structural steel sections can be classified into various groups according to their shapes. A steel section is designated by the serial size in millimeters

More information

PILING PART-VI CONSTRUCTION AND INSTALLATION OF RCC BORED CAST IN-SITU PILES

PILING PART-VI CONSTRUCTION AND INSTALLATION OF RCC BORED CAST IN-SITU PILES Page 1 of 8 PILING PART-VI OF RCC BORED CAST IN-SITU PILES REV. NO. PRAPARED APPROVED DATE 00 Marina P Mishra COPYRIGHT AND CONFIDENTAL The information on this document is the property of BHARAT HEVY ELECTRICAL

More information

Bi-Directional Static Load Testing of Driven Piles

Bi-Directional Static Load Testing of Driven Piles Bi-Directional Static Load Testing of Driven Piles Paul J. Bullock, PhD Fugro Consultants Inc. Loadtest Bi-Directional Osterberg Cell Testing Specialized jack in pile uses bearing to mobilize side shear

More information

KANSAS DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION TO THE STANDARD SPECIFICATIONS, EDITION 2015

KANSAS DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION TO THE STANDARD SPECIFICATIONS, EDITION 2015 Sheet 1 of 9 KANSAS DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION TO THE STANDARD SPECIFICATIONS, EDITION 2015 Delete SECTION 703 and replace with the following: SECTION 703 DRILLED SHAFTS 703.1 DESCRIPTION

More information

SCOPE OF WORK FOR PILING JOB

SCOPE OF WORK FOR PILING JOB SCOPE OF WORK FOR PILING JOB 1.0 PURPOSE This document defines the scope of works and specific requirements for the tank pad construction including pile foundation system for the proposed tanks at Wadala

More information

SPECIFICATION OF JACKED ANCHOR FOR RETAINING STRUCTURES

SPECIFICATION OF JACKED ANCHOR FOR RETAINING STRUCTURES SPECIFICATION OF JACKED ANCHOR FOR RETAINING STRUCTURES 1.0 GENERAL This specification deals with jacked anchors and shall be read in conjunction with the conditions of contract and the Specification for

More information

METHOD OF MAKING AND CURING CONCRETE TEST SPECIMENS IN THE FIELD FOP FOR AASHTO T 23

METHOD OF MAKING AND CURING CONCRETE TEST SPECIMENS IN THE FIELD FOP FOR AASHTO T 23 METHOD OF MAKING AND CURING CONCRETE TEST SPECIMENS IN THE FIELD FOP FOR AASHTO T 23 Scope This procedure covers the method for making, initially curing, and transporting concrete test specimens in the

More information

CASTING AND TESTING OF A BORED PILE FOUNDATIONS

CASTING AND TESTING OF A BORED PILE FOUNDATIONS CASTING AND TESTING OF A BORED PILE FOUNDATIONS J.Naga Shiva jyothi, M. David nagasivajyoyhi95@gmail.com,mogiidavid352@gmail.com ABSTRACT This project titled BORED CAST IN- SITU PILE FOUNDATIONS done in

More information

ACOUSTIC EMISSION MONITORING OF CONCRETE HINGE JOINT MODELS

ACOUSTIC EMISSION MONITORING OF CONCRETE HINGE JOINT MODELS ACOUSTIC EMISSION MONITORING OF CONCRETE HINGE JOINT MODELS K. M. Holford School of Engineering, Cardiff University, UK R. Pullin School of Engineering, Cardiff University, UK R. J. Lark School of Engineering,

More information

Sample Specifications for Testing Foundations with the Thermal Integrity Profiler (TIP)

Sample Specifications for Testing Foundations with the Thermal Integrity Profiler (TIP) September 2016 Sample Specifications for Testing Foundations with the Thermal Integrity Profiler (TIP) Note: This sample specification contains recommended or typical quantities in parenthesis, in the

More information

MODEL SPECIFICATIONS: Hydraulically Driven Steel Underpinning Pile Specifications

MODEL SPECIFICATIONS: Hydraulically Driven Steel Underpinning Pile Specifications MODEL SPECIFICATIONS: Hydraulically Driven Steel Underpinning Pile Specifications Mar/2008 v1.0 SECTION 02255 HYDRAULICLY DRIVEN STEEL UNDERPINNING PILES PART 1 GENERAL 1.01 SCOPE OF WORK The work shall

More information

Deep Water Drilled Shafts for the Herrington Lake Bridge Replacement Project

Deep Water Drilled Shafts for the Herrington Lake Bridge Replacement Project Deep Water Drilled Shafts for the Herrington Lake Bridge Replacement Project Darrin Beckett, P.E. Kentucky Transportation Cabinet 49 th Southeastern Transportation Geotechnical Engineering Conference October

More information

DIAPHRAGM WALLS, CUT-OFF WALLS AND SLURRY WALLS

DIAPHRAGM WALLS, CUT-OFF WALLS AND SLURRY WALLS DIAPHRAGM WALLS, CUT-OFF WALLS AND SLURRY WALLS Implenia Spezialtiefbau GmbH Robert Bosch Straße 25 D-63225 Langen Phone: +49 6103 988 345 Fax: +49 6103 988 277 Email: info.spezialtiefbau@implenia.com

More information

Installing DELTABEAM. Installation of DELTABEAM. Deliveries. Storage on-site

Installing DELTABEAM. Installation of DELTABEAM. Deliveries. Storage on-site Installing DELTABEAM Installation of DELTABEAM These DELTABEAM installation instructions are intended to complement the project s erection plan. Peikko s technical support can help with the erection plan

More information

APPENDIX I NASP TEST PROTOCOLS

APPENDIX I NASP TEST PROTOCOLS APPENDIX I NASP TEST PROTOCOLS I-1 I-2 I-3 I-4 NASP STRAND BOND TEST (DRAFT) Standard Test Method to Assess the Bond of 0.5 in. (12.7 mm) and 0.6 in. (15.24 mm) Seven Wire Strand with Cementitious Materials

More information

Supervision of Piling Works

Supervision of Piling Works Page 1 of 7 Supervision of Piling Works Sayeed Ahmed Assistant Director (Planning & Development) Independent University Bangladesh, Dhaka, Bangladesh e-mail ABSTRACT Supervision is utmost important in

More information

SECTION DUCTILE IRON PILES

SECTION DUCTILE IRON PILES SECTION 31 66 13 DUCTILE IRON PILES PART 1 - GENERAL 1.1 GENERAL REQUIREMENTS A. Work of this Section, as shown or specified, shall be in accordance with the requirements of the Contract Documents. B.

More information

SPECIAL INSPECTION AND OBSERVATION PROGRAM City of Walnut Creek Building Division. Project Address:

SPECIAL INSPECTION AND OBSERVATION PROGRAM City of Walnut Creek Building Division. Project Address: SPECIAL INSPECTION AND OBSERVATION PROGRAM City of Walnut Creek Building Division Permit Application #: Project Address: Purpose: To meet the requirements of City of Walnut Creek Municipal Code Section

More information

***************************************************************************************************************

*************************************************************************************************************** 03365 POST-TENSIONED CONCRETE *************************************************************************************************************** SPECIFIER: CSI MasterFormat 2004 number 03 38 00. ***************************************************************************************************************

More information

Combined Pile Foundation System for a Residential Complex

Combined Pile Foundation System for a Residential Complex Combined Pile Foundation System for a Residential Complex Alvin K.M. Lam, Geotechnical Engineer, Ove Arup & Partners Hong Kong Limited, Hong Kong, China; email: alvin.lam@arup.com Daman D.M. Lee, Civil

More information

INDEX FOR SPECIFICATIONS FOR JACKING CULVERTS THROUGH EMBANKMENTS SCOPE... 2

INDEX FOR SPECIFICATIONS FOR JACKING CULVERTS THROUGH EMBANKMENTS SCOPE... 2 INDEX FOR SPECIFICATIONS FOR JACKING CULVERTS THROUGH EMBANKMENTS 410. 1 SCOPE... 2 410. 2 DEFINITIONS 2.1 Tunneling and Jacking... 2 2.2 Tunneling... 2 2.3 Jacking... 2 410. 3 MATERIALS 3.1 General...

More information

RECORD KEEPING AND INSPECTION NOTES FOR FUTURE NEEDS

RECORD KEEPING AND INSPECTION NOTES FOR FUTURE NEEDS RECORD KEEPING AND INSPECTION NOTES FOR FUTURE NEEDS Chris Nickel, P.E. LA DOTD Pavement & Geotechnical Services 2011 Louisiana Engineering Conference TOPIC OUTLINE Driven Piles Definitions and Data table

More information

SECTION / ENGINEERED AGGREGATE PIERS (SOIL REINFORCEMENT AND FOUNDATION SYSTEM)

SECTION / ENGINEERED AGGREGATE PIERS (SOIL REINFORCEMENT AND FOUNDATION SYSTEM) PART 1 GENERAL 1.01 WORK INCLUDED SECTION 02360 / 31 34 30.13 ENGINEERED AGGREGATE PIERS (SOIL REINFORCEMENT AND FOUNDATION SYSTEM) A. Provide all equipment, material, labor and supervision to design and

More information

Special Provision No. 799F01 March 2012 CONSTRUCTION SPECIFICATION FOR THE INSTALLATION OF NOISE BARRIER TABLE OF CONTENTS

Special Provision No. 799F01 March 2012 CONSTRUCTION SPECIFICATION FOR THE INSTALLATION OF NOISE BARRIER TABLE OF CONTENTS ... m NOISE BARRIER - Item No.... m NOISE BARRIER INCLUDING PRECAST NOISE/TRAFFIC BARRIER - Item No.... m NOISE BARRIER ON STRUCTURES - Item No.... m SALVAGEABLE NOISE BARRIER - Item No.... m SALVAGEABLE

More information

ITEM NN17 - DRILLED SHAFTS ITEM NN17 - DRILLED SHAFTS (LOW OVERHEAD CLEARANCE) ITEM TRIAL SHAFTS

ITEM NN17 - DRILLED SHAFTS ITEM NN17 - DRILLED SHAFTS (LOW OVERHEAD CLEARANCE) ITEM TRIAL SHAFTS DESCRIPTION A. General. This work shall consist of furnishing the materials and installing drilled shafts at the locations, dimensions, and batters shown on the contract plans or where ordered by the Engineer

More information

CRD-C Standard Test Method for Comparing Concretes on the Basis of the Bond Developed with Reinforced Steel

CRD-C Standard Test Method for Comparing Concretes on the Basis of the Bond Developed with Reinforced Steel Standard Test Method for Comparing Concretes on the Basis of the Bond Developed with Reinforced Steel 1. Scope 1.1 This test method covers comparison of concretes on the basis of the bond developed with

More information

Construction Measurement III SBQ3314. Precast Pre stressed Concrete Works. Dr. Sarajul Fikri Mohamed

Construction Measurement III SBQ3314. Precast Pre stressed Concrete Works. Dr. Sarajul Fikri Mohamed Construction Measurement III SBQ3314 Precast Pre stressed Concrete Works Dr. Sarajul Fikri Mohamed Table of Contents 1. Pre stressed concrete in bridgeworks: technological aspects 2. SMM2 measurement rules

More information

INTERPRETATIONS OF INSTRUMENTED BORED PILES IN KENNY HILL FORMATION

INTERPRETATIONS OF INSTRUMENTED BORED PILES IN KENNY HILL FORMATION INTERPRETATIONS OF INSTRUMENTED BORED PILES IN KENNY HILL FORMATION S. S. Liew 1, Y. W. Kowng 2 & S. J. Gan 3 ABSTRACT This paper presents the results of two instrumented bored cast-in-situ test piles

More information

Legislative Council Panel on Transport Subcommittee on Matters Relating to Railways

Legislative Council Panel on Transport Subcommittee on Matters Relating to Railways Legislative Council Panel on Transport Subcommittee on Matters Relating to Railways Hong Kong Section of the Guangzhou-Shenzhen-Hong Kong Express Rail Link Supplementary Information In the meeting of the

More information

Special Provision No. 599F01 May 2004 CONSTRUCTION SPECIFICATION FOR THE INSTALLATION OF NOISE BARRIER TABLE OF CONTENTS

Special Provision No. 599F01 May 2004 CONSTRUCTION SPECIFICATION FOR THE INSTALLATION OF NOISE BARRIER TABLE OF CONTENTS ... m NOISE BARRIER - Item No.... m NOISE BARRIER INCLUDING PRECAST NOISE/TRAFFIC BARRIER - Item No.... m NOISE BARRIER ON STRUCTURES - Item No.... m SALVAGEABLE NOISE BARRIER - Item No.... m SALVAGEABLE

More information

SAMPLE GUIDE SPECIFICATIONS FOR OSTERBERG CELL LOAD TESTING OF DRILLED SHAFTS

SAMPLE GUIDE SPECIFICATIONS FOR OSTERBERG CELL LOAD TESTING OF DRILLED SHAFTS SAMPLE GUIDE SPECIFICATIONS FOR OSTERBERG CELL LOAD TESTING OF DRILLED SHAFTS 1.0 DESCRIPTION This work shall consist of furnishing all materials and labor necessary for conducting an Osterberg Cell (O-cell)

More information

Analysis of Application of Pile Foundation Technology in Construction Engineering

Analysis of Application of Pile Foundation Technology in Construction Engineering RESEARCH ARTICLE Analysis of Application of Pile Foundation Technology in Construction Engineering Xiaoyu Si, Xiangru Zhao, Lihua Wang, Baosen Du, Liping Wu Hebei University, Shijiazhuang 050000, Hebei

More information

Lantz-Boggio Architects, P.C LBA Project No

Lantz-Boggio Architects, P.C LBA Project No SECTION 313430- PART 1 GENERAL 1.1 WORK INCLUDED A. Provide all equipment, material, labor and supervision to design and install Engineered Aggregate Piers for the soil reinforcement. Design shall rely

More information

B. The Pile Contractor shall furnish and place all reinforcing steel, dowels, and anchor bolts as shown on the drawings.

B. The Pile Contractor shall furnish and place all reinforcing steel, dowels, and anchor bolts as shown on the drawings. SECTION 31 63 16 AUGER CAST GROUT PILES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of Contract, including General and Supplementary Conditions and Division- 01 Specification

More information

204 - EXCAVATION AND BACKFILL FOR STRUCTURES SECTION 204 EXCAVATION AND BACKFILL FOR STRUCTURES. Granular Backfill (Wingwalls) (Set Price)

204 - EXCAVATION AND BACKFILL FOR STRUCTURES SECTION 204 EXCAVATION AND BACKFILL FOR STRUCTURES. Granular Backfill (Wingwalls) (Set Price) SECTION 204 EXCAVATION AND BACKFILL FOR STRUCTURES 204.1 DESCRIPTION Excavate for the structures as shown in the Contract Documents. Unless specified otherwise, backfill the completed structures to the

More information

Lesson 2 Substructure. Dr S.Sreenath BSc Engg, MSc Engg, MSc (ICM), MBA, PhD

Lesson 2 Substructure. Dr S.Sreenath BSc Engg, MSc Engg, MSc (ICM), MBA, PhD Lesson 2 Substructure Dr S.Sreenath BSc Engg, MSc Engg, MSc (ICM), MBA, PhD Outline Syllabus 1. Demolition 2. Site problems 3. Substructure 4. Basements 5. Structural Frames 6. Floors 7. External walls

More information

SUPPLEMENTAL TECHNICAL SPECIFICATION

SUPPLEMENTAL TECHNICAL SPECIFICATION July 14, 2015 HIGH STRAIN DYNAMIC LOAD TESTING OF DRILLED SHAFTS 1.0 GENERAL This work shall consist of performing high-strain dynamic testing using a drop weight loading system on a test drilled shaft

More information

A.Zh.Zhussupbekov Department of Civil Engineering and Engineering Mechanics, Columbia University, New York, USA

A.Zh.Zhussupbekov Department of Civil Engineering and Engineering Mechanics, Columbia University, New York, USA UDK 69.0 A.Zh.Zhussupbekov Department of Civil Engineering and Engineering Mechanics, Columbia University, New York, USA Research of displacement pile and continuous flight auger technologies on construction

More information

INDEX FOR SPECIFICATIONS FOR REMOVING CULVERTS AND PLACING CULVERTS SCOPE... 1

INDEX FOR SPECIFICATIONS FOR REMOVING CULVERTS AND PLACING CULVERTS SCOPE... 1 March 2002 No. 400 INDEX FOR SPECIFICATIONS FOR REMOVING CULVERTS AND PLACING CULVERTS 400. 1 SCOPE... 1 400. 2 REMOVING CULVERTS AND TIMBER STRUCTURES 2.1 Concrete and Metal Pipe Culverts... 1 2.2 Structural

More information

DIVISION 700 STRUCTURES

DIVISION 700 STRUCTURES SECTION TABLE OF CONTENTS DIVISION 700 STRUCTURES 701 TEMPORARY SHORING... 700-1 702 CORRUGATED METAL SHEET PILING... 700-2 703 DRILLED SHAFTS... 700-3 704 PILING... 700-10 705 STRUCTURAL STEEL FABRICATION...

More information

CHANGES IN 2006 SPECIFICATIONS SECTION 804 DRIVEN PILES SECTION 814 DRILLED SHAFTS

CHANGES IN 2006 SPECIFICATIONS SECTION 804 DRIVEN PILES SECTION 814 DRILLED SHAFTS CHANGES IN 2006 SPECIFICATIONS SECTION 804 DRIVEN PILES SECTION 814 DRILLED SHAFTS 2006 LADOTD ENGINEERING CONFERENCE Kim Martindale Garlington, P.E. Pavement & Geotechnical Services February 13, 2007

More information

SPECIAL SPECIFICATION Thermal Integrity Profiler (TIP) Wire Cable Testing of Drilled Shafts

SPECIAL SPECIFICATION Thermal Integrity Profiler (TIP) Wire Cable Testing of Drilled Shafts SAMPLE SPECIFICATION FOR TESTING FOUNDATIONS With the Thermal Integrity Profiling Wire Cable System Note: This sample specification contains recommended or typical quantities in parenthesis, in the format

More information

A/E REVIEW CHECKLIST STRUCTURAL

A/E REVIEW CHECKLIST STRUCTURAL A/E REVIEW CHECKLIST STRUCTURAL Reviewers should - Use Checklists when reviewing any type of VA construction project for the following disciplines: Site and Landscape, Architectural, Structural, Plumbing,

More information

Rapid non-destructive test method at the Taiwan High-Speed Rail project

Rapid non-destructive test method at the Taiwan High-Speed Rail project Rapid non-destructive test method at the Taiwan High-Speed Rail project by Allen G. Davis, Ph.D., D.Sc. Construction Technology Laboratories, Inc In 2002, Construction Technology Laboratories Inc participated

More information

Soil Improvement by Compaction Grouting

Soil Improvement by Compaction Grouting CITY AND COUNTY OF DENVER ENGINEERING DIVISION Wastewater Capital Projects Management Standard Construction Specification 31-3223.12 Soil Improvement by Compaction Grouting Part 1 - General 1.01 Introduction

More information

A. Section includes temporary excavation support and protection systems.

A. Section includes temporary excavation support and protection systems. SECTION 31 50 00 - EXCAVATION SUPPORT AND PROTECTION PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division

More information

UNIFIED FACILITIES GUIDE SPECIFICATIONS

UNIFIED FACILITIES GUIDE SPECIFICATIONS USACE / NAVFAC / AFCEC / NASA UFGS-31 63 16 (November 2008) ----------------------------- Preparing Activity: USACE Superseding UFGS-31 63 16 (October 2007) UNIFIED FACILITIES GUIDE SPECIFICATIONS References

More information

SECTION GROUT. A. American Society for Testing and Materials (ASTM):

SECTION GROUT. A. American Society for Testing and Materials (ASTM): SECTION 03600 GROUT PART 1 GENERAL 1.01 SUMMARY A. Related Sections: 1. 03300 - Cast-In-Place Concrete. 2. 03600 - Grout. 1.02 REFERENCES A. American Society for Testing and Materials (ASTM): 1. C109-95

More information

There are several types of trenchless technology applications for new installations. The following are some of the most prominent applications.

There are several types of trenchless technology applications for new installations. The following are some of the most prominent applications. Applications for New Installations There are several types of trenchless technology applications for new installations. The following are some of the most prominent applications. Note that some specifications

More information

Advantages / Disadvantages of Piling Methods. Continuous Flight Auger (CFA)

Advantages / Disadvantages of Piling Methods. Continuous Flight Auger (CFA) Advantages / Disadvantages of Piling Methods In this Piling Advice Note we will explore the advantages and disadvantages of differing types of piling methods. Continuous Flight Auger (CFA) The pile is

More information

ITEM 404 DRIVING STEEL PILING

ITEM 404 DRIVING STEEL PILING AFTER MARCH 1, 2012 ITEM 404 DRIVING STEEL PILING 404.1 Description. This Item shall govern the driving of steel piling. The piling shall be of the size and weight shown on the plans and shall be in accordance

More information

Foundation Engineering ECIV 4352

Foundation Engineering ECIV 4352 Foundation Engineering ECIV 4352 Instructor : Dr. Jehad Hamad 2016-2015 Chapter (11) Deep Foundation Chapter 11 Pile Foundation Foundation- Design Considerations Factors to be taken into consideration

More information

SECTION DRILLED CONCRETE PIERS AND SHAFTS

SECTION DRILLED CONCRETE PIERS AND SHAFTS SECTION 31 63 29 PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply

More information

Application of ultrasonic testing to steel-concrete composite structures

Application of ultrasonic testing to steel-concrete composite structures More Info at Open Access Database www.ndt.net/?id=18338 Application of ultrasonic testing to steel-concrete composite structures Arisa YANAGIHARA 1, Hiroaki HATANAKA 2, Minoru TAGAMI 2, Katsuya TODA 3,

More information

Research Evaluation of Single Lift Grouting in Concrete Masonry Wall Panels

Research Evaluation of Single Lift Grouting in Concrete Masonry Wall Panels Research Evaluation of Single Lift Grouting in Concrete Masonry Wall Panels Jeffrey H. Greenwald, P.E, Dennis W. Graber, P.E., J. Marcus Cherundolo, EIT Abstract The objective of this research was to investigate

More information

Deep Foundation Testing, Analysis and Consulting Services

Deep Foundation Testing, Analysis and Consulting Services Deep Foundation Testing, Analysis and Consulting Services PDA Testing and Monitoring Dynamic Load Testing- APPLE Thermal Integrity Testing Crosshole Sonic Logging SPT Energy Calibration Low Strain Integrity

More information

Non-Destructive Testing of Drilled Shafts Current Practice and New Method

Non-Destructive Testing of Drilled Shafts Current Practice and New Method Non-Destructive Testing of Drilled Shafts Current Practice and New Method George Piscsalko PE, Pile Dynamics, Inc., Cleveland, Ohio, USA Garland Likins PE, Pile Dynamics, Inc., Cleveland, Ohio, USA Benjamin

More information

SPECIFICATION FOR PRECAST/ COMPOSITE CONCRETE FLOORS/ ROOF DECKS SECTION E60

SPECIFICATION FOR PRECAST/ COMPOSITE CONCRETE FLOORS/ ROOF DECKS SECTION E60 SPECIFICATION FOR SECTION E60 A 2007-09-26 S.W. Revision Date Issue Authorised By Approved for Issue SW Date 24.09.07 clarkebond Page 1 of 6 To be read with Preliminaries/ General Conditions. GENERAL 10

More information

Multi-Institutional Academic Health Science & Research Center Evansville, IN

Multi-Institutional Academic Health Science & Research Center Evansville, IN SECTION 02370 AUGER CAST PILES PART 1 - GENERAL 1.1 SECTION INCLUDES: The work covered by these specifications consists of furnishing all labor, equipment and materials for the installation of auger cast

More information

CHAPTER 3 BEHAVIOUR OF FERROCEMENT HOLLOW SLABS

CHAPTER 3 BEHAVIOUR OF FERROCEMENT HOLLOW SLABS 30 CHAPTER 3 BEHAVIOUR OF FERROCEMENT HOLLOW SLABS 3.1 INTRODUCTION There are numerous similarities between ferrocement and reinforced concrete. Both use similar matrix and reinforcement materials. They

More information

Using Thermal Integrity Profiling to Confirm the Structural Integrity of foundation applications

Using Thermal Integrity Profiling to Confirm the Structural Integrity of foundation applications Using Thermal Integrity Profiling to Confirm the Structural Integrity of foundation applications Authors: 1. George Piscsalko, PE, Pile Dynamics, Inc., 30725 Aurora Road, Solon, Ohio, USA, gpiscsalko@pile.com;

More information

HIGH TENSION LOAD TRANSFER USING BORED PILES FOR SOUL APARTMENTS, Surfers Paradise

HIGH TENSION LOAD TRANSFER USING BORED PILES FOR SOUL APARTMENTS, Surfers Paradise HIGH TENSION LOAD TRANSFER USING BORED PILES FOR SOUL APARTMENTS, Surfers Paradise Martin Larisch Piling Contractors Pty Ltd ABSTRACT This paper describes two different methodologies of transferring high

More information

Rapid Axial Load Testing of Drilled Shafts

Rapid Axial Load Testing of Drilled Shafts Supplemental Technical Specification for Rapid Axial Load Testing of Drilled Shafts SCDOT Designation: SC-M-712 (9/15) September 4, 2015 1.0 GENERAL This work shall consist of performing a rapid axial

More information

Topic 1 - Properties of Concrete. 1. Quick Revision

Topic 1 - Properties of Concrete. 1. Quick Revision Topic 1 - Properties of Concrete 1. Quick Revision 1.1 Constituent Materials of concrete Concrete is composed mainly of three materials, namely, cement, water and aggregate, and sometimes additional material,

More information

CHAPTER 8. Concrete Work

CHAPTER 8. Concrete Work Concrete Work Clay Bricklaying Made Easy CONCRETE WORK Foundations for walls and piers All loadbearing walls and piers are required to stand on a concrete foundation, which must be able to receive and

More information

Experimental Study on behavior of Interior RC Beam Column Joints Subjected to Cyclic Loading P.Rajaram 1 A.Murugesan 2 and G.S.

Experimental Study on behavior of Interior RC Beam Column Joints Subjected to Cyclic Loading P.Rajaram 1 A.Murugesan 2 and G.S. Experimental Study on behavior of Interior RC Beam Column Joints Subjected to Cyclic Loading P.Rajaram 1 A.Murugesan 2 and G.S.Thirugnanam 3 1 P.G.Student, Department of Civil Engineering, Institute of

More information

Fundamentals of Concrete

Fundamentals of Concrete Components Cement Water Fine Aggregate Coarse Aggregate Fundamentals of Range in Proportions Advantages of Reducing Water Content: Increased strength Lower permeability Fundamentals of Increased resistance

More information

Upon speaking with the representatives with Technical Foundations as well as Walder Foundations, it was determined that:

Upon speaking with the representatives with Technical Foundations as well as Walder Foundations, it was determined that: As part of our analyses, we have considered the design and construction of the cantilever retaining wall that will be located along the north side of Lucks Lane, between Falling Creek and Gladstone Glen

More information

Implementation of this Special Provision requires a complete understanding of the following documents:

Implementation of this Special Provision requires a complete understanding of the following documents: VIRGINIA DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR Quality Assurance/Quality Control (QA/QC) for the Construction of Deep Foundation Systems for Design-Build and PPTA Contracts November 10, 2009

More information

Geotechnical Investigation Reports and Foundation Recommendations -Present status in India -Examples

Geotechnical Investigation Reports and Foundation Recommendations -Present status in India -Examples Geotechnical Investigation Reports and Foundation Recommendations -Present status in India -Examples Prof. V.S.Raju (Formerly: Director, IIT Delhi & Professor and Dean, IIT Madras) Email: rajuvs_b@yahoo.com

More information

Misan University - College of Engineering Civil Engineering Department

Misan University - College of Engineering Civil Engineering Department CHAPTER 2 Soil and Excavations Soil investigation including two phases: surface investigation and subsurface investigation Surface investigation involves making a preliminary judgment about the site s

More information

METHOD STATEMENT for INSTALLATION OF MICROPILE

METHOD STATEMENT for INSTALLATION OF MICROPILE METHOD STATEMENT for INSTALLATION OF MICROPILE A. MATERIAL TO BE USED 1. Grout Grout shall be mixed from Ordinary Portland Cement and clean water free from harmful substances. Usage of other cement which

More information

CONTENTS. Top-up Course for TCP T3 on GIFW and Building Works with Significant Geotechnical Content. Lecture 5 : Retaining Walls

CONTENTS. Top-up Course for TCP T3 on GIFW and Building Works with Significant Geotechnical Content. Lecture 5 : Retaining Walls Top-up Course for TCP T3 on GIFW and Building Works with Significant Geotechnical Content Lecture 5 : Retaining Walls CONTENTS Common Types of Retaining Walls Design and Construction Considerations Supervision

More information

BUCKLING BEHAVIOR OF PARTIALLY EMBEDDED REINFORCED CONCRETE PILES IN SAND

BUCKLING BEHAVIOR OF PARTIALLY EMBEDDED REINFORCED CONCRETE PILES IN SAND VOL. 2, NO. 4, AUGUST 27 ISSN 1819-668 26-27 Asian Research Publishing Network (ARPN). All rights reserved. BUCKLING BEHAVIOR OF PARTIALLY EMBEDDED REINFORCED CONCRETE PILES IN SAND P. Senthil Kumar 1,

More information

Walls generally range from 600 to 1500 mm thickness, in wide between 2000 and 3500 mm and can be excavated to depths of 60m or more.

Walls generally range from 600 to 1500 mm thickness, in wide between 2000 and 3500 mm and can be excavated to depths of 60m or more. TECHNOLOGY Diaphragm walls Diaphragm walls are one of the most important technologies of special foundation engineering. A diaphragm wall is constructed using a trench excavated in ground and supported

More information

SEMINAR. Introduction to Continuous Flight Auger (CFA) piling Thursday 21/8/2013. Facilitator: Martin Larisch

SEMINAR. Introduction to Continuous Flight Auger (CFA) piling Thursday 21/8/2013. Facilitator: Martin Larisch SEMINAR Introduction to Continuous Flight Auger (CFA) piling Thursday 21/8/2013 Facilitator: Martin Larisch 1 Brief History of Piling Contractors, its capabilities and market Introduction to CFA piling

More information