1 Civil Engineering Construction I (CBE5031) Pile Test 1
2 Ch. 2B Quality Control of Piles As the design and construction of buildings become more complex, it is necessary to exercise closer supervision during construction to ensure quality of the building works. The foundation of a building is a fundamental structural element which supports the whole building. 2
3 Ch. 2B Quality Control of Piles As the foundation, when constructed, is buried in the ground, its built quality is not readily visible There is a need to enhance the supervision of foundation works during construction and testing of the completed works in order to ensure that the quality of the foundation works is up to standard. 3
4 2b.1. Pre drilling for piles founded on rock For piles founded on rock, sufficient pre drilling should be carried out before the installation works, such that the quality of the founding rock can be identified and the appropriate founding levels can be determined. The pre drilling should be sunk to at least 5m below the tentative founding rock levels of the piles. 4
5 2b.1. Pre drilling for piles founded on rock Pre drilling should be carried out for each of the large diameter bored piles, barrettes and the like. For minipiles, socketted steel H piles and similar small diameter bored piles, founding on rock, the number of pre drill boreholes required should be such that the pile tip of every such pile should be within 5 metres from a pre drill hole, or at a larger distance from it as decided by the Engineer. 5
6 2b.2 Determination of the Settlement of the Piles by Load Test Pile Loading Test Setup 6
7 2b.2 Determination of the Settlement of the Piles by Load Test Hydraulic Jack Kentledge 7
8 2b.2.1 Procedure of Load Test (Extraction from General Specification for Civil Engineering Works 2006) a. Working piles shall be tested to not less than 1.8 times working load. b. Test loads shall be applied and removed in three stages as stated in Table 1. c. The test loads shall be applied in increments, and removed in decrements, of 25% of the working load. Increments of load shall not be applied until the rate of settlement of the pile is less than 0.1 mm in 20 minutes. 8
9 2b.2.1 Procedure of Load Test d) The full test loads for Stage I shall be applied in increments and shall then be maintained for at least 24 hours after the rate of settlement has reduced to less than 0.1 mm per hour. The test loads shall be removed in decrements and the recovery of the pile determined before loading is resumed. e) The procedure stated in (d) shall be repeated for Stage II loading. f) The procedure stated in (d) shall be repeated for Stage III loading. 9
10 2b.2.1 Procedure of Load Test g) The settlement of the pile shall be measured at hourly intervals. The settlement of the pile under each increment and decrement of loading shall be measured. The exact times at which increments are applied and decrements are removed shall be recorded. h) The level of the reference beam shall be checked at regular intervals agreed by the Engineer during the test. Table 1 Test loading stages Stage Test load I 25%ofmax.testload II 50% of max. test load III 100% of max. test load 10
11 2b.2.2 Compliance criteria of load tests on piles (Remark: Buildings Department and Architectural Services Department have a different pile loading test procedure and compliance criteria. Please refer to the relevant technical documents which are available form the websites of the government departments.) 1. The settlement at any load shall be less than twice the settlement at 90% of that load (Brinch Hansen's criteria). 2. Under working load the gross pile head settlement shall not exceed 20 mm for buildings and 10 mm for other structures. 11
12 2b.3. Proof drilling 2b.3.1 For Large diameter bored piles Proof drilling shall be carried out on every largediameter bored pile to check the condition at the concrete/rock interface. A base coring tube of at least 150 mm diameter shall be left at about 1 m above the founding level of the pile. The core drilling shall be carried out to 1 m below the concrete/rock interface. 12
13 2b.3For minipiles and socketted steel H piles Proof drilling shall be carried out to verify the adequacy of the socketted length of minipiles and socketted steel H piles The depths of the proof drill holes shall be at least 5 metres below the founding levels of the adjoining piles. 13
14 2b.4Testing of concrete core from piles Concrete cores shall be 100 mm diameter. Each concrete core from a pile shall be inspected for evidence of segregation of the constituents and for the presence of voids. Specimens selected from each core shall be tested to determine the compressive strength. The concrete core shall be considered as non compliant if it exhibits honeycombing which means interconnected voids arising from, for example, inadequate compaction or lack of mortar. 14
15 2b.4Testing of concrete core from piles For any set of cores representing a test location, the average estimated equivalent cube strength shall be at least 85% of the specified grade strength. Each individual estimated equivalent cube strength shall be at least 75% of the specified grade strength. 15
16 2b.5. Sonic Test on bored pile Prior to concreting, three to four mild steel tubes of not less than 50 mm internal diameter are fixed to reinforcement cage of the cast insitu pile. The tubes shall be watertight, parallel to the axis of the pile and extend the full depth of the pile. Testing is carried out by lowering a pair of sensor probes (a transmitter and a receiver) to the bottom of the tubes. The tubes are filled with water/jelly prior to testing to provide acoustic coupling The probes are maintained at the same elevation and simultaneously raised slowly (20cm/s). The propagation of sonic signals between the tubes is recorded. 16
17 2b.5. Sonic Test on bored pile The test is repeated for each pair of tubes, i.e. three runs for a pile with three tubes and six runs for a pile with four tubes. 17
18 2b.6. Reference R.Chudley, 1985, Construction Technology Vol, 3 &4, Longman S.A.R. Jufri & R.J. Wellman, 1991, Civil Engineering Construction IV, Vol 2 & 3, Hong Kong Polytechnic R. Holmes, 1983, Introduction to Civil Engineering Construction, College of Estate Management M.J. Turner, 1997, Integrity testing in Piling Practice, Construction Industry Research and Information Association 18
Construction Technology B (CON4313)
2 - Foundation The British Standard Code of Practice BS8004 defines a foundation as 'that part of the structure designed and constructed to be in direct contact with and transmitting loads to the ground'
More informationCivil Engineering Construction I (CBE5031)
Civil Engineering Construction I (CBE5031) Basement 1 1 Quick Revision 1.1 Problems arising from basement construction a) Excavation method. b) Surface and ground water control c) Lateral stability of
More informationConstruction Technology B (CON4313)
3 - Basement 1 Quick Revision 1.1 Problems arising from basement construction a. Excavation method. b. Surface and ground water control c. Lateral stability of basement excavation. d. Stability of adjoining
More informationCapstone C O N S U L T A N T S
Ultrasonic Pulse Velocity Tests These tests are primarily done to establish: the homogeneity of concrete presence of cracks, voids and other imperfections changes in quality of concrete over time this
More informationSAMPLE SPECIFICATION for CROSSHOLE SONIC LOGGING (CSL) September 2015
SAMPLE SPECIFICATION for CROSSHOLE SONIC LOGGING (CSL) September 2015 Note: This sample specification contains recommended or typical quantities in parenthesis, in the format (quantity); the specifying
More informationThe Technical and Contractual Matters of Bored Piling Works. By Wallace Yeung Vibro (H.K.) Ltd.
The Technical and Contractual Matters of Bored Piling Works By Wallace Yeung Vibro (H.K.) Ltd. What is large diameter bored pile? How to construct a large diameter bored pile? Its advantages and limitation
More informationFURTHER TECHNICAL INFORMATION IN RELATION TO THE OPERATIONS OF OUR GROUP
A. TECHNICAL INFORMATION OF OUR FOUNDATION WORKS The major types of our foundation works (with illustrative diagram, where applicable) are set out below: 1. Bored piles 0.80m 3.5m pile shaft By Grabbing
More informationBi-Directional Static Load Testing of Drilled Shafts
Supplemental Technical Specification for Bi-Directional Static Load Testing of Drilled Shafts SCDOT Designation: SC-M-712 (9/15) September 2, 2015 1.0 GENERAL This work shall consist of furnishing all
More informationBi-Directional Static Load Testing of Drilled Shafts
Supplemental Technical Specification for Bi-Directional Static Load Testing of Drilled Shafts SCDOT Designation: SC-M-712 (01/18) 1.0 GENERAL This work shall consist of furnishing all materials, equipment,
More informationCivil Engineering Construction I (CBE5031)
Civil Engineering Construction I (CBE5031) Precast Concrete 1 Definition of Precast Concrete Precasting means casting a concrete member at a place other than where it will be used and then moving it to
More informationS.No Description Unit Quantity Rate (Rs) Amount (Rs)
, S.No Description Unit Quantity Rate (Rs) Amount (Rs) 1 2 Vertical load testing of piles in accordance with IS 2911 (Part IV) including installation of loading platform by Kentledge method and preparation
More informationsonitec The most effective solution for integrity checking of concrete piles and deep foundations
sonitec The most effective solution for integrity checking of concrete piles and deep foundations www.dextragroup.com Dextra sonitec WHAT IS CROSS SONIC LOGGING? Definition Crosshole Sonic Logging (CSL)
More informationCONTINUOUS FLIGHT AUGER (CFA) PILES QC/QA PROCEDURES. Preferred QC/QA Procedures
Preferred QC/QA Procedures The Federal Highway Administration (FHWA) has provided QC/QA guidance for this technology as noted below. The reference document also contains information about construction
More informationSECTION XXXXX STONE COLUMNS PART 1 - GENERAL
SECTION XXXXX STONE COLUMNS PART 1 - GENERAL 1.1 RELATED DOCUMENTS: Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 00 and Division 01
More informationSPECIFICATION 1035 M
MAY 1984 SPECIFICATION 1035 M SPECIFICATIONS FOR UNDERWATER CONCRETE 1035. 1. DESCRIPTION The work will consist of the mixing of concrete in accordance with the "Specifications for Reinforced Concrete",
More informationSECTION XXXXX AGGREGATE PIERS PART 1 - GENERAL
SECTION XXXXX AGGREGATE PIERS PART 1 - GENERAL 1.1 RELATED DOCUMENTS: Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 00 and Division
More informationLesson 7 REINFORCING CAGE. Version 1-1/
Lesson 7 REINFORCING CAGE 7-1 Version 1-1/15 7-1 Learning Outcomes Describe cage construction Determine the circumference of a shaft and rebar cage and calculate the required number of side spacers. Explain
More information703 - DRILLED SHAFTS SECTION 703 DRILLED SHAFTS
SECTION 703 DRILLED SHAFTS 703.1 DESCRIPTION Construct drilled shafts by the cased or uncased method depending upon site conditions and Contract Document requirements. BID ITEMS Drilled Shaft (*) (**)
More informationIntegrity evaluation of concrete by cross-hole sonic logging in Bangladesh
IABSE-JSCE Joint Conference on Advances in Bridge Engineering-III, August 2-22, 25, Dhaka, Bangladesh. ISBN: 978-984-33-933-5 Amin, Okui, Bhuiyan, Ueda (eds.) www.iabse-bd.org Integrity evaluation of concrete
More informationDetection of Concrete Damage Using Ultrasonic Pulse Velocity Method
Indian Society for Non-Destructive Testing Hyderabad Chapter Proc. National Seminar on Non-Destructive Evaluation Dec. 7-9, 2006, Hyderabad Detection of Concrete Damage Using Ultrasonic Pulse Velocity
More informationNon-destructive Testing of Installed Soil Nails Using Sonic Echo Test Method
Non-destructive Testing of Installed Soil Nails Using Sonic Echo Test Method Specifications for Grouting Mixtures and Procedures for Soil Nail Installations Research Project Number 0-4484 Research Product
More informationThe Updated Drilled Shaft Manual: Potential Impacts on AASHTO Specifications. J. Turner & D. Brown May 24, 2010 AASHTO T-15 Sacramento, CA
The Updated Drilled Shaft Manual: Potential Impacts on AASHTO Specifications J. Turner & D. Brown May 24, 2010 AASHTO T-15 Sacramento, CA Drilled Shafts: Construction Procedures and LRFD Design Methods
More informationSECTION WATERTIGHTNESS TEST FOR PLANT TANKAGE STRUCTURES
SECTION 01 48 00 - WATERTIGHTNESS TEST FOR PLANT TANKAGE STRUCTURES PART 1 - GENERAL 1.1 SCOPE OF WORK A. Furnish all labor, materials and incidentals required and perform tightness testing of water-containing
More information1. Structural Steel Sections Structural steel sections can be classified into various groups according to their shapes.
1 Structural Steelwork 1. Structural Steel Sections Structural steel sections can be classified into various groups according to their shapes. A steel section is designated by the serial size in millimeters
More informationPILING PART-VI CONSTRUCTION AND INSTALLATION OF RCC BORED CAST IN-SITU PILES
Page 1 of 8 PILING PART-VI OF RCC BORED CAST IN-SITU PILES REV. NO. PRAPARED APPROVED DATE 00 Marina P Mishra COPYRIGHT AND CONFIDENTAL The information on this document is the property of BHARAT HEVY ELECTRICAL
More informationBi-Directional Static Load Testing of Driven Piles
Bi-Directional Static Load Testing of Driven Piles Paul J. Bullock, PhD Fugro Consultants Inc. Loadtest Bi-Directional Osterberg Cell Testing Specialized jack in pile uses bearing to mobilize side shear
More informationKANSAS DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION TO THE STANDARD SPECIFICATIONS, EDITION 2015
Sheet 1 of 9 KANSAS DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION TO THE STANDARD SPECIFICATIONS, EDITION 2015 Delete SECTION 703 and replace with the following: SECTION 703 DRILLED SHAFTS 703.1 DESCRIPTION
More informationSCOPE OF WORK FOR PILING JOB
SCOPE OF WORK FOR PILING JOB 1.0 PURPOSE This document defines the scope of works and specific requirements for the tank pad construction including pile foundation system for the proposed tanks at Wadala
More informationSPECIFICATION OF JACKED ANCHOR FOR RETAINING STRUCTURES
SPECIFICATION OF JACKED ANCHOR FOR RETAINING STRUCTURES 1.0 GENERAL This specification deals with jacked anchors and shall be read in conjunction with the conditions of contract and the Specification for
More informationMETHOD OF MAKING AND CURING CONCRETE TEST SPECIMENS IN THE FIELD FOP FOR AASHTO T 23
METHOD OF MAKING AND CURING CONCRETE TEST SPECIMENS IN THE FIELD FOP FOR AASHTO T 23 Scope This procedure covers the method for making, initially curing, and transporting concrete test specimens in the
More informationCASTING AND TESTING OF A BORED PILE FOUNDATIONS
CASTING AND TESTING OF A BORED PILE FOUNDATIONS J.Naga Shiva jyothi, M. David nagasivajyoyhi95@gmail.com,mogiidavid352@gmail.com ABSTRACT This project titled BORED CAST IN- SITU PILE FOUNDATIONS done in
More informationACOUSTIC EMISSION MONITORING OF CONCRETE HINGE JOINT MODELS
ACOUSTIC EMISSION MONITORING OF CONCRETE HINGE JOINT MODELS K. M. Holford School of Engineering, Cardiff University, UK R. Pullin School of Engineering, Cardiff University, UK R. J. Lark School of Engineering,
More informationSample Specifications for Testing Foundations with the Thermal Integrity Profiler (TIP)
September 2016 Sample Specifications for Testing Foundations with the Thermal Integrity Profiler (TIP) Note: This sample specification contains recommended or typical quantities in parenthesis, in the
More informationMODEL SPECIFICATIONS: Hydraulically Driven Steel Underpinning Pile Specifications
MODEL SPECIFICATIONS: Hydraulically Driven Steel Underpinning Pile Specifications Mar/2008 v1.0 SECTION 02255 HYDRAULICLY DRIVEN STEEL UNDERPINNING PILES PART 1 GENERAL 1.01 SCOPE OF WORK The work shall
More informationDeep Water Drilled Shafts for the Herrington Lake Bridge Replacement Project
Deep Water Drilled Shafts for the Herrington Lake Bridge Replacement Project Darrin Beckett, P.E. Kentucky Transportation Cabinet 49 th Southeastern Transportation Geotechnical Engineering Conference October
More informationDIAPHRAGM WALLS, CUT-OFF WALLS AND SLURRY WALLS
DIAPHRAGM WALLS, CUT-OFF WALLS AND SLURRY WALLS Implenia Spezialtiefbau GmbH Robert Bosch Straße 25 D-63225 Langen Phone: +49 6103 988 345 Fax: +49 6103 988 277 Email: info.spezialtiefbau@implenia.com
More informationInstalling DELTABEAM. Installation of DELTABEAM. Deliveries. Storage on-site
Installing DELTABEAM Installation of DELTABEAM These DELTABEAM installation instructions are intended to complement the project s erection plan. Peikko s technical support can help with the erection plan
More informationAPPENDIX I NASP TEST PROTOCOLS
APPENDIX I NASP TEST PROTOCOLS I-1 I-2 I-3 I-4 NASP STRAND BOND TEST (DRAFT) Standard Test Method to Assess the Bond of 0.5 in. (12.7 mm) and 0.6 in. (15.24 mm) Seven Wire Strand with Cementitious Materials
More informationSupervision of Piling Works
Page 1 of 7 Supervision of Piling Works Sayeed Ahmed Assistant Director (Planning & Development) Independent University Bangladesh, Dhaka, Bangladesh e-mail ABSTRACT Supervision is utmost important in
More informationSECTION DUCTILE IRON PILES
SECTION 31 66 13 DUCTILE IRON PILES PART 1 - GENERAL 1.1 GENERAL REQUIREMENTS A. Work of this Section, as shown or specified, shall be in accordance with the requirements of the Contract Documents. B.
More informationSPECIAL INSPECTION AND OBSERVATION PROGRAM City of Walnut Creek Building Division. Project Address:
SPECIAL INSPECTION AND OBSERVATION PROGRAM City of Walnut Creek Building Division Permit Application #: Project Address: Purpose: To meet the requirements of City of Walnut Creek Municipal Code Section
More information***************************************************************************************************************
03365 POST-TENSIONED CONCRETE *************************************************************************************************************** SPECIFIER: CSI MasterFormat 2004 number 03 38 00. ***************************************************************************************************************
More informationCombined Pile Foundation System for a Residential Complex
Combined Pile Foundation System for a Residential Complex Alvin K.M. Lam, Geotechnical Engineer, Ove Arup & Partners Hong Kong Limited, Hong Kong, China; email: alvin.lam@arup.com Daman D.M. Lee, Civil
More informationINDEX FOR SPECIFICATIONS FOR JACKING CULVERTS THROUGH EMBANKMENTS SCOPE... 2
INDEX FOR SPECIFICATIONS FOR JACKING CULVERTS THROUGH EMBANKMENTS 410. 1 SCOPE... 2 410. 2 DEFINITIONS 2.1 Tunneling and Jacking... 2 2.2 Tunneling... 2 2.3 Jacking... 2 410. 3 MATERIALS 3.1 General...
More informationRECORD KEEPING AND INSPECTION NOTES FOR FUTURE NEEDS
RECORD KEEPING AND INSPECTION NOTES FOR FUTURE NEEDS Chris Nickel, P.E. LA DOTD Pavement & Geotechnical Services 2011 Louisiana Engineering Conference TOPIC OUTLINE Driven Piles Definitions and Data table
More informationSECTION / ENGINEERED AGGREGATE PIERS (SOIL REINFORCEMENT AND FOUNDATION SYSTEM)
PART 1 GENERAL 1.01 WORK INCLUDED SECTION 02360 / 31 34 30.13 ENGINEERED AGGREGATE PIERS (SOIL REINFORCEMENT AND FOUNDATION SYSTEM) A. Provide all equipment, material, labor and supervision to design and
More informationSpecial Provision No. 799F01 March 2012 CONSTRUCTION SPECIFICATION FOR THE INSTALLATION OF NOISE BARRIER TABLE OF CONTENTS
... m NOISE BARRIER - Item No.... m NOISE BARRIER INCLUDING PRECAST NOISE/TRAFFIC BARRIER - Item No.... m NOISE BARRIER ON STRUCTURES - Item No.... m SALVAGEABLE NOISE BARRIER - Item No.... m SALVAGEABLE
More informationITEM NN17 - DRILLED SHAFTS ITEM NN17 - DRILLED SHAFTS (LOW OVERHEAD CLEARANCE) ITEM TRIAL SHAFTS
DESCRIPTION A. General. This work shall consist of furnishing the materials and installing drilled shafts at the locations, dimensions, and batters shown on the contract plans or where ordered by the Engineer
More informationCRD-C Standard Test Method for Comparing Concretes on the Basis of the Bond Developed with Reinforced Steel
Standard Test Method for Comparing Concretes on the Basis of the Bond Developed with Reinforced Steel 1. Scope 1.1 This test method covers comparison of concretes on the basis of the bond developed with
More informationConstruction Measurement III SBQ3314. Precast Pre stressed Concrete Works. Dr. Sarajul Fikri Mohamed
Construction Measurement III SBQ3314 Precast Pre stressed Concrete Works Dr. Sarajul Fikri Mohamed Table of Contents 1. Pre stressed concrete in bridgeworks: technological aspects 2. SMM2 measurement rules
More informationINTERPRETATIONS OF INSTRUMENTED BORED PILES IN KENNY HILL FORMATION
INTERPRETATIONS OF INSTRUMENTED BORED PILES IN KENNY HILL FORMATION S. S. Liew 1, Y. W. Kowng 2 & S. J. Gan 3 ABSTRACT This paper presents the results of two instrumented bored cast-in-situ test piles
More informationLegislative Council Panel on Transport Subcommittee on Matters Relating to Railways
Legislative Council Panel on Transport Subcommittee on Matters Relating to Railways Hong Kong Section of the Guangzhou-Shenzhen-Hong Kong Express Rail Link Supplementary Information In the meeting of the
More informationSpecial Provision No. 599F01 May 2004 CONSTRUCTION SPECIFICATION FOR THE INSTALLATION OF NOISE BARRIER TABLE OF CONTENTS
... m NOISE BARRIER - Item No.... m NOISE BARRIER INCLUDING PRECAST NOISE/TRAFFIC BARRIER - Item No.... m NOISE BARRIER ON STRUCTURES - Item No.... m SALVAGEABLE NOISE BARRIER - Item No.... m SALVAGEABLE
More informationSAMPLE GUIDE SPECIFICATIONS FOR OSTERBERG CELL LOAD TESTING OF DRILLED SHAFTS
SAMPLE GUIDE SPECIFICATIONS FOR OSTERBERG CELL LOAD TESTING OF DRILLED SHAFTS 1.0 DESCRIPTION This work shall consist of furnishing all materials and labor necessary for conducting an Osterberg Cell (O-cell)
More informationAnalysis of Application of Pile Foundation Technology in Construction Engineering
RESEARCH ARTICLE Analysis of Application of Pile Foundation Technology in Construction Engineering Xiaoyu Si, Xiangru Zhao, Lihua Wang, Baosen Du, Liping Wu Hebei University, Shijiazhuang 050000, Hebei
More informationLantz-Boggio Architects, P.C LBA Project No
SECTION 313430- PART 1 GENERAL 1.1 WORK INCLUDED A. Provide all equipment, material, labor and supervision to design and install Engineered Aggregate Piers for the soil reinforcement. Design shall rely
More informationB. The Pile Contractor shall furnish and place all reinforcing steel, dowels, and anchor bolts as shown on the drawings.
SECTION 31 63 16 AUGER CAST GROUT PILES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of Contract, including General and Supplementary Conditions and Division- 01 Specification
More information204 - EXCAVATION AND BACKFILL FOR STRUCTURES SECTION 204 EXCAVATION AND BACKFILL FOR STRUCTURES. Granular Backfill (Wingwalls) (Set Price)
SECTION 204 EXCAVATION AND BACKFILL FOR STRUCTURES 204.1 DESCRIPTION Excavate for the structures as shown in the Contract Documents. Unless specified otherwise, backfill the completed structures to the
More informationLesson 2 Substructure. Dr S.Sreenath BSc Engg, MSc Engg, MSc (ICM), MBA, PhD
Lesson 2 Substructure Dr S.Sreenath BSc Engg, MSc Engg, MSc (ICM), MBA, PhD Outline Syllabus 1. Demolition 2. Site problems 3. Substructure 4. Basements 5. Structural Frames 6. Floors 7. External walls
More informationSUPPLEMENTAL TECHNICAL SPECIFICATION
July 14, 2015 HIGH STRAIN DYNAMIC LOAD TESTING OF DRILLED SHAFTS 1.0 GENERAL This work shall consist of performing high-strain dynamic testing using a drop weight loading system on a test drilled shaft
More informationA.Zh.Zhussupbekov Department of Civil Engineering and Engineering Mechanics, Columbia University, New York, USA
UDK 69.0 A.Zh.Zhussupbekov Department of Civil Engineering and Engineering Mechanics, Columbia University, New York, USA Research of displacement pile and continuous flight auger technologies on construction
More informationINDEX FOR SPECIFICATIONS FOR REMOVING CULVERTS AND PLACING CULVERTS SCOPE... 1
March 2002 No. 400 INDEX FOR SPECIFICATIONS FOR REMOVING CULVERTS AND PLACING CULVERTS 400. 1 SCOPE... 1 400. 2 REMOVING CULVERTS AND TIMBER STRUCTURES 2.1 Concrete and Metal Pipe Culverts... 1 2.2 Structural
More informationDIVISION 700 STRUCTURES
SECTION TABLE OF CONTENTS DIVISION 700 STRUCTURES 701 TEMPORARY SHORING... 700-1 702 CORRUGATED METAL SHEET PILING... 700-2 703 DRILLED SHAFTS... 700-3 704 PILING... 700-10 705 STRUCTURAL STEEL FABRICATION...
More informationCHANGES IN 2006 SPECIFICATIONS SECTION 804 DRIVEN PILES SECTION 814 DRILLED SHAFTS
CHANGES IN 2006 SPECIFICATIONS SECTION 804 DRIVEN PILES SECTION 814 DRILLED SHAFTS 2006 LADOTD ENGINEERING CONFERENCE Kim Martindale Garlington, P.E. Pavement & Geotechnical Services February 13, 2007
More informationSPECIAL SPECIFICATION Thermal Integrity Profiler (TIP) Wire Cable Testing of Drilled Shafts
SAMPLE SPECIFICATION FOR TESTING FOUNDATIONS With the Thermal Integrity Profiling Wire Cable System Note: This sample specification contains recommended or typical quantities in parenthesis, in the format
More informationA/E REVIEW CHECKLIST STRUCTURAL
A/E REVIEW CHECKLIST STRUCTURAL Reviewers should - Use Checklists when reviewing any type of VA construction project for the following disciplines: Site and Landscape, Architectural, Structural, Plumbing,
More informationRapid non-destructive test method at the Taiwan High-Speed Rail project
Rapid non-destructive test method at the Taiwan High-Speed Rail project by Allen G. Davis, Ph.D., D.Sc. Construction Technology Laboratories, Inc In 2002, Construction Technology Laboratories Inc participated
More informationSoil Improvement by Compaction Grouting
CITY AND COUNTY OF DENVER ENGINEERING DIVISION Wastewater Capital Projects Management Standard Construction Specification 31-3223.12 Soil Improvement by Compaction Grouting Part 1 - General 1.01 Introduction
More informationA. Section includes temporary excavation support and protection systems.
SECTION 31 50 00 - EXCAVATION SUPPORT AND PROTECTION PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division
More informationUNIFIED FACILITIES GUIDE SPECIFICATIONS
USACE / NAVFAC / AFCEC / NASA UFGS-31 63 16 (November 2008) ----------------------------- Preparing Activity: USACE Superseding UFGS-31 63 16 (October 2007) UNIFIED FACILITIES GUIDE SPECIFICATIONS References
More informationSECTION GROUT. A. American Society for Testing and Materials (ASTM):
SECTION 03600 GROUT PART 1 GENERAL 1.01 SUMMARY A. Related Sections: 1. 03300 - Cast-In-Place Concrete. 2. 03600 - Grout. 1.02 REFERENCES A. American Society for Testing and Materials (ASTM): 1. C109-95
More informationThere are several types of trenchless technology applications for new installations. The following are some of the most prominent applications.
Applications for New Installations There are several types of trenchless technology applications for new installations. The following are some of the most prominent applications. Note that some specifications
More informationAdvantages / Disadvantages of Piling Methods. Continuous Flight Auger (CFA)
Advantages / Disadvantages of Piling Methods In this Piling Advice Note we will explore the advantages and disadvantages of differing types of piling methods. Continuous Flight Auger (CFA) The pile is
More informationITEM 404 DRIVING STEEL PILING
AFTER MARCH 1, 2012 ITEM 404 DRIVING STEEL PILING 404.1 Description. This Item shall govern the driving of steel piling. The piling shall be of the size and weight shown on the plans and shall be in accordance
More informationFoundation Engineering ECIV 4352
Foundation Engineering ECIV 4352 Instructor : Dr. Jehad Hamad 2016-2015 Chapter (11) Deep Foundation Chapter 11 Pile Foundation Foundation- Design Considerations Factors to be taken into consideration
More informationSECTION DRILLED CONCRETE PIERS AND SHAFTS
SECTION 31 63 29 PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply
More informationApplication of ultrasonic testing to steel-concrete composite structures
More Info at Open Access Database www.ndt.net/?id=18338 Application of ultrasonic testing to steel-concrete composite structures Arisa YANAGIHARA 1, Hiroaki HATANAKA 2, Minoru TAGAMI 2, Katsuya TODA 3,
More informationResearch Evaluation of Single Lift Grouting in Concrete Masonry Wall Panels
Research Evaluation of Single Lift Grouting in Concrete Masonry Wall Panels Jeffrey H. Greenwald, P.E, Dennis W. Graber, P.E., J. Marcus Cherundolo, EIT Abstract The objective of this research was to investigate
More informationDeep Foundation Testing, Analysis and Consulting Services
Deep Foundation Testing, Analysis and Consulting Services PDA Testing and Monitoring Dynamic Load Testing- APPLE Thermal Integrity Testing Crosshole Sonic Logging SPT Energy Calibration Low Strain Integrity
More informationNon-Destructive Testing of Drilled Shafts Current Practice and New Method
Non-Destructive Testing of Drilled Shafts Current Practice and New Method George Piscsalko PE, Pile Dynamics, Inc., Cleveland, Ohio, USA Garland Likins PE, Pile Dynamics, Inc., Cleveland, Ohio, USA Benjamin
More informationSPECIFICATION FOR PRECAST/ COMPOSITE CONCRETE FLOORS/ ROOF DECKS SECTION E60
SPECIFICATION FOR SECTION E60 A 2007-09-26 S.W. Revision Date Issue Authorised By Approved for Issue SW Date 24.09.07 clarkebond Page 1 of 6 To be read with Preliminaries/ General Conditions. GENERAL 10
More informationMulti-Institutional Academic Health Science & Research Center Evansville, IN
SECTION 02370 AUGER CAST PILES PART 1 - GENERAL 1.1 SECTION INCLUDES: The work covered by these specifications consists of furnishing all labor, equipment and materials for the installation of auger cast
More informationCHAPTER 3 BEHAVIOUR OF FERROCEMENT HOLLOW SLABS
30 CHAPTER 3 BEHAVIOUR OF FERROCEMENT HOLLOW SLABS 3.1 INTRODUCTION There are numerous similarities between ferrocement and reinforced concrete. Both use similar matrix and reinforcement materials. They
More informationUsing Thermal Integrity Profiling to Confirm the Structural Integrity of foundation applications
Using Thermal Integrity Profiling to Confirm the Structural Integrity of foundation applications Authors: 1. George Piscsalko, PE, Pile Dynamics, Inc., 30725 Aurora Road, Solon, Ohio, USA, gpiscsalko@pile.com;
More informationHIGH TENSION LOAD TRANSFER USING BORED PILES FOR SOUL APARTMENTS, Surfers Paradise
HIGH TENSION LOAD TRANSFER USING BORED PILES FOR SOUL APARTMENTS, Surfers Paradise Martin Larisch Piling Contractors Pty Ltd ABSTRACT This paper describes two different methodologies of transferring high
More informationRapid Axial Load Testing of Drilled Shafts
Supplemental Technical Specification for Rapid Axial Load Testing of Drilled Shafts SCDOT Designation: SC-M-712 (9/15) September 4, 2015 1.0 GENERAL This work shall consist of performing a rapid axial
More informationTopic 1 - Properties of Concrete. 1. Quick Revision
Topic 1 - Properties of Concrete 1. Quick Revision 1.1 Constituent Materials of concrete Concrete is composed mainly of three materials, namely, cement, water and aggregate, and sometimes additional material,
More informationCHAPTER 8. Concrete Work
Concrete Work Clay Bricklaying Made Easy CONCRETE WORK Foundations for walls and piers All loadbearing walls and piers are required to stand on a concrete foundation, which must be able to receive and
More informationExperimental Study on behavior of Interior RC Beam Column Joints Subjected to Cyclic Loading P.Rajaram 1 A.Murugesan 2 and G.S.
Experimental Study on behavior of Interior RC Beam Column Joints Subjected to Cyclic Loading P.Rajaram 1 A.Murugesan 2 and G.S.Thirugnanam 3 1 P.G.Student, Department of Civil Engineering, Institute of
More informationFundamentals of Concrete
Components Cement Water Fine Aggregate Coarse Aggregate Fundamentals of Range in Proportions Advantages of Reducing Water Content: Increased strength Lower permeability Fundamentals of Increased resistance
More informationUpon speaking with the representatives with Technical Foundations as well as Walder Foundations, it was determined that:
As part of our analyses, we have considered the design and construction of the cantilever retaining wall that will be located along the north side of Lucks Lane, between Falling Creek and Gladstone Glen
More informationImplementation of this Special Provision requires a complete understanding of the following documents:
VIRGINIA DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR Quality Assurance/Quality Control (QA/QC) for the Construction of Deep Foundation Systems for Design-Build and PPTA Contracts November 10, 2009
More informationGeotechnical Investigation Reports and Foundation Recommendations -Present status in India -Examples
Geotechnical Investigation Reports and Foundation Recommendations -Present status in India -Examples Prof. V.S.Raju (Formerly: Director, IIT Delhi & Professor and Dean, IIT Madras) Email: rajuvs_b@yahoo.com
More informationMisan University - College of Engineering Civil Engineering Department
CHAPTER 2 Soil and Excavations Soil investigation including two phases: surface investigation and subsurface investigation Surface investigation involves making a preliminary judgment about the site s
More informationMETHOD STATEMENT for INSTALLATION OF MICROPILE
METHOD STATEMENT for INSTALLATION OF MICROPILE A. MATERIAL TO BE USED 1. Grout Grout shall be mixed from Ordinary Portland Cement and clean water free from harmful substances. Usage of other cement which
More informationCONTENTS. Top-up Course for TCP T3 on GIFW and Building Works with Significant Geotechnical Content. Lecture 5 : Retaining Walls
Top-up Course for TCP T3 on GIFW and Building Works with Significant Geotechnical Content Lecture 5 : Retaining Walls CONTENTS Common Types of Retaining Walls Design and Construction Considerations Supervision
More informationBUCKLING BEHAVIOR OF PARTIALLY EMBEDDED REINFORCED CONCRETE PILES IN SAND
VOL. 2, NO. 4, AUGUST 27 ISSN 1819-668 26-27 Asian Research Publishing Network (ARPN). All rights reserved. BUCKLING BEHAVIOR OF PARTIALLY EMBEDDED REINFORCED CONCRETE PILES IN SAND P. Senthil Kumar 1,
More informationWalls generally range from 600 to 1500 mm thickness, in wide between 2000 and 3500 mm and can be excavated to depths of 60m or more.
TECHNOLOGY Diaphragm walls Diaphragm walls are one of the most important technologies of special foundation engineering. A diaphragm wall is constructed using a trench excavated in ground and supported
More informationSEMINAR. Introduction to Continuous Flight Auger (CFA) piling Thursday 21/8/2013. Facilitator: Martin Larisch
SEMINAR Introduction to Continuous Flight Auger (CFA) piling Thursday 21/8/2013 Facilitator: Martin Larisch 1 Brief History of Piling Contractors, its capabilities and market Introduction to CFA piling