1 2 - Foundation The British Standard Code of Practice BS8004 defines a foundation as 'that part of the structure designed and constructed to be in direct contact with and transmitting loads to the ground' 1 Shallow Foundation (quick revision) 1.1 Pad footing 1.2 Strip footing 1.3 Raft footing Solid Slab Raft Beam and Slab Raft Cellular Raft 1.4 Combined footing 2. Piled Foundation 2.1 Classification of Piles Classification by Method of Load Transmission End bearing piles Friction piles Classification by Method of Installation Displacement Piles Replacement Piles - 1/26

2 3. Displacement Piles Displacement piles are preformed piles made in a factory, transported to the site, and then driven into the ground. They are also called preformed piles or driven piles. Preformed piles may be made of reinforced concrete or steel. (There was a pile type called driven cast-in-situ pile. It was formed by driving a shell or a casing with a closed end into the ground and then casting the annular space with concrete. This type of pile is now obsolete) 3.1. Piling equipment for displacement piles Displacement piles are generally driven into the ground by one of the following methods: 1. Percussion 2. Vibration Percussive driving Piles are driven into the ground by the impact of heavy pile hammers. There are several types of pile hammers: a. Drop hammer (Fig. 2.1) b. Diesel hammer (Fig. 2.2) (These two types of piles are now obsolete.) c. Hydraulic Hammer A hydraulic hammer unit is mounted on the pile while operating. It is similar to a drop hammer but the weight is raised by hydraulic jacks. The weight then falls freely under gravity on to the pile head. Hydraulic jacks are so powerful that the weight can be up to 18 tonnes. The stroke height is about 1-2 m. The blow rate depends on the stroke height and ranges from 40 to 100 blows per minutes. 2/26

3 Most hydraulic hammers are equipped with silencers nowadays. They produce less noise than diesel hammers and they do not emit exhaust fumes. They are suitable for hard drive Vibratory driving vibration hammer (Fig. 2.3) Vibration hammer is comparatively silent. It is used in driving small displacement piles such as H-piles and sheet piles. The equipment consists of a vibrating unit mounted on the pile head transmitting vibrations down the length of the pile shaft. These vibrations are in turn transmitted to the surrounding soil, reducing its shear strength enabling the pile to sink into the subsoil under its own weight and also that of the vibration hammer Piling rigs A piling rig has the function of guiding the pile at its correct alignment from the stage of first pitching in position to its final penetration. It also carries the hammer and maintains it in position co-axially with the pile. (Fig. 2.4) Helmets The head of displacement piles must be protected from damage during driving. The protection consists of resilient packing which is held in position by a steel helmet. The resilient packing distributes the impact load from the piling hammer evenly on to the pile head. (Fig. 2.5) The helmet should fit loosely around the pile, so that the pile may rotate slightly without inducing torsion on the pile. 3/26

4 3.2 Precast prestressed concrete tubular pile In the past, most of precast concrete piles were square in cross sections. They can be made of either of normal reinforced concrete or prestressed concrete. Their bearing capacity ranged between KN. In 1980s, precast concrete piles in H.K. became tubular because of the development of a manufacturing technology. This type of pile is prestressed and the concrete is compacted by centrifugal spinning process. The spinning process effectively compacts the zero slump concrete and produces a hollow tube without the need of a former. They are then steam cured in an autoclave under high steam pressure and high temperature in order to obtain a minimum concrete compressive strength of about 80 MPa within three days. The outside diameters of the piles are about mm and in lengths of up to 12 m. They have a nominal bearing capacity in the range up to 3500 KN. (Fig. 2.6) Each pile length has integral steel joint plates (end plates) cast onto ends of the pile. Lengthening is done by a full penetration butt welding of the end plates. The disadvantages of these piles are that they produce great noise and vibration during the installation of these piles. Moreover, most Hong Kong soils are coarse, containing boulders and rocks which are not too suitable for large diameter displacement piles. 3.3 Preformed Steel piles Hollow steel piles Two main types of hollow steel piles: tubular and box sections. Box piles are normally driven with closed ends (now obsolete) with internal drop hammers. Open ended tubes can be driven with vibration hammers. Hollow Steel piles have a high resistance to lateral loading and buckling and good energy-absorbing properties. 4/26

5 They are particular suitable for structures subjected to lateral and impact loading such as jetties and dolphins Steel H-pile Steel H-pile is strong and tough. The displacement of the soil is little compared with other types of displacement piles. It is widely used in HK. Driving steel piles generally do not require pile shoes. In hard conditions, the toe of the pile may be strengthened. Strengthening may be carried out by welding steel plates or angles to the toe of the pile (Fig. 2.7). Preformed pile shoes for H-piles are also available (Fig. 2.8). In ground conditions where boulders exist, Oslo point may be used (Fig. 2.9) Lengthening Lengthening of steel H-pile is done by butt-welding. Splicers may be used to help splicing Corrosion Protection Steel preformed piles may deteriorate as a result rusting. Corrosion protection is of particular importance for steel piles because they are embedded in the ground and become inaccessible for maintenance. A protective coating shall be applied on the steel piles before being driven into the ground. The surfaces of steel piles to which protective coatings will be applied shall be prepared by blast cleaning. (Source: General Specification for Civil Engineering Works) 5/26

6 3.4 Procedure of driving a displacement pile 1. Prepare a piling rig and a piling hammer. 2. Put marks on the pile length at 500 mm interval to indicate the length being driven. 3. Pitch the pile in the piling rig. Check its alignment and verticality. 4. Place a suitable pile helmet on the pile head. Mount the piling hammer on top of it and then start driving. 5. If the whole length of the pile has been driven into the ground, splice a new length on it, then continue the driving. 6. Repeat step 5 until it renders significant resistance against driving. 7. Perform the set measurement. If the predetermined set is attained, the piling process is completed. Otherwise repeat from step 5 until it does. 3.5 Measurement of set Set related to the ultimate bearing capacity of the pile can be determined by pile driving formulae by considering the parameters of the pile, the soil and the ground condition. There are many pile driving formulae, among which the Hiley formula is the most commonly used one. The final set shall be measured as: 1. penetration per 10 blows, or 2. the number of blows required to produce 25 mm penetration. 6/26

7 3.6 Advantages and disadvantages of displacement piles Advantages 1. Where large numbers of piles are to be installed in easy driving conditions, it can be more economic. 2. Projection above ground level advantageous to marine structures. 3. The pile can be inspected for quality and soundness before driving. 4. Construction operations not affected by ground water. 5. Not liable to squeezing or necking Disadvantages of displacement piles 1. Transporting the complete length of pile through narrow and/or congested streets may be difficult. 2. The driving process, which is generally percussion, can cause unacceptable noise and vibrations. 3. Pile driving hour is limited by environmental regulations. 4. May break during driving, causing delays and replacement charges. 5. Displacement of soil during driving may damage adjacent structure or cause up lifting of adjacent piles. 6. Cannot be driven in very large diameters. 7. Cannot be driven in conditions of low headroom. 7/26

8 4. Replacement Pile Replacement pile is also called 'non-displacement pile'. It is formed by boring a pile shaft and replacing the soil with in situ concrete. In Hong Kong, it is commonly called bored pile. 4.1 Methods and equipment for boring pile shafts Rotary boring Rotary boring involves a drilling rig which may be mounted on a mobile crane or a truck. The drilling rig consists of a telescopic or extendable kelly bar on which a boring tool is attached. There are various types of boring tools: 1. Cheshire auger The auger has only a few helix turns. It has to go up and down repeatly to cut the soil and bring the spoil to the ground surface. 2. Continuous auger (flight auger) It has a long helix. The spoil is continuously brought to the ground surface by the spiral motion. However, the drilling rig must provide sufficient torque to overcome the great friction (Fig. 2.10). 3. Drilling bucket It is designed to withstand the high torque forces developed during penetration of dense strata. The spoil is temporarily stored in the bucket to reduce the friction created. The frequency of up and down motions can also be reduced as compared with that of the Cheshire auger. 4. Coring bucket It is used to raise a solid core of rock. 5. Chisel - It is used break through boulder or rock. (Fig. 2.11) 8/26

9 4.1.2 Grab boring A grab consists of a clamshell bucket which is operated by means of wire ropes and suspended from a mobile crane. The grab is dropped on to the soil in an open position and is then closed. It is then raised to the surface and emptied spoil at the side of the borehole. Virtually the rope can be of infinite length. The depth of a borehole can be over a hundred meters by grab boring. Most boreholes are circular in cross section but can be rectangular by using a rectangular grab (Fig. 2.12). When boulders are encountered, they can be broken by free falling a chisel on to it. The rock fragments are then removed by the grab. Chisel and grab are often used alternatively to break through obstructions. 9/26

10 4.1.3 Down the hole (DTH) drilling A down the hole drill (DTH) is a large size hammer drill. It is equipped with a button bit that can drill holes into rock with diameters up to 750 mm and to depths of several hundred meters. A conventional hammer drill becomes less efficient as the length of borehole increases because of the loss of energy in drill stem. To overcome these difficulties the down the hole drill was developed. Its rotary motor remains above ground level while the pneumatic hammer is followed down the hole. The drill stem rotates in slow motion while the drill bit strikes rapidly. The drill debris is blown out by compressed air. (Fig. 2.13) Reverse circulation drilling (RCD) A reverse circulation drilling rig can drill at a fast rate in a wide range of ground conditions including rocks. In Hong Kong, it is commonly use to drill the bed rock sockets for bored piles. When boring in rock, rock roller bits are used. The Reverse circulation drill sits on the temporary steel casing while operating. It consists of a double wall drilling pipe and operates on the principle of air lifting. Compressed air is injected through the annular space of the drilling pipe and discharge near the base. The rising column of air and water at the centre of the drilling pipe lifts the soil or rock fragments which has been loosened by the drilling bit. (Air lifting is also commonly used to clean the bottom of a bored pile before concreting.) (Fig. 2.14) 10/26

11 4.1.6 Under-reaming The base of a bored pile can be enlarged to three times the shaft diameter to increase the bearing capacity of the pile. The method is known as under-reaming which is done by a belling bucket. The belling bucket is lowered to the bottom a borehole by a kelly bar with the cutter in retracted position. It is then rotated by the kelly bar and the cutter is jacked out to form the bell. (Fig. 2.15, 2.16) 11/26

12 4.2 Methods of supporting boreholes Self-supported (unsupported) For small diameter bored piles and in stable soils, the borehole may remain unsupported without collapsing. However, a borehole without support is not recommended in Hong Kong Supported with temporary casing (Fig. 2.17) In unstable or water-bearing ground, the bored pile shaft should be supported by a steel casing to prevent collapse. The casing can be driven into the ground by a casing oscillator (or a vibration hammer). The oscillator consists of a collar clamp and a pair of hydraulic jacks. The collar clamp grips the casing. The two hydraulic jacks extend and retract repeatly in opposite phrases. This oscillation motion helps to cut the soil by the casing shoe and sink the casing into to ground. The steel casing is usually thick and expensive and will be retrieved after the borehole is concreted. The casing oscillators (or vibrator hammer) the can be used to withdraw the casing. In a long pile the casing may be stuck by the concrete and the extraction becomes difficult. Moreover, temporary steel casings which are in contact with concrete shall be withdrawn before the initial set of the concrete has taken place. Otherwise, it shall be left in place. To overcome this problem, it is advisable to extract the casing in stages, i.e., the casing is extracted as concreting progresses upwards. However, it is important that a sufficient concrete pressure head shall be maintained within the steel casing to ensure that the pressure from external soil and ground water would not cause necking of the pile. 12/26

13 4.2.3 Permanent casing Sometimes a permanent casing will be lowered into a temporary cased borehole. The permanent casing is made of light gauge corrugated steel sheet. It is much cheaper than the thick temporary casing. The permanent casing prevents the expensive temporary casing being stuck by the fresh concrete. It also reduces the risk of necking of the pile after extraction of the temporary casing and prevents the fresh concrete being contaminated by soil and ground water. Corrugated steel casings are often used in long piles and in difficult grounds such as reclaimed land Supported with bentonite slurry (Fig. 2.18) Bentonite is a kind of clay. When mixed with the correct amount of water bentonite slurry produces thixotropic properties, it gives a liquid behaviour when agitated and a gel structure when undisturbed. During boring, the borehole is filled with bentonite slurry. The boring action stirs the slurry so it remains liquid state. But the slurry penetrates slightly into the subsoil and forms a soft gel or so called 'filter cake' at the interface of the excavation sides. Hydrostatic pressure caused by the slurry thrusting on the 'filter cake' that prevents the borehole from collapse. This method is not suitable for soil with high permeability. 4.3 Examples of Replacement Piles Bored pile Bored pile is perhaps the most popular type of pile in Hong Kong currently. The maximum diameter can be over 3 m and the pile length can be over 100 m. It can be designed to carry loads up to kn. 13/26

14 There are various techniques for boring pile shafts and supporting them. The choices of the methods and their combinations depend on the ground condition and the pile design. Some typical examples are as follows: Barrette (Fig. 2.19) (Source: General Specification for Civil Engineering Works) By definition, a barrette is exactly the same as a bored pile supported with bentonite slurry. However, a barrette is often referred as a pile in rectangular cross section. Its formation is the same as that of a bored pile except that four concrete guide walls are used instead of the collar casing. The guide walls are about 150 mm thick, arranged as a topless and bottomless box with internal dimension the same as the barrette section Socketted steel H-piles (Fig. 2.20) A socketted steel H-pile is a replacement pile with an H-pile in the core. It is formed by pre-drilling a borehole which is temporary supported with a steel casing. The borehole shall be of adequate size to allow a minimum grout cover of 40 mm to the H-pile. The borehole shall be sunk to sound rock level and the bottom of the borehole shall then be cleaned by air lifting. A H-pile is inserted into the borehole and the annular space is subsequently filled with cement grout. The temporary casing can then be withdrawn. 14/26

15 4.3.4 Minipile (Micropile) Minipiles are defined as piles having a diameter of less than 300 mm. Generally they range in shaft diameter from 50 to 250 mm, with working loads in the range of 50 to 500 kn. There are many ways of forming minipiles. A typical method currently used in Hong Kong is (Fig. 2.21): 1. Drill a borehole of about 150 mm diameter with a rotary drilling rig and line the borehole with a steel casing. 2. Grout the borehole with cement slurry from the bottom of the hole. 3. Insert the pile reinforcement into the casing. Normally it consists of 2-4 numbers of T40 or T50 bars. (The steel casing is left in place to enhance corrosion protection.) The principal use of minipiles is for underpinning work or in steep slope where large piling machine cannot access Installation procedure of Bored Piles i) Bored pile supported with temporary and permanent casing Procedure 1. Pitch a temporary steel casing in the correct position and drive it into the ground with a casing oscillator. 2. Bore within the casing with a hammer grab. Boring shall not go beyond the bottom of the casing to prevent collapse of the borehole. 3. If rocks or boulders are encountered, use a chisel to break them and then use the grab to remove the fragments. 4. Extend the steel casing and drive it into the ground if necessary. 5. Repeat steps 2 to 4 until the founding rock is reached. 15/26

16 6. Place a reverse circulation drill on top of the steel casing. Form the socket of desired depth into the bed rock with a roller cutter. The debris is removed by air lifting. 7. Remove the RCD. (Lower a permanent casing into the borehole.) 8. Lower the reinforcement cage into the borehole. 9. Check the rate of ingress of ground water. If it does not exceed 0.3 L/s, place high slump concrete into the shaft immediately after it is pumped dry. Otherwise, fill the shaft with tremie concrete. 10. Extract the temporary steel casing as the concreting is progress upward. When the concrete level reaches the desired lever, the piling process is completed. ii) Bored pile supported with bentonite slurry Procedure 1. Pitch a steel collar casing in the correct position and drive it into the ground with a vibration hammer. 2. Fill bentonite slurry within the casing and excavate the borehole with a hammer grab. 3. Maintain the slurry level to about 500 mm below the top of the casing during the whole piling process. 4. If rocks or boulders are encountered, use a chisel and the grab alternatively to break the rocks and remove the fragments. 5. Repeat steps 2 to 4 until the founding rock is reached. 6. Use the chisel and the grab alternatively to form a socket in the rock. 7. Lower the reinforcement cage into the borehole through the slurry. 8. Insert an air lift pipe to the bottom of the borehole. Clean the bottom of the borehole with air lifting. Slurry loaded with soil particles shall be pumped to a settling tank, stained and recycled. 9. Fill the pile shaft with tremie concrete. Displaced slurry shall be retrieved. 16/26

17 10. Stop concreting with the concrete reaches 1 m about the cut-off level. Remove the collar casing and the piling is completed. 17/26

18 4.4 Advantages and Disadvantages of Replacement Piles Advantages of replacement piles: 1. Soil or rock removed in boring can be inspected for comparison with site investigation data. 2. Can be installed in very large diameters. 3. Can be installed in very long length. 4. End enlargements up to three diameters are possible 5. Can be installed without appreciable noise or vibration. 6. Can be installed in conditions of very low headroom. 7. No risk of ground heave Disadvantage replacement piles: 1. Drilling a number of piles in group can cause loss of ground and settlement of adjacent structures. 2. Squeezing or necking may occur in soft ground that reduces the bearing capacity of the pile. 4.5 Placing Concrete in Piles Concreting by trunking In boreholes where the rate of ingress of water does not exceed 0.3 L/s, the piles shall be dried immediately before concrete is placed. Then the concrete can be placed using a readily workable mix (slump 100 mm, which is self-compacting but does not segregate) through a trunking. 18/26

19 4.5.2 Concreting under water (tremie method) (Fig. 2.22) If the excavations for piles are supported by bentonite slurry or if the rate of ingress of water exceeds 0.3 L/s, concrete shall be placed by a tremie. A tremie is a steel tube suspended in the water by a crane, with a hopper fixed to the top end to receive the concrete. The tube shall be watertight, smooth-bored, diameters of mm. The tremie concrete shall be of high workability (minimum 150 mm slump). Procedure: Erect the tremie pipe (with hopper) vertically and resting on the bottom of the pile shaft. Place a traveling plug (formed with foamed plastic in plastic bag) into the tremie pipe. Feed high slump concrete into the hopper to push the traveling plug downward. When the plug reaches the bottom, slightly raise the tremie pipe to let the plug and the concrete to flow out. Continuously feed fresh concrete into the tremie pipe. Pump away displaced water/bentonite slurry. Raise and remove sections of the tremie pipe progressively to maintain the concrete flow rate, but keeping at least 3 m embedment of the tremie pipe in the concrete. Continue concreting until the concrete lever reaches 750 mm above the cut-off level. Remove the tremie pipe. The concreting process is completed. (The surplus concrete shall be trimmed away hardening.) 19/26

20 5 Quality Control of Piles Construction Technology B (CON4313) As the design and construction of buildings become more complex, it is necessary to exercise closer supervision during construction to ensure quality of the building works. The foundation of a building is a fundamental structural element which supports the whole building. Moreover as the foundation, when constructed, is buried in the ground, its built quality is not readily visible. There is a need to enhance the supervision of foundation works during construction and testing of the completed works in order to ensure that the quality of the foundation works is up to standard. There are various methods to control the quality of piling works: 5.1. Pre-drilling for piles founded on rock For piles founded on rock, sufficient pre-drilling should be carried out before the installation works, such that the quality of the founding rock can be identified and the appropriate founding levels can be determined. The pre-drilling should be sunk to at least 5m below the tentative founding rock levels of the piles. Pre-drilling should be carried out for each of the large-diameter bored piles, barrettes and the like. For minipiles, socketted steel H-piles and similar small diameter-bored piles, founding on rock, the number of pre-drill boreholes required should be such that the pile tip of every such pile should be within 5 metres from a pre-drill hole, or at a larger distance from it as decided by the Engineer. 5.2 Proof drilling For Large diameter bored piles 20/26

21 Proof drilling shall be carried out on every large-diameter bored pile to check the condition at the concrete/rock interface. A base coring tube of at least 150 mm diameter shall be left at about 1000 mm above the founding level of the pile. The core-drilling shall be carried out to 1000 mm below the concrete/rock interface For minipiles and socketted steel H-piles Proof drilling shall be carried out to verify the adequacy of the socketted length of minipiles and socketted steel H-piles The depths of the proof drill holes shall be at least 5 metres below the founding levels of the adjoining piles. 21/26

22 6 Determination of the Settlement of the Piles by Load Test 6.1 Procedure of Load Test (Fig. 2.23) a. Working piles shall be tested to not less than 1.8 times working load. b. Test loads shall be applied and removed in three stages as stated in Table c. The test loads shall be applied in increments, and removed in decrements, of 25% of the working load. Increments of load shall not be applied until the rate of settlement of the pile is less than 0.1 mm in 20 minutes. d. The full test loads for Stage I shall be applied in increments and shall then be maintained for at least 24 hours after the rate of settlement has reduced to less than 0.1 mm per hour. The test loads shall be removed in decrements and the recovery of the pile determined before loading is resumed. e. The procedure stated in (d) shall be repeated for Stage II loading. f. The procedure stated in (d) shall be repeated for Stage III loading. g. The settlement of the pile shall be measured at hourly intervals. The settlement of the pile under each increment and decrement of loading shall be measured. The exact times at which increments are applied and decrements are removed shall be recorded. h. The level of the reference beam shall be checked at regular intervals agreed by the Engineer during the test. Table 8.11 Test loading stages Stage Test load I 25% of max. test load II 50% of max. test load III 100% of max. test load 6.2 Compliance criteria of load tests on piles a. The settlement at any load shall be less than twice the settlement at 90% of that load (Brinch Hansen's criteria). 22/26

23 b. Under working load the gross pile head settlement shall not exceed 20 mm for buildings and 10 mm for other structures. 23/26

24 7. Testing of concrete core from piles Concrete cores shall be 100 mm diameter. Each concrete core from a pile shall be inspected for evidence of segregation of the constituents and for the presence of voids. Specimens selected from each core shall be tested to determine the compressive strength. The concrete core shall be considered as non-compliant if it exhibits honeycombing which means interconnected voids arising from, for example, inadequate compaction or lack of mortar. For any set of cores representing a test location, the average estimated equivalent cube strength shall be at least 85% of the specified grade strength. Each individual estimated equivalent cube strength shall be at least 75% of the specified grade strength. 24/26

25 8. Sonic Test on bored pile (Fig. 2.24) Prior to concreting, three to four mild steel tubes of not less than 50 internal diameter are fixed to reinforcement cage of the cast insitu pile. The tubes shall be watertight, parallel to the axis of the pile and extend the full depth of the pile. Testing is carried out by lowering a pair of sensor probes (a transmitter and a receiver) to the bottom of the tubes. The tubes are filled with water/jelly prior to testing to provide acoustic coupling The probes are maintained at the same elevation and simultaneously raised slowly (20cm/s). The propagation of sonic signals between the tubes is recorded. The test is repeated for each pair of tubes, i.e. three runs for a pile with three tubes and six runs for a pile with four tubes. The sonic profiles of the entire length of the pile are plotted and the defects and irregularities can be assessed. 25/26

26 Reference: 1. Pile design and construction practice, fourth edition (1994), M.J. Tomlinson, E & FN Spon. 2. Introduction to civil engineering construction, third edition (1995), Roy Holmes, The college of estate management. 3. Construction Technology, second edition (1987), R. Chudley, Longman Scientific & Technical. 4. Civil Engineering Construction IV (1991), S.A.R. Jufri & R.J. Wellman, Hong Kong Polytechnic. 5. General Specification for Civil Engineering Works (1992), Hong Kong Government. 6. R.Chudley, 1985, Construction Technology Vol, 3 &4, Longman 7. S.A.R. Jufri & R.J. Wellman, 1991, Civil Engineering Construction IV, Vol 2 & 3, Hong Kong Polytechnic 8. R. Holmes, 1983, Introduction to Civil Engineering Construction, College of Estate Management 9. M.J. Turner, 1997, Integrity testing in Piling Practice, Construction Industry Research and Information Association 26/26

Diaphragm wall Construction

Diaphragm wall Construction Diaphragm wall Construction Diaphragm wall is a continuous wall constructed in ground in to facilitate certain construction activities, such as: a) As a retaining wall b) As a cut-off provision to support

More information

The Technical and Contractual Matters of Bored Piling Works. By Wallace Yeung Vibro (H.K.) Ltd.

The Technical and Contractual Matters of Bored Piling Works. By Wallace Yeung Vibro (H.K.) Ltd. The Technical and Contractual Matters of Bored Piling Works By Wallace Yeung Vibro (H.K.) Ltd. What is large diameter bored pile? How to construct a large diameter bored pile? Its advantages and limitation

More information

Combined Pile Foundation System for a Residential Complex

Combined Pile Foundation System for a Residential Complex Combined Pile Foundation System for a Residential Complex Alvin K.M. Lam, Geotechnical Engineer, Ove Arup & Partners Hong Kong Limited, Hong Kong, China; email: alvin.lam@arup.com Daman D.M. Lee, Civil

More information

METHOD STATEMENT for INSTALLATION OF MICROPILE

METHOD STATEMENT for INSTALLATION OF MICROPILE METHOD STATEMENT for INSTALLATION OF MICROPILE A. MATERIAL TO BE USED 1. Grout Grout shall be mixed from Ordinary Portland Cement and clean water free from harmful substances. Usage of other cement which

More information

Construction Planning, Equipment, and Methods PILES AND PILE-DRIVING EQUIPMENT

Construction Planning, Equipment, and Methods PILES AND PILE-DRIVING EQUIPMENT CHAPTER Construction Planning, Equipment, and Methods PILES AND PILE-DRIVING EQUIPMENT Sixth Edition A. J. Clark School of Engineering Department of Civil and Environmental Engineering 19 By Dr. Ibrahim

More information

DIAPHRAGM WALLS, CUT-OFF WALLS AND SLURRY WALLS

DIAPHRAGM WALLS, CUT-OFF WALLS AND SLURRY WALLS DIAPHRAGM WALLS, CUT-OFF WALLS AND SLURRY WALLS Implenia Spezialtiefbau GmbH Robert Bosch Straße 25 D-63225 Langen Phone: +49 6103 988 345 Fax: +49 6103 988 277 Email: info.spezialtiefbau@implenia.com

More information

TECHNOLOGY. Continuous Flight Auger

TECHNOLOGY. Continuous Flight Auger TECHNOLOGY Continuous Flight Auger CFA (Continuous Flight Auger) technology joins the advantages of driven piles with the versatility of application of drilled piles. Moreover, a wide range of diameters

More information

CONTINUOUS FLIGHT AUGER (CFA) PILES QC/QA PROCEDURES. Preferred QC/QA Procedures

CONTINUOUS FLIGHT AUGER (CFA) PILES QC/QA PROCEDURES. Preferred QC/QA Procedures Preferred QC/QA Procedures The Federal Highway Administration (FHWA) has provided QC/QA guidance for this technology as noted below. The reference document also contains information about construction

More information

Walls generally range from 600 to 1500 mm thickness, in wide between 2000 and 3500 mm and can be excavated to depths of 60m or more.

Walls generally range from 600 to 1500 mm thickness, in wide between 2000 and 3500 mm and can be excavated to depths of 60m or more. TECHNOLOGY Diaphragm walls Diaphragm walls are one of the most important technologies of special foundation engineering. A diaphragm wall is constructed using a trench excavated in ground and supported

More information

SPECIFICATION FOR REINFORCED SOIL WALL

SPECIFICATION FOR REINFORCED SOIL WALL SPECIFICATION FOR REINFORCED SOIL WALL 1.0 EXTENT OF WORK The work shall consist of Reinforced Soil walls built in accordance with this specification and in conformity with the lines, levels and details

More information

GeoEng2000 An International Conference on Geotechnical & Geological Engineering

GeoEng2000 An International Conference on Geotechnical & Geological Engineering GeoEng2000 An International Conference on Geotechnical & Geological Engineering 19-24 November 2000 Melbourne Exhibition and Convention Centre Melbourne, Australia Barrettes : A versatile foundation for

More information

ROTARY DRILLING TECHNIQUES LARGE DIAMETER

ROTARY DRILLING TECHNIQUES LARGE DIAMETER INTRODUCTION This paper presents details about large diameter rotary drilling techniques typically employed in the civil engineering industry. These techniques have also been applied to the resources /

More information

DUCTILE IRON PILES ARE HIGHLY EFFECTIVE, FAST AND VERSATILE MODULAR DRIVEN MICROPILE SYSTEMS

DUCTILE IRON PILES ARE HIGHLY EFFECTIVE, FAST AND VERSATILE MODULAR DRIVEN MICROPILE SYSTEMS DUCTILE IRON PILES DUCTILE IRON PILES ARE HIGHLY EFFECTIVE, FAST AND VERSATILE MODULAR DRIVEN MICROPILE SYSTEMS Designed to resist both compression and tension loads in either end-bearing or friction,

More information

SAMPLE SPECIFICATION for CROSSHOLE SONIC LOGGING (CSL) September 2015

SAMPLE SPECIFICATION for CROSSHOLE SONIC LOGGING (CSL) September 2015 SAMPLE SPECIFICATION for CROSSHOLE SONIC LOGGING (CSL) September 2015 Note: This sample specification contains recommended or typical quantities in parenthesis, in the format (quantity); the specifying

More information

NEW PERFORMANCE CRITERIA FOR FRESH TREMIE CONCRETE

NEW PERFORMANCE CRITERIA FOR FRESH TREMIE CONCRETE NEW PERFORMANCE CRITERIA FOR FRESH TREMIE CONCRETE Karsten Beckhaus (1), Martin Larisch (2), Habib Alehossein (3,4) (1) BAUER Spezialtiefbau GmbH, Deutschland (2) Keller Australia Pty Ltd, Australia (3)

More information

SCOPE OF WORK FOR PILING JOB

SCOPE OF WORK FOR PILING JOB SCOPE OF WORK FOR PILING JOB 1.0 PURPOSE This document defines the scope of works and specific requirements for the tank pad construction including pile foundation system for the proposed tanks at Wadala

More information

S.No Description Unit Quantity Rate (Rs) Amount (Rs)

S.No Description Unit Quantity Rate (Rs) Amount (Rs) , S.No Description Unit Quantity Rate (Rs) Amount (Rs) 1 2 Vertical load testing of piles in accordance with IS 2911 (Part IV) including installation of loading platform by Kentledge method and preparation

More information

Oweninny Wind Farm. Oweninny Environmental Impact Statement Appendix 5. Turbine Foundation Construction Method Statement

Oweninny Wind Farm. Oweninny Environmental Impact Statement Appendix 5. Turbine Foundation Construction Method Statement Oweninny Wind Farm Oweninny Environmental Impact Statement Appendix 5 Turbine Foundation Construction Method Statement Copyright ESB International Limited, all rights reserved. Farm Contents 1 Introduction

More information

SITE INVESTIGATION. Foundation Engineering

SITE INVESTIGATION. Foundation Engineering SITE INVESTIGATION Assist. Prof. Berrak TEYMUR Foundation Engineering Analysis Design Construction As a foundation engineer, you need to consider geotechnical/structural issues (involves geology, subsurface

More information

1. Introduction Selection of Pile Type Soil Report / Boreholes Obstructions Design and Installation of Piling Mat 3

1. Introduction Selection of Pile Type Soil Report / Boreholes Obstructions Design and Installation of Piling Mat 3 Contents 1. Introduction 3 2. Selection of Pile Type 3 3. Soil Report / Boreholes 3 4. Obstructions 3 5. Design and Installation of Piling Mat 3 6. Permit to Dig 4 7. Setting out 4 8. Water 5 9. Attendant

More information

Lesson 4. Construction Techniques and Materials. Learning Outcomes. Basic Construction

Lesson 4. Construction Techniques and Materials. Learning Outcomes. Basic Construction Lesson 4 Construction Techniques and Materials schnabel-eng.com Learning Outcomes Describe sequence of construction for a micropile Identify materials used to construct a micropile Describe principle function

More information

INDEX FOR SPECIFICATIONS FOR JACKING CULVERTS THROUGH EMBANKMENTS SCOPE... 2

INDEX FOR SPECIFICATIONS FOR JACKING CULVERTS THROUGH EMBANKMENTS SCOPE... 2 INDEX FOR SPECIFICATIONS FOR JACKING CULVERTS THROUGH EMBANKMENTS 410. 1 SCOPE... 2 410. 2 DEFINITIONS 2.1 Tunneling and Jacking... 2 2.2 Tunneling... 2 2.3 Jacking... 2 410. 3 MATERIALS 3.1 General...

More information

SCREW PILE APPLICATION SHEETS

SCREW PILE APPLICATION SHEETS SCREW PILE APPLICATION SHEETS Advantages of screw piles Exceptionally fast installation rate up to 2... linear metres of pile installed per minute Load bearing capacities of over 300kN SWL Load bearing

More information

Non-Destructive Testing of Drilled Shafts Current Practice and New Method

Non-Destructive Testing of Drilled Shafts Current Practice and New Method Non-Destructive Testing of Drilled Shafts Current Practice and New Method George Piscsalko PE, Pile Dynamics, Inc., Cleveland, Ohio, USA Garland Likins PE, Pile Dynamics, Inc., Cleveland, Ohio, USA Benjamin

More information

Ground Improvement Piling Piled Retaining Walls Enlarged Head Piles Innovations.

Ground Improvement Piling Piled Retaining Walls Enlarged Head Piles Innovations. Ground Improvement Piling Piled Retaining Walls Enlarged Head Piles Innovations www.keller-foundations.co.uk 4 Ground Improvement Solutions Introduction Ground Improvement Solutions Keller Ground Engineering

More information

Pipe Jacking/Microtunnelling. Dr. Mark Knight. Centre for Advancement of Trenchless Technologies (CATT) University of Waterloo.

Pipe Jacking/Microtunnelling. Dr. Mark Knight. Centre for Advancement of Trenchless Technologies (CATT) University of Waterloo. Pipe Jacking/Microtunnelling Dr. Mark Knight Centre for Advancement of Trenchless Technologies (CATT) University of Waterloo 1 New Installations New Installations Non-Steering Methods Steering Methods

More information

INNOVATIVE SLOPE STABILISATION BY USING ISCHEBECK TITAN SOIL NAILS

INNOVATIVE SLOPE STABILISATION BY USING ISCHEBECK TITAN SOIL NAILS Dipl.-Wirt.Ing. Oliver Freudenreich Friedr. Ischebeck GmbH phone: ++49 2333 8305-0 Loher Str. 31 79 fax: ++49 2333 8305-55 e-mail: freudenreich@ischebeck.de D-58256 Ennepetal www.ischebeck.com INNOVATIVE

More information

1. Structural Steel Sections Structural steel sections can be classified into various groups according to their shapes.

1. Structural Steel Sections Structural steel sections can be classified into various groups according to their shapes. 1 Structural Steelwork 1. Structural Steel Sections Structural steel sections can be classified into various groups according to their shapes. A steel section is designated by the serial size in millimeters

More information

SEMINAR. Introduction to Continuous Flight Auger (CFA) piling Thursday 21/8/2013. Facilitator: Martin Larisch

SEMINAR. Introduction to Continuous Flight Auger (CFA) piling Thursday 21/8/2013. Facilitator: Martin Larisch SEMINAR Introduction to Continuous Flight Auger (CFA) piling Thursday 21/8/2013 Facilitator: Martin Larisch 1 Brief History of Piling Contractors, its capabilities and market Introduction to CFA piling

More information

Technical Bulletin No. MK3176. PREPARED: July, 2010

Technical Bulletin No. MK3176. PREPARED: July, 2010 Geoprobe DT45 Dual Tube Sampling System Standard Operating Procedure Technical Bulletin No. MK3176 PREPARED: July, 2010 A. B. C. D. E. A. Assembled outer casing with sample sheath and liner driven to collect

More information

Silent Vibrationless. Technology. teel Sheet Piles. Vinyl Piling. etaining Walls. Piles. tory Piling. oundations. ite Piles. n Free Piling.

Silent Vibrationless. Technology. teel Sheet Piles. Vinyl Piling. etaining Walls. Piles. tory Piling. oundations. ite Piles. n Free Piling. s Silent Vibrationless Pile Pressing Technology nchors n Free Piling ilter Weep Holes teel Sheet Piles etaining Walls Vinyl Piling Corner Piles Cofferdams t Basements oundations tory Piling eet Piling

More information

techie-touch.blogspot.com www.vidyarthiplus.com CE2305 FOUNDATION ENGINEERING 2 MARKS QUESTIONS & ANSWERS 16 MARKS QUESTIONS UNIT -1 1. What are components of total foundation settlement? elastic settlement,

More information

TRENCHLESS CONSTRUCTION (BORING, JACKING, AND TUNNELING)

TRENCHLESS CONSTRUCTION (BORING, JACKING, AND TUNNELING) PART 1 - GENERAL TRENCHLESS CONSTRUCTION (BORING, JACKING, AND TUNNELING) 1.01 SECTION INCLUDES A. Trenchless Installation of Carrier Pipe with Casing Pipe B. Trenchless Installation of Carrier Pipe without

More information

h Installation Manual

h Installation Manual h Installation Manual 1 General Information The installation of HOBAS GRP Pipes is subject to applicable standards and guidelines such as EN 1610 and ISO/ TS 10465-1. Correct installation always requires

More information

Recent Advances in the Selection and Use of Drilled Foundations

Recent Advances in the Selection and Use of Drilled Foundations Recent Advances in the Selection and Use of Drilled Foundations Dan Brown, P.E., Ph.D. Dan Brown and Associates Overview Micropiles Continuous Flight Auger Piles Drilled Displacement Piles Drilled Shafts

More information

DETERMINATION OF WORKABILITY OF FRESH CONCRETE BY SLUMP TEST

DETERMINATION OF WORKABILITY OF FRESH CONCRETE BY SLUMP TEST DETERMINATION OF WORKABILITY OF FRESH CONCRETE BY SLUMP TEST Aim: To determine the workability of concrete by Slump test as per IS : 1199-1959 Mould - in the form of the frustum of a cone having the following

More information

SECTION XXXXX AGGREGATE PIERS PART 1 - GENERAL

SECTION XXXXX AGGREGATE PIERS PART 1 - GENERAL SECTION XXXXX AGGREGATE PIERS PART 1 - GENERAL 1.1 RELATED DOCUMENTS: Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 00 and Division

More information

1. All underground utilities under railroad tracks shall be encased in a larger pipe or conduit called the casing pipe.

1. All underground utilities under railroad tracks shall be encased in a larger pipe or conduit called the casing pipe. MTS Jack and Bore Design Criteria Note: For the purposes of this Design Criteria and subsequent Construction Notes, the term Jack and Bore is used generically to refer to a number of trenchless construction

More information

Monitoring Well Construction

Monitoring Well Construction Meeting logistics Monitoring Well Construction Presenter: Art Becker, MGWC, CPG, Past President NGWA President of Drilling and Safety Consultants LLC Please turn off cell phones or switch to vibrate Presentation

More information

Secoroc Rock Drilling Tools CASING ADVANCEMENT SYSTEMS

Secoroc Rock Drilling Tools CASING ADVANCEMENT SYSTEMS Secoroc Rock Drilling Tools CASING ADVANCEMENT SYSTEMS PRODUCTIVITY IN A PIPE Creating stability Drilled casings, or casing advancement systems, are today's preferred method for drilling in difficult ground

More information

Topic: Site Formation

Topic: Site Formation Topic: Site Formation Presentation prepared by Raymond Wong February 2006 Purpose of site formation is to prepare a piece of land in order to: Accommodate building/s or other facilities which will be placed

More information

Bi-Directional Static Load Testing of Driven Piles

Bi-Directional Static Load Testing of Driven Piles Bi-Directional Static Load Testing of Driven Piles Paul J. Bullock, PhD Fugro Consultants Inc. Loadtest Bi-Directional Osterberg Cell Testing Specialized jack in pile uses bearing to mobilize side shear

More information

Structural Tests and Special Inspections Form. Inspection of Fabricators (1704.2)

Structural Tests and Special Inspections Form. Inspection of Fabricators (1704.2) Inspection of Fabricators (1704.2) Furnish inspection reports (1704.2.1) - Fabricators that have not been approved Provide a Certificate of Compliance (1704.2.2) - Approved Fabricators Steel Construction

More information

CHANGES IN 2006 SPECIFICATIONS SECTION 804 DRIVEN PILES SECTION 814 DRILLED SHAFTS

CHANGES IN 2006 SPECIFICATIONS SECTION 804 DRIVEN PILES SECTION 814 DRILLED SHAFTS CHANGES IN 2006 SPECIFICATIONS SECTION 804 DRIVEN PILES SECTION 814 DRILLED SHAFTS 2006 LADOTD ENGINEERING CONFERENCE Kim Martindale Garlington, P.E. Pavement & Geotechnical Services February 13, 2007

More information

Underpinning This involves deepening an existing foundation or parts of foundation down to firmer ground to create even support for the structure.

Underpinning This involves deepening an existing foundation or parts of foundation down to firmer ground to create even support for the structure. Recent years have seen innovations in foundation construction and also innovations in techniques for solving foundation problems. However new procurement methods, especially Design & Build, have focused

More information

TRENCHLESS INSTALLATION OF ROAD DRAINAGE & SERVICE DUCTS

TRENCHLESS INSTALLATION OF ROAD DRAINAGE & SERVICE DUCTS L L S! " # #! " # # $ % & ' (! & ) * + ', - )!!!. &! - * + ', - )!!!. &! - * " # # $ % & ' (! & ) " &! % - / 0 1 2 3 4 3 2 5 6 3 7 8 4 7 9 : 7 5 ; < 7 9 = > / 1 9 3 1 >? @ A A B C 9 1 8 2 D E 1 > > F 8

More information

Wet Speed-Mixing WSM - Soil Mixing Procedure in Twinmix Design

Wet Speed-Mixing WSM - Soil Mixing Procedure in Twinmix Design Wet Speed-Mixing WSM - Soil Mixing Procedure in Design Method description WSM - a fast alternative for shoring applications What is WSM? WSM stands for Wet Speed-Mixing, a fast soil mixing procedure. The

More information

SECTION GRAVEL PACKED WATER WELL

SECTION GRAVEL PACKED WATER WELL SECTION 02520 GRAVEL PACKED WATER WELL PART 1 GENERAL 1.01 SECTION INCLUDES A. Gravel packed water well includes drilling, installing, cleaning, developing, testing, videoing, abandoning, and site clean

More information

SECTION CAST-IN-PLACE CONCRETE

SECTION CAST-IN-PLACE CONCRETE SECTION 03300 CAST-IN-PLACE CONCRETE PART 1 GENERAL 1.01 SECTION INCLUDES A. The Contractor shall furnish all work and materials, including cement, sand and coarse aggregate, water, admixtures, curing

More information

METHOD OF MAKING AND CURING CONCRETE TEST SPECIMENS IN THE FIELD FOP FOR AASHTO T 23

METHOD OF MAKING AND CURING CONCRETE TEST SPECIMENS IN THE FIELD FOP FOR AASHTO T 23 METHOD OF MAKING AND CURING CONCRETE TEST SPECIMENS IN THE FIELD FOP FOR AASHTO T 23 Scope This procedure covers the method for making, initially curing, and transporting concrete test specimens in the

More information

Installation Guidelines for Flygt Pumps Pump Anchoring Recommendations

Installation Guidelines for Flygt Pumps Pump Anchoring Recommendations Issued: Installation Guidelines for Flygt Pumps Pump Anchoring Recommendations Introduction Proper installation and anchorage of Flygt pumps and installation accessories is critical to limiting vibration

More information

OFFICE OF STATE AID ROAD CONSTRUCTION MISSISSIPPI DEPARTMENT OF TRANSPORTATION

OFFICE OF STATE AID ROAD CONSTRUCTION MISSISSIPPI DEPARTMENT OF TRANSPORTATION Supplemental Specification 901-S-803-1 LFRD Driven Pile Specifications. DATE: May 24, 2010 OFFICE OF STATE AID ROAD CONSTRUCTION MISSISSIPPI DEPARTMENT OF TRANSPORTATION SUBJECT: LRFD Driven Pile Specifications

More information

Pipe Jacking. Japan Sewage Works Association

Pipe Jacking. Japan Sewage Works Association Pipe Jacking Japan Sewage Works Association June, 2013 1 Pipe Jacking Yosuke Matsumiya y.matsumiya@ngsk.or.jp Japan Sewage Works Association Suisui Bldg. 2-10-12 Uchikanda, Chiyodaku Tokyo 101-0047 Japan,

More information

1 Exam Prep Placing Reinforcing Bars Tabs and Highlights

1 Exam Prep Placing Reinforcing Bars Tabs and Highlights 1 Exam Prep Placing Reinforcing Bars Tabs and s These 1 Exam Prep Tabs are based on the CRSI Placing Reinforcing Bars Recommended Practices, 9 th Edition. Each 1 Exam Prep tabs sheet has five rows of tabs.

More information

INNOVATIVE PILE EXTRACTION TECHNIQUE OF CFA PILES FOR THE NEW HARBOR BRIDGE PROJECT

INNOVATIVE PILE EXTRACTION TECHNIQUE OF CFA PILES FOR THE NEW HARBOR BRIDGE PROJECT INNOVATIVE PILE EXTRACTION TECHNIQUE OF CFA PILES FOR THE NEW HARBOR BRIDGE PROJECT Tracy Brettmann, P.E., D.GE, Vice President, A. H. Beck Foundation Company, Houston, Texas, (713) 413-3800, tracy.brettmann@ahbeck.com

More information

UNDERPINNING A CRANE FOUNDATION

UNDERPINNING A CRANE FOUNDATION UNDERPINNING A CRANE FOUNDATION Donald R. McMahon, P.E., McMahon & Mann Consulting Engineers, P.C., Buffalo, New York, USA Andrew J. Nichols, P.E., McMahon & Mann Consulting Engineers, P.C., Buffalo, New

More information

Standard Practice for Molding Roller-Compacted Concrete in Cylinder Molds Using a Vibrating Hammer 1

Standard Practice for Molding Roller-Compacted Concrete in Cylinder Molds Using a Vibrating Hammer 1 Designation: C 145/C 145M 05 Standard Practice for Molding Roller-Compacted Concrete in Cylinder Molds Using a Vibrating Hammer 1 This standard is issued under the fixed designation C 145/C 145M; the number

More information

EVALUATION REPORT. PFC-5551 Reissued April 1, Filing Category: DESIGN Steel (038)

EVALUATION REPORT. PFC-5551 Reissued April 1, Filing Category: DESIGN Steel (038) ICBO Evaluation Service, Inc. 5360 WORKMAN MILL ROAD WHITTIER, CALIFORNIA 90601-2299 A subsidiary corporation of the International Conference of Building Officials EVALUATION REPORT Copyright 2001 ICBO

More information

SECTION DUCTILE IRON PILES

SECTION DUCTILE IRON PILES SECTION 31 66 13 DUCTILE IRON PILES PART 1 - GENERAL 1.1 GENERAL REQUIREMENTS A. Work of this Section, as shown or specified, shall be in accordance with the requirements of the Contract Documents. B.

More information

Atlaspile. Full soil displacement bored pile, vibration free - low noise economical

Atlaspile. Full soil displacement bored pile, vibration free - low noise economical Atlaspile Full soil displacement bored pile, vibration free - low noise economical Atlaspile Possible applications The Atlaspile is used where more economical driven piles are not practicable for environmental

More information

Using Thermal Integrity Profiling to Confirm the Structural Integrity of foundation applications

Using Thermal Integrity Profiling to Confirm the Structural Integrity of foundation applications Using Thermal Integrity Profiling to Confirm the Structural Integrity of foundation applications Authors: 1. George Piscsalko, PE, Pile Dynamics, Inc., 30725 Aurora Road, Solon, Ohio, USA, gpiscsalko@pile.com;

More information

Preventing Water Leakage through Construction Joints using SYNKOFLEX Preformed Compressible Waterstop

Preventing Water Leakage through Construction Joints using SYNKOFLEX Preformed Compressible Waterstop Preventing Water Leakage through Construction Joints using SYNKOFLEX Preformed Compressible Waterstop Introduction A typical problem in most Water Retaining Structures is the leakage of water through Construction

More information

Aveng Ground Engineering Profile

Aveng Ground Engineering Profile Aveng Ground Engineering Profile Contents Overview 1 2 Piling 2 Renewable Energy 6 Lateral Support 8 Grouting 10 Geotechnical investigations 12 Flagship projects 12 Contact us 12 Visit our website for

More information

Example of the Unified Design procedure for use in the September 8, 2014, short course on in Brazil

Example of the Unified Design procedure for use in the September 8, 2014, short course on in Brazil Introduction Example of the Unified Design procedure for use in the September 8, 2014, short course on in Brazil The Unified Design procedure involves two main steps. The first is verifying that the loads

More information

Project Address: Name of Person Completing Form:

Project Address: Name of Person Completing Form: Statement of Inspections This form is provided as a way to list aspects of the project that require special inspection and testing in accordance with IBC Sections 107.1, 1704, and 1705 and define duties

More information

Trenchless Pipeline Crossings

Trenchless Pipeline Crossings Trenchless Pipeline Crossings Overview Where we started Horizontal Directional Drilling 1960 s Evolution of the process Where we are today HDD Microtunneling Direct Pipe Crossing Process Where we re going

More information

DIVISION: EARTHWORK SECTION: BORED PILES REPORT HOLDER: IDEAL MANUFACTURING, INC. 999 PICTURE PARKWAY WEBSTER, NEW YORK 14580

DIVISION: EARTHWORK SECTION: BORED PILES REPORT HOLDER: IDEAL MANUFACTURING, INC. 999 PICTURE PARKWAY WEBSTER, NEW YORK 14580 0 Most Widely Accepted and Trusted ICC-ES Evaluation Report ICC-ES 000 (800) 423-6587 (562) 699-0543 www.icc-es.org ESR-3750 Reissued 06/2017 This report is subject to renewal 06/2018. DIVISION: 31 00

More information

SPECIAL CONDITIONS FOR PIPE JACKING (PJ) October, 2006

SPECIAL CONDITIONS FOR PIPE JACKING (PJ) October, 2006 Michigan Department Of Transportation 3703C (11/06) 1 Materials 1.1 Pipe SPECIAL CONDITIONS FOR PIPE JACKING (PJ) October, 2006 Page 1 of 5 The type of pipe used for the pipe jacking method shall be capable

More information

Implementation of this Special Provision requires a complete understanding of the following documents:

Implementation of this Special Provision requires a complete understanding of the following documents: VIRGINIA DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR Quality Assurance/Quality Control (QA/QC) for the Construction of Deep Foundation Systems for Design-Build and PPTA Contracts November 10, 2009

More information

DIVISION: EARTHWORK SECTION: BORED PILES REPORT HOLDER: EMPIRE PIERS 2656 EAST HWY 47 WINFIELD, MO EVALUATION SUBJECT:

DIVISION: EARTHWORK SECTION: BORED PILES REPORT HOLDER: EMPIRE PIERS 2656 EAST HWY 47 WINFIELD, MO EVALUATION SUBJECT: 0 Most Widely Accepted and Trusted ICC-ES Evaluation Report ICC-ES 000 (800) 423-6587 (562) 699-0543 www.icc-es.org ESR-4050 Issued 12/2017 This report is subject to renewal 12/2018. DIVISION: 31 00 00

More information

Minimum Guidelines for the Design and Use of Underpins When Performing Foundation Stabilization and/or Supplementation UP-08

Minimum Guidelines for the Design and Use of Underpins When Performing Foundation Stabilization and/or Supplementation UP-08 Minimum Guidelines for the Design and Use of Underpins When Performing Foundation Stabilization and/or Supplementation UP-08 Table of Contents 1. Title 2. Designation 3. List of Figures 4. Scope 5. Referenced

More information

DIVISION: EARTHWORK SECTION: BORED PILES REPORT HOLDER: GOLIATHTECH INCORPORATED 175B RUE PELADEAU MAGOG, QUEBEC J1X 5G9 CANADA

DIVISION: EARTHWORK SECTION: BORED PILES REPORT HOLDER: GOLIATHTECH INCORPORATED 175B RUE PELADEAU MAGOG, QUEBEC J1X 5G9 CANADA 0 Most Widely Accepted and Trusted ICC-ES Evaluation Report ICC-ES 000 (800) 423-6587 (562) 699-0543 www.icc-es.org ESR-3726 Issued 10/2017 This report is subject to renewal 10/2018. DIVISION: 31 00 00

More information

PIANC UK Seminar Design Developments and Specification for Steel. Duncan Nicholson Arup Fellow 9/3/17 ICE London

PIANC UK Seminar Design Developments and Specification for Steel. Duncan Nicholson Arup Fellow 9/3/17 ICE London PIANC UK Seminar Design Developments and Specification for Steel Duncan Nicholson Arup Fellow 9/3/17 ICE London Contents 1. Design Issues 2. SPERWall Edition 3 (2016) 1. Steel Sheet Piles (Section 14)

More information

SECTION VIBRATION CONTROLS FOR HVAC PIPING AND EQUIPMENT

SECTION VIBRATION CONTROLS FOR HVAC PIPING AND EQUIPMENT SECTION 230548 - PART 1 - GENERAL 1.1 SUMMARY A. This Section includes the following: 1. Elastomeric Isolation pads. 2. Elastomeric Isolation mounts. 3. [Freestanding] [Restrained] [Freestanding and restrained]

More information

Case Studies on Soil Nailed Retaining Systems for Deep Excavations

Case Studies on Soil Nailed Retaining Systems for Deep Excavations Indian Geotechnical Conference 2010, GEOtrendz December 16 18, 2010 IGS Mumbai Chapter & IIT Bombay Case Studies on Soil Nailed Retaining Systems for Deep Excavations Murthy, B.R. Srinivasa Professor e-mail:

More information

Ground Improvement. Martin G. Taube, P.E., P.G. February 4, 2003

Ground Improvement. Martin G. Taube, P.E., P.G. February 4, 2003 ODOT Geotechnical Information Exchange Seminar Ground Improvement Martin G. Taube, P.E., P.G. February 4, 2003 Nicholson Construction Company 12 McClane Street Cuddy, PA 15031 ph. (412) 221-4500 fax (412)

More information

FIVE STAR PRODUCTS, INC. (800)

FIVE STAR PRODUCTS, INC.  (800) FIVE STAR PRODUCTS, INC. www.fivestarproducts.com (800) 243-2206 Page 1 of 11 DESIGN-A-SPEC GUIDELINES FIVE STAR RS ANCHOR GEL CONTENTS PART A - GENERAL CONDITIONS PART B - MATERIAL SPECIFICATIONS PART

More information

CTP STITCH-TIE AGAIN! Quick and easy way to re-anchor existing veneers to back-up structures.

CTP STITCH-TIE AGAIN! Quick and easy way to re-anchor existing veneers to back-up structures. Helical Wall Tie System for Stabilizing Veneers and Structural Repair AGAIN! ANOTHER CTP SOLUTION! CTP STITCH-TIE Quick and easy way to re-anchor existing veneers to back-up structures. Brick to Concrete

More information

Hollow Core Slabs in Construction Industry

Hollow Core Slabs in Construction Industry Hollow Core Slabs in Construction Industry Vidya Jose 1, Dr.P. Rajeev Kumar 2 M tech Student, Dept of Civil Engineering, Toc H Institute of Engineering and Technology, Arakunnam, Kerala, India 1 Professor,

More information

NPTEL Course GROUND IMPROVEMENT USING MICROPILES

NPTEL Course GROUND IMPROVEMENT USING MICROPILES Lecture 22 NPTEL Course GROUND IMPROVEMENT USING MICROPILES Prof. G L Sivakumar Babu Department of Civil Engineering Indian Institute of Science Bangalore 560012 Email: gls@civil.iisc.ernet.in Contents

More information

Installing DELTABEAM. Installation of DELTABEAM. Deliveries. Storage on-site

Installing DELTABEAM. Installation of DELTABEAM. Deliveries. Storage on-site Installing DELTABEAM Installation of DELTABEAM These DELTABEAM installation instructions are intended to complement the project s erection plan. Peikko s technical support can help with the erection plan

More information

September 1, 2003 CONCRETE MANUAL SPECIAL TYPES OF CONCRETE

September 1, 2003 CONCRETE MANUAL SPECIAL TYPES OF CONCRETE September 1, 2003 CONCRETE MANUAL 5-694.800 5-694.810 GENERAL SPECIAL TYPES OF CONCRETE 5-694.800 In the general use of the word concrete, the idea implied is the conventional placement of the material

More information

Concrete. Chapter 10 Properties of Fresh Concrete. Materials of Construction-Concrete 1. Wikipedia.org

Concrete. Chapter 10 Properties of Fresh Concrete. Materials of Construction-Concrete 1. Wikipedia.org Wikipedia.org Concrete Chapter 10 Properties of Fresh Concrete Materials of Construction-Concrete 1 What is Concrete? Concrete is a composite material that consists of a cement paste within which various

More information

Building Big: Civil Engineering Behind Skyscrapers

Building Big: Civil Engineering Behind Skyscrapers High Rise Building Technology Building Big: Civil Engineering Behind Skyscrapers MB Bureau Report Skyscrapers are gigantic projects demanding incredible logistics, management and strong nerves among all

More information

Underwater Concrete in Drilled Shafts: the Key Issues and Case Histories

Underwater Concrete in Drilled Shafts: the Key Issues and Case Histories Underwater Concrete in Drilled Shafts: the Key Issues and Case Histories Sam X. Yao 1 and Robert B. Bittner 2 ABSTRACT: In construction of drilled shafts under water, placing concrete in the shafts is

More information

USE OF MICROTUNNELING TO INSTALL PIPES IN AN ENVIRONMENTALLY SENSISTIVE AREA. Miranda Roman D. *, LaFaso Edward

USE OF MICROTUNNELING TO INSTALL PIPES IN AN ENVIRONMENTALLY SENSISTIVE AREA. Miranda Roman D. *, LaFaso Edward USE OF MICROTUNNELING TO INSTALL PIPES IN AN ENVIRONMENTALLY SENSISTIVE AREA Miranda Roman D. *, LaFaso Edward Iseki, Inc. 7518 Carroll Road, San Diego, Calif. 92121-2402 USA This paper will discuss the

More information

SECTION XXXX POLYMER CONCRETE PUMP STATIONS

SECTION XXXX POLYMER CONCRETE PUMP STATIONS SECTION XXXX POLYMER CONCRETE PUMP STATIONS PART 1 GENERAL 1.1 SUMMARY A. This specification shall govern for the furnishing of all work necessary for installation of polymer concrete pump stations to

More information

SECTION STRUCTURAL PRECAST HOLLOW CORE SLABS

SECTION STRUCTURAL PRECAST HOLLOW CORE SLABS PART 1 GENERAL 1.01 SCOPE OF WORK A. The Contractor shall furnish all labor, materials, equipment and incidentals to provide a complete structural precast hollow core slab system as shown on the Contract

More information

CF50/100 KW TURBINE ACCESS ROAD, CRANE PLATFORM, CONCRETE, AND LIFTING SPECIFICATIONS C&F GREEN ENERGY REVISION PREPARED BY APPROVED BY DATE

CF50/100 KW TURBINE ACCESS ROAD, CRANE PLATFORM, CONCRETE, AND LIFTING SPECIFICATIONS C&F GREEN ENERGY REVISION PREPARED BY APPROVED BY DATE CF50/100 KW TURBINE ACCESS ROAD, CRANE PLATFORM, CONCRETE, AND LIFTING SPECIFICATIONS C&F GREEN ENERGY REVISION PREPARED BY APPROVED BY DATE 001 First Draft W Hession 12.02.2014 Introduction This document

More information

Standard Practice for Thin-Walled Tube Geotechnical Sampling of Soils for Geotechnical Purposes 1

Standard Practice for Thin-Walled Tube Geotechnical Sampling of Soils for Geotechnical Purposes 1 This document is not an ASTM standard and is intended only to provide the user of an ASTM standard an indication of what changes have been made to the previous version. Because it may not be technically

More information

Jet Grouting to Increase Lateral Resistance of Pile Group in Soft Clay

Jet Grouting to Increase Lateral Resistance of Pile Group in Soft Clay GROUND MODIFICATION, PROBLEM SOILS, AND GEO-SUPPORT 265 Jet Grouting to Increase Lateral Resistance of Pile Group in Soft Clay Kyle M. Rollins 1, Matthew E. Adsero 2, and Dan A. Brown 3 1 Prof. Civil &

More information

Concrete Slab-on-Ground

Concrete Slab-on-Ground Concrete Slab-on-Ground This training package provides information on concrete slab-on-ground construction, including reinforcement, formwork, mix, placement and curing, for village infrastructure and

More information

TYPICAL INSTALLATION INSTRUCTIONS

TYPICAL INSTALLATION INSTRUCTIONS TYPICAL INSTALLATION INSTRUCTIONS Environment One Grinder Pump Feature Identification 1. Grinder Pump Basin High density polyethylene (HDPE) 2. Accessway Cover Painted Steel 3. Electrical Quick Disconnect

More information

BISON PRECAST FLOORING SPECIFICATION

BISON PRECAST FLOORING SPECIFICATION BISON PRECAST FLOORING SPECIFICATION 1.0 SCOPE OF THE SPECIFICATION 1.01 Relates to: This specification covers the design, manufacture and associated site work of the following types of floors:- Hollowcore

More information

There are several types of trenchless technology applications for new installations. The following are some of the most prominent applications.

There are several types of trenchless technology applications for new installations. The following are some of the most prominent applications. Applications for New Installations There are several types of trenchless technology applications for new installations. The following are some of the most prominent applications. Note that some specifications

More information

Dewatering & Foundations. Water. Low tech

Dewatering & Foundations. Water. Low tech Dewatering & Foundations Water It seems every time we dig a hole it fills up with rainwater, or groundwater.if we re lucky we hit an underground river or spring that keeps the hole nice and wet. But a

More information

Mix Design and Pumped Concrete

Mix Design and Pumped Concrete Mix Design and Pumped Concrete A simple method of concrete mix design for pumpable concrete based on an estimated weight of the concrete per unit volume is described in the paper. The tables and figures

More information

Civil Engineering Practice

Civil Engineering Practice Lecture # 5 Civil Engineering Practice Foundation Grouting Instructor: Engr. Dr. Attaullah Shah Department of Civil Engineering Swedish College of Engineering and Technology-Wah Cantt. 2 Grouting Grout

More information

SECTION SPECIFICATION FOR STONEBRIDGE RETAINING WALL SYSTEM

SECTION SPECIFICATION FOR STONEBRIDGE RETAINING WALL SYSTEM SECTION 32 32 23 SPECIFICATION FOR STONEBRIDGE RETAINING WALL SYSTEM PART 1: GENERAL 1.01 Scope Work includes furnishing all materials, labor, equipment, and supervision to install a Stonebridge segmental

More information