1 City of San Antonio: Special Inspections Program, Policies, and Procedures SEAoT State Conference 2012 Mike Shannon, PE, CBO Assistant Director, COSA DSD Ramiro Carrillo Building Inspection Supervisor, COSA DSD
2 What Will We discuss? Development Services A review from 2011 to present Brief introduction of the 2012 IBC Chp.17 changes and our adopted local amendments The difference between the inspections identified in IBC Section 110 and the IBC Section 1705 Inspections Submitting Engineered Letters for City review and approval Special Inspection Reviews (SIR s)
3 Organization Chart
4 Development Services Mission Statement Partnering with our community to build and maintain a safer San Antonio Goals and Objectives: 1) Improve cycle time for permits, inspections, and investigations 2) Ensure consistency and quality of inspections 3) Maintain i a customer service philosophy h of facilitation
5 International Accreditation Services (IAS) Two years ago, the department went through the accreditation process with the goal of working to be the best department in the nation This is the highest honor a building inspections department can achieve The Development Services Department is now 1 of only 13 in the world to have such a designation The City of San Antonio is the largest city to achieve IAS Accreditation
6 Insurance Services Office (ISO) ISO is an independent statistical, rating, and advisory organization that serves the insurance industry, and manages the Building Code Effectiveness Grading Schedule (BCEGS) program ISO field representatives visited DSD in December of 2010, and collected and analyzed data In Texas, the highest rating that can be achieved is a Class 2 The City of San Antonio s Development Services Dept was granted a Class 2 for commercial construction, and a Class 2 for residential construction
7 Newly Adopted Codes On December 1, 2011, City Council adopted the latest editions of the building codes DSD had a very open process with 21 advertised Code Review Committee meetings, and public hearings before each of the 4 appellate boards. On March 1, 2012, all the new codes went into effect and are listed below IBC, 2012 IRC, 2012 IFC, 2012 IEBC, 2012 IFGC, 2012 IPC, 2012 IMC, 2011 NEC
8 Let s Talk Code Chapter 1 - Compliance Letters Section 110: Required Inspections (Foundation EoR, Frame EoR, Insulation, Fire Blocking, Fire & Smoke Penetrations, Energy Efficiency, Final) Other Inspections Inspection Agencies Authorizations ti (The Building Official will accept letters from Texas Registered Design Professionals) Chapter 17 Special Inspection Letters Section refers to Special Inspections - see Section 1705
9 Section 110 Inspections and Observation Letters Foundation and Frame observation reports Section Inspection Agencies The building official is authorized to accept reports of approved inspection agencies, provided such agencies satisfy the requirements as to qualifications and reliability The building official accepts reports from registered design professionals for compliance with this section of the code
10 Section 110 continued DSD requires structural letters of observations to be submitted for review and recording prior to the release of the TOPS. (Temporary on Permanent Set). Having these documents submitted in advance assists in eliminating any delay to the issuance of the TCO or C of O DSD provides their customers with a sample of an engineer s observation letter that is acceptable for compliance with this section. The letter was developed and reviewed in partnership with our local PEPP/AIA members
11
12 Special Inspections The Process The Determination of Required Special Inspections Submitted by the RDPiRC with the plans at the permit application stage List of Required Special Inspections Submitted to the owner and RDPiRC by the special inspector Letter of Non Compliance Submitted to the RDPiRC, contractor, t and Building Official from the special inspector during gp phases of construction
13 Section The Process Special Inspection Reviews (SIR s) These are unscheduled, d unannounced visits it by city building inspectors during a project The building inspector checks the log sheets on-site, usually in the job trailer, to verify special inspections are on-going and the log sheets are up to date based on the current phase of the project The GC is required to have the log sheet available for the special inspector to sign in and out at each inspection Failure to provide the log sheets could lead to the project being issued a STOP WORK order by the Chief Building Inspector
14 Additional Responsibilities of the General Contractor The general contractor is required to provide the special inspector adequate notice so the inspector has time to become familiar with the project The general contractor is required to provide the special inspector access to the approved plans The general contractor is required to provide the special inspector access to the required inspections prior to cover up
15 Section The Process Continued Final Report of Special Inspections Submitted to the owner, contractor, and Building Official at completion of the project and prior to the issuance of the Certificate of Occupancy or Temporary C of O The RDPiRC s Final Report must match that of the Determination Letter(re:applicable/not app)
16 Key City Amendments and Special Inspection Documents Special inspections Special inspector qualifications Report requirement Fabricator approval.
17
18
19
20
21
22
23 What if a Project is Less than 5,000 Sq. Ft? An RDPiRC is not required for projects that t do not require them to be designed or sealed by a registered design professional in the State of Texas
24 What if it is a Design Build Project? 1)The RDPiRC must be identified for the project as a requirement of Chp.17 of the IBC.. The RDPiRC may be the RDPiRC of the project hired by the design team, however,, the special inspectors/agency must be hired separately by the owner.
25 Design Build Continued 2)The owner may choose to hire a 3 rd party design professional registered in the State of Texas solely for the responsibility of special inspections. In this case, the RDPiRC may employ the special inspectors/agency
26 Design Build Continued 3)In no case shall the special inspector/agency be employed by the contractor of the project Independence. An approved agency shall be objective, competent and independent from the contractor responsible for the work being inspected. The agency shall also disclose possible conflicts of interest so that objectivity can be confirmed.
27 Who Determines if the ProjectisofaMinor of Nature? The building official will make the determination after carefully reviewing i the intended d scope of work for the project and plans Exception # 2 of the IBC eliminates the special inspection requirement for projects where a design professional is not required It is understood that these smaller type of projects can be prescriptively designed
28 2012 IBC Additional Chp.17 Code Requirement Fire-Resistant Penetrations and Joints. Change Summary: Where penetration firestop systems and fire-resistant resistant joint systems are used in high-rise buildings and those buildings assigned to Risk Categories III and IV, it is now mandatory that they be inspected by an approved inspection agency as a part of the special inspection process
29 Top Turn Down Items The special inspections noted on the Final Report differ from the determination ti letter (as far as applicable versus non-applicable) The design professional on the final report is different from the design professional on the determination letter The structural observation letter is missing i the address of the project, permit number or building number The structural observation letter is not specific to the portion of the area viewed and extent of the structural observation
30 Submittal All letters for commercial projects are to be submitted to the Office of the Chief Building Inspector Our office is located at 1901 S. Alamo, 2 nd Floor, receptionist area The letter will be date and time stamped and entered for a review The Chief Building Inspector has five business days to review and approve the letter and enter it into our Hansen database system If the letter is denied, the Chief Building Inspector will immediately notify the EoR or RDPiRC of the denial
31 Acceptable Methods For Submittal ed, hand delivered originals or copies are all acceptable methods The letters must have the design professional s s seal,and and they must be signed
32 Information Locate the Resources tab Scroll to Information Bulletins to locate IB 132 for Special Insp. Scroll to Current Codes to locate the adopted amendments to the 2012 codes Current 2012 Codes IBC,IEBC,IRC,IFC,IMC, IFGC,IPC, and 2011 NEC, 2009 IECC
33
34
35
36
37
38 Contacts Michael Shannon, P.E., CBO Assistant Director Field Services Development Services (210) Mike Constantino Development Services Manager Commercial Inspections (210) Ramiro Carrillo Building Inspection Supervisor (210)
39 Questions? Always feel free to contact us to discuss an issue or concern Keep up with the latest information from DSD on our website If you want to have the Chief Inspector pre-review review a draft letter by , forward them to the following address: ramiro.carrillo@sanantonio.gov
40 Have a Great Day!
Special Inspections Program Procedures - IBC Section 1704 Special Inspections - Index:
Building Safety Department 100 W. Eldorado Pkwy Little Elm, TX 75068 (214) 975-0456 www.littleelm.org Special Inspections Program Procedures - IBC Section 1704 Special Inspections - Index: A. Owner- Responsibilities.
More informationPlan Submittal Checklist 2015 I-Codes
City of Aurora Building Division Public Works Department LIMITED PLAN REVIEW Plan Submittal Checklist 2015 I-Codes Permit Center 15151 E. Alameda Parkway, Ste 2400 Aurora, CO 80012 303.739.7420 Fax: 303.739.7412
More informationCITY OF CHEYENNE 2018 CODE ADOPTIONS
CITY OF CHEYENNE 2018 CODE ADOPTIONS Town Hall meeting 9-25-18 Public Safety Center 415 W. 18 th St Blas Hernandez CBO bhernandez@cheyennecity.org PH: 307-637-6276 Proposed changes are visible by visiting
More informationCity Council Agenda Item Report January 5, 2016
City Council Agenda Item Report January 5, 2016 Agenda Item Contact Stanley R. Fees, P.E., CFM City Engineer 312-0084 sfees@ci.buda.tx.us SUBJECT: Presentation on Possible Adoption of ICC Building Codes
More informationINSPECTION REQUIREMENT ACKNOWLEDGEMENTS. Job Site Address:
SPECIAL INSPECTION FORM and Special Inspection and Testing Agreement City of San Ramon Building & Safety Services 2401 Crow Canyon Rd., San Ramon, CA 94583 Office: (925) 973-2580 Fax (925) 242-9312 www.sanramon.ca.gov
More informationStatement of Special Inspections
Statement of Special Inspections Project: Location: Owner: Design Professional in Responsible Charge: This Statement of Special Inspections is submitted as a condition for permit issuance in accordance
More informationEffective Date: April 25, 2016 Revised: November 7, 2017
Page: 1 of 9 Reference: International Energy Conservation Code (IECC) Residential Provisions and the International Residential Code (IRC) Chapter 11 Scope This policy outlines the information that must
More information2015 IBC Chapters 1 and 35
Study Session 1 2015 IBC Chapters 1 and 35 Administration OBJECTIVE: To obtain an understanding of the administrative provisions of the International Building Code Ò (IBC Ò ), including the scope and purpose
More informationACCREDITATION CRITERIA FOR FABRICATOR INSPECTION PROGRAMS FOR WOOD WALL PANELS AC196. April 2017 (Effective June 1, 2017) PREFACE
ACCREDITATION CRITERIA FOR FABRICATOR INSPECTION PROGRAMS FOR WOOD WALL PANELS April 2017 (Effective June 1, 2017) PREFACE The attached accreditation criteria have been issued to provide all interested
More informationRecommended Amendments to the
Recommended Amendments to the And the energy provisions of the 2018 International Residential Code Governments Region (Climate Zone 3 of the IECC) The following sections, paragraphs, and sentences of the
More informationMINISTRY OF LOCAL GOVERNMENT & COMMUNITY DEVELOPMENT NOTES ON THE INTERNATIONAL BUILDING CODE VERSIONS OF 2003 AND 2012 CODES IN POSSESSION
MINISTRY OF LOCAL GOVERNMENT & COMMUNITY DEVELOPMENT NOTES ON THE INTERNATIONAL BUILDING CODE VERSIONS OF 2003 AND 2012 CODES IN POSSESSION 1 International Private Sewage Disposal Code (IPSDC) 2 International
More informationTechnical Services Division 1660 Mission Street San Francisco CA Office (415) FAX (415)
City and County of San Francisco Department of Building Inspection Edwin M. Lee, Mayor Tom C. Hui, S.E., C.B.O., Director ADMINISTRATIVE BULLETIN NO. AB-046 DATE : September 18, 2002 (Updated 01/01/2017
More informationSpecial Inspections Instructions
Special Inspections Instructions Based on Chapter 17 of the 2012 International Building Code PURPOSE The purpose of this document is to familiarize the Owner, Engineer, Architect, Special Inspector, Testing
More informationPIKES PEAK REGIONAL BUILDING DEPARTMENT
PIKES PEAK REGIONAL BUILDING DEPARTMENT Manufactured Residential Buildings - WOODLAND PARK (CITY LIMITS) Pikes Peak Regional Building Department issues permits and performs inspections of manufactured
More informationProject Address: Name of Person Completing Form:
Statement of Inspections This form is provided as a way to list aspects of the project that require special inspection and testing in accordance with IBC Sections 107.1, 1704, and 1705 and define duties
More informationNarrative Summary of Changes to PA UCC
Narrative Summary of Changes to PA UCC 401.1. Definitions. This section changes the definitions for the IBC, the IECC, the IEBC, the IFC, the IFGC, the IMC, the International Performance Code, the IPC,
More informationPICKENS COUNTY BUILDING CODES SPECIAL INSPECTION PROCEDURE IBC CHAPTER EDITION
PICKENS COUNTY BUILDING CODES SPECIAL INSPECTION PROCEDURE IBC CHAPTER 17 2012 EDITION When Required All projects that require a SC licensed Architect or Engineer per SC Architectural and Engineering registration
More informationCOMMERCIAL PROJECT INFORMATION
Community Development Building and Inspection Services 2100 Ridge Avenue Evanston, Illinois 60201-2798 T 847.448.4311 FAX 847.448.8020 www.cityofevanston.org COMMERCIAL PROJECT INFORMATION The Community
More informationSTATEMENT OF SPECIAL INSPECTIONS
STATEMENT OF SPECIAL INSPECTIONS Project: Application No. Project location: Project Owner: Address: SC Registered Design Professional in Responsible Charge: Firm (optional): License Number: SC Phone: Fax:
More informationUNIFIED FACILITIES GUIDE SPECIFICATIONS
USACE / NAVFAC / AFCEC / NASA UFGS 01 45 35.05 20 (September 2015) Change 1-02/18 ------------------------------------ Preparing Activity: NAVFAC UNIFIED FACILITIES GUIDE SPECIFICATIONS References are
More informationPROCEDURE SPECIAL INSPECTIONS PROGRAM OP PURPOSE: POLICY: SCOPE: Michael Fink. Deputy Commissioner
DEPARTMENT OF LICENSES AND INSPECTIONS PROCEDURE OP- 1304 CITY OF PHILADELPHIA OPERATIONAL PROCEDURE SUBJECT OF PROCEDURE: REFERENCE CODE SECTION(S): SPECIAL INSPECTIONS PROGRAM IBC Chapters 7,9, 17 and
More information**Section C and R ; change to read as follows:
Recommended Amendments to the 2012 International Energy Conservation Code North Central Texas Council of Governments Region (Climate Zone 3 of the IECC) The following sections, paragraphs, and sentences
More informationCity of Montevallo Commercial Construction Permitting. April 2018
City of Montevallo Commercial Construction Permitting April 2018 Urban Core Boundary Scenic Corridor Overlay FREQUENTLY ASKED QUESTIONS Commercial Building Permits: How do I submit a building permit
More informationResidential Building Inspector Curriculum and Recommended Publications
Residential Building Inspector Curriculum and Recommended Publications Below is a listing of the recommended courses and reference materials necessary to succeed as a Residential Building Inspector. This
More informationBUILDING PERMIT APPLICATION TYPE OF PERMIT: NEW CONSTRUCTION ADDITION ALTERATION HUD HOME MODULAR HOME OTHER:
BUILDING PERMIT APPLICATION TYPE OF PERMIT: NEW CONSTRUCTION ADDITION ALTERATION HUD HOME MODULAR HOME OTHER: DESCRIPTION OF PROJECT: ESTIMATED VALUE: ADDRESS SUBDIVISION BLOCK: LOT: ZONING: PROPERTY INFORMATION
More informationEXETER TOWNSHIP HOOD AND DUCT SYSTEMS FOR COMMERCIAL KITCHENS
HOOD AND DUCT SYSTEMS FOR COMMERCIAL KITCHENS POLICY STATEMENT This policy applies to NEW Hood and Duct systems. The Authority Having Jurisdiction will not waive major criteria in the applicable standards
More informationDENVER AMENDMENT PROPOSAL 2015 INTERNATIONAL CODES
DENVER AMENDMENT PROPOSAL 2015 INTERNATIONAL CODES UPDATED DEADLINE: JANUARY 9, 2015 NOTE: Each proposed Denver amendment to the International Codes must be justified. In order to be considered, the amendment
More informationA12 Single Family Residential Back-up Generator. Address: Date Stamp. Application Requirements:
Development & Planning Services A12 Single Family Residential Back-up Date Stamp Address: For the installation of a generator, see below for permit submittal requirements. Application Requirements: Permit
More informationWelcome-Joseph Montoya- Chief Building Official Project Green Award Presented to Building Division
Town of Castle Rock Development Services Building Division Contractors Luncheon Philip S Miller Park-Mill House 1375 W Plum Creek Parkway June 14, 2017 11:30 AM-1PM Sponsor Lokal Homes Welcome-Joseph Montoya-
More informationE d u c a t i o n a l S e m i n a r s f o r B u i l d i n g & R e s i d e n t i a l C o d e
I N D E X E d u c a t i o n a l S e m i n a r s f o r B u i l d i n g & R e s i d e n t i a l C o d e Title Course Number *Seminar Length (days) Pg. Class Scheduling Policies 8 International Building Code
More informationSponsored by The Boston Association of Structural Engineers and the Structural Engineers Association of Massachusetts
Commonwealth of Massachusetts State Building Code 780-CMR 9 th Edition Renovation of Existing Buildings Using The International Existing Building Code IEBC 2015 with Massachusetts Amendments Sponsored
More informationCLEAR CREEK COUNTY BUILDING DEPARTMENT PERMIT PROCEDURES AND REQUIREMENTS FOR COMMERCIAL AND MULTI-FAMILY DEVELOPMENTS
CLEAR CREEK COUNTY BUILDING DEPARTMENT PERMIT PROCEDURES AND REQUIREMENTS FOR COMMERCIAL AND MULTI-FAMILY DEVELOPMENTS After all of your other permits have been issued and your construction plans and site
More informationCity of Des Moines. Permit and Development Center 602 Robert D Ray Drive Des Moines, IA Phone: Fax:
City of Des Moines Permit and Development Center 602 Robert D Ray Drive Des Moines, IA 50309 Phone: 515-283-4200 Fax: 515-283-4270 This Code Analysis Form must be completed and returned with the Building
More informationCity of Roanoke. Commercial Permit Submittal Guidelines
City of Roanoke Commercial Permit Submittal Guidelines These guidelines are for information purposes only. The contractor is obligated to comply with all adopted codes and ordinances BUILDING INSPECTIONS
More informationHAMPTON ROADS AREA STATEMENT OF SPECIAL INSPECTIONS
Appendix A HAMPTON ROADS AREA STATEMENT OF SPECIAL INSPECTIONS PROJECT PERMIT APPLICANT PRIMARY RDP OF RECORD STRUCTURAL ENGINEER OF RECORD This Statement of Special Inspections is submitted as a condition
More informationHuntington Building Inspection
Huntington Building Inspection George W. Peterson Building Inspector PHONE 4136675763 APPLICATION Other Than One and Two Family Dwelling For ALL other projects use One and Two Family Dwelling (Residence)
More informationWashoe County PLAN SUBMITTAL
Washoe County PLAN SUBMITTAL Washoe County PLAN SUBMITTAL SPECIAL INSPECTION AND TESTING AGREEMENTS SEPTEMBER 2013 Washoe County Permits Plus Zone 1001 East Ninth Street PO Bo 11130 Reno, NV 89520-0027
More informationMultifamily Stories and Type R-1. R-2. R-3. R-4
Date of Application Compliance Path Project Project Address Owner Architect Contractor Third Party Provider City of Dallas Prescriptive Path Project Summary and Checklist Multifamily (Dwelling Units Only)
More informationIntroduction: Issue: Analysis/Conclusion:
Special Inspection Requirements for Buildings Falling under the Jurisdiction of the California Division of the State Architect and the 2007 California Building Code Released May 7, 2008 Introduction: WTCA
More informationNYC Technical Bulletin
Building Owners Architects Engineers Quality Managers Safety Professionals Construction Industry NYC Technical Bulletin 2010-020 Special Inspection Requirements for Fire Resistant Rated Construction Life
More informationDATE. January 25, 2016
SUBJECT EFFECTIVE DATE CODE SECTION PROCEDURE NUMBER Temporary Occupancy Authorization January 25, 2016 SRCC 18-04.040 CBC 111.3 3.5.10 Page 1 of 4 PURPOSE: To provide for Temporary Occupancy authorization
More informationChapter 3 Other Stakeholders Duties
Chapter 3 Other Stakeholders Duties Everyone involved in the special inspection process has a responsibility to perform their agreed upon duties correctly and in a timely fashion during the project. In
More informationCity of Aspen Building Department Policies
City of Aspen Building Department Policies The Chief Building Official is authorized to establish and adopt policies for the administration of codes adopted by the City of Aspen. This authority is specifically
More informationgwinnettcounty RACKING SHELVING CONVEYOR CONSTRUCTION CODE COMPLIANCE GUIDELINES Permitting Procedure
Plan review and permitting requirements for storage systems such as storage racks, storage shelving, pallet racks, movable shelf racks, and conveyors. Permitting Procedure A Building Permit (BLD) is required
More informationAirport Development Guide
DENTON AIRPORT THE NORTH TEXAS AIRPORT OF CHOICE in conjunction with City of Denton Building Inspections City of Denton Fire Marshal s Office Airport Development Guide Revised February 2006 1 WELCOME TO
More informationRESIDENTIAL PROJECT INFORMATION
Community Development Building and Inspection Services 2100 Ridge Avenue Evanston, Illinois 60201-2798 T 847.448.4311 FAX 847.448.8020 www.cityofevanston.org RESIDENTIAL PROJECT INFORMATION The Community
More informationCODE ACTION AMENDMENTS
UCC Review and Advisory Council OFFICIAL Record of 2015 I-Code Review May 1, 2018 CODE ACTION AMENDMENTS 2015 ADMIN ADOPT None 2015 IWUIC ADOPT None 2015 IFC ADOPT None 2015 IBC ADOPT Delete Section 913.2.2
More informationSECTION 1.0 PROJECT REVIEW AND ACCEPTANCE PROCESS
1.1 INTRODUCTION SECTION 1.0 PROJECT REVIEW AND ACCEPTANCE PROCESS 1.1.1 This technical manual has been prepared as a guide for the design and construction of water, wastewater, and reclaimed water system
More informationAssists inspection staff in utilizing conflict resolution techniques to diffuse tense situations with customers.
Job Title: Building Inspection Supervisor Department: Community Development Reports To: Building Official Open Date: May 9, 2018 Close Date: Open Until Filled Hiring Range: $22.10 - $28.23 per hour, DOE
More informationCity of Montevallo Commercial Construction Permitting. August 2016 Revised 8/12/16
City of Montevallo Commercial Construction Permitting August 2016 Revised 8/12/16 OBJECTIVES Introduction to Commercial Building Permit Process for City of Montevallo When Do I need a Permit? What are
More informationJune 7, 2012 PARTIES INTERESTED IN HVAC DUCT ENCLOSURE ASSEMBLIES
June 7, 2012 TO: PARTIES INTERESTED IN HVAC DUCT ENCLOSURE ASSEMBLIES SUBJECT: Revisions to the Acceptance Criteria for Metallic HVAC Duct Enclosure Assemblies, Subject AC179-0612-R1 (MB/CA) Dear Colleague:
More informationCodes, Standards & Guidelines, Oh My! Michael Chelednik, AIA Sr. Airport Terminal Architect URS
Codes, Standards & Guidelines, Oh My! Michael Chelednik, AIA Sr. Airport Terminal Architect URS AIA Quality Assurance The Building Commissioning Association is a Registered Provider with The American Institute
More informationREQUEST FOR PROPOSAL FOR MATERIAL TESTING AND SPECIAL INSPECTION SERVICES
REQUEST FOR PROPOSAL FOR MATERIAL TESTING AND SPECIAL INSPECTION SERVICES DATE: November 13, 2018 PROJECT: OWNER: BUDGET: University Farm Pavilion College of Agriculture and Environmental Services NC A&T
More informationBE IT RESOLVED BY THE STATE HOUSING BOARD OF THE STATE OF COLORADO;
BE IT RESOLVED BY THE STATE HOUSING BOARD OF THE STATE OF COLORADO; THAT PURSUANT TO 24-32-3301 et seq, C.R.S. as amended, the State Housing Board of the State of Colorado (the Housing Board ) repeals
More informationApproving Innovative Building Products
Approving Innovative Building Products Introduction The components/products used in building construction must comply with the code, however Introduction The code cannot realistically include every possible
More informationFill out all sections or mark with N/A (not applicable)
TOWN of PLAINVILLE 142 South St Plainville, MA. 02762 508-695-3010 ext#12 / fax # 508-695-1857 Commercial Building Permit BUILDING PERMIT INSTRUCTIONS and APPLICATION Please be advised that any incomplete
More informationUCC CONSTRUCTION PERMIT APPLICATION INSTRUCTIONS
ENGINEERING-CONSULTING- OPERATIONS UCC CONSTRUCTION PERMIT APPLICATION INSTRUCTIONS Dear East Union Township Construction Permit Applicant, Please complete enclosed application to obtain an East Union
More informationApplication for a Building Permit Commercial Work Building Commissioner 37 Main Street Charlton, MA
Paid Amount: Date: Check Number: Initials 1. Owner, Applicant Information Application for a Building Permit Work Building Commissioner 37 Main Street Charlton, MA 01507 508-248-2241 Date: Approved by:
More informationBUILDING CODES & DESIGN CRITERIA
BUILDING CODES & DESIGN CRITERIA Adopted Building Codes: 2006 International Building Code (IBC) 2006 International Residential Code (IRC) 2006 International Mechanical Code (IMC) 2006 International Plumbing
More informationFill out all sections or mark with N/A (not applicable)
TOWN of PLAINVILLE 142 South St Plainville, MA. 02762 508-695-3010 ext#12 / fax # 508-695-1857 Commercial Building Permit BUILDING PERMIT INSTRUCTIONS and APPLICATION Please be advised that any incomplete
More informationLEED v4 for Homes, Residential Project Summary and Checklist One and Two Family New Construction
LEED v4 for Homes, Residential Project Summary and Checklist One and Two Family New Construction Summary Date of Application Path Project Project Address Owner Architect Third Party Third Party Provider
More informationManufactured Buildings And The Electrical Code
2017 NCDOI Code College Electrical Series Manufactured Buildings And The Electrical Code October 31, 2017 1 Mike Hamm, PE Chief Building Code Consultant NC Department of Insurance Office of State Fire
More informationStatement. Special Inspection
Statement of Special Inspection Special Inspection Approval Project Name: Location: Owner: Owner s address: Architect of Record: Structural Engineer of Record: The Statement of Special Inspections printed
More informationCity of Jacksonville Development Guide Building Permits
City of Jacksonville TX City of Jacksonville Development Guide Building Permits A publication to help understand the Building Permit process in the City Jacksonville. Building Department 2011 J Revised
More informationCommunity Energy Code Enforcement Policy
GWINNETT COUNTY Community Energy Code Enforcement Policy The design and construction of buildings in Gwinnett County for the effective use of energy are regulated by the Georgia State Minimum Standard
More informationThe International Building Code (IBC ) is a model code that provides minimum requirements to safeguard the public health, safety and general welfare
AIA Austin is a Registered Provider with The American Institute of Architects Continuing Education Systems (AIA/CES). Credit(s) earned on completion of this program will be reported to AIA/CES for AIA
More informationCITY & COUNTY OF DENVER COMMUNITY PLANNING & DEVELOPMENT BUILDING PERMIT POLICY
Page 1 of 5 REFERENCE Denver Building and Fire Code (DBC) Section 131, International Residential Code (IRC) Section M2301, the National Electrical Code (NEC) Articles 690 & 705 PROCEDURE The procedure
More informationDecember 3, 2012 PARTIES INTERESTED IN INTUMESCENT FIRE-RESISTANT COATINGS FIELD-APPLIED TO PREFABRICATED WOOD I-JOISTS
December 3, 2012 TO: PARTIES INTERESTED IN INTUMESCENT FIRE-RESISTANT COATINGS FIELD-APPLIED TO PREFABRICATED WOOD I-JOISTS SUBJECT: Proposed Acceptance Criteria for Intumescent Fire-resistant Coatings
More informationPR (rev ) Page 1 of 22 DIVISION OF THE STATE ARCHITECT DEPERTMENT OF GENERAL SERVICES STATE OF CALIFORNIA
A Division of the State Architect (DSA) Procedure documents a process or series of steps that DSA staff and/or external stakeholders must complete in order to fulfill one or more administrative requirements
More informationTown of Poughkeepsie BUILDING DEPARTMENT 1 OVEROCKER ROAD POUGHKEEPSIE, NY12603 (845)
(845) 485-3655 Special Inspection and Testing Guidelines The special inspection requirements of the Building Code of New York State are detailed and can be a challenge to work with. The Town of Poughkeepsie
More informationINDUSTRIALIZED HOUSING AND BUILDINGS Administrative Rules of the Texas Department of Licensing and Regulation 16 Texas Administrative Code, Chapter 70
INDUSTRIALIZED HOUSING AND BUILDINGS Administrative Rules of the Texas Department of Licensing and Regulation 16 Texas Administrative Code, Chapter 70 TABLE OF CONTENTS 70.1. Authority... 1 70.10. Definitions...
More information2016 SAN FRANCISCO EXISTING BUILDING CODE AB-110 ADMINISTRATIVE BULLETIN. Building Façade Inspection and Maintenance
2016 SAN FRANCISCO EXISTING BUILDING CODE AB-110 ADMINISTRATIVE BULLETIN NO. AB-110 DATE 6/21/2017 SUBJECT TITLE Permit Review and Operations Building Façade Inspection and Maintenance PURPOSE REFERENCE
More informationBuilding Department Informational Handout. Residential Window Replacement Requirements
City of Sonoma Building Department Informational Handout Residential Window Replacement Requirements Handout No: 28 Revised: 6/8/18 These requirements apply to the replacement of existing windows in residential
More informationCAREFULLY REVIEW AND COMPLETE ALL THE ENCLOSED DOCUMENTS PLEASE ALLOW THREE (3) WEEKS FOR PROCESSING
CAREFULLY REVIEW AND COMPLETE ALL THE ENCLOSED DOCUMENTS PLEASE ALLOW THREE (3) WEEKS FOR PROCESSING U.M.T. HOURS ARE 8:30 A.M. TO 4:30 P.M. WEEKDAYS. PERMIT FORMS ARE AVAILABLE FOR DOWNLOADING AT WWW.
More informationApplication for Commercial Plan Review and Building Permit. Address:
City of Warrenton 200 West Booneslick Warrenton, MO 63383 : 636-456-3535 Fax: 636-456-1336 www. war r ent o n- mo.org Application for Commercial Plan Review and Building Permit PERMIT# Purpose: Commercial
More informationPHYSICAL FACILITIES Consultant s Handbook Specifications Division 07 Thermal and Moisture Protection 8400 Firestopping
1 General 1.1 The bidding requirements, contracting requirements, and applicable parts of Division 1 - General Requirements, as listed in the Table of Contents, shall be included in and made a part of
More informationRESIDENTIAL GUIDELINES
PO Box 368 212 Main Street Lake Dallas, Texas 75065 940 497-2226 ext 110 www.lakedallas.com RESIDENTIAL GUIDELINES NEW RESIDENTIAL PERMIT SUBMITTAL REQUIREMENTS: Before a building application may be submitted
More informationCLEAR CREEK COUNTY BUILDING DEPARTMENT REQUIREMENTS FOR A SINGLE FAMILY RESIDENCE
CLEAR CREEK COUNTY BUILDING DEPARTMENT REQUIREMENTS FOR A SINGLE FAMILY RESIDENCE After all of your other permits have been issued and your construction plans and site plan have been approved by the other
More information2012 INTERNATIONAL ENERGY CONSERVATION CODE ADOPTION TOOLKIT OCTOBER 2012
2012 INTERNATIONAL ENERGY CONSERVATION CODE ADOPTION TOOLKIT OCTOBER 2012 Building energy codes and standards have an important impact on the multifamily industry. Today, apartment properties face new
More informationSpecial Inspections. John P. Stoppi Jr., PE, FPE, CBO, CFI Stoppi Engineering
Special Inspections John P. Stoppi Jr., PE, FPE, CBO, CFI Stoppi Engineering Special Inspections Timeline 1961 1981 1988 2000 2003 Special Inspections Evolution, Codes Special Inspections Evolution, Work
More informationSpecial Inspection Program Guide. City of Novi Community Development Building Division
Special Inspection Program Guide Based on the Michigan Building Code 2015 City of Novi Community Development Building Division TABLE OF CONTENTS PAGE NO. INTRODUCTION...1 GUIDELINES FOR THE SPECIAL INSPECTION
More informationCOMMERCIAL BUILDING PLAN REVIEW CHECKLIST
Department of Urban Planning & Codes Enforcement City of Coatesville - 1 City Hall Place - Coatesville, Pennsylvania 19320 Phone: 610.384.0300 Fax: 610.384.6051 COMMERCIAL BUILDING PLAN REVIEW CHECKLIST
More informationMandatory Wood Frame Soft-story Retrofit Program PERMITTING AND INSPECTION PROCESS GUIDELINES
INFORMATION BULLETIN / PUBLIC - BUILDING CODE REFERENCE NO.: LAMC Division 93 Effective: 11/22/2015 DOCUMENT NO.: P/BC 2017-136 Revised: 1/11/2017 Previously Issued As: N/A Mandatory Wood Frame Soft-story
More informationCOMMERCIAL BUILDING PERMIT
COMMERCIAL BUILDING PERMIT TOWNSHIP OF UPPER ST. CLAIR 1820 McLaughlin Run Road, Upper St. Clair PA 15241 Phone: 412.831.9000 Ext. 501 FAX: 412.854.0773 www.twpusc.org OFFICE USE CASE NO: BLD/ZON PROPERTY
More information2639 North Monroe Street, Suite B-112 Tallahassee, FL Application for Special Inspector Certification. Rule 61G Form FBPE/006 12/17
2639 North Monroe Street, Suite B-112 Tallahassee, FL 32303 Application for Special Inspector Certification GENERAL INFORMATION ALL INFORMATION MUST BE TYPED. NOT TYPING THE INFORMATION PROVIDED IN THE
More informationVillage of Orland Hills COMMERCIAL Building Permit Application S. 94th Avenue, Orland Hills, IL
COMMERCIAL Building Permit Application 16033 S. 94th Avenue, Orland Hills, IL. 60487-4623 (PRINT or TYPE to complete this form only) Construction Address: {Construction Cost } Owner's Name: Applicant:
More informationGuidance on the Application. of ISO / IEC Accreditation International Association for Certifying Bodies
Accreditation International Association for Certifying Bodies Guidance on the Application of ISO / IEC 17020 Guidance on the Application of ISO/IEC 17020 Page 1 of 16 Introduction This guidance document
More informationOctober Purpose
ACCREDITED INSPECTION AGENCIES: GUIDELINES FOR CONDUCTING BIANNUAL INSPECTIONS OF MANUFACTURERS ACCREDITED TO THE IAS ACCREDITATION CRITERIA FOR INSPECTION PROGRAMS FOR METAL BUILDING SYSTEMS October 2008
More informationStatement of Special Inspections
Statement of Special Inspections Statement Date: Project Name: Building Permit Number: Project Address: Design Professional in Responsible Charge (DPIRC): The following information is being submitted in
More informationDEFINITIONS: The following definitions apply to terms used in this document:
PURPOSE: California Code of Regulations (CCR), Title 24, Part 1, CCR, Chapter 4, Article 1 (Sections 4-211 through 4-220) and Group1, Articles 5 and 6 (Sections 4-331 through 4-344) provide regulations
More informationThe 2009 International Residential Code and the American Recovery and Renewal Act of 2009
The 2009 International Residential Code and the American Recovery and Renewal Act of 2009 Background Recovery Act. The American Recovery and Renewal Act of 2009 requires that the Secretary shall make grants
More informationSpecial Inspection Program
Special Inspection Program Based on the 2013 California Building Code (CBC) Chapter 17 Published 2014 City of Pismo Beach Building Division 760 Mattie Road Pismo Beach, CA 93449 (805) 773-7040 Fax: (805)
More informationBASEMENT FINISH CONSTRUCTION
BASEMENT FINISH CONSTRUCTION June 2017 A City of Rochester Hills Building Department Guide to Finishing a Basement Rochester Hills Building Department 1000 Rochester Hills Dr. 248-656-4615 Guidebooks/Basement
More informationHONEY BROOK TOWNSHIP
HONEY BROOK TOWNSHIP BUILDING PERMIT DATA INFORMATION PACKET FOR PLACEMENT OF A MOBILE (MANUFACTURED) HOME UNDER THE UNIFORM CONSTRUCTION CODE (UCC) EVERYTHING IN THIS PACKET IS IMPORTANT. READ EVERYTHING
More informationTHIS IS NOT A PERMIT DO NO START CONSTRUCTION. City of Pell City. Commercial Building Permit Application
THIS IS NOT A PERMIT DO NO START CONSTRUCTION City of Pell City Commercial Building Permit Application Planning & Zoning/Permitting Department 1905 First Avenue North Pell City, AL 35125 (205) 338-2244
More informationContractor/Owner initials are verification that items #1 and #2 and items (a) thru (g) above are included in the submitted plan/drawing.
FINISH BASEMENT/ADDITION/REMODEL PLAN CORRECTIONS LIST (Based on the current Editions of the International Codes and National Electrical Code) PLAN CHECKED BY: LOT/SUBDIVISION/ADDRESS: CONTRACTOR OR OWNER/BUILDER:
More informationBuilding Plan Review - Department of Planning and Development
Plan review and permitting requirements for retaining walls that are not designed to retain water. Permitting Procedure 1 A Building Permit (BLD) is required for retaining walls that are greater than 4
More informationStatement of Special Inspections Michigan Building Code 2012 (MBC 2012)
Gaines Charter Township 8555 Kalamazoo Ave SE Caledonia MI 49316 PH: 616 698-6640 Fax: 616 698-2490 www.gainestownship.org Building Department Statement of Special Inspections Michigan Building Code 2012
More informationCity of San Pablo Community Development Department Building Inspection Division Plan Review & Permit Requirements
Table of Contents City of San Pablo Community Development Department Building Inspection Division Plan Review & Permit Requirements General Requirements Application & Processing Procedures o Plan Requirements
More informationNew Residential Building Permit Check List:
New Residential Building Permit Check List: Building Permit Application filled out and signed. - All sub-contractors (electrical, HVAC, irrigation, plumbing) must be registered with the City before a permit
More information