WORK INSTRUCTIONS COLORADO SPRINGS NNO FACILITY EQUIPMENT SALVAGE PLAN VERIZON WIRELESS PROJECT MANAGER PATRICK SKILLEN PREPARED FOR:

Size: px
Start display at page:

Download "WORK INSTRUCTIONS COLORADO SPRINGS NNO FACILITY EQUIPMENT SALVAGE PLAN VERIZON WIRELESS PROJECT MANAGER PATRICK SKILLEN PREPARED FOR:"

Transcription

1 4323 ARROWSWEST DRIVE COLORADO SPRINGS, CO PREPARED FOR: VERIZON WIRELESS PROJECT MANAGER PATRICK SKILLEN MARCH 10, 2009

2 VERIZON WIRELESS PAGE 1 PART 1 - GENERAL 1.01 PROJECT DESCRIPTION VzW is planning on reclaiming significant space in the existing Vitesse Semiconductor manufacturing plant and to use it as a datacenter. The existing manufacturing facility has considerable mechanical, electrical and manufacturing processing systems and components which will need to be removed in order to accommodate future data/communication equipment and to house future mechanical and electrical equipment. The following summarizes project work scope: A. All work under this contract shall be coordinated with owner representative, MR. David Gulbransen with Sysak Hennessy Group. B. Removal of exiting mechanical equipment from facility. This equipment includes air handling units and the associated pumps and air ducts. Mechanical equipment also includes removal of boilers and various processing equipment components. Review mechanical plans for more details. C. Removal of miscellaneous electrical equipment. This would include all of the power distribution equipment associated with mechanical equipment mentioned above. Review electrical demolition plans for scope detail. D. Contractor shall provide VzW with list of ALL equipment removed and stored. The list shall be broken down per category and shall provide detailed description of major items removed, such as panelboard or transformer size, manufacturer name, etc. E. The contractor will be responsible for removal and returning of equipment to owner. F. The contractor shall also be responsible for providing storage plan to owner representative prior to commencing with demolition of any equipment. The plan should indicate how the contractor is planning on separating and storing removed equipment. The plan shall also show where the contractor is planning on storing equipment. G. Contractor shall store equipment per manufactures recommendation. H. VzW will determine at later date how they want to salvage removed equipment.

3 VERIZON WIRELESS PAGE GENERAL INFORMATION A. Title of Contract Documents: 1. Verizon Wireless Colorado Springs NNO Facility Equipment Salvage Plan B. Owner and Architect Defined: 1. Owner: Verizon Wireless Project Manager: Patrick Skillen Patrick.Skillen@VerizonWireless.com Phone: (908) Fax: (908) Owner s Representative: David Gulbransen Syska Hennessy Group 3230 S. Nepal Way Aurora. CO Architect / Engineer: KDW, PS Address: Fifth Avenue NE, Suite 102 Seattle, WA Representative: Marwan Salih, PE MarwanS@kdw.net Phone: (425) Fax: (206) The Owner, the Architect, and various consultants hereinafter or otherwise listed shall be given access to the Work insofar as their interests are concerned. PART 2 - SUMMARY OF WORK HAZARDOUS MATERIALS 2.01 DESCRIPTION A. Hazardous Materials or materials needing special handling or disposal, that may be potentially impacted by the Project or that could be encountered during construction, are identified in the Phase 1 Environmental Site Assessment. Contractor to request the assessment and revew prior to any demolition. The purpose of this section is to address all of these materials in one section. These materials may include asbestos-containing materials (ACM), lead, PCBs, mercurycontaining fluorescent light tubes, contaminated ductwork, refrigerants from refrigeration/air conditioning equipment and silica.

4 VERIZON WIRELESS PAGE RELATED WORK A. Work performed under this specification section is governed by related drawings including, but not limited to, the following: A001 AD100 AD110 AD111 AD112 AD113 AD121 AD122 AD123 M001 MD110 MD111 MD120 MD121 MD130 MD701 MD702 MD703 MD704 E001 ED110 ED111 ED130 ED501 ED502 ED701 ARCHITECTURAL GENERAL NOTES AND LEGEND ARCHITECTURAL DEMOLITION SITE PLAN ARCHITECTURAL DEMOLITION FLOOR PLANS ARCHITECTURAL DEMOLITION FIRST FLOOR PLAN ARCHITECTURAL DEMOLITION SECOND FLOOR PLAN ARCHITECTURAL DEMOLITION ROOF PLAN ARCHITECTURAL DEMOLITION ELEVATIONS ARCHITECTURAL DEMOLITION ELEVATIONS ARCHITECTURAL DEMOLITION SECTIONS MECHANICAL GENERAL NOTES AND LEGEND MECHANICAL HVAC DEMOLITION FIRST FLOOR PLAN MECHANICAL HVAC DEMOLITION SECOND FLOOR PLAN MECHANICAL PIPING DEMOLITION FIRST FLOOR PLAN MECHANICAL PIPING DEMOLITION SECOND FLOOR PLAN MECHANICAL DEMOLITION ROOF PLAN HEATING HOT WATER PIPING RISER DIAGRAM CONDENSER WATER PIPING RISER DIAGRAM CHILLED WATER PIPING RISER DIAGRAM BOILER PIPING DIAGRAM ELECTRICAL GENERAL NOTES AND LEGEND ELECTRICAL SYSTEMS DEMOLITION FIRST FLOOR PLAN ELECTRICAL SYSTEMS DEMOLITION SECOND FLOOR PLAN ELECTRICAL SYSTEMS DEMOLITION ROOF PLAN ELECTRICAL DEMOLITION DETAILS ELECTRICAL DEMOLITION DETAILS ELECTRICAL DEMOLITION ONE-LINE DIAGRAM 2.03 GENERAL REQUIREMENTS A. SUPERVISORY AUTHORITY: The Contractor is to avail themselves of all responsibilities under applicable regulations related to their supervisory authority over Subcontractors and personnel performing work related to hazardous materials. B. EMERGENCY CONTACTS: Designated qualified representatives of the Contractor and Subcontractors are to be available on a 24-hour emergency basis for the duration of the Work. Provide contact information to the Owner s Representative for inclusion in the Project emergency contact list.

5 VERIZON WIRELESS PAGE 4 C. GENERAL HAZARDOUS MATERIALS SUBMITTALS: Contractor is to review the scope of work and submittal requirements outlined elsewhere in the sections of Related Work. All contractors performing work impacting asbestos, lead, PCBs, etc. are to submit pertinent information required by associated technical specifications. Examples of work and impact may include abatement, demolition, saw cutting, roto-hammering, welding, sanding, drilling, scraping or other remodeling and metals-related impact, impact of asbestos-containing joint compound or other material with <1% asbestos, PCB ballast removal or light tube removal and disposal ASBESTOS A. Asbestos abatement is not included in this Project. B. The Contractor shall refer to the Phase 1 Environmental Site Assessment. The Contractor shall ensure that copies of this information are made available to and retained on the Project Site by all Subcontractors LEAD A. Lead-containing Items may be included in this Project. Requirements related to lead-containing items are outlined below. B. The Owner has conducted a survey of the areas of Project to be impacted by the Work for the presence of lead-containing painted coatings and lead-containing components. Findings and related analytical data are included in the Phase 1 Environmental Site Assessment. Consider all painted coatings similar to those testing positive for lead to be lead-containing. C. The Contractor shall comply with all applicable regulations, laws and ordinances concerning the impact, removal, handling, storage, disposal, monitoring and protection against exposure or environmental pollution related to lead. Impacts to lead that may be required by the Work include, but are not limited to: manual demolition, mechanical demolition, cutting or scraping. Confirm required impacts with drawing sheets. D. Work impacting lead-containing painted coatings and lead-containing items within this Project is the responsibility of the Contractor, and all affected Subcontractors, and shall be performed in accordance with all applicable local, state and federal regulations. 1. Contractor is responsible for the disposal of all dust, debris, disposable protective equipment, cleaning rags, wash water, and any other materials contaminated with residues from activities impacting lead-containing painted coatings or lead components, such as surface preparation, sanding, scraping, etc POLYCHLORINATED BIPHENYLS (PCBs) A. Light Ballasts

6 VERIZON WIRELESS PAGE 5 1. Ballasts inspected were found to be labeled No PCBs. Ballasts labeled as containing PCBs or not marked may exist within fixtures to be impacted by the Work. The Contractor is responsible for handling, removal, storage, and proper recycling of light ballast according to all applicable regulations if unlabeled ballast is found at the Project Site. Prevent damage to any unlabeled ballasts and immediately report any leaking ballasts to the Owner s Representative. 2. Contractor shall furnish all labor, materials, equipment, services shown, or reasonably implied for the removal and handling of fluorescent light ballasts to be demolished as part of the Work MERCURY (Hg) A. Fluorescent Light Tubes 1. The Contractor is responsible for proper handling, removal, storage, proper packaging, and transport for proper recycling. 2. Following removal from fixtures, carefully place lamps in fully covered containers and transport to designated recycling facility. PART 3 - SAFETY REQUIREMENTS 3.01 SUMMARY A. The purpose of this section is to establish a summary of the minimum requirements for safety on the construction jobsite, the Contractor s role regarding creating and maintaining a safe jobsite and the working requirements of others. B. The Contractor is responsible for compliance with all applicable laws and regulations regarding safety whether noted in this section or not. Furthermore, the Contractor is responsible for creating and maintaining a safe working environment on the construction site whether the requirements of this section address a particular situation or not RESPONSIBILITY A. The Contractor shall be solely and completely responsible for conditions of the work site, including safety of all persons and property, during performance of the Work. The Contractor shall maintain the work site and perform the Work in a manner which meets or exceeds statutory and regulatory requirements for the provision of a safe place to work and which minimizes safety risks to personnel of the Contractor, Subcontractors, Owner, general public or other parties. This obligation shall apply continuously and not be limited to normal working hours.

7 VERIZON WIRELESS PAGE 6 1. The Contractor shall ensure that all Contractor and subcontractor personnel are provided sufficient training, and shall take such actions as are necessary to maintain a safe environment on the jobsite. Such training and actions shall include but not be limited to ensuring that such employees are familiar with governing construction safety requirements and the requirements for compliance with applicable regulations. The Contractor shall monitor the jobsite to ensure that employees do not create unsafe conditions for others, and shall notify employees of the requirement to alert the Contractor to any potential health or safety hazard affecting themselves or others, and to comply with the provisions of the Site Specific Safety Plan. 2. The Contractor shall establish and communicate clear expectations to its employees and its subcontractors (and their employees) of their obligation to notify any party concerning an observed unsafe or unhealthy act, or any pending hazard. B. The Contractor shall designate an on-site competent person to be the Safety and Health Officer who is qualified and authorized to supervise and enforce compliance with the Contractor s Site Specific Safety Plan during the performance of the Work. The Contractor is responsible to ensure that all necessary monitoring equipment, protective clothing, and other supplies and equipment are available to implement the Plan SUBMITTALS A. Company Safety Program: The Contractor shall submit a copy of its Company Safety Program to the Owner. The Company Safety Program shall contain, at a minimum, the following elements: 1. Organizational Structure: Include names of individuals who will perform safety duties, titles, work assignments, authority and reporting relationships. 2. Training Program. Who, how and when training is provided; method of employee training concerning safety rules and procedures; training in use of protective equipment. 3. Protective Equipment: List of personal protective equipment to be provided to employees. 4. Accident Prevention and Loss Control Plan. Work site inspection and hazard correction procedures; disciplinary procedures for safety infractions; accident response, investigation and reporting procedures. 5. Regular Safety Meetings. On-site weekly, or other frequency as appropriate, safety meetings mandatory for all employees. B. Site Specific Safety Plan: The Contractor and each of their Subcontractors shall review the Contract Documents, and the Contractor shall develop and submit a copy of a Site Specific Safety Plan to the Owner. The Site Specific Safety Plan shall be tailored to the unique issues of the Project and the specific types of hazards likely to be encountered, be in compliance with all regulatory requirements, and contain, at a minimum, the following elements. 1. Application of Company Safety Program. The Site Specific Safety Plan shall address how the following elements from the Company Safety Program will be specifically applied and modified in addressing unique issues related to the Project: organizational structure, training program, protective equipment, accident prevention and loss control plan.

8 VERIZON WIRELESS PAGE 7 2. Specific Hazards. The Site Specific Safety Plan shall address, as applicable, the following, and other specific hazards for the Project: a. Overhead Hazards/Flying Objects b. Hazardous Materials and Chemical Exposure (asbestos, lead, PCB, mercury, mold, etc.) c. Electrical Safety d. Scaffolding and Personnel Lifts e. Noise and Dust f. Lockout/Tagout and Control of Hazardous Energy g. Tripping Hazard 3.04 REQUIREMENTS A. Safety Training: Contractor shall provide work site orientation for all employees (including subcontractor employees) to become familiar with the Site Specific Safety Plan. B. Respiratory Equipment: Any personnel requiring use of respiratory protective equipment shall be fully trained in the use of such equipment. Contractor must have a respiratory protection program and ensure that all workers wearing respirators have medical clearance and fit testing, as appropriate, for the type of respirators used. C. Personal Protective Equipment: Contractor shall supply all identified Personal Protective Equipment in accordance with Labor and Industries standards. As a minimum requirement, all personnel working on the project shall be required to use approved hardhats, safety glasses, and appropriate work footwear. D. First Aid: The Contractor shall maintain at the work site office, or other well known place at the work site, all materials necessary for giving first aid to the injured (e.g., a first aid kit), and shall establish, publish, and make known to all employees procedures for ensuring immediate removal to a hospital or a doctor's care, persons, including personnel, who may have been injured on the site. E. Reporting Injuries and Incidents: Contractor shall immediately notify the Owner s Representative of any injury or incident to personnel on the site. Contractor shall conduct an immediate investigation with an emphasis on preventative actions and lessons learned. The Contractor shall submit a copy of the OSHA 301 form documenting the investigation of the incident to Owner within 24 hours of incident. Contractor shall report on a monthly basis the total number of hours worked on-site by Contractor and its employees and Subcontractors, and the total number of recordable incidents and lost time accidents. F. Reporting Potentially Serious Hazards: Contractor shall immediately notify the Owner s Representative of any potentially serious hazard to personnel on the site. Contractor shall conduct an immediate investigation and submit a report to the Owner s Representative within 24 hours of becoming aware of the potentially serious hazard. The report shall describe the potentially serious hazard, the results of the Contractor s investigation, and any steps the Contractor has taken to prevent an injury or incident from occurring based on the potentially serious hazard.

9 VERIZON WIRELESS PAGE 8 PART 4 - TEMPORARY FACILITIES AND CONTROLS 4.01 DESCRIPTION OF REQUIREMENTS A. Minimum temporary facilities and controls requirements are specified in this section. These requirements have been included for special purposes as indicated. Nothing in this section is intended to limit types and amounts of necessary temporary Work, and no omission from this section will be recognized as an indication that such temporary Work is not required for successful completion of the Project and compliance with requirements of all applicable codes. B. Included in this Section are the following items: 1. Material Storage and Handling 2. Work Area 3. Protection of existing utilities 4. Shutdowns of existing equipment and utilities 4.02 MATERIAL STORAGE AND HANDLING A. Study site and present owner with plan which indicates location of material storage. Do not proceed with demolition until owner approves plan. B. Store, and handle material in accordance with the manufacturer s recommendations, using means and methods that will prevent damage, deterioration, loss or theft. C. Store material at the site in a manner that will facilitate inspection and measurement of quantity or counting of units. D. Protect building materials subject to damage, under cover in a clean and weather tight enclosure, with ventilation adequate to prevent condensation. Maintain temperature and humidity within range required by manufacturer s instructions WORK AREA A. Confine operations and storage to the designated work area. Maintain the work area and building in a clean and in an orderly manner. B. Security: 1. Protect Work and stored products from theft and vandalism; and protect premises from entry by unauthorized persons. At the end of work day, close temporary enclosures and lock exterior doors and/or gate. Secure all openings at any time site is left unoccupied. 2. Owner s Representative will issue keys, as required, for the Contractor to perform the Work. Prior to Final Completion, return all issued keys.

10 VERIZON WIRELESS PAGE 9 C. Waste Management: 1. Dispose of all refuse and waste material off Owner's property. Do not stockpile waste material on Owner's property. Immediately clean up any spilled material. Clean all trash and debris from work area daily. Keep work area, site, and adjacent properties free from accumulations of waste materials, rubbish and debris resulting from construction operations. Provide on-site containers for collection of waste materials, debris and rubbish. Periodically remove waste from the site, at a frequency acceptable to Owner. Do not use Owner's waste containers for construction waste. Dispose of all flammable, hazardous, and toxic waste materials daily. Storage of these materials will not be permitted on the interior of building. Coordinate dumpster location with Owner s Representative PROTECTION OF EXISTING UTILITIES A. The existing concealed utilities shown on the drawings are not necessarily exact with respect to location or completeness; therefore, Contractor shall take the following steps: 1. In the event utilities are damaged during construction, temporary services and/or repairs must be made immediately to maintain continuity of services. Damaged utilities, installed by the Contractor, shall be repaired at the Contractor's sole expense SHUTDOWNS OF EXISTING EQUIPMENT AND UTILITY SERVICES A. It is generally critical that all building systems remain operational within occupied buildings, except for brief shutdowns that might be required to integrate or connect new work. B. Equipment or utility shutdowns required to facilitate the Work shall be accomplished in accordance with the following requirements: 1. Submit a schedule of equipment and utility shutdowns. 2. Confirm all requests for equipment and utility shutdowns in writing to the Owner not less than (3) days prior to the proposed date. 3. The duration of all shutdowns shall be held to a reasonable minimum as determined by Owner. PART 5 - CONSTRUCTION WASTE MANAGEMENT 5.01 SUMMARY A. Section includes: Administrative and procedural requirements for construction waste management activities. B. Related Sections: Part 4 Temporary Facilities and Controls.

11 VERIZON WIRELESS PAGE DEFINITIONS A. Construction, Demolition, and Land Clearing (CDL) Waste: Includes all non-hazardous solid wastes resulting from construction, remodeling, alterations, repair, demolition and land clearing and material that is recycled, reused, salvaged or disposed as garbage. B. Salvage: Recovery of materials for reuse. C. Reuse: Making use of a material without altering its form. Materials can be reused on-site or reused on other projects off-site. D. Recycling: The process of sorting, cleaning, treating, and reconstituting materials for the purpose of using the material in the manufacture of a new product. E. Source-Separated CDL Recycling: The process of separating recyclable materials in separate containers as they are generated on the job-site. The separated materials are hauled directly to a recycling facility or transfer station. F. Approved Recycling Facility: Any of the following: 1. A facility that can legally accept CDL waste materials for the purpose of processing the materials into an altered form for the manufacture of a new product. 2. Material Recovery Facility: A general term used to describe a waste-sorting facility. Mechanical, hand-separation, or a combination of both procedures, is used to recover recyclable materials PERFORMANCE REQUIREMENTS A. General: Divert CDL waste, by weight, from the landfill by one, or a combination of the following activities: 1. Salvage 2. Reuse 3. Source-Separated CDL Recycling B. CDL Waste materials that can be salvaged, reused or recycled include, but are not limited to, the following. Refer to drawings for equipment to be reused and stored on site: 1. Acoustical ceiling tiles 2. Drywall 3. Equipment 4. Fluorescent lights and ballasts 5. Metals 6. Paint (through hazardous waste outlets) 7. Field office waste, including office paper, aluminum cans, glass, plastic, and office cardboard.

12 VERIZON WIRELESS PAGE SUBMITTALS A. Coordinate requirements of this section with owner s representative, Mr. David Gulbransen. Proposed methods for salvage, reuse, recycling and disposal during construction including, but not limited to, one or more of the following: 1. Requiring Subcontractors to take their CDL waste to a recycling facility. 2. Contracting with a recycling hauler to haul recyclable CDL waste to an approved recycling or material recovery facility. 3. Processing and reusing materials on-site. 4. Self-hauling to a recycling or material recovery facility. 5. Name of recycling or material recovery facility receiving the CDL wastes. 6. Handling and Transportation Procedures: Include method that will be used for separating recyclable waste including sizes of containers, container labeling, and designated location on Project Site where materials separation will be located. 7. A record of the type and quantity, by weight, of each material salvaged, reused, recycled or disposed. 8. Disposal Receipts: Copy of receipts issued by a disposal facility for CDL waste that is disposed in a landfill. 9. Recycling Receipts: Copy of receipts issued by approved recycling facility. 10. Salvaged Materials Documentation: Types and quantities of materials salvaged for sale or donated to a third party. A percentage of proceeds, as agreed upon in advance, will be credited to the Owner. END OF

DIVISION 02 SELECTIVE DEMOLITION

DIVISION 02 SELECTIVE DEMOLITION DIVISION 02 SELECTIVE DEMOLITION SECTION 02 41 19 - SELECTIVE DEMOLITION PART 1 - GENERAL 1.01 SUMMARY A. This Section includes the following: 1. Demolition and removal of selected portions of a building.

More information

Site Specific Hazardous Material Abatement Work Plan

Site Specific Hazardous Material Abatement Work Plan Site Specific Hazardous Material Abatement Work Plan Jobsite Location: Pier 31 Building and Roof Repair Project Port of San Francisco San Francisco, California Prepared By: North Tower Environmental, Inc.

More information

BuildingName The Description of the Project P DOCUMENTS

BuildingName The Description of the Project P DOCUMENTS ARCHITECTURE, ENGINEERING AND CONSTRUCTION P00000000 0000 DOCUMENTS ARCHITECTURE & ENGINEERING 326 East Hoover, Mail Stop B Ann Arbor, MI 48109-1002 Phone: 734-764-3414 Fax: 734-936-3334 SPECIFICATION

More information

Construction Waste Management

Construction Waste Management Title: Waste Management Effective Date: 2/27/2012 Control Number: THG_0015 Revision Number: 1 Date: 10/10/15 Annual Review Completed: 5/13/2015 Construction Waste Management CONTENTS I. INTRODUCTION II.

More information

SECTION DEMOLITION WASTE MANAGEMENT AND DISPOSAL

SECTION DEMOLITION WASTE MANAGEMENT AND DISPOSAL SECTION 017418 PART 1 - GENERAL 1.01 GENERAL REQUIREMENTS A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION. B. Examine all conditions as they exist at the project prior to submitting

More information

SECTION POLYCHLORINATED BIPHENYLS (PCB) REMOVAL

SECTION POLYCHLORINATED BIPHENYLS (PCB) REMOVAL SECTION 18200 POLYCHLORINATED BIPHENYLS (PCB) REMOVAL PART 1 GENERAL 1.01 RELATED DOCUMENTS: A. Drawings and general provisions of Contract, including General and Supplementary Conditions and Division

More information

ATTACHMENT N LEED PROJECT PROCEDURES

ATTACHMENT N LEED PROJECT PROCEDURES ATTACHMENT N LEED PROJECT PROCEDURES 1. All subcontractors, sub-subcontractors and suppliers at all tiers are to include the following items in their trade scope of work: a. Submit data and documentation

More information

MASTERSPEC TECHNICAL SPECIFICATIONS DIVISION 01 GENERAL REQUIREMENTS SECTION CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL

MASTERSPEC TECHNICAL SPECIFICATIONS DIVISION 01 GENERAL REQUIREMENTS SECTION CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL SECTION 017419 - CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL PART 1 - GENERAL 1.1 SUMMARY A. This Section includes administrative and procedural requirements for the following: 1. Salvaging non-hazardous

More information

The University of Alabama General Requirements for Purchase Orders Involving Public Works

The University of Alabama General Requirements for Purchase Orders Involving Public Works The University of Alabama General Requirements for Purchase Orders Involving Public Works Revised January, 2011 The following items are to be included in the scope of each Purchase Order individually,

More information

C. Type of Selective Demolition Work: Demolition requires the selective removal and subsequent off-site disposal of:

C. Type of Selective Demolition Work: Demolition requires the selective removal and subsequent off-site disposal of: 02070 - SELECTIVE DEMOLITION PART 1 - GENERAL 1.1 STIPULATIONS A. The specifications sections " General Conditions of the Construction Contract ", "Special Conditions", and "Division 1 - General Requirements"

More information

1. Division 01 Section General Requirements Temporary Facilities and Controls.

1. Division 01 Section General Requirements Temporary Facilities and Controls. PAGE 024210-1 SECTION 024210 PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification sections,

More information

DSC BUILDING 1200 ALTERATIONS OCTOBER 2011 SECTION CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL

DSC BUILDING 1200 ALTERATIONS OCTOBER 2011 SECTION CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL SECTION 017419 - CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL PART 1 - GENERAL 1.1 SUMMARY A. Section includes administrative and procedural requirements for the following: 1. Salvaging nonhazardous demolition

More information

St. Monica Food Pantry Construction Waste Management and Disposal SBA-13105

St. Monica Food Pantry Construction Waste Management and Disposal SBA-13105 St. Monica Food Pantry 01 7419-1 SECTION 01 7419 - CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL PART 1 - GENERAL 1.1 SUMMARY: A. Work of this section includes administrative and procedural requirements for

More information

A. IEMA ten day notification for demolition provisions as necessary. C. IEPA Uncontaminated Soil Certification LPC 663

A. IEMA ten day notification for demolition provisions as necessary. C. IEPA Uncontaminated Soil Certification LPC 663 August 2013, Rev 00 01 7419 Construction Waste Management PART 1. GENERAL 1.01 Requirements Include: A. Each Contractor provide: 1. Participation in Construction Waste Management plan, including separation

More information

SECTION CONSTRUCTION WASTE MANAGEMENT. 1. Section Sustainable Project Requirements. 2. Section Temporary Facilities and Controls.

SECTION CONSTRUCTION WASTE MANAGEMENT. 1. Section Sustainable Project Requirements. 2. Section Temporary Facilities and Controls. Buchtel/Perldns Community Learning Center GPD 2007271.15 OSFC Project # 55-7110-9029425 Phase 3 CLC Package Bidding Documents July 1, 2010 PART 1- GENERAL 1.1 SUMMARY SECTION 01524 CONSTRUCTION WASTE MANAGEMENT

More information

HAZARDOUS MATERIAL ASSESSMENT

HAZARDOUS MATERIAL ASSESSMENT DIVISION 2 EXISTING CONDITIONS Includes the following sections: 02 26 00 Hazardous Material Assessment 02 41 00 Demolition 02 41 13 Selective Site Demolition 02 41 19 Selective Structure Demolition 02

More information

DOCUMENT CONSTRUCTION WASTE MANAGEMENT

DOCUMENT CONSTRUCTION WASTE MANAGEMENT DOCUMENT 01 50 13 PART 1 - GENERAL 1.1 RELATED DOCUMENTS AND PROVISIONS: All Contract Documents should be reviewed for applicable provisions related to the provisions in this document, including without

More information

ADDENDUM NO. 1. TO SCOPE OF WORK: Section 0220, Form 01004/5

ADDENDUM NO. 1. TO SCOPE OF WORK: Section 0220, Form 01004/5 ADDENDUM NO. 1 TO SCOPE OF WORK: Section 0220, Form 01004/5 PROJECT: Tankless Water Heaters Installation Glenn Edge and Rich Martin Apartments and Main Office Water Heater Replacement New Memorial Community

More information

Standard Operating Procedure PCB Fluorescent Light Ballast Management

Standard Operating Procedure PCB Fluorescent Light Ballast Management Page # 1 of 5 Implementation SOP Owner Devlin Piplic Approval Standard Operating Procedure PCB Management 1. Purpose This Standard Operating Procedure (SOP) outlines the work instructions for the handling

More information

SECTION SELECTIVE DEMOLITION

SECTION SELECTIVE DEMOLITION SECTION 024113- PART 1 - GENERAL 1.1 RELATED DOCUMENTS Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to the

More information

SECTION CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL. A. This Section includes administrative and procedural requirements for the following:

SECTION CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL. A. This Section includes administrative and procedural requirements for the following: SECTION 017419 - CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and

More information

SAN DIEGO STATE UNIVERSITY PACIFIC CORNERSTONE ARCHITECTS TENOCHCA HALL PROJECT NO FAN COIL UNITS, RESTROOM AND FINISH RENOVATION

SAN DIEGO STATE UNIVERSITY PACIFIC CORNERSTONE ARCHITECTS TENOCHCA HALL PROJECT NO FAN COIL UNITS, RESTROOM AND FINISH RENOVATION SECTION 02 41 14 SELECTIVE BUILDING DEMOLITION PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Procedures for systematic removal of site improvements or portions of exterior and interior of buildings

More information

Section 34 Brieser Construction SH&E Manual

Section 34 Brieser Construction SH&E Manual Brieser Construction SH&E Manual April 23 2010 This written program documents the steps has taken to minimize General Refuse and Construction & Demolition debris resulting from various construction activities

More information

SECTION TEMPORARY FACILITIES AND CONTROLS

SECTION TEMPORARY FACILITIES AND CONTROLS SECTION 015000 TEMPORARY FACILITIES AND CONTROLS PART 1 - GENERAL 1.1 GENERAL A. Each Contractor shall be responsible for arranging for and providing construction facilities and temporary controls as required

More information

B. Remove and Salvage: Carefully detach from existing construction, in a manner to prevent damage, and deliver to Owner.

B. Remove and Salvage: Carefully detach from existing construction, in a manner to prevent damage, and deliver to Owner. SECTION 02 41 19 - SELECTIVE STRUCTURE DEMOLITION PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division

More information

1. Before selective demolition, Owner will remove the following items:

1. Before selective demolition, Owner will remove the following items: SECTION 024119 - SELECTIVE STRUCTURE DEMOLITION PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Demolition and removal of selected portions of building or structure. 2. Demolition and removal of selected

More information

These procedures are to be followed by all persons required to perform the following work:

These procedures are to be followed by all persons required to perform the following work: These procedures are to be followed by all persons required to perform the following work: Entry into any ceiling space above which an asbestos-containing fireproofing or thermal insulation is present.

More information

HOTEL SANDFORD. C. Remove and Reinstall: Detach items from existing construction, prepare for reuse, and reinstall where indicated.

HOTEL SANDFORD. C. Remove and Reinstall: Detach items from existing construction, prepare for reuse, and reinstall where indicated. SECTION 024119 - PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply

More information

Alameda County Waste Management Authority Model Specification Update March 2004 SECTION CONSTRUCTION AND DEMOLITION WASTE MANAGEMENT

Alameda County Waste Management Authority Model Specification Update March 2004 SECTION CONSTRUCTION AND DEMOLITION WASTE MANAGEMENT SECTION 01505 CONSTRUCTION AND DEMOLITION WASTE MANAGEMENT 1.01 SUMMARY A. Section specifies diversion of construction and demolition (non-hazardous) debris from landfill. B. Related requirements specified

More information

In general, the management plan development process consisted of:

In general, the management plan development process consisted of: NWASCO SCHOOL DISTRICT #21 ASBESTOS MANAGEMENT PLAN PART I: GENERAL PROVISIONS OF THE MANAGEMENT PLAN 1.0 INTRODUCTION This Asbestos Management Plan was developed in accordance with the United States Department

More information

Asbestos Management Program

Asbestos Management Program Oct. 10/06 Oct 10/06 1/13 Table of Contents 1 INTRODUCTION...2 2 PURPOSE...2 3 SCOPE...2 4 ROLES & RESPONSIBILITIES...2 5 INVENTORY...6 6 ACCESS CONTROL...6 7 INSPECTION...6 8 CLASSIFICATIONS OF ASBESTOS

More information

(August 2015) UNIFIED FACILITIES GUIDE SPECIFICATIONS **************************************************************************

(August 2015) UNIFIED FACILITIES GUIDE SPECIFICATIONS ************************************************************************** USACE / NAVFAC / AFCEC / NASA UFGS-02 42 91 (May 2010) ------------------------- Preparing Activity: USACE Nontechnical Title Revision (August 2015) UNIFIED FACILITIES GUIDE SPECIFICATIONS SECTION TABLE

More information

SECTION ASBESTOS CONTAINING MATERIALS REMEDIATION

SECTION ASBESTOS CONTAINING MATERIALS REMEDIATION SECTION 13280 ASBESTOS CONTAINING MATERIALS REMEDIATION PART 1 GENERAL 1.1 SECTION INCLUDES A. Furnishing all labor, materials, equipment, and transportation necessary for properly and safely removing,

More information

2. Points of Contact Site Superintendent John Strickland

2. Points of Contact Site Superintendent John Strickland ENVIRONMENTAL PROTECTION PLAN N69450-08-D-1781/004 REPAIR FRC BUILDING 1553 MAYPORT NAVAL STATION, FLORIDA Revision 02 8/19/2010 SLONE ASSOCIATES, INC. 835 GIL HARBIN INDUSTRIAL BLVD. VALDOSTA, GEORGIA

More information

SECTION GENERAL REQUIREMENTS PART 1 - GENERAL I 1 GENERAL REQUIRMENTS

SECTION GENERAL REQUIREMENTS PART 1 - GENERAL I 1 GENERAL REQUIRMENTS SECTION 01 00 00 GENERAL REQUIREMENTS PART 1 - GENERAL 1.1 SECTION INCLUDES A. Summary of Work: 1. General 2. Contract. B. Contract Considerations: 1. Schedule of values. 2. Applications for payment. 3.

More information

INFORMATION SHEET. To demolish the entire building to the foundation will require a demolition permit (Form 6).

INFORMATION SHEET. To demolish the entire building to the foundation will require a demolition permit (Form 6). City and County of San Francisco Department of Building Inspection Edwin M. Lee, Mayor Tom C. Hui, S.E., C.B.O., Director INFORMATION SHEET NO. 5-04 DATE CATEGORY SUBJECT : June 22, 2015 Structural Demolition

More information

SECTION GREEN BUILDING POLICY IMPLEMENTATION

SECTION GREEN BUILDING POLICY IMPLEMENTATION SECTION 01390 [Note: The intent of this section is to identify Contractor specific work required for achievement of the University Green Building Policy. The policy applies to all new facilities, and partially

More information

PROJECT SPECIFICATIONS FOR THE REMOVAL OF PCB AND MERCURY

PROJECT SPECIFICATIONS FOR THE REMOVAL OF PCB AND MERCURY PROJECT SPECIFICATIONS FOR THE REMOVAL OF PCB AND MERCURY MARSHALL COURTS PHASE IV AND V 741 34 TH STREET NEWPORT NEWS, VIRGINIA ECS PROJECT NO. 47:3961 FOR VIA DESIGN ARCHITECTS, PC JUNE 9, 2017 PROJECT

More information

A. The extent of Selective Demolition Work is that Work necessary, and required to facilitate the new construction indicated.

A. The extent of Selective Demolition Work is that Work necessary, and required to facilitate the new construction indicated. Project No. El611-0l SECTION 02 41 00 - SELECTIVE DEMOLITION PART1 GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division

More information

Lockheed Martin Space Systems Company (LMSSC) Contractor Environment, Safety & Health (ESH) Site Briefing - Boulder, Colorado

Lockheed Martin Space Systems Company (LMSSC) Contractor Environment, Safety & Health (ESH) Site Briefing - Boulder, Colorado Lockheed Martin Space Systems Company (LMSSC) Contractor Environment, Safety & Health (ESH) Site Briefing - Boulder, Colorado The purpose of the Contractor ESH briefing is for LMSSC to provide information

More information

A. Illinois Asbestos Abatement Act, as amended through Public Act , effective July 14, 1995.

A. Illinois Asbestos Abatement Act, as amended through Public Act , effective July 14, 1995. April 2012, rev. 00 02 8213 Asbestos Abatement 1. General 1.01 Summary of Work A. Contractor 1.02 Definitions 1. The Contractor shall provide removal and proper disposal of asbestos containing materials.

More information

CONSTRUCTION WASTE MANAGEMENT PLAN

CONSTRUCTION WASTE MANAGEMENT PLAN CONSTRUCTION WASTE MANAGEMENT PLAN Project: Construction Manager: Location: Prepared by: PREMIER FACILITY MANAGEMENT (PFM) Date: I. OBJECTIVES The objectives of this plan are to: 1. Recycle, reuse or salvage

More information

Note year for Reference as Specified in the LEED V Manual.

Note year for Reference as Specified in the LEED V Manual. PART 1 GENERAL 1.1 SUMMARY A. Section Includes: 1. Sustainable design Project goals. 2. Sustainable design product requirements. B. Related Sections: 1. Section 01810 - Commissioning: General commissioning

More information

DUQUESNE UNIVERSITY ASBESTOS OPERATIONS & MAINTENANCE PROGRAM

DUQUESNE UNIVERSITY ASBESTOS OPERATIONS & MAINTENANCE PROGRAM DUQUESNE UNIVERSITY ASBESTOS OPERATIONS & MAINTENANCE PROGRAM Revised January 2017 Prepared by: Environmental Health and Safety Department TABLE OF CONTENTS Page Introduction 1 Scope 1 Policy Statement

More information

Asbestos and Lead Considerations in Construction Projects. Sean Purcer Senior Consultant Anthony Price Senior Consultant

Asbestos and Lead Considerations in Construction Projects. Sean Purcer Senior Consultant Anthony Price Senior Consultant Asbestos and Lead Considerations in Construction Projects Sean Purcer Senior Consultant Anthony Price Senior Consultant Who We Are History Founded in 1990 by Environmental, Health and Safety (EHS) managers

More information

Safety Approach. September 2016

Safety Approach. September 2016 Safety Approach The San Francisco Public Utilities Commission (SFPUC) Construction Safety Approach applies to all personnel and companies contracted to work on any Project related to SFPUC Capital Improvement

More information

Hazardous Materials G

Hazardous Materials G Hazardous Materials G Needham Public Schools- Mitchell and Hillside HAZARDOUS MATERIALS HAZARDOUS MATERIALS Introduction: Universal Environmental Consultants (UEC) has been providing comprehensive asbestos

More information

LIMITED POTENTIALLY HAZARDOUS MATERIAL BUILDING INSPECTION REPORT AND ASBESTOS BUILDING INSPECTION REPORT. for

LIMITED POTENTIALLY HAZARDOUS MATERIAL BUILDING INSPECTION REPORT AND ASBESTOS BUILDING INSPECTION REPORT. for LIMITED POTENTIALLY HAZARDOUS MATERIAL BUILDING INSPECTION REPORT AND ASBESTOS BUILDING INSPECTION REPORT for Michigan State University Physical Plant Division Engineering and Architectural Services Department

More information

SUBPART 56-5 PHASE IA: ASBESTOS SURVEY PLANNING AND DESIGN

SUBPART 56-5 PHASE IA: ASBESTOS SURVEY PLANNING AND DESIGN SUBPART 56-5 PHASE IA: ASBESTOS SURVEY PLANNING AND DESIGN 56-5.1 Asbestos Survey Requirements for Building/Structure Demolition, Renovation, Remodeling and Repair (a) (b) Asbestos Survey Required. An

More information

DIVISION 02 EXISTING CONDITIONS

DIVISION 02 EXISTING CONDITIONS DIVISION 02 EXISTING CONDITIONS 02 00 00 EXISTING CONDITIONS 02 01 00 Maintenance of Existing Conditions 02 01 50 Maintenance of Site Remediation 02 01 65 Maintenance of Underground Storage Tank Removal

More information

B. Sections and all references contained therein form a part of this Section of the Specifications.

B. Sections and all references contained therein form a part of this Section of the Specifications. KARGES-FAULCONBRIDGE, INC. KFI: 14-044.00 SEWARD MONTESSORI SCHOOL ADDITION & REMODELING SECTION 260010 - PART 1 - GENERAL 1.01 SCOPE OF WORK A. Drawings and general provisions of the Contract, including

More information

UW ASBESTOS MANAGEMENT PLAN MARCH 21, Scope: 2. Purpose. 3. Definitions / Acronyms

UW ASBESTOS MANAGEMENT PLAN MARCH 21, Scope: 2. Purpose. 3. Definitions / Acronyms UW ASBESTOS MANAGEMENT PLAN MARCH 21, 2016 1. Scope: This Asbestos Management Plan applies to all locations as outlined in Administrative Policy Statement (APS) 12.1, Managing Asbestos and Other Regulated

More information

SECTION 2 DIVISION 01C DESIGN SERVICES PROJECT GUIDELINES (INFORMAL)

SECTION 2 DIVISION 01C DESIGN SERVICES PROJECT GUIDELINES (INFORMAL) SECTION 2 DIVISION 01C DESIGN SERVICES PROJECT GUIDELINES (INFORMAL) PART 1 - PROJECT TITLE PAGE February 8, 2018 Project No. PROJECT NAME PART 2 - PROJECT GUIDELINES 2.1 BIDDERS/CONTRACTORS SHOULD CHECK

More information

APPENDIX B CONSTRUCTION WASTE MANAGEMENT SAMPLE SPECIFICATION

APPENDIX B CONSTRUCTION WASTE MANAGEMENT SAMPLE SPECIFICATION APPENDIX B CONSTRUCTION WASTE MANAGEMENT SAMPLE SPECIFICATION The following appendix includes information and standard drawings that are diagrammatic and are used only to convey intent. Construction Waste

More information

DIVISION 02 EXISTING CONDITIONS 2010 Edition, Published January 1, 2010; Document Revision Date: February 7, 2017

DIVISION 02 EXISTING CONDITIONS 2010 Edition, Published January 1, 2010; Document Revision Date: February 7, 2017 2010 Edition, Published January 1, 2010; Document Revision Date: February 7, 2017 02 00 00. EXISTING CONDITIONS 02 30 00. SUBSURFACE INVESTIGATION.1 Architect/Engineer RESPONSIBILITIES: The Architect/Engineer

More information

GENERIC ASBESTOS OPERATION AND MAINTENANCE (O&M) PLAN

GENERIC ASBESTOS OPERATION AND MAINTENANCE (O&M) PLAN Environmental Sciences Corporation 25 Years of Environmental Excellence National Environmental Assessment, Compliance, Industrial Hygiene, UST/AST, Construction Management and Engineering Services GENERIC

More information

Making the Case for Construction Waste Management

Making the Case for Construction Waste Management Making the Case for Construction Waste Management Hazem Elzarka, PhD, PE, LEED AP University of Cincinnati Cincinnati, Ohio, USA Construction and demolition activities generate a large portion of the total

More information

Richmond Hill Primary Renovation SECTION SELECTIVE DEMOLITION

Richmond Hill Primary Renovation SECTION SELECTIVE DEMOLITION SECTION 024119 SELECTIVE DEMOLITION PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification

More information

SPECIFICATION DIVISION 2 SECTION DESCRIPTION DIVISION 02 EXISTING CONDITIONS SECTION REGULATED CONSTRUCTION WASTE REMEDIATION

SPECIFICATION DIVISION 2 SECTION DESCRIPTION DIVISION 02 EXISTING CONDITIONS SECTION REGULATED CONSTRUCTION WASTE REMEDIATION BuildingName The Description of the Project P00000000 0000 DOCUMENTS SPECIFICATION DIVISION 2 NUMBER SECTION DESCRIPTION DIVISION 02 EXISTING CONDITIONS SECTION 028110 REGULATED CONSTRUCTION WASTE REMEDIATION

More information

1.1 SUMMARY.1 Comply with requirements of this Section when performing the following work:

1.1 SUMMARY.1 Comply with requirements of this Section when performing the following work: 125 Syndicate Avenue, Thunder Bay, Ontario Page 1 of 5 Part 1 General 1.1 SUMMARY.1 Comply with requirements of this Section when performing the following work:.1 Removing asbestos-containing transite

More information

Contractor / Vendor Safety Manual

Contractor / Vendor Safety Manual Contractor / Vendor Safety Manual All contractors and vendors conducting business at the Salk Institute for Biological Studies, the Institute, at 10010 N. Torrey Pines Road, La Jolla, CA 92037 must: 1.

More information

Asbestos Consulting Radon Measurements Lead Assessments Indoor Air Quality Testing Mold Investigations. Project Number: Page 1 of 22

Asbestos Consulting Radon Measurements Lead Assessments Indoor Air Quality Testing Mold Investigations. Project Number: Page 1 of 22 Page 1 of 22 Asbestos Survey Project Summary Pursuant to your request; Environmental, Inc., has performed an Asbestos Building Survey on 8/13/2014 and limited to the above referenced location. The Interior/Exterior/Roof

More information

CONSTRUCTION WASTE MANAGEMENT PLAN

CONSTRUCTION WASTE MANAGEMENT PLAN CONSTRUCTION WASTE MANAGEMENT PLAN The 2016 California Green Building Standards Code (Cal Green Code) is effective January 1, 2017. The Cal Green Code, Section 4.408 (Residential) and Section 5.408 (Nonresidential)

More information

Schendt Engineering Corporation 2912 Beacon Street (719)

Schendt Engineering Corporation 2912 Beacon Street (719) Schendt Engineering Corporation 2912 Beacon Street (719) 637-8850 Colorado Springs, CO 80907-9207 www.secengr.com ADDENDUM NUMBER 1 DATE: 5 July 2017 OWNER: PROJECT: University of Colorado Colorado Springs

More information

Indoor Air Quality Management Plan for LEED

Indoor Air Quality Management Plan for LEED Terminal Development Program Contract 1: 201301B San Diego Airport Terminal 2 West Expansion Indoor Air Quality Management Plan for LEED Prepared by HVAC Design Builder: California Comfort Systems USA

More information

*************************************************************************** SECTION F20 SELECTIVE BUILDING DEMOLITION 02/18

*************************************************************************** SECTION F20 SELECTIVE BUILDING DEMOLITION 02/18 NAVFAC PTS-F20 (February 2018) ------------------------------ Preparing Activity: NAVFAC SUPERSEDING PTS-F20 (September 2016) PERFORMANCE TECHNICAL SPECIFICATION SECTION F20 SELECTIVE BUILDING DEMOLITION

More information

SECTION 807 PUMP STATION REHABILITATION

SECTION 807 PUMP STATION REHABILITATION SECTION 807 PUMP STATION REHABILITATION 807-1 DESCRIPTION: Rehabilitation of pump stations shall be defined as the cleaning, removal, repair and/or replacement of any and/or all components including but

More information

*************************************************************************** SECTION F20 SELECTIVE BUILDING DEMOLITION 09/16

*************************************************************************** SECTION F20 SELECTIVE BUILDING DEMOLITION 09/16 NAVFAC PTS-F20 (September 2016) ------------------------------ Preparing Activity: NAVFAC SUPERSEDING PTS-F20 (September 2015) PERFORMANCE TECHNICAL SPECIFICATION SECTION F20 SELECTIVE BUILDING DEMOLITION

More information

SECTION CONSTRUCTION WASTE MANAGEMENT. A. Section includes administrative and procedural requirements for Construction Waste Management.

SECTION CONSTRUCTION WASTE MANAGEMENT. A. Section includes administrative and procedural requirements for Construction Waste Management. SECTION 01 35 63 CONSTRUCTION WASTE MANAGEMENT PART 1 - GENERAL 1.1 SUMMARY A. Section includes administrative and procedural requirements for Construction Waste Management. 1.2 DEFINITIONS A. Construction

More information

Construction Waste Management and Disposal

Construction Waste Management and Disposal University of New Hampshire University of New Hampshire Scholars' Repository Division 01 General Requirements Chapter 5 Technical Construction and Renovation Standards 1-25-2013 017419 - Construction Waste

More information

CHAPTER A-13 HAZARDOUS BUILDING MATERIALS SURVEY AND REMOVAL INDEX 13.4 CONCEPT/EARLY PRELIMINARY (35 PERCENT) DESIGN SUBMITTAL REQUIREMENTS

CHAPTER A-13 HAZARDOUS BUILDING MATERIALS SURVEY AND REMOVAL INDEX 13.4 CONCEPT/EARLY PRELIMINARY (35 PERCENT) DESIGN SUBMITTAL REQUIREMENTS CHAPTER A-13 HAZARDOUS BUILDING MATERIALS SURVEY AND REMOVAL INDEX April 2009 13.1 GENERAL 13.1.1 Scope 13.1.2 Overview 13.1.3 Architect-Engineer Designer Requirements 13.1.4 Architect-Engineer Responsibilities

More information

FACILITIES MAINTENANCE WORKER

FACILITIES MAINTENANCE WORKER FACILITIES MAINTENANCE WORKER Summary Statement: Under supervision, is responsible for performing routine building maintenance tasks and assisting Building Maintenance Supervisor with the performance of

More information

MATERIALS AND RESOURCES

MATERIALS AND RESOURCES MATERIALS AND RESOURCES MR- P1: STORAGE AND COLLECTION OF RECYCLABLES To reduce the waste that is generated by building occupants and hauled to and disposed of in landfills. PREREQUISITE REQUIREMENTS Provide

More information

SECTION ALTERATION PROJECT PROCEDURES

SECTION ALTERATION PROJECT PROCEDURES SECTION 013516 ALTERATION PROJECT PROCEDURES PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Requirements for protection of existing facilities during construction operations. 2. Demolition and removals

More information

Administrative and Non-classroom inspection areas. (A) Inspection of the auditoriums and student dining areas shall include the following:

Administrative and Non-classroom inspection areas. (A) Inspection of the auditoriums and student dining areas shall include the following: 3701-54-09 Administrative and Non-classroom inspection areas. (A) Inspection of the auditoriums and student dining areas shall include the following: (1) All risers, platforms, and guardrails shall be

More information

Waste Management Plan Template (SC6.11)

Waste Management Plan Template (SC6.11) Appendix 1 Waste Management Plan Template (SC6.11) Waste Management Plan 1.0 Introduction Project:... Site address:... Name of applicant:... Address of applicant:... Phone:... Fax:... Email:... Reason

More information

HEALTH AND SAFETY MANUAL

HEALTH AND SAFETY MANUAL HEALTH AND SAFETY MANUAL Title: Spray Finishing Approved by: Greg Savoy Rev. 1/108 1 Purpose/Scope: The Company is firmly committed to providing each of its employees a safe and healthy work environment.

More information

Doc No: SUBCON Midland Engineering Co., Inc. Initial Issue Date 12/04/15 Safety Management System

Doc No: SUBCON Midland Engineering Co., Inc. Initial Issue Date 12/04/15 Safety Management System Revision Preparation: Safety Mgr Authority: President Issuing Dept: Safety Page: Page 1 of 6 PURPOSE Define subcontractor responsibility for developing, implementing and adhering to their own environmental,

More information

Construction Waste Management

Construction Waste Management Best Practices for an Environmentally Optimized Job Site Photo: courtesty turner Construction Waste Management Learning Objectives After completing this course, you will be able to: Describe waste recycling

More information

Bucknell University. Lewisburg, Pennsylvania HUNT HALL IMPROVEMENTS 2017 PROJECT LOCATION MAP CS-1 DRAWING TITLE: PROJECT:

Bucknell University. Lewisburg, Pennsylvania HUNT HALL IMPROVEMENTS 2017 PROJECT LOCATION MAP CS-1 DRAWING TITLE: PROJECT: PROJECT LOCATION MAP N NORTH Bucknell University Lewisburg, Pennsylvania 8 www.bucknell.edu HUNT HALL IMPROVEMENTS 0 PLOT DATE: /0/ DRAWN BY: BDF SCALE: /8"='-0" CS- COVER SHEET Lewisburg, Pennsylvania

More information

UNIVERSITY OF KENTUCKY Memorial Hall/College of Law Expansion and Renovation UK Project No

UNIVERSITY OF KENTUCKY Memorial Hall/College of Law Expansion and Renovation UK Project No PART 1 GENERAL 1.1 RELATED DOCUMENTS REQUIREMENTS COMMON TO ALL WORK CATEGORIES 1. Drawings and general provisions of the Contract, including General Special Conditions and other Division 1 Specification

More information

Union County Vocational - Technical Schools Scotch Plains, New Jersey

Union County Vocational - Technical Schools Scotch Plains, New Jersey SECTION 024116 - STRUCTURE DEMOLITION PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification

More information

Prepared for Florida State University Facilities Planning& Construction By Environmental Health & Safety Tallahassee, Fl

Prepared for Florida State University Facilities Planning& Construction By Environmental Health & Safety Tallahassee, Fl SITE ASSESSMENT CHECKLIST FOR DEMOLITION AND RENOVATION PROJECTS INSERT BUILDING NAME FSU BUILDING NUMBER XXX CAMPUS OF FLORIDA STATE UNIVERSITY TALLAHASSEE, FLORIDA Prepared for Florida State University

More information

Indoor Air Quality (IAQ) Requirements

Indoor Air Quality (IAQ) Requirements University of New Hampshire University of New Hampshire Scholars' Repository Division 01 General Requirements Chapter 5 Technical Construction and Renovation Standards 1-25-2013 013560 - Indoor Air Quality

More information

Owners List of Known Workplace Hazards CONTRACT TITLE LIBRARY SQUARE ELEVATORS #10-#11 MODERNIZATION (OCT20/16)

Owners List of Known Workplace Hazards CONTRACT TITLE LIBRARY SQUARE ELEVATORS #10-#11 MODERNIZATION (OCT20/16) Owners List of Known Workplace Hazards CONTRACT TITLE LIBRARY SQUARE ELEVATORS #10-#11 MODERNIZATION (OCT20/16) PROJECT MANAGER (CITY EMPLOYEE) MORRIS PONTELLINI CONTRACT NAME & # (IF KWN) Purpose This

More information

FASHION INSTITUTE OF TECHNOLOGY OUTLINE FOR PREPARING WORK-SPECIFIC ENVIRONMENT, HEALTH AND SAFETY (EHS) PLAN

FASHION INSTITUTE OF TECHNOLOGY OUTLINE FOR PREPARING WORK-SPECIFIC ENVIRONMENT, HEALTH AND SAFETY (EHS) PLAN FASHION INSTITUTE OF TECHNOLOGY OUTLINE FOR PREPARING WORK-SPECIFIC ENVIRONMENT, HEALTH AND SAFETY (EHS) PLAN Before commencing work on site at FIT, Contractor shall prepare a work-specific EHS Plan and

More information

SECTION CONSTRUCTION FACILITIES AND TEMPORARY CONTROLS

SECTION CONSTRUCTION FACILITIES AND TEMPORARY CONTROLS PART 1 GENERAL 1.1 DESCRIPTION A. Temporary Utilities: Electricity, lighting, heating, cooling, ventilation, water, and sanitary facilities. B. Temporary Controls: Barriers, fencing, erosion control, exterior

More information

Environmental, Health and Safety Policy for Contractors

Environmental, Health and Safety Policy for Contractors Environmental, Health and Safety Policy for Contractors The attached policy is a tool to help contractors understand and comply with RBC's Environmental, Health and Safety rules. The information that follows

More information

END OF SECTION SECTION FINAL CLEANING PART 1 - GENERAL 1.1 REQUIREMENTS INCLUDE

END OF SECTION SECTION FINAL CLEANING PART 1 - GENERAL 1.1 REQUIREMENTS INCLUDE d. Clean exposed hard-surfaced finishes to a dirt-free condition, free of stains, films, and similar foreign substances. Avoid disturbing natural weathering of exterior surfaces. Plumbing Contractor: Clean

More information

Construction Indoor Air Quality (IAQ) Management Plan

Construction Indoor Air Quality (IAQ) Management Plan Denver School of Science & Technology Middle School 2000 Valentia Street Denver, CO 80238 Telephone: 303-643-5775 Main Fax: 303-673-5776 Construction Indoor Air Quality (IAQ) Management Plan Denver School

More information

Lancaster Condominiums CONSTRUCTION RULES AND GUIDELINES

Lancaster Condominiums CONSTRUCTION RULES AND GUIDELINES This outline provides a minimum guideline and shall not be construed as an all-inclusive list of regulations and requirements. Its purpose is to protect the safety and comfort of all residents and to preserve

More information

A. Prior to commencement of any work, make a complete inspection of all of the facilities listed in this specification

A. Prior to commencement of any work, make a complete inspection of all of the facilities listed in this specification SECTION 028200 - ABESTOS ABATEMENT PART 1 - GENERAL 1.1 SCOPE OF WORK A. The following asbestos-containing materials is known to be present on the First and Second Floor classrooms of the North Wing of

More information

14641 E. Don Julian Rd. City of Industry, CA CONTRACTOR/VENDOR SAFETY, HEALTH & FIRE PROTECTION PROCEDURES

14641 E. Don Julian Rd. City of Industry, CA CONTRACTOR/VENDOR SAFETY, HEALTH & FIRE PROTECTION PROCEDURES SCOPE CONTRACTOR/VENDOR SAFETY, HEALTH & FIRE PROTECTION PROCEDURES This procedure applies to Contractors and Vendors performing work at Bentley Mills, Inc. s facility. Its purpose is to define responsibility

More information

Constraints on how the Contractor Provides the Works

Constraints on how the Contractor Provides the Works Constraints on how the Contractor Provides the Works [DELETE AS APPROPRIATE: WHERE NOTIFIABLE CDM APPLIES:] CONSTRUCTION (DESIGN AND MANAGEMENT) REGULATIONS 2007 In line with the requirements of the above

More information

FASHION INSTITUTE OF TECHNOLOGY OUTLINE FOR PREPARING WORK-SPECIFIC ENVIROMENT, HEALTH AND SAFETY (EHS) PLAN

FASHION INSTITUTE OF TECHNOLOGY OUTLINE FOR PREPARING WORK-SPECIFIC ENVIROMENT, HEALTH AND SAFETY (EHS) PLAN FASHION INSTITUTE OF TECHNOLOGY OUTLINE FOR PREPARING WORK-SPECIFIC ENVIROMENT, HEALTH AND SAFETY (EHS) PLAN Before commencing work on site at FIT, Contractor shall prepare a work-specific EHS Plan and

More information

ARTICLE 4: ASBESTOS CONTROL STANDARDS

ARTICLE 4: ASBESTOS CONTROL STANDARDS ARTICLE 4: ASBESTOS CONTROL STANDARDS SECTION 4.01 ASBESTOS DEFINITIONS Adopted 06/08/95 (818) Revised 02/12/98 (863), 07/13/00 (918), 09/26/02 (978), 02/27/03 (987), 03/26/09 (1148) (a) AHERA BUILDING

More information

A. Section includes: removal of paving, pipes and utilities, and other site items as required by the project drawings.

A. Section includes: removal of paving, pipes and utilities, and other site items as required by the project drawings. SECTION 024113 - SITE DEMOLITION PART 1 -GENERAL 1.1 SUMMARY A. Section includes: removal of paving, pipes and utilities, and other site items as required by the project drawings. 1.2 SUBMITTALS A. Obtain

More information

DIVISION 2- EXISTING CONDITIONS

DIVISION 2- EXISTING CONDITIONS DIVISION 2- EXISTING CONDITIONS 024100- SELECTIVE DEMOLITION PART 1 - GENERAL: 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and

More information

ESTATES DEPARTMENT. Management of Asbestos Policy and Procedures Document. Rev 9

ESTATES DEPARTMENT. Management of Asbestos Policy and Procedures Document. Rev 9 ESTATES DEPARTMENT Management of Asbestos Policy and Procedures Document Rev 9 Contents SECTION 1: Estates Management of Asbestos Policy 1.1 Introduction 1.2 Policy Statement 1.3 Legal Requirements 1.4

More information