1 LBUSD SPECIFICATIONS 8/25/14 TABLE OF CONTENTS EXISTING CAMPUS ADDS, MOVES & CHANGES DIVISION 27 - COMMUNICATIONS COMMON WORK RESULTS COMMUNICATIONS GROUNDING BONDING PATHWAYS FOR COMMUNICATIONS SYSTEM COMMUNICATIONS TESTING IDENTIFICATION AND ADMINISTRATION COMMUNICATIONS CABINETS AND ENCLOSURES COMMUNICATIONS PATCH PANELS COMMUNICATIONS OPTICAL FIBER BACKBONE CABLING DATA COMMUNICATIONS HORIZONTAL CABLING COMMUNICATIONS FACEPLATES AND CONNECTORS END

2 SECTION COMMON WORK RESULTS FOR COMMUNICATIONS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. SECTION PATHWAYS FOR COMMUNICATIONS SYSTEMS, this document describes the products and execution requirements relating to furnishing and installing Telecommunications Cabling pathways. Communication cabling support is covered under this document. B. SECTION GROUNDING AND BONDING FOR COMMUNICATIONS SYSTEMS, this document describes the products and execution requirements relating to furnishing and installing Grounding/Earthing and Bonding for Communications Systems. C. SECTION COMMUNICATIONS TESTING, IDENTIFICATION AND ADMINISTRATION, this document describes the products and execution requirements relating to testing, labeling, warranties and As-Builts related to Communications Cabling Systems. D. SECTION COMMUNICATIONS CABINETS AND ENCLOSURES, this document describes the products and execution requirements relating to furnishing and installing Communication Equipment Room Fittings of cabinets, cable management, and telecommunications backboards are covered under this document. E. SECTION COMMUNICATIONS PATCH PANELS, this document describes the products and execution requirements relating to furnishing and installing Structured Communications Cable System (SCCS) Category 5e and Category 6 patch panels are covered under this document. F. SECTION COMMUNICATIONS OPTICAL FIBER BACKBONE CABLING, this document describes the products and execution requirements relating to furnishing and installing Telecommunications Cabling Optical fiber backbone cabling and terminations are covered in this document. G. SECTION DATA COMMUNICATIONS HORIZONTAL CABLING, this document describes the products and execution requirements relating to furnishing and installing Horizontal Cabling. Data Communications Horizontal Cabling is covered under this document. H. SECTION COMMUNICATIONS FACEPLATES AND CONNECTORS, this document describes the products and execution requirements relating to furnishing and installing faceplates, connectors, Category 5e and Category 6 patch cords. Communications faceplates and connectors are covered under this document Common Work Results Communications (E) LBUSD Specification 8/25/14 Page - 1

3 1.2 REFERENCES A. The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only. 1. Technical Specifications and Associated Drawings. 2. ANSI/TIA 568-C.0, Generic Telecommunications Cabling for Customer Premises 3. ANSI/TIA 568-C.1, Commercial Building Telecommunications Cabling Standard 4. ANSI/TIA 568-C.2, Balanced Twisted-Pair Telecommunication Cabling and Components Standard 5. ANSI/TIA 568-C.3, Optical Fiber Cabling Components Standard 6. ANSI/TIA-569-A Commercial Building Standard for Telecommunications Pathways and Spaces. 7. ANSI/TIA -606-A Administration Standard for the Telecommunications Infrastructure of Commercial Buildings. 8. TIA-607 Commercial Building Grounding and Bonding Requirements for Telecommunications. 9. Building Industries Consulting Services, International (BICSI) Telecommunications Distribution Methods Manual (TDMM) 11 th edition 10. National Fire Protection Agency (NFPA) - 70, National Electrical Code (NEC) FCC Part 68.5 Establishment of Telephone Premises Wiring Attestation List 12. ANSI/ICEA S (2002) Communication Wire and Cable for Wiring of Premises 13. NEMA WC 63.1(2005) NEMA Performance Standard For Twisted Pair Premise Voice And Data Communications Cables 14. REA TECM 823 (1980) Electrical Protection by Use of Gas Tube Arrestors 15. UL 444 (1994; R 1995, Bul and 1996) Communications Cables 16. UL 467 (1993; Bul and 1996, R 1996) Grounding and Bonding Equipment 17. UL 497 (1995) Safety Protector for Paired Conductor Communication Circuit 18. UL 514C (1988; R 1989, Bul and 1994) Nonmetallic Outlet Boxes, Flush- Device Boxes, and Covers 19. UL 910 (1995; R 1995, Bul and 1996) Flame-Propagation and Smoke- Density Values for Electrical and Optical-Fiber Cables Used in Spaces Transporting Environmental Air Common Work Results Communications (E) LBUSD Specification 8/25/14 Page - 2

4 20. UL 969 (1995) Marking and Labeling Systems 21. UL 1286 (1993) Office Furnishings 22. UL 1581 (1991; Bul. 1993, 1994, 1995, and 1996, R 1996, R 2003) Electrical Wires, Cables, and Flexible Cords 23. UL 1666(1991; Bul and 1996) Flame Propagation Height of Electrical and Optical-Fiber Cables Installed in Vertical Shafts 24. UL 1863 (1995) Communication Circuit Accessories 25. Public Works Standards, Inc. Green Book Standard Specifications For Public Works Construction B. Federal, state, local codes, rules, regulations, ordinances governing the work, as well as LBUSD Structured Telecommunications Cable and Pathway Standards, guidelines and practices may apply and shall be incorporated as part of these specifications. C. In reviewing the various Contract Documents, the Structured Telecommunications Cable Contractor shall be responsible for noting conflicts between proposed design/concepts and the applicable standards, guidelines and practices. A written Request for Information (RFI) shall be developed by the Structured Telecommunications Cable Contractor and submitted to LBUSD prior to commencing any work impacted by such conflicts. Such RFIs shall describe the conflict/violation and, if appropriate, recommend alternative solutions with associated costs. LBUSD warrants that they will diligently strive to address such RFIs in order to minimize negative impact on each SCCS installation completion schedule. D. Where the requirements of the Contract Documents are more stringent than applicable codes, rules, regulations, ordinances, standards, guidelines and practices, the Contract Documents shall apply. In all other instances, the most current standards, guidelines and practices shall apply. 1.2 DEFINITIONS Main Distribution Frame (MDF) A. A physical concentration or central location for terminating backbone cables to interconnect with local exchange carrier (LEC) equipment at the activity minimum point of presence. The MDF generally includes vendor specific components to support voice and data circuits, building surge protector assemblies, main cross connect blocks, equipment support frames, and plywood backboard (if MDF is wall mounted). Depending upon local site conditions, the MDF and IDF may be identical Intermediate Distribution Frame (IDF) A. An intermediate termination point for horizontal wiring and cross connections normally within another structure separate from the MDF. 1.3 SYSTEM DESCRIPTION A. The structured telecommunications cable and pathway distribution and wiring system shall include permanently installed backbone and horizontal cabling, horizontal and backbone pathways, workstation pathways, telecommunications outlet assemblies, conduit, raceway, and hardware for terminating, and interconnecting Common Work Results Communications (E) LBUSD Specification 8/25/14 Page - 3

5 B. The horizontal system includes the cabling and pathway between the MDF and/or IDFs and the work area telecommunications outlet. C. The backbone cabling and pathway system includes the interconnecting cabling, pathway, and terminal hardware to provide connectivity between the MDF's, and IDF's. D. The backbone system shall be wired in a star topology with the MDF at the center or hub of the star. E. For new cabling additions to existing structured communications cable system installations, Contractor shall provide and install Commscope Systimax or AMP Netconnect. Final selection of manufacturer shall be decided and approved by LBUSD. F. Horizontal station cable and terminating equipment shall consist of UL approved: 1. Category 5e for moves, adds and changes to existing structured communications cable systems. 2. Category 6 for installation in new buildings. 3. All horizontal station cable shall be plenum rated and U.L. CMP listed. G. Wireless Network : 1. All wireless devices shall be cabled with Category 6, plenum rated cable. 2. All wireless Category 6 cable, patch panel, jacks, faceplates and patch cords shall be AMP Netconnect or CommScope Systimax. 3. If MDF and/or IDF does not have adequate capacity to support additional cable and termination hardware, Contractor shall provide and install new IDF to support wireless networks. H. All new fiber optic cable and fiber optic termination hardware shall be manufactured by Corning. I. All indoor/outdoor rated fiber optic cable shall be plenum rated and U.L. OFNP listed. J. All Multimode fiber optic backbone cable shall not exceed a maximum distance of 500 meters. K. New fiber optic backbone cable extending from MDF shall consist of indoor/outdoor plenum rated Multimode laser-optimized OM3, 50/125µm fiber optic cable. L. When extending from existing campus IDF, new fiber optic backbone cable shall consist of indoor/outdoor plenum rated Multimode 62.5/125µm fiber optic cable. M. Fiber optic backbone cable exceeding 500 meters shall consist of indoor/outdoor plenum rated Singlemode fiber optic cable. N. Inter-building backbone pathways will consist of new conduits, trade size 2 minimum, existing conduits or a combination of both, as per the drawings and other construction documents Common Work Results Communications (E) LBUSD Specification 8/25/14 Page - 4

6 O. Horizontal pathways will consist of new conduits, trade size 2 minimum, existing conduit, J-Hooks, Cable Tray and surface mounted Wiremold 5500 raceway or combination of all and as per drawings and other construction documents. P. J-Hooks shall be used when cable routes are visible and not concealed by walls or ceilings. Q. Structured Telecommunications Cabling and Pathways Systems shall be installed in a neat and workmanlike manner as specified by ANSI/NECA/BICSI , 569-A and National Electrical Code, Sections and SUBMITTALS A. Provide BICSI RCDD registration number at time of bid. B. Provide copy of contractor s manufacturer certification at time of bid. C. Contractor is to submit the following prior to construction for District approval: Manufacturer's Catalog Data A. Telecommunications cabling (backbone and horizontal) B. Fiber optic type SC connectors C. Telecommunications outlet/connector assemblies RJ-45 jack D. Equipment racks E. Equipment cabinets F. Patch Panels (Copper and Fiber optic) G. Power Strips H. Cable Hangers I. Floor outlet boxes or modules J. Firestop material K. Non-Metallic surface mounted raceway L. Cable tray M. Conduits N. Outlet boxes O. Pull boxes P. Underground pull boxes Q. NEMA rated junction boxes Common Work Results Communications (E) LBUSD Specification 8/25/14 Page - 5

7 1.4.2 Drawings A. Telecommunications Shop and As-Built Drawings B. MDF/IDF Equipment Cabinet and/or Rack Elevation Shop and As-Built Drawings Telecommunications Shop Drawings and As-built Drawings A. Provide BICSI registered communications distribution designer (RCDD) approved drawings complete with wiring diagrams and details required to prove that the distribution system shall properly support connectivity from the MDF to the IDF to the telecommunications work area outlets. B. Show the layout of all cabling and pathway runs, MDF, IDF and ground system. C. Drawings shall depict all final telecommunications cabling configurations, including locations, gage, pair assignments and patch panels after completed telecommunications cable installation. D. Shop and As-Built drawings shall depict LBUSD approved structured communications cable system identifications and administration labeling scheme. E. As-Built drawings shall depict all final telecommunications cabling configurations, including locations, cable counts and IDF locations after completed telecommunications cable installation. F. Electronic copies of campus as-built drawings will be provided to the Structured Telecommunications Cable Contractor, if they exist. If no drawings exist, the Structured Telecommunications Cable Contractor shall create new CAD drawings for that campus. G. Work added to an existing campus will be included on as-built drawings. Added work will be clouded on the drawing and appropriate notes shall be added to the legend and title block, indicating scope of work, contractor name and date of completion. H. For each campus, provide one (1) plastic laminated schematic of telecommunications cable system showing cabling, IDF's, MDF's, and equipment rooms keyed to floor plans by room number. I. For each campus, provide two (2) electronic copies of As-Builds to LBUSD MDF/IDF Equipment Cabinet and/or Rack Elevation Shop and As-Built Drawings A. Provide shop drawing showing layouts and elevations of all applicable equipment including MDF and/or IDF cabinets, racks, cable runway, patch panels, cable management and LAN equipment. B. Prior to installation, contractor shall provide written documentation that details cabinet wall mounting and anchoring methods anticipated for each installation Statements A. Installer qualifications B. Test plan Common Work Results Communications (E) LBUSD Specification 8/25/14 Page - 6

8 C. Professional References D. Factory Test Reports E. Field Test Reports F. Operations and Maintenance Manuals G. Schedules H. Labeling Scheme Installer Qualifications A. Prior to installation, submit data of installer's experience and qualifications, which shall include 3 years on projects of similar complexity. Include names and locations of two projects successfully completed using fiber optic and copper communications cabling systems in similar environments. B. Contractor s installers shall be manufacturer trained and certified. Contractor shall provide copies of manufacturer s certificates at time of bid. C. Include specific experience in installing and testing structured telecommunications distribution systems using fiber optic and Category 6 or higher, cabling systems Professional References A. Provide a list of at least five professional references for similar projects. Include Company names, Contacts, phone numbers and a description of project Cable Certification Test Results A. Contractor shall provide performance certification cable test results. B. Contractor shall comply with testing requirements specified in section COMMUNICATIONS TESTING, IDENTIFICATION AND ADMINISTRATION. C. Electronic copies of Certification Test Results shall be provided to LBUSD within ten days of cable installation completion. D. Electronic copies of Certification Test Results shall be provided to LBUSD in PDF and native format Schedules A. Construction Schedules are required for each project. B. Construction schedules shall be managed by General Contractor and/or Structured Communications Cable System installation Contractor Labeling A. Labeling scheme must comply with TIA 606 standards. B. Contractor must coordinate with the District prior to installing any permanent labels Common Work Results Communications (E) LBUSD Specification 8/25/14 Page - 7

9 C. Contractor shall comply with labeling requirements specified in section COMMUNICATIONS TESTING, IDENTIFICATION AND ADMINISTRATION. 1.5 SYSTEM CERTIFICATION AND/OR WARRANTY A. The installation must be certified to meet the latest available manufacturer system warranty program requirements for an extended warranty of twenty (20) years minimum duration. At minimum such warranty shall, at no additional cost to LBUSD, provide a system warranty covering the installed Structured Communications Cable System (SCCS) against defects in workmanship, components and performance. At minimum, the contractors qualifications for manufacturer s certification shall include: 1. For moves, adds and changes to existing installed structured communications cable systems, contractor shall be certified by same manufacturer as existing system. For Systimax, contractor shall be Systimax certified, for AMP Netconnect, contractor shall be AMP NDI certified. 2. SCCS Contractor shall have valid Manufacturer Certification for the entire project duration of the installation agreement. In addition the SCCS Contractor shall have no known pending action or intent by Manufacturer to terminate or limit the SCCS Contractor status as a Manufacturer Certified installer. 3. SCCS Contractor shall attach to bid response a copy of their current Manufacturer Certification certificate demonstrating valid certification in the Southern California region. The attached certificate is to specifically cite the name of proposing SCCS contractor. B. SCCS Contractor shall provide installation warranty protecting LBUSD against defects in workmanship for a minimum period of two years from the date of system acceptance. Such warranty shall provide all labor and materials necessary to correct a failed portion of the system and to demonstrate performance within original specifications after the repairs are accomplished. C. A system component and performance warranty extended by manufacturer for a period of not less than twenty (20) years from date of system acceptance. The performance warranty shall warrant the installed horizontal and backbone copper portion of the system and, as applicable, the installed horizontal and backbone fiber optic portions of the system. All such links and segments shall be warranted in accordance with the latest applicable requirements as defined by TIA. D. As outlined herein, LBUSD intends that the resulting Structured Telecommunications Cable System be warranted under the extended warranty provisions extended by CommScope Systimax, AMP Netconnect, and Corning. The Technical Specification is based on the products being manufactured by Systimax, AMP Netconnect and others. The warranty shall extend to the fiber optic, Category 5e and Category 6 UTP portions of the installation to the fullest extent allowed by the manufacturers. 1.6 COORDINATION AND SUPPORT A. Coordinate layout and installation of voice, data, and video communication cabling with other LBUSD contractors and equipment suppliers Common Work Results Communications (E) LBUSD Specification 8/25/14 Page - 8

10 B. Structured Telecommunications Cable Contractor shall attend weekly project meetings. C. Meet jointly with other contractors, equipment suppliers, LBUSD in order to exchange information and agree on details of equipment arrangements and installation interfaces. D. Record agreements reached in meetings and distribute to other participants in a timely manner. E. Adjust arrangements and locations of distribution frames, cross-connect and patch panels in equipment rooms and/or telecommunications rooms to accommodate and/or optimize the arrangement and space requirements of voice and LAN equipment. F. Provide weekly progress reports and weekly crew schedules to LBUSD by 5:00 PM Thursday of each project work week. 1.7 DELIVERY AND STORAGE A. Contractor shall provide secure storage with protection from weather, moisture, dirt, dust and other contaminants for all telecommunications cabling and pathway material and equipment. PART 2 - PRODUCTS NOT USED PART 3 - EXECUTION NOT USED END Common Work Results Communications (E) LBUSD Specification 8/25/14 Page - 9

11 PART 1 - GENERAL SECTION GROUNDING AND BONDING FOR COMMUNICATIONS SYSTEMS 1.1 RELATED DOCUMENTS A. SECTION COMMON WORK RESULTS FOR COMMUNICATIONS, this document describes the LBUSD products, execution, qualifications, manufacturer warranties, and coordination requirements relating to furnishing and installing a complete, turn-key Communications Cabling System. B. SECTION PATHWAYS FOR COMMUNICATIONS SYSTEMS, this document describes the products and execution requirements relating to furnishing and installing Telecommunications Cabling pathways. Communication cabling support is covered under this document. C. SECTION COMMUNICATIONS TESTING, IDENTIFICATION AND ADMINISTRATION, this document describes the products and execution requirements relating to testing, labeling, warranties and As-Builts related to Communications Cabling Systems. D. SECTION COMMUNICATIONS CABINETS AND ENCLOSURES, this document describes the products and execution requirements relating to furnishing and installing Communication Equipment Room Fittings of cabinets, cable management, and telecommunications backboards are covered under this document. E. SECTION COMMUNICATIONS PATCH PANELS, this document describes the products and execution requirements relating to furnishing and installing Structured Communications Cable System (SCCS) Category 5e and Category 6 patch panels are covered under this document. F. SECTION COMMUNICATIONS OPTICAL FIBER BACKBONE CABLING, this document describes the products and execution requirements relating to furnishing and installing Telecommunications Cabling Optical fiber backbone cabling and terminations are covered in this document. G. SECTION DATA COMMUNICATIONS HORIZONTAL CABLING, this document describes the products and execution requirements relating to furnishing and installing Horizontal Cabling. Data Communications Horizontal Cabling is covered under this document. H. SECTION COMMUNICATIONS FACEPLATES AND CONNECTORS, this document describes the products and execution requirements relating to furnishing and installing faceplates, connectors, Category 5e and Category 6 patch cords. Communications faceplates and connectors are covered under this document. 1.2 WORK INCLUDED Grounding Bonding (E) LBUSD Specification 8/25/14 Page - 1

12 A. Provide all labor, materials, tools and equipment required for the complete installation of work called for in the Construction Documents 1.3 SCOPE OF WORK A. This document describes the products and execution requirements relating to furnishing and installing Grounding/Earthing and Bonding for Communications Systems. B. This section includes minimum requirements for the following: Grounding/Earthing System Telecommunications Grounding Busbar (TGB) Telecommunications Main Grounding Busbar (TMGB) Telecommunications Bonding Backbone (TBB) Rack Grounding/Earthing and Bonding C. All cables and related terminations, support and grounding/earthing hardware shall be furnished, installed, wired, tested, labeled, and documented by the telecommunications contractor as detailed in this document. D. Product specifications, general design considerations, and installation guidelines are provided in this document. Quantities grounding/earthing products, typical installation details and cable routing will be provided as an attachment to this document. If the bid documents are in conflict, this specification shall take precedence. The successful vendor shall meet or exceed all requirements for the cable system described in this document. 1.4 REGULATORY REFERENCES A. The following industry standards are the basis for the grounding/earthing and bonding system described in this document. 1. TIA/EIA TIA-942 J-STD-607-B TIA/EIA IEEE Std NFPA NFPA-70 Telecommunications Infrastructure Standard for Data Centers Commercial Building Grounding/Bonding Requirements Administration Standard for the Telecommunications Infrastructure of Commercial Buildings IEEE Recommend Practice for Powering and Grounding Electronic Equipment (IEEE Emerald Book) National Electric Code (NEC) B. Federal, state, local codes, rules, regulations, ordinances governing the work, as well as LBUSD Structured Telecommunications Cable and Pathway Standards, guidelines and practices may apply and shall be incorporated as part of these specifications. C. In reviewing the various Contract Documents, the Structured Telecommunications Cable Contractor shall be responsible for noting conflicts between proposed design/concepts and the applicable standards, guidelines and practices. A written Request for Information (RFI) shall be developed by the Structured Telecommunications Cable Contractor and submitted to LBUSD prior to commencing any work impacted by such conflicts. Such RFIs shall describe the conflict/violation and, if appropriate, recommend alternative solutions with associated costs. LBUSD Grounding Bonding (E) LBUSD Specification 8/25/14 Page - 2

13 warrants that they will diligently strive to address such RFIs in order to minimize negative impact on each SCCS installation completion schedule. D. Where the requirements of the Contract Documents are more stringent than applicable codes, rules, regulations, ordinances, standards, guidelines and practices, the Contract Documents shall apply. In all other instances, the most current standards, guidelines and practices shall apply. 1.5 QUALITY ASSURANCE A. See the Panduit Electrical Product Warranty on APPROVED PRODUCTS A. Approved grounding/earthing system manufacturer: PANDUIT B. Approved telecommunications grounding busbar manufacturer: PANDUIT C. Approved rack grounding kit manufacturer: PANDUIT D. Approved retrofit rack grounding kit manufacturer: PANDUIT 1.7 DEFINITIONS A. Bonding The permanent joining of metallic parts to form an electrically conductive path that will assure electrical continuity and the capacity to conduct safely any current likely to be imposed. B. Common Bonding Network (CBN) The principal means for affecting bonding and earthing inside a building. C. Ground/Earth A conducting connection, whether intentional or incidental, by which an electric circuit or equipment is connected to earth, or to some conducting body of relatively large extent that serves in place of the earth. D. Retrofit Rack Grounding/Earthing The application of grounding/earthing products and technology where equipment is already deployed and functioning. 1.8 OVERVIEW A. The purpose of the grounding/earthing system is to create a low impedance path to earth ground for electrical surges and transient voltages. Lightning, fault currents, circuit switching (motors turning on and off), and electrostatic discharge are common causes of these surges and transient voltages. An effective grounding/earthing system minimizes the detrimental effects of these electrical surges, which include degraded network performance and reliability and increased safety risks. B. The grounding/earthing system must be intentional, visually verifiable, adequately sized to handle expected currents safely, and directs these potentially damaging currents away from sensitive network equipment. As such, grounding/earthing must be purposeful in its design and installation. Four issues require special consideration: 1. Although AC powered equipment typically has a power cord that contains a ground/earth wire, the integrity of this path cannot be easily verified. Thus, many equipment manufacturers require grounding/earthing above and beyond that which is specified by local electrical codes, such as the National Electrical Code, etcetera. Always follow the grounding/earthing recommendations of the manufacturer when installing equipment Grounding Bonding (E) LBUSD Specification 8/25/14 Page - 3

14 1.9 WORKMANSHIP 2. While the building steel and metallic water piping must be bonded to the grounding/earthing system for safety reasons, neither may be substituted for the telecommunications bonding backbone (TBB). 3. Electrical continuity throughout each rack or cabinet is required to minimize safety risks. Hardware typically supplied with bolt-together racks is not designed for grounding/earthing purposes. Additionally, most racks are painted. Paint is an insulator. Unless rack members are deliberately bonded, continuity between members is incidental, and in many cases, unlikely. 4. Any metallic component that is part of the data center, including equipment, racks, ladder racks, enclosures, cable trays, etc. must be bonded to the grounding/earthing system. A. The ground/earth system must be designed for high reliability. Therefore, the grounding/earthing system shall meet following criteria: PART 2 - PRODUCTS 1. Local electrical codes shall be adhered to. 2. The grounding/earthing system shall comply with ANSI/TIA-942 and J-STD-607-A. 3. All grounding/earthing conductors shall be copper. 4. Lugs, HTAPs, grounding strips, and busbars shall be UL Listed and made of premium quality tin-plated electrolytic copper that provides low electrical resistance while inhibiting corrosion. Antioxidant shall be used when making bonding connections in the field. 5. Wherever possible, two-hole lugs shall be used because they resist loosening when twisted (bumped) or exposed to vibration. All lugs shall be irreversible compression and meet NEBS Level 3 as tested by Telcordia. Lugs with inspection windows shall be used in all non-corrosive environments so that connections may be inspected for full conductor insertion (battery rooms are an exception where windowless lugs may be used). 6. Die index numbers shall be embossed on all compression connections to allow crimp inspection. 7. Cable assemblies shall be UL Listed and CSA Certified. Cables shall be a distinctive green or green/yellow in color, and all jackets shall be UL, VW-1 flame rated. 2.1 EQUIVALENT PRODUCTS A. PANDUIT shall manufacture all products related to grounding/earthing and bonding for communications systems. There will be no substitutions allowed. 2.2 GROUNDING/EARTHING AND BONDING A. The Telecommunications Grounding Busbar (TGB) in each telecommunications space will be grounded/earthed to the Telecommunications Main Grounding Busbar Grounding Bonding (E) LBUSD Specification 8/25/14 Page - 4

15 (TMGB) located at the service entrance. The gauge of the connecting ground/earth cable, known as the Telecommunications Bonding Backbone (TBB) will follow J-STD-607-A guidelines, as is shown in the table below. Sizing of the TBB TBB Length in Linear meters (feet) TBB Size (AWG) Less than 4 (13) (14-20) (21-26) (27-33) (34-41) (42-52) 1/ (53-66) 2/0 Greater than 20 (66) 3/0 B. The TMGB will be bonded to building steel and grounded/earthed to the electrical service ground according to BICSI TDM Manual and J-STD-607-B guidelines. Local codes may supersede these requirements. In telecommunications spaces with only one rack, the rack jumper cable can be connected directly to the TGB. Cable Sizes for Other Grounding/Earthing Applications Purpose Copper Code Cable Size Aisle grounds (overhead or under #2 AWG or larger (1/0 preferred) floor) of the common bonding network Bonding conductor to each PDU or panel board serving the room. Size per NEC & manufacturer recommendations Bonding conductor to HVAC 6 AWG equipment Building columns 4 AWG Cable ladders and trays 6 AWG Conduit, water pipe, duct 6 AWG 2.3 COMPONENTS, KITS AND HARDWARE A. PANDUIT StructuredGround Grounding System (StructuredEarth Earthing System) kits, components, and hardware shall be used to construct the grounding/earthing system. B. Use PANDUIT GB4 series BICSI/J-STD-607-A telecommunications grounding busbars for the TMGB, which is ideally located at the AC service entrance. Use a PANDUIT GB2 series busbar for the TGB in each of the other telecommunications/equipment spaces throughout the building. Use PANDUIT LCC-W series lugs when connecting conductors to the TMGB and TGB. C. Route the TBB to each TGB in as straight a path as possible. The TBB should be installed as a continuous conductor, avoiding splices where possible. Use PANDUIT HTAP kits, family HTWC, to provide a tap from the TBB to each TGB. When more than one TBB is used, bond them together using the TGBs on the top floor and every third floor in between with a conductor known as a Grounding Equalizer (GE). Use the J-STD-607-A guidelines for sizing of the TBB when sizing the GE (shown in the table above). D. Avoid routing grounding/earthing conductors in metal conduits. If the grounding/earthing conductor must be routed through a metal conduit, bond each end of the conduit to the grounding/earthing conductor. Use PANDUIT GPL series grounding clamps to bond to the conduit, a PANDUIT HTWC HTAP with clear cover Grounding Bonding (E) LBUSD Specification 8/25/14 Page - 5

16 to bond to the grounding/earthing conductor, and a #6 AWG copper conductor to connect the GPL grounding clamp to the HTWC HTAP. 2.4 RACK GROUNDING/EARTHING A. Equipment and racks shall be bonded in accordance with the methods prescribed in ANSI/TIA-942, as is shown in the figure below. Paint Piercing Grounding Washer Aisle Ground Common Bonding Network to Rack Jumper (Alternate Location) Rack Ground Strip Electrostatic Discharge (ESD) Port Standard Equipment Rack Network Equipment Equipment Jumper Common Bonding Network Common Bonding Network to Rack Jumper Figure 1 - Properly Grounded/Earthed Rack (Back of Rack Shown) B. To provide electrical continuity between rack elements, PANDUIT paint piercing grounding washers, series RGW, shall be used where rack sections bolt together, on both sides, under the head of the bolt and between the nut and rack Grounding Bonding (E) LBUSD Specification 8/25/14 Page - 6

17 C. All racks shall utilize a full-length rack ground strip, PANDUIT part number RGS134, attached to the rear of the side rail with the thread-forming screws provided to ensure metal-to-metal contact. D. Mount an electrostatic discharge (ESD) port kit, PANDUIT part number RGESD-1 directly to the rack grounding strip on the back of the rack at approximately 48 inches from the floor. Mount a second RGESD-1 directly to the vertical mounting rail of the rack in the front at approximately the same height. Use the thread-forming screws provided to form a bond to the rack. Place the ESD protection identification stickers directly above the ESD ports. E. When the equipment manufacturer provides a location for mounting a grounding connection, that connection shall be utilized. Use the appropriate PANDUIT RG series jumper for the equipment being installed and the thread-forming screws provided in the kit. F. Use PANDUIT part number RGCBNJ660P (common bonding network to rack jumper) to attach the rack ground strip to the common bonding network. Do not bond racks or cabinets serially. Use the copper compression HTAP that comes with the kit to bond the conductor to the common bonding network. G. Patch panels will be bonded to racks using the PANDUIT bonding screws, part number RGTBS-C for racks having #12-24 equipment mounting holes, and RGTBSM6-C for racks having M6 equipment mounting holes. 2.5 RETROFIT RACK GROUNDING/EARTHING A. If the racks already have network equipment installed, it may not be feasible to install the rack ground strip without disrupting data cables. Further, it may be undesirable to disassemble rack hardware to install paint piercing grounding washers. In these circumstances, the PANDUIT retrofit rack grounding kits, PANDUIT part family RGR, are to be installed. B. For retrofit rack grounding/earthing installations, use PANDUIT part number RGRKCBNJ to ground/earth the rack to the common bonding network. Use PANDUIT part number RGEJ696 (provided with #6 AWG grounding conductor) or PANDUIT part number RGEJ1096 (provided with #10 AWG grounding conductor) to ground/earth equipment chassis to the rack grounding busbar provided with the RGRKCBNJ as is shown in the figure below Grounding Bonding (E) LBUSD Specification 8/25/14 Page - 7

18 Network Equipment Rack Grounding Busbar Grounding Jumper Grounding Jumper Figure 2 - Retrofit Rack Grounding/Earthing C. RGW paint piercing grounding washers are not used in this scenario. Thus, the grounding busbar provides continuity through the vertical channels of the rack, but not the top and bottom of the rack. Thus, wherever practical, the solution using the RGS rack grounding strip and the RGW paint piercing washers shall be used instead of the retrofit rack grounding kits. D. All other grounding/earthing requirements apply to retrofit installations without exception. E. Use PANDUIT STRUCTUREDGROUND Grounding System (STRUCTUREDEARTH Earthing System) in every application possible. See for the latest grounding and bonding solutions. PART 3 - EXECUTION 3.1 GROUNDING SYSTEM The communications grounding system shall be designed and/or approved by a qualified PE, or RCDD. The communications grounding system shall adhere to the recommendations of Grounding Bonding (E) LBUSD Specification 8/25/14 Page - 8

19 the ANSI/TIA-942 and J-STD-607-B standards, and shall be installed in accordance with best industry practice. A licensed electrical contractor shall perform installation and termination of the main bonding conductor to the building service entrance ground. END OF SECTION Grounding Bonding (E) LBUSD Specification 8/25/14 Page - 9

20 PART 1 - GENERAL SECTION PATHWAYS FOR EXISTING COMMUNICATIONS SYSTEMS 1.1 RELATED DOCUMENTS A. SECTION COMMON WORK RESULTS FOR COMMUNICATIONS, this document describes the LBUSD products, execution, qualifications, manufacturer warranties, and coordination requirements relating to furnishing and installing a complete, turn-key Communications Cabling System. B. SECTION GROUNDING AND BONDING FOR COMMUNICATIONS SYSTEMS, this document describes the products and execution requirements relating to furnishing and installing Grounding/Earthing and Bonding for Communications Systems. C. SECTION COMMUNICATIONS TESTING, IDENTIFICATION AND ADMINISTRATION, this document describes the products and execution requirements relating to testing, labeling, warranties and As-Builts related to Communications Cabling Systems. D. SECTION COMMUNICATIONS PATCH PANELS, this document describes the products and execution requirements relating to furnishing and installing Structured Communications Cable System (SCCS) Category 5e and Category 6 patch panels are covered under this document. E. SECTION DATA COMMUNICATIONS HORIZONTAL CABLING, this document describes the products and execution requirements relating to furnishing and installing Horizontal Cabling. Data Communications Horizontal Cabling is covered under this document. F. SECTION COMMUNICATIONS FACEPLATES AND CONNECTORS, this document describes the products and execution requirements relating to furnishing and installing faceplates, connectors, Category 5e and Category 6 patch cords. Communications faceplates and connectors are covered under this document. 1.2 WORK INCLUDED A. Provide all labor, materials, tools and equipment required for the complete installation of work called for in the Construction Documents 1.3 SCOPE OF WORK A. This document describes the products and execution requirements relating to furnishing and installing Telecommunications Cabling pathways. Communication cabling support is covered under this document Pathways for Communications System (E) LBUSD Specification 8/25/14 Page - 1

21 B. This section includes minimum requirements for the following: 1. Non-Continuous Cable Support 2. Surface Mount Raceway 3. Cable Management Waterfall 4. Threaded Rod Covers 5. Underground Pull Boxes 6. Pull Boxes 7. Communications Dust Banks and Conduit C. All cables and related terminations, support and grounding hardware shall be furnished, installed, wired, tested, labeled, and documented by the telecommunications contractor as detailed in this document. D. Product specifications, general design considerations, and installation guidelines are provided in this document. Quantities of telecommunications outlets, typical installation details, cable routing and outlet types will be provided as an attachment to this document. If the bid documents are in conflict, this specification shall take precedence. The successful vendor shall meet or exceed all requirements for the cable system described in this document. 1.4 REGULATORY REFERENCES A. The following industry standards are the basis for the structured cabling system described in this document. 1. TIA/EIA TIA/EIA-568-B TIA/EIA-569-A TIA/EIA-606 TIA/EIA NFPA NFPA ISO/IEC ISO/IEC Commercial Building Telecommunications Cabling Standard Commercial Building Standard for Telecom Pathways And Spaces Administration Standard for the Telecommunications Infrastructure of Commercial Buildings Commercial Building Grounding/Bonding Requirements National Electric Code (NEC)-1999 Generic Cabling for Customer Premises 4. PUBLIC WORKS STANDARDS, INC. GREENBOOK; Green Book Standard Specifications for Public Works Construction B. Federal, state, local codes, rules, regulations, ordinances governing the work, as well as LBUSD Structured Telecommunications Cable and Pathway Standards, guidelines and practices may apply and shall be incorporated as part of these specifications Pathways for Communications System (E) LBUSD Specification 8/25/14 Page - 2

22 C. In reviewing the various Contract Documents, the Structured Telecommunications Cable Contractor shall be responsible for noting conflicts between proposed design/concepts and the applicable standards, guidelines and practices. A written Request for Information (RFI) shall be developed by the Structured Telecommunications Cable Contractor and submitted to LBUSD prior to commencing any work impacted by such conflicts. Such RFIs shall describe the conflict/violation and, if appropriate, recommend alternative solutions with associated costs. LBUSD warrants that they will diligently strive to address such RFIs in order to minimize negative impact on each SCCS installation completion schedule. D. Where the requirements of the Contract Documents are more stringent than applicable codes, rules, regulations, ordinances, standards, guidelines and practices, the Contract Documents shall apply. In all other instances, the most current standards, guidelines and practices shall apply. 1.5 QUALITY ASSURANCE A. Structured Communications Cabling System pathways, raceways and supports shall be installed per the following: 1. Meet all NEC, CEC, TIA and BICSI commercial building wiring standards. B. All Networks shall be installed per applicable standards and manufacturer's guidelines. 1.5 PATHWAY INSTALLATIONS A. Comply with TIA/EIA-569-A, NEC and CEC. B. Shall be installed in accordance with NEC Article 314 and Article (J), (K), or (L), as applicable, and installed in accordance with Articles through , where the requirements applicable to electrical nonmetallic tubing apply. C. Conceal interior conduit under floor slabs and within finished walls, ceilings, and floors where possible. D. Keep conduit minimum 6 inches away from parallel runs of electrical power equipment, flues, steam, and hot water pipes. E. Install conduit parallel with or at right angles to ceilings, walls, and structural members where located above accessible ceilings and where conduit is visible after completion of project. F. Run conduits in crawl spaces and under floor slabs as if cable is exposed. G. Install no more than two 90-degree bends for a single horizontal cable run. H. Run conduits and surface mounted raceway as determined by site survey or as noted on drawings. I. Provide Pullboxes with Sealtight flex conduit only where flexible connections are required. LBUSD approval required prior to all "Sealtight" flex conduit installations Pathways for Communications System (E) LBUSD Specification 8/25/14 Page - 3

23 J. Provide all coring, patching and painting as needed for Intra-Building and Inter- Building pathways. Caulking is not an acceptable patching method for conduit penetrations into exterior walls. Coordinate with LBUSD for acceptable patching methods. PART 2 - PRODUCTS 2.1 NON-METALLIC SURFACE MOUNTED RACEWAY A. Conceal cable pathways within walls whenever possible. B. Unless otherwise indicated, raceway shall be three channel, Wiremold 5500 with all necessary brackets, adapters, hardware and equipment to install manufacturer certified Structured Communications Cable Systems. C. Raceway shall be ivory in color or as noted on drawings. D. Notching or modifications of raceway will not be permitted. E. Proper screws and anchors shall be used to mount raceway. F. Manufacturer: Wiremold. 2.2 NON-CONTINUOUS CABLE SUPPORT A. Material 1. Contractor shall provide and install all non-continuous cable supporting hardware. 2. Non-continuous cable supporting hardware consists of J-hooks, multi-function clips, beam clamps, etc. Bridle rings are not permitted. 3. Non-continuous cable supports shall provide a load bearing surface of sufficient width to comply with required bend radii of high-performance cables; UL Listed. Bridle rings are not permitted. 4. Non-continuous cable supports shall have flared edges to prevent damage while installing cables. 5. Non-continuous cable supports sized 1 5/16 and larger shall have a cable retainer strap to provide containment of cables within the hanger. The cable retainer strap shall be removable and reusable and be suitable for use in air handling spaces. 6. Non-continuous cable supports shall have an electro-galvanized or G60 finish and shall be rated for indoor use in non-corrosive environments. 7. Multi-tiered non-continuous cable support assemblies shall be used where separate cabling compartments are required. Assemblies may be factory assembled or assembled from pre-packaged kits. Assemblies shall consist of a steel angled hanger bracket holding up to six non-continuous cable supports, rated for indoor use in non-corrosive environments; UL Listed. 8. If required, the multi-tier support bracket may be assembled to manufacturer recommended specialty fasteners including beam clamps, flange clips, C and Z purlin clips, etc Pathways for Communications System (E) LBUSD Specification 8/25/14 Page - 4

24 9. Tee-bar support bracket with one non-continuous cable support, factory or jobsite assembled; rated for indoor use in non-corrosive environments; UL Listed. 10. Fastener to wire/rod with one non-continuous cable support, factory or jobsite assembled; rated for indoor use in non-corrosive environments; UL Listed. 11. Fastener to beam or flange with one non-continuous cable support, factory or jobsite assembled; rated for indoor use in non-corrosive environments; UL Listed. 12. Fastener to C or Z purlin with one non-continuous cable support, factory or jobsite assembled; rated for indoor use in non-corrosive environments, UL Listed. 13. Fastener to wall, concrete, or joist with one non-continuous cable support, factory or jobsite assembled; rated for indoor use in non-corrosive environments, UL Listed. 14. Fastener to threaded rod with one non-continuous cable support, factory or jobsite assembled, rated for indoor use in non-corrosive environments, UL Listed. 15. The multi-tiered support bracket shall have a static load limit of 300 lbs. 16. U-hooks and double J-hooks shall attach directly to threaded rod using standard nuts. B. Manufacturer: Panduit, Copper B-Line, or LBUSD approved equal. 2.3 THREADED ROD COVER A. The Threaded Rod Cover shall be utilized to protect communication cable from abrasion caused by contact with threaded rod. The Threaded Rod Cover shall be manufactured from a gray flame-retardant polyethylene material that is UL94V-0 rated. The material shall be pliable to allow for easy installation. B. Manufacturer: Panduit or LBUSD approved equal. Part Number For Threaded Rod Size Length TRC18FR-X8 ½ to 5/ UNDERGROUND PULL BOXES AND PULLBOXES A. Underground pull boxes shall be made of concrete and the minimum size shall be 35 ½ x 17 ½ x 12. B. Underground pull covers shall be rated for traffic (type T.05) and shall be marked communications. C. Metal covers shall be used in all location subject to vehicle traffic. D. Gravel shall be installed below all ground boxes for drainage. E. Ground boxes and pull boxes shall not be placed in areas subject to flooding. F. Establish drainage to meet Public Works Construction Standards (Green Book) Pathways for Communications System (E) LBUSD Specification 8/25/14 Page - 5

25 G. Unless otherwise noted, pull boxes shall have minimum dimensions of 20 x Interior pull boxes shall consist of 16 gauge steel minimum, unless otherwise noted on plans. 2. Indoor enclosures shall conform to NEMA Type 4, unless otherwise noted. 3. Size pull boxes to not less than minimum Code requirements. Increase size above Code requirements where necessary to provide space for pulling, racking or splicing enclosed conductors, or where specified or indicated dimensions exceed Code requirements. 4. Exterior metal pull boxes exposed to weather (and not installed in or below grade) shall be equipped with rain-tight or weatherproof-hinged doors. 5. Exterior pull boxes shall have 16 gauge steel bodies and 14 gauge steel doors. 6. Exterior pull boxes shall be equipped with external mounting feet. 7. Exterior pull boxes shall be equipped with stainless steel door clamps on three sides and a removable stainless steel continuous hinge pin. 8. Exterior pull boxes shall be equipped with a hasp and staple for padlocking 9. Enclosures installed on vertical exterior walls shall conform to NEMA Type 3R. 10. Enclosures installed on exterior horizontal surfaces such as rooftops or breezeways shall conform to NEMA Type 4 unless otherwise noted. 11. Rain tight or weatherproof boxes shall use threaded watertight hubs for top or side entry and may use knockout for bottom entry only. 12. Exterior pull boxes shall conform to these industry standards: UL 508 Type 4 NEMA/EEMAC Type 3, Type 4, Type 12, Type 13 JIC standard EGP CSA Type 4 IEC 529, IP Tamper resistant screws shall be used on all exterior, aboveground junction/pull boxes that are exposed to public/student areas. 14. Exterior pull boxes shall be manufactured by Hoffman or LBUSD approved equal. 2.5 COMMUNICATION DUCT-BANKS AND CONDUITS A. Trenches 1. All underground trenches shall be minimum 24 wide by 30 deep. 2. Trenches shall be back-filled at 95% compaction Pathways for Communications System (E) LBUSD Specification 8/25/14 Page - 6

26 B. Conduit 3. Contractor shall restore surface to same or better condition. 4. Contractor shall contact Dig Alert a minimum of 48 hours prior to excavation to verify the location of existing underground utilities. 5. Modifications to pathway design may be dictated by field conditions subject to approval by LBUSD. 6. Compaction testing notification must be provided to the District, 48 hours prior to testing so that a District inspector may be present. 7. Slurry fill trenches to within three inches (3 ) of finished grade whenever crossing paved areas. Two Sack slurry shall be used. 8. Pavement removal and patching shall conform to specifications and standards listed in the Public Works Standards (Green Book 2006). 1. Underground conduit shall consist of Schedule 40 PVC - 2 inch inside diameter or type C telephone conduit - 2 inch inside diameter (if concrete encased) 2. Innerduct, where specified, corrugated or splined (inside and outside) flexible orange innerduct, 1 inch in diameter, riser rated, will be placed for fiber optic cable protection. 3. One (1) innerduct shall be placed in a 2-inch conduit. Innerducts are to be equipped with 1/8" pull ropes. 4. Conduit shall have a factory formed bell on one end for interconnecting segments. 5. Conduit located under heavy use highways or railroad rights-of-ways shall be encased in steel casing consistent with the AASHTO or AREA specifications. The thickness of the steel casing shall be engineered for each specific application. This may vary based on campus codes. 6. Spacers: High impact spacers shall be used in all multi-duct systems, for both solely owned or joint telecommunications/power construction. They shall conform with NEMA TC-2, TC-6, TC-8, and ASTM F 512 dimensions. 7. All fittings shall be designed specifically for use with the type of conduit placed. 8. All conduits shall be equipped with seal plugs in all ground boxes and expansion rubber seal plugs within all buildings. 9. A horizontal and vertical separation of 1 inch shall between the ducts be maintained by installing high impact spacers with horizontal and vertical locking intervals of ten feet. 10. All communications conduits shall be placed in a uniform manner between ground boxes and pull boxes. Conduit in position #1 at one ground box or pull box shall maintain its position within the duct run and terminate in the #1 position at the next box. The position of all conduits between ground boxes and pull boxes shall be maintained. 11. Long radius bends (over 30 feet) shall be used whenever possible to make changes in direction. If it is found to be necessary to place a 90-degree bend in Pathways for Communications System (E) LBUSD Specification 8/25/14 Page - 7

27 the conduit run, a factory-made sweep of no less than 60-inch radius shall be used. 12. No conduit run shall exceed a total of 180 degrees of bend between any two points (such as manholes or buildings) considering both vertical and horizontal sweeps. 13. Cold-formed trench bends shall have a radius of not less than 60 inches and shall pass mandrel integrity. Bend radius criterion is 2" or less 6 times the diameter of the conduit and any conduit larger than 2" is 10 times the diameter of the conduit. 14. The length and destination of all conduits shall be identified in each ground box, pull box and building. Embossed metal or heavy plastic tags strapped to each conduit shall be used. 15. After installation of communications conduits, the contractor shall prove all conduits by pulling a mandrel with a diameter ¼ inch smaller than the conduit and 6 inches long through each conduit end-to-end. An inspector designated by the contractor and LBUSD shall be notified 24 hours before this procedure. Each conduit shall be cleaned with a bristle brush to remove any debris. 16. Utility marking tape shall be buried 12 inches below the surface directly above the conduit. 17. Where communications and power conduits occupy the same trench, all conduit structures shall be built with the telecommunications conduits placed above the power conduits and separated by a minimum of 12 of compact earth or 3 of concrete encasement, unless otherwise called out on the construction drawings and approved by LBUSD. If this type of construction is required, it shall receive the prior approval of the contractor and LBUSD. 18. Contractor shall install new ¼ pull rope in all conduits placed. C. Overhead Conduit 1. Where overhead conduit is required between or within buildings, Contractor shall utilize EMT conduit with an inside diameter of 2, unless otherwise specified. 2. All fittings shall be compression type connectors and couplers designed specifically for use with the type of conduit placed. 3. All fittings shall be watertight. Fitting types shall be pre-approved by the designated District representative. Unless pre-approved by the designated District representative, all conduits shall be installed by a qualified electrical contractor who has at least five years experience in similar installations within the Southern California area. 4. Contractor shall install conduit at roof locations utilizing the current District approved methodology and process. All conduit pathways and locations must be approved by LBUSD prior to installation. 5. All roof penetrations must be approved by LBUSD prior to installation. 6. Contractor shall install new ¼ pull rope in all conduits placed. D. Communications Entrance Conduit Pathways for Communications System (E) LBUSD Specification 8/25/14 Page - 8

28 1. To prevent shear, all inter-building conduit (either underground or aerial) shall transition from PVC or metal to Sealtite flex conduit when attaching to a permanent structure. The contractor and LBUSD shall determine the placement of all entrance conduits. All applicable standards shall be adhered to, i.e., LBUSD, NEC, BICSI or G.O Sealtight flex conduit lengths shall not exceed 24, unless approved by LBUSD. 3. Sealtight flex conduit may be used between adjacent bungalows within 24 of one another using District approved connectors and methods. Use of Seal Tite flex conduit between bungalow locations beyond the 24 distance shall require written authorization from LBUSD. 4. Contractor shall install new ¼ pull rope in all conduits placed. E. Vertical Conduit 1. Where vertical conduit is required between pull boxes or within buildings, Contractor shall utilize EMT conduit with an inside diameter of 2, unless otherwise specified. F. Duct-bank locating cable (electronically detectable warning tape) 1. Warning tape shall be a minimum of 3" wide, orange in color, and shall have a nondegradable imprint as follows: G. Pull Rope 2.6 VELCRO TIE WRAPS Caution fiber optic cable buried below The tape shall be electronically detectable. 1. Pull rope shall be new ¼" polypropylene over polyester rope with a minimum 1700 lb. Tensile strength. 2. Pull rope shall be new material that is free of knots, kinks, and abrasions and shall be placed as a single continuous length in every new conduit. 3. Pull rope shall be secured at each end. A. Velcro cable ties shall be.5 in width. B. Velcro cable ties shall be black in color. C. Velcro cable ties installed in air-handling spaces shall be plenum-rated. D. Manufacturer: Panduit Or LBUSD Approved Equal 2.7 FIRESTOPPING MATERIAL A. Contractor shall provide all necessary fire stopping of openings through which cable is installed under this specification, in accordance with NFPA 70 and all local codes. This includes installation in conduits, raceways, or bare penetrations. Provide and install UL 1479 approved (Fire Barrier Caulk) firestop material Pathways for Communications System (E) LBUSD Specification 8/25/14 Page - 9

29 2.8 DUCT SEALANT A. Contractor shall provide Polywater Duct Sealant kit #FST-kit to seal each end of all underground communications duct bank conduits. B. Duct sealant shall be a two-part, water-blown urethane foam that cures to a strong, rigid closed-cell structure. C. Duct sealant shall be capable of wetting and adhesion to metal, concrete and plastic surfaces. D. Duct sealant shall be 100% water tight, holding 15-foot (5 meters) waterhead, and acts as a barrier to smoke and air. PART 3 - EXECUTION 3.1 HORIZONTAL DISTRIBUTION CABLE INSTALLATION A. Cable shall be installed in accordance with manufacturer s recommendations and best industry practices. B. A pull cord (nylon; 1/8" minimum) shall be co-installed with all cable installed in any conduit. C. Cable raceways shall not be filled greater than the TIA/EIA-569-A maximum fill for the particular raceway type or 40%. D. Cables shall be installed in continuous lengths from origin to destination (no splices) except for transition points, or consolidation points. E. Where transition points or consolidation points are allowed, they shall be located in accessible locations and housed in an enclosure intended and suitable for the purpose. F. The cable s minimum bend radius and maximum pulling tension shall not be exceeded. G. If a J-hook or trapeze system is used to support cable bundles all horizontal cables shall be supported at a maximum of 48 to 60 inch (1.2 to 1.5 meter) intervals. At no point shall cable(s) rest on acoustic ceiling grids or panels. H. Horizontal distribution cables shall be bundled in groups of no more than 50 cables. Cable bundle quantities in excess of 50 cables may cause deformation of the bottom cables within the bundle and degrade cable performance. I. Cable shall be installed above fire-sprinkler systems and shall not be attached to the system or any ancillary equipment or hardware. The cable system and support hardware shall be installed so that it does not obscure any valves, fire alarm conduit, boxes, or other control devices. J. Cables shall not be attached to ceiling grid or lighting fixture wires. Where support for horizontal cable is required, the contractor shall install appropriate carriers to support the cabling Pathways for Communications System (E) LBUSD Specification 8/25/14 Page - 10

30 K. Any cable damaged or exceeding recommended installation parameters during installation shall be replaced by the contractor prior to final acceptance at no cost to the Owner. L. Cables shall be identified by a self-adhesive label in accordance with the System Documentation Section of this specification and ANSI/TIA/EIA-606. M. The cable label shall be applied to the cable behind the faceplate on a section of cable that can be accessed by removing the cover plate. N. Unshielded twisted pair cable shall be installed so that there are no bends smaller than four times the cable outside diameter at any point in the run and at the termination field. O. Pulling tension on 4-pair UTP cables shall not exceed 25-lbf for a four-pair UTP cable. 3.2 OPEN CABLE INSTALLATION A. Use only where specifically indicated on plans or determined during site surveys. B. When not run in surface mounted raceway or conduit, utilize non-continuous cable support above suspended ceilings and in all ceiling spaces. C. Install cabling above suspended ceilings 6 to 12 inches above ceiling T-bar using non-continuous cable support spaced on 24 to 48 inch centers and securely attached to structural ceiling. D. Do not exceed cable pull tensions recommended by the manufacturer. 3.3 FIRESTOP 1. Avoid routing copper cable in areas where there may be high levels of electromagnetic interference (EMI). EMI is caused by AC power lines, broadcast signals, X-ray equipment, motors, generators, and fluorescent lights. UTP cables shall be routed at least 5 inches away from fluorescent lighting fixtures. 2. Cables shall be placed in the non-continuous cable support located every 2 to 4 feet, as long as they are separately bundled and tie-wrapped using Velcro ties. 3. Cabling shall be organized and identified so as to facilitate locating and handling individual sheaths for maintenance functions. 4. Each bundle shall be neatly tied without over cinching or stressing cable. 5. Bundles shall be clearly marked identifying the IDF and room to which routed, the station numbers served by the bundle, and any other information that may assist in administration. 6. Great care shall be taken to protect all cabling from physical damage. 7. A 20 service loop shall be installed above ceiling on each cable installation where possible. A. A firestop system is comprised of the item or items penetrating the fire rated structure, the opening in the structure and the materials and assembly of the Pathways for Communications System (E) LBUSD Specification 8/25/14 Page - 11

31 materials used to seal the penetrated structure. Firestop systems comprise an effective block for fire, smoke, heat, vapor and pressurized water stream. B. All penetrations through fire-rated building structures (walls and floors) shall be sealed with an appropriate firestop system. This requirement applies to through penetrations (complete penetration) and membrane penetrations (through one side of a hollow fire rated structure). Any penetrating item (i.e., riser slots and sleeves, cables, conduit, cable tray, and raceways, etc.) shall be properly fire stopped. C. All firestop systems shall be installed in accordance with the manufacturer s recommendations and shall be completely installed and available for inspection by the local inspection authorities prior to cable system acceptance. 3.4 DUCT SEALANT A. Contractor shall install duct sealant in each end of underground duct bank conduits. B. All occupied and vacant communications duct bank conduits shall be sealed. C. Each underground duct bank conduit entering underground pull boxes shall have duct sealant installed. D. Each underground duct bank conduit stubbing up through building foundation shall have duct sealant installed. E. Each underground duct bank conduit through building wall shall have duct sealant installed. F. Each underground duct bank conduit end shall be sealed to be 100% water tight. END OF SECTION Pathways for Communications System (E) LBUSD Specification 8/25/14 Page - 12

32 PART 1 GENERAL SECTION COMMUNICATIONS TESTING, IDENTIFICATION AND ADMINISTRATION 1.1 RELATED DOCUMENTS A. SECTION COMMON WORK RESULTS FOR COMMUNICATIONS, this document describes the LBUSD products, execution, qualifications, manufacturer warranties, and coordination requirements relating to furnishing and installing a complete, turn-key Communications Cabling System. B. SECTION GROUNDING AND BONDING FOR COMMUNICATIONS SYSTEMS, this document describes the products and execution requirements relating to furnishing and installing Grounding/Earthing and Bonding for Communications Systems. C. SECTION PATHWAYS FOR COMMUNICATIONS SYSTEMS, this document describes the products and execution requirements relating to furnishing and installing Telecommunications Cabling pathways. Communication cabling support is covered under this document. D. SECTION COMMUNICATIONS CABINETS AND ENCLOSURES, this document describes the products and execution requirements relating to furnishing and installing Communication Equipment Room Fittings of cabinets, cable management, and telecommunications backboards are covered under this document. E. SECTION COMMUNICATIONS PATCH PANELS, this document describes the products and execution requirements relating to furnishing and installing Structured Communications Cable System (SCCS) Category 5e and Category 6 patch panels are covered under this document. F. SECTION COMMUNICATIONS OPTICAL FIBER BACKBONE CABLING, this document describes the products and execution requirements relating to furnishing and installing Telecommunications Cabling Optical fiber backbone cabling and terminations are covered in this document. G. SECTION DATA COMMUNICATIONS HORIZONTAL CABLING, this document describes the products and execution requirements relating to furnishing and installing Horizontal Cabling. Data Communications Horizontal Cabling is covered under this document. H. SECTION COMMUNICATIONS FACEPLATES AND CONNECTORS, this document describes the products and execution requirements relating to furnishing and installing faceplates, connectors, Category 5e and Category 6 patch cords. Communications faceplates and connectors are covered under this document Communications Testing Identification and Administration (E) LBUSD Specification 8/25/14 Page - 1

33 1.2 SCOPE OF WORK A. This document describes the products and execution requirements relating to testing, labeling, warranties and As-Builts related to Communications Cabling Systems. 1.3 IDENTIFICATION AND LABELING A. The contractor shall label the cabling system as indicated on the drawings and in accordance with TIA 606 Standards. B. All label printing will be machine generated. Self-laminating labels will be used on cable jackets, appropriately sized to the OD of the cable, and placed within view at the termination point on each end. Outlet, patch panel and wiring block labels shall be installed on, or in, the space provided by the termination device or housing. C. Identification of cabling, pathways and hardware shall conform to TIA 606-A. The labeling scheme for the structured cabling system shall be submitted to LBUSD Representative for approval and inclusion in all matrices for building operations prior to trim/finish. Faceplate, insert and dust cover shall be same color. D. Each information outlet faceplate and each telephone and data wire shall be labeled following University standards. The labels shall be made of waterproof material and be mechanically printed with permanent black ink. The labels must be legible with the same identification numbering corresponding to both ends. Each information outlet faceplate has removable covers that hide the mounting screws. They are located above and below each pair of module knockouts. The approved adhesive backed label should be placed on the outside of the top removable cover. The generic Systimax cover that comes with the faceplate should be used below the lower knockouts. At the MDF the telephone wiring shall be labeled on the protector blocks with black indelible ink in numerical order. Data wiring at the MDF/IDF closet should be labeled with mechanically printed labels both on the wire and on the patch panels utilizing specified label strips. Labeling products must be approved by LBUSD Representative prior to use. E. The standard LBUSD Telecommunications and Networking outlet label format consists of: 1. Floor#-IDF#-Cable I.D. 2. Floor # - Is the floor that the terminal closet is located on. 3. IDF # - Designates which closet on the floor that the outlet is served from. 4. Cable I.D. # - The individual outlet number used to identify the wire on both ends. F. Sample Faceplate Labeling Format Communications Testing Identification and Administration (E) LBUSD Specification 8/25/14 Page - 2

34 FLOOR OF IDF LOWER LEVEL 0 FIRST -1 SECOND 2 THIRD -3 X -Y-Z SYSTIMAX SYSTIMAX 1 2 SYSTIMAX SYSTIMAX 3 4 CABLE I.D IDF # SINGLE DIGIT FORMAT SYSTIMAX SYSTIMAX 5 6 X -Y-Z 1. Faceplate Configurations Figure 1 2. Faceplate Configurations Figure Communications Testing Identification and Administration (E) LBUSD Specification 8/25/14 Page - 3

35 3. Faceplate Configurations Figure 3 G. Backbone Copper Label Scheme for Inter-building: 1. Example: From MDF to IDF, Building #. Floor. Cable #. Pair Count. H. Backbone Copper Label Scheme for Intra-building Cables: From Building # To Building# Floor.Cable #. Pair Count 1. Example: From Building#.To Building#. Floor. Cable#. Pair Count I. Fiber Backbone Labeling Scheme for Inter-building Cables: 1. Example: From MDF to IDF, Building # - Cable #. 306B-1, 306B-2, 306B-3, ETC((. Cable: xxx-306b-1 will be the feed cable to the Building from Building xxx Communications Testing Identification and Administration (E) LBUSD Specification 8/25/14 Page - 4

36 J. Fiber Backbone Labeling Scheme for Intra-building Cables: X Building #, Building #, Cable # 1. Example: To - From, Building # - Building # - Cable #. In Building #168, Cable# shall read, Example: In Building #170, Cable shall read, K. Fiber Patch Panel Labeling: 1. Example: ROOM # 250U1, Patch Panel #1 = 250U1-L1 ROOM # 250U1, Patch Panel #2 = 250U1-L2 ROOM # 250U1, Patch Panel #3 = 250U1-L3 1.4 TESTING AND LBUSD ACCEPTANCE A. GENERAL 1. All cables and termination hardware shall be 100 percent tested for defects in installation and to verify cabling system performance under installed conditions according to the requirements of ANSI/TIA-568-C.1 and TIA-568-C.2 and associated addendums. All pairs of each installed cable shall be verified prior to system acceptance. Any defect in the cabling system installation including but not limited to cable, connectors, feed through couplers, patch panels, and connector blocks shall be repaired or replaced in order to ensure 100 percent useable conductors in all cables installed. 2. All cables shall be tested in accordance with this document, the ANSI/TIA standards, manufacturer specifications and best industry practice. If any of these are in conflict, the Contractor shall bring any discrepancies to the attention of the project team for clarification and resolution. B. TEST EQUIPMENT Communications Testing Identification and Administration (E) LBUSD Specification 8/25/14 Page - 5

CAMPUS NEW CONSTRUCTION & MODERNIZATION

CAMPUS NEW CONSTRUCTION & MODERNIZATION LBUSD SPECIFICATIONS 8/25/14 TABLE OF CONTENTS CAMPUS NEW CONSTRUCTION & MODERNIZATION DIVISION 27 - COMMUNICATIONS 270505 COMMON WORK RESULTS COMMUNICATIONS 270526 GROUNDING BONDING 270528 PATHWAYS FOR

More information

The University of Texas at Austin September 30, 2011

The University of Texas at Austin September 30, 2011 SECTION 27 05 26 GROUNDING AND BONDING FOR COMMUNICATIONS PART 1 - GENERAL 1.1 SUMMARY A. This section governs the products and execution requirements relating to furnishing and installing grounding and

More information

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017 SECTION 27 0526 - TECHNOLOGY GROUNDING SYSTEM PART 1 - GENERAL 1.1 RELATED DOCUMENT A. Drawing and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specifications,

More information

SECTION GROUNDING AND BONDING FOR ELECTRONIC SAFETY AND SECURITY

SECTION GROUNDING AND BONDING FOR ELECTRONIC SAFETY AND SECURITY PART 1 - GENERAL 1.1 DESCRIPTION SECTION 28 05 26 GROUNDING AND BONDING FOR ELECTRONIC SAFETY AND SECURITY SPEC WRITER NOTE: Delete // // if not applicable to project. Also delete any other item or paragraph

More information

1. Telecommunications mounting elements. 2. Backboards. 3. Telecommunications equipment racks and cabinets. 4. Grounding.

1. Telecommunications mounting elements. 2. Backboards. 3. Telecommunications equipment racks and cabinets. 4. Grounding. ALLIANT ENERGY CENTER PAVILIONS Project No. 2013 027 SECTION 27 11 00 - PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions

More information

A. Basket Cable Tray: A fabricated structure consisting of wire mesh bottom and side rails.

A. Basket Cable Tray: A fabricated structure consisting of wire mesh bottom and side rails. SECTION 27 11 00 - PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply

More information

SECTION GROUNDING

SECTION GROUNDING SECTION 16450 GROUNDING PART 1 - GENERAL 1.1 DESCRIPTION A. This section specifies general grounding and bonding requirements of electrical and telecommunication installations for personnel safety, equipment

More information

NYULMC AMBULATORY CARE CENTER FIT-OUT PHASE 1 Perkins & Will Architects PC 222 E 41st ST, NYC Project: Issued for GMP March 15, 2017

NYULMC AMBULATORY CARE CENTER FIT-OUT PHASE 1 Perkins & Will Architects PC 222 E 41st ST, NYC Project: Issued for GMP March 15, 2017 SECTION 27 05 26 PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply

More information

SECTION PATHWAYS FOR COMMUNICATIONS SYSTEMS

SECTION PATHWAYS FOR COMMUNICATIONS SYSTEMS (NOTE TO DESIGNER: These Specifications are basic minimum criteria to be met in preparing the final specifications for this section, which is the responsibility of the Designer.) PART 1 - GENERAL 1.1 SECTION

More information

Essex County College - West Essex Campus Addition And Renovations dlb # / 11-14

Essex County College - West Essex Campus Addition And Renovations dlb # / 11-14 SECTION 270526 - GROUNDING AND BONDING FOR COMMUNICATIONS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division

More information

1 data PIC location (with 2 ports) typically asf for multiple staff members

1 data PIC location (with 2 ports) typically asf for multiple staff members 1 Introduction 1.1 In the design of Telecommunications systems in Purdue facilities, the overall consideration should be to understand and treat telecom as a utility. It should be assumed that all new

More information

A. Basket Cable Tray: A fabricated structure consisting of wire mesh bottom and side rails.

A. Basket Cable Tray: A fabricated structure consisting of wire mesh bottom and side rails. SECTION 16714 - COMMUNICATIONS EQUIPMENT ROOM FITTINGS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division

More information

PHYSICAL FACILITIES Consultant s Handbook Specifications Division 27 Communication 0528 Pathways. Page 1 of 6

PHYSICAL FACILITIES Consultant s Handbook Specifications Division 27 Communication 0528 Pathways. Page 1 of 6 1 General 1.1 Scope of work 1.1.1 The Contractor is held responsible to be familiar with the provisions contained herein and with other Sections of this Specification as applicable to the completion of

More information

PHYSICAL FACILITIES Consultant s Handbook Division 27 COMMUNICATIONS 0000 COMMUNICATIONS

PHYSICAL FACILITIES Consultant s Handbook Division 27 COMMUNICATIONS 0000 COMMUNICATIONS 1 Introduction 1.1 In the design of Telecommunications systems in Purdue facilities, the overall consideration should be to understand and treat telecom as a utility. It should be assumed that all new

More information

Communications Page 1 of 9

Communications Page 1 of 9 Page 1 of 9 Last Update: April 23 rd, 2014 Introduction Design In the design of Telecommunications systems in Purdue facilities, the overall consideration should be to understand and treat telecom as a

More information

UNIVERSITY SERVICES ANNEX James Madison University Harrisonburg, Virginia State Project Code: Architect s Project Number:

UNIVERSITY SERVICES ANNEX James Madison University Harrisonburg, Virginia State Project Code: Architect s Project Number: SECTION 260526 - GROUNDING AND BONDING FOR ELECTRICAL SYSTEMS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract apply to this Section. 1.2 SUMMARY A. This Section

More information

COMMUNICATIONS CABLING SECTION COMMUNICATIONS CABLING PART 1 - GENERAL

COMMUNICATIONS CABLING SECTION COMMUNICATIONS CABLING PART 1 - GENERAL 13686.00 COMMUNICATIONS CABLING 271513-1 1.1 RELATED SECTIONS SECTION 27 1513 COMMUNICATIONS CABLING PART 1 - GENERAL A. Drawings and general provisions of the Contract, including General and Supplementary

More information

A. Product Data: For surface pathways, wireways and fittings, floor boxes, hinged-cover enclosures, and cabinets.

A. Product Data: For surface pathways, wireways and fittings, floor boxes, hinged-cover enclosures, and cabinets. ALLIANT ENERGY CENTER PAVILIONS Project No. 2013 027 SECTION 27 05 28 - PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions

More information

A. Drawings and general provisions of the Contract, including General Conditions and Division 1 Specification sections, apply to work of this Section.

A. Drawings and general provisions of the Contract, including General Conditions and Division 1 Specification sections, apply to work of this Section. SECTION 27 00 00 TELECOMMUNICATIONS CABLE PLANT 1. GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General Conditions and Division 1 Specification sections,

More information

SECTION 16xxx NON-CONTINUOUS CABLE SUPPORTS FOR HIGH-SPEED TRANSMISSION CABLES (CATEGORY 5 AND HIGHER, AND OPTICAL FIBER CABLES)

SECTION 16xxx NON-CONTINUOUS CABLE SUPPORTS FOR HIGH-SPEED TRANSMISSION CABLES (CATEGORY 5 AND HIGHER, AND OPTICAL FIBER CABLES) SECTION 16xxx NON-CONTINUOUS CABLE SUPPORTS FOR HIGH-SPEED TRANSMISSION CABLES (CATEGORY 5 AND HIGHER, AND OPTICAL FIBER CABLES) PART 1 GENERAL 1.1 SCOPE A. Non-continuous cable supports (2.3A) B. Adjustable

More information

The following sections are included in Division 27: Section : Underground Ducts and Raceways for Communication SysteMS 283

The following sections are included in Division 27: Section : Underground Ducts and Raceways for Communication SysteMS 283 P a r t IV: De s i g n St a n d a r d s 279 Division 27: Communications Ge n e ra l Professionals shall verify that all applicable portions of these standards are incorporated into the final construction

More information

The University of Texas at Austin September 30, 2011

The University of Texas at Austin September 30, 2011 SECTION 27 11 00 COMMUNICATIONS EQUIPMENT ROOM FITTINGS PART 1 - GENERAL 1.1 SUMMARY A. This Section includes basic communications room requirements. Refer to T series drawings for specific communication

More information

SECTION HORIZONTAL CABLING

SECTION HORIZONTAL CABLING PART 1 - GENERAL 1.1 SUMMARY SCOPE OF WORK SECTION 25160 HORIZONTAL CABLING 1. Horizontal cabling is the portion of the cabling system that extends from the work area to the Telecommunications Room or

More information

A. Section includes busway and fittings including plug-in units.

A. Section includes busway and fittings including plug-in units. SECTION 26 25 00 ENCLOSED BUS ASSEMBLIES PART 1 - GENERAL 1.1 SUMMARY A. Section includes busway and fittings including plug-in units. 1.2 REFERENCES A. Institute of Electrical and Electronics Engineers:

More information

SECTION COMMUNICATIONS EQUIPMENT ROOM FITTINGS

SECTION COMMUNICATIONS EQUIPMENT ROOM FITTINGS SECTION 271100 COMMUNICATIONS EQUIPMENT ROOM PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 00 and

More information

PATHWAYS FOR COMMUNICATIONS SYSTEMS

PATHWAYS FOR COMMUNICATIONS SYSTEMS 270528 PATHWAYS FOR PART 1 GENERAL 1.1 WORK INCLUDED A. Provide all labor, materials, and equipment for the complete installation of work called for in the Contract Documents. 1.2 SCOPE OF WORK A. This

More information

DIVISION 26 RACEWAYS AND BOXES FOR ELECTRICAL SYSTEMS PART 1 - GENERAL RELATED DOCUMENTS

DIVISION 26 RACEWAYS AND BOXES FOR ELECTRICAL SYSTEMS PART 1 - GENERAL RELATED DOCUMENTS PART 1 - GENERAL 01.01 RELATED DOCUMENTS A. Drawings and general provisions of Contract, including General and Supplementary Conditions and Division 1 Specification sections, apply to work of this Section.

More information

SECTION CONDUITS AND BACKBOXES FOR COMMUNICATIONS SYSTEMS

SECTION CONDUITS AND BACKBOXES FOR COMMUNICATIONS SYSTEMS SECTION 16711-27 05 28.33 PART 1 - GENERAL 1.01 SUMMARY A. This section includes Labor, materials and equipment necessary to complete the installation required for the items specified under this Section,

More information

COMMUNICATIONS EQUIPMENT ROOM FITTINGS

COMMUNICATIONS EQUIPMENT ROOM FITTINGS SECTION 271100 - COMMUNICATIONS EQUIPMENT ROOMS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01

More information

SECTION COMMON WORK RESULTS FOR COMMUNICATIONS

SECTION COMMON WORK RESULTS FOR COMMUNICATIONS SECTION 27 05 00 COMMON WORK RESULTS FOR COMMUNICATIONS PART 1 GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division

More information

Request for Proposal

Request for Proposal Request for Proposal Dillon School District Three Telecommunications Cabling for Latta Middle School Contact: Robert McIntyre, Director of Technology (843) 752-7101 office phone (843)752-2081 office fax

More information

DESIGN GUIDELINES WIRING AND CONDUITS PAGE 1 of 7

DESIGN GUIDELINES WIRING AND CONDUITS PAGE 1 of 7 DESIGN GUIDELINES WIRING AND CONDUITS PAGE 1 of 7 1.1. REFERENCE STANDARDS 1.1.1. Publications listed below (including amendments, addenda, revisions, supplements and errata) form a part of this specification

More information

This product specification is written according to the Construction Specifications Institute MasterFormat, 2014 Update.

This product specification is written according to the Construction Specifications Institute MasterFormat, 2014 Update. AFC Cable Systems, Inc. Product Specification This product specification is written according to the Construction Specifications Institute MasterFormat, 2014 Update. SECTION 260519.13 METAL CLAD CABLE-MC

More information

SECTION BASIC ELECTRICAL REQUIREMENTS

SECTION BASIC ELECTRICAL REQUIREMENTS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of Contract, including General and Supplementary Conditions, apply to work of this section. 1.2 SUMMARY A. This section specifies

More information

B. Insulated Conductors: Stranded copper wire, green or green with yellow stripe insulation, insulated for 600 V, and complying with UL 83.

B. Insulated Conductors: Stranded copper wire, green or green with yellow stripe insulation, insulated for 600 V, and complying with UL 83. SECTION 270526 - GROUNDING AND BONDING FOR COMMUNICATIONS SYSTEMS PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Grounding conductors. 2. Grounding connectors. 3. Grounding busbars. 4. Grounding

More information

Standards and Procedures Security Room Construction/Renovations At University of North Carolina Wilmington

Standards and Procedures Security Room Construction/Renovations At University of North Carolina Wilmington Standards and Procedures Security Room Construction/Renovations At University of North Carolina Wilmington Rev 062017 Provided by UNCW Physical Security and Access OVERVIEW... 3 CABLE INSTALLATION... 3

More information

Kaf-Tech Product Specification

Kaf-Tech Product Specification Kaf-Tech Product Specification This product specification is written according to the Construction Specifications Institute MasterFormat, 2014 Update. SECTION 260519.13 METAL CLAD CABLE-LUMINARY CABLE

More information

SECTION BUSWAYS

SECTION BUSWAYS PART 1 - GENERAL 1.1 DESCRIPTION SECTION 26 25 11 BUSWAYS SPEC WRITER NOTE: Delete between //----// if not applicable to project. Also delete any other item or paragraph not applicable to the section and

More information

SECTION GROUNDING AND BONDING

SECTION GROUNDING AND BONDING SECTION 16060 GROUNDING AND BONDING PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification

More information

3. Intermediate metal conduit (IMC). 4. Electric metallic tubing (EMT). 5. Flexible metal conduit (FLEX). 6. Polyvinyl chloride conduit (PVC).

3. Intermediate metal conduit (IMC). 4. Electric metallic tubing (EMT). 5. Flexible metal conduit (FLEX). 6. Polyvinyl chloride conduit (PVC). SECTION 16111 CONDUITS PART 1 - GENERAL 1.01 DESCRIPTION A. General: Provide conduits, complete, as shown, specified or required per Contract Documents. Principal items include: 1. Rigid aluminum conduit.

More information

Essex County College - West Essex Campus Addition And Renovations dlb # / SECTION CABLE TRAYS FOR COMMUNICATIONS SYSTEMS

Essex County College - West Essex Campus Addition And Renovations dlb # / SECTION CABLE TRAYS FOR COMMUNICATIONS SYSTEMS SECTION 270536 - CABLE TRAYS FOR COMMUNICATIONS SYSTEMS PART 1- GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division

More information

SECTION PATHWAYS FOR ELECTRONIC SAFETY AND SECURITY

SECTION PATHWAYS FOR ELECTRONIC SAFETY AND SECURITY SECTION 280528 - PATHWAYS FOR ELECTRONIC SAFETY AND SECURITY PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Metal conduits, tubing, and fittings. 2. Nonmetallic conduits, tubing, and fittings. 3.

More information

A. Drawings and general provisions of the Contract, including General Conditions and Division 1 Specification sections, apply to work of this Section.

A. Drawings and general provisions of the Contract, including General Conditions and Division 1 Specification sections, apply to work of this Section. SECTION 270000 TELECOMMUNICATIONS CABLE PLANT 1. GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General Conditions and Division 1 Specification sections, apply

More information

SECTION FACILITY LIGHTNING PROTECTION

SECTION FACILITY LIGHTNING PROTECTION PART 1 - GENERAL 1.1 DESCRIPTION SECTION 26 41 00 FACILITY LIGHTNING PROTECTION SPEC WRITER NOTE: Delete between //----//if not applicable to project. Also delete any other item or paragraph not applicable

More information

PCC Structured Cabling Standards

PCC Structured Cabling Standards PCC Structured Cabling Standards VERSION 2.0 07DEC16 Presented by: Portland Community College Information Technology Infrastructure Services Page 1 of 67 PCC Structured Cabling Standards 5 Purpose 5 CONTRACTOR

More information

SECTION TELECOMMUNICATIONS GENERAL REQUIREMENTS

SECTION TELECOMMUNICATIONS GENERAL REQUIREMENTS PART 1 - GENERAL 1.1 SECTION INCLUDES A. Scope of Work B. Other Affected Trades C. Codes and Standards D. General Requirements and Conditions E. Telecommunication Contractor Qualifications F. Qualifications

More information

SECTION (Master Template Final-05) ELECTRICAL BOXES. A. Provide boxes for electrical equipment and wiring devices as follows:

SECTION (Master Template Final-05) ELECTRICAL BOXES. A. Provide boxes for electrical equipment and wiring devices as follows: SECTION 16130 (Master Template Final-05) ELECTRICAL BOXES PART 1 GENERAL 1.01 SECTION INCLUDES A. Provide boxes for electrical equipment and wiring devices as follows: 1. Wall and ceiling outlet boxes.

More information

MASTERSPEC TECHNICAL SPECIFICATIONS DIVISION 26 ELECTRICAL SECTION RACEWAY AND BOXES FOR ELECTRICAL SYSTEMS

MASTERSPEC TECHNICAL SPECIFICATIONS DIVISION 26 ELECTRICAL SECTION RACEWAY AND BOXES FOR ELECTRICAL SYSTEMS SECTION 260533 - RACEWAY AND BOXES FOR ELECTRICAL SYSTEMS PART 1 - GENERAL 1.1 SUMMARY A. This Section includes raceways, fittings, boxes, enclosures, and cabinets for electrical wiring. B. See Division

More information

SECTION HANGERS AND SUPPORTS FOR ELECTRICAL SYSTEMS

SECTION HANGERS AND SUPPORTS FOR ELECTRICAL SYSTEMS SECTION 26 05 29 HANGERS AND SUPPORTS FOR ELECTRICAL SYSTEMS PART 1 GENERAL 1.1 DESCRIPTION A. Scope: 1. CONTRACTOR shall provide all labor, materials, equipment, and incidentals as shown, specified, and

More information

A. This Section includes steel cable trays and accessories.

A. This Section includes steel cable trays and accessories. SECTION 26 05 36 - PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply

More information

This product specification is written according to the Construction Specifications Institute MasterFormat, 2014 Update.

This product specification is written according to the Construction Specifications Institute MasterFormat, 2014 Update. Kaf-Tech Product Specification This product specification is written according to the Construction Specifications Institute MasterFormat, 2014 Update. SECTION 260519 METAL CLAD CABLE - MC-PLUS Neutral

More information

Student Services & Classroom Addition

Student Services & Classroom Addition SECTION 260533 - RACEWAY AND BOXES FOR ELECTRICAL SYSTEMS PART 1 - GENERAL 1.1 SUMMARY A. This Section includes raceways, fittings, boxes, enclosures, cabinets, and track busway for electrical wiring.

More information

SPECIAL SPECIFICATION 6499 Environmentally controlled Communications Building

SPECIAL SPECIFICATION 6499 Environmentally controlled Communications Building 2004 Specifications CSJ 0720-03-095 SPECIAL SPECIFICATION 6499 Environmentally controlled Communications Building 1. Description. Furnish and install Environmentally Controlled Communications Building

More information

Police/Emergency Service Center PSGP Grant #2007-GB-T CN

Police/Emergency Service Center PSGP Grant #2007-GB-T CN B. Concrete Slabs and Walls: Install sleeves for penetrations unless core-drilled holes or formed openings are used. Install sleeves during erection of slabs and walls. C. Use pipe sleeves unless penetration

More information

CONTENTS. B. System Design and Performance Requirements

CONTENTS. B. System Design and Performance Requirements 16060 Grounding and Bonding This document provides design standards only, and is not intended for use, in whole or in part, as a specification. Do not copy this information verbatim in specifications or

More information

SECTION CONDUITS AND BOXES PART 1- GENERAL. A. Work covered by this section includes the furnishing and installation of conduits and boxes.

SECTION CONDUITS AND BOXES PART 1- GENERAL. A. Work covered by this section includes the furnishing and installation of conduits and boxes. SECTION 16111 CONDUITS AND BOXES 1.01 DESCRIPTION PART 1- GENERAL A. Work covered by this section includes the furnishing and installation of conduits and boxes. 1.02 SUBMITTALS A. The Contractor shall

More information

Specification Lightning Protection Systems

Specification Lightning Protection Systems Specification Lightning Protection Systems General: Summary A) This Section specifies the lightning protection system for the building(s) or structure(s). This system provides safety for the building and

More information

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017 SECTION 26 0526 - GROUNDING AND BONDING FOR ELECTRICAL SYSTEMS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions

More information

Youngstown State University

Youngstown State University SECTION 260533 - RACEWAYS PART 1 - GENERAL SUMMARY A. This section includes raceways for electrical wiring. Types of raceways in this section include the following: 1. Flexible metal conduit 2. Liquid

More information

A. Provide a complete Distribution Panelboard system as indicated on the drawings, and as specified herein.

A. Provide a complete Distribution Panelboard system as indicated on the drawings, and as specified herein. 16470 PANELBOARDS ************************************************************************************************************* SPECIFIER: CSI MasterFormat 2004 number: 26 24 16 An optional keynote to

More information

SECTION LIGHTNING PROTECTION SYSTEM

SECTION LIGHTNING PROTECTION SYSTEM SECTION 16670 - LIGHTNING PROTECTION SYSTEM PART 1 - GENERAL 1.01 RELATED DOCUMENTS A. General: Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division

More information

INDEX. Page SECTION 1.0: SCOPE Toronto Hydro Requirements Ontario Electrical Safety Code 1 SECTION 2.0: PURPOSE 1

INDEX. Page SECTION 1.0: SCOPE Toronto Hydro Requirements Ontario Electrical Safety Code 1 SECTION 2.0: PURPOSE 1 INDEX Page SECTION 1.0: SCOPE 1 1.1 Toronto Hydro Requirements 1 1.2 Ontario Electrical Safety Code 1 SECTION 2.0: PURPOSE 1 SECTION 3.0: DEFINITIONS AND THE INTERNATIONAL SYSTEM OF UNITS 1 3.1 Definitions

More information

SECTION LOW-VOLTAGE TRANSFORMERS

SECTION LOW-VOLTAGE TRANSFORMERS PART 1 GENERAL 1.1 DESCRIPTION SECTION 26 22 00 SPEC WRITER NOTE: Use this section only for NCA projects. Delete between // // if not applicable to project. Also, delete any other item or paragraph not

More information

Design Guidelines for Facilities Construction:

Design Guidelines for Facilities Construction: Western Michigan University Office of Information Technology & Campus Planning, Design & Construction Design Guidelines for Facilities Construction: DESIGN GUIDELINE DG17-1 Outside / Inter-building Systems

More information

SECTION MOTOR CONTROL CENTER

SECTION MOTOR CONTROL CENTER SECTION 16445 MOTOR CONTROL CENTER PART 1 GENERAL 1.01 DESCRIPTION A. This section covers the contract item Motor Control Center (MCC). The contract item includes demolition and removal of existing MCC;

More information

SECTION A. ASTM B3 - Standard Specification for Soft or Annealed Copper Wire; 2013.

SECTION A. ASTM B3 - Standard Specification for Soft or Annealed Copper Wire; 2013. PART 1 GENERAL 1.1 SECTION INCLUDES SECTION 26 0519 A. Single conductor building wire. B. Metal-clad cable. C. Wiring connectors. D. Electrical tape. E. Wire pulling lubricant. F. Cable ties. 1.2 RELATED

More information

Inspection Guide for PV Systems in One- and Two- Family Dwellings (For Rooftop Photovoltaic Systems meeting the Standard Plan)

Inspection Guide for PV Systems in One- and Two- Family Dwellings (For Rooftop Photovoltaic Systems meeting the Standard Plan) TOOLKIT DOCUMENT #7 Inspection Guide for PV Systems in One- and Two- Family Dwellings (For Rooftop Photovoltaic Systems meeting the Standard Plan) This document has two sections. Neither section is all-inclusive

More information

Special Specification 6292 Radar Vehicle Detection System for Signalized Intersection Control

Special Specification 6292 Radar Vehicle Detection System for Signalized Intersection Control Special Specification 6292 Radar Vehicle Detection System for Signalized Intersection Control 1. DESCRIPTION 2. MATERIALS Furnish, install, relocate, or remove radar vehicle detection systems (RVDS) of

More information

c. Army Reserve Design Process Submittal Requirements (DPSR) d. USARC G-2/6 IT Design Criteria Updates, 26 March 2013 ( ENCLOSURE 1)

c. Army Reserve Design Process Submittal Requirements (DPSR) d. USARC G-2/6 IT Design Criteria Updates, 26 March 2013 ( ENCLOSURE 1) CELRL-PM-R March ARCOS BULLETIN - SUBJECT: IT Design. REFERENCE: a. UFC --0, Army Reserve Facilities b. Army Reserve IT Manual, Change c. Army Reserve Design Process Submittal Requirements (DPSR) d. USARC

More information

Telecommunication Spaces

Telecommunication Spaces Telecommunication Spaces October 19, 2016 Page 1 Revision History Telecommunication Spaces Standard Effective Date Email Version Contact Phone OIT-TS strevena@csustan.edu 1.0 Stan Trevena 209.667.3137

More information

SECTION PART 1 GENERAL

SECTION PART 1 GENERAL SECTION 16060 GROUNDING AND BONDING PART 1 GENERAL 1.1 SUMMARY A. Section Includes: Grounding of electrical systems and equipment and basic requirements for ground for equipment, circuits, and systems.

More information

FORMAT Technical specifications content and numbering system shall be based on 2004 CSI MasterFormat.

FORMAT Technical specifications content and numbering system shall be based on 2004 CSI MasterFormat. DIVISION 27 00 00 COMMUNICATIONS FORMAT Technical specifications content and numbering system shall be based on 2004 CSI MasterFormat. BASIS OF DESIGN Design guidelines supplement building, fire, and other

More information

SECTION FIELD PANELS

SECTION FIELD PANELS Stanford University Facilities Design Guidelines SECTION 25 14 23 FIELD PANELS PART 1 - GENERAL 1.1 SUMMARY A. This section includes control panel and enclosure requirements for building control systems.

More information

SECTION A. Underwriters Laboratories, Inc., listed and NEC approved

SECTION A. Underwriters Laboratories, Inc., listed and NEC approved PART 1 GENERAL 1.01 DESCRIPTION A. Provide all raceways, fittings, and boxes of specified type required for complete project. Install all systems in raceways unless specifically noted otherwise. Provide

More information

ELECTRICAL SECTION 2

ELECTRICAL SECTION 2 ELECTRICAL SECTION 2 COMMON WORK RESULTS FOR ELECTRICAL PART 1 - GENERAL 1.1 GENERAL REQUIREMENTS A. This Section includes raceways, conductors and cables, grounding materials, boxes, electrical identification

More information

SEISMIC PROTECTION SYSTEMS Bracing Products for Racks & Cabinets

SEISMIC PROTECTION SYSTEMS Bracing Products for Racks & Cabinets SEISMIC PROTECTION SYSTEMS Bracing Products for Racks & Cabinets Seismic Frame Two-Post Rack Page 11-3 Seismic Protection Products - Racks Page 11-6 Seismic Protection Products - Runway Page 11-8 Seismic

More information

1510 RACEWAY AND BOXES FOR ELECTRICAL SYSTEMS

1510 RACEWAY AND BOXES FOR ELECTRICAL SYSTEMS SECTION 260533-RACEWAY AND BOXES FOR ELECTRICAL SYSTEMS PART 1 GENERAL 1.1 SUMMARY A. Section includes conduit raceways, and tubing, surface raceways, wireways, outlet boxes, pull and junction boxes, and

More information

a) Line and load compartments must be separated by a stable barrier.

a) Line and load compartments must be separated by a stable barrier. 1.00 GENERAL 1.01 The electric utility shall furnish and connect all meters, instrument transformers, test switches, and meter control wiring necessary to complete the meter installation. 1.02 The customer

More information

RESEARCH AND TECHNOLOGY BUILDING RENOVATION MAY 18, 2009 SECTION COMMUNICATIONS

RESEARCH AND TECHNOLOGY BUILDING RENOVATION MAY 18, 2009 SECTION COMMUNICATIONS SECTION 27 00 00 PART 1 - GENERAL 1.1 SUMMARY A. This Section includes the following items for wiring systems used as signal pathways for voice and highspeed data transmission: 1. Communication outlets.

More information

L-SERIES: LTH3900 SPECIFICATIONS Stainless Steel Hollow Metal Sliding Fire Door System

L-SERIES: LTH3900 SPECIFICATIONS Stainless Steel Hollow Metal Sliding Fire Door System Version 5.22.13 L-SERIES: LTH3900 SPECIFICATIONS Stainless Steel Hollow Metal Sliding Fire Door System OPTIONS ARE LISTED IN BOLD, PLEASE MODIFY THESE AREAS AS NEEDED BASED ON YOUR PROJECT CONSULT MANUFACTURER

More information

UNDERGROUND SERVICES SECONDARY

UNDERGROUND SERVICES SECONDARY Reference UNDERGROUND SERVICES SECONDARY Underground services secondary... U- 1 General requirements for underground service... U- 2 Name of parts for underground service... U- 3 Conduit layouts... U-

More information

SECTION LOW-VOLTAGE ELECTRICAL POWER CONDUCTORS AND CABLES (24 Volt AC/DC or Less)

SECTION LOW-VOLTAGE ELECTRICAL POWER CONDUCTORS AND CABLES (24 Volt AC/DC or Less) SECTION 260523 LOW-VOLTAGE ELECTRICAL POWER CONDUCTORS AND CABLES (24 Volt AC/DC or Less) PART 1 - GENERAL 1.1 SUMMARY A. Related Documents: 1. Drawings and general provisions of the Subcontract apply

More information

2003 International Residential Code ELECTRICAL PROVISIONS ONLY October 2005 EDITORIAL CHANGES SEVENTH PRINTING

2003 International Residential Code ELECTRICAL PROVISIONS ONLY October 2005 EDITORIAL CHANGES SEVENTH PRINTING 2003 International Residential Code ELECTRICAL PROVISIONS ONLY October 2005 EDITORIAL CHANGES SEVENTH PRINTING E3305.3: now reads The space equal to the width and depth of the panelboard and extending

More information

DIVISION 27 COMMUNICATIONS COMMUNICATIONS GENERAL. Part 1 - General. Record Version

DIVISION 27 COMMUNICATIONS COMMUNICATIONS GENERAL. Part 1 - General. Record Version DIVISION 27 COMMUNICATIONS 270000 COMMUNICATIONS GENERAL Part 1 - General Record Version 20180122 1.1 Related Sections A. This specification section provides general conditions for all division 27 specifications.

More information

SECTION ENCLOSED BUS ASSEMBLIES

SECTION ENCLOSED BUS ASSEMBLIES SECTION 262500 ENCLOSED BUS ASSEMBLIES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification

More information

SECTION COMMON WORK RESULTS FOR COMMUNICATIONS

SECTION COMMON WORK RESULTS FOR COMMUNICATIONS SECTION 270500 COMMON WORK RESULTS FOR COMMUNICATIONS PART 1 GENERAL 1.1 SECTION INCLUDES: A. Scope of Work B. Codes and Specifications C. General Requirements and Conditions D. Qualifications of Subcontractors

More information

SECTION CONDUIT AND BOXES

SECTION CONDUIT AND BOXES PART 1 - GENERAL 1.01 SUMMARY SECTION 27 05 33 CONDUIT AND BOXES A. This Section includes specific requirements for conduits and boxes within the Communications Pathway System as defined in Division 27

More information

SECTION MODULAR GALVANIZED RF SHIELDING SYSTEM SPECIFICATIONS

SECTION MODULAR GALVANIZED RF SHIELDING SYSTEM SPECIFICATIONS SECTION 13096 MODULAR GALVANIZED RF SHIELDING SYSTEM SPECIFICATIONS Prepared by: NELCO 125 Chenoweth Lane, Ste. 206 Louisville, KY 40207 (502) 899-3726 13096-1 MODULAR GALVANIZED RF SHIELDING SYSTEM PART

More information

TABLE OF CONTENTS DIVISION 27 - COMMUNICATIONS

TABLE OF CONTENTS DIVISION 27 - COMMUNICATIONS TABLE OF CONTENTS DIVISION 27 - COMMUNICATIONS 27 00 00 COMMUNICATIONS... 2 27 00 01 GENERAL... 2 27 00 02 REFERENCES, REGULATORY REQUIREMENTS... 2 27 00 03 REFERENCES, RELATED SECTIONS of the SPECIFICATIONS...

More information

DIVISION 27: COMMUNICATIONS AND TECHNOLOGY DESIGN STANDARDS TABLE OF CONTENTS

DIVISION 27: COMMUNICATIONS AND TECHNOLOGY DESIGN STANDARDS TABLE OF CONTENTS I. PURPOSE DIVISION 27: COMMUNICATIONS AND TECHNOLOGY DESIGN STANDARDS TABLE OF CONTENTS II. III. GENERAL A. STANDARDS B. DESIGN REQUIREMENTS C. TOPOLOGY 1. Voice 2. Data Connections 3. Voice over IP (VoIP)

More information

BUSWAY LOW VOLTAGE (POW-R-WAY III) SECTION SECTION 16466

BUSWAY LOW VOLTAGE (POW-R-WAY III) SECTION SECTION 16466 BUSWAY LOW VOLTAGE (POW-R-WAY III) PART 1 GENERAL 1.01 1.02 SCOPE The Contractor shall furnish and install the busway system including all necessary fittings, hangers and accessories as specified herein

More information

SECTION to 5000 AMPERE PLUG-IN AND FEEDER BUSWAYS - SPECTRA. A. Low-Voltage Plug-in Busway to 5000 ampere, 600 VAC

SECTION to 5000 AMPERE PLUG-IN AND FEEDER BUSWAYS - SPECTRA. A. Low-Voltage Plug-in Busway to 5000 ampere, 600 VAC PART 1 GENERAL A. The requirements of the Contract, Division 1, and Division 16 apply to work in this Section. 1.01 SECTION INCLUDES A. Low-Voltage Plug-in Busway - 225 to 5000 ampere, 600 VAC 1.02 RELATED

More information

SECTION RADIO FREQUENCY SHIELDING ENCLOSURE RF Modular Pan System

SECTION RADIO FREQUENCY SHIELDING ENCLOSURE RF Modular Pan System SECTION 13096 RADIO FREQUENCY SHIELDING ENCLOSURE RF Modular Pan System Prepared by: 90 Dayton Avenue, Unit 4B, Suite 13 Passaic, NJ 07055 (973) 574-9077 13096-1 RF MODULAR PAN SYSTEM PART 1 GENERAL 1.1

More information

.2 The maximum length of horizontal cable shall not exceed 90 meters in any 360 degree direction.

.2 The maximum length of horizontal cable shall not exceed 90 meters in any 360 degree direction. 1.0 GENERAL 1.1 DOCUMENTS.1 This section of the Specification forms part of the Contract Documents and is to be read, interpreted, and coordinated with all other parts. 1.2 SUMMARY.1 Section Includes:

More information

Please check with your local inspection authority for any additional requirements before installation.

Please check with your local inspection authority for any additional requirements before installation. Specifications for Residential Underground Electric Service Installation This brochure addresses most typical residential underground service installations. Variances for the following specifications must

More information

UNLV Campus Wiring Specification September 15, 2016

UNLV Campus Wiring Specification September 15, 2016 UNLV Campus Wiring Specification September 15, 2016 1. Part I - General... 4 1.0. Purpose... 4 1.1. Contractor Qualifications... 4 1.2. Applicable Regulations... 5 A. Related Documents... 5 1.3. Submittal...

More information

1993 Specifications CSJ SPECIAL SPECIFICATION 4880 Bridge Equipment Cabinets

1993 Specifications CSJ SPECIAL SPECIFICATION 4880 Bridge Equipment Cabinets 1993 Specifications CSJ 0331-04-050 SPECIAL SPECIFICATION 4880 Bridge Equipment Cabinets 1. Description. This Item shall govern for furnishing and installation of Equipment Cabinets for the Bridge Collapse

More information

SECTION OUTLET, PULL, AND JUNCTION BOXES

SECTION OUTLET, PULL, AND JUNCTION BOXES SECTION 16131 OUTLET, PULL, AND JUNCTION BOXES PART 1 GENERAL 1.01 SUMMARY A. Related Sections: 1. 09900 - Painting. 2. 16112 - Raceways and Conduits. 1.02 SYSTEM DESCRIPTION A. Performance Requirements: