|
|
- Judith Fowler
- 5 years ago
- Views:
Transcription
1 1
2 The Exhibitor and decorator must read the Vinexpo Technical Manual ( Access Requirements", "French Regulations" and "Stand Layout and Installation") that applies to all the stands inside the exhibition halls and which can be found at: THIS DOCUMENT SETS OUT ADDITIONAL RULES APPLYING TO THE TERRACE STANDS IN PARTICULAR. 2
3 1 - CONDITIONS OF ACCESS TERRACE CAR PARKS Located on the central reservations of the P c orange parking lot, places may be reserved for Terrace stand logistics upon request of Exhibitors (bungalows, tents, refrigerated trucks, etc.) No vehicle access will be possible on the P c Blue parking lot during the assembly or disassembly phases or during the exhibition. Access will only be possible via the north side of Hall 1. DISMANTLING The stand release certificate drawn up by a Vinexpo representative and the person in charge of dismantling the stand must also mention: - any damage to Hall 1 (windows, locks, etc.) or to rental equipment (interior or exterior flooring, exterior structures, air conditioners) - adhesives left on the Hall 1 cladding and on the exterior structures In general, the stand must be left in the same condition as on the arrival of the Exhibitor or his decorator. Any breach of this rule will be subject to rebilling. 2 - FRENCH REGULATIONS ( S A F E T Y A N D F I R E - F I G H T I N G M E A S U R E S ) Since the exterior Patio is categorised as CTS ( Marquee, Tent and Structure in French) it is subject to specific French regulations: - All floating decorative elements or interior fittings such as floating billboards over 0.5m², garlands, light decorative items, etc. must be made from category M1 materials. - Drapes (curtains) must be made from category M2 materials. - Any canopies must be made from category M2 materials. The report relating to reaction to fire ratings must mention any drilling. Otherwise, only a maximum of 50% of the floor area may be used. - Canopies must be provided with a sufficient amount of hanging equipment or safety cages that are strong enough to prevent them from falling when the public is present. - The kitchen areas where the Exhibitor makes preparations are not open to the public. Gas is prohibited. Electric power is limited to 20kw per stand for all cooking or reheating appliances. It is agreed that individual partitioning need not be placed between the food storage area (or kitchen) and the area open to the public, subject to compliance with certain installation rules. Barbecues are permitted, provided that basic rules of common sense are respected, which will be verified by site fire inspectors. 3
4 3 TERMS OF SPACE PLANNING VINEXPO RULES Along with the "Project Planning" form to be sent to Vinexpo before March 31, 2017, here is the schedule for sending documents that apply to Exhibitors on the Terrace stands: - before March 31, 2017: any order for additional optional services and files to be printed on exterior signage to be sent to Vinexpo - before April 10, 2017: air-conditioning study (type, number and positioning of air conditioners), any additional cost estimate for air conditioning and for final proof(s) for external signage to be sent to Exhibitors - before April 20, 2017: additional cost estimate for air conditioning and for final proof(s) for outdoor signage to be sent to Vinexpo EXHIBITION CENTRE TECHNICAL SPECIFICATIONS All currents and fluids (water, electricity, telephone and internet cable) are available inside and outside Hall 1. Electricity. Each stand has up to eight 32 A (18 kw) three-phase connections shared out between two interior traps. One of the traps is connected to a trap outside, giving access to between one and four 32 A (18 kw) threephase connections outside. Of this potential supply outside, one or two connections are reserved for air conditioning, meaning that the exhibitor can use the technical services order form to order up to six or seven 32 A (18 kw) connections as need be. VINEXPO STAND DESIGN REGULATIONS Stand height. Due to rule " Stand located against North and South cladding of Hall 1", waiver requests may be submitted to Vinexpo, to avoid having to comply with case n 2. Vinexpo will study each request individually, with the main concern being to maintain good air conditioning in Hall 1. Removing glass from cladding on Hall 1. In the basic formula, Vinexpo can remove three panes (117cm x 217cmh) from the cladding on Hall 1, the position of which must be shown on the stand project plans. On the additional optional services order form, the Exhibitor may ask for more panes to be removed. >>> PLEASE NOTE: - Any removed panes giving direct access to the terrace outside must be equipped with a door, ensuring good air conditioning in Hall 1. - Depending on the placement plan, a slight difference in level is to be expected between Hall 1 and the external structure. In order to facilitate access to the public, the exhibitor and his or her decorator must provide the connecting piece between Hall 1 and the external structure. Door in Hall 1 cladding. For any door made in the cladding of Hall 1, Vinexpo will place a 2.5cm thick pre-frame to facilitate fixing. The remaining passage will be 100cm x 210cmh. Unlike the doors giving access to the outside Patio, the door giving access directly to the outside terrace must: - be locked, ensuring the safety of Hall 1, outside exhibition hours - be equipped with a door closer to ensure that it is completely sealed, ensuring good air conditioning in Hall 1 >>> PLEASE NOTE: the maximum weight for 1 door panel must not exceed 40kg and in the case of a double panel, each must not exceed 20kg. 4
5 Air Conditioning. In the basic formula, Vinexpo will install air conditioning using chilled water, circulated using two vertical air conditioners, for each 50m² section of the outside Patio. To ensure correct air conditioning and facilitate repairs in case of breakdown, the air conditioners must not be covered. Their position is decided by the air conditioning service, according to the interior design and the results of the thermal study. This study may lead to a supplementary cost estimate if it is necessary to add air conditioners, due to the repartitioning of the Patio. Outside Patio doors. This space should be equipped with at least two exits, appropriately distributed. The double glass doors of the outer structure, included in the basic formula, and any glass removed from the cladding in Hall 1, can be positioned as the Exhibitor chooses. Flooring in the outside terrace. In order to ensure that the doors open onto the outside, the type and thickness of flooring on the outside terrace must figure on the stand project plans. Vinexpo will then take this information into account when setting together the inside of Hall 1, the interior of the outside patio and the outside terrace. Decoration of outside terrace. To respect the architectural consistency in the Terraces stands, Vinexpo prohibits any structure other than the Patio. In general, any customised decoration must not be visible from the Allée du Lac. Table umbrellas, terrace umbrellas and Scandinavian-type natural wood and raw silk umbrellas are generally allowed. Installation of steps. Since French regulations require a direct emergency exit from the outside terrace towards the Allée du Lac, in the basic formula Vinexpo will fit a 2m-wide step, the position of which must figure on the stand project plans. Exhibitors may also request (services offered by Vinexpo) - its replacement by a gate positioned on the fence perpendicular to Hall 1 - an increase in its width (to be specified on the stand project plans) - additional footboards (to be specified on the stand project plans) Barrier. To ensure separation between the Allée du Lac and the adjoining stand, Vinexpo will install a barrier consisting of a vegetable hedge and a natural wooden fence (155cmh parallel to Hall 1 and 185cmh perpendicular to Hall 1). The exhibitor can repaint the inside of the wooden fence only, in the colour of his or her choice. Angle signage. In the basic formula, Vinexpo offers a corner signage (250cm x 300cmh x 300cmh). The Exhibitor must send the file to be printed to Vinexpo, which will take care of the printing and the installation. Entrance signage. For each entry step, in the basic formula Vinexpo offers a "plate" (50cm x 50cmh) showing the name of the exhibitor and the stand number. >>> PLEASE NOTE: the logo file must be sent to Vinexpo in amount, otherwise only the stand s name will appear by default. 5
6 3D, LAYOUT PLAN, ELEVATIONS, ITEMS TO BE REMOVED FROM THE BASIC FORMULA DETAILED DRAWINGS OF THE PATIO STRUCTURE AIR CONDITIONER DATA SHEET 6
7 7
8 8
9 9
10 10
11 11
12 12
13 13
14 14
13 16 May vinexpobordeaux.com STAND LAYOUT AND INSTALLATION
13 16 May 2019 vinexpobordeaux.com STAND LAYOUT AND INSTALLATION CONTENT 1. VINEXPO RULES... p4 1.1. STAND LAYOUT FORM... p4 1.2. ACCESS TO THE SITE... p4 1.3. HANDLING WITH MACHINERY... p4 1.4. REMOVAL
More information1. VINEXPO RULES 2. EXHIBITION CENTRE TECHNICAL SPECIFICATIONS 3. VINEXPO STAND DESIGN REGULATIONS APPENDICES
1 C O N T E N T S 1. VINEXPO RULES 1.1. STAND LAYOUT FORM 1.2. ACCESS TO THE SITE 1.3. HANDLING WITH MACHINERY 1.4. REMOVAL OF WASTE 1.5. CLEARWAYS 1.6. LIABILITY/SURVEILLANCE 4 4 4 4 4 5 5 2. EXHIBITION
More informationSTAND LAYOUT AND INSTALLATION
STAND LAYOUT AND INSTALLATION VINEXPO HONG KONG 2018 will take place at The Hong Kong Convention and Exhibition Centre (HKCEC) in the Exhibition Halls on Levels 1 and 3. The documents, ACCESS REQUIREMENTS
More informationDESIGN GUIDELINES FOR ON-PREMISE SIGNS AND AWNINGS (Adopted June 17, 2003)
DESIGN GUIDELINES FOR ON-PREMISE SIGNS AND AWNINGS (Adopted June 17, 2003) Introduction to the Guidelines: The Design Guidelines for On-Premise Signs and Awnings are established to allow for effective
More informationStand Design Regulation
Stand Design Regulation Introduction The «Architecture Regulations» of the Sial 2012 lists the norms for presentation and fitting of stands, set out in such a way as to guarantee a smooth show as well
More informationBOOTH DESIGN REGULATIONS & HALL DESCRIPTIONS
VERY IMPORTANT By signing the registration form, the Exhibitor agrees to abide by all the clauses mentioned in the general regulations and to ensure that any decorators, installers or contractors also
More informationStand Design Regulation French Regulations
Stand Design Regulation French Regulations Introduction The «Architecture Regulations» of the Sial 2016 lists the norms for presentation and fitting of stands, set out in such a way as to guarantee a smooth
More informationa. Type of Signs Freestanding signs shall be limited to ground signs or post & arm signs. [Amended Ordinance #06-14]
Section 7.03. F. Signs in the TV Town Village District [Amended Ordinance #04-11, 13-07]* 1. Freestanding Signs. a. Type of Signs Freestanding signs shall be limited to ground signs or post & arm signs.
More informationMiramar Village Homeowners Association Architectural Review Standards and Guidelines I. Purpose II. Architectural Review Objectives
Miramar Village Homeowners Association Architectural Review Standards and Guidelines (extracted from Architectural Review Standards and Guidelines Issued February 28, 1990) I. Purpose The Board of Directors
More informationQuality specifications for my home
Quality specifications for my home by 7 Benefits of a dospuntos home 2 Quality specifications Casa Banderas 01 02 Outside: Before you go in: Façades Your home will have a ceramic brick façade finished
More informationOctober 13 15, Welcome to the Richmond Home Show! Thank you for exhibiting with us!
Exhibitor Manual Richmond Raceway Complex October 13 15, 2017 Welcome to the Richmond Home Show! Thank you for exhibiting with us! This Exhibitor Manual has been compiled to help you and your staff with
More informationHONG KONG REGULATIONS
HONG KONG REGULATIONS VINEXPO HONG KONG 2018 will take place at The Hong Kong Convention and Exhibition Centre (HKCEC) in the Exhibition Halls on Levels 1 and 3. The documents, ACCESS REQUIREMENTS (document
More information(d) Metal buildings used for industrial uses are not exempt from additional landscape standards as required in Section (e).
5.22. Non-Residential and Multifamily Design Standards. 5.22-1 Applicability of Non-Residential Design Standards. All non-residential and multifamily buildings, with the exception of those described in
More informationIV. REGULATIONS GOVERNING BOOTH DECORATION WITHIN THE TAIPEI WORLD TRADE CENTER EXHIBITION HALL
IV. REGULATIONS GOVERNING BOOTH DECORATION WITHIN THE TAIPEI WORLD TRADE CENTER EXHIBITION HALL 1. Construction guidelines for exhibition booths: (1) It is essential that exhibition booths must be properly
More informationCITY OF DANA POINT WINDOW REPLACEMENTS FOR R-3 B030 WINDOWS
CITY OF DANA POINT COMMUNITY DEVELOPMENT BUILDING AND SAFETY 33282 Golden Lantern, Suite 209 Dana Point, CA 92629 949 248-3594 www.danapoint.org WINDOW REPLACEMENTS FOR R-3 B030 WINDOWS 2016 CALIFORNIA
More informationGUIDELINES AND SPECIFICATIONS SERVICES
GUIDELINES AND SPECIFICATIONS SERVICES S. No. Contents 1 STAND FITTING 5.1 General Architectural Guidelines 5.2 Standard Shell Stand and Equipment 5.3 Technical Specifications of Stands 5.4 Shell Scheme
More informationCounty Board Adopted September 20, 2014
Design Guidelines for a Certificate of Appropriateness and Administrative Certificate of Appropriateness for the Fenwick Court Townhomes, Located within the Eastman-Fenwick House Local Historic District
More informationASDA Aluminium Stockists and Distributors Association
ASDA Aluminium Stockists and Distributors Association Web: http://www.aaamsa.co.za Address: 1st Floor, Block 4 CMA Conference Center Office Park 2nd Road Midrand Registered Postal Address: PO Box 7861
More informationBuilding Envelope
9.36.2. Building Envelope Module 2 BCBC 9.36. 2014 1 Richard Kadulski Architect 9.36.2. Building Envelope Focus is on total building performance, not just thermal insulation Heat transfer and air leakage
More informationC.R. LAURENCE CO., INC. Intelli-Track SPS. Phase One - Installation Instructions
Tools and Supplies: C.R. LAURENCE CO., INC. Intelli-Track SPS Phase One - Installation Instructions Ratchet Wrench with 4" Extension 9/16" Open-End Wrench (two required for suspension mounting) 9/16" Hex
More informationFaçade Improvement Specifications: 221 S. Lafayette, Greenville, MI. General Section:
Façade Improvement Specifications:, Greenville, MI SEE ARCHITECTUAL RENDERINGS ATTACHED TO PROVIDE ADDITIONAL DETAIL: General Section: $ General Building Permit: Permit for working on project. Contact
More informationMARKETINGSERVICE EXHIBITOR SERVICE
EXHIBITOR SERVICE Karlsruher Messe- und Kongress-GmbH Festplatz 9 76137 Karlsruhe Telephone: +49 721 3720-0 Telefax: +49 721 3720-99-2116 Email: info@messe-karlsruhe.de List of contents Introduction 3
More informationFRAMING INSPECTION GENERAL
FRAMING INSPECTION GENERAL 20 FRAMING INSPECTION GENERAL Tips Check habitable rooms for minimum light, ventilation and sanitation requirements. Check that stair framing meets headroom, width, and rise
More informationDecoration AND architecture rules SIRHA 2017
Paragraph 1 Paragraph 2 Decoration AND architecture rules General information SIRHA 2017 CONTENTS - Obligations for exhibitors and/or stand designers concerning waste disposal Stand construction dossier
More informationIMPORTANT CODE UPDATE ENFORCEMENT DATE FOR NEW NATIONAL ELECTRIC CODE IS SET FOR MAY 1, 2013
IMPORTANT CODE UPDATE ENFORCEMENT DATE FOR NEW NATIONAL ELECTRIC CODE IS SET FOR MAY 1, 2013 2011 National Electrical Code (NEC) Update Statement The National Electrical Code, 2011 Edition, with Appendices,
More informationARTICLE 4 SUPPLEMENTARY PROVISIONS
ARTICLE 4 SUPPLEMENTARY PROVISIONS Section 4-10 1. Permitted Uses and Conditional Uses Permitted uses and uses permitted by special review may be located in the same building Section 4-102. District Boundaries
More informationArchitectural Review Standards and Guidelines
Architectural Review Standards and Guidelines I. Purpose The Board of Directors of Sierra Gardens has adopted these Standards and Guidelines for two primary purposes: 1. To establish and preserve a harmonious
More informationAGENDA KNOXVILLE DOWNTOWN DESIGN REVIEW BOARD MEETING OF JANUARY 18, SMALL ASSEMBLY ROOM, 4:00 P.M.
This meeting and all communications between members is subject to the provisions of the Tennessee Open Meetings Act, Tenn. Code Ann. 8-44-101, et seq. AGENDA KNOXVILLE DOWNTOWN DESIGN REVIEW BOARD MEETING
More informationThe above prices are for the Event Day Rate (ex VAT). Package deals are available for longer events; please discuss these options with Chattels.
PACKAGE PRICING 1 x Event Day from 8:00am 06:00am: R 45 000 Please note that the venue has to be cleared by 06:00am otherwise an extra day hire will be charged Setup Day & Event Day (2 days Hire): R 68
More informationVIENNA JUNE 2017
EXHIBITION STANDS SPACE ONLY STANDS The space contracted refers solely to the floor and its perimeter. Therefore, exhibitors must decorate this surface area in accordance with their needs. The Organiser
More informationAppearance Review Board Staff Report
Appearance Review Board Staff Report March 15, 2018 Case Number ARB2017-00020 Applicant Agenda Item 1 500 N. Orange Ave. AT&T/WSSA Building Rehabilitation and Renovation Wayne Dunkelberger, Baker Barrios
More informationAIR CRE Industrial Building Standards
AIR CRE Industrial Building Standards Established March 1993 AIR CRE 500 N Brand Blvd, Suite 900, Glendale CA, 91203 AIR CRE INDUSTRIAL BUILDING STANDARDS TABLE OF CONTENTS SECTION 1 Introduction P. 1
More informationSignage Code. H101.2 Signs exempt from permits. The following signs are exempt from the requirements to obtain a permit before erection:
Signage Code ICC Code: Appendix H: Signs SECTION H101 GENERAL H101.1 General. A sign shall not be erected in a manner that would confuse or obstruct the view of or interfere with exit signs required by
More informationBuilding & Ductwork Airtightness Standards
Building & Ductwork Airtightness Standards Version 1.02, August 2013 Standard Reference Technical Body Title ICS (International Classification for Standards) Scope Door and Windows EN 12207:1999 Windows
More informationAmericans with Disabilities Act Accessibility Survey
Americans with Disabilities Act Accessibility Survey Self-Evaluation and Transition Plan Sarpy County Impound Facility 14242 S. 156th St. Springfield, Nebraska 68159 Prepared by Sarpy County Facilities
More informationCHANCELLORS RESIDENCE ANNUAL INSPECTION REPORT BY BOT GOVERNANCE COMMITTEE MEMBERS A. ITEMS FROM PREVIOUS SITE INSPECTIONS-INCOMPLETE OR ON HOLD
TAB D-2b CHANCELLORS RESIDENCE ANNUAL INSPECTION REPORT BY BOT GOVERNANCE COMMITTEE MEMBERS August 5, 2015 Items added to Inspection performed by Facilities Management Team of July 16, 2015 The care of
More informationThe Catholic University of America Cardinal Station Washington, DC INTERIOR SIGNAGE GUIDELINES. January 21, 2009 (Revised)
The Catholic University of America Cardinal Station Washington, DC 20064 January 21, 2009 (Revised) OBJECTIVES The Interior Signage Guidelines for The Catholic University of America are intended to establish
More informationPLACE BONAVENTURE FIRE REGULATIONS
FIRE REGULATIONS Please note that this document reflects only part of Montreal s Fire Security Service (Service de sécurité incendie de Montréal - SSIM ). 1) Exhibit booths must be built using: non-combustible
More information2020 DISPLAY REGULATIONS
ATLANTA 2020 DISPLAY REGULATIONS IWF 2020 DISPLAY REGULATIONS Your exhibit booth display must comply with the regulations as outlined here. Please refer to your exhibit space confirmation letter or contract
More informationSECTION 6.3 DOWNTOWN HISTORIC DISTRICT (DTH)
SECTION 6.3 DOWNTOWN HISTORIC DISTRICT (DTH) A. Purpose Wylie's downtown has been identified by the Comprehensive Plan as a valuable resource worthy of preservation as a historic district. This district
More informationBUILDING INSPECTION DIVISION Vacant Property Notice Exterior & Interior Inspection Checklist
BUILDING INSPECTION DIVISION Vacant Property Notice Exterior & Interior Checklist The Charter Township of West Bloomfield Vacant Property Registration and Maintenance primary goal is to help protect the
More informationEdgewater Service Ltd
C/- BBC Strata Management Suite 42, 738 Burke Road CAMBERWELL 3124 GUIDELINES FOR THE ENCLOSURE OF A BALCONY Attached are the following documents: 1. Attachment 1: Requirements and Conditions for Enclosure
More informationSANDTOWN CROSSING PROFESSIONAL OFFICE PARK Atlanta, GA
Atlanta, GA LOCATED AT CAMP CREEK PARKWAY AND CAMPBELLTON ROAD For Sale or Lease Single units start at 1,176sf and can be combined to exact specification Custom Designed Medical and Professional finishes
More informationYou reserved a Bare Stand
You reserved a Bare Stand The following is included in your exhibit space rental fee: Floor marking of your space; A wooden partition (2.50 m high) covered with beige brushed cotton fabric (except for
More informationA field perspective-what the inspector looks for during a Racking inspection.
A field perspective-what the inspector looks for during a Racking inspection. Does existing space meet the code at time structure was built or has it been modified and now is non-conforming. LOOKING AT
More informationQLDC PROPOSED DISTRICT PLAN [PART THREE] AUGUST 2015 BUSINESS MIXED USE
16 QLDC PROPOSED DISTRICT PLAN [PART THREE] AUGUST 2015 16 b usiness mix ed use BUSINESS MIXED USE QLDC PROPOSED DISTRICT PLAN [PART THREE] AUGUST 2015 16 business mixed use 16.1 Purpose The intention
More informationA single sheet of plywood can be cut to produce several smaller pieces.
A single sheet of plywood can be cut to produce several smaller pieces. Engineering Design Process 1. On the grid provided in your Student Answer Booklet, draw a piece of plywood using the scale 2. On
More informationExhibitor Guidelines
Exhibitor Guidelines Booth Package A booth includes the following: Booths will be furnished with pipe and drape on the back and sides of booth. o 8 foot high backdrop o 3 foot high side panels o Please
More informationThe Versatile & Practical Choice. Gartec Goods Lifts. Modular & Customised
The Versatile & Practical Choice Gartec Goods Lifts Modular & Customised Gartec Goods lifts A success story The Gartec Goods Lift adds another great range to the Gartec portfolio. Throughout the world,
More informationSTAND ARCHITECTURE AND DECORATION RULES
STAND ARCHITECTURE AND DECORATION RULES CABINET DECO PLUS 13 RUE DE FOURQUEUX, SAINT GERMAIN EN LAYE France Tél +33 (0)9 67 78 93 85 europainarchi@free.fr STANDARDS AND REQUIREMENTS: CREATION, PRESENTATION
More informationAllocation of floor space ESA Partners have priority choice and booking of space until 31 October 2017.
The Trade Exhibition The trade exhibition has been designed to allow both large and small companies with interests in the field of anaesthesiology to participate. The exhibition area is located close to
More informationTraining Certification Categories
Training Certification Categories Residential Residential Building Inspector structures are free from hazardous structural conditions and comply with the UCC. Duties include inspection of footings and
More informationFENCE PERMIT APPLICATION
Department of Building, Zoning & Housing 26789 Highland Road Richmond Heights, Ohio 44143-1429 216-383-6312 Fax: 216-383-6319 richmondheightsohio.org FENCE PERMIT APPLICATION LOCATION OF JOB LOT # SUBDIVISION
More informationSANDTOWN CROSSING PROFESSIONAL OFFICE PARK Atlanta, GA
Atlanta, GA LOCATED AT CAMP CREEK PARKWAY AND CAMPBELLTON ROAD For Sale or Lease Single units start at 1,176sf and can be combined to exact specification Custom Designed Medical and Professional finishes
More informationADDENDUM NO Refer to Specifications Section Alternates. Clarifications to alternate descriptions are as follows:
ADDENDUM NO. 1 TO THE DRAWINGS AND SPECIFICATIONS FOR THE New Dishman-McGinnis Elementary School Bowling Green Independent Schools Bowling Green, Kentucky BG 12-256 RTA 1209 March 11, 2013 To All Plan
More informationINSPECTION REQUIREMENTS: FOUNDATIONS
Foundations Page 1 of 9 Revision Date: 1/2/2018 DEVELOPMENT SERVICES BUILDING INSPECTION INSPECTION REQUIREMENTS: FOUNDATIONS INSPECTION CODE: 204 SCOPE: RESIDENTIAL APPLICABLE CODES: 2016 CBC, CRC, CPC,
More informationDECORATION REGULATION
DECORATION REGULATION IMPORTANT : To avoid disputes, it is mandatory to submit for approval the scale stand layout plan before September, the 30 th with the following items: Plan as seen from above with
More informationArchitectural Subframe & Casement Windows
Architectural Subframe & Casement Windows The Metal Technology Architectural Subframe System is a complete thermally-broken framing and casement system with minimal fabrication, for all commercial and
More informationBUILDING SPECIFICATIONS
BUILDING SPECIFICATIONS FOUNDATION AND STRUCTURE Foundations using reinforced concrete slabs, according to the data of the geotechnical study, complying with building standard CTE-DB-SE-C. Concrete walls
More informationTechnical regulations
Technical Exhibition CIGRE 2018 August 27 > 31 Palais des Congrès, Paris Technical regulations These technical regulations have to be transmitted to your stand contractor A. Regulations for stand decoration
More informationSTAFF BRIEF. Excerpted from Design Guidelines for Denver Landmark Structures and Districts, January 2016
Community Planning and Development Denver Landmark Preservation 201 West Colfax, Dept. 205 Denver, CO 80202 p: 720.865.2709 f: 720.865.3050 www.denvergov.org/preservation STAFF BRIEF This document is the
More informationWhat is a Heritage Permit Application?
HERITAGE PERMIT APPLICATION SUBMISSION REQUIREMENTS City of Kitchener Community Services Department Planning Division 200 King Street West, 6 th Floor Kitchener, Ontario N2G 4G7 519-741-2426 The following
More informationNAME OF PROJECT Design Development. General Objectives of Phase. Phase Task Checklist. Quality Management Phase
General Objectives of Phase Drawings and other documents to fix and describe the size and character of the project as to architectural, structural, mechanical and electrical systems, materials and such
More informationPerformance Standards of Glass Products Manufactured by Pilkington IGP
Performance Standards of Glass Products Manufactured by Pilkington IGP Item # Item Standard term Deviations from standard terms, of which Pilkington IGP should be notified at the stage of request for quotation
More informationCentral Dartmouth Section Exterior Envelope Renovations METAL-CLAD WOOD DOORS Page 1 of 5 Dartmouth, NS
Exterior Envelope Renovations METAL-CLAD WOOD DOORS Page 1 of 5 Part 1 General 1. RELATED SECTIONS 1. Section 07 92 10 Joint Sealing 2. Section 08 71 00 Door Hardware 2. REFERENCES 1. American Society
More informationZ O N I N G B Y L A W N O
PROPOSAL SUBMITTED AT THE SECOND PUBLIC CONSULTATION MEETING (AUGUST 21) Modifications in «red» Modifications «in blue» following consultation (August 28) VILLAGE OF SENNEVILLE PROVINCE DE QUÉBEC Z O N
More informationHomeowners complain about having too much storage space about as often as they do about having an overabundance of cash. It just doesn't happen.
Homeowners complain about having too much storage space about as often as they do about having an overabundance of cash. It just doesn't happen. Nearly every home, regardless of its size, has a shortage
More informationREQUEST FOR ALTERATION REVIEW COPPERLEAF PROPERTY OWNERS ASSOCIATION, INC.
Please Complete The Following Name: Directions: 1. Fill in requested information 2. Attach required checks Address: 3. Attach required certificates 4. Sign required forms and return to: Lot number: GRS
More informationOnline Personal Design Packet
Online Personal Design Packet All Plywood Cabinets Ships in 7-10 Days Limited Lifetime Warranty Factory Built to Order Online Personal Designer Prepared For Dee Signer designservices@hdckitchens.com Phone
More informationPART IV.1 EMPLOYMENT ZONES GENRAL PROVISIONS SPECIFIC TO EMPLOYMENT ZONES
PART IV.1 EMPLOYMENT ZONES GENRAL PROVISIONS SPECIFIC TO EMPLOYMENT ZONES 56. EMPLOYMENT ZONE USE DEFINITIONS a) deleted by By-law 2006-002 ; 57. PERMITTED USES WITHIN EMPLOYMENT ZONES AND MINIMUM PARKING
More informationSECTION 11 Architectural and Nonstructural Elements Field Investigation
SECTION 11 Architectural and Nonstructural Elements Field Investigation Types of Data to Be Collected and Recorded Research in these fields should be directed at determining the effect that architecture
More informationARCHITECTURAL GUIDELINES FOR THE DUCHY AIRPARK
ARCHITECTURAL GUIDELINES FOR THE DUCHY AIRPARK Quality and architectural harmony of the Duchy Airpark are the committee s primary goal. These guidelines are intended to provide supplementary information
More informationFence Requirements Permits and Inspections Division 151 W Church Street, Lewisville, Texas Phone: Fence Requirements
151 W Church Street, Lewisville, Fence Requirements General Information Any new fence or replacement fence exceeding 20 feet in length requires a permit. If a contractor is used, that contractor must be
More informationThe ARDEN Group Development Standards 05/17/13 Rezoning Petition No (University City Auto Mall) Site Development Data:
The ARDEN Group Development Standards 05/17/13 Rezoning Petition No. 2013-052 (University City Auto Mall) Site Development Data: --Site Acreage: +/- 39 Ac. --Tax Parcel #: 047-23-108 --Existing Zoning:
More informationIndustry Brasil MSK 6140 MSK MSK Industry / Industry / Industry /
Masking tape for general use in building and decoration Recommended for simple jobs, in indoor building painting and general use. Good adhesion. Removal within 24 hours. Adhesion: 4 N/25mm Elongation to
More informationUnitised Curtain Wall Beaded
Unitised Curtain Wall Beaded Glazed Frame Unitised Curtain Wall Reference Brand: Sapa Building System Elegance 72 GF GENERAL DESCRIPTION Unitised curtain wall system using glazing beads for glass retention.
More informationBC BUILDING CODE ERRATA
BC BUILDING CODE ERRATA The following changes should be made to print and offline copies of the 2012 BC Codes. The 2012 BC Codes subscription products include these changes. Highlighted text is used in
More informationCity of Kingston Engineering Department. Application for New Outdoor Patio. Note: Agreement:
City of Kingston Engineering Department Application for New Outdoor Patio Address of area to be leased: Applicant s Name: Business Name: Business Address: Telephone Number: Contact Name: Mailing Address:
More informationSECTION DOOR HARDWARE
SECTION 087100 -DOOR HARDWARE PART 1- GENERAL 1.1 RELATED DOCUMENTS Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections,
More informationSW40 Series Data sheet
SW40 Series Data sheet The SW40 aluminium-wood window blends the quality of the materials with the elegance of its design. The open-joint product is characterised by the full wood frame for wing and by
More informationHYBRID Curtain Wall HYBRID. Product Manual Curtain Wall 2008
HYBRID Curtain Wall HYBRID Product Manual Curtain Wall 2008 HCW.1.ii 10.08 Hybrid Curtain Wall Introduction The Company Senior Aluminium Systems are a group of companies based in the United Kingdom supported
More informationSection 1 OBC FADS /13 Access to Parking Areas
Section 1 OBC 3.8.2.2 4.3.12/13 Access to Parking Areas A barrier-free path of travel is provided from: a) the entrance to the exterior parking area b) at least one parking level where a passenger elevator
More informationDESIGN GUIDELINES FOR MULTI FAMILY AND ATTACHED SINGLE FAMILY INFILL HOUSING
DESIGN GUIDELINES FOR MULTI FAMILY AND ATTACHED SINGLE FAMILY INFILL HOUSING Multi family housing is an increasingly popular form of infill development in Shaker Heights because of the city s built out
More information3 Season Porch Windows
3 Season Porch Windows Technical Information Quad pulley balance system for smooth and reliable operation Stainless steel aircraft cable supports the counterbalanced sashes for easy ventilation Dual sashes
More informationJanuary 14, 2006 Structural Thesis Proposal: Structural and Breadth Redesign Options
River Tower at Christina Landing Wilmington, DE Joseph Bednarz Structural Option Faculty Advisor: Dr. Boothby Executive Summary January 14, 2006 Structural Thesis Proposal: Structural and Breadth Redesign
More informationRS TOWER 52 double width rolling tower
RS 2 double width rolling tower Professional use Up to 14.2 meter working height Double width rolling tower, large work surface Can be combined with all components from the RS -Series Wooden or lightweight
More informationSec Development Standards in P-N-T Districts.
Sec. 4-9. Development Standards in P-N-T Districts. a. Intent: The purpose of this district is to recognize predominately residential areas which: (1) Front along major or secondary arterial streets, (2)
More informationExhibit A EXISTING RTU TO BE SCREENED ' BUILDING A EXISTING TO BE RENOVATED 2,100 SF EXISTING LANDSCAPE AREA TO REMAIN NEW ENTRANCE AREA
Received April 9, 08 - AR Exhibit A MIXED USE WITH RESIDENTIAL 44' PROPOSED BUILDING TO MIXED USE BUILDING 6.8' LOT TO LOT DISTANCE TO RESIDENTIAL USE 87.5' BUILDING TO MIXED USE BUILDING 0' 78' 4.6' 0.64'
More informationSTUDIO DESIGN GUIDE. backyard escape studios made in ontario. Modern. Accessory Buildings BEAUTIFUL, CUSTOMIZED MODERN SHED SPACES FOR ALL YEAR USE.
STUDIO DESIGN GUIDE backyard escape studios made in ontario Modern Accessory Buildings BEAUTIFUL, CUSTOMIZED MODERN SHED SPACES FOR ALL YEAR USE. Kellner Innovations Inc. 1812 Ennismore Crescent London,
More informationSECTION DEMOUNTABLE WALLS SKY WALLS - STRATUS SYSTEM
1 SECTION 10.22.19 DEMOUNTABLE WALLS SKY WALLS - STRATUS SYSTEM PART 1 - GENERAL 1.01 SUMMARY A. This section includes: 1. Full height center-glazed, butt-jointed partition system. 2. Full height doors.
More informationSABISA South African Building Interior Systems Associations
SABISA South African Building Interior Systems Associations Web: http://www.aaamsa.co.za/ Address: CMA Conference Center Office Park 1st Floor, Block 4 2nd Road Halfway House Midrand Registered Postal
More informationFunctional Requirements for New Archery Facility
Functional Requirements for New Archery Facility Introduction The archery facility, which is proposed to replace and enhance that currently located at Jubilee Park, comprises three main components: an
More informationALL HANGING SIGNS MUST BE APPROVED BY PARAMOUNT
Hanging Sign Labor 6+Booths Only Discount Deadline Anaheim Convention Cetner Monday, January 08, 2018 Feb. 27 March 1, 2018 All orders MUST have a credit card on file. ALL HANGING SIGNS MUST BE APPROVED
More informationREQUEST FOR ARC APPROVAL
Oceanside Terrace Condo Association c/o Sea Breeze Community Management Services, Inc. 4227 Northlake Boulevard Palm Beach Gardens, FL 33410 (561) 626-0917 Fax: (561) 626-7143 www.seabreezecms.com REQUEST
More informationSITE ACCESSIBILITY AND PARKING
SITE ACCESSIBILITY AND PARKING The purpose of this handout is to clarify the requirements of site accessibility under the 2013 California Building Codes, Specifically, Section 11B. Each lot or parking
More informationThe Ashland Project. Total Area: 1,778 Sq.Ft. 3 Bedroom, 2 Bath, 2 Car Garage
The Ashland Project Total Area: 1,778 Sq.Ft. 3 Bedroom, 2 Bath, 2 Car Garage The garage and bedroom extend from the front of this three bedroom home, drawing you visually into the entryway. Brick and stucco
More informationMain Information to be Provided by the Developer
Section: Hea 1 Hea 1 Daylighting available: 3 Aim To improve the quality of life in homes through good daylighting, and to reduce the need for energy to light a home. Credit Requirements All dwellings
More informationThe S.15 ALL WOOD WITH ALUMINUM CORE LIFT & SLIDE DOOR SYSTEM. Expanding spaces to the extraordinary
The S.15 ALL WOOD WITH ALUMINUM CORE LIFT & SLIDE DOOR SYSTEM Expanding spaces to the extraordinary Overview Elevation View of a 4-panel Lift & Slide Door System - Stacked Configuration Panda s Lift &
More informationCITY OF DANA POINT SITE ACCESSIBILITY AND PARKING B103 SITE INTRODUCTION
INTRODUCTION CITY OF DANA POINT COMMUNITY DEVELOPMENT, BUILDING AND SAFETY 33282 Golden Lantern, Suite 209 Dana Point, CA 92629 949 248-3594 www.danapoint.org SITE ACCESSIBILITY AND PARKING B103 SITE 2013
More informationRAMP. up-graded FEMALE TOILETS. up-graded MALE NEW LANDSCAPING TOILETS. up-graded ROOM RAMP NEW LANDSCAPING RAMP EXIT RAMP NEW LANDSCAPING AMENITIES
STAGE A - FUNCTIONS SPACES OUTDOOR DECK Remove plasterboard wall between entry foyer and function room, and replace with full height glass wall. Replace existing doors to function room with large full
More information