NYSDOT DESIGN BUILD. Design-Build Info/Design-Build Moving forward/roles and Responsibilities 2015 Overview. AGC Conference December 10, 2015

Size: px
Start display at page:

Download "NYSDOT DESIGN BUILD. Design-Build Info/Design-Build Moving forward/roles and Responsibilities 2015 Overview. AGC Conference December 10, 2015"

Transcription

1 NYSDOT DESIGN BUILD Design-Build Info/Design-Build Moving forward/roles and Responsibilities 2015 Overview AGC Conference December 10, 2015 Where DOT is currently with Design-Build Websites Under procurement Potential Projects design-build-projects Past Performance # of Projects 23 projects awarded Average # of SOQs 5.5 Average # of Short-listing 4 Teams Low Bid/Not Low Bid 60.9%/39.1% Technical Quality/Cost(Best Value) 50%/50% 2 1

2 Where DOT is currently with Design-Build Stipends To be eligible for receipt of a stipend: * Pass all the Pass/Fail requirements * Score a min. raw score on the Quality/Technical portion - 60 points * Provide a competitive and reasonable price 150% of BV cost * of course you have to be unsuccessful To receive a stipend: * Have signed the stipend agreement in the allotted time * Have to provide invoices, paperwork, proper overhead etc. * Not have filed a protest 3 Where DOT is currently with Design-Build Information on Stipends * First 3 projects there were no stipends * 20 remaining projects were eligible for stipend payments * 0n the 20 projects 78 firms were Shortlisted * That corresponds to 58 potential stipend payments * 7 DB Teams withdrew before proposal due date =>> 51 * Of those 51 potential stipend payments 9 not eligible or did not receive - 4 failed the min. score requirement - 3 Failed the competitive and reasonable price requirement - 1 failed the Pass/Fail requirement - 1 did not submit invoices for the stipend 4 2

3 Where DOT is currently with Design-Build * Of the 42 remaining eligible stipend payments - 23 have been paid totaling $4.2 M - 19 are under process valued at a potential of $1.56M > 4 at OSC > 9 in Audit > 6 in Contracts 5 Where DOT is currently with Design-Build PLAs Of the 23 projects awarded to date 17 have had Due Diligence studies performed 5 PLAs have been executed on the 23 projects awarded to date 6 3

4 Where DOT is currently with Design-Build Past year changes Scoring - 0 to 5 0 to 10 LDs for changing personnel once project is awarded BTW we are now going to refer to this as a Key Personnel change Assessment Fee -- have to report on Past performance in next DB Stipend Agreement now due 20 Calendar days after Proposal due date Expanded the DBE past performance evaluation criteria Unrestricted number of ATCs that can be submitted Design Services Payment First month 10% 25% More specific on the schedule technical scoring relative to the sub-factors that comprise it. Key Personnel scores in RFQ carried forward to RFP 7 Where DOT is currently with Design-Build Past year changes Work Payment schedule-last three items 5%,2%,5% 2%,1%,2% Minimizing the inclusion of indicative plans Incentivizing more in the Design-Build contracts Worked with Industry to Modify wording for Key personnel the shall and should 8 4

5 Where DOT is headed with Design-Build RFQ Removal of the 3 major risks evaluation criteria and shortening of the requirements for SOQ submittal RFQ to SOQ due date 5 4 weeks LOI posting to release of RFQ 4 3 weeks RFP inclusion of 3 major risks and mitigation of those risks RFP Factors have to be consolidated so scores don t get diluted For clarity purposes when special specifications are noted in the RFP to be used then the copy of that specific spec. will be included in the contract documents Working with Industry to better define the Work Payment Schedule (WPS) or provide better mechanism for payment to avoid instances where Design-Builder is financing portions of project 9 Design on Design-Build Projects Roles and responsibilities of the Design-Builder Quality Control Roles and responsibilities of the Department Quality Assurance 10 5

6 Design-Builder s Organization NYSDOT Project Manager Executive Committee Project Director/Principal Executive Quality Manager Project Manager Design Quality Control Engineer Design Manager Resident Engineer Design Personnel 11 = Reporting Line = Line of Communication The Design-Builder s Role You own the Design it is your stamp, your liability, your errors, your impact on schedule The Design Quality Control To meet the requirements of the RFP, the approved quality control plan, the provisions of the referenced design manuals, the accepted standards of the Department, Part 9 of the RFP the proposal provided Non-conformance issues Reevaluation efforts relative to NEPA Shop Drawing reviews and approvals Risk evaluation, and assessment and subsequent decision 12 6

7 The Design-Builder s Role (cont.) Protect your Design, protect your professional ethics, protect your Professional Reputation, Protect your Professional License Environmental Permitting Affect the communication in the Design-Build process that results in quicker, more efficient turn around of produced documents/plans Obligation to see that your Design is built as designed Provide stamped drawings/plans and As-Built plans 13 Design Units Defining Design Units A distinct portion of the Project which is designed as a contiguous, integrated unit Design-Builder determines Design Units Design-Builder prepares written report detailing Design Units Description Review stages and dates Responsible Engineer Locations of design Design Quality Assurance Engineer reviews and comments on Design Unit Submissions and tracks resolution of Design-Builder responses to comments through submission of RFC Documents Release for Construction Initials of DQAE on sheets approved for release 14 7

8 NYSDOT Organization Chart Commissioner Design-Build Program Director NYSDOT Project Manager Design Quality Assurance Engineer (NYSDOT and Consultant) Communication Construction Quality Assurance Engineer (NYSDOT) 15 NYSDOT Organization Chart Design Quality Assurance Engineer Reports to Department s Project Manager Interfaces with: Design-Builder s Designers/Engineers NYSDOT Construction Quality Assurance Engineer Design QC Engineer s Activities and Performance Verifies DB Design Quality Control Plan is followed Examples of Work include: Overseeing Design QC Engineer s Activities Performing Design Reviews Tracking all review comments Verifying Contract and NYSDOT Standards are followed Identifying Non-Conformance Designs Requiring Justifications Ensuring Design Exceptions and Non-Standard Features Receive Proper Approvals Reviewing Final Design Documents and As Built Drawings Initialing Release for Construction Drawings 16 8

9 Design Oversight Role The Department Is the Design-Build Team following the Quality Control Plan? Are the Designs in compliance with the requirements of the RFP? Are the plans deviating from the Department s standards? Are the Designs in compliance with the Manuals referenced in the RFP? Is the approach that of which is presented in the DB team s proposal? Are Non-conformance issues being addressed timely and properly? For all intent purposes this is an auditing function! The amount and frequency is a function of the results to date. Problems will generate more frequent and potentially more intense scrutiny. Less problems should generate a less aggressive approach. 17 Contract Overview Project Specific Provisions RFP Part 3 -Project Requirements RFP Part 4 -Utility Requirements RFP Part 5 -Special Provisions RFP Part 6 -RFP Plans ( indicative/dirctive) RFP Part 7 -Engineering Data RFP Part 8 - Special Specifications RFP Part 9 The DB teams Proposal 18 9

10 Day to Day Roles and Responsibilities Key Differences Design-Build vs.. Design-Bid-Build Reporting Lines Non-conforming work in design Preferences Contract Requirements In RFP rather than in plans Design Audit Verbal and Written Comment Guidance Participation in Design-Builder Progress and Coordination Meetings Tools, Technology and Documentation 19 What is Quality? Other Issues of Interest There is an expression of fear in the delivering of quality that some have said are driving up the Design-Build costs In procurement there is an established minimum of quality that is called for in the RFP If you meet just those requirements you should get a score of 6-7. If you provide above and beyond your scores should be higher and likewise for proposals providing less than the minimum scores should be less Designers, Contractors, CI Firms and Material and Quality Testing Firms know what quality is and whether they are meeting quality expectations or trying to cut corners to save dollars There are defined good practices of Design There are the requirements of the RFP 20 10

11 Other Issues of Interest (cont.) There are the standards, standard specs., there s standard practices, your quality control plan, there s your proposal There are no preferences that you have to adhere to good standard practice What s in the RFP is the parameters you as a Design-Builder have to live within, absent an approved ATC, a Nonconformance justification that is accepted or an accepted RFI 21 Design-Builder Quality Organization Quality Manager (QM) The designated representative of the Design-Builder who is responsible for the overall Quality Program of the Design-Builder, including the quality of management, design, and construction Reports to Design-Builder Senior Management Interfaces with: Design QC Engineer Construction QC Engineer NYSDOT Design QA Engineer NYSDOT Construction QA Engineer Examples of Work includes: Ensures Design and Construction QC Engineers Comply with Quality Control Plan Prepares and Manages the DB Quality Control Plan 22 11

12 PDH Questions 1. What Minimum Quality/Technical score has to be obtained to receive a project s stipend? Answer: Quality/Technical score of at least 60 points must be achieved 23 PDH Questions 2. Why does the Department seek a competitive and reasonable price proposal? Answer: D A. To ensure the Design-Builder has submitted a best Price proposal to win the project and not just to collect the stipend. B. To ensure that all shortlisted teams were fully engaged and actively pursuing this project C. To ensure that the taxpayers are getting what they paid for D. All of the above 24 12

13 PDH Questions 3. Who owns the project design? A. The Design-builders Engineering Design firm B. The Department C. The Design-Builder D. All of the above Answer: C The Design- Builder is responsible for the design of the project work. 25 PDH Questions 4. Name the Questions that the Department is asking themselves and seeking to Audit as part of the Quality Assurance Oversight? Answer: Is the Design-Build Team following the Quality Control Plan? Are the Designs in compliance with the requirements of the RFP? Are the plans deviating from the Department s standards? Are the Designs in compliance with the Manuals referenced in the RFP? Is the approach that of which is presented in the DB team s proposal? Are Non-conformance issues being addressed timely and properly? 26 13

14 PDH Questions 5. In Design-Build projects what aspect of the process is key to scoring high on the Design-Build approach and key to expedited reviews and the successful completion of the project both within and external to the Design-Build team? Answer: Communication 27 Questions? 28 14

SH 183 Managed Lanes Project RFQ Q & A MATRIX #2. (June 4, 2013)

SH 183 Managed Lanes Project RFQ Q & A MATRIX #2. (June 4, 2013) SH 183 Managed Lanes Project RFQ Q & A MATRIX #2 (June 4, 2013) No. Current language states: Project experience provided by a parent or sister company of the Lead Engineering Firm, Lead Contractor or Lead

More information

Procurement Documents for Progressive Design-Build Projects

Procurement Documents for Progressive Design-Build Projects Procurement Documents for Progressive Design-Build Projects March 22, 2013 John Awezec, P.E., DBIA HDR Engineering, Inc. John Doller, P.E. Carollo Engineers, Inc. Peter Hughes Executive Director WDBC Model

More information

Commonwealth of Virginia

Commonwealth of Virginia Commonwealth of Virginia Alternative Project Delivery Division April 2017 Virginia Department of Transportation TABLE OF CONTENTS INTRODUCTION... 2 1.0 DEFINITIONS... 3 2.0 PRELIMINARY PROJECT SELECTION...

More information

Selection of the Regional Consultant List

Selection of the Regional Consultant List LOCAL DESIGN SERVICES AGREEMENT (LDSA) CONSULTANT SELECTION PROCEDURE A Request For Qualifications (RFQ) pursuant to the ad in the New York State Contract Reporter was made available to any architecture/engineering

More information

Third Party Contracts Quality Management Plan (TPCQMP) Revision 00 Issue Date: August 6, 2018

Third Party Contracts Quality Management Plan (TPCQMP) Revision 00 Issue Date: August 6, 2018 Third Party Contracts Quality Management Plan (TPCQMP) Revision 00 Issue Date: August 6, 2018 Northeast Illinois Regional Commuter Railroad Corporation 547 West Jackson Boulevard Chicago, Illinois 60661

More information

FREQUENTLY ASKED QUESTION FOR VDOT DESIGN-BUILD PROJECTS. June 1, 2013

FREQUENTLY ASKED QUESTION FOR VDOT DESIGN-BUILD PROJECTS. June 1, 2013 FREQUENTLY ASKED QUESTION FOR VDOT DESIGN-BUILD PROJECTS June 1, 2013 For general guidance the following information is provided as an aid to those preparing submittals in response to Design-Build solicitations.

More information

ARKANSAS STATE HIGHWAY AND TRANSPORTATION DEPARTMENT CONSULTANT SELECTION PROCEDURES FOR ENGINEERING AND DESIGN RELATED SERVICES

ARKANSAS STATE HIGHWAY AND TRANSPORTATION DEPARTMENT CONSULTANT SELECTION PROCEDURES FOR ENGINEERING AND DESIGN RELATED SERVICES ARKANSAS STATE HIGHWAY AND TRANSPORTATION DEPARTMENT CONSULTANT SELECTION PROCEDURES FOR ENGINEERING AND DESIGN RELATED SERVICES Section I Application (These procedures do not apply to Design-Build Contracts.)

More information

I. Development, Submittal, and Acceptance of a Quality Management System

I. Development, Submittal, and Acceptance of a Quality Management System I. Development, Submittal, and Acceptance of a Quality Management System 1. Scope Under the Contract, quality assurance and quality control management are the responsibility of the Contractor. The Contractor

More information

CQR-1. CONTRACTOR QUALITY REQUIREMENTS for CONSTRUCTION SERVICES Revision Date: 6/8/2015

CQR-1. CONTRACTOR QUALITY REQUIREMENTS for CONSTRUCTION SERVICES Revision Date: 6/8/2015 CQR-1 CONTRACTOR QUALITY REQUIREMENTS for CONSTRUCTION SERVICES Revision Date: 6/8/2015 SCOPE This document establishes the minimum quality program requirements for a contractor providing equipment, material,

More information

I-64 Hampton Roads Bridge-Tunnel Expansion Responses to Questions (Questions received as of February 7, 2018)

I-64 Hampton Roads Bridge-Tunnel Expansion Responses to Questions (Questions received as of February 7, 2018) Questions and Responses I-64 Hampton Roads Bridge-Tunnel Expansion Responses to Questions (Questions received as of February 7, 2018) Q10: The Quality Assurance Manager position as described is typically

More information

Long Beach City Auditor s Office

Long Beach City Auditor s Office Long Beach City Auditor s Office Contract Administration Audit Limited Scope Review Report 7 of 10 Utiliworks Consulting, LLC July 1, 2016 Laura L. Doud City Auditor Audit Team: Deborah K. Ellis Assistant

More information

Town of Bennington, Vermont Pleasant Street and School Street Sidewalk Installation STP EH08(11)

Town of Bennington, Vermont Pleasant Street and School Street Sidewalk Installation STP EH08(11) , Vermont Pleasant Street and School Street Sidewalk Installation STP EH08(11) Request for Qualifications Construction Inspection and Testing Services Issued: January 3, 2017 Due: January 24, 2017 I. INTRODUCTION

More information

Village of Farmingdale

Village of Farmingdale DIVISION OF LOCAL GOVERNMENT AND SCHOOL ACCOUNTABILITY REPORT OF EXAMINATION 2018M-100 Village of Farmingdale Procurement, Claims Audit and Check Signing OCTOBER 2018 Contents Report Highlights.............................

More information

Town of Brandon, Vermont US Route 7 (Center Street) Bridge 114 Improvements

Town of Brandon, Vermont US Route 7 (Center Street) Bridge 114 Improvements Town of Brandon, Vermont US Route 7 (Center Street) Bridge 114 Improvements Request for Qualifications Construction Owners Representative & Inspection Services Issued: January 11, 2018 Due: February 5,

More information

State of North Carolina Department of Health and Human Services

State of North Carolina Department of Health and Human Services State of North Carolina Department of Health and Human Services REQUEST FOR PROPOSAL (RFP) Addendum #6 Date: September 5, 2018 RFP Number: 30-180397 RFP Description: Independent Verification and Validation

More information

TABLE OF CONTENTS PROCEDURES AND FORMS

TABLE OF CONTENTS PROCEDURES AND FORMS Doc. No.: DQP001 Rev. Page DQP001-1 of 3 TABLE OF CONTENTS PROCEDURES AND FORMS Document No. Description Tab No. Latest Rev. No. Rev. Date DQP001 Table of Contents Procedures and Forms 5 0

More information

Florida Cleanroom Systems

Florida Cleanroom Systems Florida Cleanroom Systems Design Build Projects / Project Quality Control Plan (PQCP) Quality Control / Quality Assurance Manual May 2010 1 TABLE OF CONTENTS Section 1: Introduction 3 1.1 Defining Plan

More information

EXHIBIT 6 Preconstruction Work

EXHIBIT 6 Preconstruction Work EXHIBIT 6 Preconstruction Work The following tasks shall be accomplished by the CM/GC as part of its obligations during the preconstruction phase. The work is to be coordinated with the services requirements

More information

APPENDIX A DEFINITION OF PROFESSIONAL ENGINEERING CONSULTING SERVICES

APPENDIX A DEFINITION OF PROFESSIONAL ENGINEERING CONSULTING SERVICES Appendix A RFP No. 894-2014 Page 1 of 1 Template Version: SrC120131129 - Consulting Services RFP APPENDIX A DEFINITION OF PROFESSIONAL ENGINEERING CONSULTING SERVICES Revision: 2014-09-22 DEFINITION OF

More information

DESIGN-BUILD PROCUREMENT AND ADMINISTRATION

DESIGN-BUILD PROCUREMENT AND ADMINISTRATION Approved: Effective: April 15, 2015 Review: April 1, 2015 Office: Construction Topic No.: 625-020-010-l Department of Transportation 1.1 PURPOSE DESIGN-BUILD PROCUREMENT AND ADMINISTRATION SECTION 1 INTRODUCTION

More information

Gloucester Parkway Extension RFQ Information Meeting

Gloucester Parkway Extension RFQ Information Meeting Gloucester Parkway Extension RFQ Information Meeting May 24, 2013 Tim Hartzell, PE District Project Manager Kevin Reichert, PE APD Project Manager and POC Topics Project Location & Overview RFQ Information

More information

Quality Assurance Policy and Procedures

Quality Assurance Policy and Procedures 650 Montana Ave, Suite A Las Cruces, NM 88001 (575) 522-0430 www.rmgovernmentservices.com Quality Assurance Policy and Procedures PURPOSE. The purpose of this policy is to outline the quality assurance

More information

Texas School for the Blind and Visually Impaired Contract Management Guide

Texas School for the Blind and Visually Impaired Contract Management Guide Texas School for the Blind and Visually Impaired Contract Management Guide TSBVI Contract Management Guide Page 1 of 9 June 2017 TABLE OF CONTENTS Section Title Page No. 1. INTRODUCTION 3 2. PROCUREMENT

More information

COMMUNITY LIVING BRANT POLICY AND PROCEDURE MANUAL

COMMUNITY LIVING BRANT POLICY AND PROCEDURE MANUAL PAGE 1 of 7 FILE UNDER SECTION: 4 EFFECTIVE DATE: January 2012 REVISION DATE: APPROVAL DATE: January 2012 POLICY: This Policy includes the requirements that are set out in the Broader Public Sector (BPS)

More information

CONSTRUCTRION MANAGEMENT AT RISK ASHE December 13, 2011 Julio Alvarado Construction State Engineer

CONSTRUCTRION MANAGEMENT AT RISK ASHE December 13, 2011 Julio Alvarado Construction State Engineer CONSTRUCTRION MANAGEMENT AT RISK CM@R ASHE December 13, 2011 Julio Alvarado Construction State Engineer 1 Agenda Background What leads DOT s to CMAR? ADOT s Outlook on CMAR Project Updates CMAR Benefits

More information

Illinois State Board of Education Nutrition and Wellness Programs Division. Procurement: NSLP Equipment Assistance Grant

Illinois State Board of Education Nutrition and Wellness Programs Division. Procurement: NSLP Equipment Assistance Grant Illinois State Board of Education Nutrition and Wellness Programs Division Procurement: NSLP Equipment Assistance Grant 2 Applicable Procurement regulations: When purchasing equipment, you must follow

More information

Annex A. Templates for the Procurement Post Review Report

Annex A. Templates for the Procurement Post Review Report Annex A. Templates for the Procurement Post Review Report Country Loan / Credit / Trust Fund #: Project name*: Project ID: Name (s) of Implementing Agency (ies): TL: APS/PAS: Hub Coordinator Post Review

More information

ENGINEERING SERVICES Phase III Construction Engineering Services for the Benedictine Parkway Improvement Project

ENGINEERING SERVICES Phase III Construction Engineering Services for the Benedictine Parkway Improvement Project VILLAGE OF LISLE REQUEST FOR QUALIFICATIONS ( RFQ ) #1267 ENGINEERING SERVICES Phase III Construction Engineering Services for the Benedictine Parkway Improvement Project DUE BY: FEBRUARY 5, 2018 @ 11:00

More information

APPENDIX A. Consultant Solicitation for Fiscal Year for Four As-Needed Environmental Services Contracts. Issue Date: January 10, 2014

APPENDIX A. Consultant Solicitation for Fiscal Year for Four As-Needed Environmental Services Contracts. Issue Date: January 10, 2014 APPENDIX A INSTRUCTIONS FOR THE LA DOTD STANDARD FORM 24-102 As modified for the Port of New Orleans (SF 24-102) Revised September 2011 (herein referred to as PONO SF24-102) Consultant Solicitation for

More information

Procurement and the Auditor (The Remix) PRESENTED BY: SHAWNISE NEWSOME, VCO AND TANESHA STOKES, VCO OF THE AUDITOR OF PUBLIC ACCOUNTS

Procurement and the Auditor (The Remix) PRESENTED BY: SHAWNISE NEWSOME, VCO AND TANESHA STOKES, VCO OF THE AUDITOR OF PUBLIC ACCOUNTS Procurement and the Auditor (The Remix) PRESENTED BY: SHAWNISE NEWSOME, VCO AND TANESHA STOKES, VCO OF THE AUDITOR OF PUBLIC ACCOUNTS Auditing the Procurement Cycle Responsibilities of the Agency Agencies

More information

THE DESIGN / BUILD / OPERATE PROJECT DELIVERY METHOD

THE DESIGN / BUILD / OPERATE PROJECT DELIVERY METHOD THE DESIGN / BUILD / OPERATE PROJECT DELIVERY METHOD A How to Seminar For Industries and Municipalities ENVIRO EXPO 2000 - Session 18.2 May 11, 2000 1 Presentation Participants Paul B. Doran, P.E., Director

More information

Request for Qualifications For Master Agreement

Request for Qualifications For Master Agreement Page 1 of 11 Capital Planning & Development Request for Qualifications For Master Agreement University of Washington Request for Qualifications ON-CALL COMMISSIONING AUTHORITY SERVICES Submittal Date:

More information

Metropolitan Council

Metropolitan Council 2011-A17 Program Evaluation and Audit Metropolitan Council Professional Services Contracts Review August 15, 2011 INTRODUCTION Background Program Evaluation and Audit (Audit) recently conducted a review

More information

2007 Summer Meeting AASHTO Highway Subcommittee on Construction Project Quality for Design- Build

2007 Summer Meeting AASHTO Highway Subcommittee on Construction Project Quality for Design- Build 2007 Summer Meeting AASHTO Highway Subcommittee on Construction Project Quality for Design- Build by Bob Burns Quality Program Manual Requirements ISO 9001:2000; Third Edition and the guide for ISO 9004

More information

New York City Transit (NYCT) DATE: July 19, 2018 CONSTRUCTION/ARCHITECTURAL & ENGINEERING CONTRACT SOLICITATION NOTICE/PROJECT OVERVIEW MTA-NYCT IS NOW ADVERTISING FOR THE FOLLOWING: SSE #: 0000226381

More information

DRAFT ITEM GP-100 ITEM GP-100 CONTRACTOR QUALITY CONTROL PROGRAM 1.1 GENERAL

DRAFT ITEM GP-100 ITEM GP-100 CONTRACTOR QUALITY CONTROL PROGRAM 1.1 GENERAL 1.1 GENERAL When the specification requires a Contractor Quality Control Program, the Contractor shall establish, provide, and maintain an effective Quality Control Program that details the methods and

More information

Salt Lake Community College Policies and Procedures

Salt Lake Community College Policies and Procedures COLLEGE PROCUREMENT POLICY Board of Trustees Approval: 04/12/2017 POLICY 10.01 Page 1 of 1 I. POLICY All products and services purchased by the College shall be procured in compliance with applicable statutes,

More information

2016 National Tribal Transportation Conference

2016 National Tribal Transportation Conference Alaska Tribal Technical Assistance Program Center 2016 National Tribal Transportation Conference Construction Management Darrel Williams Introductions Introduction to Construction Administration Construction

More information

VILLAGE OF VERNON HILLS REQUEST FOR PROPOSAL FOR CONSTRUCTION MANAGER AT RISK SERVICES. Part I: Proposal Information

VILLAGE OF VERNON HILLS REQUEST FOR PROPOSAL FOR CONSTRUCTION MANAGER AT RISK SERVICES. Part I: Proposal Information VILLAGE OF VERNON HILLS REQUEST FOR PROPOSAL FOR CONSTRUCTION MANAGER AT RISK SERVICES Part I: Proposal Information A General Information The Village of Vernon Hills is soliciting proposals for construction

More information

Request for Decision. Audit Report - Transit and Community Arena Advertising Agreement. Recommendation SUMMARY. Presented: Tuesday, Aug 13, 2013

Request for Decision. Audit Report - Transit and Community Arena Advertising Agreement. Recommendation SUMMARY. Presented: Tuesday, Aug 13, 2013 Presented To: Audit Committee Request for Decision Audit Report - Transit and Community Arena Advertising Agreement Presented: Tuesday, Aug 13, 2013 Report Date Wednesday, Jul 24, 2013 Type: Presentations

More information

Design-Build Overview Alternate Project Delivery Office. Jeff Roby, P.E., DBIA Design-Build Program Manager Alternate Project Delivery Office

Design-Build Overview Alternate Project Delivery Office. Jeff Roby, P.E., DBIA Design-Build Program Manager Alternate Project Delivery Office Design-Build Overview Alternate Project Delivery Office Jeff Roby, P.E., DBIA Design-Build Program Manager Alternate Project Delivery Office July 17, 2013 Topics Guidance Documents Available Alternate

More information

Town of Shelburne, Vermont U.S. Route 7 and Falls Road Sidewalk Installation STP BP14(5) and STP SDWK(24)

Town of Shelburne, Vermont U.S. Route 7 and Falls Road Sidewalk Installation STP BP14(5) and STP SDWK(24) , Vermont U.S. Route 7 and Falls Road Sidewalk Installation STP BP14(5) and STP SDWK(24) Request for Qualifications Construction Inspection and Testing Services Issued: January 5, 2017 Due: February 2,

More information

SAN FRANCISCO PUBLIC UTILITIES COMMISSION INFRASTRUCTURE CONSTRUCTION MANAGEMENT PROCEDURES

SAN FRANCISCO PUBLIC UTILITIES COMMISSION INFRASTRUCTURE CONSTRUCTION MANAGEMENT PROCEDURES SAN FRANCISCO PUBLIC UTILITIES COMMISSION INFRASTRUCTURE CONSTRUCTION MANAGEMENT PROCEDURES SECTION: SFPUC INFRASTRUCTURE CONSTRUCTION MANAGEMENT PROCEDURE NO: 032 TITLE: SQS PLAN AND SURVEILLANCE PROCESS

More information

Request for Proposals (RFP) Information Technology Independent Verification and Validation RFP No IVV-B ADDENDUM NO.

Request for Proposals (RFP) Information Technology Independent Verification and Validation RFP No IVV-B ADDENDUM NO. Request for Proposals (RFP) Information Technology Independent Verification and Validation ADDENDUM NO. 2 Questions and Answers RFP Amendments September 2015 Contained herein are the responses to the questions

More information

Date: Telephone: Company Name: Address: City: State: Zip Code: Contact Person: Title: Authorized Signature:

Date: Telephone: Company Name: Address: City: State: Zip Code: Contact Person: Title: Authorized Signature: SUBMISSION INFORMATION Kenton County Fiscal Court P.O. Box 792 303 Court Street, Room 207 Covington, Kentucky 41012-0792 QUALIFICATION: Radio Project Phase II RFQ OPENING DATE: December 7, 2015 TIME: 2:00

More information

Subject: Statement of Qualifications for Public Safety Building Design

Subject: Statement of Qualifications for Public Safety Building Design March 5, 2010 Subject: Statement of Qualifications for Public Safety Building Design The City of Porterville seeks Statements of Qualification (SOQ) from qualified architectural and engineering firms for

More information

ATTACHMENT D SCOPE OF SERVICES

ATTACHMENT D SCOPE OF SERVICES ATTACHMENT D SCOPE OF SERVICES OBJECTIVE Owner s Capital Improvement Program (major capital, minor construction, repair, and rehabilitation projects) includes numerous construction and renovation projects.

More information

Design-Build. Authorization. Criteria Selection/Award Process. Design-Build Construction Engineering and Inspection

Design-Build. Authorization. Criteria Selection/Award Process. Design-Build Construction Engineering and Inspection DESIGN-BUILD Design-Build Authorization Project Selection Criteria Selection/Award Process Warranties Design-Build Construction Engineering and Inspection Materials Acceptance DESIGN-BUILD AUTHORIZATION

More information

ACCOUNTING SYSTEM/PROMPT PAYMENT

ACCOUNTING SYSTEM/PROMPT PAYMENT ACCOUNTING SYSTEM/PROMPT PAYMENT FILE: DIA TITLE: Timely Settlement of District Liabilities POLICY: Each principal or other person in charge of district funds used for external procurement of goods or

More information

Request for Proposal for Annual Financial Audit Services

Request for Proposal for Annual Financial Audit Services Request for Proposal for Annual Financial Audit Services RFP # 19_001 Jan 10, 2019 Page 1 I. RFP Timeline The following Timeline has been defined to efficiently solicit multiple competitive proposals,

More information

Town of Brandon, Vermont Brandon Union St. Sidewalk STP EH 05 (4) Request for Qualifications Construction Inspection and Testing Services

Town of Brandon, Vermont Brandon Union St. Sidewalk STP EH 05 (4) Request for Qualifications Construction Inspection and Testing Services , Vermont Brandon Union St. Sidewalk STP EH 05 (4) Request for Qualifications Construction Inspection and Testing Services Issued: March 13, 20192 Due: April 3, 2019 I. INTRODUCTION The, Vermont, herein

More information

Relationship-Based, Performance-Based Contracting (RPC)

Relationship-Based, Performance-Based Contracting (RPC) Relationship-Based, Performance-Based Contracting (RPC) for Professional Construction Management Services Presented at the: CMAA Owners Forum San Antonio, Texas May 17, 2011 Presented by: Robert Mannebach,

More information

Internal Audit Follow-Up Report

Internal Audit Follow-Up Report Internal Audit Follow-Up Report Professional Engineering Procurement Services (PEPS) Consultant Procurement Process TxDOT Internal Audit Division Objective To assess the status of corrective actions for

More information

INS QA Programme Requirements

INS QA Programme Requirements Specification Date: 20/3/17 INS QA Programme Requirements UNCONTROLLED WHEN PRINTED Author: J Cooch AUTHORISATION Date: 20/3/17 A Brown Owner: J Cooch (Signature) N.B. only required for hard copy If issued

More information

CALCULATION COVER SHEET

CALCULATION COVER SHEET Doc. No.: DQP410FA Rev. Page DQP410FA - 1 of 1 CALCULATION COVER SHEET Calculation Title: Calculation Number: Total Number of Pages (including cover sheet): Total Number of Computer Runs: Prepared

More information

REQUEST FOR QUALIFICATIONS FOR CONSTRUCTION MANAGER AT RISK (CMAR) SERVICES WITH GUARANTEED MAXIMUM PRICE

REQUEST FOR QUALIFICATIONS FOR CONSTRUCTION MANAGER AT RISK (CMAR) SERVICES WITH GUARANTEED MAXIMUM PRICE CAYUCOS SANITARY DISTRICT 200 Ash Avenue P.O. Box 333, Cayucos, California 93430-0333 www.cayucossd.org 805-995-3290 REQUEST FOR QUALIFICATIONS FOR CONSTRUCTION MANAGER AT RISK (CMAR) SERVICES WITH GUARANTEED

More information

Procurement 101. Tom Blaine Senior Research Associate, Public Procurement Research Center NASPO Honorary Member CPPO, FCPM, FCPA

Procurement 101. Tom Blaine Senior Research Associate, Public Procurement Research Center NASPO Honorary Member CPPO, FCPM, FCPA Procurement 101 Monica Wilkes NASPO Honorary Member and Procurement Consultant CPPO, CPPB Universal Public Procurement Certification Council (UPPCC) Board of Directors Tom Blaine Senior Research Associate,

More information

DESIGN-BID-BUILD CONSTRUCTION MANAGER AT RISK DESIGN-BUILD

DESIGN-BID-BUILD CONSTRUCTION MANAGER AT RISK DESIGN-BUILD OWNER OWNER OWNER DESIGNER GC DESIGNER DESIGN CONSULTANTS TRADE SUBS DESIGN CONSULTANTS TRADE SUBS DESIGN CONSULTANTS TRADE SUBS DESIGN-BID-BUILD CONSTRUCTION MANAGER AT RISK DESIGN-BUILD Contracts Communications

More information

ADDENDUM #2. Design/Build Contractor RFP Bid # for the. Joint-Use 21 st Century Post-Century Education Center.

ADDENDUM #2. Design/Build Contractor RFP Bid # for the. Joint-Use 21 st Century Post-Century Education Center. ADDENDUM #2 Design/Build Contractor RFP Bid #0606-14 for the Joint-Use 21 st Century Post-Century Education Center SJECCD California July 7, 2014 SAN JOSE EVERGREEN COMMUNITY COLLEGE DISTRICT 4750 San

More information

ALTERNATIVE PROJECT DELIVERY DIVISION

ALTERNATIVE PROJECT DELIVERY DIVISION VIRGINIA DEPARTMENT OF TRANSPORTATION ALTERNATIVE PROJECT DELIVERY DIVISION INSTRUCTIONAL AND INFORMATIONAL MEMORANDUM GENERAL SUBJECT: Design-Build Requirements for Advertisement SPECIFIC SUBJECT: APPROVED:

More information

As a state agency, the College administration is required to develop procedures for Construction Manager selection.

As a state agency, the College administration is required to develop procedures for Construction Manager selection. COLLEGE of CENTRAL FLORIDA ADMINISTRATIVE PROCEDURE Title: Construction Management Selection Process Page 1 of 2 Implementing Procedure For F.S. 1013.45 Date Approved: 09/11/02 Division: Administration

More information

Professional & Personal Service Contract Audit Follow-up

Professional & Personal Service Contract Audit Follow-up Professional & Personal Service Contract Audit Follow-up March 30, 2016 Report 201621 City Auditor: Jed Johnson, CIA, CGAP Major Contributor: Christy Rodriguez, CPA Senior Auditor Contents Overall Conclusion...

More information

VIRGINIA DEPARTMENT OF TRANSPORTATION

VIRGINIA DEPARTMENT OF TRANSPORTATION VIRGINIA DEPARTMENT OF TRANSPORTATION Minimum Requirements for Quality Assurance and Quality Control on Design Build and Public-Private Transportation Act Projects January 2012 July 2018 Contents Amendment

More information

I-64/ Route 15 (Zion Crossroads) RFQ Information Meeting

I-64/ Route 15 (Zion Crossroads) RFQ Information Meeting I-64/ Route 15 (Zion Crossroads) Diverging Diamond Interchange RFQ Information Meeting December 13, 2011 Brian Arnold District Project Manager Ian Millikan, PE APD Project Manager and POC Introduction

More information

THE CHILDREN S PLACE Solution. Manual for Vendors

THE CHILDREN S PLACE Solution. Manual for Vendors THE CHILDREN S PLACE Solution Manual for Vendors What is THE CHILDREN S PLACE Facility Maintenance Optimization Initiative? THE CHILDREN S PLACE, in coordination with FacilitySource, is providing transactional

More information

Request for Qualifications Statements

Request for Qualifications Statements Request for Qualifications Statements BND WATER DISTRIBUTION AND WASTEWATER TREATMENT ENGINEERING STATEMENTS ENGINEERING DESIGN SERVICES FOR BND WATER DISTRIBUTION AND WASTEWATER TREATMENT The Brownsville

More information

REQUEST FOR QUOTATION INVITATION

REQUEST FOR QUOTATION INVITATION CITY OF CHICAGO REQUEST FOR QUOTATION INVITATION FOR: RE: Chicago Police Candidate Background Investigative Services and Reporting Small Orders - Target Market Request for Quotation (RFQ) Specification

More information

SEMINOLE COUNTY OFFICE OF MANAGEMENT AND BUDGET PURCHASING DIVISION BLANKET PURCHASE ORDER PROCESS AUDIT. March 31, 1998

SEMINOLE COUNTY OFFICE OF MANAGEMENT AND BUDGET PURCHASING DIVISION BLANKET PURCHASE ORDER PROCESS AUDIT. March 31, 1998 SEMINOLE COUNTY OFFICE OF MANAGEMENT AND BUDGET PURCHASING DIVISION BLANKET PURCHASE ORDER PROCESS AUDIT March 31, 1998 March 31, 1998 The Honorable Randall C. Morris Chairman The Board of County Commissioners

More information

Design-Build Reconstruction of I-494 in Plymouth, Minnetonka and Eden Prairie, Minnesota. PMI MN 2009 Professional Development Days

Design-Build Reconstruction of I-494 in Plymouth, Minnetonka and Eden Prairie, Minnesota. PMI MN 2009 Professional Development Days Design-Build Reconstruction of I-494 in Plymouth, Minnetonka and Eden Prairie, Minnesota PMI MN 2009 Professional Development Days Agenda Project Overview Best Practices: Knowing the Right Things Doing

More information

IN-PILE CREEP RELAXATION AND POST-IRRADIATION THERMAL CREEP TESTING

IN-PILE CREEP RELAXATION AND POST-IRRADIATION THERMAL CREEP TESTING Page 1 / 11 Ver. 1.3 MANAGEMENT SPECIFICATION FOR THE IN-PILE CREEP RELAXATION AND POST-IRRADIATION THERMAL CREEP TESTING Abstract This document specifies the management requirements: the Supplier shall

More information

REQUEST FOR QUOTE RF44-Throwbot XT

REQUEST FOR QUOTE RF44-Throwbot XT REQUEST FOR QUOTE RF44-Throwbot XT Hard Copy Bids... Hard copy bids must be received on or before the due date and time listed above at the following physical location regardless of delivery method: 8543

More information

HOUSING AUTHORITY OF THE CITY OF BOULDER (dba Boulder Housing Partners)

HOUSING AUTHORITY OF THE CITY OF BOULDER (dba Boulder Housing Partners) HOUSING AUTHORITY OF THE CITY OF BOULDER (dba Boulder Housing Partners) SOLICITATION TYPE: DESCRIPTION: Request For Proposals Paperless Invoice Automation Software ISSUE DATE: 04/03/2018 DUE DATE: 04/20/2018

More information

Department of Public Works Division of Engineering. Nassau County, New York

Department of Public Works Division of Engineering. Nassau County, New York TOWN OF OYSTER BAY Department of Public Works Division of Engineering Nassau County, New York REQUEST FOR PROPOSALS FOR CONSULTANT SERVICES SOLICITATION NO. 2017-12 NOTES: 1. ISSUANCE DATE: Thursday, October

More information

MASSACHUSETTS STATE COLLEGE BUILDING AUTHORITY REQUEST FOR QUALIFICATIONS TRADE CONTRACTOR SERVICES PART I PROJECT INFORMATION AND DESCRIPTION OF WORK

MASSACHUSETTS STATE COLLEGE BUILDING AUTHORITY REQUEST FOR QUALIFICATIONS TRADE CONTRACTOR SERVICES PART I PROJECT INFORMATION AND DESCRIPTION OF WORK MASSACHUSETTS STATE COLLEGE BUILDING AUTHORITY REQUEST FOR QUALIFICATIONS TRADE CONTRACTOR SERVICES PART I PROJECT INFORMATION AND DESCRIPTION OF WORK DATE ISSUED: January 10, 2018 DEADLINE FOR WRITTEN

More information

REQUIREMENTS FOR PROCUREMENT BY THE COLORADO DEPARTMENT OF TRANSPORTATION OF DESIGN-BUILD CONTRACTS FOR TRANSPORTATION PROJECTS

REQUIREMENTS FOR PROCUREMENT BY THE COLORADO DEPARTMENT OF TRANSPORTATION OF DESIGN-BUILD CONTRACTS FOR TRANSPORTATION PROJECTS DEPARTMENT OF TRANSPORTATION Transportation Commission and Office of Transportation Safety REQUIREMENTS FOR PROCUREMENT BY THE COLORADO DEPARTMENT OF TRANSPORTATION OF DESIGN-BUILD CONTRACTS FOR TRANSPORTATION

More information

13. Contract Changes General Change Order Process

13. Contract Changes General Change Order Process 13. Contract Changes 13.1. General 13.2. Change Order Process 13.3. Equitable Adjustments 13.4. Interim Work Authorization 13.5. Requirements for Professional Seals 13.6. Supplemental Agreements 13.1.

More information

QUALITY ASSURANCE / QUALITY CONTROL POLICY

QUALITY ASSURANCE / QUALITY CONTROL POLICY QUALITY ASSURANCE / QUALITY CONTROL POLICY TABLE OF CONTENTS SI. NO. DETAILS 1. Introduction 2. Quality Policy and Objectives 3. Organization 4. Contract Review 5. Document and Data Control 6. Purchasing

More information

REQUEST FOR PROPOSAL

REQUEST FOR PROPOSAL REQUEST FOR PROPOSAL ACQUISITION & IMPLEMENTATION OF A CORPORATE WIDE BOX STYLED STANDARD LOCKERS Proposal Release Date: March 25, 2008 Proposal Due Date: April 25, 2008 Page - 1 - of 9 TABLE OF CONTENTS

More information

Recommended AASHTO Design-Build Procurement Guide

Recommended AASHTO Design-Build Procurement Guide Recommended AASHTO Design-Build Procurement Guide NCHRP Project 20-7/172 Presentation to the AASHTO Subcommittee on Design Annual Meeting Chicago, Illinois June 28, 2005 University of Colorado Keith R.

More information

Design-Build Terminology

Design-Build Terminology Design-Build Terminology This glossary is representative of the terminology used in the design-build community and advocated by the Canadian Design-Build Institute (CDBI). For definitions of contractual

More information

Solution Manual for Service Providers

Solution Manual for Service Providers Solution Manual for Service Providers Notice to Service Providers Terms and processes in this document may change from time to time. Notification of such changes will be provided to service providers by

More information

POLYCRAFT INCORPORATED QUALITY MANUAL Quality Manual QM -10 Approval: D. Wheeler.

POLYCRAFT INCORPORATED QUALITY MANUAL Quality Manual QM -10 Approval: D. Wheeler. Polycraft, Inc. QM - 10 Title: Polycraft, Inc. Quality Manual Copy Approval: D. Wheeler This Quality Manual is the sole property of Polycraft, Inc. and intended for exclusive use by the organization. This

More information

Product Realization. Ameritube LLC 1000 N. Hwy 77, Hillsboro TX Revision Level: Procedure No. A

Product Realization. Ameritube LLC 1000 N. Hwy 77, Hillsboro TX Revision Level: Procedure No. A 5/8/2012 Page No. 1 of 32 Date Description Of Change Signature Rev. Level 5/8/2012 New Document Jeremy Wilson Procedure pproval: Company Title: Date: Quality Manager 5/8/2012 5/8/2012 Page No. 2 of 32

More information

Ensuring the Best Outcome for your Banking RFP

Ensuring the Best Outcome for your Banking RFP Ensuring the Best Outcome for your Banking RFP Stefan Jaskulak, CTP CFIP DeKalb County Laurel Hord Hill, CTP Wells Fargo Bank GGFOA Annual Conference September 2014 1 Agenda Analyze Your Banking Services

More information

Central Consolidated School District Purchasing Procurement Guidelines

Central Consolidated School District Purchasing Procurement Guidelines Central Consolidated School District Purchasing Procurement Guidelines Procurement Purchasing Procedures: The following procedures have been implemented to comply with the State of New Mexico regulations

More information

SPROUTS Training Session: Procurement-Goods and Services Overview Reference Guide Date: June 23, 2015

SPROUTS Training Session: Procurement-Goods and Services Overview Reference Guide Date: June 23, 2015 1. Procurement methods at MSU A. Purchase Orders 1. A Purchase Order (PO) is a type of contract. For well-defined purchases it may be all that is required. Purchase Orders are to be completed in advance

More information

REQUEST FOR COMPETITIVE PROPOSALS FOR ARCHITECTURAL SERVICES CITY OF PERRIS

REQUEST FOR COMPETITIVE PROPOSALS FOR ARCHITECTURAL SERVICES CITY OF PERRIS REQUEST FOR COMPETITIVE PROPOSALS FOR ARCHITECTURAL SERVICES BY CITY OF PERRIS Perris, California December 4 th, 2018 City of Perris is requesting Competitive Proposals from licensed architectural firms

More information

APPENDIX D CONSTRUCTION PHASE CRITERIA

APPENDIX D CONSTRUCTION PHASE CRITERIA A. GENERAL REQUIREMENTS CONSTRUCTION PHASE CRITERIA For the Construction Phase of the Project, the Architect/Engineer (A/E) is responsible for providing project administration for the Owner in accordance

More information

SQAR-1. SUPPLIER QUALITY ASSURANCE REQUIREMENTS for DESIGN AND PROCUREMENT SERVICES Revision Date: 2/1/2018

SQAR-1. SUPPLIER QUALITY ASSURANCE REQUIREMENTS for DESIGN AND PROCUREMENT SERVICES Revision Date: 2/1/2018 SUPPLIER QUALITY ASSURANCE REQUIREMENTS for DESIGN AND PROCUREMENT SERVICES Revision Date: 2/1/2018 1.0 SCOPE This document establishes the quality program requirements for an organization providing engineering

More information

Kirk W Buffington, CPFIM, CPPO, C.P.M.,

Kirk W Buffington, CPFIM, CPPO, C.P.M., Kirk W Buffington, CPFIM, CPPO, C.P.M., An Overview We will be talking about: The elements of the RFP process Factors determining the selection of the procurement method The elements of risk and how they

More information

Supplier Quality Agreement

Supplier Quality Agreement Supplier Quality Agreement Clyde, OH Poplar Bluff, MO Brampton, Ontario Jeffersonville, IN Page 1 of 15 TABLE OF CONTENTS Table of Contents 1. Administrative Elements... 4 1.1. Scope... 4 1.2. Parties

More information

Missoula Parks & Recreation Missoula, Montana. California Street Bridge Repair and Maintenance PROJECT PR10-08CSB DESIGN/BUILD RFQ & PROJECT SCOPE

Missoula Parks & Recreation Missoula, Montana. California Street Bridge Repair and Maintenance PROJECT PR10-08CSB DESIGN/BUILD RFQ & PROJECT SCOPE Missoula Parks & Recreation Missoula, Montana California Street Bridge Repair and Maintenance PROJECT PR10-08CSB DESIGN/BUILD RFQ & PROJECT SCOPE 1 1.0 PROJECT INTRODUCTION Project Name: California Street

More information

Addendum No. 2 February 19, 2014 City University Construction Fund Engineering Design Services Requirements Contracts RFQ Project No.

Addendum No. 2 February 19, 2014 City University Construction Fund Engineering Design Services Requirements Contracts RFQ Project No. Facilities Planning, Construction, and Management Office of Financial Management Procurement Services 555 West 57 th Street 16 th Floor New York, NY 10019 Tel: 646-664-2700 Addendum No. 2 February 19,

More information

Welcome. STAKEHOLDER ENGAGEMENT WORKSHOP. New Thinking New Beginning

Welcome. STAKEHOLDER ENGAGEMENT WORKSHOP. New Thinking New Beginning Welcome. STAKEHOLDER ENGAGEMENT WORKSHOP New Thinking New Beginning SPPRA CIRCULARS SPPRA Circular No.1 of 2015 :CONTROL OF PRICES PAID BY PROCURING ENTITIES TO PREVENT AWARDING OF CONTRACTS TO TENDERERS

More information

REQUEST FOR PROPOSAL FOR. CONSTRUCTION MANAGER and DESIGN TEAM FOR. Downtown Preservation Project URBAN RE DEVELOPMENT AUTHORITY OF PITTSBURGH

REQUEST FOR PROPOSAL FOR. CONSTRUCTION MANAGER and DESIGN TEAM FOR. Downtown Preservation Project URBAN RE DEVELOPMENT AUTHORITY OF PITTSBURGH REQUEST FOR PROPOSAL FOR CONSTRUCTION MANAGER and DESIGN TEAM FOR Downtown Preservation Project URBAN RE DEVELOPMENT AUTHORITY OF PITTSBURGH December 2010 I. GENERAL The Urban Redevelopment Authority of

More information

August 31, To Whom It May Concern:

August 31, To Whom It May Concern: August 31, 2017 To Whom It May Concern: The Aerotropolis Atlanta Community Improvement Districts (AACIDs) is soliciting Statements of Qualifications (RFQ) from qualified firm(s) or organization(s) to develop

More information

DATE: 05/03/2018. REQUEST FOR PROPOSAL: No. RFP/2018/UNHCR/PSP/MENA/001 FOR THE ESTABLISHMENT OF A FRAME AGREEMENT FOR THE PROVISION OF

DATE: 05/03/2018. REQUEST FOR PROPOSAL: No. RFP/2018/UNHCR/PSP/MENA/001 FOR THE ESTABLISHMENT OF A FRAME AGREEMENT FOR THE PROVISION OF DATE: 05/03/2018 REQUEST FOR PROPOSAL: No. RFP/2018/UNHCR/PSP/MENA/001 FOR THE ESTABLISHMENT OF A FRAME AGREEMENT FOR THE PROVISION OF Recruitment and staff administration services in Gulf Cooperation

More information

Progressive Design-Build

Progressive Design-Build November 15,2016 Progressive Design-Build A Smart Alternative to Lease/Lease back? PRESENTERS Praful Kulkarni, AIA Rebekah Gladson, FAIA, DBIA Robynne T. Parkinson, JD, DBIA Presentation Outline Value

More information

ANCHOR ISO9001:2008 RPR-007 MARINE SERVICES ADDITIONAL PROCEDURE PRODUCT REALISATION

ANCHOR ISO9001:2008 RPR-007 MARINE SERVICES ADDITIONAL PROCEDURE PRODUCT REALISATION PRODUCT REALISATION Document Control Revision History PAGE REASON FOR CHANGE REV. REVIEWER / AUTHORISED BY: RELEASE DATE: ALL NEW DOCUMENT A J.BENTINK 5/08/2016 Revision Approval: J.BENTINK Signature:

More information