5. Estimate Prepared by: The CWEs were prepared by the Alaska District Cost Engineering Branch in accordance with ER

Size: px
Start display at page:

Download "5. Estimate Prepared by: The CWEs were prepared by the Alaska District Cost Engineering Branch in accordance with ER"

Transcription

1 Basis of Cost Estimate: 1. The purpose of this cost estimate basis is to document methods and reference materials used; and to describe how rates, prices and costs were developed to produce the Feasibility Study Alternatives Estimates (CWE). 2. Project Title: Kenai Bluffs Bank Stabilization, Alaska 3. Brief Description of Project: The purpose of this study is to identify a design to stabilize the bluff along a one-mile reach of riverbank at the mouth of the Kenai River that is subject to wave attack during storms. The proposed project location is just upstream of the mouth of the Kenai River where it meets Cook Inlet. The site is characterized by a steep eroding bluff approximately 70 feet high on the north side and a low lying wetland and tide flat on the south side. 4. Documents Referenced for Scope of Work: Alternatives Drawings, Technical Specifications, and the Feasibility Report. Quantities and dimensions were verified with the project designers. Project conditions and construction costing were based upon the alternatives presented in APPENDIX A, HYDRAULIC DESIGN. Lands and Damages costs, and quantities for Relocations were provided by the Real Estate branch. PED, SIOH and the Cultural Resources costs were provided by the PM/PF. 5. Estimate Prepared by: The CWEs were prepared by the Alaska District Cost Engineering Branch in accordance with ER Cost References: The following is a list of the various cost resources used to develop the Alternatives construction cost estimates: Historical Data A-E estimates CEDEP Vendor Quotes Estimators Judgment 7. Pricing for this estimate was developed through application of the markups below. Direct M/U: Productivity 100% Work Shift 6-12 s Sales Tax 0% Payroll Tax AK WCI Class Excavation LS&H 100% Contractor M/U: JOOH 65% HOOH 7% Profit 8.87% Bond 0.71% Owner M/U:

2 **** TOTAL PROJECT COST SUMMARY **** Printed:5/10/2017 Page 1 of 3 PROJECT: Kenai River Bluff Stabilization ALT#2 CWE - Revised DISTRICT: Alaska District PREPARED: 4/27/2017 PROJECT NO: P POC: CHIEF, COST ENGINEERING, Karl Harvey LOCATION: Kenai, AK This Estimate reflects the scope and schedule in report; Kenai River Bluff Stabilization Sec 116 Study May 2017 Civil Works Work Breakdown Structure ESTIMATED COST PROJECT FIRST COST (Constant Dollar Basis) TOTAL PROJECT COST (FULLY FUNDED) Program Year (Budget EC): 2018 Effective Price Level Date: 1 OCT 17 Spent Thru: TOTAL WBS Civil Works COST CNTG CNTG TOTAL ESC COST CNTG TOTAL 1-Oct-16 FIRST COST INFLATED COST CNTG FULL NUMBER Feature & Sub-Feature Description ($K) ($K) (%) ($K) (%) ($K) ($K) ($K) ($K) ($K) (%) ($K) ($K) ($K) A B C D E F G H I J K L M N O 02 RELOCATIONS $0 $0 - $0 - $0 $0 $0 $0 $0 - $0 $0 $0 09 CHANNELS & CANALS $1,101 $ % $1, % $1,121 $224 $1,345 $0 $1, % $1,143 $229 $1, CHANNELS & CANALS $336,519 $67, % $403, % $342,737 $68,547 $411,284 $0 $411, % $358,109 $71,622 $429,731 #N/A $0 $0 - $0 - $0 $0 $0 $0 $0 - $0 $0 $0 #N/A $0 $0 - $0 - $0 $0 $0 $0 $0 - $0 $0 $0 #N/A $0 $0 - $0 - $0 $0 $0 $0 $0 - $0 $0 $0 #N/A $0 $0 - $0 - $0 $0 $0 $0 $0 - $0 $0 $0 #N/A $0 $0 - $0 - $0 $0 $0 $0 $0 - $0 $0 $0 CONSTRUCTION ESTIMATE TOTALS: $337,619 $67,524 $405, % $343,858 $68,772 $412,630 $0 $412, % $359,252 $71,850 $431, LANDS AND DAMAGES $1,355 $ % $1, % $1,380 $276 $1,656 $0 $1, % $1,392 $278 $1, PLANNING, ENGINEERING & DESIGN $10,000 $2, % $12, % $10,361 $2,072 $12,433 $0 $12, % $10,537 $2,107 $12, CONSTRUCTION MANAGEMENT $5,000 $1, % $6, % $5,180 $1,036 $6,216 $0 $6, % $5,486 $1,097 $6,584 PROJECT COST TOTALS: $353,974 $70, % $424,769 $360,779 $72,156 $432,934 $0 $432, % $376,668 $75,334 $452,001 CHIEF, COST ENGINEERING, Karl Harvey PROJECT MANAGER, Ronnie Barcak ESTIMATED TOTAL PROJECT COST: $452,001 CHIEF, REAL ESTATE, Michael Coy CHIEF, PLANNING, Cindy Upah CHIEF, ENGINEERING SERVICES, Doug Bliss CHIEF, OPERATIONS, Julie Anderson CHIEF, CONSTRUCTION, Jim Jeffords CHIEF, CONTRACTING, Chris Tew CHIEF, RM, Karen Farmer CHIEF, DPM-CW, Bruce Sexauer Filename: Kenai River Bluffs Alt#2 TPCS May 2017 r1.xlsx TPCS

3 **** TOTAL PROJECT COST SUMMARY **** Printed:5/10/2017 Page 2 of 3 **** CONTRACT COST SUMMARY **** PROJECT: Kenai River Bluff Stabilization ALT#2 CWE - Revised DISTRICT: Alaska District PREPARED: 4/27/2017 LOCATION: Kenai, AK POC: CHIEF, COST ENGINEERING, Karl Harvey This Estimate reflects the scope and schedule in report; Kenai River Bluff Stabilization Sec 116 Study May 2017 Civil Works Work Breakdown Structure ESTIMATED COST PROJECT FIRST COST (Constant Dollar Basis) TOTAL PROJECT COST (FULLY FUNDED) Estimate Prepared: Effective Price Level: 10-Apr-17 Program Year (Budget EC): Oct-16 Effective Price Level Date: 1 OCT 17 RISK BASED WBS Civil Works COST CNTG CNTG TOTAL ESC COST CNTG TOTAL Mid-Point INFLATED COST CNTG FULL NUMBER Feature & Sub-Feature Description ($K) ($K) (%) ($K) (%) ($K) ($K) ($K) Date (%) ($K) ($K) ($K) A B C D E F G H I J P L M N O FEDERAL SHARED COSTS 02 RELOCATIONS $0 $0 0.0% $0 0.0% $0 $0 $ % $0 $0 $0 09 CHANNELS & CANALS $1,101 $ % $1, % $1,121 $224 $1, Q1 1.9% $1,143 $229 $1, CHANNELS & CANALS $336,519 $67, % $403, % $342,737 $68,547 $411, Q2 4.5% $358,109 $71,622 $429,731 CONSTRUCTION ESTIMATE TOTALS: $337,619 $67, % $405,143 $343,858 $68,772 $412,630 $359,252 $71,850 $431, LANDS AND DAMAGES $1,355 $ % $1, % $1,380 $276 $1, Q3 0.9% $1,392 $278 $1, PLANNING, ENGINEERING & DESIGN 0.3% Project Management $1,054 $ % $1, % $1,092 $218 $1, Q2 0.9% $1,102 $220 $1, % Planning & Environmental Compliance $675 $ % $ % $699 $140 $ Q2 0.9% $706 $141 $ % Engineering & Design $2,026 $ % $2, % $2,099 $420 $2, Q2 0.9% $2,119 $424 $2, % Reviews, ATRs, IEPRs, VE $675 $ % $ % $699 $140 $ Q2 0.9% $706 $141 $ % Life Cycle Updates (cost, schedule, risks) $1,013 $ % $1, % $1,050 $210 $1, Q2 0.9% $1,059 $212 $1, % Contracting & Reprographics $1,350 $ % $1, % $1,399 $280 $1, Q2 0.9% $1,412 $282 $1, % Engineering During Construction $675 $ % $ % $699 $140 $ Q3 5.9% $741 $148 $ % Planning During Construction $844 $ % $1, % $874 $175 $1, Q3 5.9% $926 $185 $1, % Project Operations $1,688 $ % $2, % $1,749 $350 $2, Q2 0.9% $1,765 $353 $2, CONSTRUCTION MANAGEMENT 0.2% Construction Management $675 $ % $ % $699 $140 $ Q3 5.9% $741 $148 $ % Project Operation: $2,195 $ % $2, % $2,274 $455 $2, Q3 5.9% $2,408 $482 $2, % Project Management $2,130 $ % $2, % $2,207 $441 $2, Q3 5.9% $2,337 $467 $2,805 CONTRACT COST TOTALS: $353,974 $70,795 $424,769 $360,779 $72,156 $432,934 $376,668 $75,334 $452,001 Filename: Kenai River Bluffs Alt#2 TPCS May 2017 r1.xlsx TPCS

4 **** TOTAL PROJECT COST SUMMARY **** Printed:5/10/2017 Page 3 of 3 **** CONTRACT COST SUMMARY **** PROJECT: Kenai River Bluff Stabilization ALT#2 CWE - Revised DISTRICT: Alaska District PREPARED: 4/27/2017 LOCATION: Kenai, AK POC: CHIEF, COST ENGINEERING, Karl Harvey This Estimate reflects the scope and schedule in report; Kenai River Bluff Stabilization Sec 116 Study May 2017 Civil Works Work Breakdown Structure ESTIMATED COST PROJECT FIRST COST (Constant Dollar Basis) TOTAL PROJECT COST (FULLY FUNDED) Estimate Prepared: Effective Price Level: 10-Apr-17 Program Year (Budget EC): Oct-16 Effective Price Level Date: 1 OCT 17 WBS Civil Works COST CNTG CNTG TOTAL ESC COST CNTG TOTAL Mid-Point INFLATED COST CNTG FULL NUMBER Feature & Sub-Feature Description ($K) ($K) (%) ($K) (%) ($K) ($K) ($K) Date (%) ($K) ($K) ($K) A B C D E F G H I J P L M N O LOCAL SERVICE FACILITITES 02 RELOCATIONS $0 $0 0.0% $0 0.0% $0 $0 $ % $0 $0 $0 09 CHANNELS & CANALS $0 $0 0.0% $0 0.0% $0 $0 $ % $0 $0 $0 09 CHANNELS & CANALS $0 $0 0.0% $0 0.0% $0 $0 $ % $0 $0 $0 CONSTRUCTION ESTIMATE TOTALS: $0 $0 0.0% $0 $0 $0 $0 $0 $0 $0 01 LANDS AND DAMAGES $0 $0 0.0% $0 0.0% $0 $0 $ % $0 $0 $0 30 PLANNING, ENGINEERING & DESIGN 0.3% Project Management $0 $0 0.0% $0 0.0% $0 $0 $ % $0 $0 $0 0.2% Planning & Environmental Compliance $0 $0 0.0% $0 0.0% $0 $0 $ % $0 $0 $0 0.6% Engineering & Design $0 $0 0.0% $0 0.0% $0 $0 $ % $0 $0 $0 0.2% Reviews, ATRs, IEPRs, VE $0 $0 0.0% $0 0.0% $0 $0 $ % $0 $0 $0 0.3% Life Cycle Updates (cost, schedule, risks) $0 $0 0.0% $0 0.0% $0 $0 $ % $0 $0 $0 0.4% Contracting & Reprographics $0 $0 0.0% $0 0.0% $0 $0 $ % $0 $0 $0 0.2% Engineering During Construction $0 $0 0.0% $0 0.0% $0 $0 $ % $0 $0 $0 0.3% Planning During Construction $0 $0 0.0% $0 0.0% $0 $0 $ % $0 $0 $0 0.5% Project Operations $0 $0 0.0% $0 0.0% $0 $0 $ % $0 $0 $0 31 CONSTRUCTION MANAGEMENT 0.2% Construction Management $0 $0 0.0% $0 0.0% $0 $0 $ % $0 $0 $0 0.7% Project Operation: $0 $0 0.0% $0 0.0% $0 $0 $ % $0 $0 $0 0.6% Project Management $0 $0 0.0% $0 0.0% $0 $0 $ % $0 $0 $0 CONTRACT COST TOTALS: $0 $0 $0 $0 $0 $0 $0 $0 $0 Filename: Kenai River Bluffs Alt#2 TPCS May 2017 r1.xlsx TPCS

5 Contingency 20% SIOH 8% Escalation 5.15% 8. Factors impacting the estimate: The earthwork project includes materials, labor, and heavy equipment costs. Long transport distances for materials and mobilization translate to increased labor time and fuel costs. Fuel price is volatile in Alaska. Weather is a direct impact on working in the marine coastal environment with landbased and floating equipment. There are environmental windows to complete the work, and marine vessel traffic in Kenai River is busy in summer fishing season. This work has moderate to above average risk. 9. Major Assumptions: The Contractor will furnish all labor, equipment, supplies and materials to accomplish the work. There is no local material source and little competition for quarry materials. The earthwork is well understood, but access to the bluff toe is difficult with unstable slopes, tides, winds and eroding banks. To deliver materials and equipment to the slope toe, temporary pads will be needed at the river bank. A combination of land-based and floating marine equipment is needed. Construction mid-point is assumed to be Dec Off-season work may be required, but revetment construction in freezing weather is not satisfactory. A Cost and Schedule Risk Analysis will be required for the TSP and cost certification. Al Arruda, CCC. Date Karl J. Harvey, PE, CCE. Date Senior Cost Engineer Chief, Cost Engineering Branch

6 Print Date Wed 10 May 2017 U.S. Army Corps of Engineers Time 16:43:32 Eff. Date 4/15/2017 Project : Kenai River Mouth Relocation Alt#2 (4) CWE - River Mouth Relocation (Jetties) COE Standard Report Selections Title Page Kenai River Mouth Relocation Alt#2 (4) CWE - River Mouth Relocation (Jetties) The Secretary of the Army was directed in the Energy and Water Development Appropriations Act of 2002, Senate Report , to expend up to $500,000 to conduct a "special technical evaluation of bank stabilization needs along the lower Kenai River." Kenai is located on the western coast of the Kenai Peninsula, fronting Cook Inlet. It is approximately 65 air miles and 155 highway miles southwest of Anchorage. Problem Definition: For many years the City of Kenai has been concerned with the ongoing erosion of a one-mile portion of the steep bluff along the north bank of the Kenai River, just upstream of the river mouth. Over the past few decades the bluff has been significantly receding, requiring the relocation of privately owned buildings, as well as city infrastructure and utilities. Unless measures to control the erosion and protect the bluff are implemented, bluff erosion is expected to continue, further threatening existing buildings, infrastructure, and utilities within the city in proximity to the bluff. The top of the bluff intersects approximately 46 parcels in the project area. According to the Kenai Peninsula Borough s GIS maps, several parcels that appear to have previously been located at the top of the bluff are now along the bluff toe or in the water due to bluff recession. As such, all alternatives will involve temporary construction easements or permanent acquisition of some properties to accommodate the work and/or cut back slope. The project design life to be used in calculations of economic costs and benefits, as well as material specifications, is 50 years. Estimated maintenance costs for the duration of the project life will be amortized and compared as a present value. The cost of any material expected to need replacement within the project life will be added to the project costs. Climate data are compiled by the Western Regional Climate Center (WRCC). Extreme temperatures have ranged from -47ºF to 93ºF. Temperatures typically stay above freezing for approximately 100 days during the summer season. The area receives approximately 19 inches of precipitation annually. The mean annual total snowfall is approximately 61 inches, with an average of approximately 12 inches of snow depth during winter months. Tide elevations at Kenai typically fluctuate with a range of approximately twenty vertical feet, reaching the toe of the bluff at high tide. River ice is prominent in the Kenai River during winter months. Both sea ice and river ice collect at the toe of the bluff. The project shall withstand forces from river ice and sea ice. The design alternatives shall minimize adverse environmental impacts. Estimated by Designed by Prepared by Tetra Tech/POA-EC-CE Tetra Tech Al Arruda Preparation Date 5/10/2017 Effective Date of Pricing 4/15/2017 Estimated Construction Time 730 Days This report is not copyrighted, but the information contained herein is For Official Use Only.

7 Print Date Wed 10 May 2017 U.S. Army Corps of Engineers Time 16:43:32 Eff. Date 4/15/2017 Project : Kenai River Mouth Relocation Alt#2 (4) CWE - River Mouth Relocation (Jetties) COE Standard Report Selections Project Cost Summary Report Page 1 Description Quantity UOM ContractCost Contingency MiscOwner Escalation ProjectCost Project Cost Summary Report 353,974,345 70,794, ,769,214 1,354, ,625, LANDS AND DAMAGES 1.00 EA 1,354, , ,625,826 1,042, ,250, AQUISITIONS 1.00 EA 1,042, , ,250, , , ADMINISTRATION 1.00 EA 312,500 62, , MOBILIZATION & DEMOBILIZATION 1.00 LS 1,100, , ,321,076 Mobilization 1.00 LS 550, , ,538 Demobilization 1.00 LS 550, , , CHANNELS AND CANALS 1.00 LS 336,518,593 67,303, ,822, ,518, ,822, River Channel Relocation 1.00 EA 336,518,593 67,303, ,822, Excavate New Nav Channel 3,912, BCY 34,397,931 6,879, ,277, Excavate Dry 3,842, BCY 29,795,200 5,959, ,754, Excavate Wet 70, BCY 647, , , Dredging 136, CY 3,917, , ,700,678 38, , Hydrographic Survey 1.00 EA 38,278 7, , Jetties 1,163, ECY 302,120,662 60,424, ,544, Armor 10.5 Ton 281, CY 12,881,872 2,576, ,458, Construct Jetty New A Rock 295, ECY 12,635,444 2,527, ,162, Environmental Observers 3, HR 246,428 49, ,714

8 Print Date Wed 10 May 2017 U.S. Army Corps of Engineers Time 16:43:32 Eff. Date 4/15/2017 Project : Kenai River Mouth Relocation Alt#2 (4) CWE - River Mouth Relocation (Jetties) COE Standard Report Selections Project Cost Summary Report Page 2 Description Quantity UOM ContractCost Contingency MiscOwner Escalation ProjectCost Armor 5 Ton 189, CY 11,187,337 2,237, ,424, Construct Breakwater repairs with new quarry run rock , CY 10,952,779 2,190, ,143, Environmental Observers 2, HR 234,558 46, , B Rock 1 Ton 117, CY 5,417,728 1,083, ,501, Construct Breakwater repairs with new quarry run rock , CY 5,324,916 1,064, ,389, Environmental Observers 1, HR 92,812 18, , B Rock 0.5 Ton 58, CY 3,134, , ,761, Construct Breakwater repairs with new quarry run rock , CY 3,088, , ,706, Environmental Observers HR 45,931 9, , C Rock 100 LB 204, CY 8,522,227 1,704, ,226, Construct Breakwater repairs with new quarry run rock , CY 8,368,105 1,673, ,041, Environmental Observers 1, HR 154,122 30, , C Rock 40 LB 85, CY 4,085, , ,902, Construct Breakwater repairs with new quarry run rock , CY 4,021, , ,825,423

9 Print Date Wed 10 May 2017 U.S. Army Corps of Engineers Time 16:43:32 Eff. Date 4/15/2017 Project : Kenai River Mouth Relocation Alt#2 (4) CWE - River Mouth Relocation (Jetties) COE Standard Report Selections Project Cost Summary Report Page 3 Description Quantity UOM ContractCost Contingency MiscOwner Escalation ProjectCost Environmental Observers HR 64,501 12, , Gravel 95, CY 14,324,514 2,864, ,189, Construct Breakwater repairs with new quarry run rock , CY 5,841,604 1,168, ,009,925 5, , Environmental Observers 1, HR 8,482,909 1,696, ,179, Construct Breakwater repairs with new quarry run rock , CY 8,368,105 1,673, ,041, Quarry Rock Fee 2,095, TON 209,085,007 41,817, ,902,008 47, , Transport between quarry and placement site EA 33,481,897 6,696, ,178,276 Crew for Transport between quarry and placement site , , HR 33,481,897 6,696, ,178, Equipment Standby HR 102,748 20, ,297 10,000, ,000, PED 1.00 EA 10,000,000 2,000, ,000,000 5,000, ,000, SIOH 1.00 EA 5,000,000 1,000, ,000,000

10 Print Date Wed 10 May 2017 U.S. Army Corps of Engineers Time 16:43:32 Eff. Date 4/15/2017 Project : Kenai River Mouth Relocation Alt#2 (4) CWE - River Mouth Relocation (Jetties) COE Standard Report Selections Table of Contents Description Page Project Cost Summary Report 1 01 LANDS AND DAMAGES 1 AQUISITIONS 1 ADMINISTRATION 1 09 MOBILIZATION & DEMOBILIZATION 1 Mobilization 1 Demobilization 1 09 CHANNELS AND CANALS 1 River Channel Relocation 1 Excavate New Nav Channel 1 Excavate Dry 1 Excavate Wet 1 Dredging 1 13 Hydrographic Survey 1 Jetties 1 Armor 10.5 Ton 1 Construct Jetty New A Rock 1 Environmental Observers 1 Armor 5 Ton Construct Breakwater repairs with new quarry run rock 2 Environmental Observers 2 B Rock 1 Ton Construct Breakwater repairs with new quarry run rock 2 Environmental Observers 2 B Rock 0.5 Ton Construct Breakwater repairs with new quarry run rock 2 Environmental Observers 2 C Rock 100 LB Construct Breakwater repairs with new quarry run rock 2 Environmental Observers 2 C Rock 40 LB Construct Breakwater repairs with new quarry run rock 2 Environmental Observers 3 Gravel Construct Breakwater repairs with new quarry run rock 3 Environmental Observers Construct Breakwater repairs with new quarry run rock 3 Quarry Rock Fee 3 Transport between quarry and placement site 3 Crew for Transport between quarry and placement site 3 Equipment Standby 3

11 Print Date Wed 10 May 2017 U.S. Army Corps of Engineers Time 16:43:32 Eff. Date 4/15/2017 Project : Kenai River Mouth Relocation Alt#2 (4) CWE - River Mouth Relocation (Jetties) COE Standard Report Selections Table of Contents Description Page 30 PED 3 31 SIOH 3

12 **** TOTAL PROJECT COST SUMMARY **** Printed:5/10/2017 Page 1 of 3 PROJECT: Kenai River Bluff Stabilization ALT#3 CWE - Revised DISTRICT: Alaska District PREPARED: 4/27/2017 PROJECT NO:P POC: CHIEF, COST ENGINEERING, Karl Harvey LOCATION: Kenai, AK This Estimate reflects the scope and schedule in report; Kenai River Bluff Stabilization Sec 116 Study May 2017 Civil Works Work Breakdown Structure ESTIMATED COST PROJECT FIRST COST (Constant Dollar Basis) TOTAL PROJECT COST (FULLY FUNDED) Program Year (Budget EC): 2018 Effective Price Level Date: 1 OCT 17 TOTAL Spent Thru: FIRST WBS Civil Works COST CNTG CNTG TOTAL ESC COST CNTG TOTAL 1-Oct-16 COST INFLATED COST CNTG FULL NUMBER Feature & Sub-Feature Description ($K) ($K) (%) ($K) (%) ($K) ($K) ($K) ($K) ($K) (%) ($K) ($K) ($K) A B C D E F G H I J K L M N O 02 RELOCATIONS $363 $ % $ % $369 $74 $443 $0 $ % $386 $77 $ BANK STABILIZATION $1,765 $ % $2, % $1,798 $360 $2,157 $0 $2, % $1,878 $376 $2, BANK STABILIZATION $25,563 $5, % $30, % $26,035 $5,207 $31,242 $0 $31, % $27,203 $5,441 $32, CULTURAL RESOURCE PRESERVATION $2,908 $ % $3, % $2,962 $592 $3,554 $0 $3, % $3,095 $619 $3,714 #N/A $0 $0 - $0 - $0 $0 $0 $0 $0 - $0 $0 $0 #N/A $0 $0 - $0 - $0 $0 $0 $0 $0 - $0 $0 $0 #N/A $0 $0 - $0 - $0 $0 $0 $0 $0 - $0 $0 $0 #N/A $0 $0 - $0 - $0 $0 $0 $0 $0 - $0 $0 $0 CONSTRUCTION ESTIMATE TOTALS: $30,598 $6,120 $36, % $31,164 $6,233 $37,397 $0 $37, % $32,562 $6,512 $39, LANDS AND DAMAGES $6,259 $1, % $7, % $6,375 $1,275 $7,650 $0 $7, % $6,433 $1,287 $7, PLANNING, ENGINEERING & DESIGN $4,000 $ % $4, % $4,144 $829 $4,973 $0 $4, % $4,246 $849 $5, CONSTRUCTION MANAGEMENT $2,000 $ % $2, % $2,072 $414 $2,487 $0 $2, % $2,258 $452 $2,710 PROJECT COST TOTALS: $42,858 $8, % $51,429 $43,755 $8,751 $52,506 $0 $52, % $45,498 $9,100 $54,598 CHIEF, COST ENGINEERING, Karl Harvey PROJECT MANAGER, Ronnie Barcak ESTIMATED TOTAL PROJECT COST: $54,598 CHIEF, REAL ESTATE, Michael Coy CHIEF, PLANNING, Cindy Upah CHIEF, ENGINEERING SERVICES, Doug Bliss CHIEF, OPERATIONS, Julie Anderson CHIEF, CONSTRUCTION, Jim Jeffords CHIEF, CONTRACTING, Chris Tew CHIEF, RM, Karen Farmer Filename: Kenai River Bluffs Alt#3 TPCS May 2017 r1.xlsx TPCS CHIEF, DPM-CW, Bruce Sexauer

13 **** TOTAL PROJECT COST SUMMARY **** Printed:5/10/2017 Page 2 of 3 **** CONTRACT COST SUMMARY **** PROJECT: Kenai River Bluff Stabilization ALT#3 CWE - Revised DISTRICT: Alaska District PREPARED: 4/27/2017 LOCATION: Kenai, AK POC: CHIEF, COST ENGINEERING, Karl Harvey This Estimate reflects the scope and schedule in report; Kenai River Bluff Stabilization Sec 116 Study May 2017 Civil Works Work Breakdown Structure ESTIMATED COST PROJECT FIRST COST (Constant Dollar Basis) TOTAL PROJECT COST (FULLY FUNDED) Estimate Prepared: Effective Price Level: 10-Apr-17 Program Year (Budget EC): Oct-16 Effective Price Level Date: 1 OCT 17 RISK BASED WBS Civil Works COST CNTG CNTG TOTAL ESC COST CNTG TOTAL Mid-Point INFLATED COST CNTG FULL NUMBER Feature & Sub-Feature Description ($K) ($K) (%) ($K) (%) ($K) ($K) ($K) Date (%) ($K) ($K) ($K) A B C D E F G H I J P L M N O FEDERAL SHARED COSTS 02 RELOCATIONS $363 $ % $ % $369 $74 $ Q2 4.5% $386 $77 $ BANK STABILIZATION $1,765 $ % $2, % $1,798 $360 $2, Q2 4.5% $1,878 $376 $2, BANK STABILIZATION $25,563 $5, % $30, % $26,035 $5,207 $31, Q2 4.5% $27,203 $5,441 $32, CULTURAL RESOURCE PRESERVATION $2,908 $ % $3, % $2,962 $592 $3, Q2 4.5% $3,095 $619 $3,714 CONSTRUCTION ESTIMATE TOTALS: $30,598 $6, % $36,718 $31,164 $6,233 $37,397 $32,562 $6,512 $39, LANDS AND DAMAGES $6,259 $1, % $7, % $6,375 $1,275 $7, Q3 0.9% $6,433 $1,287 $7, PLANNING, ENGINEERING & DESIGN 2.3% Project Management $696 $ % $ % $721 $144 $ Q2 0.9% $728 $146 $ % Planning & Environmental Compliance $259 $ % $ % $268 $54 $ Q2 0.9% $271 $54 $ % Engineering & Design $1,530 $ % $1, % $1,585 $317 $1, Q2 0.9% $1,600 $320 $1, % Reviews, ATRs, IEPRs, VE $153 $ % $ % $159 $32 $ Q2 0.9% $160 $32 $ % Life Cycle Updates (cost, schedule, risks) $153 $ % $ % $159 $32 $ Q2 0.9% $160 $32 $ % Contracting & Reprographics $153 $ % $ % $159 $32 $ Q2 0.9% $160 $32 $ % Engineering During Construction $153 $ % $ % $159 $32 $ Q2 9.0% $173 $35 $ % Planning During Construction $597 $ % $ % $619 $124 $ Q2 9.0% $674 $135 $ % Project Operations $306 $ % $ % $317 $63 $ Q2 0.9% $320 $64 $ CONSTRUCTION MANAGEMENT 2.5% Construction Management $752 $ % $ % $779 $156 $ Q2 9.0% $849 $170 $1, % Project Operation: $800 $ % $ % $829 $166 $ Q2 9.0% $903 $181 $1, % Project Management $448 $ % $ % $464 $93 $ Q2 9.0% $506 $101 $607 CONTRACT COST TOTALS: $42,858 $8,572 $51,429 $43,755 $8,751 $52,506 $45,498 $9,100 $54,598 Filename: Kenai River Bluffs Alt#3 TPCS May 2017 r1.xlsx TPCS

14 **** TOTAL PROJECT COST SUMMARY **** Printed:5/10/2017 Page 3 of 3 **** CONTRACT COST SUMMARY **** PROJECT: Kenai River Bluff Stabilization ALT#3 CWE - Revised DISTRICT: Alaska District PREPARED: 4/27/2017 LOCATION: Kenai, AK POC: CHIEF, COST ENGINEERING, Karl Harvey This Estimate reflects the scope and schedule in report; Kenai River Bluff Stabilization Sec 116 Study May 2017 Civil Works Work Breakdown Structure ESTIMATED COST PROJECT FIRST COST (Constant Dollar Basis) TOTAL PROJECT COST (FULLY FUNDED) Estimate Prepared: Effective Price Level: 10-Apr-17 Program Year (Budget EC): Oct-16 Effective Price Level Date: 1 OCT 17 WBS Civil Works COST CNTG CNTG TOTAL ESC COST CNTG TOTAL Mid-Point INFLATED COST CNTG FULL NUMBER Feature & Sub-Feature Description ($K) ($K) (%) ($K) (%) ($K) ($K) ($K) Date (%) ($K) ($K) ($K) A B C D E F G H I J P L M N O LOCAL SERVICE FACILITIES 02 RELOCATIONS $0 $0 0.0% $0 0.0% $0 $0 $ % $0 $0 $0 16 BANK STABILIZATION $0 $0 0.0% $0 0.0% $0 $0 $ % $0 $0 $0 16 BANK STABILIZATION $0 $0 0.0% $0 0.0% $0 $0 $ % $0 $0 $0 18 CULTURAL RESOURCE PRESERVATION $0 $0 0.0% $0 0.0% $0 $0 $ % $0 $0 $0 CONSTRUCTION ESTIMATE TOTALS: $0 $0 0.0% $0 $0 $0 $0 $0 $0 $0 01 LANDS AND DAMAGES $0 $0 0.0% $0 0.0% $0 $0 $ % $0 $0 $0 30 PLANNING, ENGINEERING & DESIGN 2.3% Project Management $0 $0 0.0% $0 0.0% $0 $0 $ % $0 $0 $0 0.8% Planning & Environmental Compliance $0 $0 0.0% $0 0.0% $0 $0 $ % $0 $0 $0 5.0% Engineering & Design $0 $0 0.0% $0 0.0% $0 $0 $ % $0 $0 $0 0.5% Reviews, ATRs, IEPRs, VE $0 $0 0.0% $0 0.0% $0 $0 $ % $0 $0 $0 0.5% Life Cycle Updates (cost, schedule, risks) $0 $0 0.0% $0 0.0% $0 $0 $ % $0 $0 $0 0.5% Contracting & Reprographics $0 $0 0.0% $0 0.0% $0 $0 $ % $0 $0 $0 0.5% Engineering During Construction $0 $0 0.0% $0 0.0% $0 $0 $ % $0 $0 $0 2.0% Planning During Construction $0 $0 0.0% $0 0.0% $0 $0 $ % $0 $0 $0 1.0% Project Operations $0 $0 0.0% $0 0.0% $0 $0 $ % $0 $0 $0 31 CONSTRUCTION MANAGEMENT 2.5% Construction Management $0 $0 0.0% $0 0.0% $0 $0 $ % $0 $0 $0 2.6% Project Operation: $0 $0 0.0% $0 0.0% $0 $0 $ % $0 $0 $0 1.5% Project Management $0 $0 0.0% $0 0.0% $0 $0 $ % $0 $0 $0 CONTRACT COST TOTALS: $0 $0 $0 $0 $0 $0 $0 $0 $0 Filename: Kenai River Bluffs Alt#3 TPCS May 2017 r1.xlsx TPCS

15 Print Date Wed 10 May 2017 U.S. Army Corps of Engineers Time 16:59:27 Eff. Date 4/15/2017 Project : Kenai River Bluff Stabilization, Alt#3 (2) CWE - Revetting and Vegetating the Bluff Face - Buried Toe (Stone Buttress) - Revised - No Rec COE Standard Report Selections Title Page Kenai River Bluff Stabilization, Alt#3 (2) CWE - Revetting and Vegetating the Bluff Face - Buried Toe (Stone Buttress) - Revised - No Rec The Secretary of the Army was directed in the Energy and Water Development Appropriations Act of 2002, Senate Report , to expend up to $500,000 to conduct a "special technical evaluation of bank stabilization needs along the lower Kenai River." Kenai is located on the western coast of the Kenai Peninsula, fronting Cook Inlet. It is approximately 65 air miles and 155 highway miles southwest of Anchorage. "Kenai River Bluff Erosion, Bluff Stabilization Design Alternatives, Design Alternatives Report", U.S. Army Corps of Engineers, Alaska District, June 2011, prepared by Tetra Tech provides the design of bluff stabilization along with detailed engineering drawings for the preliminary design. "Kenai River Bluff Stabilization, Kenai, Alaska, Cost Engineering Report Draft Submittal", U.S. Army Corps of Engineers, Alaska District, June 2011 contains detailed cost estimates of the construction features presented in the Design Alternatives Report dated June 2011; performed by Tetra Tech. Estimated by Designed by Prepared by Tetra Tech / POA-EC-CE Tetra Tech Al Arruda Preparation Date 5/9/2017 Effective Date of Pricing 4/15/2017 Estimated Construction Time 730 Days This report is not copyrighted, but the information contained herein is For Official Use Only.

16 Print Date Wed 10 May 2017 U.S. Army Corps of Engineers Time 16:59:27 Eff. Date 4/15/2017 Project : Kenai River Bluff Stabilization, Alt#3 (2) CWE - Revetting and Vegetating the Bluff Face - Buried Toe (Stone Buttress) - Revised - No Rec COE Standard Report Selections Project Cost Summary Report Page 1 Description Quantity UOM ContractCost Contingency MiscOwner Escalation ProjectCost Project Cost Summary Report 42,857,641 8,571, ,429,169 6,259, ,511, LANDS AND DAMAGES 1.00 EA 6,259,248 1,251, ,511,098 5,196, ,236, AQUISITIONS 1.00 EA 5,196,748 1,039, ,236,098 1,062, ,275, ADMINISTRATION 1.00 EA 1,062, , ,275, RELOCATIONS 1.00 LS 362,552 72, , Relocations 1.00 LS 362,552 72, , Pipe Demolition LF 21,948 4, , Pipe Demo Earthwork CY 12,633 2, , Pipe Demolition 1.00 LS 9,315 1, , Building and Pad Demolition 1.00 LS 295,859 59, , Overlook Demolition 1.00 LS 2, , Roadway Demolition 1.00 LS 41,816 8, , MOBILIZATION & DEMOBILIZATION 1.00 LS 1,765, , ,118,074 Mobilization 1.00 LS 882, , ,059,037 Demobilization 1.00 LS 882, , ,059, BANK STABILIZATION 1.00 LS 25,562,619 5,112, ,675, Bank Stabilization 1.00 LS 25,562,619 5,112, ,675, Site Preparation 1.00 LS 1,336, , ,603, Silt Fence 2, LF 18,158 3, , Temporary Road 5, LF 163,747 32, , Pumping 1.00 LS 701, , ,970

17 Print Date Wed 10 May 2017 U.S. Army Corps of Engineers Time 16:59:27 Eff. Date 4/15/2017 Project : Kenai River Bluff Stabilization, Alt#3 (2) CWE - Revetting and Vegetating the Bluff Face - Buried Toe (Stone Buttress) - Revised - No Rec COE Standard Report Selections Project Cost Summary Report Page 2 Description Quantity UOM ContractCost Contingency MiscOwner Escalation ProjectCost 28, , Clearing and Grubbing 6.80 ACR 194,276 38, , Fencing 5, LF 258,741 51, , Earthwork 1.00 LS 6,287,940 1,257, ,545, Alluvial Deposits 140, BCY 2,534, , ,041, Excavation 140, CY 1,140, , ,368, Backfill 144, CY 1,378, , ,654, Dispose of Unusable Material CY 15,350 3, , Glacial Till 67, BCY 2,280, , ,736, Excavation 67, CY 542, , , Backfill 15, CY 144,094 28, , Dispose of Unused Material 51, CY 1,594, , ,913, Borrow Material 8, BCY 629, , , Soil Stabilization 1.00 LS 843, , ,012, Erosion Protection 56, LCY 14,563,771 2,912, ,476, Land Based Placement 28, LCY 6,478,356 1,295, ,774, Water Based Placement 28, LCY 7,417,355 1,483, ,900, Rock Loading on Barge 28, LCY 433,453 86, ,143

18 Print Date Wed 10 May 2017 U.S. Army Corps of Engineers Time 16:59:27 Eff. Date 4/15/2017 Project : Kenai River Bluff Stabilization, Alt#3 (2) CWE - Revetting and Vegetating the Bluff Face - Buried Toe (Stone Buttress) - Revised - No Rec COE Standard Report Selections Project Cost Summary Report Page 3 Description Quantity UOM ContractCost Contingency MiscOwner Escalation ProjectCost Geotextile Fabric 34, SY 234,608 46, , Vegetation 1.00 LS 3,374, , ,049,213 2,908, ,489, CULTURAL RESOURCES PRESERVATION 1.00 EA 2,908, , ,489,792 1,040, ,248, HISTORICAL AMERICAN BUILDING SURVEY 1.00 EA 1,040, , ,248, , ,120, SALVAGE RECOVERY 2.00 EA 1,868, , ,241,792 2, , Archaeological Survey 8.00 DAY 20,480 4, ,576 32, , Excavation WK 384,000 76, ,800 16, , Artifact Analysis WK 480,000 96, ,000 16, , Faunal Analysis WK 480,000 96, ,000 16, , Data Recovery Report WK 480,000 96, ,000 8, , Accession to Repository 2.00 WK 16,000 3, ,200 1, , Present Data to Community 4.00 DAY 5,120 1, , Present Data to Professionals 4.00 DAY 2, , PED 1.00 LS 4,000, , ,800, SIOH 1.00 LS 2,000, , ,400,000

19 Print Date Wed 10 May 2017 U.S. Army Corps of Engineers Time 16:59:27 Eff. Date 4/15/2017 Project : Kenai River Bluff Stabilization, Alt#3 (2) CWE - Revetting and Vegetating the Bluff Face - Buried Toe (Stone Buttress) - Revised - No Rec COE Standard Report Selections Table of Contents Description Page Project Cost Summary Report 1 01 LANDS AND DAMAGES 1 AQUISITIONS 1 ADMINISTRATION 1 02 RELOCATIONS Relocations Pipe Demolition Pipe Demo Earthwork Pipe Demolition Building and Pad Demolition Overlook Demolition Roadway Demolition 1 16 MOBILIZATION & DEMOBILIZATION 1 Mobilization 1 Demobilization 1 16 BANK STABILIZATION Bank Stabilization Site Preparation Silt Fence Temporary Road Pumping Clearing and Grubbing Fencing Earthwork Alluvial Deposits Excavation Backfill Dispose of Unusable Material Glacial Till Excavation Backfill Dispose of Unused Material Borrow Material Soil Stabilization Erosion Protection Land Based Placement Water Based Placement Rock Loading on Barge Geotextile Fabric Vegetation 3 18 CULTURAL RESOURCES PRESERVATION 3

20 Print Date Wed 10 May 2017 U.S. Army Corps of Engineers Time 16:59:27 Eff. Date 4/15/2017 Project : Kenai River Bluff Stabilization, Alt#3 (2) CWE - Revetting and Vegetating the Bluff Face - Buried Toe (Stone Buttress) - Revised - No Rec COE Standard Report Selections Table of Contents Description Page HISTORICAL AMERICAN BUILDING SURVEY 3 SALVAGE RECOVERY 3 Archaeological Survey 3 Excavation 3 Artifact Analysis 3 Faunal Analysis 3 Data Recovery Report 3 Accession to Repository 3 Present Data to Community 3 Present Data to Professionals 3 30 PED 3 31 SIOH 3

21 **** TOTAL PROJECT COST SUMMARY **** Printed:5/10/2017 Page 1 of 3 PROJECT: Kenai River Bluff Stabilization ALT#4 CWE - Revised DISTRICT: Alaska District PREPARED: 4/27/2017 PROJECT NO:P POC: CHIEF, COST ENGINEERING, Karl Harvey LOCATION: Kenai, AK This Estimate reflects the scope and schedule in report; Kenai River Bluff Stabilization Sec 116 Study May 2017 Civil Works Work Breakdown Structure ESTIMATED COST PROJECT FIRST COST (Constant Dollar Basis) TOTAL PROJECT COST (FULLY FUNDED) Program Year (Budget EC): 2018 Effective Price Level Date: 1 OCT 17 TOTAL Spent Thru: FIRST WBS Civil Works COST CNTG CNTG TOTAL ESC COST CNTG TOTAL 1-Oct-16 COST INFLATED COST CNTG FULL NUMBER Feature & Sub-Feature Description ($K) ($K) (%) ($K) (%) ($K) ($K) ($K) ($K) ($K) (%) ($K) ($K) ($K) A B C D E F G H I J K L M N O 02 RELOCATIONS $357 $ % $ % $363 $73 $436 $0 $ % $379 $76 $ BANK STABILIZATION $1,716 $ % $2, % $1,748 $350 $2,098 $0 $2, % $1,826 $365 $2, BANK STABILIZATION $28,626 $5, % $34, % $29,155 $5,831 $34,986 $0 $34, % $30,463 $6,093 $36, CULTURAL RESOURCE PRESERVATION $2,908 $ % $3, % $2,962 $592 $3,554 $0 $3, % $3,095 $619 $3,714 #N/A $0 $0 - $0 - $0 $0 $0 $0 $0 - $0 $0 $0 #N/A $0 $0 - $0 - $0 $0 $0 $0 $0 - $0 $0 $0 #N/A $0 $0 - $0 - $0 $0 $0 $0 $0 - $0 $0 $0 #N/A $0 $0 - $0 - $0 $0 $0 $0 $0 - $0 $0 $0 CONSTRUCTION ESTIMATE TOTALS: $33,607 $6,721 $40, % $34,228 $6,846 $41,074 $0 $41, % $35,763 $7,153 $42, LANDS AND DAMAGES $6,259 $1, % $7, % $6,375 $1,275 $7,650 $0 $7, % $6,433 $1,287 $7, PLANNING, ENGINEERING & DESIGN $4,000 $ % $4, % $4,144 $829 $4,973 $0 $4, % $4,252 $850 $5, CONSTRUCTION MANAGEMENT $2,000 $ % $2, % $2,072 $414 $2,487 $0 $2, % $2,258 $452 $2,710 PROJECT COST TOTALS: $45,866 $9, % $55,040 $46,819 $9,364 $56,183 $0 $56, % $48,706 $9,741 $58,447 CHIEF, COST ENGINEERING, Karl Harvey PROJECT MANAGER, Ronnie Barcak ESTIMATED TOTAL PROJECT COST: $58,447 CHIEF, REAL ESTATE, Michael Coy CHIEF, PLANNING, Cindy Upah CHIEF, ENGINEERING SERVICES, Doug Bliss CHIEF, OPERATIONS, Julie Anderson CHIEF, CONSTRUCTION, Jim Jeffords CHIEF, CONTRACTING, Chris Tew CHIEF, RM, Karen Farmer Filename: Kenai River Bluffs Alt#4 TPCS May 2017 r1.xlsx TPCS CHIEF, DPM-CW, Bruce Sexauer

22 **** TOTAL PROJECT COST SUMMARY **** Printed:5/10/2017 Page 2 of 3 **** CONTRACT COST SUMMARY **** PROJECT: Kenai River Bluff Stabilization ALT#4 CWE - Revised DISTRICT: Alaska District PREPARED: 4/27/2017 LOCATION: Kenai, AK POC: CHIEF, COST ENGINEERING, Karl Harvey This Estimate reflects the scope and schedule in report; Kenai River Bluff Stabilization Sec 116 Study May 2017 Civil Works Work Breakdown Structure ESTIMATED COST PROJECT FIRST COST (Constant Dollar Basis) TOTAL PROJECT COST (FULLY FUNDED) Estimate Prepared: Effective Price Level: 10-Apr-17 Program Year (Budget EC): Oct-16 Effective Price Level Date: 1 OCT 17 RISK BASED WBS Civil Works COST CNTG CNTG TOTAL ESC COST CNTG TOTAL Mid-Point INFLATED COST CNTG FULL NUMBER Feature & Sub-Feature Description ($K) ($K) (%) ($K) (%) ($K) ($K) ($K) Date (%) ($K) ($K) ($K) A B C D E F G H I J P L M N O FEDERAL SHARED COSTS 02 RELOCATIONS $357 $ % $ % $363 $73 $ Q2 4.5% $379 $76 $ BANK STABILIZATION $1,716 $ % $2, % $1,748 $350 $2, Q2 4.5% $1,826 $365 $2, BANK STABILIZATION $28,626 $5, % $34, % $29,155 $5,831 $34, Q2 4.5% $30,463 $6,093 $36, CULTURAL RESOURCE PRESERVATION $2,908 $ % $3, % $2,962 $592 $3, Q2 4.5% $3,095 $619 $3,714 CONSTRUCTION ESTIMATE TOTALS: $33,607 $6, % $40,328 $34,228 $6,846 $41,074 $35,763 $7,153 $42, LANDS AND DAMAGES $6,259 $1, % $7, % $6,375 $1,275 $7, Q3 0.9% $6,433 $1,287 $7, PLANNING, ENGINEERING & DESIGN 2.2% Project Management $742 $ % $ % $769 $154 $ Q2 0.9% $776 $155 $ % Planning & Environmental Compliance $284 $ % $ % $294 $59 $ Q2 0.9% $297 $59 $ % Engineering & Design $1,311 $ % $1, % $1,358 $272 $1, Q2 0.9% $1,371 $274 $1, % Reviews, ATRs, IEPRs, VE $168 $ % $ % $174 $35 $ Q2 0.9% $176 $35 $ % Life Cycle Updates (cost, schedule, risks) $168 $ % $ % $174 $35 $ Q2 0.9% $176 $35 $ % Contracting & Reprographics $168 $ % $ % $174 $35 $ Q2 0.9% $176 $35 $ % Engineering During Construction $168 $ % $ % $174 $35 $ Q2 9.0% $190 $38 $ % Planning During Construction $655 $ % $ % $679 $136 $ Q2 9.0% $740 $148 $ % Project Operations $336 $ % $ % $348 $70 $ Q2 0.9% $351 $70 $ CONSTRUCTION MANAGEMENT 1.7% Construction Management $562 $ % $ % $582 $116 $ Q2 9.0% $635 $127 $ % Project Operation: $946 $ % $1, % $980 $196 $1, Q2 9.0% $1,068 $214 $1, % Project Management $492 $ % $ % $510 $102 $ Q2 9.0% $555 $111 $667 CONTRACT COST TOTALS: $45,866 $9,173 $55,040 $46,819 $9,364 $56,183 $48,706 $9,741 $58,447 Filename: Kenai River Bluffs Alt#4 TPCS May 2017 r1.xlsx TPCS

23 **** TOTAL PROJECT COST SUMMARY **** Printed:5/10/2017 Page 3 of 3 **** CONTRACT COST SUMMARY **** PROJECT: Kenai River Bluff Stabilization ALT#4 CWE - Revised DISTRICT: Alaska District PREPARED: 4/27/2017 LOCATION: Kenai, AK POC: CHIEF, COST ENGINEERING, Karl Harvey This Estimate reflects the scope and schedule in report; Kenai River Bluff Stabilization Sec 116 Study May 2017 Civil Works Work Breakdown Structure ESTIMATED COST PROJECT FIRST COST (Constant Dollar Basis) TOTAL PROJECT COST (FULLY FUNDED) Estimate Prepared: Effective Price Level: 10-Apr-17 Program Year (Budget EC): Oct-16 Effective Price Level Date: 1 OCT 17 WBS Civil Works COST CNTG CNTG TOTAL ESC COST CNTG TOTAL Mid-Point INFLATED COST CNTG FULL NUMBER Feature & Sub-Feature Description ($K) ($K) (%) ($K) (%) ($K) ($K) ($K) Date (%) ($K) ($K) ($K) A B C D E F G H I J P L M N O LOCAL SERVICE FACILITIES 02 RELOCATIONS $0 $0 0.0% $0 0.0% $0 $0 $ % $0 $0 $0 16 BANK STABILIZATION $0 $0 0.0% $0 0.0% $0 $0 $ % $0 $0 $0 16 BANK STABILIZATION $0 $0 0.0% $0 0.0% $0 $0 $ % $0 $0 $0 18 CULTURAL RESOURCE PRESERVATION $0 $0 0.0% $0 0.0% $0 $0 $ % $0 $0 $0 CONSTRUCTION ESTIMATE TOTALS: $0 $0 0.0% $0 $0 $0 $0 $0 $0 $0 01 LANDS AND DAMAGES $0 $0 0.0% $0 0.0% $0 $0 $ % $0 $0 $0 30 PLANNING, ENGINEERING & DESIGN 2.2% Project Management $0 $0 0.0% $0 0.0% $0 $0 $ % $0 $0 $0 0.8% Planning & Environmental Compliance $0 $0 0.0% $0 0.0% $0 $0 $ % $0 $0 $0 3.9% Engineering & Design $0 $0 0.0% $0 0.0% $0 $0 $ % $0 $0 $0 0.5% Reviews, ATRs, IEPRs, VE $0 $0 0.0% $0 0.0% $0 $0 $ % $0 $0 $0 0.5% Life Cycle Updates (cost, schedule, risks) $0 $0 0.0% $0 0.0% $0 $0 $ % $0 $0 $0 0.5% Contracting & Reprographics $0 $0 0.0% $0 0.0% $0 $0 $ % $0 $0 $0 0.5% Engineering During Construction $0 $0 0.0% $0 0.0% $0 $0 $ % $0 $0 $0 2.0% Planning During Construction $0 $0 0.0% $0 0.0% $0 $0 $ % $0 $0 $0 1.0% Project Operations $0 $0 0.0% $0 0.0% $0 $0 $ % $0 $0 $0 31 CONSTRUCTION MANAGEMENT 1.7% Construction Management $0 $0 0.0% $0 0.0% $0 $0 $ % $0 $0 $0 2.8% Project Operation: $0 $0 0.0% $0 0.0% $0 $0 $ % $0 $0 $0 1.5% Project Management $0 $0 0.0% $0 0.0% $0 $0 $ % $0 $0 $0 CONTRACT COST TOTALS: $0 $0 $0 $0 $0 $0 $0 $0 $0 Filename: Kenai River Bluffs Alt#4 TPCS May 2017 r1.xlsx TPCS

24 Print Date Fri 12 May 2017 U.S. Army Corps of Engineers Time 10:25:29 Eff. Date 4/15/2017 Project : Kenai River Bluff Stabilization, Alt#4 CWE - Revetting and Vegetating the Bluff Face - Weighted Toe (3A Longitudinal Dike) COE Standard Report Selections Title Page Kenai River Bluff Stabilization, Alt#4 CWE - Revetting and Vegetating the Bluff Face - Weighted Toe (3A Longitudinal Dike) The Secretary of the Army was directed in the Energy and Water Development Appropriations Act of 2002, Senate Report , to expend up to $500,000 to conduct a "special technical evaluation of bank stabilization needs along the lower Kenai River." Kenai is located on the western coast of the Kenai Peninsula, fronting Cook Inlet. It is approximately 65 air miles and 155 highway miles southwest of Anchorage. "Kenai River Bluff Erosion, Bluff Stabilization Design Alternatives, Design Alternatives Report", U.S. Army Corps of Engineers, Alaska District, June 2011, prepared by Tetra Tech provides the design of bluff stabilization along with detailed engineering drawings for the preliminary design. "Kenai River Bluff Stabilization, Kenai, Alaska, Cost Engineering Report Draft Submittal", U.S. Army Corps of Engineers, Alaska District, June 2011 contains detailed cost estimates of the construction features presented in the Design Alternatives Report dated June 2011; performed by Tetra Tech. Estimated by Designed by Prepared by POA-EC-CE / Tetra Tech Brian Ball / Tetra Tech Al Arruda Preparation Date 5/9/2017 Effective Date of Pricing 4/15/2017 Estimated Construction Time 730 Days This report is not copyrighted, but the information contained herein is For Official Use Only.

25 Print Date Fri 12 May 2017 U.S. Army Corps of Engineers Time 10:25:29 Eff. Date 4/15/2017 Project : Kenai River Bluff Stabilization, Alt#4 CWE - Revetting and Vegetating the Bluff Face - Weighted Toe (3A Longitudinal Dike) COE Standard Report Selections Project Cost Summary Report Page 1 Description Quantity UOM ContractCost Contingency MiscOwner Escalation ProjectCost Project Cost Summary Report 45,866,296 9,173, ,039,555 6,259, ,511, LANDS AND DAMAGES 1.00 EA 6,259,248 1,251, ,511,098 5,196, ,236, AQUISITIONS 1.00 EA 5,196,748 1,039, ,236,098 1,062, ,275, ADMINISTRATION 1.00 EA 1,062, , ,275, RELOCATIONS 1.00 LS 356,606 71, , Relocations 1.00 LS 356,606 71, , Pipe Demolition LF 21,588 4, , Pipe Demo Earthwork CY 12,425 2, , Pipe Demolition 1.00 LS 9,162 1, , Building and Pad Demolition 1.00 LS 291,007 58, , Overlook Demolition 1.00 LS 2, , Roadway Demolition 1.00 LS 41,130 8, , MOBILIZATION & DEMOBILIZATION 1.00 LS 1,716, , ,059,597 Mobilization 1.00 LS 858, , ,029,798 Demobilization 1.00 LS 858, , ,029, BANK STABILIZATION 1.00 LS 28,625,951 5,725, ,351, Bank Stabilization 1.00 LS 28,067,338 5,613, ,680, Site Preparation 1.00 LS 1,794, , ,153, Silt Fence 2, LF 16,332 3, , Temporary Road 5, LF 154,025 30, ,

26 Print Date Fri 12 May 2017 U.S. Army Corps of Engineers Time 10:25:29 Eff. Date 4/15/2017 Project : Kenai River Bluff Stabilization, Alt#4 CWE - Revetting and Vegetating the Bluff Face - Weighted Toe (3A Longitudinal Dike) COE Standard Report Selections Project Cost Summary Report Page 2 Description Quantity UOM ContractCost Contingency MiscOwner Escalation ProjectCost Pumping 1, DAY 613, , ,620 26, , Clearing and Grubbing 6.80 ACR 180,954 36, , Fencing 5, LF 242,139 48, , Haul Roads 7, LF 587, , , Rock - Land Based Placement 2, LCY 427,037 85, , Soil Stabilization 13, SY 123,375 24, ,051 12, , Culverts 3.00 EA 36,799 7, , Earthwork 233, CY 11,929,101 2,385, ,314, Excavation 125, BCY 4,616, , ,540, Excavation 125, CY 963, , ,155, Dispose of Unused Material 125, CY 3,653, , ,384, Borrow Material 108, BCY 7,312,188 1,462, ,774, ARMOR DIKE - Erosion Protection Rock 59, LCY 14,080,880 2,816, ,897, Rock - Land Based Placement 29, LCY 6,354,643 1,270, ,625, Rock - Water Based Placement 29, LCY 7,688,505 1,537, ,226, Rock Loading on Barge 29, LCY 436,972 87, ,

27 Print Date Fri 12 May 2017 U.S. Army Corps of Engineers Time 10:25:29 Eff. Date 4/15/2017 Project : Kenai River Bluff Stabilization, Alt#4 CWE - Revetting and Vegetating the Bluff Face - Weighted Toe (3A Longitudinal Dike) COE Standard Report Selections Project Cost Summary Report Page 3 Description Quantity UOM ContractCost Contingency MiscOwner Escalation ProjectCost Soil Stabilization - Geotex 3, SY 37,732 7, , STONE DRAIN 4, LF 262,846 52, , Rock - Land Based Placement 1, LCY 243,924 48, , Soil Stabilization - Geotex 2, SY 18,922 3, ,706 1, , Ryan s Creek Stabilization LF 558, , , Rock - Water Based Placement 1, LCY 349,359 69, , Rock Loading on Barge 1, LCY 20,494 4, ,593 1, , Steel Sheet Pile LF 209,255 41, , Steel Sheet Piles 1, VLF 78,613 15, ,335 3, , Ship steel Piles from Seattle Docks to Kenai TON 66,990 13, , Pile Driving 1, VLF 59,554 11, , Weld Piles EA 3, , Cutoffs & Cutouts LF ,908, ,489, CULTURAL RESOURCES PRESERVATION 1.00 EA 2,908, , ,489,792 1,040, ,248, HISTORICAL AMERICAN BUILDING SURVEY 1.00 EA 1,040, , ,248, , ,120, SALVAGE RECOVERY 2.00 EA 1,868, , ,241,792 2, ,072.00

UPPER MISSISSIPPI RIVER RESTORATION FEASIBILITY REPORT WITH INTEGRATED ENVIRONMENTAL ASSESSMENT

UPPER MISSISSIPPI RIVER RESTORATION FEASIBILITY REPORT WITH INTEGRATED ENVIRONMENTAL ASSESSMENT UPPER MISSISSIPPI RIVER RESTORATION FEASIBILITY REPORT WITH INTEGRATED ENVIRONMENTAL ASSESSMENT BEAVER ISLAND HABITAT REHABILITATION AND ENHANCEMENT PROJECT POOL 14, UPPER MISSISSIPPI RIVER MILES 513.0-517.0

More information

Feasibility Report and Environmental Impact Statement. Coastal Storm Damage Reduction. SURF CITY and NORTH TOPSAIL BEACH NORTH CAROLINA.

Feasibility Report and Environmental Impact Statement. Coastal Storm Damage Reduction. SURF CITY and NORTH TOPSAIL BEACH NORTH CAROLINA. Feasibility Report and Environmental Impact Statement on Coastal Storm Damage Reduction SURF CITY and NORTH TOPSAIL BEACH NORTH CAROLINA Appendix N Project Costs Appendix N: Cost Engineering SURF CITY

More information

9. Attachments MII Cost Report Abbreviated Risk Analysis (ARA) 9.3. Total Project Cost Summary (TPCS) 9.4.

9. Attachments MII Cost Report Abbreviated Risk Analysis (ARA) 9.3. Total Project Cost Summary (TPCS) 9.4. 9. Attachments 9.1. MII Cost Report 9.2. Abbreviated Risk Analysis (ARA) 9.3. Total Project Cost Summary (TPCS) 9.4. Project Schedule 9.5. Basis of Estimate with Quantities 8 Print Date Fri 18 January

More information

COST APPENDIX MCGREGOR LAKE HABITAT REHABILITATION AND ENHANCEMENT PROJECT POOL 10, UPPER MISSISSIPPI RIVER, WISCONSIN

COST APPENDIX MCGREGOR LAKE HABITAT REHABILITATION AND ENHANCEMENT PROJECT POOL 10, UPPER MISSISSIPPI RIVER, WISCONSIN COST APPENDIX Revised 9/25/18 MCGREGOR LAKE HABITAT REHABILITATION AND ENHANCEMENT PROJECT POOL 10, UPPER MISSISSIPPI RIVER, WISCONSIN I. PROJECT SCOPE a. Project work includes the expansion of existing

More information

APPENDIX L PROJECT COST ESTIMATE

APPENDIX L PROJECT COST ESTIMATE APPENDIX L PROJECT COST ESTIMATE GENERAL REEVALUATION REPORT (GRR) AND SUPPLEMENTAL ENVIRONMENTAL IMPACT STATEMENT (SEIS) FOR THE POPLAR ISLAND ENVIRONMENTAL RESTORATION PROJECT CHESAPEAKE BAY, TALBOT

More information

Bethel Bank Stabilization

Bethel Bank Stabilization Bethel Bank Stabilization Condition of Improvements 30 December 2014 Bethel Bank Stabilization, Alaska (CWIS No. 012314, 075440) Authorization Public Law 99-662, under Section 202, 17 November 1986, as

More information

Skagit River Flood Risk Management General Investigation Skagit County, Washington. Draft Feasibility Report and Environmental Impact Statement

Skagit River Flood Risk Management General Investigation Skagit County, Washington. Draft Feasibility Report and Environmental Impact Statement Skagit River Flood Risk Management General Investigation Skagit County, Washington Draft Feasibility Report and Environmental Impact Statement Appendix G Cost Estimate May 2014 Skagit River Flood Risk

More information

Final General Reevaluation Report and Final Environmental Impact Statement. Hurricane Protection and Beach Erosion Control

Final General Reevaluation Report and Final Environmental Impact Statement. Hurricane Protection and Beach Erosion Control Final General Reevaluation Report and Final Environmental Impact Statement on Hurricane Protection and Beach Erosion Control WEST ONSLOW BEACH AND NEW RIVER INLET (TOPSAIL BEACH), NORTH CAROLINA Appendix

More information

West Sacramento General Reevaluation Report

West Sacramento General Reevaluation Report July 214 West Sacramento General Reevaluation Report Draft Report Documentation Cost Engineering Report Cover Photo Sacramento River, West Sacramento, and Yolo Bypass, March 211 Photo courtesy of Chris

More information

US Army Corps of Engineers Los Angeles District. Los Angeles River Ecosystem Restoration Feasibility Study. Final Cost Appendix

US Army Corps of Engineers Los Angeles District. Los Angeles River Ecosystem Restoration Feasibility Study. Final Cost Appendix US Army Corps of Engineers Los Angeles District Los Angeles River Ecosystem Restoration Feasibility Study Final Cost Appendix September 2015 LOS ANGELES RIVER ECOSYSTEM RESTORATION FEASIBILITY STUDY COST

More information

Community Erosion Assessment Kipnuk, Alaska 26 January 2009

Community Erosion Assessment Kipnuk, Alaska 26 January 2009 Community Erosion Assessment Kipnuk, Alaska 26 January 2009 1. Community: Kipnuk, Alaska Figure 1: Kipnuk Location & Vicinity Map 2. Community Profile Summary: Kipnuk is an unincorporated village of 664

More information

Appendix I Cost Engineering Pigs Eye Lake Ramsey County, MN Section 204 DRAFT. Draft Feasibility Study Report with Integrated Environmental Assessment

Appendix I Cost Engineering Pigs Eye Lake Ramsey County, MN Section 204 DRAFT. Draft Feasibility Study Report with Integrated Environmental Assessment Appendix I Cost Engineering Pigs Eye Lake Ramsey County, MN Section 204 Draft Feasibility Study Report with Integrated Environmental Assessment St. Paul District U.S. Army Corps of Engineers March 2018

More information

PRELIMINARY SHORELINE PROTECTION STUDY Parking Lot D to the JFK Library

PRELIMINARY SHORELINE PROTECTION STUDY Parking Lot D to the JFK Library PREPARED FOR: UNIVERSITY OF MASSACHUSETTS BOSTON PRELIMINARY SHORELINE PROTECTION STUDY Parking Lot D to the JFK Library UNIVERSITY OF MASSACHUSETTS Boston, Massachusetts PREPARED BY: PARE CORPORATION

More information

FEASIBILITY STUDY FOR THE BOARDMAN RIVER

FEASIBILITY STUDY FOR THE BOARDMAN RIVER US Army Corps of Engineers Detroit District FEASIBILITY STUDY FOR THE BOARDMAN RIVER GRAND TRAVERSE COUNTY, MICHIGAN APPENDIX C - COST ENGINEERING GREAT LAKES FISHERIES AND ECOSYSTEM RESTORATION PROGRAM

More information

Jacobi, Toombs, and Lanz, Inc.

Jacobi, Toombs, and Lanz, Inc. Area 5: Blackiston Mill Road at Dead Man's Hollow Flooding Assessment Jacobi, Toombs, and Lanz, Inc. This document summarizes an assessment of drainage and flooding concerns and provides recommendations

More information

FEASIBILITY REPORT AND ENVIRONMENTAL ASSESSMENT. WILMINGTON HARBOR NAVIGATION IMPROVEMENTS Appendix F - Cost Engineering

FEASIBILITY REPORT AND ENVIRONMENTAL ASSESSMENT. WILMINGTON HARBOR NAVIGATION IMPROVEMENTS Appendix F - Cost Engineering FEASIBILITY REPORT AND ENVIRONMENTAL ASSESSMENT WILMINGTON HARBOR NAVIGATION IMPROVEMENTS Appendix F - Cost Engineering June 2014 US Army Corps of Engineers Wilmington District Wilmington Harbor Improvements

More information

Appendix C. Clean Water Act: Section 404(b)(1) Evaluation

Appendix C. Clean Water Act: Section 404(b)(1) Evaluation Appendix C Clean Water Act: Section 404(b)(1) Evaluation CLEAN WATER ACT: SECTION 404 (b) (1) EVALUATION CLEAN WATER ACT: SECTION 404 (b) (1) EVALUATION MONTAUK POINT STORM DAMAGE REDUCTION PROJECT MONTAUK

More information

North Shore of Long Island Bayville, NY Coastal Storm Risk Management Feasibility Study. Appendix D Cost Engineering

North Shore of Long Island Bayville, NY Coastal Storm Risk Management Feasibility Study. Appendix D Cost Engineering North Shore of Long Island Bayville, NY Coastal Storm Risk Management Feasibility Study Appendix D Cost Engineering This page is intentionally left blank. Cost Introduction This feasibility study has determined

More information

REQUEST FOR CONSTRUCTION BIDS February 22, 2010

REQUEST FOR CONSTRUCTION BIDS February 22, 2010 REQUEST FOR CONSTRUCTION BIDS February 22, 2010 Roaring Branch Channel and Floodplain Restoration Project 1.0 Project Background Roaring Branch (watershed area ~ 41 square miles) flows generally west through

More information

FLAGLER COUNTY, FLORIDA. Appendix B. Cost Engineering and Risk Analysis

FLAGLER COUNTY, FLORIDA. Appendix B. Cost Engineering and Risk Analysis FLAGLER COUNTY, FLORIDA HURRICANE AND STORM DAMAGE REDUCTION PROJECT FINAL INTEGRATED FEASIBILITY STUDY AND ENVIRONMENTAL ASSESSMENT Appendix B Cost Engineering and Risk Analysis HURRICANE AND STORM DAMAGE

More information

Understanding and Evaluating Erosion Problems

Understanding and Evaluating Erosion Problems Understanding and Evaluating Erosion Problems Fast Current Slow Current Transport Sally Russell Cox Alaska Division of Community and Regional Affairs (DCRA) October 22, 2014 Helps Alaskan communities and

More information

Mamaroneck & Sheldrake Rivers Basin Village of Mamaroneck Flood Risk Management Study

Mamaroneck & Sheldrake Rivers Basin Village of Mamaroneck Flood Risk Management Study Mamaroneck & Sheldrake Rivers Basin Village of Mamaroneck Flood Risk Management Study Mamaroneck & Sheldrake Rivers Coastal Zone Consistency for the Harbor Coastal Zone Management Commission 20 July 2016

More information

SECTION SITE PREPARATION. A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION.

SECTION SITE PREPARATION. A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION. SECTION 311000 PART 1 GENERAL 1.01 GENERAL REQUIREMENTS A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION. B. Examine all conditions as they exist at the project prior to submitting

More information

Alternative No. 1 Total Cost DRAFT

Alternative No. 1 Total Cost DRAFT OPINION OF PROBABLE PROJECT COSTS SUMMARY OF ALL THREE ALTERNATIVE ALIGNMENTS Item Description Alternative No. 1 Total Cost Alternative No. 2 Total Cost Alternative No. 3 Total Cost Design Phase 1. Preliminary

More information

TAB VII Baseline Cost Estimate

TAB VII Baseline Cost Estimate Pomeroy, OH Section 14 Project Engineering Technical Appendix Pomeroy OH - Section 14 Project Pomeroy, OH Study Report Engineering Technical Appendix TAB VII Baseline Cost Estimate TABLE OF CONTENTS 1

More information

AMENDMENTS TO BAYFIELD COUNTY ZONING ORDINANCE. Lake Superior Shoreland Lot Development Requirements.

AMENDMENTS TO BAYFIELD COUNTY ZONING ORDINANCE. Lake Superior Shoreland Lot Development Requirements. AMENDMENTS TO BAYFIELD COUNTY ZONING ORDINANCE Sec. 13-1-34 is created to read as follows: Sec. 13-1-34 Lake Superior Shoreland Lot Development Requirements. Introduction. Much of Bayfield County s Lake

More information

NEW CASTLE CONSERVATION DISTRICT. through. (Name of Municipality) PLAN REVIEW APPLICATION DRAINAGE, STORMWATER MANAGEMENT, EROSION & SEDIMENT CONTROL

NEW CASTLE CONSERVATION DISTRICT. through. (Name of Municipality) PLAN REVIEW APPLICATION DRAINAGE, STORMWATER MANAGEMENT, EROSION & SEDIMENT CONTROL NEW CASTLE CONSERVATION DISTRICT through (Name of Municipality) PLAN REVIEW APPLICATION DRAINAGE, STORMWATER MANAGEMENT, EROSION & SEDIMENT CONTROL Office use only: Received by Municipality: Received by

More information

BAYFRONT CANAL AND ATHERTON CHANNEL PROJECT DESCRIPTION

BAYFRONT CANAL AND ATHERTON CHANNEL PROJECT DESCRIPTION APPENDIX I BAYFRONT CANAL AND ATHERTON CHANNEL PROJECT DESCRIPTION South Bay Salt Pond Restoration Project Phase 2 July 2015 Draft Environmental Impact Statement/Report 2185 N. California Blvd., Suite

More information

Temporary Stream Crossing

Temporary Stream Crossing Categories EC Erosion Control SE Sediment Control TC Tracking Control WE Wind Erosion Control Non-Stormwater NS Management Control Waste Management and WM Materials Pollution Control Legend: Primary Objective

More information

Alaska LNG Outlines Issues For Next Round of Resource Reports

Alaska LNG Outlines Issues For Next Round of Resource Reports Alaska LNG Outlines Issues For Next Round of Resource Reports By Larry Persily lpersily@kpb.us April 26, 2016 (This update, provided by the Kenai Peninsula Borough mayor s office, is part of an ongoing

More information

Temporary Stream Crossing

Temporary Stream Crossing Temporary Stream Crossing NS-4 Objectives EC Erosion Control SE Sediment Control TR Tracking Control WE Wind Erosion Control Non-Stormwater NS Management Control Waste Management and WM Materials Pollution

More information

Appendix D - Evaluation of Interim Solutions

Appendix D - Evaluation of Interim Solutions Appendix D - Evaluation of Interim Solutions D.1 Introduction The implementation of long-term improvements is projected to take 5 to 8 years. To reduce the number of years of flooding impacts, the partner

More information

SAND POINT CITY DOCK REPLACEMENT ALTERNATIVES ANALYSIS REPORT

SAND POINT CITY DOCK REPLACEMENT ALTERNATIVES ANALYSIS REPORT SAND POINT CITY DOCK REPLACEMENT ALTERNATIVES ANALYSIS REPORT Prepared for: City of Sand Point 3380 C Street, Suite 205 Anchorage, Alaska 99503 Prepared by: PND Engineers, Inc. 1506 W. 36 th Avenue Anchorage,

More information

TOWN OF MANCHESTER GENERAL SERVICES DEPARTMENT 494 MAIN STREET P.O. BOX 191 MANCHESTER, CONNECTICUT

TOWN OF MANCHESTER GENERAL SERVICES DEPARTMENT 494 MAIN STREET P.O. BOX 191 MANCHESTER, CONNECTICUT TOWN OF MANCHESTER GENERAL SERVICES DEPARTMENT 494 MAIN STREET P.O. BOX 191 MANCHESTER, CONNECTICUT 06045-0191 HILLIARD S POND DAM REMOVAL AND BIGELOW BROOK STREAM CHANNEL RESTORATION BID NO. 14/15-74

More information

DRAFT. Point Hudson. Marina Breakwater Rehabilitation Task 1 Design Refinement. Port of Port Townsend. August 30, 2017

DRAFT. Point Hudson. Marina Breakwater Rehabilitation Task 1 Design Refinement. Port of Port Townsend. August 30, 2017 DRAFT Point Hudson Marina Breakwater Rehabilitation Task 1 Design Refinement Port of Port Townsend August 30, 2017 Task 1 - Design Refinement Overview Contractor/ Supplier Outreach Information on cost

More information

Cook Inlet Navigation Channel

Cook Inlet Navigation Channel Cook Inlet Navigation Channel Cook Inlet Navigation Channel Page 2 of 9 Condition of Improvements 31 December 2017 Cook Inlet Navigation Channel, Alaska (CWIS No. 010324, 010534) Authorization (1) Water

More information

404(b)(1) EVALUATION

404(b)(1) EVALUATION 404(b)(1) EVALUATION SECTION 404(b)(1) EVALUATION DETAILED PROJECT REPORT AND ENVIRONMENTAL ASSESSMENT POMEROY SECTION 14 EMERGENCY STREAMBANK PROTECTION PROJECT POMEROY, OH I. INTRODUCTION As required

More information

Economic Analysis. Appendix C: Lower Pool 2 Channel Management Study: Boulanger Bend to Lock and Dam No. 2

Economic Analysis. Appendix C: Lower Pool 2 Channel Management Study: Boulanger Bend to Lock and Dam No. 2 Appendix C: Economic Analysis Lower Pool 2 Channel Management Study: Boulanger Bend to Lock and Dam No. 2 Pool 2: Boulanger Bend to Lock and Dam 2 C-1 Economic Analysis Introduction This analysis evaluates

More information

FINDINGS OF FACT And CONCLUSIONS

FINDINGS OF FACT And CONCLUSIONS FINDINGS OF FACT And CONCLUSIONS SOUTHWEST RECONNECTION PROJECT Highway 61/101 Flood Mitigation State Project No. 1009-24 and State Aid Project No. 010-661-002 Prepared for: Carver County September 2013

More information

Conceptual-Level Cost Estimates Arkansas River Corridor Dam Improvement and River Bank Stabilization Projects

Conceptual-Level Cost Estimates Arkansas River Corridor Dam Improvement and River Bank Stabilization Projects TECHNICAL MEMORANDUM Conceptual-Level Cost Estimates Arkansas River Corridor Dam Improvement and River Bank Stabilization Projects TO: COPIES: PREPARED BY: Tulsa County File CH2M HILL DATE: September 2,

More information

DOUGLAS HARBOR DREDGE MATERIAL DISPOSAL PRACTICABLE ALTERNATIVE ANALYSIS REPORT POA M3

DOUGLAS HARBOR DREDGE MATERIAL DISPOSAL PRACTICABLE ALTERNATIVE ANALYSIS REPORT POA M3 June 25, 2009 PND Project # 062065.01 DOUGLAS HARBOR DREDGE MATERIAL DISPOSAL PRACTICABLE ALTERNATIVE ANALYSIS REPORT POA 2000-495 - M3 This report is written to evaluate dredge material disposal alternatives

More information

Review Plan. For. Southport, NC Section 14 Emergency Streambank and Shoreline Erosion Protection Project Implementation Documents

Review Plan. For. Southport, NC Section 14 Emergency Streambank and Shoreline Erosion Protection Project Implementation Documents Review Plan For Southport, NC Section 14 Emergency Streambank and Shoreline Erosion Protection Project Implementation Documents Brunswick County, North Carolina P2 #: 333722 U.S. Army Corps of Engineers

More information

SITE PLAN FOR THE HURRICANE ISLAND REACH DREDGED MATERIAL MANAGEMENT PLAN WITH INTEGRATED ENVIRONMENTAL ASSESSMENT

SITE PLAN FOR THE HURRICANE ISLAND REACH DREDGED MATERIAL MANAGEMENT PLAN WITH INTEGRATED ENVIRONMENTAL ASSESSMENT SITE PLAN FOR THE HURRICANE ISLAND REACH DREDGED MATERIAL MANAGEMENT PLAN WITH INTEGRATED ENVIRONMENTAL ASSESSMENT POOL 11 DUBUQUE COUNTY, IA AND GRANT COUNTY, WI UPPER MISSISSIPPI RIVER, RIVER MILES 591608

More information

Replace BID SCHEDULE with attached revised BID SCHEDULE.

Replace BID SCHEDULE with attached revised BID SCHEDULE. CONTRACT ADDENDUM Project: 9 st Ave SE & 4 th Street SE Sidewalk Improvements Project No: 00 Addendum No: Date: 0 September 0 Addendum: Replace BID SCHEDULE with attached revised BID SCHEDULE. Section

More information

Annex X Comprehensive Baseline Cost Estimate

Annex X Comprehensive Baseline Cost Estimate Annex X Comprehensive Baseline Cost Estimate Table X1 Table X2 Table X3 Construction and Acquisition Costs Estimated Cost for Security Contingency Analysis for Levee/Channelization Option H:\WP\1346\Appendices\FEIS\D

More information

Appendix C Quantities & Costs (Cost Engineering)

Appendix C Quantities & Costs (Cost Engineering) RARITAN BAY AND SANDY HOOK BAY UNION BEACH, NEW JERSEY HURRICANE SANDY LIMITED REEVALUATION REPORT Appendix C Quantities & Costs (Cost Engineering) U.S. Army Corps of Engineers New York District June 2017

More information

SITE PLAN FOR THE HURRICANE ISLAND REACH DREDGED MATERIAL MANAGEMENT PLAN WITH INTEGRATED ENVIRONMENTAL ASSESSMENT

SITE PLAN FOR THE HURRICANE ISLAND REACH DREDGED MATERIAL MANAGEMENT PLAN WITH INTEGRATED ENVIRONMENTAL ASSESSMENT SITE PLAN FOR THE HURRICANE ISLAND REACH DREDGED MATERIAL MANAGEMENT PLAN WITH INTEGRATED ENVIRONMENTAL ASSESSMENT POOL 11 DUBUQUE COUNTY, IA AND GRANT COUNTY, WI UPPER MISSISSIPPI RIVER, RIVER MILES 591608

More information

PUBLIC NOTICE U.S. ARMY CORPS OF ENGINEERS

PUBLIC NOTICE U.S. ARMY CORPS OF ENGINEERS ISSUE DATE: December 15, 2015 EXPIRATION DATE: January 15, 2016 PUBLIC NOTICE U.S. ARMY CORPS OF ENGINEERS Availability of Draft Environmental Assessment and Draft Finding of No Significant Impact REPLY

More information

SANBORN COUNTY

SANBORN COUNTY Sheet 1 of 12 SPECIFICATIONS ESTIMATE OF QUANTITIES BID ITEM NUMBER ITEM QUANTITY UNIT 009E0010 Mobilization Lump Sum LS 110E0500 Remove Pipe Culvert 134 Ft 110E1010 Remove Asphalt Concrete Pavement 178

More information

North Umpqua Hydroelectric Project (FERC 1927) Erosion Control Plan Site Remediation/ Assessment Form

North Umpqua Hydroelectric Project (FERC 1927) Erosion Control Plan Site Remediation/ Assessment Form (FERC 1927) Erosion Control Plan Site Remediation/ Assessment Form Site # CW2-3 Priority Ranking Med Locator Information/GPS Lat: Long: Impact Rating 3 Start Project Development: Clearwater 2 Risk Rating

More information

Applicant s Proposed Mitigation Statements Seward Highway 75-90, POA , Turnagain Arm Phase 1 May 2017

Applicant s Proposed Mitigation Statements Seward Highway 75-90, POA , Turnagain Arm Phase 1 May 2017 Applicant s Proposed Mitigation Statements Seward Highway -, POA 2013-448, Turnagain Arm Phase 1 May 2017 Avoidance The project is geographically constrained by Turnagain Arm tidal mudflats on one side

More information

SECTION GENERAL EXCAVATION

SECTION GENERAL EXCAVATION 02210-1 of 11 SECTION 02210 GENERAL EXCAVATION 02210.01 GENERAL A. Description 1. General excavation shall include but not necessarily be limited to, excavation and grading for general site work, roadways,

More information

NOTICE OF AVAILABILITY

NOTICE OF AVAILABILITY Pittsburgh District Planning and Environmental Branch William S. Moorhead Federal Building 1000 Liberty Avenue Public Notice Date: 8 June 2017 Pittsburgh, Pennsylvania 15222 Expiration Date: 23 June 2017

More information

Med (3) Locator Information/GPS GPS shows 16 ft accuracy Lat: Impact Rating

Med (3) Locator Information/GPS GPS shows 16 ft accuracy Lat: Impact Rating (FERC 1927) Erosion Control Plan Site Remediation/ Assessment Form Site # Med (3) LM2-25 Priority Ranking Locator Information/GPS GPS shows 16 ft accuracy Lat: Long: Impact Rating 5 Start Project Development:

More information

RFB for Wastewater Force Main #3. October 2, Addendum 3: Clarifications and Questions from Pre-Bid Meeting Answered

RFB for Wastewater Force Main #3. October 2, Addendum 3: Clarifications and Questions from Pre-Bid Meeting Answered RFB for Wastewater Force Main #3 October 2, 2015 Addendum 3: Clarifications and Questions from Pre-Bid Meeting Answered The proposed force main will be required to transmit up to 1000 gallons of wastewater

More information

City of Tacoma Tacoma Public Utilities Tacoma Power. REQUEST FOR BIDS PG F Alder Lake Park Sewage Treatment Expansion

City of Tacoma Tacoma Public Utilities Tacoma Power. REQUEST FOR BIDS PG F Alder Lake Park Sewage Treatment Expansion City of Tacoma Tacoma Public Utilities Tacoma Power REQUEST FOR BIDS PG14-0667F Alder Lake Park Sewage Treatment Expansion Submittal Deadline: 11:00 a.m., Pacific Time, Tuesday, April 14, 2015 Submittal

More information

ESTIMATED DISTRIBUTION OF MATERIAL LIST Lomitas Negras Phase 2 Southern Sandoval County Arroyo Flood Control Authority

ESTIMATED DISTRIBUTION OF MATERIAL LIST Lomitas Negras Phase 2 Southern Sandoval County Arroyo Flood Control Authority PAY DESCRIPTION GENERAL 1 1200 Construction Traffic Control and Barricading: including any and all access signs and permitting by the City of LS 1 Rio Rancho, 2 1504 Temporary Pollution Control: NPDES

More information

Town of Friday Harbor PO Box 219 / Friday Harbor / WA / (360) / fax (360) /

Town of Friday Harbor PO Box 219 / Friday Harbor / WA / (360) / fax (360) / Town of Friday Harbor PO Box 219 / Friday Harbor / WA / 98250 (360) 378-2810 / fax (360) 378-5339 / www.fridayharbor.org LAND CLEARING, GRADING, OR FILLING PERMIT APPLICATION APPLICATION DATE GRD No. APPLICANT/FRANCHISE

More information

Alaska LNG Concept Information. Alaska LNG. Overview. October

Alaska LNG Concept Information. Alaska LNG. Overview. October Overview October December 3, 2013 Project Overview Project Team BP, ConocoPhillips, ExxonMobil and TransCanada are working together to progress an project: 300+ people involved in project planning and

More information

ADVERTISEMENT SET DECEMBER 2013

ADVERTISEMENT SET DECEMBER 2013 Sheet List Table GREELEY CANAL #2 WCR 21 PROJECT AREA N SH-392 ADVERTISEMENT SET DECEMBER 2013 LINE DESCRIPTION PROPOSED LINE POWER / COMMUNICATIONS EXISTING LINE LINE DESCRIPTION PROPOSED LINE BOUNDARY

More information

APPENDIX J. Cost Details. Revised EE/CA. Lower Duwamish Waterway Superfund Site: T-117 Early Action Area

APPENDIX J. Cost Details. Revised EE/CA. Lower Duwamish Waterway Superfund Site: T-117 Early Action Area APPENDIX J Cost Details Appendix J Cost Details Cost estimates for the T-117 Removal Action Alternatives are based on the area-specific details provided in this appendix. Costs were prepared by each participating

More information

Distribution Restriction Statement Approved for public release; distribution is unlimited.

Distribution Restriction Statement Approved for public release; distribution is unlimited. CECW-EH-D Regulation No. 1110-2-1404 Department of the Army U.S. Army Corps of Engineers Washington, DC 20314-1000 Engineering and Design HYDRAULIC DESIGN OF DEEP-DRAFT NAVIGATION PROJECTS Distribution

More information

PUBLIC NOTICE REQUEST FOR PERMISSION TO ALTER A U.S. ARMY CORPS OF ENGINEERS PROJECT PURSUANT TO 33 U.S.C. SECTION 408

PUBLIC NOTICE REQUEST FOR PERMISSION TO ALTER A U.S. ARMY CORPS OF ENGINEERS PROJECT PURSUANT TO 33 U.S.C. SECTION 408 DEPARTMENT OF THE ARMY CORPS OF ENGINEERS, NEW ORLEANS DISTRICT 7400 LEAKE AVENUE NEW ORLEANS, LOUISIANA 70118 REPLY TO ATTENTION OF Regional Planning and Environmental Division South Environmental Compliance

More information

Feasibility Report for City of Worthington, Minnesota West Gateway Drive Area Sewer & Water Extensions November 17, 2017

Feasibility Report for City of Worthington, Minnesota West Gateway Drive Area Sewer & Water Extensions November 17, 2017 Feasibility Report for City of Worthington, Minnesota West Gateway Drive Area Sewer & Water Extensions November 17, 2017 Prepared By: Introduction The purpose of this report is to determine the feasibility

More information

Greenfield Pond B Rehabilitation

Greenfield Pond B Rehabilitation Preliminary Investigation Report Centennial, Colorado November 15, 2011 Prepared for: Liverpool Metropolitan District Prepared by: Stantec Consulting Services, Inc. Table of Contents Executive Summary...

More information

CESAM-RD-A December 4, 2017 PUBLIC NOTICE NO. SAM SBC

CESAM-RD-A December 4, 2017 PUBLIC NOTICE NO. SAM SBC DEPARTMENT OF THE ARMY MOBILE DISTRICT, CORPS OF ENGINEERS P.O. BOX 2288 MOBILE, AL 36628-0001 PUBLIC NOTICE NO. SAM-2017-01123-SBC JOINT PUBLIC NOTICE U.S. ARMY CORPS OF ENGINEERS AND STATE OF ALABAMA

More information

Appendix C Cost Engineering

Appendix C Cost Engineering RARITAN BAY AND SANDY HOOK BAY UNION BEACH, NEW JERSEY HURRICANE SANDY LIMITED REEVALUATION REPORT Appendix C Cost Engineering U.S. Army Corps of Engineers New York District September 2016 Appendix C Cost

More information

PROPOSAL KITSAP COUNTY DEPARTMENT OF PUBLIC WORKS COUNTY ROAD PROJECT NO NW Golf Club Hill Road Culvert Replacement To the Honorable Board of Co

PROPOSAL KITSAP COUNTY DEPARTMENT OF PUBLIC WORKS COUNTY ROAD PROJECT NO NW Golf Club Hill Road Culvert Replacement To the Honorable Board of Co PROPOSAL KITSAP COUNTY DEPARTMENT OF PUBLIC WORKS COUNTY ROAD PROJECT NO. 3690 NW Golf Club Hill Road Culvert Replacement To the Honorable Board of Commissioners Kitsap County 614 Division Street Port

More information

Project # Brown County PCN i40h Replace Section Line Road Culvert

Project # Brown County PCN i40h Replace Section Line Road Culvert Project # 010-151 PCN i40h Replace Section Line Road Culvert R 64 W FREDERICK POP. 199 R 63 W R 62 W R 61 W 6 5 4 3 6 5 4 3 1 Dry 402 AVE 102 ST 387 AVE 12 388 AVE 390 AVE 7 8 9 10 11 12 391 AVE 393 AVE

More information

UPPER MISSISSIPPI RIVER COMPREHENSIVE PLAN

UPPER MISSISSIPPI RIVER COMPREHENSIVE PLAN UPPER MISSISSIPPI RIVER COMPREHENSIVE PLAN APPENDIX D COST ESTIMATES Prepared by the U.S. Army Corps of Engineers Rock Island, St. Louis, and St. Paul Districts March 2008 UPPER MISSISSIPPI RIVER COMPREHENSIVE

More information

Module 3 and Module 4 Watershed Analysis and RUSLE Calculation. Noboru Togawa. Presented to: Dr. Pitt Construction Site Erosion Control

Module 3 and Module 4 Watershed Analysis and RUSLE Calculation. Noboru Togawa. Presented to: Dr. Pitt Construction Site Erosion Control Module 3 and Module 4 Watershed Analysis and RUSLE Calculation by Presented to: Dr. Pitt Construction Site Erosion Control Department of Civil, Construction, and Environmental Engineering The University

More information

VISUAL SITE INSPECTION REPORT 2018

VISUAL SITE INSPECTION REPORT 2018 VISUAL SITE INSPECTION REPORT 2018 SOUTHERN INDIANA GAS AND ELECTRIC A. B. BROWN GENERATING STATION TYPE III RESTRICTED WASTE LANDFILL WEST FRANKLIN, IN ATC PROJECT NO. 170LF00614 January 9, 2019 PREPARED

More information

HYDROLOGIC RESTORATION OF THE CASH CREEK BASIN IN TATE'S HELL STATE FOREST

HYDROLOGIC RESTORATION OF THE CASH CREEK BASIN IN TATE'S HELL STATE FOREST HYDROLOGIC RESTORATION OF THE CASH CREEK BASIN IN TATE'S HELL STATE FOREST CONSTRUCTION PLAN BID SET PREPARED FOR: LOCATION MAP CARRABELLE US ROUTE 319/98 EASTPOINT Prepared By Plan Design Enable CORPORATE

More information

MINNEHAHA CREEK WATERSHED DISTRICT BOARD OF MANAGERS REVISIONS PURSUANT TO MINNESOTA STATUTES 103D.341. Adopted April 24, 2014 Effective June 6, 2014

MINNEHAHA CREEK WATERSHED DISTRICT BOARD OF MANAGERS REVISIONS PURSUANT TO MINNESOTA STATUTES 103D.341. Adopted April 24, 2014 Effective June 6, 2014 MINNEHAHA CREEK WATERSHED DISTRICT BOARD OF MANAGERS REVISIONS PURSUANT TO MINNESOTA STATUTES 103D.341 Adopted April 24, 2014 Effective June 6, 2014 EROSION CONTROL RULE 1. POLICY. It is the policy of

More information

APPENDIX F: CALTRANS COST ESTIMATE TEMPLATE (included in Appendix AA of the CALTRANS Project Development Procedures Manual)

APPENDIX F: CALTRANS COST ESTIMATE TEMPLATE (included in Appendix AA of the CALTRANS Project Development Procedures Manual) APPENDIX F: CALTRANS COST ESTIMATE TEMPLATE (included in Appendix AA of the CALTRANS Project Development Procedures Manual) PROJECT DESCRIPTION: (Enter Type of Project Planning Cost Estimate as Title)

More information

PORT OF PORT TOWNSEND. Point Hudson Marina Breakwater Preliminary Design

PORT OF PORT TOWNSEND. Point Hudson Marina Breakwater Preliminary Design PORT OF PORT TOWNSEND Point Hudson Marina Breakwater Preliminary Design December 5, 2014 1 Outline Project Status (Scopes of Work, To-Do List from Conceptual Design) Existing Conditions Alternative Evaluation

More information

Regulation 18 August 2009 NO Operations and Maintenance LEVEE ENCROACHMENT STANDARDS AND PROCEDURES

Regulation 18 August 2009 NO Operations and Maintenance LEVEE ENCROACHMENT STANDARDS AND PROCEDURES CENWP-EC DEPARTMENT OF THE ARMY PDR 30-2-5 Portland District, Corps of Engineers (Draft) P.O. Box 2946 Portland, Oregon 97208 Regulation 8 August 2009 NO. 30-2-5 Operations and Maintenance LEVEE ENCROACHMENT

More information

American River Watershed Common Features General Reevaluation Report

American River Watershed Common Features General Reevaluation Report American River Watershed Common Features General Reevaluation Report Attachment D Cost Engineering December 2015 Cover Photos courtesy of the Sacramento District: Sacramento Weir during operation Sacramento

More information

CONSTRUCTION SPECIFICATION MANUAL TECHNICAL STANDARDS FOR STORMWATER

CONSTRUCTION SPECIFICATION MANUAL TECHNICAL STANDARDS FOR STORMWATER CONSTRUCTION SPECIFICATION MANUAL TECHNICAL STANDARDS FOR STORMWATER Tavares, Florida Jones Edmunds & Associates, Inc. Project No. 06806-012-01 CONSTRUCTION SPECIFICATION MANUAL TECHNICAL STANDARDS FOR

More information

2-16 EROSION, SEDIMENT & STORM WATER CONTROL REGULATIONS APPENDIX B1

2-16 EROSION, SEDIMENT & STORM WATER CONTROL REGULATIONS APPENDIX B1 2-16 EROSION, SEDIMENT & STORM WATER CONTROL REGULATIONS APPENDIX B1 There are three ways to accomplish urban soil erosion and sedimentation control: Allow erosion to take place and then control sediment

More information

PUBLIC NOTICE. Section 404 of the Clean Water Act (33 U.S.C. 1344) Section 10 of the Rivers and Harbors Act of 1899 (33 U.S.C.

PUBLIC NOTICE. Section 404 of the Clean Water Act (33 U.S.C. 1344) Section 10 of the Rivers and Harbors Act of 1899 (33 U.S.C. US Army Corps Of Engineers Wilmington District PUBLIC NOTICE Issue Date: June 17, 2014 Comment Deadline: July 17, 2014 Corps Action ID#: SAW-2009-00655 NC DOT TIP: R-4903 The Wilmington District, Corps

More information

Debbie DeVore South Florida Coastal Program U.S. Fish and Wildlife Service Vero Beach, FL

Debbie DeVore South Florida Coastal Program U.S. Fish and Wildlife Service Vero Beach, FL Debbie DeVore South Florida Coastal Program U.S. Fish and Wildlife Service Vero Beach, FL www.cbtrust.org 30% of Mobile Bay has been armored as of 1997 using rip-rap, seawalls, and bulkheads (Douglass

More information

City of Doral 8401 NW 53 rd Ter. Doral, FL 33166

City of Doral 8401 NW 53 rd Ter. Doral, FL 33166 City of Doral 8401 NW 53 rd Ter. Doral, FL 33166 Project Address: (305) 593-6700 Permit Number: National Pollution Discharge Elimination System (NPDES) Construction Site Erosion and Sedimentation Control

More information

PART 1 GENERAL REQUIREMENTS

PART 1 GENERAL REQUIREMENTS PART 1 GENERAL REQUIREMENTS Contract Closeout Plan 110 Arrow diagram for project close-out...3 Erosion Control 121 Straw bale barrier... 5 122 Silt fence... 7 123 Diversion dike... 9 124 Inlet protection...

More information

AECOM (805) tel 1220 Avenida Acaso (805) fax Camarillo, CA 93012

AECOM (805) tel 1220 Avenida Acaso (805) fax Camarillo, CA 93012 AECOM (805)388-3775 tel 1220 Avenida Acaso (805)388-3577 fax Camarillo, CA 93012 March 27, 2012 John Zhao, PE Las Virgenes Municipal Water District 4232 Las Virgenes Road Calabasas, CA 91302 Subject: Yager

More information

Initial Construction and Maintenance Costs

Initial Construction and Maintenance Costs VI. Initial Construction and Maintenance Costs This section documents the state of knowledge regarding the initial and maintenance costs associated with terminal groin structures. As part of the cost study,

More information

Town of Essex, Vermont January, 2017 Standard Specifications For Construction CHAPTER 3 EROSION AND SEDIMENT CONTROL

Town of Essex, Vermont January, 2017 Standard Specifications For Construction CHAPTER 3 EROSION AND SEDIMENT CONTROL CHAPTER 3 EROSION AND SEDIMENT CONTROL CHAPTER 3 EROSION AND SEDIMENT CONTROL Section 300 General Summary All projects constructed within the Town of Essex shall be constructed in strict accordance with

More information

October 15, Mile Channel Remediation

October 15, Mile Channel Remediation October 15, 2009 8-Mile Channel Remediation Background / 1973 77 / 04 06 Discovery of contamination / Sep. 06 Mar. 07 Remediation work plan / Oct. Dec. 07 In-channel works / Jan. Mar. 08 Borrow material

More information

Appendix K Cost Estimate

Appendix K Cost Estimate Appendix K Cost Estimate Basis of Estimate Class 3 Estimate Columbia River Outfall and Effluent Pipeline Project Prepared for Discovery Clean Water Alliance Clark County, Washington December 06, 2017

More information

Lower San Joaquin River Feasibility Study PLAN FORMULATION ADDENDUM

Lower San Joaquin River Feasibility Study PLAN FORMULATION ADDENDUM PLAN FORMULATION ADDENDUM Non-Structural Measure Descriptions Elevate Critical Infrastructure This measure would raise at-risk critical structures above the design inundation level. Elevation would be

More information

Manhattan Levee Section 216 Feasibility Study Public Workshop 17Apr13 Manhattan Kansas

Manhattan Levee Section 216 Feasibility Study Public Workshop 17Apr13 Manhattan Kansas Manhattan Levee Section 216 Feasibility Study Public Workshop 17Apr13 Manhattan Kansas Tuttle Creek Dam and Lake Kansas City District Project Development Team Manhattan, KS US Army Corps of Engineers 1

More information

EROSION AND SEDIMENTATION CONTROL SECTION 1 - GENERAL 1.1 SUMMARY

EROSION AND SEDIMENTATION CONTROL SECTION 1 - GENERAL 1.1 SUMMARY 31 25 00 EROSION AND SEDIMENTATION CONTROL SECTION 1 - GENERAL 1.1 SUMMARY A. Erosion and sedimentation control shall be provided by the Contractor for all areas of the site denuded or otherwise disturbed

More information

EVALUATION OF SECTION 404(b)(1) GUIDELINES (SHORT FORM)

EVALUATION OF SECTION 404(b)(1) GUIDELINES (SHORT FORM) EVALUATION OF SECTION 404(b)(1) GUIDELINES (SHORT FORM) PROPOSED PROJECT: Matagorda Ship Channel Deficiency Study and Environmental Assessment (Nov 2017) 1. Review of Compliance (230.10(a)-(d)) A review

More information

ADDENDUM #1 MARCH 10, CENTRAL WINDS PARK ROADWAY IMPROVEMENTS Bid # ITB-02/16/BF

ADDENDUM #1 MARCH 10, CENTRAL WINDS PARK ROADWAY IMPROVEMENTS Bid # ITB-02/16/BF ADDENDUM #1 MARCH 10, 2016 CENTRAL WINDS PARK ROADWAY IMPROVEMENTS Bid # ITB-02/16/BF TO: ALL PLAN HOLDERS This Addendum No. 1 to the Contract Documents for City of Winter Springs project "Central Winds

More information

Appendix K Civil Engineering

Appendix K Civil Engineering Appendix K Civil Engineering Fargo-Moorhead Metropolitan Area Flood Risk Management Final Feasibility Report and Environmental Impact Statement Prepared by: U.S. Army Corps of Engineers St. Paul District

More information

State will answer most of FERC s questions by June; last items Aug. 1

State will answer most of FERC s questions by June; last items Aug. 1 State will answer most of FERC s questions by June; last items Aug. 1 By Larry Persily paper@alaskan.com April 13, 2018 The Alaska Gasline Development Corp. (AGDC) advised federal regulators on April 6

More information

SECTION EXCAVATION AND EMBANKMENT. B. Subbase Grading A samples for gradation analysis.

SECTION EXCAVATION AND EMBANKMENT. B. Subbase Grading A samples for gradation analysis. PART 1 GENERAL 1.1 DESCRIPTION A. The WORK under this Section includes providing all labor, materials, tools and equipment necessary for excavation and embankment construction to the lines, grades and

More information

All Actions Above Gavins Point Dam Least Tern and Piping Plover

All Actions Above Gavins Point Dam Least Tern and Piping Plover All Actions Above Gavins Point Dam Least Tern and Piping Plover Activity Sub Activity Stressor Likelihood of least tern and piping plover distribution (by life stage) in the action area and project footprint

More information

This silt fence system is composed of geotextile filter fabric and steel posts.

This silt fence system is composed of geotextile filter fabric and steel posts. Supplemental Technical Specification for SILT FENCE SYSTEMS SCDOT Designation: SC-M-815-2 (03/08) 1.0 Silt Fence Systems This Supplemental Specification replaces Sections 815.2.5 and 815.4.6, Silt Fences,

More information